267-2014 Addendum 2 Attachment 1

advertisement
SHUT-OFF AND
DUMP VALVE
T
T
DI
DI
DI
DI
HUMBER TREATMENT PLANT
ENGINEERING & CONSTRUCTION SERVICES
Water
FRANK QUARISA, P. ENG.
NANCY BONHAM, P. ENG.
DIRECTOR
WASTEWATER TREATMENT
ACTING DIRECTOR,
CAPITAL WORKS DELIVERY
DIGESTERS 9 AND 10 REHABILITATION
DIGESTER GAS SAFETY SHUT-OFF VALVES CONTROL DETAILS
SCHEMATIC
DESIGN:
1
No.
01/15/2015 ISSUED FOR ADDENDUM 2
DATE
CHH
REVISIONS
INITIAL
SIGNED
M.C.
DRAFTING:
G.D.
CHECK:
SCALE:
NTS
DRAWING
DATE:
DECEMBER 2014
NUMBER:
R.T.
CONTRACT No. 14FS-04WP
1021-2013-12-34
E2
49939-00(009)EL-WA002
METRIC
SV
5215A
ALL DIMENSIONS SHOWN HERE ARE IN
MILLIMETERS UNLESS OTHERWISE NOTED
0
1
2
SV
5215B
SV
5100A
SV
5100B
SV
5300B
SV
5300A
SV
5411B
SV
5411A
ZSH
5215
ZSH
5100
ZSH
5300
ZSH
5411
ZSL
5215
ZSL
5100
ZSL
5300
ZSL
5411
3m
PRIMARY DIGESTER No. 1
THR-DIG-CP-5100
THR-DIG-CP-5215
(BELOW)
PRIMARY DIGESTER No. 3
THR-DIG-CP-5411
THR-DIG-CP-5300
(BELOW)
THR-DIG-CP-5211
THR-DIG-CP-5111
THR-DIG-CP-5150
THR-DIG-CP-5113
FOAM SCRUBBER BLD #1
FOAM SCRUBBER BLD #2
PRIMARY DIGESTER No. 2
PRIMARY DIGESTER No. 4
SV
5211A
SV
5211B
SV
5150A
SV
5150B
SV
5111B
SV
5111A
SV
5113B
SV
5113A
ZSH
5211
ZSH
5150
ZSH
5111
ZSH
5113
ZSL
5211
ZSL
5150
ZSL
5111
ZSL
5113
FOAM SCRUBBER BLDG #1 AND #2 PLAN
NOTES:
1. FOAM SCRUBBER BUILDINGS ARE
CLASSIFIED CLASS 1, DIVISION 1,
GROUP D.
SV
5500B
SV
5500A
SV
5415B
SV
5415A
SV
5701A
ZSH
5500
ZSH
5415
ZSH
5701
ZSH
5602
ZSH
5601
ZSL
5500
ZSL
5415
ZSL
5701
ZSL
5602
ZSL
5601
THR-DIG-CP-5415
THR-DIG-CP-5500
(BELOW)
SV
5701B
SV
5602A
SV
5602B
SV
5601A
SV
5601B
PRIMARY DIGESTER No. 5
PRIMARY DIGESTER No. 7
THR-DIG-CP-5601
THR-DIG-CP-5616
(BELOW)
THR-DIG-CP-5602
THR-DIG-CP-5617
(BELOW)
THR-DIG-CP-5701
THR-DIG-CP-5751
(BELOW)
FOAM SCRUBBER BLD #3
FOAM SCRUBBER BLD #4
SECONDARY DIGESTER No. 6
PRIMARY DIGESTER No. 8
SV
5114B
SV
5114A
SV
5116B
THR-DIG-CP-5116
SV
5116A
SV
5751A
SV
5751B
SV
5617A
SV
5617B
SV
5616A
SV
5616B
THR-DIG-CP-5114
ZSH
5114
ZSH
5116
ZSH
5751
ZSH
5617
ZSH
5616
ZSL
5751
ZSL
5617
ZSL
5616
FOAM SCRUBBER BLDG #3 AND #4 PLAN
ZSL
5114
ZSL
5116
NOTES:
1. FOAM SCRUBBER BUILDINGS ARE
CLASSIFIED CLASS 1, DIVISION 1,
GROUP D.
HUMBER TREATMENT PLANT
ENGINEERING & CONSTRUCTION SERVICES
Water
FRANK QUARISA, P. ENG.
NANCY BONHAM, P. ENG.
DIRECTOR
WASTEWATER TREATMENT
ACTING DIRECTOR,
CAPITAL WORKS DELIVERY
DIGESTERS 9 AND 10 REHABILITATION
DIGESTERS 1 TO 8 GAS SAFETY SHUT-OFF VALVES INSTRUMENTATION
PLAN
DESIGN:
1
No.
01/15/2015 ISSUED FOR ADDENDUM 2
DATE
CHH
REVISIONS
INITIAL
SIGNED
M.C.
