Submit to Community Development City of Arcata Construction/Demolition Waste Management Final Diversion/Disposal Report Use this form upon completion of the project to report: 1) Total project waste; and 2) Final amounts of materials reused, recycled, otherwise diverted and disposed Project_______________________ Permit #_____ Location____________________ Date___________________________ Contractor’s Name______________________ Phone__________________ Email___________________________ I. Total Project Waste Quantity (tons) Landfill site Tip fee/ton $ Total cost of disposal* $ Total cost/ton $ *includes hauling, container rental & tip fee– Submit receipts for proof of materials diverted/disposed II. Quantity and Cost for Materials Reused, Recycled or otherwise Diverted Please Circle Type of Work: CONSTRUCTION DEMOLITION Example: Brick; Masonry; Tile; Cinderblock Asphalt Bath Fixtures Brick; Masonry; Tile; Cinderblock Cardboard Carpet; carpet padding Ceiling tile (acoustic) Concrete Containers – bottles and cans Dirt – (must be wet down for Kernen) Doors – Storefront, hollow, solid Drywall (new, unpainted sheets or scrap) Drywall (used) Electric Panels Furnaces/Water heater Green waste – brush, tree trimmings, stumps Metal – scrap, rails, metal siding, etc. PVC pipe Roofing; Roof shingles Trash – non-recyclable material Windows and window framing/Glass Wood & pallets – unpainted 0.25 (500 lb) Self Haul Arcata Garbage Savings If Recycled (Dollars) Disposal Costs (Dollars) Cost of Handling & Transport (Dollars) (Pounds) MATERIAL TYPE QUANTITY TRANSPORT x Environmental Services Dept. Approval: ___________________Date:____________ III. Total net cost (+) or savings(-) from all alternatives to landfill disposal of all project waste IV. Means of keeping recyclables free of contamination: V. Meetings to be held to address waste management: