HVAC GENERAL NOTES HVAC ABBREVIATIONS

advertisement
6
5
4
3
2
1
Dewberry Architects Inc.
SYMBOL
DESCRIPTION
-CEILING DIFFUSER, ROUND NECK
(CEILING DIFFUSERS ARE 4-WAY THROW UNO)
F
SYMBOL
DESCRIPTION
-TERMINAL UNIT, VARIABLE/CONSTANT AIR
VOLUME WITH ELECTRIC HEAT
-FIRE DAMPER
(WITH ACCESS PANEL)
-TERMINAL UNIT, VARIABLE/CONSTANT AIR
VOLUME WITH ELECTRIC HEAT
-FIRE & SMOKE DAMPER
(WITH ACCESS PANEL)
-ROUND DIFFUSER
-CEILING RETURN
-EXISTING FIRE DAMPER TO REMAIN
-CEILING EXHAUST
-TERMINAL UNIT, VARIABLE/CONSTANT AIR
VOLUME, FAN POWERED
-EXISTING FIRE & SMOKE DAMPER TO REMAIN
-CEILING DIFFUSER, RECTANGULAR OR
SQUARE NECK (CEILING DIFFUSERS
ARE 4-WAY THROW UNO)
SA-1
-SOUND ATTENUATOR
-SUPPLY REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
-TERMINAL UNIT, VARIABLE/CONSTANT AIR
VOLUME, FAN POWERED, WITH ELECTRIC
HEAT
-MOTOR OPERATED CONTROL DAMPER (MOD)
M
-RETURN/EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
-ELECTRIC DUCT HEATER
(W/ PANEL CLEARANCE)
-AIR FLOW MEASURING STATION
FM
-REVISION REFERENCE
1
-MANUAL BALANCING DAMPER
-DETAIL REFERENCE: TOP-DETAIL#,
BOTTOM-DRAWING# SHOWN ON
T
-THERMOSTAT/TEMPERATURE SENSOR
H
-HUMIDISTAT/HUMIDITY SENSOR
-DUCT SMOKE DETECTOR
E
-HYDRONIC REHEAT COIL
-DOOR GRILLE
UC
1
M-1
-INLINE CENTRIFUGAL FAN
-UNDERCUT DOOR
-CONNECT TO EXISTING
-PACKAGED TERMINAL AIR CONDITIONER
(PTAC)
-ACCESS DOORS, VERTICAL OR HORIZONTAL
-DEMOLISH TO POINT INDICATED
-MOTORIZED CONTROL DAMPER
M
TS
-TEMPERATURE SENSOR
P
-PRESSURE SENSOR
-STAINLESS STEEL DUCTWORK
UP
DN
-CHANGE OF ELEVATION
-FLEXIBLE CONNECTION
-FLEXIBLE DUCT
12x8
-BACKDRAFT DAMPER
BD
-FLAT OVAL DUCT
-TRANSITION, CONCENTRIC
-NEUTRAL RELATIVE PRESSURE
0
24x12
-NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN
-POSITIVE RELATIVE PRESSURE
+
_
-NEGATIVE RELATIVE PRESSURE
24x12
-EXISTING DUCTWORK TO REMAIN
1
-SHEET NOTE CALLOUT
24x12
-EXISTING DUCTWORK TO BE REMOVED
-SHEET NOTE CALLOUT
SYMBOL
DESCRIPTION
1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED
DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED
FOR EQUIPMENT FURNISHED.
AFD
-ADJUSTABLE FREQUENCY DRIVE
LD
-LINEAR DIFFUSER
AFF
-ABOVE FINISHED FLOOR
MBH
-THOUSAND BTUs PER HOUR
AFR
-ABOVE FINISHED ROOF
MCA
-MINIMUM CIRCUIT AMPS
AHU
-AIR HANDLING UNIT
MOCP
-MAXIMUM OVER CURRENT PROTECTION
AP
-ACCESS PANEL
MOD
-MOTOR OPERATED CONTROL DAMPER (MOD)
BOP
-BOTTOM OF PIPE
NC
-NORMALLY CLOSED
BHP
-BRAKE HORSEPOWER
NO
-NORMALLY OPEN
BTU
-BRITISH THERMAL UNIT
NTS
-NOT TO SCALE
h
-CENTER LINE
OA
-OUTSIDE AIR
c
-CFM (CUBIC FEET PER MINUTE)
OAL
-OUTSIDE AIR LOUVER
CD
-CEILING DIFFUSER
PRV
-PRESSURE REDUCING VALVE
CT
-COOLING TOWER
PRS
-PRESSURE REDUCING STATION
CV
-CONSTANT AIR VOLUME
PSI
-POUNDS PER SQUARE INCH
P
-CHANGE IN PRESSURE
PSIG
-PSI GAUGE
T
-CHANGE IN TEMPERATURE
PTAC
-PACKAGED TERMINAL AIR CONDITIONER
CFM
-CUBIC FEET PER MINUTE
PVC
-POLYVINYL CHLORIDE PIPE
CU
-CONDENSING UNIT
RA
-RETURN AIR
DDC
-DIRECT DIGITAL CONTROLS
RHC
-REHEAT COIL
DN
-DOWN
RHP
-ROOFTOP HEAT PUMP
EAT
-ENTERING AIR TEMPERATURE
RPM
-REVOLUTIONS PER MINUTE
ESP
-EXTERNAL STATIC PRESSURE
RS/L
-REFRIGERANT SUCTION & LIQUID LINES
EWT
-ENTERING WATER TEMPERATURE
RTU
-ROOFTOP AIR HANDLING UNIT
FCU
-FAN COIL UNIT
SA
-SUPPLY AIR
FD
-FIRE DAMPER
SP
-STATIC PRESSURE
FF
-FINAL FILTERS
TSP
-TOTAL STATIC PRESSURE
FLA
-FULL LOAD AMPS
UNO
-UNLESS NOTED OTHERWISE
FPM
-FEET PER MINUTE
V/PH
-VOLTS/PHASE
GPM
-GALLONS PER MINUTE
VAV
-VARIABLE AIR VOLUME
KW
-KILOWATT
VFD
-VARIABLE FREQUENCY DRIVE
LAT
-LEAVING AIR TEMPERATURE
LWT
-LEAVING WATER TEMPERATURE
2. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR
FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS
SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO
OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS
INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE
BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND
ELECTRICAL CONDUIT.
