6 5 4 3 2 1 Dewberry Architects Inc. SYMBOL DESCRIPTION -CEILING DIFFUSER, ROUND NECK (CEILING DIFFUSERS ARE 4-WAY THROW UNO) F SYMBOL DESCRIPTION -TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME WITH ELECTRIC HEAT -FIRE DAMPER (WITH ACCESS PANEL) -TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME WITH ELECTRIC HEAT -FIRE & SMOKE DAMPER (WITH ACCESS PANEL) -ROUND DIFFUSER -CEILING RETURN -EXISTING FIRE DAMPER TO REMAIN -CEILING EXHAUST -TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME, FAN POWERED -EXISTING FIRE & SMOKE DAMPER TO REMAIN -CEILING DIFFUSER, RECTANGULAR OR SQUARE NECK (CEILING DIFFUSERS ARE 4-WAY THROW UNO) SA-1 -SOUND ATTENUATOR -SUPPLY REGISTER OR GRILLE (VERTICAL MOUNT, SIDEWALL) -TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME, FAN POWERED, WITH ELECTRIC HEAT -MOTOR OPERATED CONTROL DAMPER (MOD) M -RETURN/EXHAUST REGISTER OR GRILLE (VERTICAL MOUNT, SIDEWALL) -ELECTRIC DUCT HEATER (W/ PANEL CLEARANCE) -AIR FLOW MEASURING STATION FM -REVISION REFERENCE 1 -MANUAL BALANCING DAMPER -DETAIL REFERENCE: TOP-DETAIL#, BOTTOM-DRAWING# SHOWN ON T -THERMOSTAT/TEMPERATURE SENSOR H -HUMIDISTAT/HUMIDITY SENSOR -DUCT SMOKE DETECTOR E -HYDRONIC REHEAT COIL -DOOR GRILLE UC 1 M-1 -INLINE CENTRIFUGAL FAN -UNDERCUT DOOR -CONNECT TO EXISTING -PACKAGED TERMINAL AIR CONDITIONER (PTAC) -ACCESS DOORS, VERTICAL OR HORIZONTAL -DEMOLISH TO POINT INDICATED -MOTORIZED CONTROL DAMPER M TS -TEMPERATURE SENSOR P -PRESSURE SENSOR -STAINLESS STEEL DUCTWORK UP DN -CHANGE OF ELEVATION -FLEXIBLE CONNECTION -FLEXIBLE DUCT 12x8 -BACKDRAFT DAMPER BD -FLAT OVAL DUCT -TRANSITION, CONCENTRIC -NEUTRAL RELATIVE PRESSURE 0 24x12 -NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN -POSITIVE RELATIVE PRESSURE + _ -NEGATIVE RELATIVE PRESSURE 24x12 -EXISTING DUCTWORK TO REMAIN 1 -SHEET NOTE CALLOUT 24x12 -EXISTING DUCTWORK TO BE REMOVED -SHEET NOTE CALLOUT SYMBOL DESCRIPTION 1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED. AFD -ADJUSTABLE FREQUENCY DRIVE LD -LINEAR DIFFUSER AFF -ABOVE FINISHED FLOOR MBH -THOUSAND BTUs PER HOUR AFR -ABOVE FINISHED ROOF MCA -MINIMUM CIRCUIT AMPS AHU -AIR HANDLING UNIT MOCP -MAXIMUM OVER CURRENT PROTECTION AP -ACCESS PANEL MOD -MOTOR OPERATED CONTROL DAMPER (MOD) BOP -BOTTOM OF PIPE NC -NORMALLY CLOSED BHP -BRAKE HORSEPOWER NO -NORMALLY OPEN BTU -BRITISH THERMAL UNIT NTS -NOT TO SCALE h -CENTER LINE OA -OUTSIDE AIR c -CFM (CUBIC FEET PER MINUTE) OAL -OUTSIDE AIR LOUVER CD -CEILING DIFFUSER PRV -PRESSURE REDUCING VALVE CT -COOLING TOWER PRS -PRESSURE REDUCING STATION CV -CONSTANT AIR VOLUME PSI -POUNDS PER SQUARE INCH P -CHANGE IN PRESSURE PSIG -PSI GAUGE T -CHANGE IN TEMPERATURE PTAC -PACKAGED TERMINAL AIR CONDITIONER CFM -CUBIC FEET PER MINUTE PVC -POLYVINYL CHLORIDE PIPE CU -CONDENSING UNIT RA -RETURN AIR DDC -DIRECT DIGITAL CONTROLS RHC -REHEAT COIL DN -DOWN RHP -ROOFTOP HEAT PUMP EAT -ENTERING AIR TEMPERATURE RPM -REVOLUTIONS PER MINUTE ESP -EXTERNAL STATIC PRESSURE RS/L -REFRIGERANT SUCTION & LIQUID LINES EWT -ENTERING WATER TEMPERATURE RTU -ROOFTOP AIR HANDLING UNIT FCU -FAN COIL UNIT SA -SUPPLY AIR FD -FIRE DAMPER SP -STATIC PRESSURE FF -FINAL FILTERS TSP -TOTAL STATIC PRESSURE FLA -FULL LOAD AMPS UNO -UNLESS NOTED OTHERWISE FPM -FEET PER MINUTE V/PH -VOLTS/PHASE GPM -GALLONS PER MINUTE VAV -VARIABLE AIR VOLUME KW -KILOWATT VFD -VARIABLE FREQUENCY DRIVE LAT -LEAVING AIR TEMPERATURE LWT -LEAVING WATER TEMPERATURE 2. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT. 3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARD. 4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK. 5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS. 6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED. 7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND EQUIPMENT OF ALL TRADES. 8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS. 9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION. 10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. 11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT BLACK. 12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT. 13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED. 14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT. 15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT. 16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS. 17. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND OTHER AIR DISTRIBUTION DEVICES. 18. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR HANDLING UNITS, AND FAN COIL UNITS. -TRANSITION, SQUARE TO ROUND 10x8 -DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST 1 DESCRIPTION 24x12 -SHEET NOTE CALLOUT 1 -TRANSITION, ECCENTRIC SYMBOL UP W/IN FLOOR DOWN -CEILING MOUNTED ACCESS DOOR 19. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE CONNECTED. -SQUARE THROAT TEE DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING 20. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE. -DUCT ELBOW, EXHAUST -DUCT ELBOW, NEGATIVE PRESSURE, RETURN -RADIUS TEE 12x8 21. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR DISPOSED OF LEGALLY, AS DIRECTED BY OWNER. -DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE D 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax -RECTANGULAR DUCT SECTION UP, POSITIVE PRESSURE, SUPPLY OR OUTSIDE AIR 22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS. -RECTANGLE-TO-ROUND TAKE-OFF 23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10' CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE LOCATIONS. -RECTANGULAR DUCT SECTION UP, NEGATIVE PRESSURE, RETURN -STANDARD BRANCH TAKE-OFF -RECTANGULAR DUCT SECTION UP, EXHAUST -ROUND DUCT SECTION UP 24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK. 25. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI. -SPIN-IN TAKE-OFF 114400 North 49th Street Clearwater, FL. DESCRIPTION HVAC GENERAL NOTES Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings SYMBOL HVAC ABBREVIATIONS Pinellas County HVAC SYMBOL LEGEND 26. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST PLUMBING DRAIN. -FLAT OVAL DUCT SECTION UP -SQUARE THROAT ELBOW W/TURNING VANES 27. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT WATER PIPING. 28. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC-110.26. -RADIUS ELBOW SEAL -RECTANGULAR/ROUND BRANCH TAKE-OFF OR ROUND/ROUND BRANCH TAKE-OFF PRELIMINARY DOCUMENTS -EXHAUST DUCT UP THROUGH SLAB W/ FAN ON ROOF ABOVE NOT FOR CONSTRUCTION -EXHAUST FAN ON ROOF W/ DUCT DOWN THROUGH ROOF KEY PLAN C HVAC PIPING SYMBOL LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC EQUIPMENT TAGS SYMBOL EQUIP. CWS -CONDENSER WATER SUPPLY -FLOW DIRECTION CWR -CONDENSER WATER RETURN -GATE VALVE -CHILLED WATER SUPPLY -BALL VALVE CHWS CHWR DESCRIPTION TAG A - P-TRAP -AIR DISTRIBUTION DEVICE 200 CFM -TWO-WAY CHECK VALVE SCALE MV AHU NUMBER -MANUAL VENT -CHILLED WATER RETURN -CALIBRATING BALANCING VALVE CD -CONDENSATE -BUTTERFLY VALVE CR -CONDENSATE RETURN -GAS COCK -PRESSURE GAUGE PC -PUMPED CONDENSATE -UNION -RELIEF VALVE AHU-1 HWR HWS -HOT WATER SUPPLY HPS -HIGH