SHUT-OFF AND DUMP VALVE T T DI DI DI DI HUMBER TREATMENT PLANT ENGINEERING & CONSTRUCTION SERVICES Water FRANK QUARISA, P. ENG. NANCY BONHAM, P. ENG. DIRECTOR WASTEWATER TREATMENT ACTING DIRECTOR, CAPITAL WORKS DELIVERY DIGESTERS 9 AND 10 REHABILITATION DIGESTER GAS SAFETY SHUT-OFF VALVES CONTROL DETAILS SCHEMATIC DESIGN: 1 No. 01/15/2015 ISSUED FOR ADDENDUM 2 DATE CHH REVISIONS INITIAL SIGNED M.C. DRAFTING: G.D. CHECK: SCALE: NTS DRAWING DATE: DECEMBER 2014 NUMBER: R.T. CONTRACT No. 14FS-04WP 1021-2013-12-34 E2 49939-00(009)EL-WA002 METRIC SV 5215A ALL DIMENSIONS SHOWN HERE ARE IN MILLIMETERS UNLESS OTHERWISE NOTED 0 1 2 SV 5215B SV 5100A SV 5100B SV 5300B SV 5300A SV 5411B SV 5411A ZSH 5215 ZSH 5100 ZSH 5300 ZSH 5411 ZSL 5215 ZSL 5100 ZSL 5300 ZSL 5411 3m PRIMARY DIGESTER No. 1 THR-DIG-CP-5100 THR-DIG-CP-5215 (BELOW) PRIMARY DIGESTER No. 3 THR-DIG-CP-5411 THR-DIG-CP-5300 (BELOW) THR-DIG-CP-5211 THR-DIG-CP-5111 THR-DIG-CP-5150 THR-DIG-CP-5113 FOAM SCRUBBER BLD #1 FOAM SCRUBBER BLD #2 PRIMARY DIGESTER No. 2 PRIMARY DIGESTER No. 4 SV 5211A SV 5211B SV 5150A SV 5150B SV 5111B SV 5111A SV 5113B SV 5113A ZSH 5211 ZSH 5150 ZSH 5111 ZSH 5113 ZSL 5211 ZSL 5150 ZSL 5111 ZSL 5113 FOAM SCRUBBER BLDG #1 AND #2 PLAN NOTES: 1. FOAM SCRUBBER BUILDINGS ARE CLASSIFIED CLASS 1, DIVISION 1, GROUP D. SV 5500B SV 5500A SV 5415B SV 5415A SV 5701A ZSH 5500 ZSH 5415 ZSH 5701 ZSH 5602 ZSH 5601 ZSL 5500 ZSL 5415 ZSL 5701 ZSL 5602 ZSL 5601 THR-DIG-CP-5415 THR-DIG-CP-5500 (BELOW) SV 5701B SV 5602A SV 5602B SV 5601A SV 5601B PRIMARY DIGESTER No. 5 PRIMARY DIGESTER No. 7 THR-DIG-CP-5601 THR-DIG-CP-5616 (BELOW) THR-DIG-CP-5602 THR-DIG-CP-5617 (BELOW) THR-DIG-CP-5701 THR-DIG-CP-5751 (BELOW) FOAM SCRUBBER BLD #3 FOAM SCRUBBER BLD #4 SECONDARY DIGESTER No. 6 PRIMARY DIGESTER No. 8 SV 5114B SV 5114A SV 5116B THR-DIG-CP-5116 SV 5116A SV 5751A SV 5751B SV 5617A SV 5617B SV 5616A SV 5616B THR-DIG-CP-5114 ZSH 5114 ZSH 5116 ZSH 5751 ZSH 5617 ZSH 5616 ZSL 5751 ZSL 5617 ZSL 5616 FOAM SCRUBBER BLDG #3 AND #4 PLAN ZSL 5114 ZSL 5116 NOTES: 1. FOAM SCRUBBER BUILDINGS ARE CLASSIFIED CLASS 1, DIVISION 1, GROUP D. HUMBER TREATMENT PLANT ENGINEERING & CONSTRUCTION SERVICES Water FRANK QUARISA, P. ENG. NANCY BONHAM, P. ENG. DIRECTOR WASTEWATER TREATMENT ACTING DIRECTOR, CAPITAL WORKS DELIVERY DIGESTERS 9 AND 10 REHABILITATION DIGESTERS 1 TO 8 GAS SAFETY SHUT-OFF VALVES INSTRUMENTATION PLAN DESIGN: 1 No. 01/15/2015 ISSUED FOR ADDENDUM 2 DATE CHH REVISIONS INITIAL SIGNED M.C. DRAFTING: O.K. CHECK: SCALE: 1:100 DRAWING DATE: DECEMBER 2014 NUMBER: R.T. CONTRACT No. 14FS-04WP 1021-2013-12-35 E3 49939-00(009)EL-WA003 PRIMARY DIGESTER No. 9 SV 5802A PRIMARY DIGESTER No. 10 THR-DIG-CP-5802 THR-DIG-CP-5817 THR-DIG-CP-5801 THR-DIG-CP-5816 THR-DIG-CP-5900 THR-DIG-CP-5950 SV 5802B SV 5817B SV 5817A ZSH 5802 ZSH 5817 ZSL 5802 ZSL 5817 SV 5801A SV 5801B SV 5816B SV 5816A ZSH 5801 ZSH 5816 ZSL 5801 ZSL 5816 SV 5900A SV 5900B SV 5950B SV 5950A ZSH 5900 ZSH 5950 ZSL 5900 ZSL 5950 FOAM SCRUBBER BLDG #5 PLAN SCALE: NTS NOTES: 1. PLAN SHOWS GENERAL LOCATION FOR THR-DIG-CP-5XXX FIELD STATIONS. CONTRACTOR SHALL CONFIRM ACTUAL MEASUREMENTS IN FIELD AND LOCATE EQUIPMENT AS NECESSARY SO AS TO NOT INTERFERE WITH EXISTING INSTALLATION. 2. THR-DIG-CP-5XXX FIELD STATIONS SHALL BE MOUNTED ON EQUIPMENT STAND TO BE PROVIDED BY CONTRACTOR. 3. FOAM SCRUBBER BLDG #5 AREA IS CLASSIFIED CLASS 1, DIVISION 1, GROUP D. HUMBER TREATMENT PLANT ENGINEERING & CONSTRUCTION SERVICES Water FRANK QUARISA, P. ENG. NANCY BONHAM, P. ENG. DIRECTOR WASTEWATER TREATMENT ACTING DIRECTOR, CAPITAL WORKS DELIVERY DIGESTERS 9 AND 10 REHABILITATION DIGESTERS 9 AND 10 GAS SAFETY SHUT-OFF VALVES INSTRUMENTATION PLAN DESIGN: 1 01/15/2015 No. DATE ISSUED FOR ADDENDUM 2 CHH REVISIONS INITIAL SIGNED A.L. DRAFTING: O.K. CHECK: SCALE: NTS DRAWING DATE: DECEMBER 2014 NUMBER: R.T. CONTRACT No. 14FS-04WP 1021-2013-12-36 E4 49939-00(009)EL-WA004 METRIC ALL DIMENSIONS SHOWN HERE ARE IN MILLIMETERS UNLESS OTHERWISE NOTED RPU-0016A 0 0.5 1 MODIFY EXISTING PLC TO CONNECT NEW SIGNALS FOR THR-DIG-V-5100 AND THR-DIG-V-5215 1.5m RPU-0018A MODIFY EXISTING PLC TO CONNECT NEW SIGNALS FOR THR-DIG-V-5411 AND THR-DIG-V-5300 PRIMARY DIGESTER No. 1 PRIMARY DIGESTER No. 3 PRIMARY DIGESTER No. 2 PRIMARY DIGESTER No. 4 RPU-0019A MODIFY EXISTING PLC TO CONNECT NEW SIGNALS FOR THR-DIG-V-5111 AND THR-DIG-V-5113 RPU-0017A MODIFY EXISTING PLC TO CONNECT NEW SIGNALS FOR THR-DIG-V-5150 AND THR-DIG-V-5211 HUMBER TREATMENT PLANT ENGINEERING & CONSTRUCTION SERVICES Water FRANK QUARISA, P. ENG. NANCY BONHAM, P. ENG. DIRECTOR WASTEWATER TREATMENT ACTING DIRECTOR, CAPITAL WORKS DELIVERY DIGESTERS 9 AND 10 REHABILITATION CONTROL GALLERY 1 (MEZZANINE) INSTRUMENTATION LAYOUT MODIFICATIONS PLAN DESIGN: 1 01/15/2015 No. DATE ISSUED FOR ADDENDUM 2 CHH REVISIONS INITIAL SIGNED M.C. DRAFTING: O.K. CHECK: SCALE: 1:50 DRAWING DATE: DECEMBER 2014 NUMBER: R.T. CONTRACT No. 14FS-04WP 1021-2013-12-37 E5 49939-00(009)EL-WA005 METRIC ALL DIMENSIONS SHOWN HERE ARE IN MILLIMETERS UNLESS OTHERWISE NOTED RPU-0020A MODIFY EXISTING PLC TO CONNECT NEW SIGNALS FOR