3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE
SMACNA HVAC DUCT CONSTRUCTION STANDARD.
4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK.
5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.
6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT
FURNISHED.
7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL
REFLECTED CEILING PLANS AND EQUIPMENT OF ALL TRADES.
8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48"
ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER
EQUIPMENT, FURNITURE, AND DOOR SWINGS.
9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE
ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.
10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE
PAINTED FLAT BLACK.
12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR
PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED.
14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR
OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING
VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL
TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.
16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED EQUIPMENT. REFER TO
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
17. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS
AND OTHER AIR DISTRIBUTION DEVICES.
18. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR
HANDLING UNITS, AND FAN COIL UNITS.
-TRANSITION, SQUARE TO ROUND
10x8
-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST
1
DESCRIPTION
24x12
-SHEET NOTE CALLOUT
1
-TRANSITION, ECCENTRIC
SYMBOL
UP W/IN FLOOR
DOWN
-CEILING MOUNTED ACCESS DOOR
19. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE
CONNECTED.
-SQUARE THROAT TEE
DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING
20. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL
OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL
NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND
PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE
SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.
-DUCT ELBOW, EXHAUST
-DUCT ELBOW, NEGATIVE PRESSURE, RETURN
-RADIUS TEE
12x8
21. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR
DISPOSED OF LEGALLY, AS DIRECTED BY OWNER.
-DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE
D
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
-RECTANGULAR DUCT SECTION UP, POSITIVE PRESSURE,
SUPPLY OR OUTSIDE AIR
22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL
FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.
-RECTANGLE-TO-ROUND TAKE-OFF
23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10' CLEAR FROM ALL PLUMBING VENTS AND
EXHAUST AIR DISCHARGE LOCATIONS.
-RECTANGULAR DUCT SECTION UP,
NEGATIVE PRESSURE, RETURN
-STANDARD BRANCH TAKE-OFF
-RECTANGULAR DUCT SECTION UP, EXHAUST
-ROUND DUCT SECTION UP
24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.
25. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI.
-SPIN-IN TAKE-OFF
114400 North 49th Street
Clearwater, FL.
DESCRIPTION
HVAC GENERAL NOTES
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
SYMBOL
HVAC ABBREVIATIONS
Pinellas County
HVAC SYMBOL LEGEND
26. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED
FULL SIZE TO THE NEAREST PLUMBING DRAIN.
-FLAT OVAL DUCT SECTION UP
-SQUARE THROAT ELBOW
W/TURNING VANES
27. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR
VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT WATER PIPING.
28. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL
SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT
BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF
THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING
WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC-110.26.
-RADIUS ELBOW
SEAL
-RECTANGULAR/ROUND BRANCH TAKE-OFF
OR ROUND/ROUND BRANCH TAKE-OFF
PRELIMINARY DOCUMENTS
-EXHAUST DUCT UP THROUGH SLAB W/
FAN ON ROOF ABOVE
NOT FOR CONSTRUCTION
-EXHAUST FAN ON ROOF W/ DUCT DOWN
THROUGH ROOF
KEY PLAN
C
HVAC PIPING SYMBOL LEGEND
SYMBOL
DESCRIPTION
SYMBOL
DESCRIPTION
HVAC EQUIPMENT TAGS
SYMBOL
EQUIP.
CWS
-CONDENSER WATER SUPPLY
-FLOW DIRECTION
CWR
-CONDENSER WATER RETURN
-GATE VALVE
-CHILLED WATER SUPPLY
-BALL VALVE
CHWS
CHWR
DESCRIPTION
TAG
A
- P-TRAP
-AIR DISTRIBUTION DEVICE
200
CFM
-TWO-WAY CHECK VALVE
SCALE
MV
AHU NUMBER
-MANUAL VENT
-CHILLED WATER RETURN
-CALIBRATING BALANCING VALVE
CD
-CONDENSATE
-BUTTERFLY VALVE
CR
-CONDENSATE RETURN
-GAS COCK
-PRESSURE GAUGE
PC
-PUMPED CONDENSATE
-UNION
-RELIEF VALVE
AHU-1
HWR
HWS
-HOT WATER SUPPLY
HPS
-HIGH PRESSURE STEAM SUPPLY
MPS
-MEDIUM PRESSURE STEAM SUPPLY
-LOW PRESSURE STEAM SUPPLY
S
-STRAINER
FM
-FLOW METER
-CONTROL VALVE
M
-WATER METER
-SOLENOID VALVE
-PSI REG.
-CHECK VALVE
HPR
-HIGH PRESSURE STEAM RETURN
MPR
-MEDIUM PRESSURE STEAM RETURN
-FLOW SWITCH
LPR
-LOW PRESSURE STEAM RETURN
-SLOPE DIRECTION (DOWN)
-REFRIGERANT LIQUID
-FLEX CONNECTION
RL
RS
-REFRIGERANT SUCTION
D
D
-VALVE ON RISER
-CAP
-CONNECTION, BOTTOM
VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS
VTU - VARIABLE TERMINAL UNIT
CTU - CONSTANT TERMINAL UNIT
PTU - PARALLEL TERMINAL UNIT
STU - SERIES TERMINAL UNIT
AHU NUMBER
TERMINAL NUMBER
VTU-1-1
No.
