rowan university department of facilities management bole

advertisement
ROWAN UNIVERSITY
ROWAN UNIVERSITY DEPARTMENT OF FACILITIES MANAGEMENT
BOLE HALL HVAC REPLACEMENT
IAL
ORL
M
ME HAL
B
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
PARKING
LOT R
T
BU HE
GR RN
OU S
P
N
LE
BO LL
A
H
S T R E E T
TEAM
HOUSE
RESIDENT LOT
PARKING LOT B
TENNIS COURT
COMPLEX
50
BUI 0
LDIN
G
PRACTICE
FOOTBALL
SOFTBALL
FIELD
FIELD
PARKING LOT D
FOOTBALL STADIUM
SOCCER FIELD
30
BUI 0
LDIN
G
STUDENT
REC. CENTER
MAGNOLIA
HALL
S
ITIE
L
I
G
C
FA ILDIN
BU
G
RIN G
E
N
H
ATI
E
H
T
AN
PL
MIMOSA HALL
R
PA
T
EN
D
U
R
ST NTE
E
C
3
R
PARKING LOT A
H
TO
55
I
R
A
R
E
NC
U
B
D
O
A
BASEBALL
FIELD
LL
HA
D
DAY CARE
CENTER
PROJECT
LOCATION
1
CS001
LE
BO LL
HA
MEP NOTES, SYMBOLS, AND ABBREVIATIONS
BASEMENT HVAC REMOVALS
FIRST FLOOR HVAC REMOVALS
SECOND FLOOR HVAC REMOVALS
BASEMENT HVAC INSTALLATIONS
FIRST FLOOR HVAC DUCT INSTALLATIONS
FIRST FLOOR HVAC PIPE INSTALLATIONS
SECOND FLOOR HVAC DUCT INSTALLATIONS
SECOND FLOOR HVAC PIPE INSTALLATIONS
ENLARGED FIRST FLOOR DUCT INSTALLATIONS
ENLARGED FIRST FLOOR PIPE INSTALLATIONS
FLOW DIAGRAMS
CONTROL IDENTIFICATION
CONTROL DIAGRAMS
SEQUENCE OF OPERATION
P&ID DIAGRAMS
DETAILS
SCHEDULES
DP001
DP002
P001
P002
P003
BASEMENT PLUMBING REMOVALS
1ST FLOOR PLUMBING REMOVALS
BASEMENT PLUMBING INSTALLATIONS
1ST FLOOR PLUMBING INSTALLATIONS
RISER DIAGRAMS, SCHEDULES, AND DETAILS
12/3/2014 ISSUED FOR BID
Date
DE001 BASEMENT POWER REMOVALS
DE002 FIRST FLOOR POWER AND LIGHTING
REMOVALS
DE003 SECOND FLOOR POWER AND LIGHTING
REMOVALS
E001
BASEMENT POWER INSTALLATIONS
E002
FIRST FLOOR POWER INSTALLATIONS
E003
SECOND FLOOR POWER INSTALLATIONS
E004
LIGHTING PLAN-REMOVALS AND
INSTALLATIONS
S001
S002
Revision
ROWAN
UNIVERSITY
STRUCTURAL PLAN AND DETAILS
DETAILS
Y
LL
HA
PARKING
LE X
O
B
LOT P
NE
AN
PARKING LOT Z-1
R
N
A
E
G001
DM001
DM002
DM003
M001
M002
M003
M004
M005
M006
M007
M008
M009
M010
M011
M012
M013
M014
1
No.
E
E
US
O
H
EN
E
GR
BOZORTH HALL
G
CARRIAGE HOUSE
A
A
TRIAD
E
UT
RO
LAUREL
HALL
HOLLYBUSH
B
E
L
C
A501
ARCHITECTURAL CONVENTIONS
FIRST FLOOR DEMOLITION PLAN
SECOND FLOOR DEMOLITION PLAN
DOOR SCHEDULE AND DETAILS
PARTIAL ENLARGED FIRST FLOOR PLAN
PARTIAL ROOF PLAN AND DETAILS
BUILDING SECTIONS
FIRST FLOOR REFLECTED CEILING PLAN
SECOND FLOOR REFLECTED CEILING PLAN
ENLARGED TOILET ROOM PLANS AND INTERIOR
ELEVATIONS
INTERIOR ELEVATIONS AND MILWORK DETAILS
N
U
L
OAK
HALL
I T
M
L
HAWTHORN
HALL
LL
HA
H
LO
T
I C
I L
H
L
RIA
O
M
ME HALL
D
E
EVERGREEN
HALL
S
N
DE
LIN
P
E
W
PA
RK
IN
G
L
O
A
MULLICA HALL
E
G
KIN
R
PA
T
LO
2
U
LL
HA
WESTBY
HALL
TR
IA
D
U
SAVITZ
HALL
O
2
N
E
NC
E
I
SC
R
T
TITLE
E
B O W E
LIBRARY
U
T
LO
ALUMNI CENTER
V
ROBINSON
HALL
ROWAN
HALL
G
KIN
PARKING
LOT U
OK
BO RE
O
ST
WILSON HALL
AC000
D100
D101
A000
A101
A102
A300
A401
A402
A500
ABBOTT'S
POND
WILLOW
HALL
ALL PURPOSE FIELD
NO.
KEY PLAN
CS001 COVER SHEET
EDGEWOOD PARK APARTMENTS
D
N LL
A
RM HA
NO
FIELD HOCKEY
DRAWING LIST
CHESTNUT HALL
PARKING LOT M
ES
JAM
MAIN
STR
EET
MANSION PARK
APARTMENTS
INTRAMURAL FIELD
B O U L E V A R D
NORTH HALLS
PARKING
2
BUI 00
LDIN
G
PARKING LOT C
TO
4
BUI 00
LDIN
G
TO ROUTE 47
C A R P E N T E R
Project Title
BOLE HALL
RENOVATIONS
PARKING
LOT R
Drawing Title
COVER SHEET
ROWAN UNIVERSITY CAMPUS MAP
1" = 160'-0"
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
CS001
Printed: 12/3/2014 11:31:16 AM
CONVENTIONS
ABBREVIATIONS
ABV
AFF
ACOUST
ACT
ADH
ADJ
AGGR
A/C
ALUM
ANCH
ANOD
APRX
ARCH
AVG
ABOVE
ABOVE FINISHED FLOOR
ACOUSTICAL
ACOUSTICAL TILE
ADHESIVE
ADJACENT
AGGREGATE
AIR CONDITIONING
ALUMINUM
ANCHOR, ANCHORAGE
ANODIZED
APPROXIMATE
ARCHITECT (URAL)
AVERAGE
B
BSMT
BRG
BLW
BTW
BVL
BHP
BIT
BLK
BLKG
BD
BO
BLDG
BASE CABINETS
BASEMENT
BEARING
BELOW
BETWEEN
BEVELED
BRAKE HORSE POWER
BITUMINOUS
BLOCK
BLOCKING
BOARD
BOTTOM OF
BUILDING
CD
CSMT
CS
CLG
CH
CEM
CL
CER
CT
CIR
CO
COL
CONC
CMU
CONST
CONT
CONTR
CORR
CTR
CU
CFM
CW
CYD
COIL CONDENSATE DRIP PIPING
CASEMENT
CAST STONE
CEILING
CEILING HEIGHT
CEMENT
CENTER LINE
CERAMIC
CERAMIC TILE
CIRCLE
CLEAN OUT
COL
CONCRETE
CONCRETE MASONRY UNIT
CONSTRUCTION
CONTINUOUS OR CONTINUE
CONTRACT(OR)
CORRUGATED
COUNTER
CUBIC
CUBIC FEET/MINUTE
COLD WATER
CUBIC YARD
D
DEMO
DEPR
DTL
DIAG
DIAM
DIM
DIV
DN
DR
DH
DS
DB
DWG
DEEP/DEPTH
DEMOLISH/DEMOLITION
DEPRESSED
DETAIL
DIAGONAL
DIAMETER
DIMENSION
DIVISION
DOWN
DOOR
DOUBLE HUNG
DOWNSPOUT
DRAWER BASE CABINET
DRAWING
GENERAL NOTES
E
EA
EAT
ELEC
EC
EP
EWC
ELEV
EQ
EQUIP
EXH
EF
ESP
EXIST
(E)
(ER)
EXP
EXT
EXISTING TO REMAIN
EACH/EXHAUST AIR
ENTERING AIR TEMPERATURE
ELECTRIC (AL)
ELECTRICAL CONTRACTOR
ELECTRICAL PANELBOARD
ELECTRIC WATER COOLER
ELEVATION
EQUAL
EQUIPMENT
EXHAUST
EXHAUST FAN
EXTERNAL STATIC PRESSURE
EXISTING
EXISTING
EXISTING TO BE RELOCATED
EXPOSED
EXTERIOR
FL.
FD
FIN
FF
FLSHG
FLR
FLUR
FT
FTG
FOUND
FPM
FRMG
FV
FLOOR
FLOOR DRAIN
FINISH/FINISHED
FINISHED FLOOR
FLASHING
FLOOR/FLOORING
FLUORESCENT
FOOT/FEET
FOOTING
FOUNDATION
FEET PER MINUTE
FRAME/FRAMING
FIELD VERIFY
GA
GAL
GALV
GC
GFP
GL
GPM
GRD
HB
HDW
HWD
HDR
HTG
HVAC
HT
HM
HORIZ
HP
HTW
HW
HWH
HWR
HWS
GAGE/GAUGE
GALLON(S)
GALVANIZED
GENERAL CONTRACT/CONTRACTOR
GOVERNMENT FURNISHED PROPERTY
GLASS/GLAZING
GALLONS PER MINUTE
GRADE/GRADING
HOSEBIB
HARDWARE
HARDWOOD
HEADER
HEATING
HEATING/VENTILATING/AIR COND.
HEIGHT/HIGH
HOLLOW METAL
HORIZONTAL
HORSE POWER
HIGH TEMPERATURE WATER
HOT WATER
HOT WATER HEATER
HOT WATER RETURN
HOT WATER SUPPLY
IN
INCL
ID
INSUL
INT
INCH/INCHES
INCLUDE(D)/INCLUDING
INSIDE DIAMETER/DIMENSION
INSULATE(D)/INSULATION
INTERIOR
JC
JT
JF
J
JANITOR'S CLOSET
JOINT
JOINT FILLER
JOIST
KIT
KW
KITCHEN
KILOWATTS
LAT
LBL
LAM
LAV
LH
L
LL
LRA
LT
LF
LEAVING AIR TEMPERATURE
LABEL
LAMINATE(D)
LAVATORY
LEFT HAND
LENGTH/LONG
REFRIGERANT LIQUID LINE
LOCKED ROTOR AMPS
LIGHT
LINEAL FOOT
MFR
MAS
MO
MAT
MAX
MECH
MC
MTL
M
MIN
MISC
MR
MT
MANUFACTURE(R)
MASONRY
MASONRY OPENING
MATERIAL(S)
MAXIMUM
MECHANIC(AL)
MECHANICAL CONTRACTOR
METAL
METER(S)
MINIMUM
MISCELLANEOUS
MOP RECEPTOR
MOUNT(ED)/MOUNTING
N
NRC
NOM
NIC
NTS
NEW
NOISE REDUCTION COEFFICIENT
NOMINAL
NOT IN CONTRACT
NOT TO SCALE
OC
OPG
OPP
OD
OA
ON CENTER(S)
OPENING
OPPOSITE
OUTSIDE DIAMETER/DIMENSION
OVERALL/OUTSIDE AIR
PRESSURE DROP
PAINT/PAINTED
PANEL
PEDESTAL
PERFORATE(ED)
PERIMETER
PLASTER
PLATE
PLUMBING CONTRACTOR
PLYWOOD
POINT
POLYVINYL CHLORIDE
POUNDS PER SQUARE INCH
PRECAST
PREFABRICATE(D)
PD
PTD
PNL
PED
PERF
PERIM
PLAS
PL
PC
PLYD
PT
PVC
PSI
PC
PREFAB
R
RAD
REF
RFL
REFR
REINF
RESIL
REV
RH
RFG
RM
RO
RPM
RS
REMOVE
RADIUS
REFERENCE
REFLECT(ED)
REFRIGERATOR
REINFORCE(D)/REINFORCING
RESILIENT
REVISION(S)/REVISED
RIGHT HAND
ROOFING
ROOM
ROUGH OPENING
REVOLUTIONS PER MINUTE
REFRIGERANT SUCTION LINE
SAN
SECT
SHT
SB
SPEC.
SQ
SI
SF
SQ. FT.
SY
SS
STD
STL
STR
SUSP
SANITARY DRAIN
SECTION
SHEET
SINK BASE CABINET
SPECIFICATION(S)
SQUARE
SQUARE INCH
SQUARE FOOT
SQUARE FEET (FOOT)
SQUARE YARD
SERVICE SINK
STANDARD
STEEL
STRUCTURAL
SUSPENDED
TDH
THK
TLT
TO
TYP
TOTAL DYNAMIC HEAD
THICK/THICKNESS
TOILET
TOP OF
TYPICAL
UR
URINAL
V
VD
VERT
VCT
VT
VTR
VENT
VOLUME DAMPER
VERTICAL
VINYL COMPOSITION TILE
VINYL TILE
VENT THROUGH ROOF
W
WH
WF
WSCT
WC
WWF
WB
W.
WDW
W/
WO
WD
WP
WALL CABINET
WATER HEATER
WASH FOUNTAIN
WAINSCOT
WATER CLOSET
WELDED WIRE FABRIC
WET BULB TEMPERATURE
WIDTH/WIDE
WINDOW
WITH
WITHOUT
WOOD
WEATHERPROOF
YD
YARD(S)
DRAWING LABEL
*
*
BUILDING SECTION
Building Section
1/8" = 1'-0"
A KEYNOTING SYSTEM IS USED ON THE DRAWINGS FOR MATERIALS REFERENCES AND NOTES. REFER TO THE
KEYNOTE LEGEND ON THE DRAWING FOR THE INFORMATION WHICH RELATES TO EACH KEYNOTE ON THE RESPECTIVE
DRAWING.
2.
THE ORGANIZATION OF THE KEYNOTING SYSTEM ON THE DRAWINGS, WITH THE KEYNOTE REFERENCE NUMBERS,
SHALL NOT CONTROL THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTOR'S OR IN ESTABLISHING THE
EXTENT OF WORK TO BE PERFORMED BY ANY TRADE.
3.
DO NOT SCALE DRAWINGS. EXISTING CONDITIONS MAY VARY. CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND CONDITIONS AT THE BUILDING/SITE BEFORE BEGINNING WORK.
4.
ALL WORK INDICATED ON THESE DOCUMENTS HAS BEEN DESIGNED TO MEET THE NEW JERSEY UNIFORM
CONSTRUCTION CODE, ALL SUB-CODES, AND ICC/ANSI A117.1-2003. CONTRACTOR TO PERFORM ALL WORK IN
ACCORDANCE WITH ABOVE MENTIONED CODES, THE NATIONAL STANDARD PLUMBING CODE, AND THE NATIONAL
ELECTRICAL CODE.
INDICATES DIRECTION OF CUTTING PLANE
DIMENSION
DIMENSION TO FACE (TYPICAL)
DIMENSION ON PLAN = FACE OF CORE (STUD, CMU, ETC...)
DRAWING NUMBER WHERE SECTION IS LOCATED (TYPICAL)
(DRAWING NUMBER)
INTERIOR ELEVATION
*
*
*
*
DRAWING NUMBER WHERE ELEVATION IS LOCATED (TYPICAL)
(DRAWING NUMBER)
ROOM TAG
INDICATES DIRECTION OF ELEVATION
*
DRAWING NUMBER WHERE ELEVATION IS LOCATED (TYPICAL)
(DRAWING NUMBER)
*
*
CALLOUT
*
*
FINISH KEY
CEILING HEIGHT
EARTH
ROOM NUMBER
L
RIA
MO LL
E
M HA
INSULATION
KEYNOTING
DIVISION NUMBER
SUBDIVISION NUMBER
NOTE IDENTIFIER
INDICATES DIRECTION OF ELEVATION
DRAWING NUMBER WHERE DETAIL IS LOCATED (TYPICAL)
(DRAWING NUMBER)
SYMBOL LEGEND
ROOM NAME
Office
108 A 9'-0"
ALPHA-NUMERIC INDICATES LOCATION OF ELEVATION
(SECTION NUMBER)
DETAIL
ROWAN UNIVERSITY
DIMENSION TO CENTERLINE
ALPHA-NUMERIC INDICATES LOCATION OF ELEVATION
(SECTION NUMBER)
BUILDING ELEVATION
SCALE
DRAWING NUMBER
ALPHA-NUMERIC INDICATES LOCATION OF BUILDING SECTION
(SECTION NUMBER)
*
*
*
1.
TITLE
LEVEL LINE
*
ALPHA-NUMERIC INDICATES LOCATION ON DRAWING
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
ROUGH WOOD
GRAVEL (SECTION)
092900.A1
BITUMINOUS PAVING
FINISHED WD.
CONCRETE
PLYWOOD
NOTE
Note: Refer to drawing
OAK
HALL
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
INDICATES DIRECTION OF CUTTING PLANE
ALPHA-NUMERIC INDICATES LOCATION OF DETAIL
(SECTION NUMBER)
DOOR TAG
DRAWING NUMBER WHERE DETAIL IS LOCATED (TYPICAL)
(DRAWING NUMBER)
ALPHA-NUMERIC INDICATES LOCATION OF DETAIL
(SECTION NUMBER)
DOOR NUMBER
RIGID INSULATION PANEL
WITH NAILABLE BASE
ACOUSTICAL
TILE
CONCRETE MASONRY
UNIT
GYPSUM
WALLBOARD
STEEL
TILE ON
CONCRETE
LE
BO LL
HA
PARKING
LOT R
102
WINDOW TAG
WINDOW TYPE
A
N
METAL FRAMING
NORTH ARROW
PHASING LEGEND
KEY PLAN
BUILDING DATA
CODE:
SUBCHAPTER 6 - REHABILITATION SUBCODE, 6.6 ALTERATIONS WITHIN THE NEW JERSEY UNIFORM
CONSTRUCTION CODE AND IN COMPLIANCE WITH THE
INTERNATIONAL BUIDING CODE/ 2009 NJ EDITION
CONSTRUCTION TYPE:
USE GROUP:
OCCUPANCY:
BUILDING SQUARE FOOTAGE:
1ST FLOOR:
2ND FLOOR:
BASEMENT:
TOTAL:
III B
B, BUSINESS
199
PHASE 1
BOTH PHASE 1 PHASE 2
14,950 S.F.
3,790 S.F.
3,350 S.F.
22,090 S.F.
BOLE HALL TOILET FIXTURE COUNT
PHASE 2
1ST FLOOR "B" USE - 14,950 S.F. / 100 =
150 O.C.C.
2ND FLOOR "B" USE - 3,600 S.F. / 100 =
36 O.C.C.
2ND FLOOR "MECH" USE - 190 S.F. / 300 =
1 12/3/2014
No.
Date
ISSUED FOR BID
Revision
1 O.C.C.
BASEMENT "MECH" USE - 3,350 S.F. / 300 = 12 O.C.C.
199 O.C.C.
X .667
X
132.667
.5
66.3 = 67/SEX OF OCCUPANT
REQUIRED FIXTURES
MEN'S FIXTURES:
3 WATERCLOSETS/URINALS
2 LAVATORIES
WOMEN'S FIXTURES: 3 WATERCLOSETS
3 LAVATORIES
DRINKING FOUNTAIN: 1/100 X 200 = 2
SERVICE SINK:
1/FLOOR X 2 FLOORS = 2
EXISTING FIXTURES
MEN'S FIXTURES:
4 WATERCLOSETS/URINALS
2 LAVATORIES
Architecture
WOMEN'S FIXTURES: 5 WATERCLOSETS
5 LAVATORIES
2
1/16" = 1'-0"
AC000
Second Floor Phasing Plan
1/16" = 1'-0"
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
1 WATERCLOSET
1 LAVATORY
William P. Lammey AIA
Anthony R. Giorgio AIA
PROPOSED FIXTURES
MEN'S FIXTURES:
3 WATERCLOSETS/URINALS
2 LAVATORIES
WOMEN'S FIXTURES: 4 WATERCLOSETS
3 LAVATORIES
UNISEX FIXTURES:
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
1 WATERCLOSET
1 LAVATORY
1
A402
DR
UNIT OF MAX EXPECTED
OCC
EGRESS OCC
36" 100/22" 163
1
A500
36
1
A101
1
A401
Project Title
BOLE HALL
RENOVATIONS
60' -0"
44' -0"
72' -0"
16' -0"
54' -0"
48' -0"
78' -0"
60' -0"
Drawing Title
ARCHITECTURAL
CONVENTIONS
60' -0"
72' -0"
26' -0"
AC000
First Floor Phasing Plan
35' -0"
1
UNISEX FIXTURES:
Planning
48' -0" 90' -0"
70' -0"
70' -0"
DR
10/24/2014
Scale
AS NOTED
Drawn By:
UNIT OF MAX EXPECTED
OCC
EGRESS OCC
36" 100/22" 163
Date:
Checked By
36
Job No:
3
AC000
First Floor Egress Plan
1/16" = 1'-0"
SOUTHWING = 7,100 S.F. = 71 O.C.C
4
AC000
First Floor Key Plan
1/16" = 1'-0"
5
AC000
Second Floor Key Plan
1/16" = 1'-0"
2014-064
Drawing No.
AC000
DEMOLITION NOTES
3
2
2
1
1
5
1
5
4
3
1
5
REMOVE EXISTING LIGHT FIXTURE AND SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION
3
REMOVE EXISTING SUPPLY AIR DIFFUSER. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
4
REMOVE EXISTING RETURN AIR GRILL. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
5
COORDINATE REMOVAL OF EXISTING FIRE ALARM DEVICES WITH OWNER
6
REMOVE INDICATED PORTION OF EXISTING WALL
7
REMOVE EXISTING DOOR, FRAME, AND ALL ASSOCIATED HARDWARE
8
OWNER TO REMOVE EXISTING WINDOW, FRAME, AND ALL ASSOCIATED HARDWARE. CONTRACTOR
TO PATCH EXISTING FLOOR, WALL AND CEILING SURFACES.
9
REMOVE EXISTING FLOOR FINISH AND 2" THICK MUD BED. POUR NEW CONCRETE FLOWABLE FILL AND
PREPARE SUBSTRATE FOR NEW FINISHES
10
REMOVE EXISTING CEILINGS, LIGHT FIXTURES, WALLS, WALL PANELS, WINDOW TREATMENTS AND
FLOOR FINISHES IN ALL SPACES IN THIS AREA. REFER TO ASBESTOS ABATEMENT REPORT FOR
FURTHER INFORMATION. PATCH ALL WALLS WITH MATERIALS TO MATCH EXISTING.
S
3
6
1
28
11
REMOVE EXISTING ACOUSTIC CEILING TILES AND GRID. SAVE FOR REUSE. AFTER MECHANICAL AND
ELECTRICAL WORK IS COMPLETED REINSTALL GRID.
12
REMOVE EXISTING WALL MOUNTED LAVATORY. SEE PLUMBING DRAWINGS FOR MORE INFORMATION
16
13
REMOVE EXISTING WATER CLOSET. SEE PLUMBING DRAWINGS FOR MORE INFORMATION
12
14
REMOVE EXISTING URINAL. SEE PLUMBING DRAWINGS FOR MORE INFORMATION
15
REMOVE EXISTING JANITOR SINK.SEE PLUMBING DRAWINGS FOR MORE INFORMATION
16
REMOVE EXISTING TOILET PARTITION
17
REMOVE AND REINSTALL ALL TOILET ROOM ACCESSORIES, UNLESS OTHERWISE NOTED.
18
REMOVE EXISTING SILL, PORTION OF BLOCK WALL AND PLASTER. SEE DETAIL 2/D100 FOR MORE
INFORMATION
19
REMOVE EXISTING SILL. PROTECT EXISTING WINDOW SYSTEM FROM DAMAGE
20
REMOVE EXISTING PORTION OF BLOCK WALL AND STEEL ANGLE
21
REMOVE EXISTING PORTION OF PLASTER WALL
22
REMOVE EXISTING RETURN AIR GRILL
23
PROVIDE METAL PLATE OVER HOLES IN SLAB. CONTRACTOR TO ASSUME 24 HOLES @ 8" X 12". SEAL
AROUND PLATES
24
CUT TRENCH INTO EXISTING SLAB SO THAT NEW FLOOR RECEPTACLES AND NEW ELECTRIC CAN BE
INSTALLED
25
REMOVE EXISTING HVAC WINDOW UNIT. INSTALL NEW GLASS TO MATCH EXISTING
26
OWNER TO REMOVE ASBESTOS CONTAINING TRANSITE PANELS, WALLS AND DOORS AND DISPOSE
OF AS ASBESTOS WASTE. CONTRACTOR TO PATCH EXISTING FLOOR, WALL AND CEILING SURFACES.
27
OWNER TO REMOVE EXISTING ASBESTOS CONTAINING FLOOR & MASTIC AND DISPOSE OF WASTE.
CONTRACTOR TO PREPARE SUBSTRATE FOR NEW FINISHES
28
REMOVE EXISTING FLOOR FINISH & 2" THICK MUD BED, EXISTING WALL FINISHES AND EXISTING
CEILING. POUR NEW CONCRETE FLOWABLE FILL AND PREPARE SUBSTRATE, WALLS AND CEIING FOR
NEW FINISHES
29
REMOVE AND REPLACE PORTION OF EXISTING CHASE WALL TO ACCESS EXISTING DUCTWORK. SEE
DETAIL 2/A401 - PIPE CHASE PHOTO DETAIL FOR MORE INFORMATION.
12
2
6
9
6
13
3
1
17
5
ROWAN UNIVERSITY
2
3
2
2
S
2
S
2
2
3
S
5
5
REMOVE EXISTING ACOUSTIC CEILING TILE SYSTEM IN IT'S ENTIRETY, INCLUDING BUT NOT LIMITED TO
ACOUSTIC TILE, GRID, AND SUSPENSION WIRE. REMOVE EXISTING Z-TILE CEILING, PLASTER, AND
METAL BAR SUPPORTS AND TIES ABOVE ACOUSTIC CEILING TILE SYSTEM.