PRESSURE STEAM SUPPLY MPS -MEDIUM PRESSURE STEAM SUPPLY -LOW PRESSURE STEAM SUPPLY S -STRAINER FM -FLOW METER -CONTROL VALVE M -WATER METER -SOLENOID VALVE -PSI REG. -CHECK VALVE HPR -HIGH PRESSURE STEAM RETURN MPR -MEDIUM PRESSURE STEAM RETURN -FLOW SWITCH LPR -LOW PRESSURE STEAM RETURN -SLOPE DIRECTION (DOWN) -REFRIGERANT LIQUID -FLEX CONNECTION RL RS -REFRIGERANT SUCTION D D -VALVE ON RISER -CAP -CONNECTION, BOTTOM VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS VTU - VARIABLE TERMINAL UNIT CTU - CONSTANT TERMINAL UNIT PTU - PARALLEL TERMINAL UNIT STU - SERIES TERMINAL UNIT AHU NUMBER TERMINAL NUMBER VTU-1-1 No. Description Date -COUPLING -O.S.&Y. GATE VALVE -ELBOW, 90° -STEAM TRAP -ELBOW, 45° -THREE-WAY CONTROL VALVE -ELBOW, TURNED DOWN -45° PIPE RISE (R) / DROP (D) -ELBOW, TURNED UP -PIPE ANCHORS -REHEAT COIL RHC-1-1 TERMINAL UNIT TYPE -INLINE PUMP -CONNECTION, TOP -TEE, OUTLET DOWN -TEE, OUTLET UP -INLINE PUMP 12" = 1'-0" COIL NUMBER -HOT WATER RETURN LPS B AHU NUMBER -AIR HANDLING UNIT -THERMOMETER REVISIONS DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE -CONCENTRIC REDUCER -ECCENTRIC REDUCER 03/19/2014 TITLE MECHANICAL LEGEND A NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT PROJECT NO. M-000 SHEET NO. 50057109 6 5 4 3 2 1 Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax F SAFE HARBOR GENERAL NOTES: (N)CHWS/R BRANCH TO NEW BUILDING 1. ALL EXISTING, PLASTIC CHILLED WATER PIPING SHALL BE DEMOLISHED/ABANDONED. ANY METALLIC BRANCH PIPING THAT IS CONNECTED TO PLASTIC MAIN PIPE SHALL BE DISCONNECTED FROM THE PLASTIC PIPE. METAL ENDS SHALL BE CAPPED AND LEFT IN SUITABLE CONDITION FOR CONNECTION TO NEW, METALLIC UNDERGROUND CHILLED WATER LINES. CONTRACTOR TO VERIFY WHERE PLASTIC PIPE ENDS AND METAL PIPE BEGINS. 2. FINAL PIPE SIZE TO BE DETERMINED BY FINAL DESIGN BUILD CONTRACTOR. (N)CHWS/R DISTRIBUTION (E)4" CHWS/R (E)4" CHWS/R "M1" (E)6" CHWS/R (E)6" CHWS/R (E)1" BALL VALVES (N) CHWS/R DISTRIBUTION (E)8" CHWS/R "B" 145TH AVE N HEALTH CARE FACILITY (E)4" CHWS/R (E) CHWS/R VALVE BOX "A" SHERIFF ADMIN. 2' V ALLEY GU TTER (E)4" CHWS/R (E)4" CHWS/R "C" D "M2" 49TH ST N (E)3" CHWS/R (E)3" CHWS/R (E)8" CHWS/R 142ND AVE N (N) 20" CHWS/R DISTRIBUTION RUN PARALLEL TO EXISTING PIPING SERVING CENTRAL/INTAKE AND HOUSING A-G (E) CHWS/R CENTRAL DIVISION POND POND 114400 North 49th Street Clearwater, FL. (N)CHWS/R DISTRIBUTION Pinellas County E Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings CR OS SB AYO U (N)CHWS/R BRANCH TO NEW BUILDING SEAL PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION C PINELLAS COUNTY CRIMINAL COURT COMPLEX SOUTH DIVISION (E) CHWS/R (N)CHWS/R PIPING BRIDGED OVER TO STATE ATTORNEY/ CJC CENTER "G" MAINTENANCE KEY PLAN POND "F" "E" "D" "C" POND SCALE 1" = 100'-0" SIR LB021 (FI R 1/2" LB1344 0.30' S., 0.50' W.) OHE OHE OHE LAND LINE JURISDICT IONAL WET B No. Description Date REVISIONS DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE JUVENILE DETENTION CENTER 03/19/2014 TITLE MECHANICAL SITE PLAN EDGE OF W ATER ASPHALT WALK A 1 MECHANICAL SITE PLAN 140TH AVE N FIR 1/2" LB1344 PROJECT NO. EDGE OF W ATER M-001 Scale: 1" = 100'-0" SHEET NO. 50057109 6 5 4 3 2 1 1 2 3 4 5 6 7 F 1 1.1 3 5 USED OIL TANK 6.9 Keynotes AREA TO BE PROVIDED WITH DEDICATED CHILLED WATER FAN COIL UNIT. AREA TO BE EXHAUSTED. FAN TO BE CHEMICAL RATED. AREA TO BE EXHAUSTED. VAV BOX WITH ELECTRIC HEAT. PROVIDE ACCESS PANEL AS REQUIRED. PROVIDE LINT TRAP. DRYER EXHAUST FAN. ROUTE TO EXTERIOR WALL. COMBUSTION AIR MAKE UP FAN. ROUTE TO EXTERIOR WALL. Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax 7 NEW OIL TANK A A S WORKER STAGING 122 LOADING DOCK 105 PROGRAM MEETING ROOM 111 4 STORAGE B D 4 SALLYPORT SERVICE DRIVE 103 DOCK STORAGE 102 BULK REFIG STORAGE 109 JANITOR 142 3 INMATE TOILET 119 4 INMATE TOILET 113 3 T S STORAGE 112 B JANITOR 114 3 T T T T 1 SEARCH 123 Pinellas County 3 INMATE TOILET 121 DOCK STAGING 107 SECURITY ELECTRONICS 101 Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings E PROGRAM MEETING ROOM 116 PROGRAM MEETING ROOM 110 BULK DRY STORAGE 108 STAFF 4 3 3 4 118 T S STAIR A SA1 MEDIUM PRESSURE SUPPLY DUCT ESTIMATED 80x30 FEC FEC C CO AND NO2 SENSORS LINKED TO ALARM ELEVATOR A EA 1 ELECTRICAL 140 CART WASH 139 OFFICE/ 137 WATER HEATER 124 ELEVATOR B EB 114400 North 49th Street Clearwater, FL. A.1 A.1 STAIR B SB1 ELEVATOR C EC C C SEAL 3 STAFF TOILET 125 NOT FOR CONSTRUCTION AIR 1 COMPRESSOR 126 GARBAGE/ RECYCLE DOCK 106 C PRELIMINARY DOCUMENTS KEY PLAN 3 UTILITY WASH 136 TRASH COMPACTOR CLEAN LAUNDRY STORAGE 135 CENTRAL LAUNDRY 138 T SCALE D D 1/8" = 1'-0" 4 T S PARKING AREA WATER TANK STORAGE 104 B DRYERS 127 STORAGE 134 MAINTENANCE SUPPLY 133 T 7 S 4 T T RISER ROOM 132 UNIFORM STORAGE 131 INMATE TOILET 129 BREAK ROOM 130 CHEMICAL STORAGE 128 2 3 5 No. E.9 H E.9 6 2448 2448 Description Date REVISIONS C F F DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE 03/19/2014 TITLE 1 A 1 1.1 FIRST FLOOR MECHANICAL PLAN 3 5 6.9 7 FIRST FLOOR MECHANICAL PLAN Scale: 1/8" = 1'-0" PROJECT NO. M-110 SHEET NO. 50057109 4 3 2 1 1 2 3 4 5 6 F 7 1.1 3 5 6.9 A C H 5 SECURED STORAGE 209 E 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax 7 A C A.1 DRY FOOD STORAGE 204 Dewberry Architects Inc. H 1 Keynotes ROUTE EXHAUST DUCTWORK, APPROXIMATELY 60x20, TO KITCHEN HOODS. COORDINATE WITH KITCHEN DESIGNER. ROUTE MAKE UP DUCTWORK, APPROXIMATELY 50x20, TO KITCHEN EQUIPMENT. COORDINATE WITH KITCHEN DESIGNER. ROUTE SUPPLY AND DUCTING TO MECHANICAL CHASE. AREA TO BE EXHAUSTED. AREA TO BE EXHAUSTED. FAN TO BE CHEMICAL RATED. AREA TO BE PROVIDED WITH DEDICATED CHILLED WATER FAN COIL UNIT. REFRIGERATER/ FREEZER AREA. SEE KITCHEN EQUIPMENT PLANS. BREAK ROOM 211 A.1 CHEMICAL STORAGE (SECURE) 216 WARE WASH AREA 215 4 EQUIPMENT STORAGE 203 UNIFORM 205 TRAY MAKE-UP 220 OFFICE 213 INMATE TOILET 207 B H C JAN/EQUIP SUPPLIES 202 6 C KITCHEN/LAUNDRY STORAGE 201 H CORRIDOR 210 4 INMATE TOILET 208 B FOOD SERVICE MGMT OFFICE 214 4 STORAGE 218 C CART STORAGE AND WASHING 219 STAFF TOILET 206 Pinellas County STORAGE/ FUTURE LINK 217 CORRIDOR 212 4 4 D STAIR A SA2 CORRIDOR 221 CORRIDOR 250 FEC FEC 6 4 4 TRASH HOLDING 246 ICE/BEV. 234 ELEVATOR A EA ELEVATOR B EB ELEC 233 D DAIRY COLDROOM 247 JAN 249 114400 North 49th Street Clearwater, FL. 5 Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings 6 STAIR B SB2 ELEVATOR C EC D C D2 C D2 C1 C1 SEAL E1 E2 G 3 E1 E2 G D1 STAFF DINING MULTI-PURPOSE 232 NOT FOR CONSTRUCTION 12"X12" 1075 CFM .27" S.P. G G FIRE CABINET G G G STEAM CO N DEN SATE TRAP AN D ST RAI N ER 12"X10" 1456 CFM .39" S.P. 9"X8" 538 CFM .07" S.P. G G 12"X12" 937 CFM .27" S.P. SAFET Y VA LVE VALVE 1/ 2" N PT SATE 12"X9"CO N DEN RETU RN 1217 CFM STEAM .37" S.P. CO N TRO L SAFET Y VA LVE STEAM CO N DEN SATE TRAP AN D ST RAI N ER STEAM CO N TRO L VALVE 1/ 2" N PT 12"X12" 937 CFM .27" S.P. 1 C C STEAM CO N DEN SATE TRAP AN D ST RAI N ER H D APPROXIMATE RETURN DUCT SIZE 70x24 SAFET Y VA LVE G 12"X10" 1353 CFM .43" S.P. 1/ 2" N PT CO N DEN SATE RETU RN 11"X8" 1012 CFM .29" S.P. SCALE D 