Description
Date
-COUPLING
-O.S.&Y. GATE VALVE
-ELBOW, 90°
-STEAM TRAP
-ELBOW, 45°
-THREE-WAY CONTROL VALVE
-ELBOW, TURNED DOWN
-45° PIPE RISE (R) / DROP (D)
-ELBOW, TURNED UP
-PIPE ANCHORS
-REHEAT COIL
RHC-1-1
TERMINAL UNIT TYPE
-INLINE PUMP
-CONNECTION, TOP
-TEE, OUTLET DOWN
-TEE, OUTLET UP
-INLINE PUMP
12" = 1'-0"
COIL NUMBER
-HOT WATER RETURN
LPS
B
AHU NUMBER
-AIR HANDLING UNIT
-THERMOMETER
REVISIONS
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
-CONCENTRIC REDUCER
-ECCENTRIC REDUCER
03/19/2014
TITLE
MECHANICAL
LEGEND
A
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
PROJECT NO.
M-000
SHEET NO.
50057109
6
5
4
3
2
1
Dewberry Architects Inc.
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
F
SAFE HARBOR
GENERAL NOTES:
(N)CHWS/R BRANCH TO
NEW BUILDING
1.
ALL EXISTING, PLASTIC CHILLED WATER PIPING SHALL BE
DEMOLISHED/ABANDONED. ANY METALLIC BRANCH PIPING
THAT IS CONNECTED TO PLASTIC MAIN PIPE SHALL BE
DISCONNECTED FROM THE PLASTIC PIPE. METAL ENDS SHALL
BE CAPPED AND LEFT IN SUITABLE CONDITION FOR
CONNECTION TO NEW, METALLIC UNDERGROUND CHILLED
WATER LINES. CONTRACTOR TO VERIFY WHERE PLASTIC PIPE
ENDS AND METAL PIPE BEGINS.
2.
FINAL PIPE SIZE TO BE DETERMINED BY FINAL DESIGN BUILD
CONTRACTOR.
(N)CHWS/R DISTRIBUTION
(E)4" CHWS/R
(E)4" CHWS/R
"M1"
(E)6" CHWS/R
(E)6" CHWS/R
(E)1" BALL VALVES
(N) CHWS/R DISTRIBUTION
(E)8" CHWS/R
"B"
145TH AVE N
HEALTH CARE FACILITY
(E)4" CHWS/R
(E) CHWS/R
VALVE BOX
"A"
SHERIFF ADMIN.
2' V ALLEY GU TTER
(E)4" CHWS/R
(E)4" CHWS/R
"C"
D
"M2"
49TH ST N
(E)3" CHWS/R
(E)3" CHWS/R
(E)8" CHWS/R
142ND AVE N
(N) 20" CHWS/R DISTRIBUTION RUN PARALLEL TO EXISTING
PIPING SERVING CENTRAL/INTAKE AND HOUSING A-G
(E) CHWS/R
CENTRAL DIVISION
POND
POND
114400 North 49th Street
Clearwater, FL.
(N)CHWS/R DISTRIBUTION
Pinellas County
E
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
CR
OS
SB
AYO
U
(N)CHWS/R BRANCH TO
NEW BUILDING
SEAL
PRELIMINARY DOCUMENTS
NOT FOR CONSTRUCTION
C
PINELLAS COUNTY
CRIMINAL COURT
COMPLEX
SOUTH DIVISION
(E) CHWS/R
(N)CHWS/R PIPING BRIDGED OVER TO
STATE ATTORNEY/ CJC CENTER
"G"
MAINTENANCE
KEY PLAN
POND
"F"
"E"
"D"
"C"
POND
SCALE
1" = 100'-0"
SIR LB021
(FI R 1/2" LB1344 0.30' S., 0.50' W.)
OHE
OHE
OHE
LAND LINE
JURISDICT IONAL WET
B
No.
Description
Date
REVISIONS
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
JUVENILE DETENTION CENTER
03/19/2014
TITLE
MECHANICAL SITE
PLAN
EDGE OF W ATER
ASPHALT WALK
A
1
MECHANICAL SITE PLAN
140TH AVE N
FIR 1/2" LB1344
PROJECT NO.
EDGE OF W ATER
M-001
Scale: 1" = 100'-0"
SHEET NO.
50057109
6
5
4
3
2
1
1
2
3
4
5
6
7
F
1
1.1
3
5
USED OIL TANK
6.9
Keynotes
AREA TO BE PROVIDED WITH DEDICATED CHILLED
WATER FAN COIL UNIT.
AREA TO BE EXHAUSTED. FAN TO BE CHEMICAL
RATED.
AREA TO BE EXHAUSTED.
VAV BOX WITH ELECTRIC HEAT. PROVIDE ACCESS
PANEL AS REQUIRED.
PROVIDE LINT TRAP.
DRYER EXHAUST FAN. ROUTE TO EXTERIOR WALL.
COMBUSTION AIR MAKE UP FAN. ROUTE TO
EXTERIOR WALL.
Dewberry Architects Inc.
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
7
NEW OIL TANK
A
A
S
WORKER
STAGING
122
LOADING
DOCK
105
PROGRAM
MEETING ROOM
111
4
STORAGE
B
D
4
SALLYPORT
SERVICE DRIVE
103
DOCK
STORAGE
102
BULK REFIG
STORAGE
109
JANITOR
142
3
INMATE
TOILET
119
4
INMATE
TOILET
113
3
T
S
STORAGE
112
B
JANITOR
114
3
T
T
T
T
1
SEARCH
123
Pinellas County
3
INMATE
TOILET
121
DOCK
STAGING
107
SECURITY
ELECTRONICS
101
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
E
PROGRAM
MEETING ROOM
116
PROGRAM
MEETING ROOM
110
BULK DRY
STORAGE
108
STAFF
4
3
3
4
118
T
S
STAIR
A
SA1
MEDIUM PRESSURE SUPPLY DUCT ESTIMATED 80x30
FEC
FEC
C
CO AND NO2 SENSORS LINKED TO ALARM
ELEVATOR
A
EA
1
ELECTRICAL
140
CART
WASH
139
OFFICE/
137
WATER
HEATER
124
ELEVATOR
B
EB
114400 North 49th Street
Clearwater, FL.