3
2
S
1
S
28
12
2
10
13
7
12
9
L
RIA
MO LL
E
M HA
OAK
HALL
LAUREL
HALL
15
1
16
18
18
27
18
18
26
9
18
28
6
26
27
LE
BO LL
HA
26
1
26
26
18
2
26
29
1
26
2
26
27
26
26
1
8
24
2
26
26
27
KEY PLAN
26
27
26
26
11
PARKING
LOT R
26
6
26
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
14
9
HOLLYBUSH
27
26
27
8
24
8
2
1
2
26
26
26
27
27
27
26
27
1
26
26
1
26
2
27
26
2
LEGEND
18
26
1
27
27
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
EXISTING CONSTRUCTION TO REMAIN.
26
EXISTING CONSTRUCTION TO BE REMOVED.
8
2
26
11
2
24
11
2
26
26
26
26
1. CONTRACTOR SHALL PROTECT EXISTING FURNITURE AND FINISHES IN OCCUPIED AREA DURING
CONSTRUCTION.
7
1
1
2
2
18
GENERAL NOTE
25
27
18
18
27
18
27
18
Architecture
1
D100
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
First Floor Demolition Plan
1/8" = 1'-0"
William P. Lammey AIA
Anthony R. Giorgio AIA
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
19
20
21
Project Title
BOLE HALL
RENOVATIONS
22
23
Drawing Title
FIRST FLOOR
DEMOLITION
PLAN
2
D100
Window Sill Demolition Detail
1 1/2" = 1'-0"
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
Checked By
Job No:
2014-064
Drawing No.
D100
DEMOLITION NOTES
1
REMOVE EXISTING ACOUSTIC CEILING TILE SYSTEM IN IT'S ENTIRETY, INCLUDING BUT NOT LIMITED TO
ACOUSTIC TILE, GRID, AND SUSPENSION WIRE. REMOVE EXISTING Z-TILE CEILING, PLASTER, AND
METAL SUPPORTS AND TIES ABOVE ACOUSTIC CEILING TILE SYSTEM. PROTECT EXISTING GYPSUM
BOARD SOFFITS AT WINDOWS THAT WILL REMAIN.
2
REMOVE EXISTING LIGHT FIXTURE AND SAVE FOR REUSE. SEE ELECTRICAL DRAWINGS FOR MORE
INFORMATION
3
REMOVE EXISTING SUPPLY AIR DIFFUSER. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
4
REMOVE EXISTING RETURN AIR GRILL. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
5
COORDINATE REMOVAL OF EXISTING FIRE ALARM DEVICES WITH OWNER.
6
REMOVE EXISTING SPEAKER AND WIRE
7
REMOVE EXISTING PLASTER CEILING, AND METAL SUPPORTS AND TIES. PREPARE AREA TO RECEIVE
NEW ACOUSTICAL TILE CEILING SYSTEM
8
REMOVE EXISTING WINDOW HVAC UNIT. REPLACE GLAZING IN EXISTING WINDOW FRAME WITH
GLAZING TO MATCH EXISTING.
ROWAN UNIVERSITY
LEGEND
L
RIA
MO LL
E
M HA
EXISTING CONSTRUCTION TO REMAIN.
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
EXISTING CONSTRUCTION TO BE REMOVED.
GENERAL NOTE
1. CONTRACTOR SHALL PROTECT EXISTING FURNITURE AND FINISHES IN OCCUPIED AREA DURING
CONSTRUCTION.
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
HA
PARKING
LOT R
3
1
7
2
2
1
3
3
6
S
5
5
2
3
S
A402
3
TYP.
4
3
S
5
2
2
1
8
SPEAKER
5
2
S
KEY PLAN
2
S
8
2
7
S
4
5
2
2
4
1
S
5
S
3
S
3
2
SPEAKER
8
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
1
S
5
2
4
2
TYP.
S
6
4
2
3
A402
2
3
5
3
S
3
2
5
2
S
1
2
7
5
5
S
4
S
2
2
3
3
Architecture
2
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
1
1
1
D101
Planning
William P. Lammey AIA
Anthony R. Giorgio AIA
2
Second Floor Demolition Plan
1/8" = 1'-0"
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
Project Title
BOLE HALL
RENOVATIONS
Drawing Title
SECOND
FLOOR
DEMOLITION
PLAN
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
Checked By
Job No:
2014-064
Drawing No.
D101
DRAWING KEYNOTES
No.
Width
Height
Thickness
Doors
Material
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
2' - 6"
3' - 0"
3' - 0"
3' - 0"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
WOOD
Door Schedule
Frames
Material
Type
Type
Leaves
Glass
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
4
A
A
A
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
FIRE RATED
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
TEMP
-
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
Buck
B
C
A
A
B
B
D
D
D
D
D
D
B
B
C
D
D
D
D
D
D
D
D
B
D
D
D
E
E
C
E
E
C
Hardware Set
No.
Saddle
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
A
B
B
A
07
THERMAL AND MOISTURE PROTECTION
072100.F1
SOUND BATT INSULATION
079200.B1
SEALANT
Fire Rating
A
A
A
A
A
08
OPENINGS
081113.C1
HOLLOW METAL DOOR FRAME
081416.C1
SOLID CORE DOOR
088000.E2
CLEAR TEMPERED FLOAT GLASS
60 MIN.
1
1
2
2
1
2
2
2
2
2
2
3
1
1
3
2
2
2
2
2
2
2
2
1
2
2
2
3
4
5
4
6
4
B
Remarks
ROWAN UNIVERSITY
09
FINISHES
092216.E1
3 5/8" METAL STUD FRAMING
092900.E1
5/8" GYPSUM WALLBOARD
10
SPECIALTIES
101400.B1
SIGNAGE
CONSTRUCTION NOTES
1
EXISTING WALL TO REMAIN
L
RIA
MO LL
E
M HA
60 MIN.
60 MIN.
PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER
PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER
60 MIN.
60 MIN.
PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER
PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
079200.B1
079200.B1
1
081113.C1
LE
BO LL
HA
081113.C1
PARKING
LOT R
092900.E1
1 15/16"
092216.E1
SEE SCHEDULE
Door Type
1/4" = 1'-0"
A000
SEE SCHEDULE
2"
2' - 0"
2"
2"
SEE SCHEDULE
2"
5 7/8"
SEE SCHEDULE
2"
3' - 5 1/2" 2" 5"
2"
072100.F1
092900.E1
5/8"
079200.B1
079200.B1
A
B
C
D
E
HM
HM
HM
HM
HM
KEY PLAN
8"
088000.E2
088000.E2
8"
088000.E2
081113.C1
081113.C1
SEE SCHEDULE
2"
3' - 5 1/2" 2" 5"
081113.C1
6"
2"
081113.C1
SEE SCHEDULE
2"
3' - 5 1/2" 2" 5"
2
2"
8"
SEE SCHEDULE
SEE SCHEDULE
Wood
SEE SCHEDULE
4"
2"
081113.C1
A
A000
2"
SEE SCHEDULE
081416.C1
1
2"
SEE SCHEDULE 9"
2"
2"
2"
2"
2"
2"
SEE SCHEDULE 1' - 6"
2"
2"
Frame Types
3
1/4" = 1'-0"
A000
A
B
3 5/8" Mtl Stud/HM Frame
Existing Wall/HM Frame
Buck Type
3" = 1'-0"
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
2
1
5"
RESILIENT
FLOOR
1/4"
CARPET
1/4" 1/4"
EPOXY FLOOR
A
B
Marble Threshold
4
A000
CARPET TILE
31/32"
Resilient Floor to Carpet Transition
Saddle Types
12" = 1'-0"
Architecture
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
7"
FIN. FLR.
1/2"
ROWAN
UNIVERSITY
4 1/4"
EQ
1/2"
3/4"
1/2"
WOMEN
EQ
FIN. FLR.
FIN. FLR.
SIGN TYPE B
INTERIOR
INTERIOR
5/8" HIGH
LETTERS
(HELVETICA)
TYPE II
BRAILLE
EQ
Project Title
SIGN TYPE C
SIGN TYPE A
NJ C6793
NJ 07626
101400.B1
7"
EQ
TYPE II
BRAILLE
MOUNTING HEIGHT
1/2"
6"
REPLACEABLE
TEXT SLEEVE
TOILET
5/8" HIGH
LETTERS
(HELVETICA)
4'
6"
7 -1/8"
FRAME
1/2"
1"
7"
5/8" HIGH NUMBERS
(HELVETICA)
1/2"
1/2"
OCCUPANT
TEXT
TEXT
William P. Lammey AIA
Anthony R. Giorgio AIA
1/2"
6"
101400.B1
4"
TYPE II BRAILLE
MOUNTING HEIGHT
1"
2 1/2"
7"
MOUNTING HEIGHT
- 6"
74'5/8"
1"
5"
1" HIGH NUMBERS
(HELVETICA)
216
1/2"
1"
1/2"
1"
5"
4'
6"
7 -1/8"
1"
7"
101400.B1
1"
1 1/2"
1/2"
7"
1/2"
Planning
INTERIOR
BOLE HALL
RENOVATIONS
7"
1/2"
1/2"
101400.B1
Drawing Title
1/2"
6"
DOOR
SCHEDULE
AND DETAILS
EQ
4' - 6"
1/2"
1"
5/8" HIGH
LETTERS
(HELVETICA)
MEN
1/2"
MOUNTING HEIGHT
4'
6"
7 -1/8"
7"
4"
101400.B1
TYPE II
BRAILLE
EQ
FIN. FLR.
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
SIGN TYPE D
INTERIOR
SIGNAGE MOUNTING HEIGHT
SCALE 1/4"=1'-0"
Checked By
Job No:
5
A000
Sign Details
3" = 1'-0"
2014-064
Drawing No.
A000
Key
A
B
C
D
E
Floor
Base
Carpet
Carpet
Resilient Vinyl
Carpet
Epoxy Floor
Walls
Vinyl
Vinyl
Vinyl
Vinyl
Epoxy
WALL LEGEND
Finish Schedule
Wall Fin.
Existing/Gypsum Board
Gypsum Board
Gypsum Board
Existing/Gypsum Board
Existing/Gypsum Board
Ceiling
Paint
Paint
Paint
Paint
Ceramic Tile/Glass Tile
Remarks
ACT/Gypsum Board, Painted
ACT
ACT
Gypsum Board, Painted
ACT
DRAWING KEYNOTES
03
CONCRETE
033000.H5
CAST-IN-PLACE CONCRETE FILL
033000.O2
6 MIL VAPOR BARRIER
EXISTING WALL TO REMAIN. PATCH EXISTING PLASTER IN WORK AREAS.
3-5/8" METAL STUD WALL WITH 5/8" GYPSUM WALLBOARD ON EACH
SIDE AND 3 1/2" SOUND ATTENUATION BLANKET.
Accent Tile @ Wall
06
WOOD, PLASTICS, AND COMPOSITES
064023.A1
SOLID SURFACE COUNTERTOP WITH 4" HIGH BACKSPLASH
064023.A2
SOLID SURFACE COUNTERTOP
066500.A1
SOLID SURFACE WINDOW SILL
NEW 1-HR 3-5/8" METAL STUD WALL WITH 5/8" FIRE CODE GYPSUM
WALLBOARD ON EACH SIDE AND 3 1/2" SOUND ATTENUATION BLANKET.
WALL TO EXTEND TO THE UNDERSIDE OF FLOOR STRUCTURE
ROWAN UNIVERSITY
08
OPENINGS
083313.B1
OVERHEAD COILING SECURITY SHUTTER
260533.A1
10
SPECIALTIES
101100.C1
MARKER BOARD
104413.B1
FIRE EXTINGUISHER CABINET
033000.H5
1' - 2"
11
4"
3/4"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
EQUIPMENT
113100.B1
REFRIGERATOR
12
FURNISHINGS
123530.B1
BASE CABINET
123530.B3
WALL CABINET
1 1/2"
6"
1"
7
5"
22
PLUMBING
224000.A1
ACCESSIBLE SINK
1 1/2"
132
130
260533.A2
Men's Toilet Room
135 E 9'-0"
129
033000.O2
Floor Patch Detail
2
A101
CONSTRUCTION NOTES
4"
1
A500
A101
1
2
3
4
5
6
7
8
066500.A1
Sill/Grille Hole Pattern
3
3" = 1'-0"
L
RIA
MO LL
E
M HA
26
ELECTRICAL
260533.A1
FLOOR BOX
260533.A2
ELECTRIC CONDUIT
1"
Women's Toilet
Room
132 E 9'-0"
3" = 1'-0"
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
SYSTEMS FURNITURE BY OWNER
FILE CABINET BY OWNER
PATCH VERTICAL SHAFT WALL. SEE DETAIL
PATCH EXISTING PLASTER WALLS WITH MATERIALS TO MATCH EXISTING
PATCH CONCRETE FLOOR AT NEW ELECTRIC. SEE DETAIL 2/A101
REPLACE GLAZING TO MATCH EXISTING
EXISTING CONCRETE SLAB
SEE DETAIL 3/A101 FOR HOLE PATTERN. LENGTH TO MATCH RADIATOR BELOW
LE
BO LL
HA
PARKING
LOT R
1
A300
128
12
A501
10
A501
5
A501
5
8
Janitor Closet
133 E 9'-0"
5
A501
8
12
A501
A501
8
8
12
A501
5
8
8
A501
8
2
5
A300
A501
10
A501
8
10
A501
4"
1' - 11"
4
20' - 1"
20' - 6"
1' - 11"
104
2
6' - 1"
13' - 1"
4
Corridor
107 D VARIES
1' - 11"
4
8"
7' - 1"
4
1
4
5
SIM.
A501
8
103
105
106
107
1
14
Payroll
SIM.
Director
104 B 8'-0"
Office
105 B 8'-0"
3
13' - 10"
10' - 5"
11' - 11"
12' - 4"
5' - 5"
5
Acc. Services
Assoc. Director
109 B 8'-0"
11' - 5"
3' - 8"
Payroll Assist.
Supervisor
103 B 8'-0"
Acc. Services
Director
108 B 8'-0"
4
10' - 2"
SIM.
A501
8
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
8"
A501
12' - 4"
6' - 0"
102
12' - 4"
4
Mail/Copy
102 A 8'-0"
KEY PLAN
8" 1' - 8" 8"
4
SIM.
8"
2' - 10"
12' - 7"
7' - 6 3/8"
2
20' - 6"
8"
4
3' - 8"
8"
8'-1" +/-
7' - 1"
4 1/8"
8"
4"
4"
20' - 6"
35' - 9 1/2"
4"
Corridor
106 B 8'-0"
3' - 0"
13' - 10"
14' - 8"
7' - 8"
1' - 8"
Conference
Room/Office
112 B 8'-0"
1
Copy
111 B 8'-0"
A501
064023.A1
5
1
2
064023.A1
Acc. Payable
Manager
114 B 8'-0"
1
8
5
101100.C1
A501
114
Closet
116 B 8'-0"
11' - 2"
Media/P.R.
118 B 8'-0"
Media/P.R.
119 B 8'-0"
2' - 2 1/2"
11' - 5"
11' - 2"
Office
120 B 8'-0"
11' - 8"
Office
121 B 8'-0"
1' - 6 1/2"
William P. Lammey AIA
Anthony R. Giorgio AIA
12
A501
4
33' - 5" +/-
Office
122 B 8'-0"
1
2' - 1"
1' - 6 1/2"
1
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
1' - 11"
113
11' - 6"
2' - 1"
5' - 4"
10' - 1"
4
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
5
2' - 6 1/2"
Lobby
100 A 9'-0"
2' - 1"
A501
Architecture
5' - 5"
Corridor
106A B 8'-0"
108
5' - 5"
109
2' - 6 1/2"
4' - 7"
110
104413.B1
112
2' - 6 1/2"
100
064023.A2
2' - 1"
6' - 5"
A300
123530.B3
2' - 1"
6' - 4"
3' - 0"
123530.B1
111
101
3
20' - 6"
224000.A1
3
SIM.
A501
123530.B1
083313.B1
Acc. Services
Director
113 B 8'-0"
12' - 4"
16' - 8 1/2"
Break Room
110 C 8'-0"
2' - 6"
2' - 1"
A501
123530.B3
7' - 7"
Open Office
131 A VARIES
14
12' - 4"
113100.B1
Payroll Open
Office
101 A VARIES
10
SIM.
A501
2
2' - 5"
1' - 8"
15' - 8"
1' - 11"
2' - 1"
1' - 8"
SIM.
1' - 1"
8'-2"+/-
1' - 2"
A501
2
4
2' - 1"
2' - 1"
14
12' - 4"
1' - 3 1/4"
1' - 9"
8 5/8"
127
4"
2
10' - 10"
A101
5
4
116
126
125
118
119
5
Corridor
124 B 8'-0"
123
124
122
121
SIM.
A501
Project Title
BOLE HALL
RENOVATIONS
20' - 6"
Corridor
123 B 8'-0"
117
5' - 5"
115
Reception
117 A 8'-0"
120
8
Media/P.R.
126 A VARIES
Media/P.R.
127 A VARIES
Office
128 A VARIES
Office
129 A VARIES
Budget Director
130 A VARIES
1' - 0"
2' - 1"
10' - 11"
8
10' - 6 3/4"
5
A501
1
A101
Partial Enlarged First Floor Plan
1/4" = 1'-0"
4
8
4
5
A501
SIM.
5
A501
SIM.
8
20' - 6"
SIM.
12
A501
5
A501
SIM.
Drawing Title
PARTIAL
ENLARGED
FIRST FLOOR
PLAN
4
4
8
1' - 11"
6
A501
13' - 1"
8
20' - 6"
12
A501
10' - 11"
8
1' - 11"
SIM.
SIM.
1' - 7"
10' - 11"
°
135
4
°
135
4
10' - 11"
6
4
1
4"
10'-7"+/-
1
10' - 4"
Media/P.R.
125 A VARIES
8
1' - 11"
6
A501
5
A501
20' - 6"
SIM.
SIM.
12
A501
5
A501
SIM.
8
1' - 11"
5
A501
SIM.
20' - 6"
12
A501
Date:
10/24/2014
Scale
1/4" = 1'-0"
8
5
A501
Drawn By:
SIM.
Checked By
Job No:
2014-064
Drawing No.
A101
DRAWING KEYNOTES
05
METALS
051200.A1
051200.D2
055000.A2
055000.A3
C8 FRAME AROUND OPENING. GALVINIZED
STRUCTURAL STEEL COLUMN - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION
SET BOLT IN SEALANT
GASKET
4
A102
24'-0"+-
06
WOOD, PLASTICS, AND COMPOSITES
061000.A1
PRESSURE TREATED WOOD BLOCKING
1
TYP.
07
THERMAL AND MOISTURE PROTECTION
075423.A1
POURABLE SEALER
075423.A2
TPO FLASHING HEAT WELDED IN PLACE
075423.A3
NON-SHRINK GROUT
075423.C2
TAPERED RIGID INSULATION
075423.C5
ONE PLY OF THERMOPLASTIC MEMBRANE TO MATCH EXISTING 8" ONTO EXISTING MEMBRANE
075423.C7
PRE-FABRICATED MECHANICAL EQUIPMENT CURB
075423.C8
CURB FLASHING FASTEN APROX. 8" O.C.
075423.C9
MEMBRANE FLASHING
075423.C10
GALVINIZED FASTENERS. HEAT-DUCT SEAM PLATES AROUND OPENING
079200.B1
SEALANT
2
A102
2
A102
3
A102
7
6
6
7
A102
A102
A102
A102
08
OPENINGS
089000.A1
MECHANICAL EQUIPMENT SCREEN
CONSTRUCTION NOTES
25' - 0"
2
1
2
3
3
2
A102
3
A102
4
5
6
7
A102
4
A102
3
A102
2
A102
TYP.
8
9
10
11
12
15'-1"+-
8
A102
ROWAN UNIVERSITY
68' - 8"
L
RIA
MO LL
E
M HA
EXISTING ROOF TO REMAIN
REFER TO MECHANICAL DRAWINGS FOR INFORMATION REGARDING HVAC EQUIPMENT
PROVIDE PITCH POCKET AT NEW DUNNAGE COLUMNS- SEE DETAIL 4/A103 FOR FURTHER
INFORMATION.
EXISTING CONCRETE DECK
MOUND POURABLE SEALER TO SHED WATER. POUR AT A MINIMUM DEPTH OF 2".
2" HEAT WELDED SEAM
EXISTING ROOF INSULATION AND RECOVERY BOARD CUT BACK TO ACCOMMODATE NEW
STRUCTURAL STEEL COLUMN
EXISTING ROOF INSULATION
EXISTING MEMBRANE ROOF
ROOF EQUIPMENT
MECHANICAL DUCTWORK
VENT THRU ROOF
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
HA
PARKING
LOT R
32' - 2"
1
A102
1
A102
KEY PLAN
Partial Roof Plan
1/8" = 1'-0"
051200.D2
Key Plan
089000.A1
089000.A1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
8'-0" +/-
1/32" = 1'-0"
5
075423.A1
075423.A2
055000.A2
2 1/2"
3
1
10
055000.A3
075423.C8
089000.A1
051200.D2
075423.C9
7
6
075423.C5
3
2"
075423.C2
8" MIN.
1
9
051200.D2
075423.A3
075423.C2
4
061000.A1
2
Mechanical Louver Plan Detail
3
1 1/2" = 1'-0"
A102
8
075423.C2
Architecture
061000.A1
4
NOTE: NEW ROOF PENETRATIONS TO BE COORDINATED WITH ORIGINAL ROOFING MANUFACTURER TO MAINTAIN EXISTING ROOF WARRANTY
4
A102
A102
4
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
075423.C2
Mechanical Louver Section
4
1 1/2" = 1'-0"
A102
Pitch Pocket Detail
1 1/2" = 1'-0"
6
A102
Planning
William P. Lammey AIA
Anthony R. Giorgio AIA
Roof Mount Equipment Curb
1 1/2" = 1'-0"
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
11
075423.C8
Project Title
061000.A1
BOLE HALL
RENOVATIONS
075423.C7
075423.A2
12
075423.C5
079200.B1
9
079200.B1
Drawing Title
075423.A2
8
PARTIAL ROOF
PLAN AND
LOUVER
DETAILS
075423.C10
4
079200.B1
6
075423.C2
061000.A1
2" MIN
2" MIN
8
051200.A1
NOTE: EXISTING ROOF IS FLEX FB 100 ELVALOY MEMBRANE SYSTEM BY
FLEX MEMBRANE INTERNATIONAL, INC. CONTRACTOR SHALL COORDINATE
WITH EXISTING ROOFING MANUFACTURER FOR PROPER EQUIPMENT
CURB
INSTALLATION.
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
075423.C2
4
075423.C2
Checked By
7
A102
Fan Curb Detail
1 1/2" = 1'-0"
8
A102
Vent Thru Roof
1 1/2" = 1'-0"
Job No:
2014-064
Drawing No.
A102
DRAWING KEYNOTES
3
06
WOOD, PLASTICS, AND COMPOSITES
066500.A1
SOLID SURFACE WINDOW SILL
A300
07
THERMAL AND MOISTURE PROTECTION
072100.F1
SOUND BATT INSULATION
092216.A1
092216.E1
092216.E1
092216.E1
092216.E1
092216.E1
09
FINISHES
092216.A1
092216.E1
092900.E1
092900.O1
095123.B3
095400.B1
096513.C1
096519.B1
096813.B1
Parapet
15' - 6"
092216.E1
092900.E1
26
ELECTRICAL
265100.A1
LED PENDANT FIXTURE
2
15
A501
SIM.
TYP.
9
A501
9
TYP.
A501
9
TYP.
A501
9
TYP.
A501
9
TYP.
A501
Top of Roof Deck
13' - 7"
3
9
TYP.
A501
CONSTRUCTION NOTES
16
A501
092900.E1
092900.O1
1
2
3
092216.E1
265100.A1
095123.B3
092216.E1
Payroll
Director
104 B 8'-0"
092900.E1
072100.F1
Break Room
110 C 8'-0"
066500.A1
Media/P.R.
118 B 8'-0"
096813.B1
096519.B1
1
Media/P.R.
126 A VARIES
092900.E1
096513.C1
EXISTING WINDOWS TO REMAIN
EXISTING ROOF DECK
PATCH EXISTING PLASTER WALLS WITH MATERIALS TO MATCH EXISTING
L
RIA
MO LL
E
M HA
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
095123.B3
10' - 5"
Payroll Open
Office
101 A VARIES
265100.A1
Corridor
123 B 8'-0"
096813.B1
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
5
A501
2' - 1"
1
095123.B3
3' - 6"
11' - 4"
5
SIM.
A501
072100.F1
066500.A1
ROWAN UNIVERSITY
3 5/8" METAL COUNTOUR CEILING FRAMING
3 5/8" METAL STUD FRAMING
5/8" GYPSUM WALLBOARD
CEILING SUPPORT SYSTEM
2X4 ACOUSTICAL TILE
DECORATIVE COMPOSITE CEILING PANEL
RESILIENT COVE BASE
RESILIENT TILE FLOORING
TILE CARPET
First Floor
0' - 0"
LE
BO LL
HA
PARKING
LOT R
Building Section
1
A300
1/4" = 1'-0"
KEY PLAN
3
A300
9
A501
9
A501
2
15 SIM.
A501
4' - 9"
3
092900.E1
095123.B3
095400.B1
092900.E1
095400.B1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
15
A501
092216.E1
092216.E1
1
095400.B1
265100.A1
092216.A1
1
092216.A1
1
1
SIM.
5
A501
096813.B1
Open Office
131 A VARIES
096513.C1
096513.C1
096813.B1
2' - 1"
7' - 11"
10' - 0"
1
8' - 6"
066500.A1
Building Section
2
A300
Architecture
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
1/4" = 1'-0"
William P. Lammey AIA
Anthony R. Giorgio AIA
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
1
A300
2
A300
9
A501
7
A501
Parapet
15' - 6"
9
A501
9
A501
2
092216.E1
072100.F1
092216.E1
095400.B1
101
111
Lobby
100 A 9'-0"
092900.E1
110
109
092900.E1
108
Drawing Title
1
092900.E1
1
1
265100.A1
SIM.
Open Office
131 A VARIES
E
BUILDING
SECTIONS
11' - 4"
092900.E1
Corridor
106A B 8'-0"
BOLE HALL
RENOVATIONS
15
A501
092216.E1
092900.E1
Project Title
092216.A1
10' - 0"
092216.E1
SIM.
095123.B3
6' - 7"
095123.B3
3
095400.B1
265100.A1
072100.F1
Top of Roof Deck
13' - 7"
5
A501
096813.B1
096813.B1
096513.C1
096513.C1
096513.C1
096513.C1
066500.A1
2' - 1"
095123.B3
6' - 8"
11' - 4"
3
11' - 4"
092900.E1
265100.A1
First Floor
0' - 0"
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
Checked By
3
A300
Partial Building Section
1/4" = 1'-0"
Job No:
2014-064
Drawing No.