12"X12" 937 CFM .27" S.P. JAN 228 STEAM CO N TRO L VALVE SAFET Y VA LVE #321.2L C STEAM CO N DEN SATE TRAP AN D ST RAI N ER 1/ 2" N PT CO N DEN SATE RETU RN STEAM CO N TRO L VALVE #321.1L SAFET Y VA LVE CO N DEN SATE 12" X9" RETU RN 1216 CFM .37" S.P. 12"X12" 937 CFM .27" S.P. 12"X10" 1379 CFM .42" S.P. R 12"X10" 809 CFM .20" S.P. D R C D G D KEY PLAN R #321.2R R FINISHED BULK COLDROOM 243 3 SERVING 231 #321.6L STEAM CO N TRO L VALVE BULK MEAT COLDROOM 242 2 FOOD PREP SERVICE AREA 230 D C PRELIMINARY DOCUMENTS CORRIDOR 222 G FINISH PRODUCE COLDROOM 245 G HOT FOOD PRODUCTION 235 12"X11" 1648 CFM .47" S.P. CORRIDOR 251 D1 #321.6R BULK PRODUCE COLDROOM 248 STEAM CO N DEN SATE TRAP AN D ST RAI N ER 1/8" = 1'-0" 12"X12" 937 CFM .27" S.P. 4 FAUCET, TANGENT DRAW-OFF ARE OPTIONAL H C DEN SATE 12"X10"CO N RETU RN 1352 CFM .43" S.P. 1/ 2" N PT G 12"X10" 809 CFM .20" S.P. G #321.1R G G THAW/PULL 241 11"X8" 1011 CFM .29" S.P. C BULK COLDROOM 242 4 FIRE CABINET D C D MULTI-PURPOSE 223 STAFF TOILET 227 CORRIDOR 229 STAFF 4 TOILET 226 H APPROXIMATE SUPPLY DUCT SIZE 96x24 A/V CLOSET 224 REF DAILY DRY STORAGE 236 FINISH VEG PREP 237 REF FINISH MEAT PREP 238 -10 FREEZER 239 C -20 FREEZER 240 MIC MIC H C B 6 E.9 E.9 C H H C F F 7 CONNECTOR TO CENTRAL TOWER CN No. Description Date REVISIONS DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE 03/19/2014 TITLE 1 A 1 1.1 SECOND FLOOR MECHANICAL PLAN Scale: 1/8" = 1'-0" 3 5 6.9 7 SECOND FLOOR MECHANICAL PLAN PROJECT NO. M-120 SHEET NO. 50057109 6 5 4 3 2 1 1 2 3 4 5 6 7 F 8 9 10 11 1 1.1 3 5 6.9 7 12 13 14 Keynotes GENERATOR RADIATOR. PIPE TO AND FROM GENERATOR. THREE- WAY CATALYST INSTALLED ON EXHAUST GAS PIPE. ROUTE EXHAUST GAS PIPE SHORTEST DISTANCE TO ABSORPTION CHILLER. NEW CHILLED WATER FAN COIL UNIT. ROUTE OUTSIDE AIR THROUGH ROOF. COORDINATE ROOF PENETRATIONS WITH STRUCTURAL. AREA TO BE PROVIDED WITH DEDICATED CHILLED WATER FAN COIL UNIT. AREA TO BE EXHAUSTED. ROOFTOP CHILLED WATER AIR HANDLER. PROVIDE MANUFACTURER'S CLEARANCES. SUPPLY AND RETURN DUCTING PENETRATIONS TO BE COORDINATED WITH STRUCTURE. ROOFTOP MAKE UP FAN FOR KITCHEN EQUIPMENT. COORDINATE WITH KITCHEN DESIGNER. COORDINATE ROOF PENETRATIONS WITH STRUCTURAL. ROOFTOP EXHAUST FAN FOR KITCHEN EQUIPMENT. COORDINATE WITH KITCHEN DESIGNER. COORDINATE ROOF PENETRATIONS WITH STRUCTURAL. ROUTE ABSORPTION CHILLER EXHAUST THROUGH ROOF TO MUFFLER. COORDINATE ROOF PENETRATIONS WITH STRUCTURAL. PROVIDE DEDICATED DX/ CHILLED WATER UNIT FOR ELEVATOR MACHINE ROOM. ACOUSTICAL TREATED WALL. PROVIDE ACOUSTICAL WRAP FOR PIPING PENETRATIONS. REFRIGERANT PURGE SYSTEM FAN. PROVIDE OUTSIDE AIR DROP FOR PURGE SYSTEM. Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax 13 14 A E FUTURE ELECTRIC CHILLER ELECTRIC CHILLER CHWPFUTURE ABS CWP-2 ABS CHWP-2 ABS CWP-1 ABS A.1 CHWP-1 ABS Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings CWPFUTURE ABS CONTROL CONFERENCE RM 313 ELECTRIC CHILLER FUTURE ABSORPTION CHILLER ABSORPTION CHILLER 10 CONTROL ROOM 302 FUTURE SYS PUMP SYS PUMP CHW FAN COIL REF Pinellas County A.1 OFFICE 4301 10 4 REF B B CHW FAN COIL 5 STAIR A SA3 STAFF TOILET 305 CWP- FUTURE D VESTIBULE 303 6 CHWP-FUTURE CHW FAN COIL ELEVATOR LOBBY CWP-3 CHWP-3 CWP- 2 CHWP-2 CWP-1 CHWP-1 CHW/ DX FAN COIL CHW FAN COIL ELEVATOR A EA 5 310 WATER TREATMENT AND HYDRONIC SPECIALTIES AREA CHW FAN COIL GENERATOR CONTROL 309 11 CHEMICAL STORAGE 4 4 COUPON RACK AND CHEMICALS ELEVATOR C EC STAIR B SB3 CHW FAN COIL I.T. ROOM 5 306 SEAL SHOT FEEDER & PUMPS ELECTRICAL C 114400 North 49th Street Clearwater, FL. A C 312 PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION LAUNDRY CHW AHU KEY PLAN C 8 1 7 2 GAS ENGINE SCALE 9 3 1/8" = 1'-0" D GENERATOR ROOM 311 EXTERIOR ROOF ER1 1 EXTERIOR ROOF ER2 D KITCHEN CHW AHU 2 7 B FUTURE GAS ENGINE KITCHEN EQUIPMENT CONDENSING UNIT No. 3 Description Date REVISIONS E.9 E.9 12 F F DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE 03/19/2014 20" CHWS/R PIPING TO SOUTH CAMPUS. SEE STRUCTURAL AND ARCHITECTURAL FOR ROUTING. TITLE 1 1.1 3 5 6.9 7 THIRD FLOOR MECHANICAL PLAN A 1 THIRD FLOOR PIPING PLAN PROJECT NO. Scale: 1/8" = 1'-0" M-130 SHEET NO. 50057109 6 5 4 3 2 1 1 2 F 3 4 1 1.1 3 5 6.9 Dewberry Architects Inc. Keynotes ROUTE CONDENSER PIPING FROM TOWER THROUGH ROOF SLAB TO PUMP LOCATED IN MECHANICAL ROOM. COORDINATE ROOF PENETRATION WITH STRUCTURAL. GENERATOR ROOM INTAKE FAN. COORDINATE FAN WITH STRUCTURE. PROVIDE PENTHOUSE. PROVIDE SILENCERS AS REQUIRED. GENERATOR ROOM EXHAUST FAN. COORDINATE FAN WITH STRUCTURE. PROVIDE PENTHOUSE. PROVIDE SILENCERS AS REQUIRED. ABSORPTION CHILLER MUFFLER AND SILENCER. PROVIDE HEAT RECOVERY SYSTEM. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax 7 A A A.1 FUTURE MUFFLER E 1 B FUTURE 2-CELL COOLING TOWER (ELECTRIC CHILLER) 1 1 2-CELL COOLING TOWER (ELECTRIC CHILLER) 2-CELL COOLING TOWER (ELECTRIC CHILLER) (2) SINGLE-CELL COOLING TOWERS (ABSORPTION CHILLERS) (1) FUTURE Pinellas County 4 4 1 B STAIR A SA4 D 114400 North 49th Street Clearwater, FL. MUFFLER Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings A.1 SEAL C C 1 PRELIMINARY DOCUMENTS STAIR B SB4 NOT FOR CONSTRUCTION KEY PLAN C 2 3 SCALE 1/8" = 1'-0" D D 2 B 3 No. FUTURE SUPPLY FAN Description Date FUTURE EXHAUST FAN REVISIONS E.9 E.9 F F DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE 03/19/2014 TITLE 1 A 1 1.1 ROOF PIPING PLAN 3 5 6.9 7 ROOF MECHANICAL PLAN Scale: 1/8" = 1'-0" PROJECT NO. M-140 SHEET NO. 50057109 6 5 4 3 2 1 Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax F PIPING SYMBOL LEGEND -FLOW DIRECTION -GATE VALVE -BALL VALVE -CALIBRATING BALANCING VALVE -BUTTERFLY VALVE -GAS COCK E Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings -STRAINER -CONTROL VALVE -CHECK VALVE -FLOW SWITCH -FLEX CONNECTION -O.S.&Y. GATE VALVE Pinellas County -THREE-WAY CONTROL VALVE -THERMOMETER -TWO-WAY CHECK VALVE MV -MANUAL VENT CHWP-1 -PRESSURE GAUGE CHWP-2 FUTURE CHWP ABSORPTION CHWP EXPANSION TANK FUTURE ABSORPTION CHWP BYPASS -RELIEF VALVE FM -FLOW METER M -WATER METER -INLINE PUMP -INLINE PUMP D FUTURE CHILLER FROM BLDG AIR SEPARATOR 114400 North 49th Street Clearwater, FL. -UNION TO BLDG. FUTURE SYSTEM PUMP SEAL CH-2 PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION SYSTEM PUMP KEY PLAN C CH-1 SCALE NOT TO SCALE ABSORPTION CHILLER B FUTURE ABSORPTION CHILLER No. Description Date REVISIONS CHILLED WATER PIPING DIAGRAM No Scale 1 DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE 03/19/2014 TITLE MECHANICAL DIAGRAMS A PROJECT NO. M-200 SHEET NO. 50057109 6 5 4 3 2 1 Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax F PIPING SYMBOL LEGEND -FLOW DIRECTION -GATE VALVE -BALL VALVE -CALIBRATING BALANCING VALVE -BUTTERFLY VALVE -GAS COCK -STRAINER -CONTROL VALVE -CHECK VALVE -FLOW SWITCH -FLEX CONNECTION Pinellas County -O.S.