rochester improvement project

advertisement
WAYFINDING
UNIDIRECTIONAL PLAN
PAINT CREEK BRIDGE IMPROVEMENTS
VIA PEDESTRIAN IMPROVEMENTS
2012 MAIN STREET RECONSTRUCTION
CLINTON RIVER BRIDGE IMPROVEMENTS
ROCHESTER IMPROVEMENT PROJECT
THE GROUNDWORK
2002 – PARKING STUDY
2005 – EAST AREA DESIGN STUDY
2006 – WEST AREA DESIGN STUDY
2007 – WAYFINDING SYSTEM DEVELOPMENT
THE KEY PLAYERS
THE DDA SITE DEVELOPMENT COMMITTEE, LED BY CHAIRMAN DR. PIERRE ATALLAH
HUBBELL, ROTH & CLARK CONSULTING ENGINEERS
MICHAEL J. DUL & ASSOCIATES, LANDSCAPE ARCHITECTURE
NEUMANN SMITH ARCHITECTURE
WHAT ARE THE GOALS OF THE ROCHESTER IMPROVEMENT PROJECT?
DEMONSTRATE THE VALUE OF INVESTING IN ROCHESTER
EXPAND DOWNTOWN BEYOND THE CORE MAIN STREET BLOCKS
ATTRACT NEW BUSINESSES TO START/EXPAND IN ROCHESTER
DEVELOP COMPETITIVE ADVANTAGE TO COMPETE FOR INVESTORS
HOW WILL THESE PROJECTS BE FUNDED?
DDA CAPITAL IMPROVEMENT FUND
DDA CAPITAL IMPROVEMENT ANNUAL BUDGET
MDOT ENHANCEMENT GRANTS
SHORT TERM GOALS
WAYFINDING
UNIDIRECTIONAL PLAN
PAINT CREEK BRIDGE IMPROVEMENTS
VIA PEDESTRIAN IMPROVEMENTS
W AY F I N D I N G
VEHICULAR GUIDE
W AY F I N D I N G
PEDESTRIAN GUIDE
UNIDIRECTIONAL PLAN
U N I D I R E CT I O N A L BY P A S S
PLAN
PAINT CREEK BRIDGE IMPROVEMENTS
existing
PAINT CREEK BRIDGE
LOOKING NORTH
proposed
PAINT CREEK BRIDGE
LOOKING NORTH
CRAFTED LIGHTS AND RAILING
ORNAMENTAL MASONRY
PLANTER FOR VEHICULAR/
PEDESTRIAN SEPERATION
STAMPED CONCRETE PAVING
MASONRY PILLARS AND WALLS
EXPOSED AGGREGATE
CONCRETE PAVING
STAIR/RAMP ACCESS TO
PAINT CREEK WALKWAY
existing
P A I NT C R E E K B R I D G E /T R A I LW AY
R E N OV AT I O N
proposed
P A I NT C R E E K B R I D G E /T R A I LW AY
MASONRY STONE FACED BRIDGE
PANELS AND WING WALLS
LAYERED BOULDERS AT CREEK EDGE
R E N OV AT I O N
LANDSCAPE
ENHANCEMENTS
VIA PEDESTRIAN IMPROVEMENTS
existing
WEST VIA LOOKING
NORT H
proposed
WEST VIA LOOKING
NORT H
RELOCATED LIGHTS FROM MAIN
STREET MOUNTED HIGH ON
CONCRETE FOUNDATIONS
MASONRY TRASH
ENCLOSURE
13’-0” ONE WAY
STAMPED CONCRETE PEDESTRIAN
WALK (7’ MAX. WIDTH)
OPTIONAL SURFACE PLANTERS
PLANTINGS WHERE
POSSIBLE
existing
EAST VIA
L OOKI NG N ORTH
proposed
EAST VIA
L OOKI NG N ORTH
RELOCATED LIGHTS
FROM MAIN STREET
PLANTINGS WHERE
POSSIBLE
OPTIONAL SURFACE PLANTERS
STAMPED CONCRETE PEDESTRIAN WALK
(7’ MAX WIDTH)
FLUSH CURB
INTERMEDIATE GOALS
2012 RECONSTRUCTION PROJECT
proposed
201 2 R E C O N ST R U CT I O N P R O J E CT
UNIVERSITY DRIVE
FOURTH STREET
THIRD STREET
SECOND STREET