A300
DRAWING LEGEND
2 x 4 ACOUSTIC CEILING TILE
1
2 x 2 ACOUSTIC CEILING TILE
1
ROWAN UNIVERSITY
1
GYPSUM WALLBOARD CEILING/SOFFIT
Payroll
Director
104 B 8'-0"
1
1
2 x 4 RECESSED LIGHT FIXTURE
1
1
Women's Toilet Rm.
132 E 9'-0"
Break Room
110 C 8'-0"
Office
105 B 8'-0"
Payroll Assist.
Supervisor
103 B 8'-0"
1
Acc. Services
Director
108 B 8'-0"
Conference
Room/Office
112 B 8'-0"
1
Payroll Open
Office
101 A VARIES
1
122413.B1
Unisex Toilet Room
134 E 8'-0"
Janitor's Closet
133 E 9'-0"
Corridor
106A B 8'-0"
Corridor
106 B 8'-0"
A300
083113.A1
Acc. Services
Director
113 B 8'-0"
Copy
111 B 8'-0"
LED LINEAR PENDANT
Corridor
107 D VARIES
DRAWING KEYNOTES
08
OPENINGS
083113.A1
NEW ACCESS HATCH TO BE PLACED UNDER NEW VOLUME DAMPER
Acc. Services
Assoc. Director
109 B 8'-0"
09
FINISHES
095400.B1
DECORATIVE COMPOSITE CEILING PANEL
Acc. Payable
Manager
114 B 8'-0"
Open Office
131 A VARIES
A300
083113.A1
122413.B1
Men's Toilet Rm.
135 E 9'-0"
083113.A1
122413.B1
12
FURNISHINGS
122413.B1
ROLLER WINDOW SHADE
2
083113.A1
122413.B1
L
RIA
MO LL
E
M HA
CONSTRUCTION NOTES
122413.B1
1
2
3
4
EXISTING LIGHT FIXTURE TO BE REPLACED - SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION
EXISTING LIGHT FIXTURE TO REMAIN - SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION
REMOVE AND REINSTALL EXISTING CEILING
CONTRACTOR SHALL PATCH THE VERTICAL SHAFT WITH 3-5/8 METAL STUDS AND TWO LAYERS OF
5/8" TYPE 'X' GYPSUM BOARD AT OPENINGS. PROVIDE FIRE PENETRATION SEALANT AT ALL
CONDUITS, EDGES AND PENETRATIONS. CONTRACTOR SHALL PATCH WALL FROM OPENING TO
UNDERSIDE OF DECK. SEE DETAIL 2/A401.
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
HA
PARKING
LOT R
122413.B1
3
3
1
083113.A1
4
095400.B1
Mail/Copy
102 A 8'-0"
KEY PLAN
3
122413.B1
1
095400.B1
083113.A1
3
3
A300
1
Lobby
100 A 9'-0"
083113.A1
095400.B1
Reception
117 A 8'-0"
Media/P.R.
118 B 8'-0"
Media/P.R.
126 A VARIES
Media/P.R.
125 A VARIES
2
3
2
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
122413.B1
083113.A1
083113.A1
3
2
122413.B1
083113.A1
122413.B1
Media/P.R.
127 A VARIES
Corridor
123 B 8'-0"
1
A401
083113.A1
Office
128 A VARIES
Office
120 B 8'-0"
Media/P.R.
119 B 8'-0"
122413.B1
122413.B1
Office
129 A VARIES
Budget Director
130 A VARIES
Office
121 B 8'-0"
Office
122 B 8'-0"
083113.A1
122413.B1
Corridor
124 B 8'-0"
First Floor Reflected Ceiling Plan
Architecture
1/8" = 1'-0"
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
William P. Lammey AIA
Anthony R. Giorgio AIA
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
PATCH AREA
Project Title
BOLE HALL
RENOVATIONS
Drawing Title
FIRST FLOOR
REFLECTED
CEILING PLAN
CONTRACTOR SHALL PATCH THE VERTICAL SHAFT WITH 3-5/8 METAL STUDS AND
TWO LAYERS OF 5/8" TYPE 'X' GYPSUM BOARD AT OPENINGS. PROVIDE FIRE
PENETRATION SEALANT AT ALL CONDUITS, EDGES AND PENETRATIONS.
CONTRACTOR SHALL PATCH WALL FROM OPENING TO UNDERSIDE OF DECK.
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
Checked By
Job No:
2
A401
Pipe Chase Photo Detail
NO SCALE
2014-064
Drawing No.
A401
DRAWING LEGEND
2 x 4 ACOUSTIC CEILING TILE
ROWAN UNIVERSITY
2 x 2 ACOUSTIC CEILING TILE
2 x 4 RECESSED LIGHT FIXTURE
2 x 2 RECESSED LIGHT FIXTURE
DRAWING KEYNOTES
05
METALS
055000.A6
4" X 4" X 1/8" STEEL ANGLE. BEAR 4" ON EACH SIDE OF OPENING
06
WOOD, PLASTICS, AND COMPOSITES
061000.G9
2X6 PRESSURE TREATED WOOD BLOCKING
064023.H2
5/4X6 WOOD TRIM
07
THERMAL AND MOISTURE PROTECTION
078413.A1
FIRE STOPPING SEALANT
09
FINISHES
092216.C1
092900.E1
095123.B3
095123.G1
2 1/2" METAL STUD FRAMING @16" O.C.
5/8" GYPSUM WALLBOARD
2X4 ACOUSTICAL TILE
WALL ANGLE
CONSTRUCTION NOTES
1
2
3
4
5
6
1
3
1
EXISTING LIGHT FIXTURE TO BE REPLACED. SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION
REPLACE EXISTING GLAZING TO MATCH EXISTING
PATCH EXISTING PLASTER WALLS
EXISTING CONSTRUCTION TO REMAIN
EXISTING WALL TO REMAIN
FIRE DAMPER. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
L
RIA
MO LL
E
M HA
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
LE
BO LL
HA
PARKING
LOT R
4
A402
1
3
A402
2
TYP.
2
1
1
1
3
4
A402
KEY PLAN
1
2
1
1
4
A402
1
3
TYP.
2
1
A402
1
1
3
4
1
A402
2
1
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
4
1
A402
4
1
A402
1
1
1
A402
Second Floor Reflected Ceiling Plan
1/8" = 1'-0"
Architecture
Planning
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
William P. Lammey AIA
Anthony R. Giorgio AIA
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
5
078413.A1
055000.A6
078413.A1
061000.G9
5
078413.A1
078413.A1
Project Title
092900.E1
BOLE HALL
RENOVATIONS
092216.C1
4
6
095123.B3
064023.H2
078413.A1
Drawing Title
078413.A1
5
078413.A1
078413.A1
2
A402
Fire Damper Detail
1 1/2" = 1'-0"
NOTE: CONTRACTOR TO FILL IN OPENING LEFT BY DEMOLISHED
DUCTWORK. CONTRACTOR TO ASSUME 24" X 24" SIZE
PER OPENING. PROVIDE LINTELS & FIRE PENETRATION
SEALANT @ ALL NEW FIRE DAMPERS. SEE MECHANICAL
DRAWINGS FOR QUANTITY AND LOCATIONS AND MORE
INFORMATION
3
A402
Lintel Detail
1 1/2" = 1'-0"
NOTE: CONTRACTOR TO FILL IN OPENING LEFT BY DEMOLISHED
DUCTWORK. CONTRACTOR TO ASSUME 24" X 24" SIZE
PER OPENING. PROVIDE LINTELS & FIRE PENETRATION
SEALANT @ ALL NEW FIRE DAMPERS. SEE MECHANICAL
DRAWINGS FOR QUANTITY AND LOCATIONS AND MORE
INFORMATION
095123.G1
4
A402
Window Head Detail
3" = 1'-0"
SECOND
FLOOR
REFLECTED
CEILING PLAN
Date:
10/24/2014
Scale
1/4" = 1'-0"
Drawn By:
Checked By
Job No:
2014-064
Drawing No.
A402
102800.A1
102800.B1
5' - 3"
DRAWING KEYNOTES
102800.B3
5' - 6"
06
WOOD, PLASTICS, AND COMPOSITES
061000.B1
BLOCKING
064023.A1
SOLID SURFACE COUNTERTOP WITH 4" HIGH BACKSPLASH
064023.A3
3/4" PLYWOOD SHEATHING
066500.A4
1" SOLID SURFACE COUNTER SUPPORT
224000.C2
09
FINISHES
093000.A1
093000.B1
095123.B3
096700.A1
36" DR
5"
A
D
102800.D3
C
5' - 0"
CLEAR
102800.D2
B
3' - 1"
5' - 0"
131
2
A500
9'-11 1/2".
224000.C2
4
A500
3' - 1"
24" DR
132
SPECIALTIES
102113.B1
TOILET PARTITION
102800.A1
RECESSED HAND DRYER
102800.A2
UNDERCOUNTER LAVATORY GUARD
102800.B1
PAPER TOWEL DISPENSER
102800.B2
TOILET TISSUE DISPENSER
102800.B3
WASTE RECEPTACLE
102800.B5
SANITARY NAPKIN DISPOSAL UNIT
102800.B6
SOAP DISPENSER
102800.D2
36" GRAB BAR
102800.D3
42" GRAB BAR
102800.D4
18" GRAB BAR
102800.E2
ACCESSIBLE MIRROR
Women's Toilet
Room
132 E 9'-0"
11' - 2"
24" DR
224000.B2
4' - 11 3/4"
102800.B2
4' - 10"
130
4"
1
2
3
4
5
6
4'-1".
4"
224000.E3
102800.D2
3'-4".
LAUREL
HALL
CONSTRUCTION NOTES
1'-3"+-
129
OAK
HALL
Men's Toilet Room
135 E 9'-0"
5' - 0"
CLEAR
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
26
ELECTRICAL
265100.D1
WALL MOUNT FIXTURE
224000.B1
4"
224000.B2
L
RIA
MO LL
E
M HA
22
PLUMBING
224000.A2
ACCESSIBLE URINAL
224000.B1
WATER CLOSET
224000.B2
ACCESSIBLE WATER CLOSET
224000.C2
ACCESSIBLE LAVATORY
224000.E3
JANITOR SINK
102800.B5
3' - 7"
ACCENT TILE
GLAZED WALL TILE
2X4 ACOUSTICAL TILE
EXPOXY FLOOR AND BASE
10
CLEAR
Unisex Toilet Room
134 E 8'-0"
4'-9 3/4".
5'-1 1/2"+-
102113.B1
ROWAN UNIVERSITY
LE
BO LL
HA
REINSTALL EXISTING GRAB BAR
REINSTALL EXISTING MIRROR
REINSTALL EXISTING TOILET TISSUE DISPENSER
REINSTALL EXISTING SOAP DISPENSER
EXISTING WINDOW TO REMAIN
INSTALL PIPE INSULATION AT ALL EXPOSED PIPING
PARKING
LOT R
224000.C2
5"
5' - 6"
224000.A2
102800.B1
102113.B1
224000.B2
B
3'-4 1/2".
102800.D3
128
102800.A1
A
3
A500
KEY PLAN
102800.B2
C
9"
36" DR
Janitor Closet
133 E 9'-0"
5 5/8"
4'-2 3/4".
5"
6' - 7"
4'-11"+-
5"
Enlarged Toilet Room Plan
1
A500
1/2" = 1'-0"
095123.B3
093000.A1
5
265100.D1
A500
093000.B1
095123.B3
102800.E2
102800.E2
093000.B1
224000.C2
093000.A1
095123.B3
102113.B1
093000.B1
1
12/3/2014
ISSUED FOR BID
No.
Date
Revision
095123.B3
093000.A1
093000.A1
102800.B6
102800.D4
093000.B1
224000.C2
102800.D2
102800.D3
064023.A1
5
39"-41"
25"
12"
6"
7'-0"
7'-0"
102113.B1
36"
MIN.
42"
MIN.
18"
MIN.
9'-0"
064023.A1
7'-0"
9'-0"
9'-0"
102800.D4
102800.B5
096700.A1
102800.B3
102800.B1
A
066500.A4
066500.A4
102800.A2
102800.A2
096700.A1
19"
MAX.
4'-0" MIN.
CLEAR FLOOR SPACE
102800.B2
B
224000.B2
102800.B2
102800.B2
224000.B1
224000.B1
224000.B2
C
1'-9"
36"
MAX.
1'-5"
102800.B2
102800.B5
39"-41"
3'-0"
MAX.
1'-9"
1'-5"
1'-9"
38" MAX.
11"
MIN.
066500.A4
102113.B1
7"-9"
1'-5"
9"
102800.A1
MIN.
29" MIN.
8"
MIN.
34" MAX.
3'-2"
2'-10"
2'-5"
4'-0"
3'-11"
7"-9"
Architecture
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
096700.A1
224000.B2
D
102800.B2
William P. Lammey AIA
Anthony R. Giorgio AIA
096700.A1
Women's Toilet Room Elevations
2
A500
102800.A1
061000.B1
095123.B3
095123.B3
102113.B1
093000.B1
093000.B1
095123.B3
093000.A1
265100.D1
093000.B1
102800.D4
224000.C2
093000.B1
095123.B3
064023.A1
093000.A1
102800.B6
102800.B1
064023.A3
102800.D4
102800.E2
Project Title
093000.A1
102800.D2
2
102800.D3
4
BOLE HALL
RENOVATIONS
39"-41"
5
224000.C2
6"
8'-0"
128
42"
MIN.
7'-0"
18"
MIN.
7'-0"
7'-0"
12"
6'-6"
9'-0"
9'-0"
36"
MIN.
9'-0"
1
6"
3
Drawing Title
ENLARGED
TOILET ROOM
FLOOR PLANS &
INTERIOR
ELEVATIONS
A500
096700.A1
6
224000.A2
B
224000.B2
102800.D2
224000.B2
102800.B2
2' - 5"
C
102800.D3
096700.A1
224000.C2
096700.A1
224000.B2
1' - 1"
6
4
A500
2' - 10"
3'-0"
MAX.
2'-5"
3'-2"
2'-10"
1'-5"
1'-9"
36"
MAX.
39"-41"
1'-9"
1'-5"
1'-5"
2'-5"
2'-10"
3'-2"
4'-0"
38" MAX.
4'-0"
6
1'-6"
MAX.
1"
Toilet Room Elevation
11"
19"
MAX.
Men's Toilet Room Elevations
1/2" = 1'-0"
34" MAX.
11"
MIN.
10"
10"
Date:
10/24/2014
Scale
1/4" = 1'-0"
102800.A2
Drawn By:
066500.A4
Checked By
9"
3
A
102800.B2
MIN.
9"
096700.A1
29" MIN.
7"-9"
8"
MIN.
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
1/2" = 1'-0"
093000.A1
Planning
1/2" = 1'-0"
Job No:
5
A500
Section Thru Lavatory
1 1/2" = 1'-0"
2014-064
Drawing No.
A500
8
4
A501
095123.B3
A501
095123.B3
DRAWING KEYNOTES
PAYROLL
05
METALS
055000.A1
9
06
WOOD, PLASTICS, AND COMPOSITES
061000.B1
BLOCKING
061600.E11
3/4" PLYWOOD SHEATHING
064023.A1
SOLID SURFACE COUNTERTOP WITH 4" HIGH BACKSPLASH
064023.A2
SOLID SURFACE COUNTERTOP
064023.A8
VENEER PLYWOOD
064023.A9
4" HIGH WOOD BASE
064023.A10
VENEER PLYWOOD SUPPORT
064023.H12
1X4 WOOD TRIM
066500.A1
SOLID SURFACE WINDOW SILL
8"
095123.B3
224000.A1
064023.A1
092900.E1
3' - 0"
21DB
096519.B1
24BC
096513.C1
24BC
123530.B1
30BC
3/4"
08
OPENINGS
083313.B1
OVERHEAD COILING SECURITY SHUTTER
064023.A8
3/4"
096513.C1
096813.B1
09
FINISHES
092216.A2
092216.E1
092900.D2
092900.E1
092900.J2
092900.O1
095123.B3
096513.C1
096519.B1
096813.B1
064023.A1
30BC
113100.B1
Breakroom
1
A501
096813.B1
3'-5 1/2".
1' - 1"
2' - 3" MIN.
2
1 1/2"
3'-5 1/2".
2
1/2" = 1'-0"
A501
Copy Room
Payroll Counter
3
1/2" = 1'-0"
A501
ROWAN UNIVERSITY
07
THERMAL AND MOISTURE PROTECTION
072100.B3
R-13 BATT INSULATION
072100.F1
SOUND BATT INSULATION
079200.B1
SEALANT
064023.A2
123530.B1
1
096513.C1
123530.B3
2' - 10"
1' - 8"
2' - 10"
064023.A1
8' - 0"
092900.E1
3
5' - 11"
2442WC
9' - 0"
2442WC
1' - 6"
2142WC
123530.B3
3042WC
4' - 2"
3042WC
123530.B3
8' - 0"
092900.E1
3' - 6"
3624WC
3' - 6"
3624WC
CONCEALED HANGERS 2" X 1 1/2" ALUMINUM ANGLES
1/2" = 1'-0"
11
L
RIA
MO LL
E
M HA
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
E
US
HO
ALL
N
EE
E H X PARKING
L
R
G
BO NNE
LOT P
A
LL
HA
E
NC
BU
EQUIPMENT
113100.B1
REFRIGERATOR
12
FURNISHINGS
122413.B1
ROLLER WINDOW SHADE
123530.B1
BASE CABINET
123530.B3
WALL CABINET
123530.B1
066500.A1
1/4" ALUMINUM REVEAL
3 5/8" METAL STUD FRAMING
1/2" TYPE X GYPSUM WALLBOARD
5/8" GYPSUM WALLBOARD
J BEAD
CEILING SUPPORT SYSTEM
2X4 ACOUSTICAL TILE
RESILIENT COVE BASE
RESILIENT TILE FLOORING
TILE CARPET
LE
BO LL
HA
PARKING
LOT R
22
PLUMBING
224000.A1
ACCESSIBLE SINK
26
ELECTRICAL
265100.A1
LED PENDANT FIXTURE
061000.B1
1'-1".
7
7
092900.E1
4
8
064023.H12
092216.E1
4
A501
072100.B3
Cabinet Section- Typical
CONSTRUCTION NOTES
1" = 1'-0"
1
2
3
4
5
6
7
8
9
10
5"
6
3".
5
& 3' - 4" +/-
2'-2" +\-
092216.A2
061000.B1
072100.F1
066500.A1
092900.E1
8"
KEY PLAN
095123.B3
092216.E1
066500.A1
PROVIDE WOOD VALANCE TO MATCH ADJACENT CABINETS
PROVIDE ADA COMPLIANT ANTI-SCALD PIPE INSULATION PROTECTION
WOOD PRIVACY SCREEN
EXISTING WALL
EXISTING CONCRETE SLAB
EXISTING RIGID INSULATION
EXISTING WINDOW
EXISTING ROOF DECK
ENGRAVED WOOD VENEER PANEL
PATCH EXISTING PLASTER WALLS WITH MATERIALS TO MATCH EXISTING
072100.F1
072100.F1
092900.D2
055000.A1
092216.E1
6°
5
A501
Window Sill Detail
6
A501
1 1/2" = 1'-0"
Window Mullion Detail
7
1 1/2" = 1'-0"
A501
1 hr Wall/Ceiling Detail
4' - 2"
12/3/2014
ISSUED FOR BID
No.
Date
Revision
3/4" = 1'-0"
7
066500.A1
7
4
7
13
092216.E1
A501
4
7' - 0"
4
1
3
8
11
064023.A2
11
A501
A501
SIM.
10
092216.E1
9"
1' - 0"
092900.E1
092216.E1
096513.C1
092216.A2
092216.A2
092216.A2
092900.E1
092900.E1
092216.E1
092216.E1
092900.E1
092900.E1
3 5/8"
096513.C1
5
8"
066500.A1
096813.B1
5/8".
8"
066500.A1
4 3/4".
6"
10
072100.F1
055000.A1
4
092900.E1
10
095123.B3
2' - 10"
055000.A1
3 5/8".
2'-0".
072100.F1
055000.A1
092216.A2
3 5/8".
2'-0".
10
10
092216.E1
8"
055000.A1
10
092900.E1
092216.A2
Architecture
4 3/4".
092900.E1
2' - 0"
092900.E1
4 3/4".
215 Highland Ave. - Suite B
Haddon Township, NJ 08108
(856) 833-0010
092216.A2
092216.E1
William P. Lammey AIA
Anthony R. Giorgio AIA
066500.A1
092900.E1
096813.B1
8
A501
Payroll Counter Section
9
A501
Typical Wall/Ceiling Detail
10
3/4" = 1'-0"
A501
Pipe Chase Plan Detail
11
1 1/2" = 1'-0"
A501
Pipe Chase Detail
12
1 1/2" = 1'-0"
A501
Planning
Column Pipe Chase Plan Detail
NJ C6793
NJ 07626
ROWAN
UNIVERSITY
1 1/2" = 1'-0"
1" = 1'-0"
092216.E1
8
8
092216.E1
4
4
Project Title
092900.E1
BOLE HALL
RENOVATIONS
092216.E1
066500.A1
095123.B3
2' - 4 1/2"
2' - 8 1/2"
061600.E11
072100.F1
072100.F1
092216.E1
7
135
°
092216.E1
4
092900.O1
072100.F1
A501
1 1/2" = 1'-0"
°
092216.E1
14
A501
Soffit Detail 1
3/4" = 1'-0"
2' - 9"
092900.J2
092216.E1
095123.B3
092900.E1
9'-0" A.F.F.
15
A501
Soffit Detail 2
3/4" = 1'-0"
092900.E1
092900.E1
095123.B3
16
A501
Soffit Detail 3
3/4" = 1'-0"
9'-0" A.F.F.
265100.A1
6'-8" A.F.F.
092900.E1
Column Pipe Chase Detail
INTERIOR
ELEVATIONS
AND MILLWORK
DETAILS
092900.J2
2' - 6"
13
Drawing Title
079200.B1
072100.F1
079200.B1
8'-0" A.F.F.
096813.B1
092900.E1
092900.E1
45
092900.E1
5
122413.B1
095123.B3
10
072100.F1
2' - 4 1/2"
3' - 4"
092900.E1
092216.E1
096513.C1
2' - 8 1/2"
°
45
& 3'-4" +/-
2'-2" +/-
092216.E1
°
135
2' - 4 1/2"
061000.B1
122413.B1
7
Date:
10/24/2014
Scale
1/4" = 1'-0"
265100.A1
Drawn By:
Checked By
Job No:
2014-064
Drawing No.
A501
PHASING OF CONSTRUCTION:
1.
2.
3.
4.
5.
6.
PORTIONS OF THE BUILDING WILL REMAIN OCCUPIED DURING THE WORK. REFER TO
DRAWING AC000 FOR PHASING PLAN. CONTRACTOR SHALL MAINTAIN NECESSARY
SYSTEMS AND COMPONENTS IN OPERATION AS LONG AS REQUIRED TO ACCOMPLISH
THE WORK IN PHASES AND MAINTAIN HVAC SERVICES TO OCCUPIED AREAS.
PHASING NOTES BELOW ARE NOT INTENDED TO ENCOMPASS ALL PORTIONS OF THE
WORK AND WILL NOT RELIEVE THE CONTRACTOR FROM THE ENTIRE SCOPE OF WORK
DESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS. CONTRACTOR SHALL BE
RESPONSIBLE TO SUBMIT A PHASING PLAN AT THE BEGINNING OF THE PROJECT ALONG
WITH THEIR CONSTRUCTION SCHEDULE FOR REVIEW AND APPROVAL BY THE OWNER
AND ENGINEER PRIOR TO STARTING WORK.
EXISTING HOT WATER PUMPS, HEAT EXCHANGERS, STEAM PIPING, ETC.. WILL REMAIN
IN OPERATION UNTIL THE END OF THE HEATING SEASON (APPROX. APRIL 15) AND THE
NEW SYSTEM SHALL BE FULLY OPERATIONAL BY THE START OF THE HEATING SEASON
(APPROX. SEPT 15) UNLESS OTHERWISE DIRECTED BY THE OWNER.
NEW CHILLED WATER SYSTEM WILL BE OPERATIONAL BY APRIL 15 UNLESS OTHERWISE
DIRECTED BYTHE OWNER.
CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY PIPING AND DUCT
CONNECTIONS AS REQUIRED BETWEEN PHASE 1 AND PHASE 2 AREAS OF WORK UNTIL
PHASE 1 WORK IS COMPLETE AND REMAINING AREAS ARE UNOCCUPIED.
PRESIDEN'TS OFFICE SUITE WILL REMAIN OCCUPIED DURING THE DURATION OF
CONSTRUCTION
SYMBOLS LIST:
ELECTRICAL LEGEND:
DEMOLITION
NEW
XX;YY
XX;YY
2.
3.
4.
5.
6.
7.
8.
CONNECTION TO FURNITURE POWER SUPPLY. MAKE FINAL CONNECTION TO EQUIPMENT.
COORDINATE EQUIPMENT CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER.
J
CONNECTION TO EQUIPMENT. RUN CABLE AND CONDUIT PER CIRCUIT
CALL-OUT. MAKE FINAL CONNECTION TO EQUIPMENT. COORDINATE EQUIPMENT
CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER.
CONNECTION TO HAND DRYER. MAKE FINAL CONNECTION TO EQUIPMENT. COORDINATE EQUIPMENT
CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER.
P
DUPLEX RECEPTACLE FOR PROJECTOR, 4"x4"x2",120VAC, 20A, MOUNT IN CEILING
COORDINATE FINAL LOCATION WITH ROWAN AND VENDOR. SIDE WIRE FOR CABLE LARGER THAN #10AWG.
S
CONNECTION TO SINK POWER SUPPLY. MAKE FINAL CONNECTION TO EQUIPMENT. COORDINATE
EQUIPMENT CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER.
CONNECTION TO TOILET POWER SUPPLY. MAKE FINAL CONNECTION TO EQUIPMENT. COORDINATE
EQUIPMENT CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER.
T
GENERAL PURPOSE SIMPLEX RECEPTACLE, 120VAC, 20A MOUNT AT 18" AFF. TO CENTERLINE,
UNLESS NOTED OTHERWISE. SIDE WIRE FOR CABLE LARGER THAN #10AWG.