DRAFTING:
O.K.
CHECK:
SCALE:
1:100
DRAWING
DATE:
DECEMBER 2014
NUMBER:
R.T.
CONTRACT No. 14FS-04WP
1021-2013-12-35
E3
49939-00(009)EL-WA003
PRIMARY DIGESTER No. 9
SV
5802A
PRIMARY DIGESTER No. 10
THR-DIG-CP-5802
THR-DIG-CP-5817
THR-DIG-CP-5801
THR-DIG-CP-5816
THR-DIG-CP-5900
THR-DIG-CP-5950
SV
5802B
SV
5817B
SV
5817A
ZSH
5802
ZSH
5817
ZSL
5802
ZSL
5817
SV
5801A
SV
5801B
SV
5816B
SV
5816A
ZSH
5801
ZSH
5816
ZSL
5801
ZSL
5816
SV
5900A
SV
5900B
SV
5950B
SV
5950A
ZSH
5900
ZSH
5950
ZSL
5900
ZSL
5950
FOAM SCRUBBER BLDG #5 PLAN
SCALE: NTS
NOTES:
1.
PLAN SHOWS GENERAL LOCATION FOR THR-DIG-CP-5XXX
FIELD STATIONS. CONTRACTOR SHALL CONFIRM ACTUAL
MEASUREMENTS IN FIELD AND LOCATE EQUIPMENT AS
NECESSARY SO AS TO NOT INTERFERE WITH EXISTING
INSTALLATION.
2.
THR-DIG-CP-5XXX FIELD STATIONS SHALL BE MOUNTED ON
EQUIPMENT STAND TO BE PROVIDED BY CONTRACTOR.
3.
FOAM SCRUBBER BLDG #5 AREA IS CLASSIFIED
CLASS 1, DIVISION 1, GROUP D.
HUMBER TREATMENT PLANT
ENGINEERING & CONSTRUCTION SERVICES
Water
FRANK QUARISA, P. ENG.
NANCY BONHAM, P. ENG.
DIRECTOR
WASTEWATER TREATMENT
ACTING DIRECTOR,
CAPITAL WORKS DELIVERY
DIGESTERS 9 AND 10 REHABILITATION
DIGESTERS 9 AND 10 GAS SAFETY SHUT-OFF VALVES INSTRUMENTATION
PLAN
DESIGN:
1
01/15/2015
No.
DATE
ISSUED FOR ADDENDUM 2
CHH
REVISIONS
INITIAL
SIGNED
A.L.
DRAFTING:
O.K.
CHECK:
SCALE:
NTS
DRAWING
DATE:
DECEMBER 2014
NUMBER:
R.T.
CONTRACT No. 14FS-04WP
1021-2013-12-36
E4
49939-00(009)EL-WA004
METRIC
ALL DIMENSIONS SHOWN HERE ARE IN
MILLIMETERS UNLESS OTHERWISE NOTED
RPU-0016A
0
0.5
1
MODIFY EXISTING PLC TO
CONNECT NEW SIGNALS FOR
THR-DIG-V-5100 AND
THR-DIG-V-5215
1.5m
RPU-0018A
MODIFY EXISTING PLC TO
CONNECT NEW SIGNALS FOR
THR-DIG-V-5411 AND
THR-DIG-V-5300
PRIMARY DIGESTER
No. 1
PRIMARY DIGESTER
No. 3
PRIMARY DIGESTER
No. 2
PRIMARY DIGESTER
No. 4
RPU-0019A
MODIFY EXISTING PLC TO
CONNECT NEW SIGNALS FOR
THR-DIG-V-5111 AND
THR-DIG-V-5113
RPU-0017A
MODIFY EXISTING PLC TO
CONNECT NEW SIGNALS FOR
THR-DIG-V-5150 AND
THR-DIG-V-5211
HUMBER TREATMENT PLANT
ENGINEERING & CONSTRUCTION SERVICES
Water
FRANK QUARISA, P. ENG.
NANCY BONHAM, P. ENG.
DIRECTOR
WASTEWATER TREATMENT
ACTING DIRECTOR,
CAPITAL WORKS DELIVERY
DIGESTERS 9 AND 10 REHABILITATION
CONTROL GALLERY 1 (MEZZANINE) INSTRUMENTATION LAYOUT MODIFICATIONS
PLAN
DESIGN:
1
01/15/2015
No.
DATE
ISSUED FOR ADDENDUM 2
CHH
REVISIONS
INITIAL
SIGNED
M.C.
DRAFTING:
O.K.
CHECK:
SCALE:
1:50
DRAWING
DATE:
DECEMBER 2014
NUMBER:
R.T.