A.1
A.1
STAIR
B
SB1
ELEVATOR
C
EC
C
C
SEAL
3
STAFF
TOILET
125
NOT FOR CONSTRUCTION
AIR
1
COMPRESSOR
126
GARBAGE/
RECYCLE DOCK
106
C
PRELIMINARY DOCUMENTS
KEY PLAN
3
UTILITY
WASH
136
TRASH COMPACTOR
CLEAN LAUNDRY
STORAGE
135
CENTRAL
LAUNDRY
138
T
SCALE
D
D
1/8" = 1'-0"
4
T
S
PARKING AREA
WATER TANK
STORAGE
104
B
DRYERS
127
STORAGE
134
MAINTENANCE
SUPPLY
133
T
7
S
4
T
T
RISER
ROOM
132
UNIFORM
STORAGE
131
INMATE
TOILET
129
BREAK
ROOM
130
CHEMICAL
STORAGE
128
2
3
5
No.
E.9
H
E.9
6
2448
2448
Description
Date
REVISIONS
C
F
F
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
03/19/2014
TITLE
1
A
1
1.1
FIRST FLOOR MECHANICAL PLAN
3
5
6.9
7
FIRST FLOOR
MECHANICAL
PLAN
Scale: 1/8" = 1'-0"
PROJECT NO.
M-110
SHEET NO.
50057109
4
3
2
1
1
2
3
4
5
6
F
7
1.1
3
5
6.9
A
C
H
5
SECURED
STORAGE
209
E
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
7
A
C
A.1
DRY FOOD
STORAGE
204
Dewberry Architects Inc.
H
1
Keynotes
ROUTE EXHAUST DUCTWORK, APPROXIMATELY 60x20, TO
KITCHEN HOODS. COORDINATE WITH KITCHEN
DESIGNER.
ROUTE MAKE UP DUCTWORK, APPROXIMATELY 50x20, TO
KITCHEN EQUIPMENT. COORDINATE WITH KITCHEN
DESIGNER.
ROUTE SUPPLY AND DUCTING TO MECHANICAL CHASE.
AREA TO BE EXHAUSTED.
AREA TO BE EXHAUSTED. FAN TO BE CHEMICAL RATED.
AREA TO BE PROVIDED WITH DEDICATED CHILLED
WATER FAN COIL UNIT.
REFRIGERATER/ FREEZER AREA. SEE KITCHEN
EQUIPMENT PLANS.
BREAK
ROOM
211
A.1
CHEMICAL STORAGE
(SECURE)
216
WARE WASH
AREA
215
4
EQUIPMENT
STORAGE
203
UNIFORM
205
TRAY
MAKE-UP
220
OFFICE
213
INMATE
TOILET
207
B
H
C
JAN/EQUIP
SUPPLIES
202
6
C
KITCHEN/LAUNDRY
STORAGE
201
H
CORRIDOR
210
4
INMATE
TOILET
208
B
FOOD SERVICE
MGMT OFFICE
214
4
STORAGE
218
C
CART STORAGE
AND WASHING
219
STAFF
TOILET
206
Pinellas County
STORAGE/
FUTURE LINK
217
CORRIDOR
212
4
4
D
STAIR
A
SA2
CORRIDOR
221
CORRIDOR
250
FEC
FEC
6
4
4
TRASH
HOLDING
246
ICE/BEV.
234
ELEVATOR
A
EA
ELEVATOR
B
EB
ELEC
233
D
DAIRY
COLDROOM
247
JAN
249
114400 North 49th Street
Clearwater, FL.
5
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
6
STAIR
B
SB2
ELEVATOR
C
EC
D
C
D2
C
D2
C1
C1
SEAL
E1
E2
G
3
E1
E2
G
D1
STAFF DINING
MULTI-PURPOSE
232
NOT FOR CONSTRUCTION
12"X12"
1075 CFM
.27" S.P.
G G
FIRE CABINET
G
G
G
STEAM CO N DEN SATE
TRAP AN D ST RAI N ER
12"X10"
1456 CFM
.39" S.P.
9"X8"
538 CFM
.07" S.P.
G G
12"X12"
937 CFM
.27" S.P.
SAFET Y VA LVE
VALVE
1/ 2" N PT
SATE
12"X9"CO N DEN
RETU RN
1217 CFM
STEAM
.37" S.P.
CO N TRO L
SAFET Y VA LVE
STEAM CO N DEN SATE
TRAP AN D ST RAI N ER
STEAM
CO N TRO L
VALVE
1/ 2" N PT
12"X12"
937 CFM
.27" S.P.
1
C
C
STEAM CO N DEN SATE
TRAP AN D ST RAI N ER
H
D
APPROXIMATE RETURN DUCT SIZE 70x24
SAFET Y VA LVE
G
12"X10"
1353 CFM
.43" S.P.
1/ 2" N PT
CO N DEN SATE
RETU RN
11"X8"
1012 CFM
.29" S.P.
SCALE
D
12"X12"
937 CFM
.27" S.P.
JAN
228
STEAM
CO N TRO L
VALVE
SAFET Y VA LVE
#321.2L
C
STEAM CO N DEN SATE
TRAP AN D ST RAI N ER
1/ 2" N PT
CO N DEN SATE
RETU RN STEAM
CO N TRO L
VALVE
#321.1L
SAFET Y VA LVE
CO N DEN SATE
12"
X9"
RETU RN
1216 CFM
.37" S.P.
12"X12"
937 CFM
.27" S.P.
12"X10"
1379 CFM
.42" S.P.
R
12"X10"
809 CFM
.20" S.P.
D
R
C D
G
D
KEY PLAN
R
#321.2R
R
FINISHED BULK
COLDROOM
243
3
SERVING
231
#321.6L
STEAM
CO N TRO L
VALVE
BULK MEAT
COLDROOM
242
2
FOOD PREP
SERVICE AREA
230
D
C
PRELIMINARY DOCUMENTS
CORRIDOR
222
G
FINISH PRODUCE
COLDROOM
245
G
HOT FOOD
PRODUCTION
235
12"X11"
1648 CFM
.47" S.P.