GENERAL PURPOSE DUPLEX RECEPTACLE, 120VAC, 20A MOUNT AT 18" AFF. TO CENTERLINE,
UNLESS NOTED OTHERWISE. SIDE WIRE FOR CABLE LARGER THAN #10AWG.
DUPLEX RECEPTACLE, GROUND FAULT CIRCUIT INTERRUPTER, 120VAC, 20A. SIDE WIRE
FOR CABLE LARGER THAN #10AWG.
NON-FUSED DISCONNECT SWITCH. REFER TO SCHEDULE ON DRAWING E006.
+
M
2.
3.
4.
5.
6.
7.
8.
9.
REMOVE EXISTING AHU-1B AND ASSOCIATED DUCTWORK (INCLUDING REMAINING AHU-1A
DUCTWORK) AS SHOWN ON THE DRAWINGS.
REMOVE EXISTING AHU-2, DUCTWORK AND PIPING ON SECOND FLOOR INCLUDING CONDENSING
UNIT IN SECOND FLOOR MECHANICAL ROOM.
REMOVE EXISTING HOT WATER SYSTEM COMPONENTS AS SHOWN ON THE DRAWINGS
INCLUDING BUT NOT LIMITED TO HEAT EXCHANGERS, STEAM PIPING, HOT WATER PIPING AND
DIVERTING VALVES.
UPON REMOVAL OF AHU-1B, AHU-2 AND EXISTING HOT WATER SYSTEM, EXISTING PNEUMATIC
CONTROL PANEL AND AIR COMPRESSOR SHALL BE REMOVED.
FURNISH AND INSTALL ALL NEW WORK ASSOCIATED WITH PHASE 2 AS DESCRIBED ON THE
DRAWINGS ALONG WITH NEW HEATING SYSTEM COMPONENTS IN BASEMENT MECHANICAL ROOM
AND CHILLED AND HOT WATER RISERS TO SECOND FLOOR.
EXISTING AREAS IN PRESIDENT'S SUITE SERVED OFF EXISTING AHU-1B WILL REMAIN OCCUPIED
DURING PHASE 2. PERFORM REMOVALS IN THESE AREAS ON NIGHTS OR WEEKENDS TO
MINIMIZE DOWNTIME AND EXPEDITE INSTALLATION OF VAV BOX-100G AND ASSOCIATED
DUCTWORK TO THESE AREAS.
UPON COMPLETION OF PHASE 2 WORK, PERFORM STARTUP, TESTING AND BALANCING OF NEW
AHU-2 LOCATED ON SECOND FLOOR MECHANICAL ROOM INCLUDING CONTROLS AND
VERIFICATION OF OPERATIONAL CONTROL AT CAMPUS SCADA SYSTEM.
BALANCE HOT WATER AND CHILLED WATER SYSTEMS FOR AHU-2 AND VAV BOXES.
PERFORM FINAL BALANCING OF AHU-1 AIRFLOW AND HYDRONIC SYSTEMS AFTER ALL SYSTEMS
AND COMPONENTS ARE OPERATIONAL IN THEIR FINAL CONFIGURATION.
DEVICE MOUNTED 18" ABOVE COUNTERTOP.
MOTOR RATED SWITCH
SINGLE-LINE LEGEND:
THERMAL MAGNETIC CIRCUIT BREAKER
CONTACTOR, FULL VOLTAGE NON-REVERSING
DISCONNECT SWITCH HEAVY DUTY, NEMA TYPE 1 ENCLOSURE,
UNLESS OTHERWISE INDICATED.
FUSED DISCONNECT SWITCH HEAVY DUTY, NEMA TYPE 1 ENCLOSURE,
UNLESS OTHERWISE INDICATED. DUAL ELEMENT TIME DELAY FUSE
PHASE 2 (FIRST FLOOR AND SECOND FLOOR):
1.
HOME RUN TO SOURCE PANEL; 'XX' INDICATES PANEL NO.
& 'YY' INDICATES CIRCUIT NO.
F
PHASE 1 (FIRST FLOOR NEW OFFICE WING AND RESTROOMS):
CONTRACTOR SHALL PERFORM A PRE-CONSTRUCTION AIRFLOW AUDIT OF AHU-1A AND 1B AND ASSOCIATED DUCTWORK. AUDIT SHALL INCLUDE COMPLETE UNIT PROFILES AND
DUCT TRAVERSES FOR MAIN DUCTWORK IN BASEMENT AND FOUR (4) MAIN DUCT
BRANCHES ON THE FIRST FLOOR. RECORD TOTAL AIRFLOW AND STATIC PRESSURES AT
THE TRAVERSE LOCATIONS. SUBMIT A BOUND REPORT TO THE ENGINEER FOR
APPROVAL. AUDIT WILL BE USED FOR TEMPORARY BALANCING OF AHU 1-B TO PHASE 2
AREAS THAT WILL REMAIN OCCUPIED.
UPON APPROVAL OF PRE-CONSTRUCTION AIRFLOW AUDIT, CONTRACTOR SHALL REMOVE
AHU-1A WHILE MAINTAINING AHU-1B OPERATIONAL. NEATLY DEMOLISH AHU-1A AND
FURNISH AND INSTALL TEMPORARY CASING PANELS FOR AHU-1B AS NECESSARY TO
MAINTAIN OPERATION. IF AHU-1B REQUIRES TEMPORARY SHUTDOWN DURING WORK, ALL
ASSOCIATED WORK WILL BE PERFORMED AT NIGHT OR ON WEEKENDS TO MINIMIZE
IMPACT TO OCCUPIED AREAS.
REMOVE AHU-1A DUCT RISER TO FIRST FLOOR CEILING.
REMOVE AHU-1A AND AHU-1B DUCT BRANCHES IN PHASE 1 AREA OF WORK. CONTRACTOR
SHALL PROVIDE TEMPORARY DUCTWORK AND BALANCING DAMPERS TO CONNECT
AHU-1B RISER AT THE FIRST FLOOR TO EXISTING AHU-1A AND AHU-1B BRANCHES SERVING
PHASE 2 AREA OF WORK. PERFORM WORK ASSOCIATED WITH TEMPORARY DUCTWORK
AT NIGHT OR WEEKEND TO MINIMIZED IMPACT TO OCCUPIED AREAS.
TEMPORARILY REBALANCE AHU-1B TO REQUIRED AIRFLOWS FOR THE REMAINING DUCT
BRANCHES AS RECORDED DURING THE PRE-CONSTRUCTION AIRFLOW AUDIT.
PERFORM REMOVALS AND INSTALL ALL NEW WORK IN PHASE 1 AREA AS DESCRIBED ON
THE DRAWINGS INCLUDING INSTALLATION OF NEW DDC CONTROL SYSTEM WHILE
MAINTAINING EXISTING PNEUMATIC SYSTEM OPERATION TO OCCUPIED PORTIONS OF THE
BUILDING. SHUTDOWNS AND DRAINING OF PERIMETER HOT WATER SYSTEM FOR
REPLACEMENT OF FINNED TUBE RADIATION SHALL BE PERFORMED BY THE CONTRACTOR
UNDER THE SUPERVISION OF THE OWNER. CUT AND CAP SYSTEM IN THE BASEMENT
DURING NIGHT OR WEEKEND HOURS AND REFILL SYSTEM TO MINIMIZE IMPACT TO
OCCUPIED AREAS.
REMOVE EXISTING CHILLED WATER PIPING IN BASEMENT DURING WINTER MONTHS AND
AFTER REMOVAL OF AHU-1A. HAVE NEW CHILLED WATER PUMP, PRIMARY-SECONDARY
CHILLED WATER INTERFACE AND PIPING INSTALLED, TESTED AND BALANCED PRIOR TO
THE START OF THE COOLING SEASON (APPX. APRIL 15 OR AS DIRECTED BY THE OWNER).
TEMPORARILY CONNECT NEW SECONDARY CHILLED WATER PIPING TO SECOND FLOOR
(PHASE 2) CHILLED WATER RISERS.
UPON COMPLETION OF PHASE 1 WORK PERFORM STARTUP OF AHU-1 AND PERFORM
TEMPORARY TESTING AND BALANCING INCLUDING VERIFICATION OF OPERATIONAL
CONTROL AT CAMPUS SCADA SYSTEM. TEMPORARILY BALANCE HOT WATER AND
CHILLED WATER SYSTEMS FOR AHU-1 AND VAV BOXES REQUIRED.
CIRCUIT CALL-OUT; 'XX' INDICATES PANEL NO. & 'YY'
INDICATES CIRCUIT NO. TREAT AS HOMERUN
PANELBOARD
H
1.
SYMBOLS
MECHANICAL ABBREVIATIONS
EXISTING
MOTOR OVERLOADS
DUAL ELEMENT TIME DELAY FUSE (DETD)
TRANSFORMER
COMBINATION MOTOR STARTER
XX
MOTOR
XX DESIGNATES HP
LIGHTING CONTROL LEGEND:
V
VACANCY SWITCH, 120V, 48" AFF TO CENTERLINE, UON
SEE DETAIL 3 / E004
ELECTRICAL ABBREVIATIONS
(E)
(R)
(RE)
A
AC
ADA
AF
AFC
AFF
AMP
ANSI
AT
AWG
BAS
BHP
BLDG
BTU
BTU/HR
C
CAT
CB
CD
CFM
CKT
CLG
CND
COMM
CU
DT
EAT
EC
EG
EMT
ESP
EWT
FLA
FLMC
FMC
G,GND
GC
GFCI
HP
HR
JB
KVA
KW
LAT
LRG
LSD
LWT
MBH
MC
MCB
MLO
MTD
NEC
NL
OA
P
PD
PH
PVC
RECP
RG
RGS
RM
RPM
SCH
SPD
SPEC
STP
TEMP
TYP
UON
V
VFD
W
XFMR
EXISTING TO REMAIN
REMOVE
RELOCATE EXISTING
AMPERE
ALTERNATING CURRENT
AMERICAN DISABILITIES ACT
AMPERE FRAME
ABOVE FINISHED CEILING
ABOVE FINISHED FLOOR
AMPERE
AMERICAN NATIONAL STANDARDS INSTITUTE
AMPERE TRIP
AMERICAN WIRE GAUGE
BUILDING AUTOMATION SYSTEM
BRAKE HORSEPOWER
BUILDING
BRITICH THERMAL UNIT
BRITISH THERMAL UNITS PER HOUR
CONDUIT
CATEGORY
CIRCUIT BREAKER
CANDELA
CUBIC FEET PER MINUTE
CIRCUIT
CEILING
CONDUIT
COMMUNICATION
COPPER
DUAL TECHNOLOGY
ENTERING AIR TEMPERATURE
ELECTRICAL CONTRACTOR
EXHAUST GRILLE
ELECTRICAL METALLIC TUBING
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
FULL LOAD AMPS
FLEXIBLE LIQUIDTIGHT METALLIC CONDUIT
FLEXIBLE METALLIC CONDUIT
GROUND
GENERAL CONTRACTOR
GROUND FAULT CIRCUIT INTERRUPTER
HORSE POWER
HOUR'
JUNCTION BOX
KILOVOLT-AMPERE
KILOWATT
LEAVING AIR TEMPERATURE
LINEAR RETURN GRILLE
LINEAR SLOT DIFFUSER
LEAVING WATER TEMPERATURE
THOUSAND BTU/HR
MECHANICAL CONTRACTOR
MAIN CIRCUIT BREAKER
MAIN LUG ONLY
MOUNTED
NATIONAL ELETRICAL CODE
NIGHT LIGHTING
OUTSIDE AIR
POLE
PRESSURE DROP
PHASE
POLYVINYL CHLORIDE
RECEPTACLE
RETURN GRILLE
RIGID GALVANIZED STEEL
ROOM
ROTATIONS PER MINUTE
SCHEDULE
SURGE PROTECTIVE DEVICE
SPECIFICATION
SHIELDED TWISTED PAIR
TEMPORARY
TYPICAL
UNLESS OTHERWISE NOTED
VOLT
VARIABLE FREQUENCY DRIVE
WATT
TRANSFORMER
(G)
AD
AFMS
AHU
AS
BF
BFP
BHP
BOD
BOP
BOS
BTU
C
CFM
CHWR
CHWS
COND
CU
CW
DN
DWG
EA
EAT
EF
EFF
EJ
ESP
FD
FG
FT OR '
FTR
GAL
GPM
HHWR
HHWS
HP
HR
HW
HWR
HWRHR
HWRHS
IM
KW
LAT
LRG
LSD
OA
PC
PCHWR
PCHWS
RA
RL
RR
RS
S
SA
SD
SH
SP
SS
STD
TEMP
THRU
TON
TSTAT
TYP
UR
V
VD
VEL
VFD
WMB
WMS
XP
°F
Ø
INDICATES GLYCOL
ACCESS DOOR
AIRFLOW MEASURING STATION
AIR HANDELING UNIT
AIR SEPERATOR
BELOW FLOOR
BACKFLOW PREVENTOR
BRAKE HORSEPOWER
BASIS OF DESIGN OR BOTTOM OF DUCT
BOTTOM OF PIPE
BOTTOM OF STEEL
BRITISH THERMAL UNITS
CONDENSATE
CUBIC FEET PER MINUTE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE
CONDENSING UNIT
DOMESTIC COLD WATER
DOWN
DRAWING
EXHAUST AIR
ENTERING AIR TEMPERATURE
EXHAUST FAN
EFFICIENCY
EXPANSION JOINT
EXTERNAL STATIC PRESSURE
FLOOR DRAIN
FUEL GAS
INDICATES FEET
FINNED TUBE RADIATION
GALLON
GALLONS PER MINUTE
HOT WATER RETURN
HOT WATER SUPPLY
HORSEPOWER
HOUR
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
HOT WATER REHEAT HYDRONIC RETURN
HOT WATER REHEAT HYDRONIC SUPPLY
ICE MAKER
KILOWATT
LEAVING AIR TEMPERATURE
LINEAR RETURN GRILLE
LINEAR SLOT DIFFUSER
OUTSIDE AIR
PUMPED CONDENSATE
PRIMARY CHILLED WATER RETURN
PRIMARY CHILLED WATER SUPPLY
RETURN AIR
REFRIGERANT LIQUID
RETURN REGISTER
REFRIGERANT SUCTION
STEAM OR SANITARY
SUPPLY AIR
SUPPLY DIFFUSER
SHOWER
STATIC PRESSURE
STAINLESS STEEL
STANDARD
TEMPERATURE OR TEMPORARY
THROUGH
TONS OF AC
THERMOSTAT
TYPICAL
URINAL
VENT
VOLUME DAMPER
VELOCITY
VARIABLE FREQUENCY DRIVE
WASHING MACHINE BOX
WIRE MESH SCREEN
EXPLOSION PROOF
DEGREES FARENHEIT
DIAMETER
ROWAN UNIVERSITY
PIPE RISING UP
PIPE DROPPING DOWN
UNION
PUMP
M
MOTOR
VERTICAL
CO
CLEAN-OUT
CO
FLR. MTD.
NC NO
IAL
ORL
M
ME HAL
OAK
HALL
LAUREL
HALL
GATE VALVE
VAV BOX
CONTROL VALVE
B
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
BUTTERFLY VALVE
LE
BO LL
A
H
CONTINUATION/BREAK
PARKING
LOT R
BALL VALVE
3-WAY VALVE (MOTOR OPERATED)
2-WAY VALVE (MOTOR OPERATED)
RELIEF VALVE
CHECK VALVE
Y-TYPE STRAINER
KEY PLAN
FLOOR DRAIN
PRESSURE GUAGE
THERMOMETER
BALANCING VALVE
T
THERMOSTAT
REDUCER (CONCENTRIC)
1
12/3/2014 ISSUED FOR BID
No.
Date
Revision
PITCH OF PIPING
DIRECTION OF DIFFUSER FLOW
DIRECTION OF FLOW
LINEAR DIFFUSER/RETURN
SQUARE DIFFUSER
SQUARE RETURN GRILLE
SQUARE EXHAUST GRILLE
VOLUME DAMPER
GENERAL ELECTRICAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
PROVIDE RACEWAYS, CABLES, ASSOCIATED BOXES, FITTINGS, AND CONNECTORS FOR ALL BRANCH CIRCUITS
FROM THE OVERCURRENT PROTECTIVE DEVICES TO FINAL TERMINATIONS AT EQUIPMENT, DEVICES, AND
FIXTURES INCLUDING LOCAL CONTROL DEVICE(S) AS REQUIRED FOR A COMPLETE INSTALLATION, U.O.N.
INSTALL ALL ELECTRICAL WIRING IN METAL CONDUIT UNLESS OTHERWISE NOTED. MINIMUM CONDUIT SIZE
SHALL BE 3/4" FOR POWER AND 1" FOR COMMUNICATIONS.
PROVIDE A GREEN INSULATED EQUIPMENT GROUND CONDUCTOR WITH ALL BRANCH CIRCUITS AND FEEDERS.
COORDINATE ALL WORK WITH ARCHITECTURAL DRAWINGS, ELEVATIONS, AND DETAILS. CEILING MOUNTED
DEVICES SHALL BE LOCATED PER REFLECTED CEILING PLANS. WALL MOUNTED DEVICES SHALL BE LOCATED
PER ELEVATIONS AND DETAILS.
COORDINATE LOCATIONS OF EQUIPMENT DISCONNECTS AND CONNECTION REQUIREMENTS WITH THE
RESPECTIVE TRADE CONTRACTOR/VENDOR.
COORDINATE, VERIFY, AND CONFIRM ELECTRICAL RATINGS OF EQUIPMENT, MOTORS, AND APPLIANCES WITH
THE RESPECTIVE INSTALLER/VENDOR BEFORE INSTALLING RESPECTIVE BRANCH CIRCUITS, DISCONNECTS,
CONTROLLERS, AND OVERCURRENT PROTECTIVE DEVICES. PROVIDE THE CORRECT SIZES AND CIRCUITS AS
REQUIRED FOR THE FURNISHED EQUIPMENT.
OUTLET BOXES FOR TELECOMMUNICATION DEVICES, SECURITY DEVICES AND MISCELLANEOUS ELECTRONIC
SYSTEMS SHALL BE 4"SQ x 2 1/8"D MINIMUM WITH SINGLE GANG DEVICE RING U.O.N.
MOUNT DEVICES PER ARCHITECTURAL DRAWINGS.
ALL CLEARANCES SHALL BE MAINTAINED PER NEC, NESC AND UL. ALL PARTS, DEVICES, EQUIPMENT, ETC.
WHICH REQUIRE MAINTENANCE, ADJUSTMENT, OPERATION OR EXAMINATION DURING NORMAL OPERATION
SHALL BE ARRANGED SO AS TO BE ACCESSIBLE BY THE PROVISION OF ADEQUATE WORKING SPACES,
WORKING FACILITIES AND CLEARANCES.
ALL DIMENSIONS INDICATED IN THESE DOCUMENTS ARE FOR REFERENCE AND COORDINATION PURPOSES
ONLY. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS IN THE FIELD.
THE CONTRACTOR SHALL COORDINATE WITH OTHER TRADES FOR THE ACTUAL EQUIPMENT TO BE INSTALLED
AND SHALL SECURE DIMENSIONAL DATA THAT WILL ASSIST IN DETERMINING ADEQUATE SPACE REQUIREMENTS
FOR INSTALLING ALL ELECTRICAL EQUIPMENT, LUMINARES, DEVICES, ROUGH-IN REQUIREMENTS, ETC. ADJUST
ACTUAL LOCATION OF ELECTRICAL PROVISIONS ACCORDINGLY. ADVISE ALL TRADES THAT THE INSTALLATION
OF HVAC DUCT WORK, PIPING, DEVICES, ETC., ABOVE ELECTRICAL EQUIPMENT IS NOT ALLOWED. NAMEPLATE
DATA OR MANUFACTURER'S WRITTEN DATA OF ACTUAL EQUIPMENT INSTALLED SHALL BE USED TO DETERMINE
EXACT UNIT OR DEVICE PROTECTION, CONDUCTOR TERMINATION REQUIREMENTS, ETC.
ALL DEVICES SHALL BE COORDINATED FOR THE PROPER VOLTAGE, OPERATION, CONTACT RATINGS, COLOR
CODING, ETC. ALL WALL BOXES FOR SWITCHES, RECEPTACLES, DEVICES, ETC., SHALL BE INSTALLED FLUSH
WITH THE FINISHED WALL SURFACE. COORDINATE WITH ALL TRADES FOR THE FINAL ADJUSTMENT AND
INSTALLATION TO ALLOW FOR WALL THICKNESS, EXTENSION RINGS, ETC.
ALL NON-CURRENT CARRYING METALLIC PARTS OF DEVICES AND SYSTEMS, ENCLOSURES, OUTLET BOXES,
SUPPORTS, ETC., SHALL BE BONDED THROUGH THE INTERIOR GROUNDING SYSTEM. FACE PLATES AND
COVERS SHALL BE EFFECTIVELY GROUNDED PER MANUFACTURER'S UL LISTING.
CONTRACTOR SHALL PROVIDE ALL PANEL SCHEDULES WITH TYPED SCHEDULES.
PP
DT
LIGHTING CONTROL POWER PACK, 277V, 20A; MOUNT ABOVE CEILING
SEE DETAIL 4 / E004
DUAL TECHNOLOGY OCCUPANCY SENSOR, LOW VOLTAGE, CEILING MOUNTED
W - DENOTES WALL MOUNT
FLEXIBLE DUCT
EG
2
INDICATES EQUIPMENT ABBREVIATION
INDICATES EQUIPMENT NUMBER
TELECOMMUNICATIONS LEGEND:
INDICATES SECTION NUMBER
X
TELEDATA DROP, MOUNT IN CEILING
COORDINATE FINAL LOCATION WITH ROWAN AND VENDOR
M-115
INDICATES DRAWING ON
WHICH SECTION APPEARS
ROWAN
UNIVERSITY
POINT OF CONNECTION
BETWEEN NEW AND EXISTING
POINT OF CONNECTION BETWEEN
EXISTING TO REMAIN AND
EXISTING TO BE REMOVED
Project Title
BOLE HALL
RENOVATIONS
Drawing Title
MEP GENERAL
NOTES, SYMBOLS,
AND
ABBREVIATIONS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
G001
Printed: 12/3/2014 11:31:35 AM
G
REMOVAL KEYNOTES
3/4" HWR
1
2
1" HWS
REMOVE EXISTING HEAT EXCHANGER, MOUNTS, BRACKETS, TRIM, ETC.
CONTRACTOR SHALL SHUT DOWN EXISTING AIR COMPRESSOR TO VERIFY IF ANY EXISTING
SYSTEMS TO REMAIN ARE ON PNEUMATIC CONTROLS. REMOVE EXISTING AIR COMPRESSOR,
PNEUMATIC TUBING, AND ALL ASSOCIATED PNEUMATIC CONTROLS, INCLUDING
THERMOSTATS, AND CONTROL VALVES. TURN COMPRESSORS OVER TO ROWAN UNIVERSITY
OR DISCARD.
REMOVE EXISTING PNEUMATIC CONTROL PANEL AND ALL ASSOCIATED COMPONENTS.
REMOVE EXISTING HOT WATER PUMPS AND ALL ASSOCIATED COMPONENTS.
REMOVE EXISTING AIR HANDLING UNITS, AND ALL ASSOCIATED COMPONENTS.
REMOVE EXISTING EXPANSION TANKS, HANGERS, SUPPORTS, AND ALL ASSOCIATED
COMPONENTS.
REMOVE EXISTING 4" CHWS/R FROM FURTHEST POINT BACK TO SHUT OFF VALVE IN
BASEMENT AS INDICATED. COORDINATE WITH THE UNIVERSITY FOR SHUT DOWN OF CHILLED
WATER SERVICE TO BUILDING AT MANHOLE.
REMOVE EXISTING INTAKE LOUVER AND OA DUCTWORK TO AHU'S.
EXISTING 3-WAY DIVERTING VALVES. SUPPLY CONNECTION NOT SHOWN FOR CLARITY.
REFER TO SINGLE LINE DIAGRAM FOR DETAILS.
1" HWR
3/4" HWR
ELECTRICAL
ROOM
UP TO EXISTING
RADIATOR ON FIRST
FLOOR (TYP.)
3/4" HWR
002
3
4
5
6
1" HWR
STEAM SERVICE
ENTRANCE
1" HWR
3/4" PC
7
5" LPS
8
9
1-1/4" HWS
Room
ROWAN UNIVERSITY
001
1/2" HWS
UP
GENERAL NOTES
IAL
ORL
M
ME HAL
STORAGE
004A
1.
2.
CORRIDOR
EXISTING
RADIATOR
(TYP.)
1" HWR
H001
CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS
PRIOR TO STARTING WORK.
REFER TO PHASING OF CONSTRUCTION NOTES AND PHASE REMOVALS IN A
MANNER TO MAINTAIN HVAC AND HYDRONIC SERVICES TO OCCUPIED
SPACES DURING CONSTRUCTION.
B
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
2-1/2" HWR
LE
BO LL
A
H
PARKING
LOT R
ZONE A
1-1/4" HWR
ZONE J
1" HWR
1" PC
5" LPS
1-1/4" HWS
2-1/2" HWS
1-1/4" HWR
ZONE J
T
KEY PLAN
UP
3
5
4" CHWS TO
AHU COILS
STORAGE
1-1/2" HWR
4" CHWR FROM
AHU COILS
2" HWS
005
4" HWS TO
AHU COILS
8 72" x 36"
INTAKE LOUVER
ABANDON
PIPING IN
CHASE
2-1/2" HWR
2-1/2" CHWS/R UP
TO 2ND FLOOR
AHU
1
7
1A
(E)CHWR TO CAMPUS
CHW LOOP
UP
2" HWS UP
2" HWR (ZONE I)
1-1/4" HWR (ZONE G)
4" CHWR
7
4" CHWR
4" CHWS
006
2-1/2" CHWR FROM AHU-1-B
2-1/2" CHWS FROM AHU-1A
(E)CHWS FROM
CAMPUS CHW LOOP
3" CHWR
2-1/2" CHWS TO AHU-1
36X28" UP
48X18 SA
3" HWR
4" HWS
4" CHWS
2
36X28" UP
4" HWR
48X18 SA
2" HWS
1-1/4" HWR (ZONE C)
3-1/2" HWS
TYPICAL
4" HWS
3" LPS DN TO HX
1
3" LPS DN TO HX
2" HWS INTO
MECH RM
1-1/4" HWR
FROM ZONE "D"
208.5MBH
79.0 MBH
FROM HWS TO
ZONE "F"
5
1-1/4" HWR FROM ZONE "C"
1" RELIEF PIPING
6
9
2" HWR FROM
AHU 1-B
2-1/2" HWR
4" HWR
DM001
1" HWR FROM ZONE "F"
1-1/2" HWR
2" HWS SUPPLY TO
ZONE "C" AND "D"
1" HWS
1-1/4" HWR (ZONE D)
1
72.0 MBH
FROM HWS TO
ZONE "F"
1-1/4" HWR
1" PC
REMOVE EXISTING
72X36 DAMPER AND
LOUVER
1
2-1/2" CHWS FROM AHU-1A
PIPING TO
FIRST FLOOR
RADIATIONS IN
CRAWLSPACE
36x28
4
3" CHWS
2" HWS
1B
1/2" HWS
1" HWR (ZONE F)
Revision
2-1/2" CHWS FROM AHU-1B
AHU
PIPING TO
FIRST FLOOR
RADIATIONS IN
CRAWLSPACE
Date
2-1/2" CHWR FROM AHU-2
UP
MECHANICAL
ROOM
12/3/2014 ISSUED FOR BID
No.
