c(nl l\^ Protection Audit of NTPC/Kaniha | ! Name/Details: A) 22Ol<11Meramandali 1 & 2 B) c) 22Ol<11Rengali zzoKVTTPS Description Sl. No L 2 3. 4. Main I-Distance Protection Main II-Distance Protection Status Remarks Yes LZ96 (ABB) for Rengali & TTPS Circuit & RAZFE (ABB) for Yes Directional Inverse Definite Minimum Time 0DMT) type earth fault relay Directional IDMT over current and earth fault back up protection YES No Meramandali Circuit - I &2 MCOM P444 (AREVA) for all the Circuit The same is enable in the MICOm P444 Distance Relay Stand Alone IDMT E/F & O/C Relay Not Available. 5. Two stage over voltage protection NO 6. Auto Reclosing NO Not envisaged during the Engineering NO Not envisaged during the Engineering NO Speech & Data Communication facility Available but Protection not available (not envisaged during 7 Carrier aided inter-trippi ng/blocking feature Are Power Line Carrier Communication (PLCC) equipment with Protection B 9. Coupler complete for speech transmission, line protection and data channels provided? Are L00o/o back up Communication Channels provided for transmission line & line compensating equipment? Engineering). NO Stand Alone DR 1.0 LI Disturbance Recorder Yes Distance to Fault Locator Yes Make - Hathaway Type - IDMT1 Stand Alone Fault Locator is not available, But the feature of fault locator is available in the MICOM P444 Relay. Event Logger: 12. i) Stand Alone iD Part of S/S or switchyard automation system Are Time Synchronizing Equipment (TSE) complete t3 Yes with antenna, all S/S Stage-l (HATHAWAY-SER7000) for 400 kV Bays 1 to 17 is used for the 220 kV system Events. cables, processing equipments etc. provided to receive synchronizing pulse through Global Positioning System (GPS) YES Stand Alone DRs & ELs are time synchronized compatible for synchronization of event logger, disturbance recorder SCADA/automation system 1.4. and ? Are all protection employed Numerical Wpe? ')/ q w lr[V. Kalyanramen) Executive Engineer, ERPC fu1,,1,,' [P. S. Das) Chiefmanager, ERLDC No Only Main - II Numerical for all kff.tr.*)r,rr Ury-- (RKPadhi) (S.KSuar) Deputy lllanager, PGCIL AGM(EMD), NTPC/IGniha Protection Audit ofNTPC/Kaniha | CHECK LIST FOR TRANSMISSION LINE Name/Details: A) 220KV Meramandali 1 & 2 B) 220KV Rengali c) 220KV TTPS Are two protection channels in addition 15. to one speech plus data channel provided for each direction? NO 76. Local Breaker Backup Protection (LBB) Yes 17. Any other Protection RAICA (ABB) for all the lines ** Check the availability & functional healthiness. Note: a) Sl No.2 is optional at voltage level 220KV & not required at voltage level 132KV; bJ Sl No.3 is required, atZZO KV ifboth Main-l & Main-ll are distance protectiont otherwise not required. At 132 KV level it is not required; c) d) Sl No.4 is required at220 I(V level if Main-ll is not pr(rvided, otherwise not. Sl No.14 is required at 220KV and above; U%) l.1, lw [V. Kalyanramen) Executive Engineer, ERPC /"1 %i1,-,4t,-(P. S. Das) Chief manager, ERLDC {'H-r11,- $)^\- (R K Padhi) (S. K. Suar) Deputv Manager, PGCIL AGMIEMD), NTPC/IGniha 2 Protection Audit of NTPC/Kaniha | 3 CHECK LIST FOR SUB-STATION/SWITCHYARp Name/Details: NTPC/Kaniha Remarks Status** Protection Scheme SI. No 7. Bus bar Protection Yes RADSS (ABB) 2. Event Logger (EL) Yes Stage-l (HATHAWAY-SER7000) for 400 kV Bays 1 to 17 is used for the 220 kV system Events. Provided 3. Synchronizing Facility Yes 4. Are Synchro Check Relay provided with requisite settings? No in synchronizing Trolley Alsthom-SKD11 for manual closing of all 400 &220 kV Breakers RASC(ABB) Provided for all lines (Auto reclosure facility not envisaged during Engineering) DC supply: 5. i) ii) 220v Yes Yes 4BV 6. DG set No 7 Auxiliary Supply Yes B. Special Protection Scheme (SPS) No Under Frequency Relay(UFR) 9. 10. L7. 12. D ii) iii) 220V- 02 SETS (40OAH each), 4BV-02 SETS [50OAH each) DG Supply is available for the Unit Emersency Bus [ 415V) From 11KV Unit Bus of Unit - 7 &2 : Stage I No Stage II Stage III Has the Fault level Increased since connected to grid? If status at SI. no 10 is "Yes", then whether Sectionalization of the bus/ Series Reactor on the line or bus provided to Iimit the fault level? Has the size and number of ICT in the S/S been planned in a way that the outage of any single unit does not overload the remaining ICTs or the Not Applicable Yes underlying transmission system SCADA: 13. i) Yes Yes Voice ii) Data 1,4. 15. 76. t7. Yes Switching Schemes Are Circuit Breakers suitable for singlephase and three-phase auto reclosing? Are Circuit Breakers provided with two trip coils? Are Circuit Breakers provided with Pre Insertion Resistors? \'tw. Executive Engineer, ERPC Two Main & One Transfer Bus Yes Yes No fuqrr4-r-- -&'*f-lr>)tz- (P.S.Das) Chief manager, (RKPadhi) $P"t (S.KSuar) ERLDC Deputy Manager, PGCIL AGM(EMD), NTPC/Ihniha Protection Audit of NTPC/Kaniha | 4 CHECK LIST FOR SUB-STATION/SWITCHYARD Name/Details: NTPC/Kaniha Protection Scheme Status** Are Earth Switches provided at appropriate locations to facilitate Yes Sl. No 18. earthing of outgoing transmission lines to Remarks enable maintenance? L9, 20 Are all main protection relays of numerical type? Are protection functions subdivided into two independent groups & capable of providing uninterrupted protection even in the event of one protection groups No Main - II Numerical for all Yes failing? 2t. 22. 23. Are two sets of DC sources available? If status to Sl. no ?1 is Yes, then whether relays are electrically and physically segregated into two groups to obtain redundancy and to take Protection systems out for maintenance while the equipment remains in service? If status to Sl. No 21 is "No", then whether relays are electrically and physically segregated into two groups by giving DC Yes Yes N.A. rate fuses? 24. Bus Bar Protection Yes 25 Bus Bar Protection scheme has provision for future expansion Yes 26. Any other Protection ** Check the availability & functional healthiness' Note: uirements for SI No.14 are: Voltage level Switching Scheme 66KV & L3zto'l Main & Transfer Bus or Double bus Double Main & Transfer Bus or Double bus 220tc.t Breaker & a half or Double Main and Transfer bus 40OKV It w. l/ ) Executive Engineer, ERPC %r,* (P. S. Das) Chief manager, ERLDC {*l.ptollr-llL S\- (S. K Suar) K. Padhi) Deputy Manager, PGCIT AGM(EMD), NTPC/IGniha (R Protection Audit of NTPC/Kaniha I CHECK IIST FOR TRANSMISSION LINE A) 400IW Rourkela 1&2(Line Length (171KM) B) 40010 Rengali - L &2 (25lff) Name/Details: C) 4O0KVMeramundali - 1& 2 (45KM) Description Sl. No 1. Main I-Distance Protection Yes 2. Main II-Distance Protection Yes 3. 4. Remarks Status** Directional Inverse Definite Minimum Time 0DMT) Wpe earth fault relay Directional IDMT over current and earth fault back up protection MtcoMP444 LZ96 - A &B 7SA52 - C No No RXEG21 (ABB) for A & B 7RW6000 (SIEMENS) for C Stase-l 5, 6. 7 Two stage over voltage Protection Yes Auto Reclosing Carrier aided inter-tripping/blocking feature Are Power Line Carrier Communication 8. 9 with Protection Coupler speech transmission, line (PLCC) equipment complete for Yes ? and data channels Are 700o/o back up Communication Channels provided for transmission line & Yes Linel -110%, 4sec (ALARM) Line? -tl2o/0, Ssec (ALARMJ Linel -110%, Ssec (TRIP) Line? -172o/o, Ssec (TRIP) Stage-ll Linel - 140 o/o, 0.1 sec (TRIP) Line2 - t40 o/0, 0.1 Sec (TRIP) RAAM (ABB) forA & B 7VK572 (SIEMENS) for C (Dead Time- 1sec, Reclaim Time 25Sec) PUTT Z2 - A,B PUTT (21 ExtJ - C [21 ext-Line Length + 20o/o) Yes Yes Yes Yes line Stand Alone DR 10. Yes Disturbance Recorder Make - HATHAWAY Type - IDM T1 Stand Alone Fault Locator (RANZA) Lt. Distance to Fault Locator Yes availableinA&B In built Fault Locator function is available in C in numerical Relay (75A52 for Event Logger: 12. i) iD Stand Alone Part of S/S or switchyard automation system $,,1,.. (V. Kalyanramen) Executive Engineer, ERPC - C & MICOM P444 for allJ Stand Alone