CORRIDOR
251
D1
#321.6R
BULK PRODUCE
COLDROOM
248
STEAM CO N DEN SATE
TRAP AN D ST RAI N ER
1/8" = 1'-0"
12"X12"
937 CFM
.27" S.P.
4
FAUCET, TANGENT DRAW-OFF
ARE OPTIONAL
H C
DEN SATE
12"X10"CO N RETU
RN
1352 CFM
.43" S.P.
1/ 2" N PT
G
12"X10"
809 CFM
.20" S.P.
G
#321.1R
G G
THAW/PULL
241
11"X8"
1011 CFM
.29" S.P.
C
BULK
COLDROOM
242
4
FIRE CABINET
D
C
D
MULTI-PURPOSE
223
STAFF
TOILET
227
CORRIDOR
229
STAFF 4
TOILET
226
H
APPROXIMATE SUPPLY DUCT SIZE 96x24
A/V
CLOSET
224
REF
DAILY DRY
STORAGE
236
FINISH VEG
PREP
237
REF
FINISH MEAT
PREP
238
-10 FREEZER
239
C
-20 FREEZER
240
MIC MIC
H
C
B
6
E.9
E.9
C
H
H
C
F
F
7
CONNECTOR TO
CENTRAL TOWER
CN
No.
Description
Date
REVISIONS
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
03/19/2014
TITLE
1
A
1
1.1
SECOND FLOOR MECHANICAL PLAN
Scale: 1/8" = 1'-0"
3
5
6.9
7
SECOND FLOOR
MECHANICAL
PLAN
PROJECT NO.
M-120
SHEET NO.
50057109
6
5
4
3
2
1
1
2
3
4
5
6
7
F
8
9
10
11
1
1.1
3
5
6.9
7
12
13
14
Keynotes
GENERATOR RADIATOR. PIPE TO AND FROM
GENERATOR.
THREE- WAY CATALYST INSTALLED ON EXHAUST GAS
PIPE.
ROUTE EXHAUST GAS PIPE SHORTEST DISTANCE TO
ABSORPTION CHILLER.
NEW CHILLED WATER FAN COIL UNIT. ROUTE OUTSIDE
AIR THROUGH ROOF. COORDINATE ROOF PENETRATIONS
WITH STRUCTURAL.
AREA TO BE PROVIDED WITH DEDICATED CHILLED
WATER FAN COIL UNIT.
AREA TO BE EXHAUSTED.
ROOFTOP CHILLED WATER AIR HANDLER. PROVIDE
MANUFACTURER'S CLEARANCES. SUPPLY AND RETURN
DUCTING PENETRATIONS TO BE COORDINATED WITH
STRUCTURE.
ROOFTOP MAKE UP FAN FOR KITCHEN EQUIPMENT.
COORDINATE WITH KITCHEN DESIGNER. COORDINATE
ROOF PENETRATIONS WITH STRUCTURAL.
ROOFTOP EXHAUST FAN FOR KITCHEN EQUIPMENT.
COORDINATE WITH KITCHEN DESIGNER. COORDINATE
ROOF PENETRATIONS WITH STRUCTURAL.
ROUTE ABSORPTION CHILLER EXHAUST THROUGH ROOF
TO MUFFLER. COORDINATE ROOF PENETRATIONS WITH
STRUCTURAL.
PROVIDE DEDICATED DX/ CHILLED WATER UNIT FOR
ELEVATOR MACHINE ROOM.
ACOUSTICAL TREATED WALL. PROVIDE ACOUSTICAL
WRAP FOR PIPING PENETRATIONS.
REFRIGERANT PURGE SYSTEM FAN.
PROVIDE OUTSIDE AIR DROP FOR PURGE SYSTEM.
Dewberry Architects Inc.
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
13
14
A
E
FUTURE ELECTRIC CHILLER
ELECTRIC CHILLER
CHWPFUTURE
ABS
CWP-2
ABS
CHWP-2
ABS
CWP-1
ABS
A.1
CHWP-1
ABS
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
CWPFUTURE
ABS
CONTROL
CONFERENCE RM
313
ELECTRIC CHILLER
FUTURE ABSORPTION CHILLER
ABSORPTION CHILLER
10
CONTROL
ROOM
302
FUTURE SYS PUMP
SYS PUMP
CHW FAN COIL
REF
Pinellas County
A.1
OFFICE
4301
10
4
REF
B
B
CHW FAN COIL
5
STAIR
A
SA3
STAFF
TOILET
305
CWP- FUTURE
D
VESTIBULE
303
6
CHWP-FUTURE
CHW FAN COIL
ELEVATOR
LOBBY
CWP-3
CHWP-3
CWP- 2
CHWP-2
CWP-1
CHWP-1
CHW/ DX FAN COIL
CHW FAN COIL
ELEVATOR
A
EA
5
310
WATER
TREATMENT AND
HYDRONIC
SPECIALTIES AREA
CHW FAN COIL
GENERATOR
CONTROL
309
11
CHEMICAL
STORAGE
4
4
COUPON RACK AND
CHEMICALS
ELEVATOR
C
EC
STAIR
B
SB3
CHW FAN COIL
I.T.
ROOM
5
306
SEAL
SHOT FEEDER &
PUMPS
ELECTRICAL
C
114400 North 49th Street
Clearwater, FL.
A
C
312
PRELIMINARY DOCUMENTS
NOT FOR CONSTRUCTION
LAUNDRY CHW AHU
KEY PLAN
C
8
1
7
2
GAS ENGINE
SCALE
9
3
1/8" = 1'-0"
D
GENERATOR
ROOM
311
EXTERIOR
ROOF
ER1
1
EXTERIOR
ROOF
ER2
D
KITCHEN CHW AHU
2
7
B
FUTURE GAS ENGINE
KITCHEN EQUIPMENT
CONDENSING UNIT
No.