2" HWR FROM
AHU 1-A
1-1/2" HWR
FROM ZONES
"A" AND "J"
1-1/2" HWR
3" HWR
2-1/2" HWR
BASEMENT FLOOR PLAN
3-1/2" HWS
ROWAN
UNIVERSITY
1/4" = 1'-0"
4" HWS
52.0 MBH
EXPANSION TANK
TYPICAL OF 2
2" HWR FROM ZONE
"G" AND AHU-2
64.0 MBH
(E)1" CW
MAKEUP
4" HWR
HOT WATER
PUMP
TYPICAL OF 3
1" RELIEF
PIPING
1-1/4" HWR FROM
ZONE "I"
2" HWS
2" HWS
2" HWS TO ZONES
"G", "I" AND AHU-2
5" LPS
P-1
P-2
P-3
1'-1/4" HWS SUPPLY TO
ZONE "A" AND "J"
3-1/2" HWS
TYP. OF 2
3-1/2" LPS
(TYP.2)
BOLE HALL
RENOVATIONS
2" HWS TO AHU 1-A
3" HWS
Project Title
1" HWS TO
ZONE F
Drawing Title
2" HWS TO AHU 1-B
3-1/2" HWS
1" PC
2-1/2" HWS
1" PC
CONDENSATE
RECEIVER
3-1/2" HWS
HX-1
T
HX-2
T
DIVERTING
VALVES FOR
ZONES "A" AND "J"
T
2-1/2" HWS
OUTSIDE MECH.
RM TO ZONES
"C" AND "D"
1" HWR FROM
ZONE "A"
60.0 MBH
1-1/2" HWR
84.0 MBH
GRAVITY
CONDENSATE
2
DM001
PIPING FLOW DIAGRAM
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
NO SCALE
2014-064
Drawing No.
1-1/4" HWR FROM
ZONE "J"
Printed: 12/3/2014 11:31:21 AM
BASEMENT HVAC
REMOVALS
DM001
REMOVAL KEYNOTES
1
REMOVE EXISTING DUCTWORK IN MECHANICAL SHAFT. COORDINATE WITH GC FOR SHAFT
REMOVAL.
REMOVE EXISTING FINNED TUBE RADIATORS, PIPING AND SUPPORTS. CUT AND CAP
EXISTING 1/2" SUPPLY AND RETURN RISERS ABOVE 1ST FLOOR SLAB.
EXISTING BRANCH DUCTWORK TO ALL DIFFUSERS WAS NOT ABLE TO BE FIELD VERIFIED.
CONTRACTOR SHALL REMOVE ALL EXISTING DIFFUSERS AND ASSOCIATED BRANCH
DUCTWORK BACK TO MAIN.
REMOVE EXISTING THERMOSTAT ASSOCIATED WITH EXISTING RTU-1 SERVING
PRESIDENT'S SUITE.
2
3
4
ROWAN UNIVERSITY
IAL
ORL
M
ME HAL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
G
ZONE A
DN
B
OFFICE
104B
OAK
HALL
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
W110
LE
BO LL
A
H
PARKING
LOT R
OFFICE
104C
W109
12X10
W108
12X10
12X10
ZONE "A"
WOMEN
105
TOILET
103
LOUNGE
102
T
KEY PLAN
12X10
UP
ZONE D
UP
J.C.
106
JANITOR
101
2-1/2" CHWS/R UP
TO 2ND FLOOR
EXISTING RADIATOR
(TYP.)
MEN
107
1-1/2" HWS/R
UP & 2"DN
1-1/4"
HWR DN
EXISTING 12X6 LOW RETURN
TO PIPE CHASE TO BE
CLOSED BY G.C. (TYP.)
1
VESTIBULE
L101
H
H102
J
T
UP
ZONE "C"
S1
H100
20X16
W116
36X18
W115
OFFICE
110D
110C
OFFICE
114
OFFICE
113
1
26X18
ZONE D
CH101
36X18
SUPPLY
CLOSET
100I
32X18
OFFICE
109B
108
REFERENCE
AREA
111A
OPEN
OFFICE AREA
110A
W114
12X12
5
W111
W113
30X18
OFFICE
110F
OFFICE
110E
3
TYP. FOR ALL
OFFICE
117
W106
W104
ZONE F
COPY
ROOM
112
W105
OFFICE
100E
FILE
ROOM
116A
OFFICE
116
24X18
20X16
H101
18X16
14X16
3
STORAGE
122
OPEN
OFFICE AREA
124
OFFICE
119
OPEN
OFFICE AREA
100
W103
4 T
LOBBY
L100
12X12
OFFICE
100C
OFFICE
111B
18X16
ZONE D
OFFICE
100D
20X18
110
PAYROLL STORAGE
110G
TOILET
100C1
22X18
OPEN
OFFICE AREA
111
16X12
W107
W112
24X18
32X18
30X18
ZONE F
36X28 DN ("B" DUCT)
TELE/COM
COPY ROOM
108A
Revision
OFFICE
115
36X28 DN ("A" DUCT)
OFFICE
100F
Date
110H
OPEN
OFFICE AREA
109
12X8
12/3/2014 ISSUED FOR BID
No.
12X10
OFFICE
109A
DN
T
OFFICE
AHU-1A
OFFICE
110B
OFFICE
110A1
STAIR
KITCHEN
100H
L
K
7
CH100
FILE
ROOM
100G
ZONE C
2
ZONE C
FILE
ROOM
104A
OPEN
OFFICE AREA
104
CONFERENCE
ROOM
100B
CONFERENCE
ROOM
125
OPEN
OFFICE AREA
118
OFFICE
123
OFFICE
121
W102
OFFICE
124A
W100
W101
OFFICE
124B
OFFICE
120
OFFICE
123A
ZONE "D"
AHU-1B
ZONE D
OFFICE
119A
ROWAN
UNIVERSITY
T
T
1
ZONE F
OFFICE
100A
FOYER
V100
STAIR
S2
UP
Project Title
ZONE D
1
DM002
FIRST FLOOR PLAN
BOLE HALL
RENOVATIONS
1/8" = 1'-0"
Drawing Title
FIRST FLOOR
HVAC REMOVALS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
DM002
Printed: 12/3/2014 11:31:22 AM
REMOVAL KEYNOTES
1
2
G
3
4
5
REMOVE
STEEL
SUPPORTS
TYP. OF 2
REMOVE EXISTING RELIEF VENT AND CURB. CAP EXISTING CURB PER DETAIL 13 ON M-013
COORDINATE WITH GC FOR PATCHING OF ALL EXISTING DUCT OPENINGS IN CORRIDOR
WALLS TO MAINTAIN FIRE RATING.
RE-USE EXISTING DUCTWORK FROM BRANCH TO DIFFUSER IN THE STAIRWELL.
REMOVE EXISTING 24" Ø EXHAUST FAN, ROOF CURB, AND ASSOCAITED COMPONENTS
SERVING FIRST FLOOR BATHROOMS.
CUT AND REMOVE EXISTING EQUIPMENT IN PIECES TO FIT THROUGH EXISTING DOORWAY.
PROTECT ROOF DURING REMOVAL AND NEW WORK.
ROWAN UNIVERSITY
3'-0" DOOR TO
MECHANICAL
ROOM 5
4
REMOVE
COOLING
TOWER
1ST FLOOR
ROOF
210
IAL
ORL
M
ME HAL
2" CWS/R DN
2-1/2" CHWS/R
DN
REMOVE
AHU-2
7
B
UP
205B1
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
S1
LE
BO LL
A
H
1-1/2" HWS/R DN
PARKING
LOT R
DN
205A
205B
1
36x26 OAI
UP THRU
ROOF
AHU-2
8X10
T
36x10
TRANSFER
OPENING
TYP. OF 2
KEY PLAN
205
209
5
26X26
36X6
203
8X6
208
1
12/3/2014 ISSUED FOR BID
No.
H200
2
Revision
207
TYP. FOR ALL
H201
EXISTING
RADIATOR
(TYP.)
W202
9X10
24X26
ZONE G
Date
202
ZONE "I"
T
ZONE I
36X6
204
3
36X6
7X10
20X26
W201
206
200
ROWAN
UNIVERSITY
200C
W200
T
ZONE "G"
20X16
200B
3
8X10
14X10
20X16
Project Title
200A
1
BOLE HALL
RENOVATIONS
DN
201
L200
ZONE G
1
DM003
SECOND FLOOR PLAN
1/4" = 1'-0"
S2
Drawing Title
SECOND FLOOR
HVAC REMOVALS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
DM003
Printed: 12/3/2014 11:31:23 AM
G
INSTALLATION KEYNOTES
1
3/4" HWR
2
1" HWS
3
1" HWR
3/4" HWR
3/4" HWR
3/4" PC
UP TO EXISTING
RADIATOR ON FIRST
FLOOR (TYP.)
4
5
1" HWR
STEAM SERVICE
ENTRANCE
1" HWR
6
5" LPS
ELECTRICAL
ROOM
1-1/4" HWS
7
002
8
Room
5" STEAM
SHUTOFF VALVE
001
FURNISH AND INSTALL REMOTE FLOW CONVERTERS AND
TEMPERATURE/PRESSURE INDICATING TRANSMITTERS ON THE WALL FOR
CHILLED WATER AND STEAM METERS.
FURNISH AND INSTALL ADAMS TRIPLE OFFSET VALVE FOR BUILDING LOW
PRESSURE STEAM ISOLATION. COORDINATE WITH UNIVERSITY FOR SHUTDOWN
OF STEAM SERVICE TO BUILDING.
FURNISH AND INSTALL NEW DDC CONTROL PANEL AND FLOW COMPUTER FOR
CHILLED WATER AND STEAM METERS.
FURNISH AND INSTALL HOUSEKEEPING PAD AND INERTIA BASE FOR PUMPS.
CORE DRILL, SLEEVE, AND FIRESTOP NEW PIPING PENETRATIONS AT MECH. ROOM
WALL.
REMOVE EXISTING 1-1/2" RIGID INSULATION ON CEILING OF EXISTING MECHANICAL
ROOM M006 AND FURNISH AND INSTALL NEW INSULATION. MECHANICALLY FASTEN
TO UNDERSIDE OF DECK IN MECHANICAL ROOM TO MATCH EXISTING.
FURNISH AND INSTALL DUPLEX CONDENSATE PUMP AND CONTROL PANEL BASIS
OF DESIGN ITT MODEL 62.5CC, 6GPM, 25PSIG, 14 GALLON CAST IRON RECIEVER,
0.5HP, 3500 RPM, ODP, 208/2/60. PANEL MOUNTING NEMA TYPE 2 CONTROL PANEL
WITH FUSED DISCONNECT.
FURNISH AND INSTALL NEW THREE WAY DIVERTING VALVE. CONNECT TO
EXISTING PIPING. FURNISH AND INSTALL FITTINGS AS REQUIRED.
ROWAN UNIVERSITY
2
IAL
ORL
M
ME HAL
1/2" HWS
UP
OAK
HALL
LAUREL
HALL
STORAGE
004A
CORRIDOR
1" HWR
H001
B
EXISTING
RADIATOR
(TYP.)
2-1/2" HWS
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
Room
PARKING
LOT R
1" PC
8
ZONE A
8
ZONE J
HWS
H101
1-1/4" HWR
5" LPS
1-1/4" HWS
2-1/2" HWS
1-1/4" HWR
1" HWR
HWR
ZONE J
T
5"X4" REDUCING EL
BOP = 8'-2"
HWS
KEY PLAN
2" HWR
3
1-1/2" HWS
1-1/2" CHWS/R UP
5
BAS
MTRS
UP
4
M013
CHWP
3" CHWS&R
BOP=8'-8"
1
1-1/2" CHWS
STORAGE
1-1/2" CHWR
005
HWR
4
5
2" HWS
BOP=8'-8"
2-1/2" CHWR (BOP=7'-8")
1
2-1/2" CHWS (BOP=7'-8")
1
T
1-1/2" HWRHS/R UP
EF-2
Date
Revision
7
CAP CHWS&R
M
3" CHWS&R
BOP=6'-8"
12/3/2014 ISSUED FOR BID
No.
3" MAGNETIC FLOW
METER FOR CHILLED
WATER
CHOKE VALVE
M
8
M
24"X24" MOTOR
OPERATED INTAKE
DAMPER
UP
2" HWS
4" VORTEX STEAM
METER
MECHANICAL
ROOM
006
72"x36" LOUVER. SAFE
OFF UN-USED PORTION
WITH INSULATED
METAL PANEL (TYP. 2).
UP
2" HWR (BOP=8'-8")
1-1/2" HWS (BOP=8'-8")
2" HWS UP TO FTR (ZONE C & D)
1-1/4" HWR DN FROM FTR (ZONE C)
2" HWR (ZONE I)
1-1/4" HWR (ZONE G)
6
2" HWRHR (BOP=7'-8")
2-1/2" CHWS/R UP
1-1/2" VENT UP
1/2" HW UP
TO RAD (TYP.)
2" HWRHS (BOP=7'-8")
3" HWR
2" HWRHS/R UP
4" PCHWS&R
1" PC (BOP=8'-2")
4" LPS (BOP=8'-2")
3/4" CR
1-1/4" HWR DN FROM FTR (ZONE D)
SHOT FEEDER
CAP
2
M001
DIVERTING VALVE (ZONE D)
5
EF
2
1/2" HWS
1" HWR
(ZONE F)
1" HWS
1-1/4" HWR
(ZONE D)
CRU
HWP
HWP
HWP
HX
3
2
1
1
EXPANSION TANK
BASIS OF DESIGN B&G
MODEL D-40V
3/4" CW MAKE-UP
2" HWRHS TO VAV
2-1/2 HWS TO FTR
1
M001
AIR SEPERATOR BASIS
OF DESIGN B&G
MODEL RL-2-1/2N
1
7
DIVERTING VALVE (ZONE C)
1-1/2" VENT DN
1-1/2" CR BELOW
1-1/2" VENT
ABOVE
ROWAN
UNIVERSITY
BASEMENT FLOOR PLAN
1/4" = 1'-0"
COLD WATER MAKEUP AND BACKFLOW
PREVENTER. REFER TO 1/M-008 SINGLE LINE
PIPING DIAGRAM
EXPANSION TANK
STRAINER
TYPICAL
4" STEAM
3" HWS
HWR FOM ZONES D & F
PUMPED
CONDENSATE
CEILING (9'-3" AFF)
3/4" CR FROM
LPS HEADER
DRIP LEG
Project Title
3" HWR
3" HWS
ISOLATION VALVE
TYPICAL
3/4"
1-1/2" V TO
ROOF
2-1/2" HWS TO FINNED
TUBE SYSTEMS (62 GPM)
RELIEF
VALVE
3/4" TO HWR
SHOT
FEEDER
1/3-2/3 STEAM CONTROL
VALVE STATION
HWP
HWP
HWP
1
2
3
BOLE HALL
RENOVATIONS
2" HWRHS TO VAV
SYSTEMS (30 GPM)
Drawing Title
12
M013
3/4" HWS
CONNECT 3/4" VENT TO
EXISTING VENT LINE
AIR
SEPERATOR
CRU
1
LOW PRESSURE
CONDENSATE
TYP.3
BASEMENT HVAC
INSTALLATIONS
FLOOR
STEAM TRAP
TYPICAL
HX
1
HEAT EXCHANGER
SUPPORTS
INCLUDE SADDLE SUPPORTS AND
ATTACH TO STEEL SUPPORT
6
S002
ISOLATION VALVE
TYPICAL
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2
M001
Printed: 12/3/2014 11:31:36 AM
ELEVATION
NO SCALE
2014-064
Drawing No.
M001
ZONE A
SD-1B
SD-1
RG-1
VAV
SD-2B
200 CFM
360 CFM
104B
210 CFM
G
RG-1
450 CFM
INSTALLATION KEYNOTES
SD-1C
SD-2A
8ø
VD
VD
8ø
250 CFM
100 CFM
1
SD-2A
8ø
10x10
SD-2A
100 CFM
2
VD
8x10
RG-1
10x12
6ø
10x10
EG-1
3
325 CFM
14ø
VD
65 CFM
RG-1
10ø
6ø
75 CFM
VD
4
5
6
8ø
75 CFM
REFER TO STRUCTURAL DRAWINGS FOR NEW ROOF OPENING SIZES AND
LOCATIONS. MECHANICAL CONTRACTOR TO FURNISH AND INSTALL NEW ROOF
CURB. REFER TO DETAIL 3/S002. ROOFING TO BE PERFORMED BY G.C.
MAINTAIN FIRE RATING AT ALL WALL PENETRATIONS TO RENOVATED OFFICE
SUITE. COORDINATE WITH ARCHITECTURAL PLANS FOR WALL SECTIONS.
REFER TO DETAIL 11/M013 FOR FIRE DAMPER INSTALLATION.
FURNISH AND INSTALL NEW EQUIPMENT SUPPORT CURB FOR AHU. ROOFING
TO BE PERFORMED BY G.C.
CONNECT TO EXISTING DIFFUSER. REBALANCE TO PROVIDE 100 CFM.
CONNECT TO EXISTING DIFFUSER. REBALANCE TO PROVIDE 200 CFM.
CONNECT TO EXISTING DIFFUSER. REBALANCE TO PROVIDE 260 CFM.
ROWAN UNIVERSITY
SD-1C
8ø
245 CFM
8ø
18x14
VD
SD-2C
VAV
EG-1
VAV
104A
RG-1
225 CFM
104C
8ø
10ø
VD
160 CFM
2
M002
10x10
IAL
ORL
M
ME HAL
8ø
VD
ZONE D
175 CFM
18x14
10x12
SD-1D
12x12 EA UP
VAV
360 CFM
EG-1
102
ZONE C
50 CFM
EG-1
EG-1
VD
H
150 CFM
18x14
18x14
75 CFM
J
L
K
M
B
7
OAK
HALL
LAUREL
HALL
LE
BO LL
A
H
8ø
VD
VD
4
2
8ø
14x10
10ø
VD
ZONE D
ZONE C
6ø
18x14
5
VD
5ø
2
14x10
6ø
VD
VAV
4
H100
5
2
30x24
KEY PLAN
10ø
5
VAV
VD
100G
2
20x16
SD-1D
RG-1
360 CFM
400 CFM
24x24
ZONE F
PARKING
LOT R
20x16
10ø
VD
540 CFM
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
12ø
RG-1
HOLLYBUSH
14ø
2
M006
VAV
12x12
1
M007
3
3
VAV-125
L100
VD
ZONE F
2
T
VAV
ZONE D
125
1
VD
4
12/3/2014 ISSUED FOR BID
No.
Date
Revision
VD
4
VD
VD
6
TYP. OF 3
1
ZONE D
ZONE F
G
ZONE D
1
M002
H
FIRST FLOOR PLAN
J
L
K
M
7
1/8" = 1'-0"
1-1/2" VENT PIPE
THROUGH ROOF,
REFER TO DETAIL
8/A102
1-1/2" GOOD NECK,
TERMINATE AT 24" ABOVE
ROOF DECK. PROVIDE S.S.
WIRE MESH SCREEN
ROWAN
UNIVERSITY
5
RELIEF AIR HOOD
AHU
34X34 RETURN AIR DN
1
1
Project Title
18x14 RA DUCT
BOD=10'-6"
6"Ø EA DUCT
BOD=10'-10"
6"Ø EA DUCT
BOD=9'-3"
1
S001
ROOF SUPPORT
BOLE HALL
RENOVATIONS
3
3
18x14 SA DUCT
BOD=9'-2"
34X34 SUPPLY AIR DN
CEILING
1
SCREEN WALL
SERVICE CLEARANCE
TYPICAL
OUTSIDE AIR
INTAKE HOOD
14
M013
Drawing Title
DUCT ROOF
SUPPORT TYPICAL
FIRST FLOOR
HVAC DUCT
INSTALLATIONS
PIPING VESTIBULE
CORRIDOR WALLS
1
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2
M002
Printed: 12/3/2014 11:31:40 AM
1ST FLOOR CORRIDOR
1/4" = 1'-0"
3
M002
FIRST FLOOR ROOFPLAN
1/8" = 1'-0"
2014-064
Drawing No.
M002
INSTALLATION KEYNOTES
1
FURNISH AND INSTALL NEW COMMUNICATING THERMOSTAT FOR
PRESIDENT'S WING RTU FOR INTEGRATION INTO NEW DDC CONTROL
SYSTEM AND FRONT END. BASIS OF DESIGN HONEYWELL MODEL TB7600.
CORE DRILL AND SLEEVE ALL PIPE PENETRATIONS AT FLOOR. EXTEND
SLEEVE 1" ABOVE TOP OF SLAB. PACK ANNULAR SPACE WITH MINERAL WOOL
AND FIRESTOP.
2
ROWAN UNIVERSITY
IAL
ORL
M
ME HAL
G
B
OAK
HALL
LAUREL
HALL
LE
BO LL
A
H
OFFICE
OFFICE
VAV-104B
T
VAV
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
OFFICE
104B
HOLLYBUSH
PARKING
LOT R
104C
W110
T VAV-104C
104B
1/2" HWRHS & R
OPEN OFFICE
VAV
FILE ROOM
104
104A
VAV
104A
104C
VAV-104
T
LOUNGE
TYP.
3/4" HWRHS & R
1/2" HWRHS & R
VAV
102
102
KEY PLAN
2
WOMEN'S ROOM
M002
105
VAV-102
2
8
M013
3/4" HWRHS & R
T
1/2" HWRHS & R
1-1/2" CHWS/R &
1-1/4" HWRHS/R
UP TO 2ND FLR
MECH. ROOM
MEN'S ROOM
107
VESTIBULE
CORR.
L100
H100
1-1/2" HWRHS/R &
1-1/2" CHWS/R
DN TO BASEMENT
H
2
J
K
L
M
7
T
1
12/3/2014 ISSUED FOR BID
No.
Date
Revision
VAV-100G
CONFERENCE
ROOM
KITCHEN
VAV
100H
H100
101G
STORAGE
100I
5
1/2" HWRHS & R
VAV
100G
1/2" HWRHS & R
1/2" HWRHS & R
3/4" HWRHS & R
1/2" HWRHS & R
1/2" HWRHS & R
VAV
125
3
T
T
VAV-125
VAV
VAV-L100
L100
CONFERENCE
ROOM
ZONE F T
1 T
125
LOBBY
ROWAN
UNIVERSITY
L100
1
FOYER
V100
Project Title
BOLE HALL
RENOVATIONS
1
M003
FIRST FLOOR PLAN
1/8" = 1'-0"
Drawing Title
FIRST FLOOR
HVAC PIPE
INSTALLATIONS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M003
Printed: 12/3/2014 11:31:41 AM
INSTALLATION KEYNOTES
1
G
2
3
4
78"X12" INTAKE LOUVER
BASIS OF DESIGN
GREENHECK EHH-701
EF
54X12 AND 24"X12"
MOTOR OPERATED
DAMPER AT INTERIOR
SECTION OF LOUVER
6
1
5
6
UH
7
1
M
M
14"X14" RELIEF UP TO ROOF
MOUNTED LOUVERED
PENTHOUSE BASIS OF
DESIGN GREENHECK WRH 6
SERIES 14"X14"X12"
AHU
7
2
6
UH-1
EF-3
MOD
T
EF
3
30x18
4
3
RF
9
3'-0" DOOR TO
MECHANICAL
ROOM
5
M013
1
8
9 OAT
SAW CUT EXISTING CORRIDOR AND MECHANICAL ROOM MASONRY WALLS. FURNISH AND
INSTALL FIRE DAMPER PER 11/M013 AND FIRE STOP.
CONNECT TO EXISTING DUCTWORK THAT SERVES DIFFUSER IN STAIRWELL.
REBALANCE ASSOCIATED DIFFUSER TO 200 CFM.
FURNISH AND INSTALL EXHAUST FAN ON THE ROOF OF THE EXISTING MECHANICAL
ROOM. REFER TO ARCHITECTURAL AND STRUCTURAL CONTRACT DRAWINGS FOR
ROOFING AND SUPPORT DETAILS.
FURNISH AND INSTALL THERMOSTAT TO OPEN INTAKE DAMPER AND START EXHAUST
FAN UPON RISE OF SPACE TEMPERATURE ABOVE 85°F (ADJ.) START UNIT HEATER AND
MODULATE HW COIL UPON DROP OF SPACE TEMPERATURE BELOW 50°F (ADJ.)
SAW CUT OPENING IN EXISTING BRICK WALL. REFER TO DETAIL 1/S001.
FURNISH AND INSTALL NEW ROOF CURB FOR ROOF MOUNTED EQUIPMENT. ROOFING
TO BE PERFORMED BY G.C.
CONTRACTOR SHALL BREAKDOWN INDIVIDUAL AHU MODULES AND COMPONENTS AS
REQUIRED TO FIT THROUGH EXISTING MECHANICAL ROOM DOORWAY AND
RE-ASSEMBLE IN PLACE. RE-ASSEMBLY SHALL BE SUPERVISED FULLTIME BY AHU
MANUFACTURER TO ENSURE COMPLIANCE WITH ASSEMBLY INSTRUCTIONS.
FURNISH AND INSTALL DUCT STATIC PRESSURE SENSOR. REFER TO CONTROL
DRAWINGS ON M010 AND M011 FOR ADDITIONAL INFORMATION.
FURNISH AND INSTALL OUTDOOR AIR TEMPERATURE SENSOR IN SHIELD.
