Operating Procedure Flexible Ramping Constraint (New) Procedure No. Version No. Effective Date 2250 1.1 1/31/14 Distribution Restriction: None Table of Contents Purpose........................................................................................................................................... 1 1. Responsibilities ...................................................................................................................... 2 2. Scope/Applicability .............................................................................................................. 2 2.1 Background ................................................................................................................... 2 2.2 Scope / Applicability..................................................................................................... 2 3. Procedure Detail.................................................................................................................... 3 3.1 Flexi-Ramping Capacity Require- ments..................................................................... 3 3.1.1 Require- ments Description .............................................................................. 3 3.1.2 Adjusting Require- ments ................................................................................. 3 4. Supporting Information ....................................................................................................... 6 Operationally Affected Parties ............................................................................................ 6 References ........................................................................................................................... 6 Definitions........................................................................................................................... 6 Version History ................................................................................................................... 7 5. Periodic Review Procedure ................................................................................................. 7 Review Criteria ................................................................................................................... 7 Frequency............................................................................................................................ 7 Incorporation of Changes .................................................................................................... 7 Manager Approval ........................................................................................................................ 8 Director Approval ......................................................................................................................... 8 Appendix ........................................................................................................................................ 8 Attachment: None ............................................................................................................... 8 Purpose Provides guidelines for the process, considerations and methodology for setting the requirement for the flexi-ramping nomogram in the real-time market. Page 1 of 8 Operating Procedure Flexible Ramping Constraint (New) 1. 2250 1.1 1/31/14 Distribution Restriction: None Responsibilities Generation Dispatcher Shift Supervisor Renewable Resource Coordinator 2. Procedure No. Version No. Effective Date Estimate the quantity of the flexible ramping capacity for each applicable CAISO Market run Provide information to the generation dispatcher on upcoming events that may impact system ramping. Provide Generation Dispatcher updates on weather and other conditions that may impact the availability and or the energy supply from intermittent resources. Scope/Applicability 2.1 Background 2.2 Scope / Applicability The flexi-ramping nomogram is a constraint used in the Real Time markets. The CAISO may enforce an upward Flexible Ramping Constraint in HASP and RTPD (HASP, RTUC) and then RTD (RTED). If implemented in RTPD, meeting the Flexible Ramping Constraint provides a minimum amount of ramping capacity that can be ramped up in 10 minutes. A portion of the flexiramping capacity procured in RTPD and made available for RTD is protected in future (advisory) RTD intervals (not the binding interval) of each RTD run. All available ramping capacity including the ramp provided by the Flexible Ramping Constraint is made available for balancing supply and demand in RTD binding intervals. The minimum requirement can be adjusted by ISO operators to meet the operational needs in real-time based on forecast load changes, system resource availability, potential intermittent resource volatility, system and market conditions. Page 2 of 8 Operating Procedure Flexible Ramping Constraint (New) 3. Procedure No. Version No. Effective Date 2250 1.1 1/31/14 Distribution Restriction: None Procedure Detail 3.1 Flexi-Ramping Capacity Requirements The requirements for upward flexi-ramping capacity in RTPD are as follows: • Base requirement: 300 MW • Normal range: 300 MW to 400 MW • Maximum: 600 MW 3.1.1 Requirements Description Description Base Requirement: The base requirement of 300 MW shall be in place as a default setting in the real-time market software for RTPD. This is the HASP and RTPD minimum requirement for the Flexible Ramping Constraint. The default setting may be reviewed for adjustment by the ISO’s Market Analysis and Development (MAD) department based on flexi-ramping capacity utilization and other market and operational considerations. In RTD the Flexible Ramping Constraint in the binding interval is zero and increases in advisory intervals up to ½ the HASP/RTPD requirement. 