3
Description
Date
REVISIONS
E.9
E.9
12
F
F
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
03/19/2014
20" CHWS/R PIPING TO SOUTH CAMPUS.
SEE STRUCTURAL AND ARCHITECTURAL FOR ROUTING.
TITLE
1
1.1
3
5
6.9
7
THIRD FLOOR
MECHANICAL
PLAN
A
1
THIRD FLOOR PIPING PLAN
PROJECT NO.
Scale: 1/8" = 1'-0"
M-130
SHEET NO.
50057109
6
5
4
3
2
1
1
2
F
3
4
1
1.1
3
5
6.9
Dewberry Architects Inc.
Keynotes
ROUTE CONDENSER PIPING FROM TOWER
THROUGH ROOF SLAB TO PUMP LOCATED IN
MECHANICAL ROOM. COORDINATE ROOF
PENETRATION WITH STRUCTURAL.
GENERATOR ROOM INTAKE FAN. COORDINATE
FAN WITH STRUCTURE. PROVIDE PENTHOUSE.
PROVIDE SILENCERS AS REQUIRED.
GENERATOR ROOM EXHAUST FAN.
COORDINATE FAN WITH STRUCTURE. PROVIDE
PENTHOUSE. PROVIDE SILENCERS AS
REQUIRED.
ABSORPTION CHILLER MUFFLER AND
SILENCER. PROVIDE HEAT RECOVERY SYSTEM.
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
7
A
A
A.1
FUTURE MUFFLER
E
1
B
FUTURE 2-CELL
COOLING TOWER
(ELECTRIC CHILLER)
1
1
2-CELL COOLING TOWER
(ELECTRIC CHILLER)
2-CELL COOLING TOWER
(ELECTRIC CHILLER)
(2) SINGLE-CELL COOLING TOWERS
(ABSORPTION CHILLERS)
(1) FUTURE
Pinellas County
4
4
1
B
STAIR
A
SA4
D
114400 North 49th Street
Clearwater, FL.
MUFFLER
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
A.1
SEAL
C
C
1
PRELIMINARY DOCUMENTS
STAIR
B
SB4
NOT FOR CONSTRUCTION
KEY PLAN
C
2
3
SCALE
1/8" = 1'-0"
D
D
2
B
3
No.
FUTURE SUPPLY FAN
Description
Date
FUTURE EXHAUST FAN
REVISIONS
E.9
E.9
F
F
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
03/19/2014
TITLE
1
A
1
1.1
ROOF PIPING PLAN
3
5
6.9
7
ROOF
MECHANICAL
PLAN
Scale: 1/8" = 1'-0"
PROJECT NO.
M-140
SHEET NO.
50057109
6
5
4
3
2
1
Dewberry Architects Inc.
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
F
PIPING SYMBOL LEGEND
-FLOW DIRECTION
-GATE VALVE
-BALL VALVE
-CALIBRATING BALANCING VALVE
-BUTTERFLY VALVE
-GAS COCK
E
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
-STRAINER
-CONTROL VALVE
-CHECK VALVE
-FLOW SWITCH
-FLEX CONNECTION
-O.S.&Y. GATE VALVE
Pinellas County
-THREE-WAY CONTROL VALVE
-THERMOMETER
-TWO-WAY CHECK VALVE
MV
-MANUAL VENT
CHWP-1
-PRESSURE GAUGE
CHWP-2
FUTURE CHWP
ABSORPTION CHWP
EXPANSION TANK
FUTURE ABSORPTION CHWP
BYPASS
-RELIEF VALVE
FM
-FLOW METER
M
-WATER METER
-INLINE PUMP
-INLINE PUMP
D
FUTURE CHILLER
FROM BLDG
AIR SEPARATOR
114400 North 49th Street
Clearwater, FL.
-UNION
TO BLDG.
FUTURE SYSTEM PUMP
SEAL
CH-2
PRELIMINARY DOCUMENTS
NOT FOR CONSTRUCTION
SYSTEM PUMP
KEY PLAN
C
CH-1
SCALE
NOT TO SCALE
ABSORPTION CHILLER
B
FUTURE ABSORPTION CHILLER
No.
Description
Date
REVISIONS
CHILLED WATER PIPING DIAGRAM
No Scale
1
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
03/19/2014
TITLE
MECHANICAL
DIAGRAMS
A
PROJECT NO.
M-200
SHEET NO.
50057109
6
5
4
3
2
1
Dewberry Architects Inc.
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
F
PIPING SYMBOL LEGEND
-FLOW DIRECTION
-GATE VALVE
-BALL VALVE
-CALIBRATING BALANCING VALVE
-BUTTERFLY VALVE
-GAS COCK
-STRAINER
-CONTROL VALVE
-CHECK VALVE
-FLOW SWITCH
-FLEX CONNECTION
Pinellas County
-O.S.&Y. GATE VALVE
-THREE-WAY CONTROL VALVE
-THERMOMETER
CT-ABSORPTION FUTURE
CT-ABSORPTION
CT-1
CT-2
CT-FUTURE
-TWO-WAY CHECK VALVE
-RELIEF VALVE
MV
-MANUAL VENT
-PRESSURE GAUGE
FM
-FLOW METER
M
-WATER METER
-INLINE PUMP
D
-INLINE PUMP
FUTURE
CWP-ABSORPTION
CWP-ABSORPTION
CWP-1
FUTURE CHILLER
CH-2
CWP-2
CWP- FUTURE
114400 North 49th Street
Clearwater, FL.
E
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
-UNION
SEAL
CH-1
PRELIMINARY DOCUMENTS
NOT FOR CONSTRUCTION
KEY PLAN
C
ABSORPTION CHILLER
SCALE
FUTURE ABSORPTION CHILLER
NOT TO SCALE
B
No.
Description
Date
REVISIONS
CONDENSER WATER PIPING DIAGRAM
No Scale
1
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
03/19/2014
TITLE
MECHANICAL
DIAGRAMS
A
PROJECT NO.
M-201
SHEET NO.