THR-DIG-V-5500 AND THR-DIG-V-5415 0 0.5 1 1.5m PRIMARY DIGESTER No. 5 PRIMARY DIGESTER No. 7 PRIMARY DIGESTER No. 6 PRIMARY DIGESTER No. 8 RPU-0021A MODIFY EXISTING PLC TO CONNECT NEW SIGNALS FOR THR-DIG-V-5114 AND THR-DIG-V-5116 HUMBER TREATMENT PLANT ENGINEERING & CONSTRUCTION SERVICES Water FRANK QUARISA, P. ENG. NANCY BONHAM, P. ENG. DIRECTOR WASTEWATER TREATMENT ACTING DIRECTOR, CAPITAL WORKS DELIVERY DIGESTERS 9 AND 10 REHABILITATION CONTROL GALLERY 2 (MEZZANINE) INSTRUMENTATION LAYOUT MODIFICATIONS PLAN DESIGN: 1 No. 01/15/2015 ISSUED FOR ADDENDUM 2 DATE CHH REVISIONS INITIAL SIGNED M.C. DRAFTING: O.K. CHECK: SCALE: 1:50 DRAWING DATE: DECEMBER 2014 NUMBER: R.T. CONTRACT No. 14FS-04WP 1021-2013-12-38 E6 49939-00(009)EL-WA006 METRIC ALL DIMENSIONS SHOWN HERE ARE IN MILLIMETERS UNLESS OTHERWISE NOTED INSPECT AND CLEAN HEAT EXCHANGERS REFER TO SECTION 02228 0 1 2 3m ISOLATE, DISMANTLE CLEAN SLUDGE RECIRCULATION PUMPS REFER TO SECTION 02228 ISOLATE, DISMANTLE CLEAN SLUDGE RECIRCULATION PUMPS REFER TO SECTION 02228 THR-DIG-V-0934 THR-DIG-V-1034 THR-DIG-V-0938 PT PT THR-DIG-RPU-0005A ISOLATION VALVE THR-DIG-V-0935 MODIFY EXISTING PLC TO CONNECT NEW SIGNALS FOR THR-DIG-V-5802, THR-DIG-V-5900, THR-DIG-V-5816, THR-DIG-V-5817, AND THR-DIG-V-5950 THR-DIG-V-0926 THR-DIG-V-1036 ISOLATION VALVE THR-DIG-RPU-0005 PRIMARY DIGESTER No. 9 PRIMARY DIGESTER No. 10 THR-DIG-V-0925 THR-DIG-V-1025 THR-DIG-V-1026 (BELOW THR-DIG-V-1025) THR-DIG-V-0908A THR-DIG-V-1008A THR-DIG-V-0909A THR-DIG-V-1009A THR-DIG-V-0910A THR-DIG-V-1010A THR-DIG-V-0911A THR-DIG-V-1011A THR-DIG-V-0912A THR-DIG-V-1012A NOTES: FRANK QUARISA, P. ENG. NANCY BONHAM, P. ENG. DIRECTOR WASTEWATER TREATMENT ACTING DIRECTOR, CAPITAL WORKS DELIVERY No. 01/15/2015 ISSUED FOR ADDENDUM 2 DATE CHH REVISIONS INITIAL SIGNED 2. INSTALLATION TYPE IS BASED ON FIRST NAMED SUPPLIER. COSTS ASSOCIATED WITH MODIFICATION OF DIFFERENT NAMED SUPPLIER WILL BE THE RESPONSIBILITY OF CONTRACTOR. 3. ALL INSTALLATIONS INSIDE DIGESTER AND WITHIN 1.5m DIGESTER ENVELOPE CLASS 1, ZONE 1. 4. AREA CLASSIFICATION: CLASS 1 DIVISION 2 - ENVELOPE 1.5m FROM DIGESTER. DIGESTERS 9 AND 10 REHABILITATION CONTROL GALLERY 4 INSTRUMENTATION LAYOUT MODIFICATIONS PLAN DESIGN: 1 CONTRACTOR TO CONFIRM ALL TAG NUMBERS WITH CONTRACT ADMINISTRATOR PRIOR TO FABRICATION AND PLACEMENT OF TAGS. HUMBER TREATMENT PLANT ENGINEERING & CONSTRUCTION SERVICES Water 1. M.C. DRAFTING: O.K. CHECK: SCALE: 1:75 DRAWING DATE: DECEMBER 2014 NUMBER: R.T. CONTRACT No. 14FS-04WP 1021-2013-12-39 E7 49939-00(009)EL-WA007