3.1.2 Adjusting Requirements Step 1 CAISO Renewable Resource Coordinator Actions If there is load forecast uncertainty or a risk to intermittent resources ability to supply energy, advise the Generator Dispatcher of the magnitude and duration of the risk. Page 3 of 8 Operating Procedure Flexible Ramping Constraint (New) Procedure No. Version No. Effective Date 2250 1.1 1/31/14 Distribution Restriction: None Step 2 CAISO Generation Dispatcher Actions The Base Flexible Ramping Constraint may be increased within Normal range under the following operating conditions: The normal adjustment range of 300 MW to 400 MW in RTPD/ HASP can be made by operators in the normal course of daily real-time operations based on real-time conditions. A higher MW value for the Flexible Ramping Constraint is expected to occur during large load ramping periods, periods when there is a risk of intermittent resources ability to supply energy as identified by the Renewable Resource Coordinator, forecast uncertainty, and during peaking conditions when ramping needs exist to meet load and supply uncertainty but ramping availability may be limited. 3 The Flexible Ramping Constraint may also be increased to Maximum range under the following operating conditions: Under more volatile conditions when demand and/or supply deviates significantly or expect to deviate significantly, operators may increase the Flexi Ramp Constraint requirement up to 600 MW. 4 When possible, it is recommended initial adjustments to the Flexi Ramp Constraint be done for HASP, allowing intertie energy procurement to align with flexi-ramping procurement. 5 After the Flexible Ramping Constraint is adjusted in HASP/RTPD, the Flexible Ramping Constraint needs to be adjusted in RTD. In RTD the Flexible Ramping Constraint in the binding interval is zero and increases in advisory intervals up to ½ the HASP/RTPD requirement. Page 4 of 8 Operating Procedure Flexible Ramping Constraint (New) Procedure No. Version No. Effective Date 2250 1.1 1/31/14 Distribution Restriction: None 6 The Flexible Ramping Constraint may be turned off or reduced under the following operating conditions: Excess supply conditions (Potential over generation condition) When there are extended periods of Flexible Ramping Constraint infeasibility If the Flexible Ramping Constraint is having or is suspected of having an impact on reliability. If the Flexible Ramping Constraint is suspected of using excessive fast start resources early in the day and the remaining available starts are anticipated to be needed later in the day. (During a peak load period or during large load ramping periods.) 7 The Flexible Ramping Constraint may be turned off on individual resources when conditions indicate a resource would not be able to provide flexi ramping. Reasons may include: When blocking upward A/S on a resource. A resource does not have the ability to provide flexi ramp due to a constraint. A fast start resource that is being started and will not have a remaining start for anticipated reliability needs later in the day. 8 When RTD is protecting flexible ramp on resources procured in RTPD, only those resources that have been awarded flex ramp in RTPD are protected in RTD for flex ramp. 9 After the Day Ahead market if current or previous similar day experience indicates there may be a shortage of flexible ramping resources available in RTD for the trade day, consult with Shift Supervisor and consider if additional resource(s) will need to be committed using Exceptional Dispatch. Refer to Operating Procedure 2330C for commitment reasons. Page 5 of 8 Operating Procedure Flexible Ramping Constraint (New) 4. Procedure No. Version No. Effective Date 2250 1.1 1/31/14 Distribution Restriction: None Supporting Information Operationally Shared on the Internet Affected Parties References Definitions Resources studied in the development of this procedure and that may have an effect upon some steps taken herein include but are not limited to: CAISO Tariff 27.10 Flexible Ramping Constraint CAISO Operating Procedure 2330C Exceptional Dispatch Instruction Type Codes Unless the context otherwise indicates, any word or expression defined in the Master Definitions Supplement to the CAISO Tariff shall have that meaning when capitalized in this Operating Procedure. The following additional terms are capitalized in this Operating Procedure when used as defined below: Flexible Ramping Constraint A constraint that may be enforced in the optimization of a given CAISO Market run to ensure that the unit commitment or Dispatch of resources for intervals beyond the applicable commitment or Dispatch period provide for the availability of required capacity for Dispatch in subsequent Real-Time Dispatch intervals as further described in Section 27.10. Page 6 of 8 Operating Procedure Procedure No. Version No. Effective Date Flexible Ramping Constraint (New) 2250 1.1 1/31/14 Distribution Restriction: None Version History Version Change 1.0 1.1 Initial document. Changed normal upper range to 400MW Changed maximum range to 600MW By Date 11/1/12 1/31/14 5. Periodic Review Procedure Review Criteria There are no specific review criteria identified for this procedure, follow instructions in Procedures 5510 and 5520. Frequency Review as recommended in Procedures 5510 and 5520. Incorporation of Changes There are no specific criteria for changing this document, follow instructions in Procedures 5510 and 5520. Page 7 of 8 Operating Procedure Flexible Ramping Constraint (New) Procedure No. Version No. Effective Date 2250 1.1 1/31/14 Distribution Restriction: None Manager Approval Reviewed By Content Expert Operating Procedures Program Supervisor Day-Ahead Market Lead Signature Date 1/30/14 1/30/14 1/30/14 Director Approval Approved By Director, System Operations Director, Operations Engineering Services Director Day-Ahead Market and RealTime Operations Support Signature Date 10/31/12 10/31/12 10/31/12 *Signed previous version only; changes to this version were minor and did not require full signature approval. Appendix Attachment: None Page 8 of 8