Yes S/S Separate for Stage -l & II Stage-l (HATHAWAY-SER7000) for Bays L to 17 & Stage-ll (SIEMENS SIESER) for Bays 18 to 41 4,,* (P. S. Das) Chief manager, ERLDC {r*yar lHt-(R K. Padhi) $,*t (S. K. Suar) Deputy Manager, PGCIT AGM(EMD), NTPC/Kaniha Protection Audit of NTPC/Kaniha E CHECK LIST FOR TRANSMISSION LINE A) 40010 Rourkela 1&2(Line Length (171KM) B) 400Kv Rengali - 1 &2 (25KM) C) 400KV Meramundali - 1 & ? (45KM) Name/Details: Remarks Status** Description Sl. No Are Time Synchronizing Equipment (TSE) complete 13. with antenna, all cables, processing equipments etc. provided to receive synchronizing pulse through Global Positioning System (GPS) compatible for synchronization disturbance of event reccrder SCADA/automation system Yes Stand Alone DRs & ELs are time synchronized logger, and ? - 1 Distance Protection for all the 400 kV lines and Main - II Distance Protections of 400 kV Meramandali Circuits are of Numerical type. Only the Main t4. Are all protection employed Nutt.,.erical type? No 15. Are two protection channels in addition to one speech plus data channel provided for each direction? 16 Local Breaker Backup Protection (LBB) Yes 77 Any other Protection N.A. Yes RAICA (ABBJ for Rourkela & Rengali Circuit, whereas 7SV600 (SIEMENS) for Meramandali Circuit. ** Check the availability & functional healthiness. Note: a) b) Sl No.2 is optional at voltage level 220KV & not required at voltage level L32KV; Sl No.3 is required at220 KV if both Main-l & Main-ll are distance protections, otherwise not required. AtL32 KV level it is not required; c) d) Sl No.4 is required Sl No.14 is at220 KV level if Main-ll is not provided, otherwise not. required at220W and above; Q)q,' [V. K.alyanramen] Executive Engineer, ERPC @,^'* d-^6 \)rfltr_ (P. S. Das) Chiefmanager, ERLDC U'eputy Manager, PGCIL (R K Padhi) $l't (S. K. Suar) AGM(EMD), NTPC/Kaniha Protection@B CHECK LIST FOR TRANSFORMER Name/Details:400/220l33KV. 315MVA ICT 1 & 2. TSTPP 1. Yes Differential Protection Yes Over Fluxing 2 Remarks Status*r Protection Scheme Sl. No RADSB (ABB) RATUB [ABB) 110o/o,3.5 Sec (Alarm) Inverse Definite Minimum Time flDMT) Trip Yes Restricted Earth Fault 3 Directional Over Current Backup directional over current and earth 4. fault protection (HV & LV side) or impedance protection Yes 5. Buchholz Yes 6. Winding Temperature Indicator (WTII Yes 7 Oil Temperature Indicator (OTI) Yes B 9. Magnetic Oil Gauge (M0G) with low oil level alarm Oil Surge Relay (OSR) for On Load Tap RADHD (ABB) (CDD, ALSTOM) is available on both HV & LV side of ICT. Yes Yes 10. Pressure Relieve Device (PRD) Yes Ll. Surge Arrester (SA) on both primary and secondary sides of transformers located outdoors and connected to over head lines Yes t2. Tertiary winding Protection Yes 13. Over load alarm Yes 74. Cooling 15 Any other protection 0NAN/ ONAFT OFAF ** Check the availability & functional healthiness. Note: a) sl No.6 is required at voltage level 220KV for 100MVA & above rating; b) OTI is required for 1 MVA and above; ln-n ,Alrchw [V. Kalyanramen) Executive Engineer, ERPC W,,* (P. S. Das) Chiefmanager, ERLDC <**b>\)tottt_ (R K Padhi) ql'^t (S. K. Suar) Deputy Manager, PGCIL AGM(EMD), NTPC/Kaniha Protection Audit of NTPC/Kaniha I CHECK LIST FOR REACTOR Name/Details: SOMVAR L/R-ROURKELA 1& 2 Protection Scheme Sl. No Status ** Remarks 1. Differential Protection Yes RADHA 2. Restricted Earth Fault [REF) Yes RADHD 3. Reactor backup protection (impedance type or definite time over current (O/C) and earth fault (E/F) Proteq&4) Yes RAKZB Back up Impedance type, 4. Buchholz Yes 5 Winding Temperature Indicator IWTI) Yes 6. Magnetic Oil Gauge (MOG) Yes 7 Oil Temperature Indicator (OTI) Yes 8. Surge Arrestor (SA) Yes 9. Cooling Yes ONAN 10. Any other Protection N.A. Not Applicable ** Check the availability & functional healthiness' Wy.)