ACCC® Conductor Installation Guidelines Chapter 1 – General Guidelines WI-750-070 Rev A Page 1 of 7 Chapter 1 – General Guidelines – Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................1 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. ACCC®INSTALLATIONDIFFERENCES..................................................................................................2 6. GENERALCONDUCTORHANDLINGGUIDELINES................................................................................3 6.3. SharpAngles..................................................................................................................................................5 7. TENINSTALLATIONDON’TS..............................................................................................................6 7.1. DON’TOVER-BEND!.......................................................................................................................................6 7.2. ONETensionerDON'T...................................................................................................................................6 7.3. TWOPayoutReelDON'TS.............................................................................................................................6 7.4. THREEHandlingandEquipmentDON'TS......................................................................................................6 7.5. TWOPulling/StringingDON’TS....................................................................................................................6 7.6. ONETerminationDON’T...............................................................................................................................6 1. PURPOSE 1.1. This is Chapter 1 of the ACCC® Conductor Installation Guidelines, covering general installation subjects. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, the nine chapters comprise the entire Installation Guidelines: 1.1.1. Chapter 1 — General Installation Guidelines 1.1.2. Chapter 2 — Safety 1.1.3. Chapter 3 — Training 1.1.4. Chapter 4 — Reel Handling and Storage 1.1.5. Chapter 5 — Site Considerations and Set-ups 1.1.6. Chapter 6 — Required Equipment 1.1.7. Chapter 7 — Stringing / Pulling 1.1.8. Chapter 8 — Terminations, Sagging, and Suspending 1.1.9. Chapter 9 — Maintenance and Repair 1.2. The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, recommendations and requirements necessary to safely and successfully install the ACCC® composite-core bare overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to serve as a more intensive training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. 2. SCOPE 2.1. This guideline applies to equipment and techniques required to successfully install all sizes of ACCC® conductor. 2.2. This guideline includes additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 1 – General Guidelines WI-750-070 Rev A Page 2 of 7 3. DEFINITIONS 3.1. ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. 4. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalent 4.3. The remaining Chapters of the Installation Guidelines 5. ACCC® INSTALLATION DIFFERENCES Three unique features of ACCC® must be considered for a trouble-free installation: 5.1. The aluminum is softer than conventional conductor (because it conducts electricity better, and all the conductor’s rated tensile strength is designed into the ACCC® composite core after the knee point is achieved , not relying on any aluminum for rated tensile strength). All handling and tools which come in contact with the conductor must avoid gouging or scratching the aluminum surface, which can create corona effects which can cause damage and failures at voltages over 138k. 5.2. The individual aluminum strands are trapezoid shaped and fit tightly together to form each layer of strands. The individual strands can slide axially with respect to one another, but not as easily as conventional round strands. This makes the conductor more susceptible to “loosening” and the condition known as birdcage. While loosening or birdcage conditions themselves are not a defect or failure, they can and should be avoided and/or corrected. The ACCC® Conductor Installation Guidelines highlight the areas and techniques to avoid loosening and birdcage in the first place. 5.3. The composite carbon core of ACCC® is much stronger than conventional steel core, and is quite flexible, but not as flexible as equivalent steel core. Bending beyond a minimum bending diameter will fracture the ACCC® core instead of yielding like conventional steel core. This one difference accounts for almost all installation issues and drives nearly all of the elements of the installation guidelines. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 1 – General Guidelines WI-750-070 Rev A Page 3 of 7 6. GENERAL CONDUCTOR HANDLING GUIDELINES 6.1. Never bend ACCC® conductor further than its minimum sheave working diameter (see Chapter 6). It is CRITICAL to AVOID sharp bends in the conductor to prevent core damage! 6.2. It is not always obvious that a particular handling practice may apply a bending force over a too-small radius and result in core damage. For instance: 6.2.1. Dropping the conductor on a rock or edge 6.2.2. Pulling the conductor over a fence, pipe, wall, or other obstacle that presents a bending diameter smaller than the minimum allowable ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 1 – General Guidelines WI-750-070 6.2.3. Rev A Page 4 of 7 Hoisting a section of conductor or placing a side force on the conductor using a hook, chain, rope, or narrow sling. When using a sling, spread the straps. X ✓ ✓ 6.2.4. Hanging equipment or personnel from a conductor using a rope, hook, or narrow strap. 6.2.5. Applying tension or force (like conductor bouncing or dropping) over an undersized sheave, block, or roller. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 1 – General Guidelines WI-750-070 6.2.6. Rev A Page 5 of 7 Poor brake operation on the payout reel, resulting in bouncing of the conductor on the tensioner fairlead. 6.3. Sharp Angles 6.3.1. Any conductor stringing angle which is greater than 30 degrees, or any situation that includes severe uplift or down pull must use a larger block, tandem sheave blocks or multiple roller sheaves. Even with large sheaves, the extended contact area between the sheave and the outer layer of aluminum strands will tend to loosen the strands, especially at higher tension levels. To avoid loosening, always use a larger block or tandem sheaves for sharp angles. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 1 – General Guidelines WI-750-070 Rev A Page 6 of 7 7. TEN INSTALLATION DON’TS 7.1. DON’T OVER-BEND! 7.1.1. Don’t allow the conductor to contact surfaces that present sharp angles or small diameters. 7.2. ONE Tensioner DON'T 7.2.1. Don’t let ACCC® run hard on the end roller of the fairlead. Always use an interim sheave to feed the conductor into the middle of the tensioner fairlead opening. A multiple-roller “banana” fairlead is highly recommended. 7.3. TWO Payout Reel DON'TS 7.3.1. Don’t allow the conductor to bounce or jump up and down between the payout reel and the tensioner. When the conductor is jumping or bouncing, the core can be damaged. 7.3.2. Don’t use a payout reel with insufficient brakes. Poorly maintained or undersized brakes will cause jumping and bouncing of the conductor between the payout reel and the tensioner. The payout reel brakes should allow the tensioner to draw new conductor from the reel smoothly and evenly. 7.4. THREE Handling and Equipment DON'TS 7.4.1. Don’t use grips that aren’t designed for installing ACCC®. Use Klein “Chicago” long jaw grips or equal, designed for the size conductor being installed. Never use pocketbook grips! 7.4.2. Don't allow the conductor tail or the deadend to fall or droop unsupported while handling the conductor. If the tail is not controlled, it will damage the core at the back of the grip. 7.4.3. Don’t hoist the conductor in any manner which causes a sharp bend in the conductor. 7.5. TWO Pulling / Stringing DON’TS 7.5.1. Don’t install any ACCC® with under-diameter sheaves on the first and last structure or any angles that are over 30 degrees. 7.5.2. Don't pull in conductor using old conductor if it is rusty. Don’t use old conductor with splices or broken strands for pulling. Always cut splices and any damaged areas out and replace with Kellum grips before using old conductor for pulling. When in doubt, pull in a pilot line using the old conductor and pull in ACCC® using the pilot line. Always use a pilot line for long spans and river crossings. 7.6. ONE Termination DON’T 7.6.1. Don’t allow a sharp bend where the conductor exits the termination hardware. Hoisting conductor or deadend without paying attention to this area can damage the core at that point. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 1 – General Guidelines WI-750-070 Rev A Page 7 of 7 REVISION HISTORY REV. CHANGE REQUEST # DATE A 121515-1 15 Dec 2015 ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 1 of 7 Chapter 2 – Installation Safety – Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................1 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. ACCC®UNIQUESAFETYCONSIDERATIONS.........................................................................................2 6. GROUNDING.....................................................................................................................................3 7. TENINSTALLATIONDON’TS..............................................................................................................5 7.1. DON’TOVER-BEND!.......................................................................................................................................5 7.2. ONETensionerDON'T...................................................................................................................................5 7.3. TWOPayoutReelDON'TS.............................................................................................................................5 7.4. THREEHandlingandEquipmentDON'TS......................................................................................................5 7.5. TWOPulling/StringingDON’TS....................................................................................................................5 7.6. ONETerminationDON’T...............................................................................................................................5 AppendixA—MSDS...................................................................................................................................6 1. PURPOSE 1.1. This is Chapter 2 of the ACCC® Conductor Installation Guidelines, covering safety during installation. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, the nine chapters comprise the entire Installation Guidelines: 1.1.1. 1.1.2. 1.1.3. 1.1.4. 1.1.5. 1.1.6. 1.1.7. 1.1.8. Chapter 1 — Chapter 2 — Chapter 3 — Chapter 4 — Chapter 5 — Chapter 6 — Chapter 7 — Chapter 8 — General Installation Guidelines Safety Training Reel Handling and Storage Site Considerations and Set-ups Required Equipment Stringing / Pulling Sagging, Terminations, and Suspensions 1.1.9. Chapter 9 — Maintenance and Repair 1.2. The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, recommendations and requirements necessary to safely and successfully install the ACCC® composite-core bare overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to serve as a more intensive training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. 2. SCOPE 2.1. It is far beyond the scope of these guidelines to present the required safety practices for working high voltage transmission lines. Some extensive and effective safety procedures ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 2 of 7 are found in the referenced documentation. CTC recommends strict adherence to a comprehensive safety program and compliance with locally applicable regulations and company policies. 2.2. These guidelines apply to equipment and techniques required to successfully install all sizes of ACCC® conductor. 2.3. These guidelines include additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. 3. DEFINITIONS 3.1. ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. 4. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors or IEC or other governing body equivalent. 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalents. 4.3. The remaining Chapters of the Installation Guidelines 5. ACCC® UNIQUE SAFETY CONSIDERATIONS 5.1. ACCC® bare core, and to a lesser extent ACCC® conductor, presents a striking hazard if the conductor is bent and then suddenly released. 5.2. The carbon fiber composite core is sheathed in a fiberglass layer. Tiny glass slivers are produced when the core is cut or broken. Always wear leather work gloves and safety glasses when cutting or working with the end of ACCC® conductor or core. 5.3. The carbon and glass fibers that comprise the composite core have diameters that range from 7 to 25 microns, and these fibers are embedded in a thermoset resin. Nanotubes or nanofillers that have diameters in the nanometer range, are not used in the composite core. When cutting the composite core during installation, the size of the dust particles will be governed by the cutting device used; a hack saw will generate relatively large dust particles compared to the diameters of the fibers that make up the core. No nano-dust that might represent a short-term breathing hazard is created when cutting or sanding down the core. The dust that is created consists of carbon and glass fibers; only long term exposure to excessive quantities of dust (more than 100 times the amount of dust from installation cutting/sanding) may result in detrimental health effects. 5.4. A Material Safety Data Sheet (MSDS) for ACCC® composite core is found in Appendix A. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 3 of 7 6. GROUNDING 6.1. Disclaimer: Although the wording and pictures below are industry standards, it is always the responsibility of the employer to create their own grounding program to protect their employees and equipment. 6.2. CTC recommends equal potential grounding practices per OSHA 1910.269 or local equivalent. 6.3. Grounds shall be sized to interrupt the maximum fault current that could be seen on the installed conductor. Ground clamps with smooth inside surfaces are preferred to avoid damage to the annealed aluminum. Serrated surface ground clamps may be used if indentations are not created in the aluminum conductor wire surfaces. 6.4. During installation, grounds must be placed on ACCC® conductors, just as they would be utilized on other transmission and distribution conductors. CONDUCTOR GROUNDS MUST BE PLACED DIRECTLY ON THE ALUMINUM STRANDS. The composite core is non-conductive. 6.5. Rolling Grounds should be in good condition, make good contact, and roll smoothly, reference OSHA 1926.950. Rolling grounds should be used in addition to grounding mats and NOT IN PLACE of equal potential grounding practices. Rolling grounds should be placed in front of the puller and tensioner, not between the payout reel and tensioner. 6.6. De-energizing circuits, grounding including equal-potential grounding shall comply with OSHA 1926.961, OSHA 1926.962, OSHA 1910.269 and/or country specific safety requirements relating to de-energizing and grounding transmission and distribution lines. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 4 of 7 6.7. Protecting workers on the ground. The employer may use several methods, including equal potential zones, insulating equipment, and restricted work areas, to protect employees on the ground from hazardous differences in electrical potential. 6.8. An equal potential zone will protect workers within it from hazardous step and touch potentials. Equal potential zones will not, however, protect employees located either wholly or partially outside the protected area. The employer can establish an equal potential zone for workers on the ground, with respect to a grounded object, through the use of a metal mats connected to the grounded object. The employer can use a grounding grid to equalize the voltage within the grid or bond conductive objects and between the objects and between object and ground. (Bonding an object outside the work area can increase the touch potential to that object, however.) 6.8.1. Insulating equipment, such as rubber gloves, can protect employees handling grounded equipment and conductors from hazardous touch potentials. The insulating equipment must be rated for the highest voltage that can be impressed on the grounded objects under fault conditions (rather than for the full system voltage.) 6.8.2. Employees should be restricted from any step or touch potential not involved in the stringing, deadending, or clipping processes. The employer must ensure that employees on the ground in the vicinity of transmission structures are at a distance where step voltages would be insufficient to cause injury. Employees must not handle grounded conductors or equipment likely to become energized to hazardous voltages unless the employees are within an equal potential zone or protected by insulating equipment. 6.9. Live lines nearby can induce voltage and current into the conductor, especially parallel live lines, and this is common when re-conductoring. ALWAYS follow recommended grounding procedures. 6.10. Grounds shall never be removed without approval from the designated individual holding the line clearance. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 5 of 7 7. TEN INSTALLATION DON’TS 7.1. DON’T OVER-BEND! 7.1.1. Don’t allow the conductor to contact surfaces that present sharp angles or small diameters. 7.2. ONE Tensioner DON'T 7.2.1. Don’t let ACCC® run hard on the end roller of the fairlead. Always use an interim sheave to feed the conductor into the middle of the tensioner fairlead opening. A multiple-roller “banana” fairlead is highly recommended. 7.3. TWO Payout Reel DON'TS 7.3.1. Don’t allow the conductor to bounce or jump up and down between the payout reel and the tensioner. When the conductor is jumping or bouncing, the core can be damaged. 7.3.2. Don’t use a payout reel with insufficient brakes. Poorly maintained or undersized brakes will cause jumping and bouncing of the conductor between the payout reel and the tensioner. The payout reel brakes should allow the tensioner to draw new conductor from the reel smoothly and evenly. 7.4. THREE Handling and Equipment DON'TS 7.4.1. Don’t use grips that aren’t designed for installing ACCC®. Use Klein “Chicago” long jaw grips or equal, designed for the size conductor being installed. Never use pocketbook grips! 7.4.2. Don't allow the conductor tail or the deadend to fall or droop unsupported while handling the conductor. If the tail is not controlled, it will damage the core at the back of the grip. 7.4.3. Don’t hoist the conductor in any manner which causes a sharp bend in the conductor. 7.5. TWO Pulling / Stringing DON’TS 7.5.1. Don’t install any ACCC® with under-diameter sheaves on the first and last structure or any angles that are over 30 degrees. 7.5.2. Don't pull in conductor using old conductor if it is rusty. Don’t use old conductor with splices or broken strands for pulling. Always cut splices and any damaged areas out and replace with Kellum grips before using old conductor for pulling. When in doubt, pull in a pilot line using the old conductor and pull in ACCC® using the pilot line. Always use a pilot line for long spans and river crossings. 7.6. ONE Termination DON’T 7.6.1. Don’t allow a sharp bend where the conductor exits the termination hardware. Hoisting conductor or deadend without paying attention to this area can damage the core at that point. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 6 of 7 Appendix A — MSDS F-824-006-E ACCC Safety Data Sheet SDS NO. 061306001 Safety Data Sheet May be used to comply with OSHA’s Hazard Communication Standards, 29 CFR 1910, 1200, Standard must be consulted for specific requirements. IDENTITY (As Used on Label and List) Note: Blank spaces are not permitted. If any item is not applicable, or no Information is available, the space must be marked as indicated that. ACCC Cable Core Section I Manufacture’s Name Emergency Telephone Number CTC Global Corporation Infotrac 800-535-5053 Address (Number, Street, City, State, and Zip Code) Telephone Number for Information 2026 McGaw Ave Irvine, CA 92714 949-428-8500 Date Prepared 08/18/14 Signature of Preparer (optional) Section II – Hazardous Ingredients/Identity Information Hazardous Components (Specific Chemical; Common name(s)) None OSHA PEL ACGIH TLV Other Limits Recommended N/E N/E N/E % (Optional) N/E None Established—N/E Section III – Physical/Chemical Characteristics Boiling Point Specific Gravity (H 2 0 = 1) N/A 2.03 g/cc Vapor Pressure (mm Hg.) Melting Point N/A N/A Vapor Density (AR = 1) Evaporation Rate N/A (Butyl Acetate = 1) N/A Solubility in Water <0.1% Appearance and Odor Tan/Brown solid rod Section IV – Fire and Exposition Hazard Area Flash Point (Method Used) Flammable Limits LEL UEL > 300 deg C / 570 deg F Estimated Not Established NE NE Extinguishing Media Water, Foam, CO2, Dry Chem. Special Fire Fighting Procedures Use self contained breathing apparatus Unusual Fire and Explosion Hazards Combustion product may be toxic. Note: Cable on reel under high tension. Fire may burn through cable releasing tension violently. Section V – Reactivity Data Stability Unstable Conditions to Avoid None Stable X Incompatibility (Materials to Avoid) None known Page 1 ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A REVISION HISTORY REV. CHANGE REQUEST # DATE A 121515-1 15 Dec 2015 ©2016 CTC Global- For use with ACCC® Conductor only Page 7 of 7 ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 1 of 7 Chapter 2 – Installation Safety – Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................1 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. ACCC®UNIQUESAFETYCONSIDERATIONS.........................................................................................2 6. GROUNDING.....................................................................................................................................3 7. TENINSTALLATIONDON’TS..............................................................................................................5 7.1. DON’TOVER-BEND!.......................................................................................................................................5 7.2. ONETensionerDON'T...................................................................................................................................5 7.3. TWOPayoutReelDON'TS.............................................................................................................................5 7.4. THREEHandlingandEquipmentDON'TS......................................................................................................5 7.5. TWOPulling/StringingDON’TS....................................................................................................................5 7.6. ONETerminationDON’T...............................................................................................................................5 AppendixA—MSDS...................................................................................................................................6 1. PURPOSE 1.1. This is Chapter 2 of the ACCC® Conductor Installation Guidelines, covering safety during installation. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, the nine chapters comprise the entire Installation Guidelines: 1.1.1. 1.1.2. 1.1.3. 1.1.4. 1.1.5. 1.1.6. 1.1.7. 1.1.8. Chapter 1 — Chapter 2 — Chapter 3 — Chapter 4 — Chapter 5 — Chapter 6 — Chapter 7 — Chapter 8 — General Installation Guidelines Safety Training Reel Handling and Storage Site Considerations and Set-ups Required Equipment Stringing / Pulling Sagging, Terminations, and Suspensions 1.1.9. Chapter 9 — Maintenance and Repair 1.2. The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, recommendations and requirements necessary to safely and successfully install the ACCC® composite-core bare overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to serve as a more intensive training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. 2. SCOPE 2.1. It is far beyond the scope of these guidelines to present the required safety practices for working high voltage transmission lines. Some extensive and effective safety procedures ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 2 of 7 are found in the referenced documentation. CTC recommends strict adherence to a comprehensive safety program and compliance with locally applicable regulations and company policies. 2.2. These guidelines apply to equipment and techniques required to successfully install all sizes of ACCC® conductor. 2.3. These guidelines include additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. 3. DEFINITIONS 3.1. ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. 4. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors or IEC or other governing body equivalent. 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalents. 4.3. The remaining Chapters of the Installation Guidelines 5. ACCC® UNIQUE SAFETY CONSIDERATIONS 5.1. ACCC® bare core, and to a lesser extent ACCC® conductor, presents a striking hazard if the conductor is bent and then suddenly released. 5.2. The carbon fiber composite core is sheathed in a fiberglass layer. Tiny glass slivers are produced when the core is cut or broken. Always wear leather work gloves and safety glasses when cutting or working with the end of ACCC® conductor or core. 5.3. The carbon and glass fibers that comprise the composite core have diameters that range from 7 to 25 microns, and these fibers are embedded in a thermoset resin. Nanotubes or nanofillers that have diameters in the nanometer range, are not used in the composite core. When cutting the composite core during installation, the size of the dust particles will be governed by the cutting device used; a hack saw will generate relatively large dust particles compared to the diameters of the fibers that make up the core. No nano-dust that might represent a short-term breathing hazard is created when cutting or sanding down the core. The dust that is created consists of carbon and glass fibers; only long term exposure to excessive quantities of dust (more than 100 times the amount of dust from installation cutting/sanding) may result in detrimental health effects. 5.4. A Material Safety Data Sheet (MSDS) for ACCC® composite core is found in Appendix A. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 3 of 7 6. GROUNDING 6.1. Disclaimer: Although the wording and pictures below are industry standards, it is always the responsibility of the employer to create their own grounding program to protect their employees and equipment. 6.2. CTC recommends equal potential grounding practices per OSHA 1910.269 or local equivalent. 6.3. Grounds shall be sized to interrupt the maximum fault current that could be seen on the installed conductor. Ground clamps with smooth inside surfaces are preferred to avoid damage to the annealed aluminum. Serrated surface ground clamps may be used if indentations are not created in the aluminum conductor wire surfaces. 6.4. During installation, grounds must be placed on ACCC® conductors, just as they would be utilized on other transmission and distribution conductors. CONDUCTOR GROUNDS MUST BE PLACED DIRECTLY ON THE ALUMINUM STRANDS. The composite core is non-conductive. 6.5. Rolling Grounds should be in good condition, make good contact, and roll smoothly, reference OSHA 1926.950. Rolling grounds should be used in addition to grounding mats and NOT IN PLACE of equal potential grounding practices. Rolling grounds should be placed in front of the puller and tensioner, not between the payout reel and tensioner. 6.6. De-energizing circuits, grounding including equal-potential grounding shall comply with OSHA 1926.961, OSHA 1926.962, OSHA 1910.269 and/or country specific safety requirements relating to de-energizing and grounding transmission and distribution lines. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 4 of 7 6.7. Protecting workers on the ground. The employer may use several methods, including equal potential zones, insulating equipment, and restricted work areas, to protect employees on the ground from hazardous differences in electrical potential. 6.8. An equal potential zone will protect workers within it from hazardous step and touch potentials. Equal potential zones will not, however, protect employees located either wholly or partially outside the protected area. The employer can establish an equal potential zone for workers on the ground, with respect to a grounded object, through the use of a metal mats connected to the grounded object. The employer can use a grounding grid to equalize the voltage within the grid or bond conductive objects and between the objects and between object and ground. (Bonding an object outside the work area can increase the touch potential to that object, however.) 6.8.1. Insulating equipment, such as rubber gloves, can protect employees handling grounded equipment and conductors from hazardous touch potentials. The insulating equipment must be rated for the highest voltage that can be impressed on the grounded objects under fault conditions (rather than for the full system voltage.) 6.8.2. Employees should be restricted from any step or touch potential not involved in the stringing, deadending, or clipping processes. The employer must ensure that employees on the ground in the vicinity of transmission structures are at a distance where step voltages would be insufficient to cause injury. Employees must not handle grounded conductors or equipment likely to become energized to hazardous voltages unless the employees are within an equal potential zone or protected by insulating equipment. 6.9. Live lines nearby can induce voltage and current into the conductor, especially parallel live lines, and this is common when re-conductoring. ALWAYS follow recommended grounding procedures. 6.10. Grounds shall never be removed without approval from the designated individual holding the line clearance. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 5 of 7 7. TEN INSTALLATION DON’TS 7.1. DON’T OVER-BEND! 7.1.1. Don’t allow the conductor to contact surfaces that present sharp angles or small diameters. 7.2. ONE Tensioner DON'T 7.2.1. Don’t let ACCC® run hard on the end roller of the fairlead. Always use an interim sheave to feed the conductor into the middle of the tensioner fairlead opening. A multiple-roller “banana” fairlead is highly recommended. 7.3. TWO Payout Reel DON'TS 7.3.1. Don’t allow the conductor to bounce or jump up and down between the payout reel and the tensioner. When the conductor is jumping or bouncing, the core can be damaged. 7.3.2. Don’t use a payout reel with insufficient brakes. Poorly maintained or undersized brakes will cause jumping and bouncing of the conductor between the payout reel and the tensioner. The payout reel brakes should allow the tensioner to draw new conductor from the reel smoothly and evenly. 7.4. THREE Handling and Equipment DON'TS 7.4.1. Don’t use grips that aren’t designed for installing ACCC®. Use Klein “Chicago” long jaw grips or equal, designed for the size conductor being installed. Never use pocketbook grips! 7.4.2. Don't allow the conductor tail or the deadend to fall or droop unsupported while handling the conductor. If the tail is not controlled, it will damage the core at the back of the grip. 7.4.3. Don’t hoist the conductor in any manner which causes a sharp bend in the conductor. 7.5. TWO Pulling / Stringing DON’TS 7.5.1. Don’t install any ACCC® with under-diameter sheaves on the first and last structure or any angles that are over 30 degrees. 7.5.2. Don't pull in conductor using old conductor if it is rusty. Don’t use old conductor with splices or broken strands for pulling. Always cut splices and any damaged areas out and replace with Kellum grips before using old conductor for pulling. When in doubt, pull in a pilot line using the old conductor and pull in ACCC® using the pilot line. Always use a pilot line for long spans and river crossings. 7.6. ONE Termination DON’T 7.6.1. Don’t allow a sharp bend where the conductor exits the termination hardware. Hoisting conductor or deadend without paying attention to this area can damage the core at that point. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A Page 6 of 7 Appendix A — MSDS F-824-006-E ACCC Safety Data Sheet SDS NO. 061306001 Safety Data Sheet May be used to comply with OSHA’s Hazard Communication Standards, 29 CFR 1910, 1200, Standard must be consulted for specific requirements. IDENTITY (As Used on Label and List) Note: Blank spaces are not permitted. If any item is not applicable, or no Information is available, the space must be marked as indicated that. ACCC Cable Core Section I Manufacture’s Name Emergency Telephone Number CTC Global Corporation Infotrac 800-535-5053 Address (Number, Street, City, State, and Zip Code) Telephone Number for Information 2026 McGaw Ave Irvine, CA 92714 949-428-8500 Date Prepared 08/18/14 Signature of Preparer (optional) Section II – Hazardous Ingredients/Identity Information Hazardous Components (Specific Chemical; Common name(s)) None OSHA PEL ACGIH TLV Other Limits Recommended N/E N/E N/E % (Optional) N/E None Established—N/E Section III – Physical/Chemical Characteristics Boiling Point Specific Gravity (H 2 0 = 1) N/A 2.03 g/cc Vapor Pressure (mm Hg.) Melting Point N/A N/A Vapor Density (AR = 1) Evaporation Rate N/A (Butyl Acetate = 1) N/A Solubility in Water <0.1% Appearance and Odor Tan/Brown solid rod Section IV – Fire and Exposition Hazard Area Flash Point (Method Used) Flammable Limits LEL UEL > 300 deg C / 570 deg F Estimated Not Established NE NE Extinguishing Media Water, Foam, CO2, Dry Chem. Special Fire Fighting Procedures Use self contained breathing apparatus Unusual Fire and Explosion Hazards Combustion product may be toxic. Note: Cable on reel under high tension. Fire may burn through cable releasing tension violently. Section V – Reactivity Data Stability Unstable Conditions to Avoid None Stable X Incompatibility (Materials to Avoid) None known Page 1 ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 2 – Installation Safety WI-750-071 Rev A REVISION HISTORY REV. CHANGE REQUEST # DATE A 121515-1 15 Dec 2015 ©2016 CTC Global- For use with ACCC® Conductor only Page 7 of 7 ACCC® Conductor Installation Guidelines Chapter 3 – Training WI-750-072 Rev A Page 1 of 6 Chapter 3 – Training – Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................2 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. TRAINING.........................................................................................................................................2 6. INSTALLATIONTRAININGSYLLABUS.................................................................................................3 6.1. The3DIFFERENCES(Classroomonly,practicaldemonstration)...................................................................3 6.2. ConductorReelHandling(ClassroomandField)...........................................................................................3 6.3. SiteandEquipmentSetup(Classroomonly).................................................................................................3 6.4. ConductorHandling(ClassroomandField)...................................................................................................3 6.5. StringingandSagging(ClassroomandField).................................................................................................3 6.6. Terminations.................................................................................................................................................3 6.7. EquipmentRequirements(ClassroomandField)..........................................................................................4 6.8. The10DON’Ts(ClassroomandField)...........................................................................................................4 7. TENINSTALLATIONDON’TS..............................................................................................................5 7.1. DON’TOVER-BEND!.......................................................................................................................................5 7.2. ONETensionerDON'T...................................................................................................................................5 7.3. TWOPayoutReelDON'TS.............................................................................................................................5 7.4. THREEHandlingandEquipmentDON'TS......................................................................................................5 7.5. TWOPulling/StringingDON’TS....................................................................................................................5 7.6. ONETerminationDON’T...............................................................................................................................5 1. PURPOSE 1.1. This is Chapter 3 of the ACCC® Conductor Installation Guidelines, covering installation training. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, the nine chapters comprise the entire Installation Guidelines: 1.1.1. 1.1.2. 1.1.3. 1.1.4. 1.1.5. 1.1.6. 1.1.7. 1.1.8. 1.1.9. Chapter 1 — General Installation Guidelines Chapter 2 — Safety Chapter 3 — Training Chapter 4 — Reel Handling and Storage Chapter 5 — Site Considerations and Set-ups Chapter 6 — Required Equipment Chapter 7 — Stringing / Pulling Chapter 8 — Terminations, Sagging, and Suspending Chapter 9 — Maintenance and Repair 1.2. The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, recommendations and requirements necessary to safely and successfully install ACCC® composite-core bare overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 3 – Training WI-750-072 Rev A Page 2 of 6 serve as a more intensive training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. 2. SCOPE 2.1. These guidelines apply to equipment and techniques required to successfully install all sizes of ACCC® conductor. 2.2. These guidelines include additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. 3. DEFINITIONS 3.1. ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. 3.2. ULS – Ultra Low Sag. Conductor that has a stronger core and is used for heavy ice conditions along with long spans across rivers, etc. 4. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors. 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalent. 4.3. The remaining Chapters of the Installation Guidelines 4.4. CTC Installation Training Slides (F-750-066) and Sign-In Roster (F-750-277) 5. TRAINING 5.1. CTC offers an ACCC® specific Installation Training course which consists of approximately ½ day classroom instruction and ½ day hands-on instruction. 5.2. CTC strongly recommends that all line personnel, safety inspectors, and construction crew(s) attend the ACCC® Installation Training Course prior to the start of installation. Attendance by installation supervisor(s) should be mandatory. Should a change in crew occur during the course of construction, ACCC® installation training must be completed before that crew starts work. 5.3. Improper installation techniques are not covered by the CTC Warranty and could result in line damage or failure. 5.4. An appropriate classroom equipped with digital projector is needed for the classroom instruction portions of the ACCC® Training Course. 5.5. A language interpreter may be needed for presentation of training, both classroom and hands-on. CTC training is available in English and Spanish only at this time. 5.6. CTC offers a separate Maintenance and Repair Training course for ACCC®. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 3 – Training WI-750-072 Rev A Page 3 of 6 6. INSTALLATION TRAINING SYLLABUS 6.1. The 3 DIFFERENCES (Classroom only, practical demonstration) 6.2. Conductor Reel Handling (Classroom and Field) 6.2.1. Proper lifting and handling of the new conductor reels 6.2.2. Preparation of new reel for stringing 6.3. Site and Equipment Setup (Classroom only) 6.3.1. Puller 6.3.2. Tensioner 6.3.3. Payout Reel 6.4. Conductor Handling (Classroom and Field) 6.4.1. Installing first and last structure sheaves 6.4.2. Installing tangent structure sheaves along with installing larger or tandem sheaves on structures with over a 30-degree angle 6.4.3. Pulling the conductor up to the first structure and attaching to old conductor 6.5. Stringing and Sagging (Classroom and Field) 6.5.1. Loading the conductor onto the reel stand 6.5.2. Stringing the conductor through the tensioner 6.5.3. Core Retainer (Bug) Installation 6.5.4. Installing and anchoring wire mesh sock clamp onto conductor, installing swivel and preparing to pull the conductor 6.5.5. Paying close attention to any bad angles or long spans 6.5.6. Sagging (Cutting Conductor to Length) 6.6. Terminations 6.6.1. Installing Deadends and Splices (Classroom and Field) 6.6.1.1. Threaded Collet Hardware 6.6.1.2. Compression Collet Hardware 6.6.1.3. Sleeve Compression 6.6.2. Installing Conductor Suspensions and Dampners (Classroom and Field) 6.6.3. Installing Terminal Pads and “T” Taps (Classroom and Field) 6.6.4. Installing Ancillary Hardware ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 3 – Training WI-750-072 Rev A Page 4 of 6 6.7. Equipment Requirements (Classroom and Field) 6.7.1. Sheave Sizes and Types including special rigging for exceptional stringing conditions 6.7.2. Core Retainers (Bugs) 6.7.3. Presses and Dies 6.7.4. Clamps 6.7.5. Socks (wire mesh) and Banding 6.8. The 10 DON’Ts (Classroom and Field) ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 3 – Training WI-750-072 Rev A Page 5 of 6 7. TEN INSTALLATION DON’TS 7.1. DON’T OVER-BEND! 7.1.1. Don’t allow the conductor to contact surfaces that present sharp angles or small diameters. 