GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
SPIN - is an online system developed to monitor the installations of Solar
Photovoltaic Systems of grid connected rooftop. Through this online system
it is proposed to do all monitoring works related to SPV installations. By
considering the importance of the project and the target fixed by the Govt.
of India, a new website has been registered for the grid connected rooftop
namely solarrooftop.gov.in. So in order to access the system you may type
http://solarrooftop.gov.in in the browser and no need to go through
http://mnre.gov.in.
You can see a login icon at the top right corner and by clicking it you can
login with the registered user id and password. Once you login the following
screen will come.
[1] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
Dashboard
Inbox
On clicking the icon you can find the emails and letters send from MNRE to
your office. If the reply is required there is a reply link also available and by
[2] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
clicking it you can give the reply. Hence it is requested to check this option
regularly to know the regular updates from MNRE.
Interest Requests
Through this option you will get a list where the different people from your
state entered the interest for installing the system. You may contact this
people and update the remarks and proceed installation.
Total Customers Contacted
It shows the list of companies and how much customers they contacted from
the interest request received in their dashboard.
Details of customers contacted by Agencies
It will give a list of companies and how many customers they contacted for a
particular range of date given by you.
Details of Installation
It will give a simple list of installations where you entered the Project
Completion Report (PCR).
[3] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
Details of Installation By Pvt. Agencies in your state
It will give a list of installations by Pvt. Agencies in your state. These are
non-subsidized entries made by the agencies.
Approved Proposals
It will give the list of proposals approved from MNRE. So you have to enter
the installation details of these sanctions through the PCR entry.
Administrator



Change Password By using this option you can change your
password.
Edit Profile By using this option you can update the contact details
of your officer and office.
Agency Entry / Edit form. This option is used to enter the details
of agencies which are specific to your office and not available in the
SPIN for PCR entry. Care should be taken while entering here as
there should not be any duplicate entry. Before entry check the
availability of name in the PCR entry option.
[4] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
Proposals
This is exclusively for submitting the proposals. When you want to submit a
proposal to MNRE you may select this option and submit. It may be noted
that you need to submit the individual cases instead as a bulk you can apply.
Apply Proposal
Each item is explained below.
1. Financial Year
Select the financial year
2. Title of the proposal
Brief title of the proposal
3. Total cumulative capacity (in kWp)
Total capacity applying
for a proposal
4. Expected annual energy generation estimated by the
projects
5. Total no. of projects (A+B+C+D)
Divide total project in to
the following category
and
enter
it
correspondingly
A. Estimated no of projects (1 to 10kWp)
B. Estimated no of projects (10kWp to 50kWp)
[5] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
C. Estimated no of projects(50kWp to 100kWp)
D. Estimated no of projects ( above 100kWp)
6. Category of beneficiary
It is again categorizing
in to beneficiary type.
Note both 5 & 6 should
be same.
E. Commercial beneficiary nos.
F. Government/PSU’s beneficiary nos.
G. Industrial beneficiary nos.
H. Residential beneficiary nos.
I.
Institutional beneficiary nos.
7. Whether Solar Rooftop Policy by the State is in place
Yes/No
8. Whether State Electricity Regulatory Commissions order
Yes/No
for Grid Connected Solar Rooftop projects is in place in
the State
9. Metering mechanism
Net metering/Feed in
tariff/Others
10. Monitoring mechanism
Self-certification/third
party certification/Online
remote monitoring
11. Estimated project duration in months
12. Tentative overall cost of the project
13. Means of finance
J.
Expected Financial Assistance from MNRE
K. Subsidy from State Govt. if any
L. Contribution of beneficiaries
M. Other source of funding
After
finishing
the
entry
click
on
SAVE
it
will
be
saved.
EDIT PROPOSAL
As the name suggests this option is for correcting the mistake if any.
[6] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
Upload Documents
Once you correctly entered the proposal you have to download the
proposal which is a single page PDF document. It is to be printed and sign
it, scan and then upload it here. Similarly a covering letter of your own is
to be uploaded by using the option given. It is mandatory. The approval
in the MNRE will start only after getting the signed copy and covering
letter.
Final Submission
Once you upload everything as above and then you may click this option
so that your proposal will be forwarded to MNRE for processing. After
clicking this option you cannot modify any of the entries. Before clicking
the entry you can make any changes. Once you change anything don’t
forget to download the proposal and upload the signed one.
PCR [Project Completion Report]
Once the projects are completed you have to enter the completion report
for each project and upload the required documents. You have to enter
[7] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
corresponding to each approval / sanctions issued from MNRE. Please do not
mix the entries with different sanctions.