\[V. Kalyanramen) Executive Engineer, ERPC M zqilvltl/ (P. S. Das) Chief manager, ERLDC 21 (R K. L- $ry (S. K. Suar) Deputy Manager, PGCIL AGM(EMD), NTPC/Kaniha Protection Audit of NTPC/Kaniha I CHECK LIST FOR SUB-STATION/SWITCHYARD Name/Details: NTP C/Kaniha Protection Scheme Sl. No 1 Status** Remarks Yes Busl&II-RADSS(ABB) BUS-III TO VI - TTMTOOO & 7556010 Bus Bar ME Stand Alone Separate for Stage 2. Event Logger (EL) Yes 3 Synchronizing FacilitY Yes 4 Are Synchro Check Relay provided with DC 5. Yes requisite settings? i) supply: Yes Yes 220v 4BV 6. DG set No 7 Auxiliary Supply Yes B Special Protection Scheme (SPS) Yes -l & II Stage-l IHATHAWAY-SER7000) for Bays 1 to 17 & Stage-ll (SIEMENS SIESERI for Bays LB to 4L Provided in synchronizing Trolley Alsthom-SKD11 for manual closing of all400 &220 kV Breakers RASC(ABB) Provided for all lines [required in case of three phase Auto Reclosure only) 220v- 02 SETS (400AH each), 48V-02 SETS (50OAH each) DG Supply is available for the Unit Emersency Bus ( 415V) From 11KV Unit Bus of Unit SPS - 450 & SPS - I &2 - 1000 are available to take care of the Talcher - Kolar HVDC Pole Under Frequency RelaY[UFR) 9. 10. D iD iii) Only Islanding scheme for : No No No Stage I Stage II Stage III Generators are available for the House Load Operation. Unit-L&2 Unit - 3 4 -46HZ,1.5Sec 5&6-47 2.0 Sec Has the Fault level Increased since grid? to connected If status at Sl. no 10 is '' Yes", then whether 77 Sectionalization of the bus/ Series Reactor on the line or bus provided to limit the fault level? L2. Has the size and number of ICT in the S/S been planned in a way that the outage of any single unit does not overload the remaining ICTs or the underlYing transmission system Not Applicable Yes SCADA: 13. 74. D Voice Ycs Data Yes Yes Switching Schemes Wplp [V. K.alyanrdrhen) Executive Engineer, ERPC W,r,rDas) One and half & Two Breaker scheme for 400 kV System. {*^* >tlty,t- E'L (S. K Suar) (R H. Padhfl NTPC/Ihniha AGM(EMD), PGCIL Manager, Deputy ERLDC Chief rnanager, [P. S. Protection Audit of NTPC/Kaniha b , I CHECK LIST FOR SUB-STATION/SWITCHYARD ' Name/Details : NTPC/Kaniha Sl. No 15 Protection Scheme Are Circuit Breakers suitable for singleauto and 76. \7. 18. Are Circuit Break(3rs provided with two Yes Yes coils? Are Circuit Breakers provided with Pre Insertion Resistors? Are Earth Switches P rovided at appropriate locations to facilitate earthing of outgoing transmission lines to Yes 20. 21. ')') 23. Are all main Protection relaYs of Yes No numerical tYPe? Are protection functio ns subdivide,l into two independent groups & capa ble of providing uninterrupted protection evell in the event of one protection groups Yes Are two sets of DC sources available? Yes If status to Sl' No 21 is Yes, then whether relays are electricallY and physically segregated into two groups to obtain redundancy and to take protection systems out for maintenance whil e the remains in service? No 21 is "No", then whether Sl' to If status el ectricallY and physically are relays two groups by giving DC into s egregated Pre Insertion Resistors are provided for all the breakers related to 400 kV HVDC AC feeders. Lines ena ble maintenance? 19. Remarks Status** Line Earth Switches are provided in 400 kV Meramandali Circuit - I & 2, but Line E/S are not envisaged in 400 Circuit. kV Rourkela & Protection Distance 1 Only the Main of Protections II for all & and Main numerical Meramandali are of Yes N,A fuses? 24 25 26. Bus Bar Protection Yes Bus Bar Protection scheme has Provision Yes for future Any other Protection sectionalizing beakers Two Main Bus are segregated illo I Bus sections each using x 630KVA Transformers 415v,2 iwitchyard AuxitiariJs fnrm 11KV Unit Bus using L1KV7 i* Check the availability & functional healthiness' 1) ,; Note: for Sl No.14 are: a level Scheme bus Double or Bus Mai n & Transfer Dou ble Main & Transfer Bus or Doubrl e bus bus B reaker & a half or Double Main and Transfer ) l-/ w. Executive Engineer, ERPC W,,,,. (P. S. Das) Chief manager, ERLDC 66KV & 132 KV 2201(]'l 40OKV 4^,a n)H)> (R K Padhi) Deputy Marrager, PGCIL (s. AGM(EMD), NTPC/Kaniha