CONTRACT No. 14FS-04WP
1021-2013-12-37
E5
49939-00(009)EL-WA005
METRIC
ALL DIMENSIONS SHOWN HERE ARE IN
MILLIMETERS UNLESS OTHERWISE NOTED
RPU-0020A
MODIFY EXISTING PLC TO
CONNECT NEW SIGNALS FOR
THR-DIG-V-5500 AND
THR-DIG-V-5415
0
0.5
1
1.5m
PRIMARY DIGESTER
No. 5
PRIMARY DIGESTER
No. 7
PRIMARY DIGESTER
No. 6
PRIMARY DIGESTER
No. 8
RPU-0021A
MODIFY EXISTING PLC TO
CONNECT NEW SIGNALS FOR
THR-DIG-V-5114 AND
THR-DIG-V-5116
HUMBER TREATMENT PLANT
ENGINEERING & CONSTRUCTION SERVICES
Water
FRANK QUARISA, P. ENG.
NANCY BONHAM, P. ENG.
DIRECTOR
WASTEWATER TREATMENT
ACTING DIRECTOR,
CAPITAL WORKS DELIVERY
DIGESTERS 9 AND 10 REHABILITATION
CONTROL GALLERY 2 (MEZZANINE) INSTRUMENTATION LAYOUT MODIFICATIONS
PLAN
DESIGN:
1
No.
01/15/2015 ISSUED FOR ADDENDUM 2
DATE
CHH
REVISIONS
INITIAL
SIGNED
M.C.
DRAFTING:
O.K.
CHECK:
SCALE:
1:50
DRAWING
DATE:
DECEMBER 2014
NUMBER:
R.T.
CONTRACT No. 14FS-04WP
1021-2013-12-38
E6
49939-00(009)EL-WA006
METRIC
ALL DIMENSIONS SHOWN HERE ARE IN
MILLIMETERS UNLESS OTHERWISE NOTED
INSPECT AND CLEAN
HEAT EXCHANGERS
REFER TO SECTION 02228
0
1
2
3m
ISOLATE, DISMANTLE
CLEAN SLUDGE RECIRCULATION PUMPS
REFER TO SECTION 02228
ISOLATE, DISMANTLE
CLEAN SLUDGE RECIRCULATION PUMPS
REFER TO SECTION 02228
THR-DIG-V-0934
THR-DIG-V-1034
THR-DIG-V-0938
PT
PT
THR-DIG-RPU-0005A
ISOLATION VALVE
THR-DIG-V-0935
MODIFY EXISTING PLC TO
CONNECT NEW SIGNALS FOR
THR-DIG-V-5802, THR-DIG-V-5900,
THR-DIG-V-5816, THR-DIG-V-5817,
AND THR-DIG-V-5950
THR-DIG-V-0926
THR-DIG-V-1036
ISOLATION VALVE
THR-DIG-RPU-0005
PRIMARY DIGESTER
No. 9
PRIMARY DIGESTER
No. 10
THR-DIG-V-0925
THR-DIG-V-1025
THR-DIG-V-1026
(BELOW THR-DIG-V-1025)
THR-DIG-V-0908A
THR-DIG-V-1008A
THR-DIG-V-0909A
THR-DIG-V-1009A
THR-DIG-V-0910A
THR-DIG-V-1010A
THR-DIG-V-0911A
THR-DIG-V-1011A
THR-DIG-V-0912A
THR-DIG-V-1012A
NOTES:
FRANK QUARISA, P. ENG.
NANCY BONHAM, P. ENG.
DIRECTOR
WASTEWATER TREATMENT
ACTING DIRECTOR,
CAPITAL WORKS DELIVERY
No.
01/15/2015 ISSUED FOR ADDENDUM 2
DATE
CHH
REVISIONS
INITIAL
SIGNED
2.
INSTALLATION TYPE IS BASED ON FIRST NAMED SUPPLIER.
COSTS ASSOCIATED WITH MODIFICATION OF DIFFERENT
NAMED SUPPLIER WILL BE THE RESPONSIBILITY OF
CONTRACTOR.
3.
ALL INSTALLATIONS INSIDE DIGESTER AND WITHIN 1.5m
DIGESTER ENVELOPE CLASS 1, ZONE 1.
4.
AREA CLASSIFICATION: CLASS 1 DIVISION 2 - ENVELOPE 1.5m
FROM DIGESTER.
DIGESTERS 9 AND 10 REHABILITATION
CONTROL GALLERY 4 INSTRUMENTATION LAYOUT MODIFICATIONS
PLAN
DESIGN:
1
CONTRACTOR TO CONFIRM ALL TAG NUMBERS WITH
CONTRACT ADMINISTRATOR PRIOR TO FABRICATION AND
PLACEMENT OF TAGS.
HUMBER TREATMENT PLANT
ENGINEERING & CONSTRUCTION SERVICES
Water
1.
M.C.
DRAFTING:
O.K.
CHECK:
SCALE:
1:75
DRAWING
DATE:
DECEMBER 2014
NUMBER:
R.T.
CONTRACT No. 14FS-04WP
1021-2013-12-39
E7
49939-00(009)EL-WA007
Download