Installation Instructions
Screen Boom by Draper
CAUTION
1 Inspect all boxes to make sure you have received the proper parts.
2 Open cartons lengthwise.
3 All hardware must be installed level.
4 Installation should only be completed by qualified personnel.
5 Locate and identify all parts using the hardware list and the drawings.
6 Operates on 110-120V, 60 Hz AC.
7 Switch to be in full view of unit during operation.
8 Wiring diagram can be found on Page 4 of these instructions.
9 These instructions are meant as a guide only. They do not bind Draper, Inc.
in any way and do not imply any responsibility of Draper, Inc. for improper
installation or faulty work man ship at the job site.
Preparation
1 Determine area where Screen Boom is to be installed and insure that there
is sufficient clear wall space for the installation. Screen Boom can be installed
to fold either left or right (Fig. 1) and with the electric linear actuator located
A) toward the direction of the fold or B) AWAY from the direction of fold,
so you will need to determine the desired direction and method of
fold to insure you are allowing sufficient space.
TOWARDS
AWAY
ACTUATOR
Act
uat
FROM ACTUATOR
or
A
ct
ua
to
r
82.0°
MAX FOLD
88.0°
MAX FOLD
A
B
Wall Pad Installation
NOTE: Draper is not responsible for wall strength. Attachment
method to be determined by project architect/engineer.
Note: Drawings will show locations of wall pads. Pads shown with vertical
orientation, but can be rotated 90 as needed. Before drilling, make sure there
are no obstructions or electrical wiring where you will be drilling. Spread
plastic throws on inside floor before drilling.
1 Mark wall attachment locations on Wood
Wall Pads (see fig. 2 at right).
These may be adjusted to meet field
conditions. (If thru-bolts are present,
lay out holes to match bolt locations).
Drill four 9/16" diameter holes if anchor
bolts are ½" dia. (or larger, as needed).
2 Position part to be attached to wood pad
on center line. Mark hole locations, and
drill required number of 9/16" holes.
3 Turn wood pad to unfinished side,
countersink 9/16" holes so carriage bolt
heads will be flush with wood pad
(1¼" diameter x ¼" deep).
4 Place wood pad against wall and mark
wall where anchor holes are drilled in
wood pad.
5 Drill holes in wall as required.
Wood Wall Pad Dimensions
1½"(typ.)
3"
9"
9
/16"
Hole (2)
3'
4¾"
1'6"
9"
3"
Figure
7½"
= Suggested wall
mounting bolt locations.
= Suggested hanger bolt
mounting locations (9/16" dia).
6 Install ½"-13 x 2½" carriage bolts in
9
/16" holes from back side of pad.
7 Place wood pad on wall and attach with type of wall bolt appropriate for
field conditions.
Figure
8 Tighten wall bolts with hand wrench.
C420.002MA
2 If installing with the
C420.017MA
C420.002MA
electric actuator toward
the direction of fold you
will use the C420.017MA
Short Actuator Mount
and two C420.002MA
Long Leg Mounts.
Attachment Methods
Lag Screw with Lag Shield
Outside
Flat
Washer
Lag
Shield
C420.101MA
C420.101MA
C420.001MA
C420.001MA
Toggle Bolt
Outside
3 If installing with the electric actuator away from the direction of fold
you will use the
C420.101MA Long
Actuator Mount and two
C420.001MA Short Leg
Mounts.
4 You can discard the unused Actuator Mount and Leg Mounts.
½” min. x 4"
Lag Screw
2 1/2"
Min.
Min. 1/2"
Toggle
Bolt
Lock
Washer
Use only in joint of block,
brick, or concrete wall.
NOTE: Install Lag Shield first, using a hammer to
sink it into pre-drilled hole.
NOTE: Insert Toggle Bolt into hole far enough to allow
head to rotate, then pull flush against inside of wall.
Figure
Through Bolt
Set-In Bolt
Outside
2 1/2"
Min.
2 1/2"
Min.
1
/2" Min.
Machine
Bolt
1
/2" Min.
Machine
Bolt
Pre-set by
General Contractor
Copyright © 2015 Draper Inc.
Form ScreenBoom_Inst15
Printed in U.S.A.
NOTE: Attachment method determined by project architect/engineer.
Attachment hardware provided by others.
Screen Boom by Draper
Screen Boom Assembly
Figure
C420.002MA
C420.100MA
C420.017MA
C420.001MA
C420.101MA
C419.016WA
C420.102MA
1 After wood wall pads are installed and
correct actuator and leg mounts have
been attached, locate the C420.100MA
Swivel Assembly and attach swivel
assembly to top hinge using ½-13 x 2”
Bolt and Nylon Lock Nut. Do not over
tighten. Swivel should be as tight as
possible that still allows it to move
side-to-side freely.