IAL
ORL
M
ME HAL
FIRST FLOOR
ROOF
AHU COIL PULLS
TYPICAL
7
SD-1B
SD-1C
ROWAN UNIVERSITY
B
OAK
HALL
LAUREL
HALL
LE
BO LL
A
H
UP
205A
205A
COPY ROOM
205B
6ø
PARKING
LOT R
1
24x16
VAV
26x14
OFFICE
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
100 CFM
300 CFM
HOLLYBUSH
DN
VD
10ø
VD
VD
RG-1
18x14
RG-1
24x10
190 CFM
270 CFM
6ø
SD-1B
OFFICE
18x14
VD
24x12
210 CFM
KEY PLAN
209
6ø
VD
RG-1
8ø
90 CFM
SD-1B
100 CFM
12x8
VD
RG-1
CORRIDOR
2
VD
8ø
M004
6ø
250 CFM
OFFICE
SD-1B
208
RA
5
VD
VAV
209
12x8
90 CFM
205
VD
SD-1C
VD
8ø
203
24x12
OFFICE
225 CFM
1
145 CFM
RG-1
12/3/2014 ISSUED FOR BID
No.
Date
Revision
8ø
135 CFM
8ø
H201
8x12
6ø
300 CFM
18x14
8ø
203
SD-1
8ø
VD
255 CFM
VD
RA
H200
TYP. FOR ALL
VD
12x10
W202
10x10
VAV
10ø
SD-2B
W202
75 CFM
8ø
VD
4ø
VD
OFFICE
VD
202
200 CFM
3
SD-2B
SD-2B
STORAGE
60 CFM
VD
RG-1
125 CFM
204
14x12
RG-1
100 CFM
20x16
SD-1B
285 CFM
VD
CONFERENCE RM.
180 CFM
SD-1C
207
CORR.
1
8ø
OFFICE
10ø
CORR.
VAV
270 CFM
8ø
RG-1
20x18
VD
RG-1
20x10
VD
VD
OFFICE
RG-1
55 CFM
6ø
215 CFM
VD
SD-1C
240 CFM
SD-2B
206
8
VD
135 CFM
SP
CORR.
SD-2B
W201
100 CFM
12x10
6ø
8ø
VD
200
FURNISH AND INSTALL
10"Ø SOUND TRAP BASIS
OF DESIGN PRICE MODEL
CMTX36/10A
8ø
VAV
200
9x9
12x8
10ø
12x8
12x8
ROWAN
UNIVERSITY
VAV
16x14
OFFICE
6ø
14x10
VD
VD
207
14x14x12 LOUVERED
PENTHOUSE BASIS OF
DESIGN GREENHECK WRH
OR APPROVED EQUAL
8ø
VD
WAITING AREA
W200
2' DEEP CONCRETE BEAM
16x12
VD
201
VD
8ø
VAV
VD
12x10
RG-1
5
200 CFM
VAV
270 CFM
200B
1
RETURN AIR (BEHIND)
SUPPLY AIR
M
78X12 INTAKE LOUVER
DESIGN GREENHECK
EHH-701 OR
APPROVED EQUAL
350 CFM
BOLE HALL
RENOVATIONS
16x24
14x26
EXISTING 10X8
2'-0" CLEAR
MIN 18"
VD
201
Project Title
1
DN
OFFICE
5
ROOF DECK
SD-1C
12x8
RG-1
2
7
RF
FIELD INSTALLED
MOTOR OPERATED
DAMPER
SD-1C
300 CFM
Drawing Title
AHU
LOBBY
2
L200
ROOF DECK
FULL HEIGHT
CMU WALL
7
S002
1
M004
SECOND FLOOR PLAN
1/4" = 1'-0"
2
M004
FULL HEIGHT
CMU WALL
AHU-2 AND DUCT MAINS
DROP CEILING
SECOND FLOOR
HVAC DUCT
INSTALLATIONS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
1/4" = 1'-0"
Drawing No.
M004
Printed: 12/3/2014 11:31:43 AM
G
INSTALLATION KEYNOTES
1
2
3
4
UH
4
1
2
CORE DRILL AND SLEEVE ALL PIPE PENETRATIONS AT FLOOR. EXTEND
SLEEVE 1" ABOVE TOP OF SLAB. PACK ANNULAR SPACE WITH MINERAL
WOOL AND FIRESTOP.
1/2" HWS&R TO UNIT HEATER.
1-1/2" CHWS&R TO AHU-1.
TRAP CONDENSATE AND PIPE TO EXISTING FLOOR DRAIN BELOW UNIT.
ROWAN UNIVERSITY
AHU
2
9
M013
3
M013
CHWS
1 1-1/2"
& R DN
IAL
ORL
M
ME HAL
3
1-1/4" HWRHS
1 & R DN
7
OFFICE
VAV
205A
205A
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
UP
1
M013
1/2" HWRHS & R
B
OAK
HALL
PARKING
LOT R
1" HWRHS & R
COPY ROOM
DN
205B
1
M013
1/2" HWRHS & R
VAV-205A T
OFFICE
TYP. ALL CORRIDOR
WALL PENETRATIONS
KEY PLAN
209
VAV-209
T
VAV
OFFICE
209
203
5
CORRIDOR
2
205
1" HWRHS & R
M004
OFFICE
VAV-203
T
VAV-W202
1
208
1/2" HWRHS & R
12/3/2014 ISSUED FOR BID
No.
Date
Revision
T
CORR.
VAV
H201
203
OFFICE
T
CORR.
207
VAV-207
H200
T
CONFERENCE RM.
ZONE I
ZONE I
ZONE G
W202
VAV
W202
1" HWRHS & R
OFFICE
3
202
8
M013
STORAGE
204
T
ZONE G
CORR.
W201
VAV-200 T
TYP. FOR ALL
1/2" HWRHS & R
3/4" HWRHS & R
1/2" HWRHS & R
3/4" HWRHS & R
1/2" HWRHS & R
OFFICE
206
ROWAN
UNIVERSITY
VAV
OFFICE
VAV
200
207
200
1/2" HWRHS & R
WAITING AREA
W200
3/4" HWS & R
CAPPED FOR
FUTURE.
VAV
201
T
VAV-201
Project Title
T
VAV-200B
BOLE HALL
RENOVATIONS
VAV
1
200B
DN
OFFICE
Drawing Title
201
LOBBY
L200
ZONE G
1
M005
SECOND FLOOR PLAN
SECOND FLOOR
HVAC PIPE
INSTALLATIONS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
1/4" = 1'-0"
Job No:
2014-064
Drawing No.
M005
Printed: 12/3/2014 11:31:44 AM
INSTALLATION KEYNOTES
1
H
SCREEN WALL
J
K
SCREEN WALL
L
MAINTAIN FIRE RATING AT ALL WALL PENETRATIONS TO RENOVATED OFFICE
SUITE. COORDINATE WITH ARCHITECTURAL PLANS FOR WALL SECTIONS.
REFER TO DETAIL 11/M013 FOR FIRE DAMPER INSTALLATION.
COORDINATE WITH G.C. FOR ACCESS DOORS AT ALL BALANCING DAMPER
LOCATIONS ABOVE HARD CEILINGS.
FURNISH AND INSTALL ADDITIONAL REINFORCING (10"W.G.)FOR 34"x34" DUCT
RISER AND MAIN DUCT BRANCHES ABOVE CORRIDOR TO MINIMIZE BREAKOUT
SOUND FROM AHU. FURNISH AND INSTALL 2" THICK (6LB/CF) RIGID BOARD
INSULATION FOR THESE SECTIONS OF DUCT.
FURNISH AND INSTALL STATIC PRESSURE SENSOR. REFER TO CONTROL
DRAWINGS M010 AND M011 FOR MORE INFORMATION.
CONNECT TO EXISTING LINEAR SLOT DIFFUSER PLENUM BOX. BALANCE
SYSTEM TO LISTED CFM'S
2
3
34X34 DUCT
THRU ROOF
4
AHU
40x40
1
36x36
5
ROOF
ROWAN UNIVERSITY
VAV
131B
20x28
16x16
16x20
20x30
26x30
IAL
ORL
M
ME HAL
16x18
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
26x32
B
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
1ST FLOOR
1
1ST FLOOR SECTION
1/4" = 1'-0"
M006
G
RG-1
H
75 CFM
J
LRG
LRG
215 CFM
215 CFM
L
LRG
LRG
315 CFM
K
315 CFM
7
LRG
LRG
240 CFM
235 CFM
VD
VD
LSD-1
SD-2C
300 CFM
300 CFM
215 CFM
6ø
475 CFM
6ø
111
113
5ø
SD-2B
120 CFM
VD
VD
8ø
12ø
20x16
115
VD
VD
VD
RG-1
RG-1
75 CFM
75 CFM
SD-3
390 CFM
131A
390 CFM
34X34 UP
TO ROOF
VD
LRG
315 CFM
8ø
22x12
8ø
22x12
3
6ø
30x26
32x26
32x20
3
Open Office
VAV
LRG
131
131B
350 CFM
30x20
18x16
SD-3
1
65 CFM
VD
70 CFM
65 CFM
260 CFM
VD
120
RG-1
6ø
VD
VAV
65 CFM
Office
VAV
122
121
VD
RG-1
Project Title
65 CFM
10x10
118
10ø
20x18
VD
8x8
RG-1
6ø
6ø
117
3
VD
VD
VD
Office
LSD-2
22x12
70 CFM
SD-2A
6ø
12x12
VD
Reception
700 CFM
SD-1
10ø
70 CFM
RG-1
121
VD
10ø
70 CFM
70 CFM
6ø
SD-1
VD
VD
6ø
SD-2A
SD-2A
ROWAN
UNIVERSITY
390 CFM
VD
Office
6ø
28x16
RG-2
119
118
6ø
6ø
Media/P.R.
VD
6ø
VD
Media/P.R.
VD
50 CFM
6ø
SD-2B
100
SD-3
390 CFM
6x8
Lobby
6ø
M006
16x16
16x16
VD
5
115 CFM
3
28x20
SD-3
VAV
6ø
VAV
VD
114
80 CFM
10x8
RG-1
140 CFM
315 CFM
Acc. Payable
Manager
SD-2A
6ø
REFER TO M002
VD
VD
VD
VD
112
RG-1
34X34 UP
TO ROOF
VD
108
80 CFM
Conference
Room/Office
VD
60 CFM
8ø
20x16
390 CFM
VAV
VD
SD-2A
130 CFM
RG-1
VAV
110
117
6x8
12x12
Copy
VD
390 CFM
22x12
80 CFM
Acc. Services
Director
112
1
SA
VD
Corridor
SD-1A
Break Room
BOLE HALL
RENOVATIONS
5
VD
SD-1A
260 CFM
125
LSD-1
LSD-1
360 CFM
350 CFM
340 CFM
5
10ø
LSD-2
Media/P.R.
260 CFM
125
2
126
VD
Media/P.R.
Media/P.R.
126
127
SD-3
390 CFM
390 CFM
VD
VD
10ø
VD
VD
130
VD
LSD-1
VD
SD-2E
360 CFM
10ø
Office
128
12x12
Drawing Title
ENLARGED FIRST
FLOOR DUCT
INSTALLATIONS
VAV
350 CFM
VD
SD-3
16x16
LSD-1
12x12
VD
VAV
350 CFM
124
16x14
VD
LSD-1
VD
VD
VD
LRG
Corridor
100 CFM
10ø
LSD-2
SD-2B
20x14
VD
10ø
150 CFM
CONFERENCE
ROOM
VD
VD
10ø
5
140 CFM
Office
Budget Director
129
130
VD
10ø
24x14
16x12
16x12
RG-1
8ø
10ø
VD
355 CFM
1
LRG
LRG
LRG
LRG
LRG
LRG
LRG
LRG
325 CFM
320 CFM
310 CFM
315 CFM
320 CFM
325 CFM
350 CFM
350 CFM
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2
M006
Printed: 12/3/2014 11:31:48 AM
Revision
6ø
155 CFM
RG-1
SD-3
VD
22x20
5ø
107
8ø
SD-1A
Date
VAV
106
101
VAV
85 CFM
VD
Payroll Open
Office
SD-3
SD-2A
6ø
VD
65 CFM
32x26
12/3/2014 ISSUED FOR BID
LRG
20x14
SD-2A
SD-2A
110
REF.
230 CFM
1
109
VD
6ø
8ø
8ø
230 CFM
VAV
VD
80 CFM
SD-2A
85 CFM
80 CFM
10ø
1
SD-2D
24x14
8x8
20x24
SD-2D
104
12x12
No.
VD
SD-2A
VD
105
12x14
VD
108
Director
104
102
VD
6ø
VD
VD
12x12
10x12
10x8
VAV
VD
Office
VD
Acc. Services
Assoc. Director
Acc. Services
Director
6ø
VD
SP
Mail/Copy
VD
VD
16x14
VD
VD
103
VD
75 CFM
6ø
4
1
Supervisor
6ø
101
75 CFM
RG-1
VD
28x14
50 CFM
VD
6ø
VAV
10x10
1
VD
RG-1
VD
VD
12x12
LSD-1
14x12
12x10
SD-2A
215 CFM
107
14x12
12x10
18x14
SD-2C
Corridor
VD
KEY PLAN
8ø
VD
1
PARKING
LOT R
DUCTWORK PLAN
1/4" = 1'-0"
2014-064
Drawing No.
M006
FINNED TUBE SCHEDULE
TAG
CAPACITY
(BTU/LF)
EWT
(°F)
LWT
(°F)
TUBE SIZE
FINS PER FT
FIN SIZE
FTR-1
1290
190
170
3/4"
40
4-1/4" X 3-5/8"
FTR-2
1520
190
170
3/4"
50
4-1/4" X 3-5/8"
ENCLOSURE
TYPE
BASIS OF
DESIGN
CUSTOM REFER TO
DETAILS
CUSTOM REFER TO
DETAILS
STERLING
INSTALLATION KEYNOTES
NOTES
STERLING
1
CORE DRILL, SLEEVE, AND FIRESTOP PIPE PENETRATIONS AT CHASE
WALL.
CORE DRILL, SLEEVE, AND WATERSTOP PENETRATION AT ROOF BELOW
PIPING VESTIBULE.
CONNECT TO EXISTING PIPING SERVING FINNED TUBE ELEMENT IN
CONFERENCE ROOM 125. EXISTING RETURN PIPING IN CONFERENCE
ROOM TO BELOW SLAB RETURN PIPING TO REMAIN.
CONNECT TO EXISTING CONVECTOR RISER SUPPLY PIPING AT POINT
ABOVE FIRST FLOOR SLAB TO SERVE TWO EXISTING AREAS TO REMAIN
ON BELOW SLAB DISTRIBUTION: STAIRWELL S2, AND OFFICE 100A
CORE DRILL, SLEEVE, AND WATERSTOP PENETRATION AT ROOF BELOW
PIPING VESTIBULE.
2
3
4
5
ZONE C
G
H
L
15
M013
J
K
TYPICAL
7
FTR-1
8'-0"
10.3
1/2" HWR
1/2" HWS
FTR-2
FTR-2
FTR-2
FTR-2
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
5/8" HWR
16
5/8" HWS
T
ZONE C
Corridor
M013
FTR-2
FTR-2
6'-0"
9.12
6'-0"
9.12
FTR-1
6'-0"
7.74
1/2" HWS
1/2" HWR
5/8" HWR
107
1-1/2" HWRHS
1-1/4" HWR
1-1/2" HWS
1-1/2" HWRHR
1-1/2" HWRHS
1-1/4" HWRHS
1" HWRHS
1-1/2" HWRHR
1-1/4" HWRHR
1" HWRHR
FTR-1
5/8" HWS
3'-0"
3.87
2" HWS DN
1-1/2" HWR DN
2-1/2" CHWS DN
T
1-1/2" VENT UP
THROUGH ROOF
ZONE C
VAV-101
T
T
VAV-107
VAV-104
T
VAV-108
8
M013
1" HWR
2-1/2" CHWR DN
1-1/2" HWRHR DN
1-1/2" HWRHS DN
1-1/2" HWR DN
1
VAV
Supervisor
104
TYP. FOR ALL
105
104
103
VAV
Office
Director
1" HWRHR
1/2" HWR
3/4" HWRHR
3/4" HWRHS
1/2" HWRHR
1" HWRHS
VAV
1/2" HWRHS
101
Acc. Services
Assoc. Director
Acc. Services
Director
3'-0"
3.87
TYP. FOR ALL
108
VAV
1/2" HWR
108
1/2" HWS
VAV-131A
1/2" HWR
T
3/4" HWRHR
Payroll Open
Office
101
1/2" HWRHR
5
1/2" HWRHS
REF.
1/2" HWRHS
KEY PLAN
109
107
3/4" HWRHS
FTR-1
5/8" HWR
2
1/2" HWRHR
VAV
1" HWRHS
Conference
Room/Office
110
1" HWRHR
1-1/2" HWR
Acc. Payable
Manager
Acc. Services
Director
3/4" HWRHR
T
131A
VAV
Open Office
T
3/4"
HWRHS
Revision
VAV
106
VAV-112
112
Date
6'-0"
9.12
114
Corridor
VAV
VAV-110
No.
FTR-2
113
117
12/3/ ISSUED FOR BID
2014
3/4" HWRHR
115
VAV
1
3/4" HWRHS
VAV
111
110
1/2" HWRHS
1/2" HWRHR
1" HWRHR
112
Copy
Break Room
1" HWRHS
131B
131
T
FTR-2
VAV-115
M006
VAV
5/8" HWRHS
5/8" HWRHR
6'-0"
9.12
2
Lobby
3/4" HWRHS
100
125
Closet
Media/P.R.
116
119
3/4" HWRHR
3/4" HWS
3/4" HWR
2-1/2" CHWS/R UP TO RTU-1
VAV-131B
3/4" HWRHR
Media/P.R.
3/4" HWRHS
1/2" HWRHR
118
1/2" HWRHS
Office
1/2" HWRHS
120
Office
T
Office
121
1/2" HWRHR
ZONE D
1
2
M013
3
122
1-1/2" HWR
1-1/4" HWS
1/2" HWRHS
VAV-118
Reception
VAV
VAV
1/2" HWRHR
126
118
T
VAV-121
T
117
1" HWR
VAV
121
FTR-2
VAV
5/8" HWRHS
Corridor
130
5/8" HWRHR
6'-0"
9.12
Corridor
124
123
T
3/4" CAPPED AND
VALVED FOR FUTURE
VAV-126
1/2" HWS
1/2" HWR
EXISTING FTR
T
T
3/4" HWS
VAV-130 ZONE D
1-1/4" HWR
5/8" HWS
5/8" HWR
Media/P.R.
Media/P.R.
Media/P.R.
Office
Office
Budget Director
125
126
127
128
129
130
FTR-2
FTR-2
FTR-2
FTR-2
FTR-2
FTR-2
FTR-2
4'-0"
6.08
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
6'-0"
9.12
3
1/2" DN TO RETURN PIPING
BELOW SLAB
CALIBRATED BALANCING VALVE,
TYP. ALL RAD. 5
1" HWS
1-1/4" HWR
ROWAN
UNIVERSITY
5/8" HWS
5/8" HWR
ZONE D
T
FTR-2
6'-0"
9.12
FTR-2
FTR-2
6'-0"
9.12
6'-0"
9.12
Project Title
1
4
BOLE HALL
RENOVATIONS
ZONE D
1/2" DN TO FTR SUPPLY
PIPING BELOW SLAB
Drawing Title
1
M007
PIPING PLAN
1/4" = 1'-0"
ENLARGED FIRST
FLOOR PIPE
INSTALLATIONS
Date:
12/2/2014
Scale
1/4" = 1'-0"
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M007
Printed: 12/3/2014 11:31:50 AM
ROWAN UNIVERSITY
IAL
ORL
M
ME HAL
(E)CHWR TO
CAMPUS CHW LOOP
CHOKE VALVE
3" CHWR
LAUREL
HALL
NO
3" CHWS
1-1/2" CHWS TO AHU-1
B
NO
LE
BO LL
A
H
(E)CHWS FROM
CAMPUS CHW LOOP
1-1/4" HWR FROM ZONE
"C" PIPING IN FIRST
FLOOR CEILING
2" HWS PIPING TO ZONE
"C" AND "D" RUN IN FIRST
FLOOR CEILING
72.0 MBH
1-1/4" HWR
FROM HWS TO
ZONE "F"
2" HWR
1" HWR FROM ZONE "F"
1-1/2" HWR
2" HWS TO
CRAWLSPACE
79.0 MBH
97.5 MBH
1-1/4" HWR
FROM ZONE "D"
FROM HWS TO
ZONE "F"
2" HWS
KEY PLAN
(A) 1-1/4" HWR FROM ZONE "C" IN
CRAWLSPACE
111.0 MBH
1-1/2" HWR FROM PROVOST
AREA & 2ND FLOR VAV'S
1-1/2" HWR FROM
RENOVATED WING VAV'S
1-1/2" HWR
FROM ZONES
"A" AND "J"
1-1/2" HWR
3" HWR
3" HWR
1-1/2 HWRHS TO RISER
SERVING FIRST AND
SECOND FLOOR VAV BOXES
2-1/2" HWR
3" HWS
2" HWRHS TO RISER
SERVING FIRST FLOOR
VAV BOXES
3" HWS
1" RPZ. PIPE
RELIEF TO
FD.
(E)1" CW
MAKEUP
HW EXPANSION
TANK
1
52.0 MBH
3" HWR
2" HWS
HOT WATER
PUMP
TYPICAL OF 3
1" RELIEF
PIPING
PARKING
LOT R
1-1/2" HWR FROM ZONE
"D" PIPING IN FIRST
FLOOR CEILING
1-1/2"
HWR
2" HWS INTO
MECH RM
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
2-1/2" CHWS TO RTU-1
CHWP-1
HOLLYBUSH
1-1/2" CHWR FROM AHU-1
2-1/2" CHWR FROM RTU-1
NO
OAK
HALL
12
M013
4" LPS. REFER TO 2/M012 FOR
STEAM METER INSTALLATION.
12/3/2014 ISSUED FOR BID
No.
Date
Revision
2" HWR FROM ZONE
"G"
64.0 MBH
3-1/2" LPS
1-1/4" HWR FROM
ZONE "I"
HWP-1
1/2-2/3 STEAM CONTROL
VALVE ASSEMBLY WITH
BYPASS
1" PC
3" HWS
HWP-3
2" HWS
2" HWS TO ZONES
"G" AND "I"
1'-1/4" HWS SUPPLY TO
ZONE "A" AND "J"
AT WALL OF
MECH RM.
3" HWS
1" PC
HWP-2
2" HWS
3/4" DRIP LEG
1" HWS TO
ZONE F
3" HWS
2-1/2" HWS
CONDENSATE
RECEIVER
2-1/2" HWS
2-1/2" HWS
OUTSIDE MECH.
RM TO ZONES
"C" AND "D"
HX-1
T
T
DIVERTING
VALVES FOR
ZONES "A" AND "J"
AIR
SEPERATOR
60.0 MBH
1" HWR FROM
ZONE "A"
1-1/2" HWR
84.0 MBH
GRAVITY
CONDENSATE
ROWAN
UNIVERSITY
1-1/4" HWR FROM
ZONE "J"
1
M008
PIPING FLOW DIAGRAM
NO SCALE
Project Title
BOLE HALL
RENOVATIONS
Drawing Title
FLOW DIAGRAMS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M008
Printed: 12/3/2014 11:31:51 AM
LETTER
INSTRUMENT TAGGING AND IDENTIFICATION
MEASURED OR INITIATING
READOUT OR PASSIVE
VARIABLE
FUNCTION
MODIFIER
INSTRUMENT SYMBOLS
OUTPUT OPTION
MODIFIER
FLOW METERING:
A
B
ANALYSIS
BURNER COMPONENT
-
ALARM
USER'S CHOICE
USER'S CHOICE
C
D
E
USER'S CHOICE
USER'S CHOICE
VOLTAGE (EMF)
DIFFERENTIAL
-
CONTROL
-
F
FLOW
-
-
G
USER'S CHOICE
RATIO
(FRACTION)
-
PRIMARY ELEMENT
(SENSOR)
-
USER'S
CHOICE
-
GLASS VIEWING
DEVICE
INDICATE
-
-
-
CONTROL STATION
HIGH
-
LIGHT
-
-
H
I
J
K
L
M
HAND
CURRENT (ELECTRICAL)
POWER
SCAN
TIME OR TIME SCHEDULE TIME RATE OF
CHANGE
LEVEL
USER'S CHOICE
MONETARY
N
USER'S CHOICE
-
USER'S CHOICE
USER'S CHOICE
O
P
USER'S CHOICE
PRESSURE OR VACUUM
-
-
Q
QUANTITY
-
-
R
S
T
U
RADIATION
SPEED OR FREQUENCY
TEMPERATURE
MULTIVARIABLE
INTEGRATE
OR TOTALIZE
SAFETY
-
ORIFICE RESTRICTION
POINT (SET)
CONNECTION
-
LOW
MIDDLE
INTERMED
IATE
USER'S
CHOICE
-
RECORD
MULTIFUNCTION
SWITCH
TRANSMIT
MULTIFUNCTION
V
VIBRATION MECH
ANALYSIS
WEIGHT OR FORCE
UNCLASSIFIED
-
-
X-AXIS
WELL
UNCLASSIFIED
VALVE, DAMPER OR
LOUVER
UNCLASSIFIED
MULTIFUN
CTION
-
W
X
Y
Z
EVENT, STATEOR
PRESENCE
POSITION, DIMENSION
Y-AXIS
-
Z-AXIS
-
RELAY, COMPUTE, OR
CONVERT
DRIVE, ACTUATOR,
UNCLASSIFIED FINAL
CONTROL ELEMENT
ROWAN UNIVERSITY
FIELD MOUNTED
GAUGE OR TRANSMITTER
WITH ROOT VALVE
NON DIFFERENTIAL
TYPE FLOW
TRANSMITTER
CORIOLIS TYPE
PRIMARY PANEL
MOUNTED, FRONT
ORIFICE ASSEMBLY
& DIFFERENTIAL
TYPE FLOW
GAUGE OR TRANSMITTER
WITH SEAL
PCS CONTROL
IAL
ORL
M
ME HAL
VENDOR PLC
TEMP GAUGE OR XMITTER
WITH THERMOWELL
NON ORIFICE DP
FLOW ASSEMBLY
UNDEFINED
INTERLOCK LOGIC
B
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
GAUGE WITH PIGTAIL
INTERNAL PCS
SOFTWARE FUNCTION
OR CALCULATION
UNCLASSI
FIED
-
INSTRUMENTS SHARING
COMMON HOUSING
LEVEL GAUGE
KEY PLAN
-
VISUAL FLOW GAUGE
1
12/3/2014 ISSUED FOR BID
No.
BULB TYPE TEMPERATURE
SENSING ELEMENT
FAN
VAPOR TENSION TEMPERATURE
SENSING ELEMENT (LOW LIMIT)
BULB TYPE TEMPERATURE
SENSING ELEMENT LOCATED
INSIDE SEPARABLE SOCKET/WELL
DUCT SMOKE DETECTOR
COMBINATION BULB TYPE
TEMPERATURE
SENSING ELEMENT AND HUMIDITY
SENSOR (DUCT MOUNTED)
Revision
ATC ABBREVATIONS
ATC LEGEND
AVERAGING TYPE TEMPERATURE
SENSING ELEMENT
Date
A
AC
ADJ
AFF
AHU
ALM
ALT
AUTO
AUX
AVG
BLDG
BTU
C
CC
CB
CFM
CHP
CHW
CHWR
CHWS
CIRC
CKT
CL
CLG
COM
CON
CV
ALARM
AIR CONDITIONING
ADJUST
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
ALARM
ALTERNATE
AUTOMATIC
AUXIILLIARY
AVERAGE
BUILDING
BRITISH THERMAL UNITS
COMMAND / CONTROL
COOLING COIL
CIRCURIT BREAKER
CUBIC FEET PER MINUTE
CHILLED WATER PUMP
CHILLED WATER
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CIRCULATING
CIRCUIT
CLOSE
COOLING
COMMON
CONTRACTOR
FLOW COEFFICIENT
DA
DB
DIR
DPR
DPS
DX
E
EA
E.C.
EF
EN
EP
F
FCU
FLG
FLTR
FPM
FTG
F.W.E.
GA
GL
GHR
GHS
GPM
GND
H
H/C
HL
HOA
HTG
DISCHARGE AIR
DRY BULB
DIRECT ACTING
DAMPER
DIFFERENTIAL PRESSURE
SENSOR
DIRECT EXPANSION
ENABLE
EXHAUST AIR
ELECTRICAL CONTRACTOR
EXHAUST FAN
ENCLOSURE
ELECTRO-PNEUMATIC
FAHRENHEIT
FAN COIL UNIT
FLANGE
FILTER
FEET PER MINUTE
FITTING
FURNISHED WITH EQUIPMENT
GAGE
GLOBE
GLYCOL HEATING RETURN
GLYCOL HEATING SUPPLY
GALLONS PER MINUTE
GROUND
HUMIDITY
HEATING COIL
HIGH LIMIT
HAND-OFF-AUTO
HEATING
HTR
HWP
HX
Hz
I
JB
KW
LL
LPS
LT
MA
mA
MAN
MAX
MBH
MCC
M.C.
MECH
MFR
MIN
NC
NEG
NO
NPT
O
O.D.
OA
OCC
OP
OWS
HEATER
HOT WATER PUMP
HEAT EXCHANGER
HERTZ
INSIDE DIAMETER
JUNCTION BOX
KILOWATT
LOW LIMIT
LOW PRESSURE STEAM
LOW TEMPERATURE
MIXED AIR
MILLIAMP
MANUAL
MAXIMUM
1000BTU PER HOUR
MOTOR CONTROL CENTER
MECHANICAL CONTRACTOR
MECHANICAL
MANUFACTURER
MINIMUM
NORMALLY CLOSED
NEGATIVE
NORMALLY OPEN
NATIONAL PIPE THREAD
OUTPUT
OUTSIDE DIAMITER
OUTSIDE AIR
OCCUPIED
OPEN
OPERATOR WORKSTATION
PE
PH
PNEU
PS
PROP
PRV
PSI
PSIG
R
RA
REV
RF
RPM
S
SA
SET
SD
SF
SP
SPEC
STD
STM
SUM
SW
T
TC
TDR
TE
UN
UNOCC
PRESSURE ELECTRIC
PREHEAT
PNEUMATIC
PRESSURE SENSOR
PROPORTIONAL
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
PSI (GAGE)
RELAY
RETURN AIR
REVERSE ACTING
RETURN FAN
REVOLUTIONS PER MINUTE
STATUS
SUPPLY AIR
SETPOINT
SMOKE DAMPER
SUPPLY FAN
STATIC PRESSURE
SPECIFICATION
STANDARD
STEAM
SUMMER
SWITCH
TEMPERATURE
TEMPERATURE CONTROLLER
TIME DELAY RELAY
TEMPERATURE ELEMENT
UNION
UNOCCUPIED
V
VA
VAC
VAV
VDC
VEL
VSD
VOL
VP
W/
WC
W/O
WB
WG
WIN
XFR
ZN
%OPN
%CLS
%CMD
VOLT
VOLT AMPERES
VOLTS ALTERNATING CURRENT
VARIABLE AIR VOLUME
VOLTS DIRECT CURRENT
VELOCITY
VARIABLE SPEED DIRVE
VOLUME
VELOCITY PRESSURE
WITH
WARMER / COOLER
WITHOUT
WET BULB
WATER GAGE
WINTER
TRANSFORMER
ZONE
PERCENT OPEN
PERCENT CLOSE
PERCENT COMMAND
ROWAN
UNIVERSITY
Project Title
BOLE HALL
RENOVATIONS
HUMIDIFIER
PUMP
C
COILING COIL
Drawing Title
CONTROL
IDENTIFICATION
C
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M009
Printed: 12/3/2014 11:31:52 AM
OUTSIDE AIR
TEMPERATURE/HUMIDITY
SENSOR MOUNTED IN
SHIELD
RF-C
EAD-O
EAD-FBK
RF-A
RELIEF AIR
VFD-C
OA-TH
ROWAN UNIVERSITY
NC
SMOKE
DETECTOR
RAD-O
RAD-FBK
CONTROLS CONTRACTOR SHALL FURNISH
AND INSTALL CONDUIT AND WIRING TO
CONNECT TO STARTER CIRCUIT AND DDC
CONTROLLER. WIRING TO FACP BY ROWAN
FIRE ALARM CONTRACTOR. (TYP. 2)
SD-2
VFD-A
AFMS
(AHU-1 ONLY)
RA-TH
SP-A
RETURN
AIR FROM
BUILDING
NO
FURNISHED AND INSTALLED BY
ROWAN FIRE ALARM CONTRACTOR.
(TYP. 2)
RETURN FAN
(INLINE FOR AHU-2)
SF-C
IAL
ORL
M
ME HAL
SF-A
VFD-C
CONNECT SWITCHES TO
SAFETY CIRCUIT
SF-S
VFD-A
TO DIGITAL CONTROLLER
MIN. OA (PARALLEL BLADE)
0-100F
AFMS
(AHU-1 ONLY)
(2 ACTUATORS)
OAD-O
OAD-FBK
MA-T
AFMS
(AHU-1 ONLY)
LT-A
B
SD-1
SA-T
SMOKE DETECTOR
C
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
SP-A
PARKING
LOT R
SUPPLY
AIR
SD-1
OA
OAK
HALL
C
MAX. OA (OPPOSED BLADE)
(AHU-1 ONLY)
NC
SUPPLY FAN
CLGV-O
CLGV-FBK
LOCATE 2/3
DISTANCE IN DUCT
RUN
SCHWR
SUM-WIN
SA-SP
SCHWS
KEY PLAN
SAT-RESET
SUPPLY
AIR
SA
IN CEILING BELOW ROOF (FOR AHU-1)
1
M010
AHU-1 & AHU-2 ATC DIAGRAM
NO SCALE
HWP1-DP
HWP1-C
TYPICAL FOR 3 PUMPS
HWP1-A
1
12/3/2014 ISSUED FOR BID
No.
Date
Revision
VFD1-C
HWR-T
VFD1-A
HWR
HWS TO FTR
N.O.
N.O.
HWP-1
HWP2-DP
SA-T
PHT
N.C.
N.C.
C
HWP-2
(STANDBY)
H
)
L)
HWP3-DP
VAV-O
VAV-FB
FLOW-S
ZN-T
HTGV-0
HTGV-FB
HWS TO VAV RH
N.O.
N.O.
ROWAN
UNIVERSITY
HWP-3
HWR
SUM-WIN
LPS
OA - T
HWS
N.C.
C
HWS FROM PUMPS
HWR TO HX
STMV1-0
STMV2-FB
STMV2-0
STMV2-FB
HWS-T
RADV-0
RADV-FB
Project Title
BOLE HALL
RENOVATIONS
EXISTING ZONE RADIATOR
N.O.
Drawing Title
HWS TO ZONE RADIATORS
CONTROL
DIAGRAMS
HX-1
HWR FROM ZONE RADIATORS
2
M010
VAV AND FINNED TUBE
NO SCALE
3
M010
HEATING HOT WATER
Date:
12/3/2014
NO SCALE
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M010
Printed: 12/3/2014 11:31:53 AM
AHU-1 AND AHU-2
VAV AND FINNED TUBE RADIATION
HEATING HOT WATER SYSTEM
BASEMENT AND 2ND FLOOR MECHANICAL
ROOM HEATING AND VENTILATION
GENERAL:
GENERAL:
GENERAL:
GENERAL:
THE VARIABLE VOLUME AIR HANDLING UNIT(S) CONSISTS OF A MIXED AIR SECTION WITH
OUTDOOR AIR DAMPERS AND RETURN AIR CONNECTION, FILTER SECTION, HOT WATER COIL,
CHILLED WATER COOLING COIL, RETURN FAN AND SUPPLY FAN. THE UNIT IS DDC CONTROLLED
USING ELECTRIC ACTUATION. THE UNIT SHALL BE COMMANDED ON BY THE BUILDING'S
OCCUPANCY SCHEDULE OR MANUALLY BY THE BUILDING OPERATOR.
THE SINGLE DUCT VARIABLE VOLUME AIR BOXES CONSISTS OF A VOLUME DAMPER AND FLOW
SENSING RING. ZONE HEATING IS PERFORMED BY EITHER EXISTING PERIMETER FIN TUBE
RADIATION OR REHEAT COILS LOCATED IN THE VAV BOX.
THE HEATING HOT WATER SYSTEM CONSISTS OF ONE LOW PRESSURE STEAM TO HOT WATER
SHELL AND TUBE HEAT EXCHANGER AND THREE PARALLEL INLINE CIRCULATION PUMPS (2
OPERATING/1STANDBY). ONE PUMP SERVING VAV BOX REHEAT COILS AND UNIT HEATERS, WITH
THE SECOND PUMPS SERVING THE PERIMETER FINNED TUBE RADIATION. THE HEATING HOT
WATER SYSTEM INCLUDES VARIABLE FREQUENCY DRIVES FOR REDUCED VOLTAGE STARTING
AND BALANCING, HOWEVER, THE SYSTEM SHALL OPERATE AS A CONSTANT VOLUME SYSTEM.
THE BASEMENT MECHANICAL ROOM CONSISTS OF ONE INTAKE LOUVER AND ONE EXHAUST FAN
(EF-2) FOR VENTILATION COOLING. THE 2ND FLOOR MECHANICAL ROOM CONSISTS OF ONE
INTAKE LOUVER, ONE EXHAUST FAN (EF-3)FOR VENTILATION COOLING AND ONE HOT WATER
TYPE UNIT HEATER(UH-1).
OPERATION:
THE BASEMENT EXHAUST FAN (EF-2) SHALL BE NORMALLY OFF. UPON A RISE IN SPACE
TEMPERATURE ABOVE 85°F (ADJ.), THE MOTOR OPERATED DAMPER SHALL OPEN. ONCE
PROVEN OPEN, EF-2 SHALL RUN. UPON A DROP IN SPACE TEMPERATURE BELOW SETPOINT,
THE REVERSE SHALL OCCUR.
ROWAN UNIVERSITY
THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW CONTROL PANEL TO BE LOCATED IN
THE BASEMENT MECHANICAL ROOM ADJACENT TO THE EXISTING PANEL TO ALLOW FOR A
PHASED TRANSITION. EXISTING CONTROL PANEL, DEVICES, TUBING, WIRING ETC.. SHALL BE
REMOVED IN ITS ENTIRETY AFTER NEW SYSTEM IN COMMISSIONED AND OPERATIONAL.
ALL SAFTEY DEVICES SHALL BE HARDWIRED. SAFTEY FUNCTIONS SHALL NOT BE PERFORMED
VIA LOGIC CONTROL. SMOKE DETECTORS TO BE FURNISH AND INSTALLED BY THE
UNIVERSITY'S THIRD PARTY FIRE ALARM CONTRACTOR.. ALL CONTROL WIRING AND CONDUIT TO
UNIT'S SHUTDOWN CIRCUIT AND BAS PANEL SHALL BE BY THE CONTROLS CONTRACTOR.. ALL
WIRING AND CONDUIT TO FIRE ALARM SYSTEM TO BE INSTALLED BY THE FIRE ALARM
CONTRACTOR..
AIRFLOW MEASURING STATIONS SHALL BE FURNISHED AND INSTALLED FOR AHU-1 AT SUPPLY
AND RETURN FANS AND OUTSIDE AIR INTAKE OPENINGS. RETURN FAN SHALL TRACK SUPPLY
FAN VOLUME TO MAINTAIN SCHEDULE DIFFERENTIAL AIR VOLUME. OUTSIDE AIR DAMPER AND
RELIEF DAMPER POSITIONS SHALL MODULATE TO MAINTAIN SCHEDULED OUTSIDE AIR AMOUNTS
THROUGH ECONOMIZER OPERATION. AHU-2 DOES NOT HAVE ECONOMIZER.
THE VAV BOX SHALL BE INDEXED TO THE HEATING OR COOLING MODE BASED ON OUTSIDE AIR
TEMPERATURE AND IN CONJUNCTION WITH ITS RESPECTIVE AHU.
WHEN THE COOLING MODE IS ENGAGED, THE HOT WATER REHEAT COIL SHALL BE MAINTAINED
CLOSED TO ELIMINATE SIMULTANEOUS HEATING AND COOLING UNTIL THE BOX REACHES ITS
SUMMER MINIMUM POSITITION (30% OF MAX.) IN ACCORDANCE WITH THE ENERGY CODE.
THE BOX SHALL MODULATE BETWEEN ITS RESPECTIVE WINTER AND SUMMER MIN. AND MAX.
POSITIONS AS NOTED IN THE EQUIPMENT SCHEDULE.
ALL CONTROLS SHALL BE FURNISHED AND INSTALLED BY THE CONTROLS VENDOR/CONTRACTOR.
OCCUPIED:
BUILDING START-UP
WHEN INDEXED TO THE BUILDING STARTUP MODE BASED ON THE OPERATION OF ITS RESPECTIVE
AHU OR RTU, THE VAV BOXES SHALL OPERATE IN THE OCCUPIED MODE AS DESCRIBED BELOW.
OCCUPIED MODE:
OCCUPIED:
BUILDING START-UP
THE UNIT SHALL BE COMMANDED ON 1 HOUR (ADJ.) PRIOR TO THE BUILDING'S REGULAR
OCCUPANCY SCHEDULE. THE UNIT SHALL BE STARTED IN FULL RE-CIRCULATION MODE. THE
OUTSIDE AIR DAMPER(S) SHALL BE FULLY CLOSED, RETURN AIR DAMPER FULLY OPEN AND
CHILLED WATER VALVE SHALL OPERATE AS DESCRIBED BELOW. UPON PROVING THE RETURN
AIR DAMPER IS OPEN, THE RETURN AND SUPPLY FANS SHALL BE ENERGIZED. IF EITHER
DAMPER OR FAN IS NOT PROVEN TO BE OPEN/STARTED, AN ALARM SHALL BE SENT TO THE
CAMPUS OPERATION CONTROL CENTER (OCC).
COOLING/ECONOMIZER MODE (OAT ABOVE 40F (ADJ.)): ON A RISE IN SPACE TEMPERATURE
ABOVE 78F (ADJ.) AS SENSED BY THE ZONE THERMOSTAT, THE VAV BOX SHALL MODULATE FROM
COOLING MIN. SETPOINT TO 100% OPEN. UPON A FALL IN SPACE TEMPERATURE BELOW
SETPOINT, THE REVERSE SHALL OCCUR. IF SPACE TEMPERATURE CONTINUES TO FALL BELOW
SETPOINT AND THE BOX IS AT MINIMUM POSTITION, THE REHEAT COIL SHALL BE ENGAGED.
PUMP P-3 SERVING VAV BOX REHEAT COILS SHALL OPERATE CONTINUOUSLY. PUMP P-1
SERVING PERIMETER FINNED TUBE RADIATION SHALL BE ENGAGED ONLY WHEN THE OUTSIDE
AIR TEMPERATURE DROPS BELOW 40F (ADJ.)
ISOLATION VALVES FOR HOT WATER PUMPS P-1 AND P-3 AND STANDBY PUMP P-2 SHALL BE
MANUALLY OPERATED. WHEN ANY PUMP IS INDEXED TO START, FLOW SHALL BE PROVEN
BASED ON THE PUMPS RESPECTIVE DP SENSOR. IF FLOW IS NOT PROVEN, THE PUMP SHALL
BE DE-ENERGIZED AND AN ALARM SENT BY THE OCC.
UPON CONFIRMATION OF FLOW AT THE HEAT EXCHANGERS BASED ON THEIR RESPECTIVE
FLOW SWITCH, THE HEAT EXHANGERS STEAM CONTROL VALVES SHALL BE ALLOWED TO
MODULATE TO MAINTAIN THE SYSTEM HOT WATER SUPPLY TEMPERATURE BASED ON THE PREPROGRAMMED HOT WATER SUPPLY TEMPERATURE RESET SCHEDULE.
THE 2ND FLOOR EXHAUST FAN (EF-3) SHALL BE NORMALLY OFF. UPON A RISE IN SPACE
TEMPERATURE ABOVE 85°F(ADJ.), THE MOTOR OPERATED DAMPER SHALL OPEN. ONCE
PROVEN OPEN, EF-3 SHALL RUN. ONCE PROVEN OPEN, EF-2 SHALL RUN. UPON A DROP IN
SPACE TEMPERATURE BELOW SETPOINT, THE REVERSE SHALL OCCUR.
THE 2ND FLOOR UNIT HEATER (UH-1) SHALL BE NORMALLY OFF. UPON A DROP IN SPACE
TEMPERATURE BELOW 55° (ADJ.) THE UNIT HEATER SHALL ENERGIZE AND THE CONTROL VALVE
SHALL OPEN.
IAL
ORL
M
ME HAL
FAILURE MORE:
UPON A FAILURE OF THE MOTOR OPERATED DAMPER TO OPEN, THE EXHAUST FAN TO START,
THE UNIT HEATER TO START, A RISE IN TEMPERATURE ABOVE 95 (ADJ) DEGREES, OR A DROP IN
TEMPERATURE BELOW 45 DEGREES (ADJ), AN ALARM SHALL BE SENT TO THE OCC.
FAILURE MORE:
UPON A FAILURE OF THE SYSTEM TO MAINTAIN THE PROGRAMMED SUPPLY WATER
TEMPERATURE WITHIN 10 DEG F (ADJ.) AN ALARM SHALL BE SENT TO THE OCC.
B
NORMAL OCCUPIED MODE:
HEATING MODE (OAT BELOW 40F (ADJ.)): THE VAV BOX SHALL MAINTAIN CONSTANT AIRFLOW AT ITS
HEATING MIN. SETPOINT. UPON A DROP IN SPACE TEMPERATURE FOR INTERIOR ZONES
CONTAINING A HOT WATER REHEAT COIL, THE CONTROL VALVE SHALL MODULATE OPEN TO
MAINTAIN SPACE TEMPERATURE SETPOINT OF 72F, (ADJ.). UPON A RISE IN SPACE TEMPERATURE
ABOVE SETPOINT, THE REVERSE SHALL OCCUR. FOR EXTERIOR ZONES, THE VAV BOX REHEAT
COIL SHALL BE MODULATED TO MAINTAIN A CONSTANT SUPPLY AIR TEMPERATURE OF (72F ADJ.).
THE UNIT SHALL BE COMMANDED TO THE OCCUPIED MODE BY THE BUILDING'S REGULAR
OCCUPANCY SCHEDULE. WHEN INDEXED TO THE OCCUPIED MODE THE MIN. OUTSIDE AIR
DAMPER SHALL BE OPENED TO ITS MINIMUM POSITION AND RETURN AIR DAMPER CLOSED
PROPORTIONALLY. IF THE OUTSIDE AIR DAMPER IS NOT PROVEN TO BE OPEN, AN ALARM SHALL
BE SENT TO THE OCC.
EXTERIOR ZONE HEATING SHALL BE PERFORMED BY FINNED TUBE RADIATORS. UPON A DROP IN
SPACE TEMPERATURE BELOW SETPOINT AS SENSED BY THE MASTER THERMOSTAT FOR THE
HYDRONIC LOOP, THE THREE WAY DIVERTING VALVE SHALL MODULATE OPEN TO MAINTAIN SPACE
TEMPERATURE SETPOINT. UPON A DROP IN SPACE TEMPERATURE THE REVERSE SHALL OCCUR.
THE MASTER THERMOSTAT FOR THE HYDRONIC ZONE SHALL BE SELECTABLE AT THE BAS.
IN THE OCCUPIED MODE, THE UNIT SHALL BE OPERATED TO MAINTAIN A SUPPLY AIR
TEMPERATURE OF 55F (ADJ.) AS SENSED BY SUPPLY AIR TEMPERATURE SENSOR, SA-T. IN THE
COOLING MODE, WHEN THE SAT RISES ABOVE 55F (ADJ.), THE CHILLED WATER CONTROL VALVE
SHALL BE MODULATED OPEN. UPON A DROP IN SUPPLY AIR TEMPERATURE, THE REVERSE
SHALL OCCUR.
UNOCCUPIED (NORMAL OFF):
THE UNIT SHALL BE INDEXED TO THE ECONOMIZER MODE (AHU-1 ONLY) WHEN THE OUTSIDE AIR
DEW POINT TEMPERATURE DROPS BELOW 55F(ADJ.) AND THE OUTDOOR AIR ENTHALPY IS
LOWER THAN THE RETURN AIR ENTHALPY. THE ECONOMIZER CONTROLLER SHALL MODULATE
THE MAXIMUM OUTSIDE AIR DAMPER AND RETURN AIR DAMPER TO MAINTAIN 55F (ADJ.) SUPPLY
AIR TEMPERATURE AS SENSED BY, SA-T.
THE HEATING HOT WATER SYSTEM SHALL OPERATE CONTINUOUSLY TO MAINTAIN A 190F
SUPPLY WATER TEMPERATURE (ADJ.)
OPERATION:
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
UNOCCUPIED MODE:
WHEN INDEXED TO THE UNOCCUPIED MODE BY THE BUILDING'S REGULAR OCCUPANCY
SCHEDULE, THE VAV BOX HOT WATER REHEAT COILS FAIL INTO THEIR NORMALLY OPEN POSITION.
UNOCCUPIED HEATING SETPOINTS FOR EXTERIOR ZONES SHALL BE RESET TO 65F (ADJ.) AT THE
BAS. DIVERTING VALVES FOR PERIMETER HOT WATER RADIATION SYSTEM SHALL MODULATE TO
MAINTAIN ZONE TEMPERATURE AS SENSED BY THE MASTER THERMOSAT FOR THE ZONE.
KEY PLAN
FAILURE MODE:
THE SUPPLY FAN SHALL VFD SHALL MODULATE THE FAN SPEED TO MAINTAIN DUCT STATIC
PRESSURE SETPOINT IN THE SUPPLY DUCTWORK.
UPON A FAILURE OF THE PRIMARY AHU SERVING THE ZONE, THE VAV BOX HOT WATER REHEAT
COILS SHALL FAIL IN THEIR NORMALLY OPEN POSITION.
UNOCCUPIED (NORMAL OFF):
UNOCCUPIED MODE:
WHEN INDEXED TO THE UNOCCUPIED MODE BY THE BUILDING'S REGULAR OCCUPANCY
SCHEDULE, THE SUPPLY FAN SHALL BE COMMANDED OFF, THE COOLING COIL VALVE AND HOT
WATER HEATING COIL VALVES ARE CLOSED AND THE OUTSIDE AIR DAMPERS ARE CLOSED.
SAFETY:
SMOKE DETECTORS IN THE SUPPLY AND RETURN AIR STREAMS SHALL DE-ENERGIZE THE
SUPPLY FAN AND RETURN FAN UPON ACTIVATION, THE COOLING COIL VALVE SHALL CLOSE AND
SMOKE DAMPERS IN THE RETURN AND SUPPLY AIR STREAMS SHALL BE CLOSED. THE HOT
WATER HEATING SUPPLY VALVE SHALL OPERATE IN THE FREEZE PROTECTION MODE AS
DESCRIBED BELOW.
1
12/3/2014 ISSUED FOR BID
No.
Date
Revision
LOW TEMPERATURE ALARM, LT-A SHALL DE-ENERGIZE THE SUPPLY FAN WHEN
TEMPERATURES BELOW 38 DEG F (ADJ.) ARE SENSED. THE CHILLED WATER VALVE SHALL
OPEN, THE BUILDING CHILLED WATER PUMP SHALL START IN FULL RECIRCULATION MODE, THE
OUTSIDE AIR DAMPER(S) SHALL CLOSE AND AN ALARM SHALL BE SENT TO THE OCC.
WHEN THE STATIC PRESSURE ACROSS THE FILTER BANK EXCEEDS 2.5"W.C. (ADJ.) AN ALARM
SHALL BE SENT TO THE OCC. WHEN THE STATIC PRESSURE ACROSS THE FILTER BANK
EXCEEDS 3.0"W.C. THE SUPPLY FAN AND RETURN FANS SHALL BE COMMANDED OFF, OUTSIDE
AIR DAMPER(S) SHALL CLOSE AND A SECOND, SEPERATE ALARM SHALL BE SENT TO THE OCC.
WHEN THE STATIC PRESSURE IN THE SUPPLY OR RETURN DUCTWORK EXCEEDS 3.0" W.C.(ADJ.)
AN ALARM SHALL BE SENT TO THE OCC AND THE SUPPLY AND RETURN FANS SHALL BE
COMMANDED OFF AND THE OUTSIDE AIR DAMPER(S) SHALL CLOSE
FAILURE MODE:
THE UNIT SHALL NOT BE ALLOWED TO START BASED ANY OF THE ALARMS DESCRIBED ABOVE.