&Y. GATE VALVE -THREE-WAY CONTROL VALVE -THERMOMETER CT-ABSORPTION FUTURE CT-ABSORPTION CT-1 CT-2 CT-FUTURE -TWO-WAY CHECK VALVE -RELIEF VALVE MV -MANUAL VENT -PRESSURE GAUGE FM -FLOW METER M -WATER METER -INLINE PUMP D -INLINE PUMP FUTURE CWP-ABSORPTION CWP-ABSORPTION CWP-1 FUTURE CHILLER CH-2 CWP-2 CWP- FUTURE 114400 North 49th Street Clearwater, FL. E Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings -UNION SEAL CH-1 PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION KEY PLAN C ABSORPTION CHILLER SCALE FUTURE ABSORPTION CHILLER NOT TO SCALE B No. Description Date REVISIONS CONDENSER WATER PIPING DIAGRAM No Scale 1 DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE 03/19/2014 TITLE MECHANICAL DIAGRAMS A PROJECT NO. M-201 SHEET NO. 50057109 6 5 4 3 2 1 Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax F REFER TO P201, DETAIL 9 FOR FURTHER DETAIL PLUMBING SYSTEM TO HEAT RECOVERY RECIRC PUMP E HOT EXHAUST GAS HEAT RECOVERY HEAT EXCHANGER, SHELL IN TUBE EXHAUST BYPASS VALVE NO NC NO ENGINE HIGH TEMP RADIATOR Pinellas County FLEX CONNECTION (TYP) NATURAL GAS GENSET ABSORPTION CHILLER 3-WAY CATALYTIC HIGH TEMP PUMP RETURN TEMPERAURE REGULATING 3-WAY VALVE EXPANSION TANK D COGENERATOR DIAGRAM 114400 North 49th Street Clearwater, FL. SILENCER Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings FROM 1 No Scale SEAL PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION KEY PLAN C FUTURE EXPANSION TANK ON TOP OF RADIATOR 12" MAX. EXPANSION TANK ON TOP OF RADIATOR FLOW LIMITING VALVES SCALE MOUNT HEAT EXCHANGER AS CLOSE AS POSSIBLE TO RADIATOR. NOT TO SCALE TYPICAL FLEXIBLE CONNECTIONS HOT WATER PIPING (200 F.) OFF THE DUAL ENGINES PIPING TO PLUMBING SYSTEM SEE PLUMBING FOR CONTINUATION REFER TO P201, DETAIL 9 FOR FURTHER DETAIL TYPICAL SHUT-OFF VALVE 12" MAX. RADIATOR HEAT EXCHANGER B No. Description Date REVISIONS COGENERATOR DIAGRAM No Scale 2 DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE 03/19/2014 TITLE MECHANICAL DIAGRAMS A PROJECT NO. M-202 SHEET NO. 50057109 6 5 4 3 2 1 Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax AUTOMATIC FLOW CONTROL DEVICE PRESET BY MANUF. W/ P & T TEST PORTS, STRAINER, AND DRAIN. (PRE-MANUF. SINGLE ASSEMBLY ACCEPTABLE) THREE WAY CONTROL VALVE EXTENDED OPERATOR ON BALANCE DAMPER SPIN-IN FITTING W/VOLUME CONTROL DAMPER (INSUL. PER SPEC.) MANUAL AIR VENT W/AUTO SHUT-OFF COCK DRAW BAND (PRE-MANUF. SINGLE ASSEMBLY ACCEPTABLE) STEEL RODS W/THREADED ENDS (TYP. 4 PLACES) SUPPORT FROM STRUCTURE ABOVE AS REQUIRED THREADED CAP, HAND TIGHTENED COIL RETURN SPRING VIB. ISOLATORS THREADED CAP WITH 1/4" DIA. HOLE DRILLED IN TOP, HAND TIGHTENED. UNION PROVIDE WITH FILTER OVER OPENING FLEXIBLE DUCT MAX. 8'-0" IN LENGTH FULLY EXTENDED. COOLING COIL FLEX CONN. (TYP.) SA SUPPLY FAN RA B PLUG COCK SHUT-OFF VALVE (TYP.) DRAW BAND A DRAIN PAN SLOPE TO DRAIN BLANK-OFF PLATES WHERE REQUIRED C P/T TEST PORTS CASING SLEEVE FLOAT SWITCH UNION (TYP.) DIFFUSER CONE (INSUL. PER SPEC.) SNUBBER CONDENSATE DRAIN PIPING DIMENSIONS: THERMOMETER W/SEPARABLE WELL (TYP.) CEILING TEE ROUTE MAIN CONDENSATE LINE TO FLOOR DRAIN A = FULL SIZE OF UNIT DRAIN CONNECTION B > 1-1/2" TIMES FAN SUCTION STATIC PRESSURE C > FAN DISCHARGE STATIC PRESSURE PLUS 1/2" INCH BALL VALVE CEILING GALVANIZED SHEET METAL SECONDARY DRAIN PAN TO EXTEND 3" BEYOND UNIT ON ALL SIDES BY 1-1/2" DEEP COORDINATE MOUNTING/CURB HEIGHT AS REQUIRED TO PROVIDE PROPER CONDENSATE DRAINAGE. FLEX. CONNECTION (TYP.) NOTES: 1. PROVIDE (4 x DIA.) OF STRAIGHT PIPE ON BOTH SIDES OF BALANCING VALVE 2. ALL COMPONENTS FULL LINE SIZE UNLESS NOTED OTHERWISE 3. LOCATE UNIONS TO ALLOW FOR COIL PULL LIGHT 3-WAY COIL PIPING DIAGRAM (FCU-4) 1 NOT TO SCALE AHU CONDENSATE DRAIN TRAP 2 NOT TO SCALE D DIFFUSER MOUNTING 3 NOT TO SCALE