2 Locate the C025.092 147” long, ¾” OD
diagonal brace. Attach to diagonal brace
to the swivel assembly installed using
½-13 x 2” bolt and nylon lock nut. Tighten
the nut to the point where the diagonal
brace is difficult to rotate, but not too tight.
3 Locate C419.016WA – 193” long
extension arm assembly and attach it to
bottom hinge using ½-13 a 2” Bolt and
Nylon Lock Nut. Do not over tighten –
Extension Arm should be as tight as
possible that still allows it to move
side-to-side freely.
4 Locate one of the C016.088MA 2-1/2”
tube clamps (2 half clamps), two 3/8-16 a
1-3/4” bolts and two 3/8-16 flange lock
nuts. Connect half clamps together with
one bolt and nut, slide clamp over
extension arm with bolt at bottom then
connect diagonal brace between half
clamps with bolting passing through all
three pieces.
5 Diagonal brace should be attached per
the appropriate (toward or way)
dimensioned diagram so that it runs at
about a 45 degree angle, but the brace
can be slid in and out slightly as
necessary to make sure the
extension arm level. After you have
determined that extension arm is
level, tighten the tube clamp assembly.
C016.088MA
6 Locate the C266.009 Electric Linear Actuator and connect the motor end to
the Wall Mounted Actuator Hanger using
a ½-13 x 3” bolt and 1-2-13 nylon lock nut.
Do not over tighten – Actuator should be
as tight as possible that still allows it to
move side-to-side freely.
C057.030
C025.092
C025.092 - Diagonal Brace
2 of 4
C266.009
www.draperinc.com
C266.009 - Electric Linear Actuator
(765) 987-7999
Screen Boom by Draper
3 of 4
7 Locate C420.098 Actuator Tube Mount
(one half clamp and one half clamp with hinge lugs), two 3/8-16
a 1 ¾” bolts and two 3/8-16 flange lock nuts. Connect Actuator
tube mount to extension arm in approximately the location
shown on the appropriate dimensioned diagram.
Lead from Actuator to Junction Box
8 Connect the eye-bolt end of the Linear Actuator to the Actuator
Tube Mount using ½-13 x 3” Bolt and ½-13 Nylon Lock Nut. It
may be necessary to connect power to the actuator to extend
linear actuator to Tube Mount. Do not over tighten –
actuator must rotate freely during folding process.
White (Common)
Red (Up)
Black (Down)
Green (Ground)
WIRING DIAGRAM
(by others)
9 Locate two of the C016.088MA 2-1/2” tube clamps (2 half
clamps each), four 3/8-16 a 1-3/4” bolts, four 3/8-16 flange
lock nuts and two C057.078 Pear Shaped Snap Links.
Connect half clamps together with one bolt and nut, slide over
extension arm with bolt at top. Place Small End of Snap Link
between half clamps and insert bolt making sure it goes through
the clamps and the snap link. Repeat process with other clamp.
Clamp locations will be determined by screen location and
length. Clamps should be left loose until screen is attached.
Ground
Single gang box by others
Black (Down)
SWITCH
10 If necessary, installer can cut the extension arm. Use a saw to
cut the 2-1/2” tube to desired length, but not less than 115” from
the wall.
Red (Up)
11 Place plastic cap over end of tube.
Dashed wiring by electrician
12 Connect the Projection Screen using snap links.
13 Use a level to make sure that extension arm is level. If not level
loosen diagonal brace clamp on extension arm and slid in or out
as necessary.
To 110-120v Line
14 Make electrical connections to actuator motor per wiring
diagram and applicable control.
15 Make electrical connections to Projection Screen per the screen
instructions and applicable control.
Adjusting Limit Switches
1 The retracted position is pre-set at the factory.
2 The upper plastic ring (A) controls the extended position.
Should this need to be adjusted, simply rotate clockwise for more travel and counterclockwise for less travel.
A
MUST
REMOVE
COVER
C266.009
ELECTRIC
LINEAR ACTUATOR
Black
(Hot)
Figure
Please Note: The inner tube must be turned out three full turns (½") for safe,
repeatable operation. It can be turned out more if required by application and
if the upper cam is adjusted properly to prevent driving the inner tube against
the full extend positive stop.
www.draperinc.com
(765) 987-7999
Screen Boom by Draper
4 of 4
Screen Boom Dimensions
110 1/8”
Away
110 1/8”
107”
107”
34 3/8”
34 3/8”
5 5/8”
181”
31¼”
12”
198 7/8”
5 5/8”
181”
31¼”
198 /8”
7
Toward
12”
112 7/8”
112 7/8”
107”
107”
25½”
25½”
8 3/8”
181”
60”
12”
2015/8”
8 3/8”
181”
60”
12”
2015/8”
www.draperinc.com
(765) 987-7999