MAIN STREET
N
existing
PEDESTRIAN
C O RNE R T REAT M E NT
proposed
PEDESTRIAN
C O RNE R T REAT M E NT
ORNAMENTAL SIGNAL POLE
WITH STREET LIGHTS
PEDESTRIAN LIGHTPOLE
WITH LED LIGHTING
RECLAIMED BRICK SEATWALL
WITH LIMESTONE COPING
TREE PLANTER WITH
ORNAMENTAL TREE GUARD
CRAFTED ORNAMENTAL
IRON FENCE
ORNAMENTAL BOLLARD
OPTIONAL
SURFACE
PLANTER
EXPOSED AGGREGATE WALK
STAMPED CONCRETE PAVING
PEDESTRIAN
PLAN VIEW
C O RNE R T REAT M E NT
PEDESTRIAN
SECTION
C O RNE R T REAT M E NT
PEDESTRIAN
STREETSIDE ELEVATION
C O RNE R T REAT M E NT
PEDESTRIAN
C O RNE R T REAT M E NT
STREETSIDE ELEVATION
PLAN VIEW
SECTION
D OW NT OW N
existing
MAIN
ST RE ET E N HAN C E ME NT S
proposed
D OW NT OW N
PEDESTRIAN STREET LIGHT
MAIN
ST RE ET E N HAN C E ME NT S
TREE PLANTER WITH
ORNAMENTAL TREE GUARD
SEATING AREA WITH
ORNAMENTAL IRON PANELS
RECLAIMED BRICK CURB
EXPOSED AGGREGATE
CONCRETE PAVING
OPTIONAL SURFACE PLANTERS
WITH PERENNIAL FLOWERS
7’-0” MINIMUM FURNITURE ZONE
6’-0” MINIMUM WALKWAY
TY P I C A L S E AT I N G A R E A
PLAN VIEW
TY P I C A L S E AT I N G A R E A
SECTION
TY P I C A L S E AT I N G A R E A
STREETSIDE ELEVATION
TY P I C A L S E AT I N G A R E A
STREETSIDE ELEVATION
PLAN VIEW
SECTION
TREE PLANTING WITH
SECTION
O RNA ME NTA L T RE E G UA RD
OPTIONA L
FREE
STA ND I N G P LA NT E R S
ELEVATION
SIT E FU R NIT U R E
BOLLARD SECTIONS
SIT E FU R NIT U R E
‘LANDSCAPEFORMS’ PLAINWELL BENCH WITH BACK
AND THIRD ARM
SUPPORT OPTION IN
CENTER OF BENCH
SIT E FU R NIT U R E
‘LANDSCAPEFORMS’ PLAINWELL TRASH
RECEPTACLE OR RECYCLING UNIT
LONG TERM GOALS
CLINTON RIVER BRIDGE IMPROVEMENT PROJECT
proposed
CLINTON
R IV E R B R I D G E S
MILL STREET
PLAN VIEW
ELEVATION
existing
CLINTON
R IV E R B R I D G E
LOOKING NORTH
proposed
CLINTON
R IV E R B R I D G E
LOOKING NORTH
ORNAMENTAL CRAFTED
LIGHTS AND RAILING
POTENTIAL OVERLOOKS
STONE MASONRY
PILLARS AND WALLS
WAYFINDING: CITY
WELCOME SIGN
STAMPED CONCRETE PAVING
ACCESS TO PARK
BELOW
LANDSCAPE ENHANCEMENTS
existing
CLINTON
R IV E R B R I D G E
LOOKING SOUTH
proposed
CLINTON
R IV E R B R I D G E
LOOKING SOUTH
ORNAMENTAL CRAFTED
LIGHTS AND RAILING
LINEAL PLANTER BARRIER
BETWEEN PEDESTRIAN
ACCESS & PARKING
PEDESTRIAN ACCESS
TO PARK
STONE MASONRY PILLARS
AND WALLS
WIDENED TO PROTECT
WALKWAY (10’-0” WIDE)
STAMPED CONCRETE PAVING
LANDSCAPE ENHANCEMENTS
proposed
PRECAST ARCHED
FACADE
CLINTON RIVER BRIDGE
proposed
EAST AND WEST
FASCIA
CLINTON RIVER BRIDGE
proposed
EAST AND WEST
FASCIA
CLINTON RIVER BRIDGE
Download