7.2. ONE Tensioner DON'T 7.2.1. Don’t let ACCC® run hard on the end roller of the fairlead. Always use an interim sheave to feed the conductor into the middle of the tensioner fairlead opening. A multiple-roller “banana” fairlead is highly recommended. 7.3. TWO Payout Reel DON'TS 7.3.1. Don’t allow the conductor to bounce or jump up and down between the payout reel and the tensioner. When the conductor is jumping or bouncing, the core can be damaged. 7.3.2. Don’t use a payout reel with insufficient brakes. Poorly maintained or undersized brakes will cause jumping and bouncing of the conductor between the payout reel and the tensioner. The payout reel brakes should allow the tensioner to draw new conductor from the reel smoothly and evenly. 7.4. THREE Handling and Equipment DON'TS 7.4.1. Don’t use grips that aren’t designed for installing ACCC®. Use Klein “Chicago” long jaw grips or equal, designed for the size conductor being installed. Never use pocketbook grips! 7.4.2. Don't allow the conductor tail or the deadend to fall or droop unsupported while handling the conductor. If the tail is not controlled, it will damage the core at the back of the grip. 7.4.3. Don’t hoist the conductor in any manner which causes a sharp bend in the conductor. 7.5. TWO Pulling / Stringing DON’TS 7.5.1. Don’t install any ACCC® with under-diameter sheaves on the first and last structure or any angles that are over 30 degrees. 7.5.2. Don't pull in conductor using old conductor if it is rusty. Don’t use old conductor with splices or broken strands for pulling. Always cut splices and any damaged areas out and replace with Kellum grips before using old conductor for pulling. When in doubt, pull in a pilot line using the old conductor and pull in ACCC® using the pilot line. Always use a pilot line for long spans and river crossings. 7.6. ONE Termination DON’T 7.6.1. Don’t allow a sharp bend where the conductor exits the termination hardware. Hoisting conductor or deadend without paying attention to this area can damage the core at that point. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 3 – Training WI-750-072 Rev A REVISION HISTORY REV. CHANGE REQUEST # DATE A 121515-1 15 Dec 2015 ©2016 CTC Global- For use with ACCC® Conductor only Page 6 of 6 ACCC® Conductor Installation Guidelines Chapter 4 – Reel Handling and Storage WI-750-073 Rev A Page 1 of 9 Chapter 4 – Reel Handling and Storage – Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................1 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. NEWCONDUCTORREELS..................................................................................................................2 6. CONDUCTORREELHANDLING...........................................................................................................3 7. CONDUCTORandCONDUCTORREELSTORAGE.................................................................................4 8. TENINSTALLATIONDON’TS..............................................................................................................6 8.1. DON’TOVER-BEND!.......................................................................................................................................6 8.2. ONETensionerDON'T...................................................................................................................................6 8.3. TWOPayoutReelDON'TS.............................................................................................................................6 8.4. THREEHandlingandEquipmentDON'TS......................................................................................................6 8.5. TWOPulling/StringingDON’TS....................................................................................................................6 8.6. ONETerminationDON’T...............................................................................................................................6 AppendixA—ACCC®ReelSpecifications.....................................................................................................7 1. PURPOSE 1.1. This is Chapter 4 of the ACCC® Conductor Installation Guidelines, covering ACCC® conductor reel handling and storage. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, the nine chapters comprise the entire Installation Guidelines: 1.1.1. Chapter 1 — General Installation Guidelines 1.1.2. Chapter 2 — Safety 1.1.3. Chapter 3 — Training 1.1.4. Chapter 4 — Reel Handling and Storage 1.1.5. Chapter 5 — Site Considerations and Set-ups 1.1.6. Chapter 6 — Required Equipment 1.1.7. Chapter 7 — Stringing / Pulling 1.1.8. Chapter 8 — Terminations, Sagging, and Suspending 1.1.9. Chapter 9 — Maintenance and Repair 1.2. The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, and requirements necessary to safely and successfully install the ACCC® overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to serve as a training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. 2. SCOPE 2.1. These guidelines apply to equipment and techniques required to successfully install all sizes of ACCC® conductor. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 4 – Reel Handling and Storage WI-750-073 Rev A Page 2 of 9 2.2. These guidelines include additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. 3. DEFINITIONS 3.1. ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. 3.2. Terminology differs around the world when referring to the parts of a reel: North America Reel Europe Spool or Bobbin Transverse Flange Drum or Hub Arbor Flange Transverse Hub, Drum, or Barrel Boss Size Convention: flange x transverse x drum dia. Size Convention: flange x hub dia. x transverse 4. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors. 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalents. 4.3. The remaining Chapters of the Installation Guidelines 4.4. ACCC® Product Specification WI-750-023 4.5. ACCC® Conductor Reel Specification F-750-032 4.6. NEMA WC26-2008 Binational Wire and Cable Packaging Standard 5. NEW CONDUCTOR REELS 5.1. ACCC® conductors are shipped on industry standard reels with added packaging that safeguards the conductor during transit, storage, and at the point of installation. The conductor reels must be verified by the conductor manufacturer against the specification in Appendix A. The conductor is inspected during all stages of fabrication; packaging is inspected prior to shipment, and only properly packaged material is delivered to the carrier. 5.2. The conductor is packaged with a protective covering over the top layer of conductor on the reel to prevent damage during shipping and handling. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 4 – Reel Handling and Storage WI-750-073 Rev A Page 3 of 9 5.3. New conductor reels should be inspected and verified against the above requirements. 5.4. New conductor reels are marked with manufacturer’s name and location, date of manufacture, and a reel identification number that provides manufacturing traceability. This information should be recorded as the reels are installed. 6. CONDUCTOR REEL HANDLING 6.1. Reels should be properly controlled during the loading, unloading and staging processes. 6.2. Proper equipment must be available to hoist and handle conductor reels. Cranes or other equipment of adequate capacity must be used to avoid damage and safety hazards. 6.3. Reels may be handled with forklift equipment of adequate capacity. It is important that reels of ACCC® conductor are not lifted by placing the forks of the forklift under the drum area of the reel, which would allow the forks to come in direct contact with the conductor or its wrapping material. Slings, winch lines, nylon straps or any other types of lifting devices shall never be placed around the conductor to lift the reel. The ACCC® conductor will be damaged if such devices are used. Reels are constructed so that they must be supported either by the reel flanges from below or on an axle (mandrel) through the arbor hole. When an axle through the arbor hole is used to lift reels, a spreader bar must be employed to prevent damage to the reel flanges, or conductor, or both, by inward force on the reel flange. A spreader bar with slings or chains rigged vertically to each end of an adequately sized axle through the arbor hole is the preferred method of hoisting. If a spreader bar is not available at least 3 – 4 meter (15’) steel or nylon slings or lifting chains must be used to prevent damage to the top of the reel flange ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 4 – Reel Handling and Storage WI-750-073 Rev A Page 4 of 9 6.4. Returnable metal reels may be supported by a singletree arrangement that clamps to the flange and is lifted from above. 6.5. Reels may be placed on flat ground or floor. Always chock the reel flanges (never chock under the conductor itself or it’s protective lagging) to prevent rolling. 6.6. At no time shall a loaded reel be laid on its side either during handling, loading, unloading or storage. 7. CONDUCTOR and CONDUCTOR REEL STORAGE 7.1. If the conductor is to be stored for an extended period of time before use, the reel shall be kept off of the ground and otherwise protected from possible damage. Only all-steel reels, should be used for long-term or outdoor storage. Wood reels or steel spoke reels with ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 4 – Reel Handling and Storage WI-750-073 Rev A Page 5 of 9 wooden flanges and center drum should never be used for long-term, outdoor, or damp conditions storage. ACCC® should never be submerged or allowed to remain wet during storage. ACCC® core can absorb moisture. This does not affect the tensile strength of the core and has no effect on installed conductor, but it can increase the allowable bending diameter which may subject the conductor core to increased risk during installation. 7.2. Identification tags and other markings should be retained on all packages until the conductor is to be used. Identification tags should be protected from weather to retain information. 7.3. The reels are delivered from the factory with a protective wrapping which could include wood lagging and/or fiber board held down with steel bands over the outermost layer of conductor. The outermost protective covering should be left on the reels if stored for an extended period of time. 7.4. Storage Temperatures: 7.4.1. Maximum storage temperature: +55°C (131°F) 7.4.2. Minimum storage temperature: -40°C (-40°F) ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 4 – Reel Handling and Storage WI-750-073 Rev A Page 6 of 9 8. TEN INSTALLATION DON’TS 8.1. DON’T OVER-BEND! 8.1.1. Don’t allow the conductor to contact surfaces that present sharp angles or small diameters. 8.2. ONE Tensioner DON'T 8.2.1. Don’t let ACCC® run hard on the end roller of the fairlead. Always use an interim sheave to feed the conductor into the middle of the tensioner fairlead opening. A multiple-roller “banana” fairlead is highly recommended. 8.3. TWO Payout Reel DON'TS 8.3.1. Don’t allow the conductor to bounce or jump up and down between the payout reel and the tensioner. When the conductor is jumping or bouncing, the core can be damaged. 8.3.2. Don’t use a payout reel with insufficient brakes. Poorly maintained or undersized brakes will cause jumping and bouncing of the conductor between the payout reel and the tensioner. The payout reel brakes should allow the tensioner to draw new conductor from the reel smoothly and evenly. 8.4. THREE Handling and Equipment DON'TS 8.4.1. Don’t use grips that aren’t designed for installing ACCC®. Use Klein “Chicago” long jaw grips or equal, designed for the size conductor being installed. Never use pocketbook grips! 8.4.2. Don't allow the conductor tail or the deadend to fall or droop unsupported while handling the conductor. If the tail is not controlled, it will damage the core at the back of the grip. 8.4.3. Don’t hoist the conductor in any manner which causes a sharp bend in the conductor. 8.5. TWO Pulling / Stringing DON’TS 8.5.1. Don’t install any ACCC® with under-diameter sheaves on the first and last structure or any angles that are over 30 degrees. 8.5.2. Don't pull in conductor using old conductor if it is rusty. Don’t use old conductor with splices or broken strands for pulling. Always cut splices and any damaged areas out and replace with Kellum grips before using old conductor for pulling. When in doubt, pull in a pilot line using the old conductor and pull in ACCC® using the pilot line. Always use a pilot line for long spans and river crossings. 8.6. ONE Termination DON’T 8.6.1. Don’t allow a sharp bend where the conductor exits the termination hardware. Hoisting conductor or deadend without paying attention to this area can damage the core at that point. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 4 – Reel Handling and Storage WI-750-073 Rev A Appendix A — ACCC® Reel Specifications ©2016 CTC Global- For use with ACCC® Conductor only Page 7 of 9 ACCC® Conductor Installation Guidelines Chapter 4 – Reel Handling and Storage WI-750-073 Rev A Page 8 of 9 F-750-032D ACCC®ReelSpecificationRequirements page2 ULSCONDUCTORS Diameter(mm) Core 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 9.53 9.53 9.53 9.78 9.78 10.54 10.54 10.54 10.54 Spool(mm) Reel(inches) Conductor Minimum‡Hub ReferenceBoss Minimum‡ Reference International Weight* Dia. Diameter DrumDia. ArborDiameter Conductor ASTMName Name kg/km 22.40 ULSOslo ULSIrving 981 1515 130 60 5.25 26.40 ULSStockholm 1395 1515 5.25 26.42 ULSLubbock 1376 130 60 27.69 ULSGalveston 1526 130 60 28.63 ULSHamburg ULSPlano 1627 1515 130 60 5.25 29.11 ULSMilan ULSCorpusChristi 1686 1515 130 60 5.25 31.78 ULSPrague 2031 1515 5.25 31.80 ULSElPaso 2002 130 60 34.16 ULSBittern 2331 130 60 25.15 ULSLeipzig 1253 1635 5.25 28.14 ULSDublin ULSDrake 1583 1635 130 65 5.25 29.90 ULSRome ULSArlington 1774 1635 130 65 5.25 36.86 ULSAntwerp 2760 1645 5.25 36.88 ULSDallas 2761 130 65 20.79 ULSMonteCarlo 799 1810** 130 72** 5.25 25.00 ULS25mm 1216 1810** 5.25 28.96 ULSCurlew 1610 130 72** 29.01 ULSMahakam 1677 1810** 130 5.25 *Internationalweightwhenapplicable,ASTMequivalentstypically1-2%lighterduetoaluminumfillfactor †Stockholm2L;Stockholm3L=1368kg/km ‡effectiveforbothcorereelsandconductorreels **1780mm(70inches)allowablefor3monthsstorageorless SteelReelsarerecommended,meetingDIN46395orNEMAWC26,exceptfordrumdiametersabove WoodenReelsshallnotbeusedforoutdoorstoragelongerthan3months WoodenReelsshouldmeetDIN46395orNEMAWC26Class3,exceptfordrumdiametersabove Spacersmaybeusedprovidedthefollowingcriteriaaremet: Spacermustmaintainauniformroundnessandbefreeofbumpsorangles Itisnotrequiredforthespacertobeaffixedorattachedtothereelhubprovidedtheconductorisattachedtothereelasnormal Materialmustbeofsuitablestrengthtowithstandtheloadoftheconductorwithoutbeingcrushedordeforming Loadbearingcapabilitymustbesustainedacrosstheentirewindingsurfacefromflangetoflange Materialshallbeweatherresistantsuchthatitcanbestoredoutsideinrain,snoworiceconditionswithoutdegradation North America Reel Europe Spool or Bobbin Transverse Flange Drum or Hub Arbor Flange Transverse Hub, Drum, or Barrel Boss Size Convention: flange x transverse x drum dia. Size Convention: flange x hub dia. x transverse ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 4 – Reel Handling and Storage WI-750-073 Rev A REVISION HISTORY REV. CHANGE REQUEST # DATE A 121515-1 15 Dec 2015 ©2016 CTC Global- For use with ACCC® Conductor only Page 9 of 9 ACCC® Conductor Installation Guidelines Chapter 5 – Site Considerations & Set-ups WI-750-074 Rev A Page 1 of 9 Chapter 5 – Site Considerations and Set-ups – Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................2 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. SITECONSIDERATIONS......................................................................................................................2 5.1. Setupareas....................................................................................................................................................2 5.2. WirePullPlan................................................................................................................................................4 6. SET-UPS............................................................................................................................................4 6.1. PayoutReel/TensionerSet-up.....................................................................................................................4 6.2. TensionerFeedSheave..................................................................................................................................5 6.3. FirstStructureSheaveSet-up........................................................................................................................6 6.4. RestrictedAreaAlternatives..........................................................................................................................7 6.5. Back-to-BackReelPulls.................................................................................................................................7 7. TENINSTALLATIONDON’TS..............................................................................................................8 7.1. DON’TOVER-BEND!.......................................................................................................................................8 7.2. ONETensionerDON'T...................................................................................................................................8 7.3. TWOPayoutReelDON'TS.............................................................................................................................8 7.4. THREEHandlingandEquipmentDON'TS......................................................................................................8 7.5. TWOPulling/StringingDON’TS....................................................................................................................8 7.6. ONETerminationDON’T...............................................................................................................................8 1. PURPOSE 1.1. This is Chapter 5 of the ACCC® Conductor Installation Guidelines, covering installation site considerations and set-ups. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, the nine chapters comprise the entire Installation Guidelines: 1.1.1. 1.1.2. 1.1.3. 1.1.4. 1.1.5. 1.1.6. 1.1.7. 1.1.8. 1.1.9. Chapter 1 — Chapter 2 — Chapter 3 — Chapter 4 — Chapter 5 — Chapter 6 — Chapter 7 — Chapter 8 — Chapter 9 — General Installation Guidelines Safety Training Reel Handling and Storage Site Considerations and Set-ups Required Equipment Stringing / Pulling Sagging, Terminations, and Suspending Maintenance and Repair 1.2. The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, recommendations and requirements necessary to safely and successfully install the ACCC® composite-core bare overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to ® ©2016CTCGlobal-ForusewithACCC Conductoronly ACCC® Conductor Installation Guidelines Chapter 5 – Site Considerations & Set-ups WI-750-074 Rev A Page 2 of 9 serve as a more intensive training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. 2. SCOPE 2.1. These guidelines apply to equipment and techniques required to successfully install all sizes of ACCC® conductor. 2.2. These guidelines include additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. 3. DEFINITIONS 3.1. ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. 4. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors. 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalents. 4.3. The remaining Chapters of the Installation Guidelines 5. SITE CONSIDERATIONS 5.1. Setup areas 5.1.1. Setup areas, where conductor reel handling equipment will be placed, must allow for access for the delivery, unloading and handling of new reels of conductor, and for the loading and handling of take-up reels. Additional detail regarding storage and handling of conductor reels is found in Chapter 4. 5.1.2. Setup areas must allow for access by and proper placement of payout reel stands and tensioners. The tensioner should be positioned at least three (3) times the height of the first structure back from the first structure. The payout reel must be at least 50’ (15 meters) away from the tensioner. See 6.1. ® ©2016CTCGlobal-ForusewithACCC Conductoronly ACCC® Conductor Installation Guidelines Chapter 5 – Site Considerations & Set-ups WI-750-074 Rev A Page 3 of 9 5.1.3. With proper use of sheaves, the tensioner and / or payout reel equipment may be offset to avoid obstacles or take advantage of better setup areas. 5.1.4. Tensioners and payout reel stands must be prevented from shifting or movement during use. In some soil conditions this can be done with screw anchors or dug-in “dead man” anchor. In some cases, concrete weighting may be used. Often, large trucks or heavy equipment is used for anchoring. 5.1.5. 5.1.6. For bundled conductor projects, conductor bundles should be pulled simultaneously. Allow for extra sets of payout reels, tensioners, and pullers at setup areas. Additional detail regarding bundled conductor considerations is found in Chapter 8. Clearance distances from existing electric power lines shall be respected and maintained: Voltage Minimum Clearance Minimum Clearance (nominal, kV, alternating current) Distance (feet) Distance (meters) up to 50 10 3 over 50 to 200 15 5 over 200 to 350 20 6.5 over 350 to 500 25 8 over 500 to 750 35 11 over 750 to 1,000 45 14 over 1,000 * * *(asestablishedbytheutilityowner/operatororregisteredprofessionalengineerwhoisa qualifiedpersonwithrespecttoelectricalpowertransmissionanddistribution). Note:Thevaluethatfollows"to"isuptoandincludesthatvalue.Forexample,over50to200 meansuptoandincluding200kV. Note:ThistablefromOSHA1906.1408 ® ©2016CTCGlobal-ForusewithACCC Conductoronly ACCC® Conductor Installation Guidelines Chapter 5 – Site Considerations & Set-ups WI-750-074 Rev A Page 4 of 9 5.1.7. Live lines nearby can induce voltage and current into the conductor, especially parallel live lines, and this is common when re-conductoring. ALWAYS follow recommended grounding procedures. 5.2. Wire Pull Plan 5.2.1. A project will benefit from a detailed plan for the series of pulls to install the conductor. A detailed wire pull plan can even order the correct amount of conductor on each reel. 5.2.2. The pulling plan should consider available setup areas, length of pulls, and should include planning of where conductor terminations and splices will be done, whether on the ground (consider ground conditions) or in the air (consider equipment and personnel access). 5.2.3. The pulling plan must consider clearance distances from existing electric power lines, see table above. 5.2.4. The pulling plan should be available before the project start and should be reviewed with the ACCC® Field Representative. 6. SET-UPS 6.1. Payout Reel / Tensioner Set-up 6.1.1. Minimum Required Distance between Tensioner and First Structure: The tensioner must be placed three times the height of the first structure back from the structure. X 3X 6.1.2. The payout reel must be positioned so that it will rotate in the same direction as the tensioner bullwheels. The payout reel must always feed the tensioner from the top. 6.1.3. Minimum Required Distance between Reel and Tensioner: 15 meters! Loosening of the stranding that often occurs between the reel and the bullwheels of the tensioner is caused to a great extent by coil memory in the conductor. As the conductor is unwound from the reel and straightens out, the outer strands become loose, a condition that is particularly noticeable in a large diameter conductor and can be best observed at the point at which it leaves the reel. As the conductor ® ©2016CTCGlobal-ForusewithACCC Conductoronly ACCC® Conductor Installation Guidelines Chapter 5 – Site Considerations & Set-ups WI-750-074 Rev A Page 5 of 9 enters the bullwheel groove, the pressure of contact tends to push the loose outer strands back toward the reel where the looseness accumulates, leading to the condition commonly known as birdcage. If this condition is not controlled, the strands can become damaged to the extent that the damaged length of conductor must be removed. This problem can be remedied by allowing enough distance between the reel and tensioner to permit the strand looseness to distribute along the intervening length of conductor and simultaneously maintaining enough back tension on the reel to stretch the core and inner strands to sufficiently tighten the outer strands. 15m 6.2. Tensioner Feed Sheave 6.2.1. ALWAYS install a minimum working diameter sheave between the payout reel and the tensioner. Position the sheave to guide the conductor into the CENTER of the tensioner fairlead. The purpose of the feed sheave is to prevent the conductor from bending sharply at any of the tensioner fairlead rollers, under any conditions. ® ©2016CTCGlobal-ForusewithACCC Conductoronly ACCC® Conductor Installation Guidelines Chapter 5 – Site Considerations & Set-ups WI-750-074 Rev A Page 6 of 9 6.2.2. The tensioner Feed Sheave shall be the same or greater diameter as the first and last structure sheaves. X X ✓ 6.2.3. The Tensioner Feed Sheave may also be used, if properly positioned and mounted, to facilitate alignment differences between payout reel, tensioner, and first structure. 6.3. First Structure Sheave Set-up 6.3.1. The first structure sheave groove must always be free to align exactly with the plane of the conductor path, or the conductor will ride up out of the bottom of the sheave groove which can cause birdcage or damage the aluminum strands. 6.3.2. Pulling tension tends to naturally produce this alignment. However, when the angle is large, the pulling tension may be too low to produce sufficient alignment. In this case, use a rope and hoist to create the correct vertical angle of the sheave such that the conductor will ride in the bottom of the sheave groove. X ✓ ® ©2016CTCGlobal-ForusewithACCC Conductoronly ACCC® Conductor Installation Guidelines Chapter 5 – Site Considerations & Set-ups WI-750-074 Rev A Page 7 of 9 6.3.3. Assure that contact between the sheave and the structure itself does not restrict the alignment between the sheave groove and conductor path. X 6.4. Restricted Area Alternatives 6.4.1. The purpose of the 3:1 rule (paragraph 6.1.1) is to keep the angle of the conductor over the first sheave under about 20° and to provide sufficient length for the conductor to absorb the opening of strands that tends to occur when any helical wound conductor passes over a sheave under tension. When set-up areas are restricted and the 3:1 rule cannot be achieved, the alternatives are, in order of preference: 6.4.2. Use a larger sheave at the first structure. 6.4.3. Use a tandem sheave block at the first structure. 6.4.4. Reduce the height of the first structure sheave. 6.4.5. Move the set-up area for tensioner / payout reel to the other direction side and pull that reel in from the other direction. 6.4.6. Skip that set-up area: pull back-to-back reels instead (usually last choice). 6.4.7. The choice of alternatives is best made by experienced personnel based on site conditions. In all cases, watch for strand opening at the tensioner and each sheave. If opening is observed, reduce stringing tension if possible. 6.5. Back-to-Back Reel Pulls 6.5.1. Reels of ACCC® conductor may be pulled back-to-back for a variety of reasons including to avoid difficult setup areas. Two reels may be pulled back to back and up to three reels if the site conditions don’t allow proper access. As a guideline, pulls should not be more than 20 spans. 6.5.2. Back-to-Back Pulls must always be joined by double-socks (wire mesh grips), with bugs. Splices must be installed after the conductor is in place. ACCC® splices must never be allowed to run through sheaves. ® ©2016CTCGlobal-ForusewithACCC Conductoronly ACCC® Conductor Installation Guidelines Chapter 5 – Site Considerations & Set-ups WI-750-074 Rev A Page 8 of 9 7. TEN INSTALLATION DON’TS 7.1. DON’T OVER-BEND! 7.1.1. Don’t allow the conductor to contact surfaces that present sharp angles or small diameters. 7.2. ONE Tensioner DON'T 7.2.1. Don’t let ACCC® run hard on the end roller of the fairlead. Always use an interim sheave to feed the conductor into the middle of the tensioner fairlead opening. A multiple-roller “banana” fairlead is highly recommended. 7.3. TWO Payout Reel DON'TS 7.3.1. Don’t allow the conductor to bounce or jump up and down between the payout reel and the tensioner. When the conductor is jumping or bouncing, the core can be damaged. 7.3.2. Don’t use a payout reel with insufficient brakes. Poorly maintained or undersized brakes will cause jumping and bouncing of the conductor between the payout reel and the tensioner. The payout reel brakes should allow the tensioner to draw new conductor from the reel smoothly and evenly. 7.4. THREE Handling and Equipment DON'TS 7.4.1. Don’t use grips that aren’t designed for installing ACCC®. Use Klein “Chicago” long jaw grips or equal, designed for the size conductor being installed. Never use pocketbook grips! 7.4.2. Don't allow the conductor tail or the deadend to fall or droop unsupported while handling the conductor. If the tail is not controlled, it will damage the core at the back of the grip. 7.4.3. Don’t hoist the conductor in any manner which causes a sharp bend in the conductor. 7.5. TWO Pulling / Stringing DON’TS 7.5.1. Don’t install any ACCC® with under-diameter sheaves on the first and last structure or any angles that are over 30 degrees. 7.5.2. Don't pull in conductor using old conductor if it is rusty. Don’t use old conductor with splices or broken strands for pulling. Always cut splices and any damaged areas out and replace with Kellum grips before using old conductor for pulling. When in doubt, pull in a pilot line using the old conductor and pull in ACCC® using the pilot line. Always use a pilot line for long spans and river crossings. 7.6. ONE Termination DON’T 7.6.1. Don’t allow a sharp bend where the conductor exits the termination hardware. Hoisting conductor or deadend without paying attention to this area can damage the core at that point. ® ©2016CTCGlobal-ForusewithACCC Conductoronly REVISION HISTORY REV. CHANGE REQUEST # DATE A 121515-1 15 Dec 2015 ® ©2016CTCGlobal-ForusewithACCC Conductoronly ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 1 of 18 Chapter 6 – Required Tools & Equipment – Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................2 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. REQUIREDTOOLS&EQUIPMENT......................................................................................................2 5.1. Tools&EquipmentChecklists.......................................................................................................................2 5.2. SafetyEquipment..........................................................................................................................................2 5.3. ReelHandling................................................................................................................................................3 5.4. PayoutReelStand.........................................................................................................................................3 5.5. Tensioner.......................................................................................................................................................4 5.6. TensionerFairlead.........................................................................................................................................5 5.7. CoreRetainer(Bug).......................................................................................................................................6 5.8. ConductorGrips,Clamps,andSocks.............................................................................................................6 5.9. Blocks(SheavesorTravelers)........................................................................................................................7 5.10. HoistingEquipment.......................................................................................................................................8 5.11. Puller.............................................................................................................................................................9 5.12. BucketTruck(ifavailable).............................................................................................................................9 5.13. StingerTruck(ifavailable).............................................................................................................................9 5.14. Swivels.........................................................................................................................................................10 5.15. TerminatingandSplicing.............................................................................................................................10 6. TENINSTALLATIONDON’TS............................................................................................................13 6.1. DON’TOVER-BEND!.....................................................................................................................................13 6.2. ONETensionerDON'T.................................................................................................................................13 6.3. TWOPayoutReelDON'TS...........................................................................................................................13 6.4. THREEHandlingandEquipmentDON'TS....................................................................................................13 6.5. TWOPulling/StringingDON’TS..................................................................................................................13 6.6. ONETerminationDON’T.............................................................................................................................13 AppendixA—EquipmentChecklist...........................................................................................................14 AppendixB—RecommendedSheaveDiameters......................................................................................15 AppendixC—CompressionDies...............................................................................................................17 1. PURPOSE 1.1. This is Chapter 6 of the ACCC® Conductor Installation Guidelines, covering required tools and equipment. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, the nine chapters comprise the entire Installation Guidelines: 1.1.1. 1.1.2. 1.1.3. 1.1.4. 1.1.5. 1.1.6. 1.1.7. Chapter 1 — Chapter 2 — Chapter 3 — Chapter 4 — Chapter 5 — Chapter 6 — Chapter 7 — General Installation Guidelines Safety Training Reel Handling and Storage Site Considerations and Set-ups Required Equipment Stringing / Pulling ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 1.1.8. 1.1.9. Rev A Page 2 of 18 Chapter 8 — Terminations, Sagging, and Suspending Chapter 9 — Maintenance and Repair 1.2. The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, recommendations and requirements necessary to safely and successfully install the ACCC® composite-core bare overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to serve as a more intensive training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. 2. SCOPE 2.1. These guidelines apply to specific equipment and techniques required to successfully install all sizes of ACCC® conductor. 2.2. These guidelines include additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. 3. DEFINITIONS 3.1. ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. 4. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors. 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalent. 4.3. The remaining Chapters of the Installation Guidelines 5. REQUIRED TOOLS & EQUIPMENT 5.1. Tools & Equipment Checklists 5.1.1. The Tools & Equipment described herein and listed in Appendix A are generic for all sizes of ACCC® Conductors. 5.1.2. Major equipment (tensioners, payout reel stands, pullers) and a variety of minor equipment (sheaves, grips, swivels, presses, dies, etc.) are specific to conductor size (diameter). CTC can produce a size-specific checklist upon request. Send your request, with the desired ACCC® Conductor size, to: Fieldservice@ctcglobal.com 5.2. Safety Equipment 5.2.1. Personal Safety Equipment: Hard hats, safety shoes, eye and ear protection, work gloves, rubber gloves, high visibility clothing, long sleeves, long pants, and safety harness with lanyard should be used as appropriate by personnel working around ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 5.2.2. Rev A Page 3 of 18 Grounding Safety Equipment: Hot sticks, voltage tester, ground cables with appropriate clamps, driven or screw type ground rods, grounding mats if needed, rubberized blankets if needed, equal potential area warning tape, conductor working zone boundary flags, all may be needed and should be used, but are outside the scope of this document. 5.3. Reel Handling 5.3.1. Spreader Bar 5.3.2. Nylon Slings 5.4. Payout Reel Stand 5.4.1. Brakes. The function of the payout reel stand is to feed new conductor to the tensioner UNDER CONTROLLED TENSION so the conductor feeds smoothly and evenly into the tensioner. The brakes effect this tension and must be maintained in excellent operating condition. Many reel stands are equipped with disc brakes. These are often undersized and poorly maintained. Hydraulic brakes are preferred to be used for ACCC® installation, preferably synchronized with the tensioner. NEVER use timbers, boards, poles or other make-shift devices for brakes! 5.4.2. Mandrel / Arbor Sizes 5.4.2.1. ACCC® is shipped on heavy duty reels appropriate to support and protect the conductor for its storage and transport mode(s). The reels, depending on conductor size, will typically have one of the following arbor (bore) sizes. Complete reel specifications are found in the Appendix of Chapter 4. Small Large 5.4.2.2. 5.4.3. ASTM (inches) 3.25 5.25 International (mm) 100 or 125 140 or 200 or 250 Bushings must be used, if needed, to adjust the payout reel mandrel size up to the arbor size so that the reel rotates evenly about it’s axis. Wooden Reel Stands are equipped with a mandrel that supports the weight of the reel and arms that clamp onto the wooden reel flanges and effect the rotational control of the reel. Wooden reel stands should NOT be used with metal reels unless the wooden reel stand is adapted to hold the metal reels so that good brake control is achieved. Ideally, metal reel stands should be used for metal reels and wooden reel stands should be used for wooden reels. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 4 of 18 5.4.4. Metal Reel Stands are equipped with a mandrel that supports the weight of the reel and arm(s) with drive pins that fit into matching holes in reel flanges and effect the rotational control of the reel. Wooden reels can be used with metal reel stands as long as there is a hole in the side of the reel to anchor the wooden reel with the pin that controls the reel. 5.4.5. Whether stands are designed for metal or wooden reels, rotational control is typically provided by either disc brakes or hydraulic motor. Hydraulic motor braking is strongly preferred for ACCC® installation. If disc brakes are used, the brakes must be in excellent condition and fully capable of quickly stopping a full reel rotating at payout speed. 5.5. Tensioner 5.5.1. Tensioner bull wheels must be a minimum of 40 times the diameter of the conductor, measured at the bottom of the grooves of the bull wheel. For any ACCC® conductor utilizing a ULS composite core, the tensioner bull wheel diameter shall be a minimum of 70 inches (1778 mm). 5.5.2. Only multi-groove tensioners and a minimum of four grooves should be used. The number of grooves in the bullwheel shall be sufficient to prevent the outer layer of wires from slipping over the lower layers and to maintain good tension control. 5.5.3. Tensioner bull wheel groove depth should be minimum .55 times conductor diameter to help control strand opening. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 5 of 18 5.6. Tensioner Fairlead 5.6.1. Poor tension control of the conductor feeding the tensioner will cause the conductor to bounce on the rollers of the tensioner fairlead. This will damage the conductor core. Poor tension control at the fairlead is always caused by poor control of the brake on the payout reel stand, due either to poor condition or under capacity brake, or brake operation error. This has been the most common installation error in the history of ACCC®. It is critical to a) maintain good control of payout reel braking and b) correctly set-up the tensioner fairlead. 5.6.2. A curved, multi-roller (banana) fairlead on the input side of the tensioner is highly recommended for ACCC®. Pictured below is Tesmec/Condux, fairlead part number AYU077. 5.6.3. ALWAYS install a minimum working diameter sheave between the payout reel and the tensioner. Position the sheave to guide the conductor into the CENTER of the tensioner fairlead. The purpose of the feed sheave is to prevent the conductor from bending sharply at any of the tensioner fairlead rollers, under any conditions. X X ✓ ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 6 of 18 5.7. Core Retainer (Bug) 5.7.1. ACCC® conductor is constructed with a smooth composite core surrounded by one or more layers of aluminum strands. The core retainer (bug) prevents the core from slipping back inside during conductor installation so that the core is accessible for termination procedures. The bug is temporary, used only during handling and pulling/stringing. 5.7.2. Bugs are ACCC® specific and supplied by CTC. Bugs may be re-used but should not be used indefinitely. Do not reuse a bug when the nut does not screw into the body easily or if the inside collet appears worn or damaged. 5.7.3. Bug Installation / Removal Tools 5.7.3.1. 5.7.4. Hammer Core punch (included with bug) 5.7.4.1. Fine-Tooth Hack Saw 5.7.4.2. Steel Wire Brush 5.7.4.3. 15” Crescent Wrench (2) 5.8. Conductor Grips, Clamps, and Socks 5.8.1. Grips and Clamps – Must be long jaw, lever type, rated for the loads as determined by the conductor size and the project pulling and sagging tensions. Klein brand Chicago® style (1628 series) grips are recommended. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 7 of 18 5.8.2. Clamps should be inspected for rough surfaces and rough edges which may scratch or gouge the soft aluminum surface strands of ACCC®. Rough edges or surfaces must be corrected with fine tooth file or sandpaper. 5.8.3. Wire Mesh Grips or “Socks” – must be correctly sized, and kept in good condition, free of rust or other contamination. Hubbell brand Kellems® K-Type Pulling Grips or Arrow Heart K-type Heavy Duty Pulling Grips are recommended. 5.8.4. Banding Tool 5.8.5. Consumables 5.8.5.1. Electrical Tape 5.8.5.2. Banding 5.9. Blocks (Sheaves or Travelers) 5.9.1. Grooves should be inspected before use to avoid surface defects which may damage the fully annealed aluminum of ACCC®. Grooves should be lined with material (neoprene or urethane) which will help avoid marking the surface of the conductor. 5.9.2. See Minimum Sheave Size Chart, Appendix B ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 8 of 18 5.10. Hoisting Equipment 5.10.1. A Capstan Hoist will provide a smooth hoisting alternative to manual methods which can damage the ACCC® conductor core. Ensure that the hoist rating exceeds the loads. 5.10.2. Chain Hoist. Ensure that the hoist rating exceeds the loads. 5.10.3. Hoist Hooks, Rigging. ACCC® conductor can be damaged by using point-contact hoisting equipment. Forces must be spread using wide hooks or nylon slings. Slings should be spread to provide for wide contact with the conductor. X ✓ ©2016 CTC Global- For use with ACCC® Conductor only ✓ ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 9 of 18 5.11. Puller 5.11.1. Ensure that the rating exceeds the loads. 5.12. Bucket Truck (if available) 5.12.1. Personnel lifts, platforms, or buckets greatly enhance safety and efficiency 5.12.2. Should be insulated and designed for electrical work. 5.13. Stinger Truck (if available) 5.13.1. A stinger truck is a boom crane mounted on a flatbed truck equipped with outboard stabilizers. It is used for equipment handling and can be equipped with a personnel bucket, if equal potential ground is assured. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 10 of 18 5.14. Swivels 5.14.1. Pulling swivels must be in good condition, rotate freely, and be rated for the pulling tensions. 5.15. Terminating and Splicing 5.15.1. Termination Hand Tools 5.15.1.1. Ratchet Cutter or Cable Cutter – for rough cuts only! Never use a ratchet cutter or cable cutter for final cut. 5.15.1.2. Cable Trimmer – cable trimmers must be kept sharp and in good mechanical condition. Cable trimmers with (correctly selected) cut depth control bushings are preferred. A cable trimmer that cuts too deeply can nick or score the conductor core, which will result in failure. 5.15.1.3. Fine Tooth Hacksaw. In all cases, the final cut of ACCC® core MUST be made with a fine tooth hacksaw! ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 11 of 18 5.15.1.4. Metal File – Smooth tooth, to remove flashing from deadend or splice crimping process. 5.15.1.5. Crescent Wrenches (2) – approximately 15” or 380mm length. 5.15.2. Presses and Dies 5.15.2.1. Presses must be of sufficient capacity to properly crimp the termination hardware. Double-acting pumps and presses will dramatically improve the termination process time. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 12 of 18 5.15.2.2. Dies - the use of proper press dies, sized and configured correctly for both the press and the hardware, is critical for successful termination hardware installation. See the Compression Die Chart, Appendix B. 5.15.3. Caulking Gun for application of AFL filler compound for Alcoa® Hardware 5.15.4. Consumables • • • • • • Hacksaw Blades – Fine Tooth Deadend Body and Splice Body Lubricant or Soap Sandpaper - 220 Grit Electrical Tape Black Permanent Felt Tip Markers HT Penetrox™ or Alnox® Electrical Joint Compound or equivalent oxidation inhibitor. MUST be high temperature (200° C) oxidation inhibitor. o Repels water o Improves thermal transfer (helps joints run cooler) o Inhibits oxidation and corrosion • OR AFL (brand) Filler Compound (AFC) or equivalent o Filler Compound protects the compressed steel barrels from corrosion. Compressing removes galvanizing from the forging. The filler compound acts as a barrier to moisture. o Filler Compound contains aluminum particles, which clean the strands (removing oxides) while compressing. Compressing forces the compounds within the strands. o Filler Compound blocks moisture, which can wick up through the strands. Compressing forces the compound throughout the conductor strands. o Filler Compound aids in the holding strength of the accessory. o Note: Main reason for accessory failure is inadequate amount of filler compound in the accessory. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 13 of 18 6. TEN INSTALLATION DON’TS 6.1. DON’T OVER-BEND! 6.1.1. Don’t allow the conductor to contact surfaces that present sharp angles or small diameters. 6.2. ONE Tensioner DON'T 6.2.1. Don’t let ACCC® run hard on the end roller of the fairlead. Always use an interim sheave to feed the conductor into the middle of the tensioner fairlead opening. A multiple-roller “banana” fairlead is highly recommended. 6.3. TWO Payout Reel DON'TS 6.3.1. Don’t allow the conductor to bounce or jump up and down between the payout reel and the tensioner. When the conductor is jumping or bouncing, the core can be damaged. 6.3.2. Don’t use a payout reel with insufficient brakes. Poorly maintained or undersized brakes will cause jumping and bouncing of the conductor between the payout reel and the tensioner. The payout reel brakes should allow the tensioner to draw new conductor from the reel smoothly and evenly. 6.4. THREE Handling and Equipment DON'TS 6.4.1. Don’t use grips that aren’t designed for installing ACCC®. Use Klein “Chicago” long jaw grips or equal, designed for the size conductor being installed. Never use pocketbook grips! 6.4.2. Don't allow the conductor tail or the deadend to fall or droop unsupported while handling the conductor. If the tail is not controlled, it will damage the core at the back of the grip. 6.4.3. Don’t hoist the conductor in any manner which causes a sharp bend in the conductor. 6.5. TWO Pulling / Stringing DON’TS 6.5.1. Don’t install any ACCC® with under-diameter sheaves on the first and last structure or any angles that are over 30 degrees. 6.5.2. Don't pull in conductor using old conductor if it is rusty. Don’t use old conductor with splices or broken strands for pulling. Always cut splices and any damaged areas out and replace with Kellum grips before using old conductor for pulling. When in doubt, pull in a pilot line using the old conductor and pull in ACCC® using the pilot line. Always use a pilot line for long spans and river crossings. 6.6. ONE Termination DON’T 6.6.1. Don’t allow a sharp bend where the conductor exits the termination hardware. Hoisting conductor or deadend without paying attention to this area can damage the core at that point. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 14 of 18 Appendix A — Equipment Checklist ¨ PersonnelSafetyEquipment ¨ ReelHoistingSpreaderBar ¨ ReelHoistingSlings ¨ PayoutReelStand ¨ CorrectSizeMandrel and/orBushings ¨ BrakesGoodCondition ¨ Tensioner ¨ TensionerFairlead– Banana ¨ Bugs ¨ HammerandPunch ¨ FineToothHackSaw ¨ LargeAdjustableWrenches ¨ SteelWireBrush ¨ ChicagoGrips ¨ KellumSocks ¨ BandingTool,Banding, Hammer ¨ Tape ¨ Blocks,Sheaves ¨ TandemSheaves ¨ GoodNylonRope ¨ CapstanHoist ¨ ChainHoist ¨ WideConductorHoistHooks ¨ NylonStraps,ShortSlings ¨ Puller ¨ Radios ¨ BucketTruck ¨ StingerTruck ¨ Swivels ¨ TerminationHandTools ¨ CableTrimmer ¨ CableCutter ¨ RatchetCutter ¨ FineToothHacksaw ¨ FineToothFile ¨ LargeAdjustable Wrenches ¨ DiePress ¨ Dies ¨ CaulkingGun ¨ Consumables ¨ HacksawBlades–FineTooth ¨ DeadendBodyandSplice BodyLubricantorSoap ¨ Sandpaper-220Grit ¨ ElectricalTape ¨ ElectricalJointCompound ¨ BlackPermanentFeltTip Markers ¨ FillerCompound ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 15 of 18 Appendix B — Recommended Sheave Diameters F-750-071RevA RecommendedCommonSheaveandTensionerWheelSizesforACCC® InternationalName ASTMName Helsinki Copenhagen Reykjavik Glasgow Pasadena Linnet Oriole Casablanca MonteCarlo Lisbon Oslo Amsterdam Brussels Stockholm Waco Laredo Hawk Irving Dove Grosbeak Lubbock Galveston Warsaw Dublin Hamburg Kolkata Milan Rome Vienna Budapest Prague Mumbai Drake Plano Curlew CorpusChristi Arlington Cardinal FortWorth ElPaso Munich London Paris Bordeaux Antwerp Madrid Berlin Beaumont SanAntonio Bittern Dallas Lapwing Houston Falcon Chukar Athens Bluebird ULSOslo ULSStockholm ULSHamburg ULSMilan ULSPrague ULSIrving ULSLubbock ULSGalveston ULSPlano ULSCorpusChristi ULSElPaso ULSBittern ULSLeipzig ULSDublin ULSRome ULSAntwerp ULSDrake ULSArlington ULSDallas ULSMonteCarlo ULS25mm ULSCurlew ULSMahakam Diameter-Inches(millimeters) FirstandLast Intermediate Structure Structures* 0.616(15.646) 24(610) 22(560) 0.72(18.288) 24(610) 22(560) 0.741(18.821) 24(610) 22(560) 0.818(19.533) 24(610) 22(560) 0.77(19.558) 24(610) 22(560) 0.807(20.498) 24(610) 22(560) 0.818(20.777) 35(890) 35(890) 0.0858(21.793) 24(610) 22(560) 0.882(22.403) 35(890) 28(710) 0.927(23.546) 28(710) 24(610) 0.99(25.146) 28(710) 24(610) 1.039(26.391) 35(890) 28(710) 1.04(26.416) 28(710) 28(710) 1.09(27.686) 28(710) 28(710) 1.091(27.711) 35(890) 28(710) 1.108(28.143) 35(890) 28(710) 1.127(28.626) 35(890) 28(710) 1.127(28.626) 35(890) 28(710) 1.14(28.956) 42(1067) 42(1067) 1.146(29.108) 35(890) 28(710) 1.177(29.896) 35(890) 28(710) 1.198(30.429) 35(890) 28(710) 1.24(31.496) 35(890) 28(710) 1.251(31.775) 35(890) 28(710) 1.251(31.775) 35(890) 28(710) 1.252(31.801) 28(710) 28(710) 1.293(32.842) 35(890) 28(710) 1.294(32.868) 35(890) 28(710) 1.315(33.401) 35(890) 28(710) 1.345(34.163) 35(890) 28(710) 1.408(35.76) 42(1067) 35(890) 1.451(36.855) 35(890) 28(710) 1.452(36.881) 35(890) 28(710) 1.504(38.202) 35(890) 28(710) 1.504(38.202) 42(1067) 42(1067) 1.506(38.252) 42(1067) 42(1067) 1.545(39.243) 42(1067) 42(1067) 1.604(40.742) 42(1067) 35(890) 1.762(44.75) 42(1067) 42(1067) 1.762(44.755) 42(1067) 42(1067) ULSConductors(T=TandemSheaveBlock) 0.818(20.79) T42(1067) 42(1067) 0.882(22.4) T42(1067) 42(1067) 0.984(25) T42(1067) 42(1067) 0.99(25.15) T42(1067) 42(1067) 1.039(26.4) T42(1067) 42(1067) 1.04(26.42) T42(1067) 42(1067) 1.09(27.69) T42(1067) 42(1067) 1.108(28.14) T42(1067) 42(1067) 1.127(28.63) T42(1067) 42(1067) 1.14(28.96) T42(1067) 42(1067) 1.142(29.01) T42(1067) 42(1067) 1.146(29.11) T42(1067) 42(1067) 1.177(29.9) T42(1067) 42(1067) 1.251(31.78) T42(1067) 42(1067) 1.252(31.8) T42(1067) 42(1067) 1.345(34.16) T42(1067) 42(1067) 1.451(36.86) T42(1067) 42(1067) 1.452(36.88) T42(1067) 42(1067) Conductor DirectionChange 20°-30° 24(610) 24(610) 24(610) 24(610) 24(610) 24(610) 35(890) 24(610) 35(890) 28(710) 28(710) 35(890) 28(710) 28(710) 35(890) 35(890) 35(890) 35(890) 42(1067) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 42(1067) 35(890) 35(890) 35(890) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) TensionerBullWheels:60"(1500mm)forallACCC®conductorsexceptULS;70"(1800mm)forACCC®ULSconductors. *IntermediateStructures:forlongspans,orwherelargebellysareanticipated(ex.:makingspliceonthegroundandthenlet-up),thenuseFirstandLastStructuresheavesize. Page1 ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 16 of 18 Appendix B — Minimum Sheave Diameters F-750-071RevA ACCC®SheaveWheels page2-SheaveWheelSelectionGuidelines MinimumSheaveWheelSizes Diameter(mm) Core Conductor 5.97 15.65 5.97 18.29 7.11 18.82 7.11 19.53 7.11 20.50 7.11 21.79 7.75 19.56 7.75 23.55 8.13 25.15 8.76 22.40 8.76 26.39 8.76 26.42 8.76 27.69 8.76 27.71 8.76 28.63 8.76 29.11 8.76 30.43 8.76 31.78 8.76 31.80 8.76 34.16 9.53 28.14 9.53 28.63 9.53 29.90 9.53 31.50 9.53 31.78 9.53 32.84 9.53 32.87 9.78 33.40 9.78 36.86 9.78 36.88 9.78 38.20 10.03 40.74 10.54 20.78 10.54 28.96 10.54 35.76 10.54 38.20 10.54 38.25 10.54 39.24 10.54 44.75 10.54 44.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 9.53 9.53 9.53 9.78 9.78 10.54 10.54 10.54 10.54 22.40 26.40 26.42 27.69 29.11 28.63 31.78 31.80 34.16 25.15 28.14 29.90 36.86 36.88 20.79 25.00 28.96 29.01 InternationalName ASTMName Helsinki Copenhagen Reykjavik Glasgow Casablanca Lisbon Pasadena Linnet Oriole Amsterdam Brussels Oslo Stockholm Laredo Hawk Waco Dove Grosbeak Irving Lubbock Galveston Warsaw Hamburg Milan Vienna Prague Paris Dublin Kolkata Rome Budapest Mumbai Munich London Antwerp Madrid Plano CorpusChristi Cardinal ElPaso Bittern Drake Arlington FortWorth Beaumont SanAntonio Dallas Lapwing Chukar MonteCarlo Curlew Bordeaux Berlin Houston Falcon Athens ULSOslo ULSStockholm ULSMilan ULSHamburg ULSPrague Bluebird ULSConductors ULSIrving ULSLubbock ULSGalveston ULSCorpusChristi ULSPlano ULSElPaso ULSBittern ULSLeipzig ULSDublin ULSRome ULSAntwerp ULSMonteCarlo ULS25mm ULSDrake ULSArlington ULSDallas ULSMonteCarlo ULSCurlew ULSMahakam SheaveMinimumWorkingDiameter Millimeters Inches 500 19.69 495 19.49 595 23.43 595 23.43 595 23.43 595 23.43 645 25.39 645 25.39 640 25.20 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 795 31.30 795 31.30 795 31.30 795 31.30 795 31.30 795 31.30 795 31.30 800 31.50 800 31.50 800 31.50 800 31.50 800 31.50 805 31.69 875 34.45 875 34.45 875 34.45 870 34.25 870 34.25 870 34.25 870 34.25 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1090 1090 1000 1000 1200 1000 1000 1200 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37 42.91 42.91 39.37 39.37 47.24 39.37 39.37 47.24 Reference Size Working Diameter Groove Radius4 1) SheavesarerequiredtorespectMinimumWorking Diameterforfirstandlaststructure,andstructures wherestringingpathisotherthanstructureto structure.(Forex:whereaspliceismadeonthe groundandthenletup.) 2) SheavesarerecommendedtorespectMinimumWorking Diameterforinterimstructures.Smallerinterim sheavesizesmaybeconsideredwherestringing b)forspansgreaterthan1.2timestherulingspan tensionsarehighenoughtoalwayskeeptheangle overthesheavelessthan20degrees. 3) Tandemsheavesarerequired: a)wherestringingangleexceeds20degrees c)forchangesofdirection>30° d)forULSConductors,firstandlaststructures 4) GrooveRadiusmustbeatleast0.55times conductordiameter.Neoprene,Nylon,orUrethane linedgroovesarerecommended. Page2 ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A Page 17 of 18 Appendix C — Compression Dies F‐750‐069‐B Compression Die Chart for Deadends, Splices, and Burndy Terminal Pads Diameter (mm) Core 5.97 7.11 7.75 8.13 8.76 9.53 9.78 10.03 10.54 International Conductor Name 15.65 Helsinki 18.29 Copenhagen 18.82 Reykjavik 20.50 Casablanca 21.79 Lisbon 19.53 Glasgow 23.55 Amsterdam 25.15 Brussels 22.40 Oslo 26.39 Stockholm 27.69 Warsaw 28.63 Hamburg 29.11 Milan 30.43 Vienna 31.78 Prague 34.16 Paris 25.15 ULS Leipzig 28.14 Dublin 28.63 Kolkata 29.90 Rome 31.50 Budapest 31.78 Mumbai 32.84 Munich 33.40 London 36.86 Antwerp 38.20 Madrid 40.74 20.78 Monte Carlo 25.00 ULS 25mm 28.96 29.01 ULS Mahakam 38.20 Berlin 39.24 44.76 Athens ASTM Name Pasadena Linnet Oriole Laredo Hawk Waco Dove Grosbeak Irving Lubbock Galveston Plano Corpus Christi Cardinal El Paso Bittern Drake Arlington Fort Worth Beaumont San Antonio Dallas Lapwing Chukar Curlew Houston Falcon Bluebird Burndy Terminal Pads W/O Inner Sleeve W/ Inner Sleeve Deadends & Splices Dervaux PLP L717W L720W L722W L724W L722W L725W 46mm L727W 43mm 50.5mm L725W L725W L727W L728W L724W L725W L735W 56.5mm 56.5mm L7351W L735W ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 56.5mm 56.5mm ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ L727W L728W L7351W L735W ‐‐‐‐‐ ‐‐‐‐‐ L724W L727W L727W L735W ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ L735W ‐‐‐‐‐ ‐‐‐‐‐ Deadends and Splices Forjasul (Tramontina) ‐‐‐‐‐ 40mm (+3/‐0.2) ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 40mm (+3/‐0.2) 40.8mm (+3/‐0.2) ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 52.2mm (+3/‐1) ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ to be determined Dervaux, PLP, and Forjasul Die Sizes are mm between hex flats ©2016 CTC Global- For use with ACCC® Conductor only AFL Core AFL Sleeve 10014SH 10024AH 10014SH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 10030AH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 10018SH 10040AH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 10018SH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 10040AH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ACCC® Conductor Installation Guidelines Chapter 6 – Required Tools and Equipment WI-750-075 Rev A REVISION HISTORY REV. CHANGE REQUEST # A 121515-1 ©2016 CTC Global- For use with ACCC® Conductor only DATE Page 18 of 18 ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 1 of 16 Chapter 7 – Stringing / Pulling – Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................2 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. PAYOUTREELSET-UP........................................................................................................................2 6. INSTALLPULLINGSOCK(GRIP)..........................................................................................................3 7. PAYOUTREELOPERATION................................................................................................................3 8. TENSIONERFEEDSHEAVE.................................................................................................................5 9. TENSIONEROPERATION....................................................................................................................5 9.5. SynchronizedTensioner-PayoutReelStandOperation.................................................................................6 10. INSTALLCORERETAINER(BUG).........................................................................................................6 11. CONNECTTOPULLINGLINE..............................................................................................................7 12. HOISTINGTOFIRSTSTRUCTURE........................................................................................................7 13. STRUCTURESHEAVES........................................................................................................................8 13.3. SharpPullingAngles......................................................................................................................................8 14. PULLER.............................................................................................................................................9 15. FOLLOWTHEFLAG............................................................................................................................9 16. BIRDCAGE.........................................................................................................................................9 17. BACK-TO-BACKPULLING.................................................................................................................10 18. LONGSPANS,RIVERCROSSINGS,ROADCROSSINGS.......................................................................10 19. MANUALSTRINGING......................................................................................................................11 20. REWINDING....................................................................................................................................12 21. SPECIALCONDITIONS......................................................................................................................12 21.1. Weather.......................................................................................................................................................12 21.2. LiveLines.....................................................................................................................................................12 22. TENINSTALLATIONDON’TS............................................................................................................13 22.1. DON’TOVER-BEND!.....................................................................................................................................13 22.2. ONETensionerDON'T.................................................................................................................................13 22.3. TWOPayoutReelDON'TS...........................................................................................................................13 22.4. THREEHandlingandEquipmentDON'TS....................................................................................................13 22.5. TWOPulling/StringingDON’TS..................................................................................................................13 22.6. ONETerminationDON’T.............................................................................................................................13 AppendixA—RecommendedSheaveDiameters......................................................................................14 1. PURPOSE 1.1. This is Chapter 7 of the ACCC® Conductor Installation Guidelines, covering ACCC® conductor stringing or pulling. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, the chapters comprise the entire Installation Guidelines: 1.1.1. Chapter 1 — General Installation Guidelines 1.1.2. Chapter 2 — Safety 1.1.3. Chapter 3 — Training 1.1.4. Chapter 4 — Reel Handling and Storage 1.1.5. Chapter 5 — Site Considerations and Set-ups ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A 1.2. 2. 3. 5. 1.1.6. Chapter 6 — Required Equipment 1.1.7. Chapter 7 — Stringing / Pulling 1.1.8. Chapter 8 — Terminations, Sagging, and Suspending 1.1.9. Chapter 9 — Maintenance and Repair The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, considerations, and requirements necessary to safely and successfully install the ACCC® composite-core bare overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to serve as a more intensive training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. SCOPE 2.1. These guidelines apply to equipment and techniques required to successfully install all sizes of ACCC® conductor. 2.2. These guidelines include additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. DEFINITIONS 3.1. 4. Page 2 of 16 ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors. 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalents. 4.3. The remaining Chapters of the Installation Guidelines PAYOUT REEL SET-UP 5.1. Load the reel of new ACCC® conductor into the payout reel stand. Refer to reel handling guidelines in Chapter 3. The reel mandrel, or axle, must be sized to match the arbor holes in the reel. Use arbor spacers (bushings) if needed. The reel must turn smoothly on the mandrel to avoid jumping or bouncing of the conductor during payout. 5.2. Verify that the Payout Reel Brake is of sufficient capacity and is in good working order. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 6. 7. Rev A Page 3 of 16 INSTALL PULLING SOCK (GRIP) 6.1. Wire Mesh Grips or “Socks” are used to pull in conductor. They must be correctly sized and kept in good condition, free of rust or other contamination. Hubbell brand Kellems® K-Type Pulling Grips or Arrow Heart brand K-type Heavy Duty Pulling Grips are recommended. Pulling socks must be equipped with guarding on the wires at the eye end to prevent the conductor end strands or bug from damaging the sock wires. Do not use grips with broken or rusted wires. 6.2. Wipe the conductor free of oil, dirt or other contamination for at least the length of the sock. 6.3. The full length of the wire mesh must be fully installed on conductor or the sock will be damaged and could fail. 6.4. ALWAYS anchor the far end of the wire mesh sock. Preferred anchor method is bands using the banding tool and appropriate banding (see Chapter 6). Alternatively, two screwtype radiator hose clamps may be used. NEVER anchor the sock anywhere except on the END furthest from the eye. 6.5. Tape the anchor. It is CRITICAL that the anchoring installed above is completely covered by plastic electrical tape to protect the lining on the blocks and assure smooth travel through blocks. 6.6. Tape between the eye and end of the sock, to prevent the bug from coming out of the sock and to protect the lining on the blocks and assure smooth travel through blocks. 6.7. When removing the sock after use, all of the protective tape MUST also be removed from the sock. The tape will retain moisture and cause rusting which will weaken the sock and may cause it to fail. 6.8. There may be occasions when it is necessary or desirable to pull long spans with a deadend attached. Never pull a deadend through a sheave. Always be very careful of creating sharp angles in the conductor where it exits the deadend. PAYOUT REEL OPERATION 7.1. Payout Reel Brake. The tensioner pulls conductor from the reel and the payout reel brakes resist the pulling. The payout reel braking system must be in good operating condition. It is NEVER acceptable to use or operate a payout reel that does not have a working brake system. 7.2. Correct operation of the payout reel brake is critical to maintain even, light tension between the reel and the tensioner. Brake tension should be set just high enough to prevent over-run when the pulling stops. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 7.3. 7.4. Page 4 of 16 Rev A If the brake tension is too high, the conductor may start to open (birdcage) or the conductor may begin to wedge into the underlying layers on the reel. Either condition can damage the conductor. As the reel empties, the moment arm available to overcome the brake drag is reduced, and therefore the tension rises. This may cause the conductor to wedge into the underlying layers on the reel which may damage the conductor core. Hydraulic braking systems automatically avoid this condition. For other braking systems, it is important to periodically adjust the brake as the conductor is payed off. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 8. Rev A Page 5 of 16 TENSIONER FEED SHEAVE 8.1. ALWAYS install a minimum working diameter sheave between the payout reel and the tensioner. Position the sheave to guide the conductor into the CENTER of the tensioner fairlead. The purpose of the feed sheave is to prevent the conductor from bending sharply at any of the tensioner fairlead rollers, under any conditions. X X ✓ 9. TENSIONER OPERATION 9.1. Threading the Tensioner 9.1.1. The minimum bend diameter of the conductor must be respected at all times during the threading of the tensioner. 9.1.2. ACCC® conductors always have a right-hand direction of lay for the outer wires, bullwheels should be arranged so that when facing in the direction of pull, the conductor will enter the bullwheel on the left and pull off from the right side. This arrangement is necessary to avoid loosening of the outer layer of strands as the conductor passes over the bullwheels. The tensioner must be fed using the right hand lay method, meaning the conductor coming off of the payout reel goes into the left side of the tensioner, and the conductor going to the first structure will be coming out of the right side of the tensioner. 9.1.3. Incorrect tensioner feed (in = right, out = left) will cause loosening of the strands on the tensioner and could result in bird-caging. 9.1.4. The material and finish of the grooves must be maintained properly so it will not damage the surface of the conductor. Elastomer lined grooves are recommended ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 6 of 16 for all conductors, but are particularly important for non-specular finished conductors. When a semi-conducting elastomer is used for lining the grooves, it must not be relied upon for grounding. 9.1.5. The tensioner should be threaded with conductor using a rope around the bull wheels. Install a “bug” on the conductor, insert the conductor into the sock and anchor the sock with two bands or a radiator hose clamp. Tape the eye of the sock to eliminate any sharp edges and attach the sock to an approved swivel. The swivel is then attached to the rope. The rope is then pull the conductor through the tensioner bull wheels. See Section 9 and 10 below. 9.2. As the puller advances conductor through the pull, it is the tensioner which controls the tension on the pull and the sag in the spans of the pull. 9.3. Constant, open, priority communication between puller operation and tensioner operation is required to coordinate stops, starts, and speed of the pull. 9.4. Tensioner and puller operation is critical and must be accomplished by experienced operators, familiar with all of the controls of the tensioner and the puller. 9.5. Synchronized Tensioner-Payout Reel Stand Operation. 9.5.1. Tensioner / Payout Reel Stand equipment may be equipped with hydraulic synchronization. Synchronized operation is strongly preferred for ACCC® installation. In this case, the tensioner operator also operates the braking functions of the payout reel and is responsible for smooth operation of the payout reel as above. It is critical that the tensioner operator takes out the belly of the conductor between the reel and the tensioner before the pull begins. 10. INSTALL CORE RETAINER (BUG) 10.1. ACCC® conductor is constructed with a smooth composite core surrounded by one or more layers of aluminum strands. The core retainer (bug) prevents the core from slipping back inside during conductor installation so that the core is accessible for termination procedures. The bug is temporary, used only during handling and pulling/stringing. 10.2. Core Retainers are ACCC® specific and supplied by CTC. Bugs may be re-used but should not be used indefinitely. Do not reuse a bug when the nut does not screw into the body easily or if the inside collet appears worn or damaged. 10.3. Detailed, step by step instructions for installing and removing bugs are included in CTC training and an instruction sheet that ships with each new bug. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 7 of 16 11. CONNECT TO PULLING LINE 11.1. Old conductor may be used to pull in new ACCC® ONLY if the old conductor is entirely free of splices and damage. Splices or old conductor damage can damage sheave surfaces, which can then transfer that damage to the surface of the new ACCC®. Splices or damage can hang up in sheaves, creating violent bouncing which can damage the new conductor or drop the conductor onto the ground 11.2. If the old conductor has ANY splices, or if the core is rusted or has broken strands, then a pulling (pilot wire) line must be used. 11.3. Connect the pulling line to the new ACCC® pulling sock with a swivel of sufficient capacity and in good working order. 12. HOISTING TO FIRST STRUCTURE 12.1. If old conductor is to be used for pulling, the new ACCC® must be hoisted to connect to it it. After threading the tensioner, hoisting to the first structure must be done smoothly using a capstan hoist or similar motorized device, tractor or truck. Manual lifting, jerking, and bouncing of the conductor must be avoided. If a pilot line is used to pull in the new conductor, the pilot line can pulled to the tensioner and the pilot line attached to the conductor at that point. Hoisting to the first structure must not put bending load on the conductor at the grip. Use ropes to avoid sharp angles. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 8 of 16 12.2. Never use manually operated block and tackle or rope hoists to lift ACCC® conductor. The bouncing of the conductor created by the start/stop and uneven speed of such equipment can expose the conductor to damage. Use a capstan hoist, tractor or truck to pull the conductor up smoothly. X ✓ 13. STRUCTURE SHEAVES 13.1. Sheaves sizes are always required to respect minimum working diameters, see Appendix B. 13.2. Smaller interim sheave sizes, per Appendix B, may be considered where stringing sags are relatively low and stringing path is structure-to-structure only. When in doubt, use a larger diameter sheave. 13.3. Sharp Pulling Angles 13.3.1. Where there is a severe uplift, down pull, or angles over 20 degrees on the ACCC® conductor, it is critical to use tandem sheaves. For angles over 30 degrees, please contact CTC Global service department (Fieldservice@ctcglobal.com) for review and recommendations. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 9 of 16 13.4. The sheaves in a tandem set must have their axles rigidly mounted together such that the sheave flanges are close and the sheaves relatively fixed. 13.5. Tandem sheaves must be mounted to allow free movement of the tandem set in the plane of the pull. If the sheaves are not allowed to pivot as a pair, they cannot share the load and halve the angle as intended. 14. PULLER 14.1. If there is room, use the same 3:1 ratio for distance from the tower to the height of the tower, as was used for the tensioner set-up. In this case ACCC® may be pulled through the last sheave if it is minimum working diameter or greater. 14.2. An alternate set-up is to use “square rigging” wherein a sheave is used at the arm where the conductor is being pulled, another where the arm is attached, another at the square of the structure and one at the bottom of the structure. Do not pull ACCC® conductor through any of these sheaves. 15. FOLLOW THE FLAG 15.1. Attach an easily visible flag near the swivel between the pulling line and the leading end of the ACCC®. 15.2. An individual in reliable radio contact with the puller/tensioner operator should keep this flag in sight at all times during pulling, watching especially for hang-ups at blocks and paying special attention at angles. 16. BIRDCAGE 16.1. Loosening and opening of the conductor strands, commonly called “birdcage” is not a failure, is difficult to avoid in some special situations, and can usually be corrected. 16.2. There are three causes (or “sources”) of birdcage or strand loosening. In all cases, the loosening normally appears not at the source, but where the strands are constrained near the ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 10 of 16 source. If the nearest constraint is far enough away (about 15m in the case of ACCC®), the strands have room to distribute the displacement and the loosening is not noticeable. 16.3. The first cause is displacement of the aluminum in each strand as a result of compression of the conductor, either in a grip or installation of a compression sleeve – deadends and splices for example. These can usually be avoided by making successive compressions away from the constraint. 16.4. The second cause is also displacement of the aluminum in each strand which can occur if the conductor passes over a sheave with an undersized groove, under tension. Sheave groove radius should be 0.53 to 0.55 times the conductor diameter. 16.5. The third cause occurs if there is keystoning of the top layer of conductor. Compressing a keystoned section also causes displacement of the aluminum strands. Keystone is normally a defect in the stranding of the conductor. 16.6. If loosening occurs, it often takes care of itself when the constraint is removed, allowing the displacement to re-distribute over a longer length of conductor and become unnoticeable. 16.7. The re-distribution can be assisted if necessary, by applying pulling force after the constraint has been removed. Tapping the conductor with a rubber hose can supply vibration which facilitates the re-distribution. 16.8. Never strike the conductor with wood or hammer in an effort to address a bird cage condition. Never attempt to realign strands with screwdriver or other tools. 17. BACK-TO-BACK PULLING 17.1. Also see Back-To-Back Pulling set up considerations in Chapter 5, Section 6.5. 17.2. Core retainers (bugs) must be used at each end of ACCC® conductor for back-to-back pulls. 17.3. Special attention should be paid to the capacity and condition of wire mesh (sock) grips used for back-to-back reel pulls. 17.4. Swivels must be used between reels. Special attention should be paid to the capacity and condition of swivels. 17.5. Splices between reels must be installed only after the conductor has been pulled into position. A splice must never be allowed to pass through a sheave. 18. LONG SPANS, RIVER CROSSINGS, ROAD CROSSINGS 18.1. Long pulls often require higher pulling tensions. Double check equipment load ratings. Use only NEW wire mesh (Kellum) (sock) grips on the ACCC® conductor for long, critical pulls. Use only NEW or new condition swivels and hardware. 18.2. When re-conductoring, a pilot wire must be used to pull the ACCC®. Do not pull ACCC® in with the old wire. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 11 of 16 18.3. Consider the structures at each end of a long pull to be first and last structures when selecting sheave sizes. When tall structures combined with large belly in the conductor during the pull results in angles greater than 20°, always use tandem sheave blocks. When angles greater than 30° are expected, special multiple-sheave blocks may be required; please consult with CTC Service (service@ctcglobal.com). 18.4. Temporary guys or support for towers or arms may be necessary to compensate for the additional weight and tension applied to structures during long pulls. 19. MANUAL STRINGING 19.1. In special situations, especially when re-conductoring, accommodation of powered pulling equipment (pullers and/or tensioners) may not be possible. In these cases, manual stringing of ACCC® may be required. 19.2. Manual stringing situations must be especially careful of dropping or pulling the conductor over obstacles or edges which are of smaller effective diameter than minimum allowable. Fences, rocks, walls, roofs, scaffolding are examples of obstacles which can cause ACCC® conductor damage. When in doubt, and if unavoidable, cover such obstacles with protection that assures the conductor will contact only surfaces that are minimum sheave working diameter or greater. Split liquid storage drums can work well in this situation. 19.3. Rotation of the payout reel must always be controlled, and light tension on the paid-out conductor must always be maintained to prevent loosening of conductor wraps on the reel. If conductor wrap loosening is allowed, and then placed under tension, the conductor could be damaged if the top layer of conductor drops down into the next layer causing it to catch on the next layer down. If loosening of conductor wraps on the reel occurs, it may be corrected by rewinding under light tension – just enough to keep the wraps smooth and even. 19.4. Paid-out conductor must be kept clean until it is hoisted into place. Do not drag or drop the new conductor in dirt or mud. Do not allow the new conductor to lay in dirt or mud. 19.5. Special care must be used when hoisting the conductor to always respect the minimum allowable bending diameter. Pay special attention to placing strain on the conductor where it exits deadends or grips. A capstan winch or equipment which starts, stops, and operates smoothly should be used for hoisting. Manual hoisting can cause bouncing and jerking during the hoist, which can damage the conductor. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 12 of 16 20. REWINDING 20.1. If conditions arise that excess ACCC® needs to be rewound on its reel, the conductor can be rewound either manually or hydraulically and shall have light back tension applied at all times. The conductor MUST NOT be allowed to cross over itself during the rewinding process. When tension is applied to such cross-overs, the core may be damaged. 21.SPECIAL CONDITIONS 21.1. Weather 21.1.1. No special considerations exist for ACCC® conductor installation with respect to any other conductor installation, due to weather conditions. 21.2. Live Lines 21.2.1. No special considerations exist for ACCC® conductor installation with respect to any other conductor installation, when working live. CTC recommends strict adherence to the procedures for working energized lines found in IEEE-516. 21.3. Long Spans, Crossings 21.3.1. It is especially important to respect minimum first and last sheave diameter requirements for long spans. For long spans, use a pilot line (hard line). See paragraph 18. 21.4. Please contact CTC for advice regarding special conditions not covered in the installation guidelines: support@ctcglobal.com ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 13 of 16 22. TEN INSTALLATION DON’TS 22.1. DON’T OVER-BEND! 22.1.1. Don’t allow the conductor to contact surfaces that present sharp angles or small diameters. 22.2. ONE Tensioner DON'T 22.2.1. Don’t let ACCC® run hard on the end roller of the fairlead. Always use an interim sheave to feed the conductor into the middle of the tensioner fairlead opening. A multiple-roller “banana” fairlead is highly recommended. 22.3. TWO Payout Reel DON'TS 22.3.1. Don’t allow the conductor to bounce or jump up and down between the payout reel and the tensioner. When the conductor is jumping or bouncing, the core can be damaged. 22.3.2. Don’t use a payout reel with insufficient brakes. Poorly maintained or undersized brakes will cause jumping and bouncing of the conductor between the payout reel and the tensioner. The payout reel brakes should allow the tensioner to draw new conductor from the reel smoothly and evenly. 22.4. THREE Handling and Equipment DON'TS 22.4.1. Don’t use grips that aren’t designed for installing ACCC®. Use Klein “Chicago” long jaw grips or equal, designed for the size conductor being installed. Never use pocketbook grips! 22.4.2. Don't allow the conductor tail or the deadend to fall or droop unsupported while handling the conductor. If the tail is not controlled, it will damage the core at the back of the grip. 22.4.3. Don’t hoist the conductor in any manner which causes a sharp bend in the conductor. 22.5. TWO Pulling / Stringing DON’TS 22.5.1. Don’t install any ACCC® with under-diameter sheaves on the first and last structure or any angles that are over 30 degrees. 22.5.2. Don't pull in conductor using old conductor if it is rusty. Don’t use old conductor with splices or broken strands for pulling. Instead, pull in a pilot line using the old conductor and pull in ACCC® using the pilot line. Always use a pilot line for long spans and river crossings. 22.6. ONE Termination DON’T 22.6.1. Don’t allow a sharp bend where the conductor exits the termination hardware. Hoisting conductor or deadend without paying attention to this area can damage the core at that point. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A Page 14 of 16 Appendix A — Recommended Sheave Diameters InternationalName ASTMName Helsinki Copenhagen Reykjavik Glasgow Pasadena Linnet Oriole Casablanca MonteCarlo Lisbon Oslo Amsterdam Brussels Stockholm Waco Laredo Hawk Irving Dove Grosbeak Lubbock Galveston Warsaw Dublin Hamburg Kolkata Milan Rome Vienna Budapest Prague Mumbai Drake Plano Curlew CorpusChristi Arlington Cardinal FortWorth ElPaso Munich London Paris Bordeaux Antwerp Madrid Berlin Beaumont SanAntonio Bittern Dallas Lapwing Houston Falcon Chukar Athens Bluebird ULSOslo ULSStockholm ULSHamburg ULSMilan ULSPrague ULSIrving ULSLubbock ULSGalveston ULSPlano ULSCorpusChristi ULSElPaso ULSBittern ULSLeipzig ULSDublin ULSRome ULSAntwerp ULSDrake ULSArlington ULSDallas ULSMonteCarlo ULS25mm ULSCurlew ULSMahakam F-750-071RevA RecommendedCommonSheaveandTensionerWheelSizesforACCC® Diameter-Inches(millimeters) FirstandLast Intermediate DirectionChange Conductor Structure Structures* 20°-30° 0.616(15.646) 24(610) 22(560) 24(610) 0.72(18.288) 24(610) 22(560) 24(610) 0.741(18.821) 24(610) 22(560) 24(610) 0.818(19.533) 24(610) 22(560) 24(610) 0.77(19.558) 24(610) 22(560) 24(610) 0.807(20.498) 24(610) 22(560) 24(610) 0.818(20.777) 35(890) 35(890) 35(890) 0.0858(21.793) 24(610) 22(560) 24(610) 0.882(22.403) 35(890) 28(710) 35(890) 0.927(23.546) 28(710) 0.99(25.146) 28(710) 1.039(26.391) 35(890) 1.04(26.416) 28(710) 1.09(27.686) 28(710) 1.091(27.711) 35(890) 1.108(28.143) 35(890) 1.127(28.626) 35(890) 1.127(28.626) 35(890) 1.14(28.956) 42(1067) 1.146(29.108) 35(890) 1.177(29.896) 35(890) 1.198(30.429) 35(890) 1.24(31.496) 35(890) 1.251(31.775) 35(890) 1.251(31.775) 35(890) 1.252(31.801) 28(710) 1.293(32.842) 35(890) 1.294(32.868) 35(890) 1.315(33.401) 35(890) 1.345(34.163) 35(890) 1.408(35.76) 42(1067) 1.451(36.855) 35(890) 1.452(36.881) 35(890) 1.504(38.202) 35(890) 1.504(38.202) 42(1067) 1.506(38.252) 42(1067) 1.545(39.243) 42(1067) 1.604(40.742) 42(1067) 1.762(44.75) 42(1067) 1.762(44.755) 42(1067) ULSConductors(T=TandemSheaveBlock) 0.818(20.79) T42(1067) 0.882(22.4) T42(1067) 0.984(25) T42(1067) 0.99(25.15) T42(1067) 1.039(26.4) T42(1067) 1.04(26.42) T42(1067) 1.09(27.69) T42(1067) 1.108(28.14) T42(1067) 1.127(28.63) T42(1067) 1.14(28.96) T42(1067) 1.142(29.01) T42(1067) 1.146(29.11) T42(1067) 1.177(29.9) T42(1067) 1.251(31.78) T42(1067) 1.252(31.8) T42(1067) 1.345(34.16) T42(1067) 1.451(36.86) T42(1067) 1.452(36.88) T42(1067) 24(610) 24(610) 28(710) 28(710) 28(710) 28(710) 28(710) 28(710) 28(710) 42(1067) 28(710) 28(710) 28(710) 28(710) 28(710) 28(710) 28(710) 28(710) 28(710) 28(710) 28(710) 35(890) 28(710) 28(710) 28(710) 42(1067) 42(1067) 42(1067) 35(890) 42(1067) 42(1067) 28(710) 28(710) 35(890) 28(710) 28(710) 35(890) 35(890) 35(890) 35(890) 42(1067) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 35(890) 42(1067) 35(890) 35(890) 35(890) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) 42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) T42(1067) TensionerBullWheels:60"(1500mm)forallACCC®conductorsexceptULS;70"(1800mm)forACCC®ULSconductors. *IntermediateStructures:forlongspans,orwherelargebellysareanticipated(ex.:makingspliceonthegroundandthenlet-up),thenuseFirstandLastStructuresheavesize. Page1 ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Page 15 of 16 Appendix A — Minimum Sheave Diameters F-750-071RevA ACCC®SheaveWheels page2-SheaveWheelSelectionGuidelines MinimumSheaveWheelSizes Diameter(mm) Core Conductor 5.97 15.65 5.97 18.29 7.11 18.82 7.11 19.53 7.11 20.50 7.11 21.79 7.75 19.56 7.75 23.55 8.13 25.15 8.76 22.40 8.76 26.39 8.76 26.42 8.76 27.69 8.76 27.71 8.76 28.63 8.76 29.11 8.76 30.43 8.76 31.78 8.76 31.80 8.76 34.16 9.53 28.14 9.53 28.63 9.53 29.90 9.53 31.50 9.53 31.78 9.53 32.84 9.53 32.87 9.78 33.40 9.78 36.86 9.78 36.88 9.78 38.20 10.03 40.74 10.54 20.78 10.54 28.96 10.54 35.76 10.54 38.20 10.54 38.25 10.54 39.24 10.54 44.75 10.54 44.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 9.53 9.53 9.53 9.78 9.78 10.54 10.54 10.54 10.54 22.40 26.40 26.42 27.69 29.11 28.63 31.78 31.80 34.16 25.15 28.14 29.90 36.86 36.88 20.79 25.00 28.96 29.01 InternationalName ASTMName Helsinki Copenhagen Reykjavik Glasgow Casablanca Lisbon Pasadena Linnet Oriole Amsterdam Brussels Oslo Stockholm Laredo Hawk Waco Dove Grosbeak Irving Lubbock Galveston Warsaw Hamburg Milan Vienna Prague Paris Dublin Kolkata Rome Budapest Mumbai Munich London Antwerp Madrid Plano CorpusChristi Cardinal ElPaso Bittern Drake Arlington FortWorth Beaumont SanAntonio Dallas Lapwing Chukar MonteCarlo Curlew Bordeaux Berlin Houston Falcon Athens ULSOslo ULSStockholm ULSMilan ULSHamburg ULSPrague Bluebird ULSConductors ULSIrving ULSLubbock ULSGalveston ULSCorpusChristi ULSPlano ULSElPaso ULSBittern ULSLeipzig ULSDublin ULSRome ULSAntwerp ULSMonteCarlo ULS25mm ULSDrake ULSArlington ULSDallas ULSMonteCarlo ULSCurlew ULSMahakam SheaveMinimumWorkingDiameter Millimeters Inches 500 19.69 495 19.49 595 23.43 595 23.43 595 23.43 595 23.43 645 25.39 645 25.39 640 25.20 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 745 29.33 795 31.30 795 31.30 795 31.30 795 31.30 795 31.30 795 31.30 795 31.30 800 31.50 800 31.50 800 31.50 800 31.50 800 31.50 805 31.69 875 34.45 875 34.45 875 34.45 870 34.25 870 34.25 870 34.25 870 34.25 Reference Size Working Diameter Groove Radius4 1) SheavesarerequiredtorespectMinimumWorking 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1090 1090 1000 1000 1200 1000 1000 1200 Page2 Rev A 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37 39.37 42.91 42.91 39.37 39.37 47.24 39.37 39.37 47.24 Diameterforfirstandlaststructure,andstructures wherestringingpathisotherthanstructureto structure.(Forex:whereaspliceismadeonthe groundandthenletup.) 2) SheavesarerecommendedtorespectMinimumWorking Diameterforinterimstructures.Smallerinterim sheavesizesmaybeconsideredwherestringing b)forspansgreaterthan1.2timestherulingspan tensionsarehighenoughtoalwayskeeptheangle overthesheavelessthan20degrees. 3) Tandemsheavesarerequired: a)wherestringingangleexceeds20degrees c)forchangesofdirection>30° d)forULSConductors,firstandlaststructures 4) GrooveRadiusmustbeatleast0.55times conductordiameter.Neoprene,Nylon,orUrethane linedgroovesarerecommended. ACCC® Conductor Installation Guidelines Chapter 7 – Stringing / Pulling WI-750-076 Rev A REVISION HISTORY REV. CHANGE REQUEST # A 121515-1 DATE Page 16 of 16 ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 1 of 12 Chapter 8 – Sagging, Terminations, and Suspensions– Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................2 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. SAGGING..........................................................................................................................................2 6. INSTALLGRIPS..................................................................................................................................3 6.5. DoubleGrips..................................................................................................................................................4 7. CUTTINGTHECONDUCTOR...............................................................................................................4 8. TERMINATIONS................................................................................................................................5 8.1. Deadending...................................................................................................................................................5 8.3. Splicing..........................................................................................................................................................5 8.6. TerminalPads................................................................................................................................................6 8.7. T-Taps............................................................................................................................................................6 9. SUSPENSIONSandANCILLARYHARDWARE.......................................................................................6 10. BUNDLEDCONDUCTORS...................................................................................................................7 11. TENINSTALLATIONDON’TS..............................................................................................................8 11.1. DON’TOVER-BEND!.......................................................................................................................................8 11.2. TWOTensionerDON'TS.................................................................................................................................8 11.3. TWOPayoutReelDON'TS.............................................................................................................................8 11.4. THREEHandlingandEquipmentDON'TS......................................................................................................8 11.5. TWOPulling/StringingDON’TS....................................................................................................................8 AppendixA—ACCC®DeadendInstallationInstructions..............................................................................9 AppendixB—ACCC®SpliceInstallationInstructions..................................................................................10 AppendixC–CompressionDieChart.........................................................................................................11 1. PURPOSE 1.1. This is Chapter 8 of the ACCC® Conductor Installation Guidelines, covering ACCC® sagging, suspensions, terminations, and ancillary hardware. The chapter also covers bundling. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, the chapters comprise the entire Installation Guidelines: 1.1.1. Chapter 1 — General Installation Guidelines 1.1.2. Chapter 2 — Safety 1.1.3. Chapter 3 — Training 1.1.4. Chapter 4 — Reel Handling and Storage 1.1.5. Chapter 5 — Site Considerations and Set-ups 1.1.6. Chapter 6 — Required Equipment 1.1.7. Chapter 7 — Stringing / Pulling 1.1.8. Chapter 8 — Terminations, Sagging, and Suspending 1.1.9. Chapter 9 — Maintenance and Repair 1.2. The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 2 of 12 recommendations and requirements necessary to safely and successfully install the ACCC® composite-core bare overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to serve as a more intensive training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. 2. SCOPE 2.1. These guidelines apply to equipment and techniques required to successfully install all sizes of ACCC® conductor. 2.2. These guidelines include additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. 3. DEFINITIONS 3.1. ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. 3.2. Initial Sag occurs when new conductor is pulled and clipped in. 3.3. Final Sag occurs when conductor has been energized. 3.4. Ruling Span is the assumed uniform, or average span that best represents the actual spans in any specified section of a line. 4. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors. 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalents. 4.3. IEEE Standard 516™ Guide for Maintenance Methods on Energized Power Lines 4.4. The remaining Chapters of the Installation Guidelines 5. SAGGING 5.1. There is nothing unique about sagging ACCC® versus any other bare conductor. This guideline assumes that the user is familiar with industry standard sagging techniques. 5.2. Any of the four common methods of sagging may be used: line of sight, transit, stopwatch, and dynometer (least preferred). 5.3. It is recommended that conductors not be allowed to hang in the stringing blocks more than 24 hours before being pulled to the specified sag. If this time is exceeded, the cable manufacturer should be consulted to determine if short-term creep correction factors are required. The total time that the conductors are allowed to remain in the stringing blocks before being clipped should never be more than 72 hours. If this time is exceeded, damage ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 3 of 12 may occur to the conductors and/or sheaves. Tension should be kept as low as possible when snubbed-off; the tension should never approach that of the sagging tension value. Keeping the holding tension low and working within the 24-hour window avoids having to rely on short-term creep correction curves for subsequent sagging. These curves become less accurate as time increases. 5.4. Sagging ACCC® is most successful when time (overnight) is allowed for initial creep. If sagging must be done same day, an acceptable alternative is to subtract 5° C (9° F) from ambient temperature in the sagging calculations. 6. INSTALL GRIPS 6.1. Never use wire mesh or “sock” grips for sagging. 6.2. The free end of the conductor MUST be supported during installation of grip and deadend hardware. This may be done with small ropes. 6.3. Grips are heavy and awkward, especially for larger size conductors. The free end of the conductor MUST be controlled to prevent over-bending and possible damage of the core. Good working platforms (hook ladders, bucket trucks, baker boards) should be provided for personnel for these operations, if available. 6.4. The grip should be attached 4-5 meters from the end of the insulator to provide working room to install the deadend hardware. Install a split rubber hose over the conductor just where it leaves the grip to protect the aluminum from the grip attachment and use a small rope to tighten the free end of the conductor to the grip attachment. This rope will help prevent over-bend and possible damage to the conductor during subsequent operations. Protect the conductor where the grip and hoist are attached. Use ropes or other means to tie up the conductor to the hoist and sling to prevent the end of the conductor from falling which could damage the conductor. ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 4 of 12 6.5. Double Grips 6.5.1. In cases where gripping the conductor due to residual stranding oil or other contamination or high tension due to long spans, or high sagging tension, it may be necessary to double grip the conductor. 6.5.2. In these cases, use a short sling (approximately 3 feet or 1 meter) to equalize the pull tension between the two grips. Protect the exposed portions of the conductor between the grips with split rubber hose. 6.5.3. The grips MUST NOT touch when under full load, and they MUST NOT be too far apart or a bird-cage will be created between them. 7. CUTTING THE CONDUCTOR 7.1. Rough cuts of the conductor may be made by any conventional tools or methods such as ratchet cutters or cable cutters. Note that any method other than hacksaw WILL damage the ACCC® core locally to the cut. When a rough cut of the conductor is made, ensure that the tension is relaxed so that a bird cage doesn’t occur as the aluminum will flow towards the grip under tension. 7.2. The final cut of ACCC® core must be done with a fine-tooth hacksaw only. Any other cutting method is unacceptable. 7.3. Cutting of the aluminum strands of ACCC® may be accomplished by either a fine tooth hacksaw or approved conductor stripper with the correct bushing. However, the method used must NEVER nick or scratch the core. To avoid core surface damage, the final separation of the aluminum strands on the bottom layer must be by gentle, repetitive bending fatigue only. 7.4. To ensure proper sagging dimensions, measure all of the linkage attached to the structure including insulators and any linkage required to attach the dead end eye for the ACCC® conductor plus the dead end eye. Mark the conductor with this measurement. After marking the conductor at the appropriate location, cut the conductor towards the structure adding at least 12 inches (305 mm) of extra conductor in addition to the amount marked on the conductor. The initial cut can be made with cable cutters or ratchet cutters. Make the final cut according to the directions in the deadending kit. Final Cut Rough Cut ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 5 of 12 8. TERMINATIONS 8.1. Deadending 8.2. Installing ACCC® deadends is very similar to installing deadends for any common bare overhead conductor with two exceptions: 8.2.1. Conductor, Grip, and Deadend Handling. The weight of the deadend and/or conductor is sufficient to damage the ACCC® core at the point where it exits the grip. The deadend must be supported in-line with the conductor during installation and subsequent handling. Similarly, it is possible to damage the ACCC® core at the point where it exits the deadend if too much bending force or weight is allowed there. 8.2.2. Back Pressing. ACCC® terminations are pressed from the conductor end toward the eye end. The usual method of pressing from the eye toward the conductor can displace the trapezoidal aluminum strands of ACCC® and cause a bird-cage. 8.2.3. Step by step instructions for correct installation of ACCC® deadends are found in ACCC® training programs, in the Appendices here, and are packaged with each deadend hardware kit. 8.3. Splicing 8.4. Installing ACCC® splices is very similar to installing splices for any common bare overhead conductor with two exceptions: 8.4.1. Conductor, Grip, and Splice Handling – same issues as with deadends above. ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 8.4.2. Rev A Page 6 of 12 Pressing Direction. Splices must be pressed from the short side of the conductor span toward the long side of the conductor span. 8.5. Step by step instructions for correct installation of ACCC® splices are found in ACCC® training programs and are packaged with each splice hardware kit. 8.6. Terminal Pads 8.6.1. Installing ACCC® terminal pads is identical to installing terminal pads for any common bare overhead conductor with one exception: ACCC® terminal pads are back-pressed for the same reason as deadends. 8.7. T-Taps 8.7.1. Installing ACCC® T-Taps is identical to installing T-Taps for any common bare overhead conductor with one exception: ACCC® T-Taps must be pressed AWAY from the deadend, for the same reason that deadends are back-pressed. 8.7.2. Avoid placing T-Taps closer than 1meter from a deadend. 9. SUSPENSIONS and ANCILLARY HARDWARE 9.1. Armor rods or protector rods are always required for all suspension and ancillary hardware and must be capable and rated for the higher operating temperatures for which ACCC® is rated. 9.2. ACCC® is a high temperature, low sag (HTLS) conductor. It operates at much higher temperatures than conventional conductors, up to 180° C (350° F). Appropriate high temperature suspension hardware and ancillary hardware is REQUIRED. 9.3. Tandem suspensions and yoke plates must be used where change of direction angles exceed 30 degrees. ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 7 of 12 10.BUNDLED CONDUCTORS 10.1. Considerations for bundled ACCC® conductors are identical with any conventional conductors. When ACCC® is used in bundled applications, all conductors in the bundle should be pulled in together. Synchronized and multiple conductor tensioners and pullers are typically used. Set-up areas must accommodate a set of equipment for each conductor. 10.2. All payout reel tensions should be consistent. 10.3. Multi-sheave blocks must be used (same diameter as would be used for single conductor pulling). Running boards must be used for pulling, but not for alignment at anchors. Always keep running boards (gators) at a constant speed going through travelers. (Do not slow down when the gator gets to the blocks). 10.4. For sagging, horizontal spacing of sheaves should match the final horizontal spacing. 10.5. Never apply tension above the interim (final before energizing) sag tension. Over-tension or over-sag will cause the conductors’ sag behavior to differ which will result in uneven bundle sagging. ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 8 of 12 11.TEN INSTALLATION DON’TS 11.1. DON’T OVER-BEND! 11.1.1. Don’t allow the conductor to contact surfaces that present sharp angles or small diameters. 11.2. TWO Tensioner DON'TS 11.2.1. Don’t use a conventional tensioner fairlead for ACCC® conductor. A multipleroller fairlead with large effective radius MUST be used. 11.2.2. Don’t let ACCC® run hard on the end roller of the fairlead. Use an interim sheave to raise the conductor if needed. 11.3. TWO Payout Reel DON'TS 11.3.1. Don’t allow the conductor to bounce or jump up and down between the payout reel and the tensioner. When the conductor is jumping or bouncing, the core can be damaged. 11.3.2. Don’t use a payout reel with insufficient brakes. Poorly maintained or undersized brakes will cause jumping and bouncing of the conductor between the payout reel and the tensioner. The payout reel brakes should allow the tensioner to draw new conductor from the reel smoothly and evenly. 11.4. THREE Handling and Equipment DON'TS 11.4.1. Don’t use grips that aren’t designed for installing ACCC®. Use Klein “Chicago” long jaw grips or equal, designed for the size conductor being installed. Never use pocketbook grips! 11.4.2. Don't allow the conductor tail or the deadend to fall or droop unsupported while handling the conductor. If the tail is not controlled, it will damage the core at the back of the grip. 11.4.3. Don’t hoist the conductor in any manner which causes a sharp bend in the conductor. 11.5. TWO Pulling / Stringing DON’TS 11.5.1. Don’t install any ACCC® with under-diameter sheaves on the first and last structure or any angles that are over 30 degrees. 11.5.2. Don't pull in conductor using old conductor if it is rusty. Don’t use old conductor with splices or broken strands for pulling. Instead, pull in a pilot line using the old conductor and pull in ACCC® using the pilot line. Always use a pilot line for long spans and river crossings. ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 9 of 12 Appendix A — ACCC® Deadend Installation Instructions 1. With the tapered end of the inner sleeve facing the end of the ® ACCC conductor slide it down the conductor about 3.5 ft (1.1 mm). 2. Slide the outer sleeve over the ACCC conductor with the pad 3.5 ft (1.1 mm) from the cut end of the conductor (See Fig 1). 3. Tape aluminum strands measured at the length of the collet housing plus 2 inches (50mm) from conductor end. 4. Expose the solid core by cutting aluminum strands at the mark one layer at a time. 5. CAUTION: Do not cut or nick the core. Ensure that the core end is cut with a fine tooth hacksaw. Failure to follow these instructions could result in a poor connection. 6. Wipe outer surface of the core clean and free from oil. Then rub the core lightly with 220 mesh sanding paper (provided) until it becomes white and re-wipe the core with a clean cloth. 7. Slide the collet housing, wrench flats toward the aluminum strands onto the core (See Fig. 2). 8. Install the collet (See Fig. 2), narrow end towards the housing, onto the core leaving 0.25 in (6mm) of the core exposed from the wide end of the collet (See Fig. 3). 9. Install the eye and hand tighten before fully tightening with a wrench (85.0 ft-lbs or 115 N-m torque required). Ensure that approximately 3.0 in (76 mm) of core is exposed between the aluminum and the collet after tightening (See Fig. 4). The 3 inches occurs when you measure housing plus 2 inches (50 mm). When starting to tighten the dead end eye into the housing, ensure that the approximate ¼” still extends out of the collet. ® 10. Wire brush the aluminum strands that will be covered with outer sleeve and liberally apply oxidation inhibitor (supplied) along the length of the brushed aluminum strands, then slide the aluminum outer sleeve towards the eye up to the painted/machined mark (See Fig. 4). 11. Liberally apply oxidation inhibitor to the outer diameter of the aluminum inner sleeve and slide the inner sleeve into the outer sleeve. 12. Crimp/compress starting at opposite end from the eye using correct die size (Appendix C) and slightly overlapping the crimps in the direction of the eye until the crimps/compressions meet the mark on the aluminum outer tube (See Fig. 5). 13. Crimp/compress in the area marked on the aluminum outer tube to secure the eye. Ensure washer is flush with pad. Do not over crimp to damage washer. This should require 1 to 3 crimps to secure (See Fig. 5). Note: Appropriate sized dies for each conductor size must be utilized to complete crimps/compressions – see Appendix C ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 10 of 12 Appendix B — ACCC® Splice Installation Instructions ® 1. With the tapered end of the inner sleeve facing the end of the ACCC conductor, slide the inner sleeves down the conductor about 3.5 feet (1.1 m). (See Fig 1) 2. Slide the outer sleeve over the side furthest from the structure (Side B) with the end of the tube 2.0 ft (0.61m) from the cut end of the conductor (See Fig 1). 3. Tape aluminum strands at the following distances from the conductor end: a. Side A – measure the length of the collet housing plus 2 inches (50mm) b. Side B – measure the length of the collet housing only 4. Expose the solid core by cutting aluminum strands at the mark one layer at a time (See Fig 1). CAUTION: Do not cut or nick the core. Ensure that the core end is uncrushed; if necessary square off with a hacksaw. Failure to follow these instructions could result in a poor connection. 5. Wipe outer surface of the core clean and free from oil. Then rub the core lightly with 220 mesh sanding paper (provided) until it becomes white and re-wipe the core with a clean cloth. 6. Slide the collet housing, wrench flats toward the aluminum strands onto the core (See Fig. 2). 7. Install the collet (See Fig. 2), narrow end towards the housing, onto the core leaving 0.25 in (6mm) of the core exposed from the wide end of the collet (See Fig. 3). Repeat for opposite side. 8. Install the coupling on Side A (closet to structure) and the collet retainer on the opposite Side B (furthest from structure) and tighten by hand; complete the tightening with wrenches (85 ft-lbs or 115 N-m torque required). 9. For Side A ensure that approximately 3.0 in (76 mm) core and the narrow end of the collet are visible after tightening (See Fig. 4). 10. For Side B ensure that approximately 1.0 in (25 mm) core and the narrow end of the collet are visible after tightening (See Fig. 4). 11. Bring the two sides together and hand-tighten the swivel end of coupling to the collet retainer. Complete tightening with wrenches (85 ft-lbs or 115 N-m torque required) (See Fig. 5). 12. Mark the conductor, on Side A, 17.0 in (432 mm) from the end of the aluminum strands using tape or a felt tip marker. This mark will be the location of the inner sleeve nose end. NOTE: If using tape you must remove before crimping (See Fig. 5). 13. Wire brush the aluminum strands that will be covered with outer sleeve and liberally apply oxidation inhibitor (supplied) along the length of the brushed aluminum strands. 14. Slide the outer sleeve over the coupling assembly. 15. Side A – Liberally apply oxidation inhibitor to the outer diameter of the inner sleeve, slide the inner sleeve, nose end, into the outer sleeve up to the 17 in (432 mm) marked spot on the conductor. Make sure the outer tube bump is up against the inner sleeve. Move outer sleeve as necessary. 16. Once the outer sleeve is in place, crimp/compress (Appendix C) the outer sleeve beginning form Side A, starting crimp point, in an inwards direction using the correct die size and overlapping the crimps approximately 1/8 – 1/4 in (3 – 6 mm) ( to the end of the crimp zone on Side A (See Fig. 6). 17. Crimp the center of the outer tube to the coupling assembly with one crimp (See Fig. 6). 18. Side B – Liberally apply oxidation inhibitor to the outer diameter of the inner sleeve; slide the inner sleeve into the outer sleeve. Make sure the outer tube bump is up against the inner sleeve. (See Fig. 6) 19. Crimp Side B beginning form the inside mark (compressing outwards) up until the ending crimp point. Ensure the inner sleeve is up against the bump of the outer tube before making the first crimp. Overlap the crimps approximately 1/8 – 1/4 in (3 – 6 mm) to the end of the crimp zone on Side A (See Fig. 6). Note: Appropriately sized dies for each conductor size must be utilized to complete crimps/compressions – see Appendix C ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A Page 11 of 12 Appendix C – Compression Die Chart F‐750‐069‐B Compression Die Chart for Deadends, Splices, and Burndy Terminal Pads Diameter (mm) Core 5.97 7.11 7.75 8.13 8.76 9.53 9.78 10.03 10.54 International Conductor Name 15.65 Helsinki 18.29 Copenhagen 18.82 Reykjavik 20.50 Casablanca 21.79 Lisbon 19.53 Glasgow 23.55 Amsterdam 25.15 Brussels 22.40 Oslo 26.39 Stockholm 27.69 Warsaw 28.63 Hamburg 29.11 Milan 30.43 Vienna 31.78 Prague 34.16 Paris 25.15 ULS Leipzig 28.14 Dublin 28.63 Kolkata 29.90 Rome 31.50 Budapest 31.78 Mumbai 32.84 Munich 33.40 London 36.86 Antwerp 38.20 Madrid 40.74 20.78 Monte Carlo 25.00 ULS 25mm 28.96 29.01 ULS Mahakam 38.20 Berlin 39.24 44.76 Athens ASTM Name Pasadena Linnet Oriole Laredo Hawk Waco Dove Grosbeak Irving Lubbock Galveston Plano Corpus Christi Cardinal El Paso Bittern Drake Arlington Fort Worth Beaumont San Antonio Dallas Lapwing Chukar Curlew Houston Falcon Bluebird Burndy Terminal Pads W/O Inner Sleeve W/ Inner Sleeve Deadends & Splices Dervaux PLP L717W L720W L722W L724W L722W L725W 46mm L727W 43mm 50.5mm L725W L725W L727W L728W L724W L725W L735W 56.5mm 56.5mm L7351W L735W ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 56.5mm 56.5mm ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ L727W L728W L7351W L735W ‐‐‐‐‐ ‐‐‐‐‐ L724W L727W L727W L735W ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ L735W ‐‐‐‐‐ ‐‐‐‐‐ Deadends and Splices Forjasul (Tramontina) ‐‐‐‐‐ 40mm (+3/‐0.2) ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 40mm (+3/‐0.2) 40.8mm (+3/‐0.2) ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 52.2mm (+3/‐1) ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ to be determined Dervaux, PLP, and Forjasul Die Sizes are mm between hex flats AFL Core AFL Sleeve 10014SH 10024AH 10014SH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 10030AH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 10018SH 10040AH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 10018SH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ 10040AH ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ‐‐‐‐‐ ACCC® Conductor Installation Guidelines Chapter 8 – Sagging, Terminations, Suspensions, Ancillary Hardware WI-750-077 Rev A REVISION HISTORY REV. CHANGE REQUEST # A 121515-1 DATE Page 12 of 12 ACCC® Conductor Installation Guidelines Chapter 9 – Maintenance and Repair WI-750-019 Rev D Page 1 of 4 Chapter 9 – Maintenance and Repair – Table of Contents 1. PURPOSE..........................................................................................................................................1 2. SCOPE...............................................................................................................................................2 3. DEFINITIONS.....................................................................................................................................2 4. ASSOCIATEDDOCUMENTS................................................................................................................2 5. MAINTENANCE.................................................................................................................................2 5.2. ConductorTrolleys........................................................................................................................................2 6. REPAIRMETHODS.............................................................................................................................2 7. REPAIRGUIDELINES..........................................................................................................................4 1. PURPOSE 1.1. This is Chapter 9 of the ACCC® Conductor Installation Guidelines, covering ACCC® maintenance and repair. The Guidelines consist of nine chapters, each written to stand alone to address specific installation subjects. Taken together, nine ten chapters comprise the entire Installation Guidelines: 1.1.1. 1.1.2. 1.1.3. 1.1.4. 1.1.5. 1.1.6. 1.1.7. 1.1.8. 1.1.9. Chapter 1 — Chapter 2 — Chapter 3 — Chapter 4 — Chapter 5 — Chapter 6 — Chapter 7 — Chapter 8 — Chapter 9 — General Installation Guidelines Safety Training Reel Handling and Storage Site Considerations and Set-ups Required Equipment Stringing / Pulling Sagging, Terminations, and Suspensions Maintenance & Repair 1.2. The purpose of the Guidelines is to provide experienced transmission engineers, project managers and planners, field inspectors, utility personnel and linemen with guidelines, recommendations and requirements necessary to safely and successfully install the ACCC® composite-core bare overhead conductor and accessories. This document is an overview and guideline covering what to do but not necessarily how to do it. It is not intended to serve as a more intensive training manual or act as a substitute for proper training, required personnel skill sets, or industry experience. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 9 – Maintenance and Repair WI-750-019 Rev D Page 2 of 4 2. SCOPE 2.1. These guidelines apply to equipment and techniques required to successfully maintain and repair all sizes of ACCC® conductor. 2.2. These guidelines include additional equipment and techniques that are required for UltraLow Sag (ULS) ACCC® conductor sizes. 3. DEFINITIONS 3.1. ACCC® is a registered trademark of CTC Global, and is defined as Aluminum Conductor Composite Core, stranded with Aluminum 1350-0 (where 0 stands for fully annealed) or Aluminum 1350-0 Z-wire trapezoidal wire. 4. ASSOCIATED DOCUMENTS 4.1. IEEE Standard 524™ Guide to the Installation of Overhead Transmission Line Conductors. 4.2. OSHA Electric Power Generation, Transmission, and Distribution Standards 1910.269 and 1926.950 or ISO 29.240.20 or local country equivalents. 4.3. The remaining Chapters of the Installation Guidelines 5. MAINTENANCE 5.1. Once installed, maintenance of ACCC® conductor consists simply of periodic inspection for environmental damage, structure degradation, broken insulators, vegetation encroachment, or other issues, and then repair of such damage, exactly as any other bare overhead conductor. 5.2. Conductor Trolleys 5.2.1. There are no special requirements for the use of conductor trolleys on undamaged conductor. If aluminum strand damage is observed and the condition of the core is suspected to have been compromised, then a conductor trolley must not be used for access and an alternative source of access should be used to allow further detailed investigation. 6. REPAIR METHODS 6.1. All conductor damage should be inspected carefully and an accurate count of the number of damaged strands taken in order to correctly identify the most appropriate repair. 6.2. If aluminum strand damage is observed and the condition of the core is suspected to have been compromised, then a conductor trolley must not be used for access. Alternative method of access should be used to allow further detailed investigation. 6.3. There are three methods of repair techniques for repairing damage to ACCC® conductor that are available: 6.3.1. Pre-formed Helical Repair Sleeve (96” armor rod) ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 9 – Maintenance and Repair WI-750-019 6.3.2. Compression Repair Sleeve 6.3.3. Mid-span Splice (CTC Global Splice) Rev D Page 3 of 4 6.4. Conventional methods are used to repair ACCC® conductor strands. Aluminum Repair Methods: NumberofDamaged HelicalPreform Compression AluminumStrands Repair(96”) Repair 1OuterLayerStrands X X 2OuterLayerStrands -- X 3+OuterLayerStrands -- -- AnyInnerLayerStrands -- -- MidSpanJoint -- -- X X 6.5. Example One: Aluminum strand damage only. Use appropriate repair method from table above. 6.6. Example Two: Conductor is damaged and core is damaged in a single area. Remove damaged core area and install a mid-span splice. 6.7. Example Three: Conductor is damaged and core is damaged over a larger area than can be replaced by a single splice. Using splices, replace 50’ to 100’ (15 to 30 m) of conductor per each phase that is damaged. Keep splices at least 50’ (15 m) away from any structure. 6.8. Example Four: Conductor is damaged mid-span and also at one structure at the armor rod suspension. Using splices, replace all damaged conductor, keeping splices at least 50’ (15 m) from any structure. 6.9. Example Five: Conductor is damaged and core is damaged in a dead-end span. Add a section of conductor with a splice and add a new dead-end. ©2016 CTC Global- For use with ACCC® Conductor only ACCC® Conductor Installation Guidelines Chapter 9 – Maintenance and Repair WI-750-019 Rev D Page 4 of 4 7. REPAIR GUIDELINES 7.1. Never install a splice any closer than 50’ (15 m) from a structure. 7.2. Repairs must always be made with materials and components which are rated for ACCC® operating temperatures (180° C). 7.3. The minimum distance from a repair sleeve to another fitting on the conductor shall be 1.2m, this includes other repair sleeves. (If the repair sleeve is moved closer to the deadend, the conductor strands may loosen and open and remain open). 7.4. A spacer damper of the appropriate size should be fitted 2 - 8 m from the repair sleeve to prevent sub-conductor clashing in the vicinity of the repair. 7.5. ACCC® splices or dead-ends cannot be installed via live line maintenance because of the mechanical way that the splice or dead-end fasten the core. REVISION HISTORY REV. CHANGE REQUEST # DATE A 8 May 2012 B 10 May 2012 C 31 July 2013 D 121515-1 ©2016 CTC Global- For use with ACCC® Conductor only 15 Dec 2015