[8] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
[9] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
Parameters are explained below.
Approval Year
Approval Number
Select the corresponding year
Select the approval / sanction number from the drop
dpws.
Installed Agency
Name of the agency who installed. Select from the drop
down. If it is not available you can add the details of the
agency by ADD Agency and continue the entry
Date Installation
Actual date of installation of the plant
SPIN
Customer If a customer is already available in SPIN ie. by entering
Code information the interest of installation through [Installation Interest
Request] then you need to enter the customer code or
mobile number of the customer so that all the available
details will be displayed by the computer and no need to
enter it again. If it is not there just ignore
Category of the Select the category from the drop down
beneficiary
Sub Category of Select from the drop down
the beneficiary
Now enter the contact details of the customer including PIN code. If the
installation address is same then click the option otherwise enter the
installation address separately. Mobile number is mandatory whereas the
Aadhaar number is required at the time of release
DISCOM
Select the name of the DISCOM company from the drop
down. (If it is not there then send the name and address
of the DISCOM to saji.ka@nic.in
Electric
This is consumer number of the customer in DISCOM. It
Consumer
is mandatory
Number
Netmetering
Yes or No
connection given
by DISCOM
If No add the Reason for not given the netmetering
reason
Capacity in KW
Here the capacity of the plant is to be entered in KW
Capacity / Power Three sets you can enter. Total capacity * number
of
each
PV should be >= Total capacity installed
module
Solar
Cell Select the solar cell technology
Technology
Type
of
the Select the type of the inverter
inverter
[10] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
Make
of
the Select the make of the inverter. If it is not available
inverter
please send it again to saji.ka@nic.in
Capacity / Power Here also three sets can be entered
of each PCU /
Inverter in WP
Details of the metering can be selected from the drop down
No
of
units Actual unit
generated
by
solar plant as per
mete (in Kwh)
Monitoring
Select from the drop down
mechanism
No of person to
be trained in O &
M
Grid connectivity level and voltage to be selected from drop down
Total
Cost
of Here you have to enter the total cost of installation.
installation
There is no break up is required
Envisaged
CFA Calculate the actual subsidy. You need to enter that
from MNRE
figure. Computer will give a rough figure.
Subsidy from the If any subsidy is available enter it.
state
Contribution
of Balance
beneficiary
Longitude
&
latitude
After entry just save it. Then if you want to edit just use the edit option as
follows.
[11] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
The following details to be uploaded.
1. Joint inspection report – This can be printed from SPIN and scan it and
upload it in PDF format.
[12] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
GRID CONNECTED SOLAR PHOTOVOLTAIC ROOF TOP INSTALLATIONS [SPIN ]
2.
3.
4.
5.
Photo of installed Plant – Max size 2 MB
Photo of the beneficiary – Max size 200KB
Id proof
Module capacity/ Power (Wp) – PDF or Excel max size 1 MB
Final Submission
After correcting everything just click final submission and now you cannot
do anything on that PCR.
Reports
The following reports are available


Proposal Sanction issued from MNRE
Project Completion Report(individual print by selecting the
project code)
Help
Through this option you will get this guideline. It will be updated
frequently whenever some change made in SPIN.
Contact Details
Director Grid Connected Technical Director NIC
Rooftop
Director : Ms. Veena Sinha
Block 14, Ministry of New and
Renewable Energy,CGO
Complex, Lodhi Road, New Delhi
3.
Phone :- 011-24362706
Email :veena[dot]sinha[at]nic[dot]in
For SPV related query
Shri. Saji K Abraham,
National Informatics Centre
10th Floor,
Paryavaranbhawan,
MNRE,CGO Complex,
Lodhi Road, New Delhi 3.
Phone: 011-24361891
or
011-24360707,
011-24360404
Extension 1015
Email: saji[dot]ka[at]nic.in
Scientist
C,
Grid
Connected Rooftop
Mr. Hiren Chandra Borah,
Room No. 1016,
10th Floor,
Paryavaranbhawan,
MNRE,CGO Complex,
Lodhi Road,New Delhi 3.
Phone:-011-24360707,
011-24360404
Extension 1054
Email:-
hiren[dot]borah[at]nic.in
For SPIN or web site For SPV Related query
related query
[13] National Informatics Centre [NIC] | Ministry of New and Renewable Energy [MNRE] | New Delhi
User Manual for empanelled Government Agencies and State Nodal Agencies
10-Aug-16 11:22:55 AM
Download