online application for grant of consent to industries

advertisement
ONLINE APPLICATION FOR
GRANT OF CONSENT
TO INDUSTRIES
Delhi Pollution Control Committee
Delhi
APPLICANT TYPE
Existing User
1.
2.
3.
For those who had applied for any
application at DPCC manually has
already been issued login & password.
If they have misplaced it, they have
to submit their request for
re-issuance to Enquiry Counter by
bringing an authority letter from
the organisation clearly mentioning
their email id.
Login and Password of their
account will be sent by mail only.
New User
1.
2.
3.
Applicant need to register
first with the DPCC website.
Email is a compulsory field and
all future communication will be
done by mail also besides by post.
Applicant can file their application
immediately after signing up with
DPCC website and same login
and password is to be used for
various applications or future
applications
Security Code is mandatory along with Login and Password to access DPCC online application
DPCC LOGIN PAGE
FLOW DIAGRAM OF
ONLINE FILLING FOR CONSENT
NIC
Server
Units can proceed
for online payment
after filling online
consent application
AXIS
Bank
Payment
Gateway
Details of consent application
updated online for consent
received manually
Industrial
Units
Submits Consent
Application Manually
at DPCC Enquiry Counter
And
also submits the bank draft
DPCC
Office
Data
Entry
Operator
FLOW DIAGRAM OF
CONSENT APPROVAL
Application
received
at DPCC
File is received
Office after
at AEE Level
Completion
of payment
AT AEE/EE LEVEL
1.
AEE / EE
2.
3.
Scrutinizing
Committee
FACT SHEET
GENERATION
4.
5.
Verify all the files
received manually at
DPCC Enquiry Counter.
If any correction is
required they do the
changes and accepts
the files.
Once they accepts the
files received manually,
the status of application
starts reflecting in the
DPCC software as
“Pending”.
Then a “fact sheet”
is generated. This is predetermined Performa
both for „Orange‟ and
„Green‟ Category.
AEE/EE puts their initial
remarks and put forward
for Scrutinizing Committee
FLOW DIAGRAM OF
CONSENT APPROVAL
1.
Scrutinizing Committee
takes place at the level
of MS, DPCC for the
“orange category” only.
Then it is sent to “Consent
Management Committee”
after detailed discussion
1.
2.
3.
At this level, recommendations of Scrutinizing
Committee is discussed. The recommendations are
approved and if any short coming is found then is
sent back for clarification.
The clarification is carried by CMC engineers either
by calling the details from the units or by inspection
and put again to Scrutinizing Committee and then to
CMC.
CMC issues the minutes of recommendations and
after approval from the Chairman, approved consents
are issued
Consent
Management
Committee
Scrutinizing
Committee
If any shortcomings
Action Taken
If approved
Consent Grant
SERVICES FOR ONLINE FILLING
1.
Consent to Industries
2.
Authorization under Bio Medical Waste Rules
3.
Self Assessment of Water CESS
4.
Authorization under Municipal Solid Waste Rules
5.
Request and Report of Laboratory Test
6.
Consent to Thermal Power Plant (TPP) /
Common Effluent Treatment Plant (CETP) /
Sewage Treatment Plant (STP)
CONSENT TO INDUSTRIES
(Consent to Establish / Operate / Renewal)
I. Type of Consent :
S.
No.
Consent Type
Consent
Category
01.
Establish
Green / Orange
02.
Operate
Green / Orange
03.
Renewal
Green / Orange
II. Application: Common Application for Consent Under Water (Prevention
and Control of Pollution) Act, 1974 and Under Air
(Prevention and Control of Pollution) Act, 1981, as amended.
III. Available Payment Mode :
1.
Credit Card by Master & Visa (Online)
2.
Net Banking only for AXIS Bank Customer (Online)
3.
Bank Challan through any branches of AXIS Bank in Delhi.
4.
Demand Draft payable at Delhi (Offline)
CONSENT TO INDUSTRIES
(Consent to Establish / Operate / Renewal)
Consent applicant is divided in two parts :
1.
Industrial Area
a) All Industrial Unit.
b) Malls / Shopping Complexes Projects.
c) Commercial Complex including IT Complex
(excluding Shopping Malls) Projects.
d) Town Development Projects.
e) Office cum Residential Projects.
f) Institutional / Educational Projects.
2.
Non – Industrial Area
a) Banquet Halls.
b) Dhabha
c) Eating Joints
d) Hotels
e) Petrol Pump cum Services Station.
f) Restaurant
g)
Sweet Shop
Bio Medical Waste Rules
Form I
Form II
Consent
:
:
:
Application for Authorisation
Annual Report
Common Application for Consent Under
Water (Prevention and Control of
Pollution) Act, 1974 and Under Air
(Prevention and Control of Pollution)
Act, 1981, as amended.
Available Payment Mode :
1.
Credit Card by Master & Visa (Online)
2.
Net Banking only for AXIS Bank Customer (Online)
3.
Bank Challan through any branches of AXIS Bank in Delhi
4.
Demand Draft payable at Delhi (Offline)
Laboratory Test
1.
Online laboratory test request for Air, Water & Noise other empanelled labs will
also be connected shortly.
2.
There are 211 activities and in each activity test report is required either for Air or
Water or Noise. Applicant can select one or more activity but the most stringent
passing values (max. and min.) for all unique parameter of different activities is
selected by the software.
3.
Once the analysis is complete and the result is generated by the system, applicant
can see the report through their login and password.
Few Advantages of Online Filling – Industrial Unit
1.
Correctness and complete Information.
2.
Convenience.
3.
Not to restrict to office timings.
4.
Can see the current status of their application any time.
5.
Have all their records in digitised format.
6.
Will help environment.
7.
Lesser paperwork.
8.
Once they apply for ‘Consent to Establish’ the system will
populate all the data while applying for ‘Consent to
Operate or Renewal’.
Elimination of ‘Pseudo Professional’ .
9.
10. Confirm delivery of notices in case where email ID is available.
Few Advantages of Online Filling – DPCC
1.
Correctness and complete Information.
2.
Without filling ‘Consent to Establish’ they can’t apply for ‘Consent to
Operate or Renewal’.
3.
Industrial Unit can’t change their activities or industrial location once
they have applied for ‘Consent to Establish’.
4.
All industrial activities are divided in Hazardous or Non- Hazardous
nature so it will be mandatory for the unit to file under HWMR if the
activity is Hazardous in nature.
5.
Have all the application, reports and processing in digitised format and
can be accessed through authorised login and password.
6.
Processing of application will be faster as different kind of fact sheet or
other kind of information can be managed and generated with lesser
efforts.
7.
System can show the complete history of the units related to date of
application, payments, Notice Issued, Direction Issued, Bank
Guarantee, Consent Revoked/Granted/Refused etc.
8.
Zero Interface.
Thank You