50057109
6
5
4
3
2
1
Dewberry Architects Inc.
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
F
REFER TO P201, DETAIL 9 FOR FURTHER DETAIL
PLUMBING SYSTEM
TO
HEAT RECOVERY RECIRC PUMP
E
HOT EXHAUST GAS
HEAT RECOVERY HEAT EXCHANGER, SHELL IN TUBE
EXHAUST BYPASS VALVE
NO
NC
NO
ENGINE HIGH TEMP RADIATOR
Pinellas County
FLEX CONNECTION (TYP)
NATURAL GAS
GENSET
ABSORPTION CHILLER
3-WAY CATALYTIC
HIGH TEMP PUMP
RETURN TEMPERAURE
REGULATING 3-WAY VALVE
EXPANSION TANK
D
COGENERATOR DIAGRAM
114400 North 49th Street
Clearwater, FL.
SILENCER
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
FROM
1
No Scale
SEAL
PRELIMINARY DOCUMENTS
NOT FOR CONSTRUCTION
KEY PLAN
C
FUTURE EXPANSION TANK ON TOP OF RADIATOR
12" MAX.
EXPANSION TANK ON TOP OF RADIATOR
FLOW LIMITING
VALVES
SCALE
MOUNT HEAT EXCHANGER AS CLOSE
AS POSSIBLE TO RADIATOR.
NOT TO SCALE
TYPICAL FLEXIBLE CONNECTIONS
HOT WATER PIPING
(200 F.) OFF THE DUAL ENGINES
PIPING TO PLUMBING SYSTEM
SEE PLUMBING FOR CONTINUATION
REFER TO P201, DETAIL 9 FOR FURTHER DETAIL
TYPICAL SHUT-OFF VALVE
12" MAX.
RADIATOR
HEAT EXCHANGER
B
No.
Description
Date
REVISIONS
COGENERATOR DIAGRAM
No Scale
2
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
03/19/2014
TITLE
MECHANICAL
DIAGRAMS
A
PROJECT NO.
M-202
SHEET NO.
50057109
6
5
4
3
2
1
Dewberry Architects Inc.
401 SW Water St.
Suite 701
Peoria, IL 61602
309.282.8000 Phone
309.282.8001 Fax
AUTOMATIC FLOW
CONTROL
DEVICE PRESET BY MANUF.
W/ P & T TEST PORTS,
STRAINER, AND DRAIN.
(PRE-MANUF. SINGLE
ASSEMBLY ACCEPTABLE)
THREE WAY
CONTROL
VALVE
EXTENDED OPERATOR
ON BALANCE DAMPER
SPIN-IN FITTING W/VOLUME
CONTROL DAMPER (INSUL.
PER SPEC.)
MANUAL AIR VENT
W/AUTO
SHUT-OFF COCK
DRAW BAND
(PRE-MANUF. SINGLE
ASSEMBLY ACCEPTABLE)
STEEL RODS W/THREADED
ENDS (TYP. 4 PLACES)
SUPPORT FROM STRUCTURE
ABOVE AS REQUIRED
THREADED CAP, HAND TIGHTENED
COIL
RETURN
SPRING VIB. ISOLATORS
THREADED CAP WITH 1/4" DIA.
HOLE DRILLED IN TOP, HAND
TIGHTENED.
UNION
PROVIDE WITH FILTER
OVER OPENING
FLEXIBLE DUCT MAX.
8'-0" IN LENGTH
FULLY EXTENDED.
COOLING COIL
FLEX CONN. (TYP.)
SA
SUPPLY
FAN
RA
B
PLUG
COCK
SHUT-OFF VALVE (TYP.)
DRAW BAND
A
DRAIN PAN
SLOPE TO DRAIN
BLANK-OFF PLATES
WHERE REQUIRED
C
P/T TEST PORTS
CASING SLEEVE
FLOAT SWITCH
UNION (TYP.)
DIFFUSER CONE (INSUL. PER SPEC.)
SNUBBER
CONDENSATE DRAIN PIPING DIMENSIONS:
THERMOMETER W/SEPARABLE WELL (TYP.)
CEILING TEE
ROUTE MAIN CONDENSATE
LINE TO FLOOR DRAIN
A = FULL SIZE OF UNIT DRAIN CONNECTION
B > 1-1/2" TIMES FAN SUCTION STATIC PRESSURE
C > FAN DISCHARGE STATIC PRESSURE PLUS 1/2" INCH
BALL VALVE
CEILING
GALVANIZED SHEET METAL SECONDARY
DRAIN PAN TO EXTEND 3" BEYOND UNIT
ON ALL SIDES BY 1-1/2" DEEP
COORDINATE MOUNTING/CURB HEIGHT AS REQUIRED TO PROVIDE PROPER CONDENSATE DRAINAGE.
FLEX. CONNECTION (TYP.)
NOTES: 1. PROVIDE (4 x DIA.) OF STRAIGHT PIPE ON BOTH SIDES OF
BALANCING VALVE
2. ALL COMPONENTS FULL LINE SIZE UNLESS NOTED OTHERWISE
3. LOCATE UNIONS TO ALLOW FOR COIL PULL
LIGHT
3-WAY COIL PIPING DIAGRAM (FCU-4)
1
NOT TO SCALE
AHU CONDENSATE DRAIN TRAP
2
NOT TO SCALE
D
DIFFUSER MOUNTING
3
NOT TO SCALE
FAN COIL UNIT
4
NOT TO SCALE
GEAR W/HAND WHEEL
5" AND LARGER
LEVER LATH HANDLE
W/MEMORY STOP
4" AND SMALLER
THREE LAYERS OF 5/8" GYPBOARD, REFER
TO SPECIFICATION SECTION 15910
DAMPER, TYPICAL
MANUAL BALANCING
PRESSURE GAUGE
BUTTERFLY
VALVE (TYP.)
TOP OF DUCT TO BE
AS HIGH AS POSSIBLE
TAP, TYPICAL 45
DEGREE BOOT
114400 North 49th Street
Clearwater, FL.