FAN COIL UNIT 4 NOT TO SCALE GEAR W/HAND WHEEL 5" AND LARGER LEVER LATH HANDLE W/MEMORY STOP 4" AND SMALLER THREE LAYERS OF 5/8" GYPBOARD, REFER TO SPECIFICATION SECTION 15910 DAMPER, TYPICAL MANUAL BALANCING PRESSURE GAUGE BUTTERFLY VALVE (TYP.) TOP OF DUCT TO BE AS HIGH AS POSSIBLE TAP, TYPICAL 45 DEGREE BOOT 114400 North 49th Street Clearwater, FL. PRESSURE GAUGE & COCK (TYP.) E Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings DIFFUSER NECK (INSUL. PER SPEC.) AIR FLOW STRAINER W / BLOWDOWN Pinellas County F SNUBBER BALL VALVE EXTEND TREATMENT ACROSS OPEN CEILING SEE PLAN DRWGS. DIFFERENTIAL PRESSURE TRANSMITTER P/T PORT W/BLOWDOWN VALVE (TYP.) DRAW BAND NON-SLAM CHECK VALVE SEAL FLEXIBLE CONNECTER SILENCER SUPPLY DUCT FLEXIBLE CONNECTOR DIAMETER TO MATCH SYSTEM PIPING DIAMETER PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION s" PUMP DRAIN, EXTEND TO FLOOR NEAREST DRAIN SUCTION DIFFUSER W/INTEGRAL STRAINER & 3/4" BLOW DOWN VALVE. EXTEND TO NEAREST FLOOR DRAIN C FLEXIBLE DUCT SPIN-IN FITTING W/VOLUME CONTROL DAMPER (INSUL. PER SPEC. REQ'D.) PIPE SUPPORT RADIUS ELBOWS MAY BE USED IN LIEU OF SQUARE ELBOWS KEY PLAN WALL DIAMETER TO MATCH PUMP INLET DIAMETER NOISE CONTROL TREATMENT AT DUCT SILENCER 5 NOT TO SCALE CONCRETE HOUSEKEEPING PAD PIPE SUPPORT SPLIT-CASE DOUBLE SUCTION PUMP 6 NOT TO SCALE TYPICAL FLEX DUCT CONNECTION 7 NOT TO SCALE TYPICAL PRESSURE DUCTWORK SCALE 8 NOT TO SCALE NOT TO SCALE VALVES ABOVE TUBE PULL (TYP.) ACTUATOR & VALVE BY CONTROLS CONTRACTOR (TYP.) LUG TYPE BUTTERFLY VALVE W/GEAR OPERATOR (TYP.) 120 VAC BEACON ALARM WIRING PER ASHRAE 15 TO EMS TEMP. SENSOR (TYP.) A DIFFERENTIAL PRESSURE SENSOR/TRANSMITTER (TYP.) CWS ANALOG OUTPUT WIRING PROVIDE NEW REMOTE ALARM BEACON OUTSIDE ALL CHILLER ROOM ENTRY DOORS B A REFRIGERANT MONITOR PANEL ROCK FREE BACKFILL 1'-0" MIN. PITTWRAP JACKETING FLEXIBLE CONNECTOR FLEX CONNECTION RESETTING RELIEF ASSEMBLY BY EQUIPMENT MANUFACTURER FOAMGLASS INSULATION SAMPLE TUBE FLANGED JOINT 6". SAND BACKFILL 6". 6" MIN. COMPRESSION COUPLING FILTER FULL SIZE OF VENT OPENING (MIN.) OR AS CODE REQUIRES CHILLER 12" TO 18" GRAVEL No. Description Date RELIEF VENT TO CHILLER PIPE CHWR SAMPLE LINES SUPPORT TO COLUMN OR WALL NOTES: 1. PROVIDE REFRIGERANT MONITOR CAPABLE OF SENSING R-123 REFRIGERANT. 2. NEW EXHAUST FAN. 3. PROVIDE TWO REFRIGERANT SAMPLE LINES I LOCATIONS AS SHOWN ON PLANS. CHILLER DIFFERENTIAL PRESSURE SWITCH TO CHILLER CONTROL PANEL PRESSURE GAUGE W/ SNUBBER & BALL VALVES (TYP.) CONNECT NEW RELIEF PIPING TO EXISTING RELIEF PIPING HEADER. 6" MIN. THERMOMETER (TYP.) CHWS CWR R OOF COMPRESSOR SUCTION CONNECTION RELIEF PIPING SHALL BE SIZED AND INSTALLED IN ACCORDANCE WITH ASHRAE STANDARD 15. MINIMUM RELIEF PIPING SIZE INDICATED ON FLOOR PLAN. DEVIATION FROM SIZE INDICATED IS ACCEPTABLE ONLY AFTER RECOMMENDATION FROM CHILLER MANUFACTURER AND APPROVAL OF THE ENGINEER. COORDINATE RELIEF PIPING REQUIREMENTS WITH CHILLER MANUFACTURER. REVISIONS CONTROL PANEL CONDENSER TO CONTROL PANEL DRAWN BY HAT APPROVED BY LTE CHECKED BY LTE DATE VIBRATION ISOLATION SPRINGS (TYP.) EVAPORATOR 03/19/2014 TITLE HOUSEKEEPING PAD MECHANICAL DETAILS FLANGED ELBOW W/ LIFT PLATE (TYP.) FLOOR SLAB FLOOR A 6" MINIMUM MECHANICAL JOINT (SIMILIAR TO A VICTAULIC COUPLING) r" FL x r" NPT DRAIN VALVE (5'-0" ABOVE FLR.) PETE'S PLUG (TYP.) PROJECT NO. UNDERGROUND PIPING INSTALLATION NOT TO SCALE 9 REFRIGERANT MONITORING NOT TO SCALE 10 RELIEF PIPING NOT TO SCALE 11 WATER COOLED CHILLER NOT TO SCALE 12 M-300 SHEET NO. 50057109