PRESSURE GAUGE &
COCK (TYP.)
E
Pinellas County Jail Phase I
Infrastructure Criteria Package - Drawings
DIFFUSER NECK (INSUL. PER SPEC.)
AIR FLOW
STRAINER W / BLOWDOWN
Pinellas County
F
SNUBBER
BALL VALVE
EXTEND TREATMENT
ACROSS OPEN CEILING
SEE PLAN DRWGS.
DIFFERENTIAL
PRESSURE
TRANSMITTER
P/T PORT W/BLOWDOWN
VALVE (TYP.)
DRAW BAND
NON-SLAM CHECK
VALVE
SEAL
FLEXIBLE CONNECTER
SILENCER
SUPPLY
DUCT
FLEXIBLE
CONNECTOR
DIAMETER TO MATCH
SYSTEM PIPING
DIAMETER
PRELIMINARY DOCUMENTS
NOT FOR CONSTRUCTION
s" PUMP DRAIN,
EXTEND TO FLOOR
NEAREST DRAIN
SUCTION DIFFUSER W/INTEGRAL
STRAINER & 3/4" BLOW DOWN
VALVE. EXTEND TO NEAREST
FLOOR DRAIN
C
FLEXIBLE DUCT
SPIN-IN FITTING W/VOLUME
CONTROL DAMPER (INSUL. PER
SPEC. REQ'D.)
PIPE SUPPORT
RADIUS ELBOWS MAY
BE USED IN LIEU OF
SQUARE ELBOWS
KEY PLAN
WALL
DIAMETER TO MATCH PUMP
INLET DIAMETER
NOISE CONTROL TREATMENT AT DUCT SILENCER
5
NOT TO SCALE
CONCRETE
HOUSEKEEPING
PAD
PIPE SUPPORT
SPLIT-CASE DOUBLE SUCTION PUMP
6
NOT TO SCALE
TYPICAL FLEX DUCT CONNECTION
7
NOT TO SCALE
TYPICAL PRESSURE DUCTWORK
SCALE
8
NOT TO SCALE
NOT TO SCALE
VALVES ABOVE TUBE
PULL (TYP.)
ACTUATOR & VALVE
BY CONTROLS
CONTRACTOR (TYP.)
LUG TYPE BUTTERFLY
VALVE W/GEAR
OPERATOR (TYP.)
120 VAC
BEACON
ALARM WIRING PER
ASHRAE 15 TO EMS
TEMP. SENSOR
(TYP.)
A
DIFFERENTIAL PRESSURE
SENSOR/TRANSMITTER
(TYP.)
CWS
ANALOG OUTPUT
WIRING
PROVIDE NEW REMOTE
ALARM BEACON
OUTSIDE ALL
CHILLER ROOM
ENTRY DOORS
B
A
REFRIGERANT
MONITOR
PANEL
ROCK FREE BACKFILL
1'-0" MIN.
PITTWRAP JACKETING
FLEXIBLE
CONNECTOR
FLEX CONNECTION
RESETTING RELIEF ASSEMBLY
BY EQUIPMENT MANUFACTURER
FOAMGLASS INSULATION
SAMPLE TUBE
FLANGED JOINT
6".
SAND BACKFILL
6".
6" MIN.
COMPRESSION
COUPLING
FILTER
FULL SIZE OF VENT
OPENING (MIN.) OR AS
CODE REQUIRES
CHILLER
12" TO 18"
GRAVEL
No.
Description
Date
RELIEF VENT
TO CHILLER
PIPE
CHWR
SAMPLE LINES
SUPPORT TO
COLUMN OR
WALL
NOTES:
1.
PROVIDE REFRIGERANT MONITOR CAPABLE OF
SENSING R-123 REFRIGERANT.
2.
NEW EXHAUST FAN.
3.
PROVIDE TWO REFRIGERANT SAMPLE LINES I
LOCATIONS AS SHOWN ON PLANS.
CHILLER DIFFERENTIAL PRESSURE
SWITCH TO CHILLER CONTROL PANEL
PRESSURE GAUGE W/
SNUBBER & BALL
VALVES (TYP.)
CONNECT NEW
RELIEF PIPING TO
EXISTING RELIEF
PIPING HEADER.
6" MIN.
THERMOMETER (TYP.)
CHWS
CWR
R OOF
COMPRESSOR
SUCTION
CONNECTION
RELIEF PIPING SHALL BE SIZED
AND INSTALLED IN ACCORDANCE
WITH ASHRAE STANDARD 15.
MINIMUM RELIEF PIPING SIZE
INDICATED ON FLOOR PLAN.
DEVIATION FROM SIZE INDICATED
IS ACCEPTABLE ONLY AFTER
RECOMMENDATION FROM
CHILLER MANUFACTURER AND
APPROVAL OF THE ENGINEER.
COORDINATE RELIEF PIPING
REQUIREMENTS WITH CHILLER
MANUFACTURER.
REVISIONS
CONTROL
PANEL
CONDENSER
TO CONTROL
PANEL
DRAWN BY
HAT
APPROVED BY
LTE
CHECKED BY
LTE
DATE
VIBRATION ISOLATION
SPRINGS (TYP.)
EVAPORATOR
03/19/2014
TITLE
HOUSEKEEPING
PAD
MECHANICAL
DETAILS
FLANGED ELBOW W/
LIFT PLATE (TYP.)
FLOOR SLAB
FLOOR
A
6" MINIMUM
MECHANICAL JOINT (SIMILIAR
TO A VICTAULIC COUPLING)
r" FL x r" NPT DRAIN
VALVE (5'-0" ABOVE FLR.)
PETE'S PLUG (TYP.)
PROJECT NO.
UNDERGROUND PIPING INSTALLATION
NOT TO SCALE
9
REFRIGERANT MONITORING
NOT TO SCALE
10 RELIEF PIPING
NOT TO SCALE
11 WATER COOLED CHILLER
NOT TO SCALE
12
M-300
SHEET NO.
50057109