WHEN THE UNIT IS RESET FROM OCC BY THE BUILDING OPERATOR, THE ALARMS WILL CLEAR,
AND THE UNIT WILL RESTART.
ROWAN
UNIVERSITY
Project Title
BOLE HALL
RENOVATIONS
Drawing Title
SEQUENCE OF
OPERATION
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M011
Printed: 12/3/2014 11:31:54 AM
ZC
PIT
SEQUENCE OF OPERATION NOTES:
TIT
TIT
ZIC
SENSING LINE, TYP.
ROWAN UNIVERSITY
OPERATION:
TE
THE CHILLED WATER SYSTEM SHALL BE CONTROLLED THROUGH THE LOCAL BUILDING
AUTOMATION SYSTEM (BAS). THE BAS WILL ENGAGE THE SECONDARY CHILLED WATER PUMPS
TO START WHEN THE BUILDING PRESSURE DIFFERENTIAL IS 2PSI (ADJ.) BELOW THE
PREDEFINED SETPOINT (ADJ.)
TE
M
4" PCHWR
WHEN THE SECONDARY PUMP IS ENGAGED, THE PUMP SHALL START AT MINIMUM SPEED (30%
ADJ.). UPON A DROP IN BUILDING PRESSURE DIFFERENTIAL, THE SECONDARY PUMP SPEED
SHALL BE INCREASED THROUGH ITS RESPECTIVE VFD. UPON AN INCREASE IN BUILDING
PRESSURE DIFFERENTIAL, THE REVERSE SHALL OCCUR.
N.O.
REMOTE MOUNT ON
NEAREST WALL. 5'-6"
OFF FLOOR. FURNISH
AND INSTALL SENSING
LINES AND WIRING
(TYP. ALL INDICATING
TRANSMITTERS)
PIT
UTILITY ISOLATION
VALVES
TIT
THE PUMP SHALL BE DE-ENERGIZED WHEN THE BUILDING PRESSURE DIFFERENTIAL IS 3PSI
(ADJ.) ABOVE SETPOINT FOR A PERIOD OF 5 MINS. (ADJ.).
LOCATE AT
HYDRAULICALLY MOST
REMOTE AHU
THE BAS WILL MODULATE THE CHILLED WATER CONTROL (CHOKE) VALVE TO MAINTAIN A 15
DEGREE CHILLED WATER DIFFERENTIAL ON THE PRIMARY SYSTEM. THE CHOKE VALVE WILL
ALSO MODULATE TO MAINTAIN THE MAXIMUM BUILDING PRESSURE (PB) BELOW THE BUILDING
SET-POINT PRESSURE (ADJ.) AS FOLLOWS:
- DELTA T < 15 DEG. F (ADJ.) - CHOKE VALVE CLOSES
- DELTA T > 15 DEG. F (ADJ.) - CHOKE VALVE OPENS
- DELTA PB > SETPOINT (ADJ.) - CHOKE VALVE CLOSES.
- DELTA PB < SETPOINT (ADJ.) - VFD MODULATES PUMP SPEED
PDT
TIT
THE PRIMARY CHILLED WATER RETURN WATER TEMPERATURE SHALL NOT EXCEED 60F (ADJ.)
TE
TE
IAL
ORL
M
ME HAL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
CHOKE VALVE MINIMUM NORMAL OPERATING POSITION SHALL BE 30% (ADJ.)
N.0.
SECONDARY PUMPS SHALL BE DISABLED AT OUTSIDE AIR TEMPERATURE BELOW 48F (ADJ.)
4" PCHWS
THE BAS SYSTEM SHALL ALTERNATE SECONDARY CHILLED WATER PUMPS TO EQUALIZE RUNTIME.
30' SIGNAL WIRE
(FURNISHED BY
FLOWMETER VENDOR)
SAFETY:
B
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
SECONDARY CHILLED WATER PUMP SHALL RUN IN FULL BUILDING
RECIRCULATION MODE (I.E. CHOKE VALVE FULLY CLOSED) WHEN
INDEXED TO THE FREEZE PROTECTION MODE BY EITHER THE BUILDING
AHU OR RTU. THE AIR HANDLING UNIT CHILLED WATER COILS SHALL
MODULATE TO THE FULLY OPEN POSITION AND THE SECONDARY PUMPS
SHALL RUN AT 100%.
MAGNETIC FLOWMETER
REMOTE MOUNT ON
NEAREST WALL. 5'-6"
OFF FLOOR)
FIT
EXCITATION WIRE
(FURNISHED BY
CONTRACTOR AND
INSTALLED IN
SEPERATE CONDUIT.
BELDEN 8720 OR
EQUAL)
OAK
HALL
LE
BO LL
A
H
PARKING
LOT R
FAILURE MODE:
SIC
UPON A FAILURE OF A PUMP TO START AN ALARM SHALL BE SENT TO THE CAMPUS
OPERATIONS CONTROL CENTER (OCC). , THE ALTERNATE PUMP SHALL BE INDEXED TO START
MANUALLY BY THE OCC.
YI
UPON A FAILURE OF THE CHOKE VALVE TO MAINTAIN A MAXIMUM 60F PRIMARY CHILLED WATER
RETURN TEMPERATURE OR TO MAINTAIN THE BUILDING PRESSURE (PB) BELOW SETPOINT, AN
ALARM SHALL BE SENT TO THE OCC.
HS
ENERGY METERING:
FY
THE BUILDING CHILLED WATER ENERGY METERING SYSTEM CONSISTS OF A MAGNETIC
FLOWMETER, REMOTE MOUNTED FLOW CONVERTER, RTD/TEMPERATURE INDICATING
TRANSMITTERS MOUNTED ON THE PRIMARY SUPPLY AND CHILLED WATER RETURN PIPING
AND FLOW COMPUTER.
SIC
RS-485 TO BAS
BRIDGE CONTROLLER
KEY PLAN
THE STEAM ENERGY METERING SYSTEM CONSISTS OF A VORTEX FLOWMETER, REMOTE
MOUNTED FLOW CONVERTER, RTD/TEMPERATURE INDICATING TRANSMITTER AND PRESSURE
INDICATING TRANSMITTER.
THE FLOW COMPUTERS SHALL BE HOUSED IN A NEMA 4X ENCLOSURE AND SHALL EACH BE
WIRED TO THE BAS. REFER TO SPECIFICATION SECTION 130219 FOR GRAPHICS AND
COMMUNICATIONS REQUIREMENTS AT THE UNIVERSITY SCADA SYSTEM.
REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR STRAIGHT RUN AND OTHER
INSTALLATION REQUIREMENTS.
REFER TO ELECTRICAL DRAWING E-XXX FOR NEW ELECTRICAL SERVICE METER. FURNISH AND
INSTALL NEW RS-485 COMMUNICATION TO BAS PANEL. REFER TO SPECIFICATION SECTION
XXXXXX FOR GRAPHICS AND COMMUNICATIONS REQUIREMENTS AT THE UNIVERSITY SCADA
SYSTEM.
1
12/3/2014 ISSUED FOR BID
No.
1
M012
Date
Revision
PRIMARY AND SECONDARY CHILLED WATER INTERFACE AND METERING
NO SCALE
PIT
REMOTE MOUNT ON
NEAREST WALL. 5'-6"
OFF FLOOR. FURNISH
AND INSTALL SENSING
LINES AND WIRING
SENSING LINE
TIT
TE
5" LPS
5" LPS
30' SIGNAL WIRE
(FURNISHED BY
FLOWMETER VENDOR)
VORTEX FLOWMETER
REMOTE MOUNT ON
NEAREST WALL. 5'-6"
OFF FLOOR
FIT
ROWAN
UNIVERSITY
FY
Project Title
BOLE HALL
RENOVATIONS
RS-485 TO BAS
BRIDGE CONTROLLER
DESIGNATION
TYPE
BILL OF MATERIALS
QUANTITY
BASIS OF DESIGN
COMMENTS
Drawing Title
-
2
M012
STEAM ENERGY METERING
NO SCALE
FIC
PDIT
TE
TTT
MAGNETIC FLOW METER
(CHILLED WATER)
VORTEX FLOW METER
(STEAM)
FLOW CONVERTER
PRESSURE DIFFERENTIAL
INDICATING TRANSMITTER
1
YOKOGAWA AXF100
1
YOKOGAWA DY100
2
1
YOKOGAWA AXF SERIES
YOKOGAWA EJA 530E
TEMPERATURE ELEMENT
TEMPERATURE
INDICATING TRANSMITTER
5
5
YOKOGAWA TSE-200
YOKOGAWA YTA-110
FURNISH WITHIN 30 FEET OF SENSING
LINE AND TERMINATION KIT
FURNISH WITHING 30 FEET OF
SENSING LINE AND TERMINATION KIT.
FURNISH WITH ANDERSON
GREENWOOD INSTRUMENT POWER
MANIFULD
-
P&ID DIAGRAMS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M012
Printed: 12/3/2014 11:31:55 AM
COIL AIR VENT
VALVE W/ PLUG
AIR VENT (3/4" BALL
VALVE WITH CAP)
DIFFERENTIAL
PRESSURE SENSOR
THERMOMETER W/
SEPARABLE SOCKET
THERMOMETER
BUTTERFLY
VALVE (TYP.)
COIL AIR VENT
VALVE W/ PLUG
PIPE INSULATION
BUTTERFLY
VALVE
ROWAN UNIVERSITY
TRIPLE DUTY
VALVE
CHWR
PIPING
CMU WALL
FIRESTOP SEALANT
ALL SIDES
DISCHARGE
REDUCER
AIR VENT (3/4" BALL
VALVE WITH CAP)
TYPICAL
SUCTION
COOLING COIL
2-WAY MODULATING VALVE
COOLING COIL
PRESSURE
GAUGE
DPS
BRAIDED STEEL
COVERED
ISOLATION FITTING
BASE MOUNTED
PUMP
MOTOR
PRESSURE GAUGE
W/ BALL VALVE
CHWS PIPING
MINERAL WOOL
WHERE CLEARANCE
IS GREATER THAN 1/4"
CORE DRILL
AND SLEEVE
SUCTION
DIFFUSER
CALIBRATED BALANCING AND
FLOW MEASURING VALVE
CONCRETE PAD
ADJUSTABLE
SUPPORT
IAL
ORL
M
ME HAL
FLOOR
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
PRESSURE GAUGE
W/ BALL VALVE
1
PIPE PENETRATION DETAIL
3/4" DRAIN
W/BALL VALVE &
HOSE COUPLING
2-WAY MODULATING VALVE
NO SCALE
M013
4
3/4" COIL DRAIN VALVE W/
HOSE COUPLING
(TYPICAL FOR BOTH COILS)
NO SCALE
M013
REDUCER
DIFFERENTIAL
PRESSURE
SENSOR
BASE MOUNTED PUMP DETAIL
B
CALIBRATED BALANCING AND
FLOW MEASURING VALVE
BUTTERFLY
VALVE (TYP.)
LE
BO LL
A
H
DPS
3/4" COIL DRAIN VALVE W/
HOSE COUPLING
(TYPICAL FOR BOTH COILS)
3
3/4" DRAIN W/ BALL VALVE
BASIS OF DESIGN APOLLO
MODEL 77-204-01 & HOSE
COUPLING
TYPICAL
2
M013
CHILLED WATER COIL
NO SCALE
M013
CHILLED WATER COIL
MIN. 3 DUCT
DIAMETERS (NO
FLEX DUCT)
VAV BOX
CONTROLS
CHWS
PIPING
FASTEN TO
ROOF/DECK ABOVE
VOLUME DAMPER
NO SCALE
SUPPLY DUCT
1
AAV
1
KEY PLAN
HOT WATER
REHEAT COIL
BALANCING
VALVE
SHEETMETAL
DUCT
1" MIN
SPRING ISOLATOR
DUCT MAIN
NC
P/T
1" MIN
ADJUSTABLE
ELBOW RINGS
BALL VALVE
C
METAL BAND SUPPORT
MOUNT TO STEEL OR
CONCRETE DECK
3-WAY ELECTRIC
CONTROL VALVE
°
45
°
45
FULL LENGTH AND
WIDTH OF BRANCH
DUCT
SEAL AROUND
TAKEOFF
LAY-IN SUPPLY AIR
DIFFUSER WITH
ROUND NECK.
3/4" HWS&R
CONSTRUCTION NOTES:
MAINTAIN ADEQUATE SERVICE CLEARANCE FOR HOT WATER COIL, PIPING
1 AND
VAV BOX CONTROLS.
T-BAR TYPE
SUSPENDED CEILING
VOLUME DAMPER
8
INLINE RETURN
6
NO SCALE
M013
7
DUCT TAKEOFF DETAIL
NO SCALE
Revision
NO SCALE
NO SCALE
PROVIDE
INDEPENDENT
SUPPORT FOR
PUMP
CLEARANCE BETWEEN FIRE DAMPER AND
WALL SHALL BE 1/8" PER FOOT OF PERIMETER.
6" MAXIMUM
WALL
Date
FLEXIBLE DUCT TO DIFFUSER DETAIL
M013
MINIMUM 24 GA SHEET
METAL ESCUTCHEON
PLATE ON BOTH SIDES
OF WALL ALL AROUND
12/3/2014 ISSUED FOR BID
No.
VAV BOX WITH REHEAT
M013
RETURN FAN DETAIL
1
1
VOLUME DAMPER
FULL DIAMETER OF
BRANCH DUCT
DUCT MAIN
STRAINER
AIRFLOW
SEAL AROUND
TAKEOFF
M013
HW
S
P/T
DUCT MAIN
AIRFLOW
5
HW
R
N0
1/4" DUCT WIDTH
BUT MINIMUM 10"
DRAIN VALVE W/
HOSE CONNECTION
FLEXIBLE DUCT
PARKING
LOT R
CHWR
PIPING
THERMOMETER W/
SEPARABLE SOCKET
MOTOR
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
1-1/2" X 1-1/2" X
10 GUAGE
MINIMUM ANGLE
IRON AROUND
DISCHARGE
MIN 1" LAP
AROUND ENTIRE
OPENING
SUCTION
SEE NOTE
1-1/2" ANGLE
1" MIN.
BOLTS
FOT
DUCT
HOT WATER SUPPLY
3-WAY CONTROL VALVE
HOT WATER RETURN
MANUAL AIR VENT
WITH GLOBE VALVE
NUT OR BOLT
OR WELDED
DUCT
SEE PLANS FOR
PIPE SIZES
UNIT HEATER WILL BE
SECURED TO BLDG. WITH A
MINIMUM OF TWO BRACKETS
FLANGED
CONNECTIONS
OR UNIONS
DUCT LINER (AS
SPECIFIED)
NOTE:
SHEET METAL
SCREW
PROVIDE BALANCING VALVE AND FLOW SENSOR AS REQUIRED BY PIPE SIZE
AND SPECIFICATION SECTION 15180. INSTALL FLOW SENSOR PER
MANUFACTURER'S REQUIREMENTS FOR STRAIGHT RUN OF PIPE DIAMETERS.
HINGED ACCESS DOOR
WITH CAM FASTENER
AND NEOPRENE GASKET
MINIMUM SIZE 6 X 6
UNIT HEATER
MOTOR HOUSING
CALIBRATED BALANCE VALVE
ON LINE SIZED BYPASS
INSULATION
AS SPECIFIED
APPLY HEAVY BEAD OF
FIRE CAULK SEALANT
ALL AROUND OPENING
5 PIPE DIAMETERS
MINIMUM STRAIGHT
PIPE
12
M013
"S" SLIP TYPE
WITH SHEET
METAL SCREWS
INLINE CIRCULATING PUMP
ROWAN
UNIVERSITY
NO SCALE
UNION, TYPICAL
22 GA SHEET METAL
WALL SLEEVE
ISOLATION VALVE
PACK SPACE BETWEEN
DUCT AND SHEET METAL
SLEEVE WITH HIGH DENSITY
FIBERGLASS INSULATION
STRAINER
10 GAUGE
SLEEVE
NOTES:
1.
2.
9
HYDRONIC WALL MOUNTED UNIT HEATER
M013
NO SCALE
10
M013
DUCT PENETRATION(CMU)
PROVIDE FIRE DAMPER FOR ROUND DUCT OR USE
TRANSITIONS FOR ROUND TO SQUARE DUCT.
FURNISH AND INSTALL SIGNAGE COMPLIANT WITH IMC-2012
FOR IDENTIFYING FIRE DAMPERS
11
NO SCALE
M013
FIRE DAMPER
Project Title
NO SCALE
BOLE HALL
RENOVATIONS
EXISTING ROOF CURB
SET BOLT IN
SEALANT
GASKET
8" MIN.
SHEET METAL
COVER
M013
NO SCALE
Printed: 12/3/2014 11:31:58 AM
FTR SUPPLY
(BELOW)
MEMBRANE FLASHING
EXISTING CONCRETE DECK
NEW 1/2" RIGID
INSULATION BY G.C.
FTR RETURN
(ABOVE)
NEW PIPE
CHASE BY G.C.
ROOF MOUNT DUCT SUPPORT CURB
NO SCALE
FTR (SEE PLANS FOR
DIMS.)
5/8" FTR RETURN
DRAIN VALVE (TYP.)
PRESSURE TREATED
WOOD BLOCKING, TYP.
M013
PERFORATED OPENING
IN SILL BY GC. (MIN
50% FREE AREA; 6"
WIDER THAN ELEMENT)
RETURN
5/8" FTR SUPPLY
14
Drawing Title
DETAILS
2 PLY ROOFING
MEMBRANE 8" MIN. ONTO
EXISTING ROOFING
EXISTING
INSULATION
EXIST. CONCRETE DECK
ROOF CURB REPLACEMENT AND PATCHING
EXISTING COLUMN
5-1/2"
EXISTING BUILT UP
ROOFING
NOTE:
LARGE SIZE OPENINGS WILL NEED SUPPLEMENTAL BRACING UNDER THE
PLYWOOD DECK. CONTRACTOR SHALL CONSULT WITH THE CURB
MANUFACTURER, FOR REQUIREMENTS. BRACING, AND FASTENING TO BE
PROVIDED BY ROOD CURB MANUFACTURER.
13
FASTEN APPROX.
8" O.C.
EXISTING COLUMN
BEYOND
6-1/2"
VARIES
NEW PIPE CHASE BY
G.C.
L2 "x2"x3/8" LEG TO
SUPPORT DUCT SEE
PLAN VIEW FOR
LOCATIONS
1'-4"
12" MIN
3/4" EXTERIOR GRADE PLYWOOD DECK
WITH SHEETMETAL COVER TO BE
PROVIDED BY CURB MANUFACTURER.
SEE DETAIL NOTE.
CAP SECURED AT 24" O.C. WITH SS
SCREWS AND NEOPRENE GASKETS.
15
M013
M-FINNED TUBE-PLAN
NO SCALE
16
M013
4" RETURN GRILLE
(6" WIDER THAN
ELEMENT)
FINNED TUBE SECTION
NO SCALE
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M013
ROWAN UNIVERSITY
AIR HANDLING UNIT
SUPPLY FAN
RETURN FAN
FAN
TAG
LENGTH WEIGHT OA MAX/MIN
(IN)
(LBS)
(CFM)
AHU-1
390
9635
2,000/12,100
AHU-2
90
1855
400/400
MOTOR
CHILLED WATER COIL
FAN
PANEL FILTER
MOTOR
SENSIBLE TOTAL EAT-DB EAT-WB LAT-DB LAT-WB
FV
APD EWT LWT
WPD
FAN
ESP
TSP
ESP
TSP
(°F)
(°F)
(°F)
(FT/MIN) (INH2O) (°F) (°F) GPM (INH20) ROWS FPI TYPE
TYPE QTY. CLASS CFM RPM BHP (INH20) (INH20) ELEC. HP RPM CTRL TYPE QTY. CLASS CFM RPM BHP (INH2O) (INH2O) ELEC. HP RPM CTRL (BTU/HR) (BTU/HR) (°F)
30"
PLENUMDIRECT
DRIVE
16"
PLENUMDIRECT
DRIVE
1
2
12100 1339 12.34
1
2
3500
2665
3.86
1
4.58
1.1
4.68
208/60/3 15
1160
VFD
30"
PLENUM
-DIRECT
DRIVE
208/60/3 7.5 3500 NONE
-
QTY.
CLEAN DIRTY
PD
PD
DEPTH EFF. (INH2O) (INH2O)
TYPE
QTY.
CLEAN DIRTY
PD
BD
DEPTH EFF. (INH2O) (INH2O)
COMMENTS
1
2
10890
872
3.08
0.85
1.01
208/60/3
5
1160
VFD
325,676
431,599
78
65
53
53
427
0.63
45
60
57.1
8.7
8
9
PLEATED (4)-12X24
(MERV 8) (8)-20X24
2
30
0.25
1
VARICEL II MH (4)-12X24
CARTRIDGE (8)-20X24
4
85
.047
1.5
SEE NOTE(S) 2,3,4
-
-
-
-
-
-
-
-
-
-
-
90,260
113,910
80
64
55
53
467
0.79
45
60
15.2
5.7
8
10 PLEATED (1)-24X12
(MERV 8) (2)-24X20
2
30
0.31
1
VARICEL II MH (1)-24X12
CARTRIDGE (2)-24X20
4
85
0.57
1.5
SEE NOTE(S) 1,3,5
NOTES:
1.
VFD FOR AHU-2 FAN SHALL BE FURNISHED BY AHU MANUFACTURER AND FIELD INSTALLED/WIRED IN MECHANICAL ROOM BY E.C.(REFER TO ELECTRICAL DRAWINGS).
2.
VFD'S FOR AHU-1 SUPPLY AND RETURN FANS SHALL BE FACTORY INSTALLED BY THE AHU MANUFACTURER.
3.
REFER TO SPECIFICATIONS FOR ADDITIONAL UNIT REQUIREMENTS SUCH AS MARINE LIGHTS, MIXING BOXES, DAMPERS, AND BLENDERS.
4.
BASIS OF DESIGN DAIKIN MODEL OAH OR APPROVED EQUAL. (REFER TO SPEC SECTION 237413).
5.
BASIS OF DESIGN DAIKIN MODEL CAH OR APPROVED EQUAL. (REFER TO SPEC. SECTION 237313).
TAG
LOCATION
DESCRIPTION
UH-1
2ND FLOOR
WALL MOUNTED
TAG
CHWP-1
HWP-1
HWP-2
HWP-3
SERVICE
MBH
UNIT HEATER
WATER
EWT
LWT
GPM
180
IAL
ORL
M
ME HAL
VENTILATION SCHEDULE
CFM
AIR
EAT
LAT
VOLTAGE
PHASE
HZ
MODEL
65
95
120
1
60
HSB-HC
160
PUMP
VOLTAGE
PHASE
REMARKS
FLOW (GPM)
FT HD
HP
RPM
TYPE
HZ
MANUFACTURER
MODEL
COMMENTS
AHU 1 & 2
100
40
2
1750
BASE MOUNTED
208
3
60
BELL AND GOSSETT
SERIES 1510 2AD-ES
100 GPM INCLUDES ADDITIONAL 25 GPM FOR
FUTURE LOAD OF PRESIDENT'S SUITE.
FINNED TUBE
RADIATION
STANDBY
VAV REHEAT
62
35
0.5
1750
INLINE
208
3
60
BELL AND GOSSETT
SERIES E-901.5AB
62
30
35
35
0.5
1
1750
1750
INLINE
INLINE
208
208
3
3
60
60
BELL AND GOSSETT
BELL AND GOSSETT
SERIES E-901.5AB
SERIES E-901.5AB
HEAT EXCHANGER
SHELL
TUBE
TAG
LOCATION
SYSTEM
FLUID
LBS/HOUR
PSIG
FLUID
GPM
LWT
MAX PRESSURE
DROP (PSIG)
BASIS OF DESIGN
HX-1
BASEMENT MECHANICAL ROOM
HOT WATER
STEAM
936
5
WATER
92
180
0.5
BELL AND GOSSETT SU-84-2
ROOM
NUMBER
100
100H
100I
101
101G
102
102
103
104
104
104A
104B
104C
105
105
106
107
107
108
109
REMARKS
110
111
112
113
114
VAV BOX
TAG
MAX CFM
MIN CFM
(WINTER)
VAV-100G
VAV-101
VAV-102
VAV-104
VAV-104A
VAV-104B
VAV-104C
VAV-107
VAV-108
VAV-110
VAV-112
VAV-115
VAV-117
VAV-118
VAV-121
VAV-125
VAV-126
VAV-130
VAV-131A
VAV-131B
VAV-200
VAV-200B
VAV-201
VAV-203
VAV-205A
VAV-207
VAV-209
VAV-H100
VAV-L100
VAV-W202
600
1055
170
250
355
475
495
785
325
155
130
280
200
140
210
780
1050
1060
1560
1560
425
450
300
450
475
420
355
770
150
285
300
530
85
125
180
240
250
390
165
80
65
140
100
70
100
390
525
530
780
780
215
225
150
225
240
210
180
385
75
145
TAG
CFM
ESP
EF-1
EF-2
EF-3
RF-1
550
500
250
2550
0.4 in. wg.
0.5 in wg.
0.3 in. wg.
0.5 in. wg.
MIN CFM
(SUMMER) INLET SIZE MAX NC LEVEL
180
315
50
75
105
150
150
235
100
50
40
85
60
45
65
235
315
320
470
470
130
135
90
135
145
125
106
230
45
85
8
10
4
5
6
6
6
8
6
4
4
5
4
4
4
8
10
10
12
12
6
6
5
6
6
6
6
8
4
5
1/4
1/4
1/6
3/4
LAT(°F)
EWT(°F)
LWT(°F)
GPM
REHEAT MBH
BASIS OF DESIGN
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
55
55
55
55
55
55
55
55
55
55
84
86
93
87
92
88
87
83
94
94
97
86
91
94
89
86
86
86
86
86
84
83
84
83
83
84
84
83
97
84
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
160
160
160
158
160
160
160
157
159
160
160
158
159
159
160
160
160
160
160
160
156
156
155
156
156
156
156
156
160
155
1.1
2.1
0.4
0.5
.0.8
1.0
1.0
1.3
0.8
0.4
0.4
0.5
0.4
0.8
0.4
1.4
2.1
2.1
3.1
3.1
0.6
0.6
0.4
0.6
0.6
0.6
0.5
1.0
0.4
0.4
11.2
20.7
4.0
5.1
8.2
9.8
10.0
14.1
7.7
3.75
3.3
5.5
4.4
7.7
8.8
13.2
20.6
20.7
30.1
30.1
6.6
6.9
4.8
6.9
7.25
6.5
5.6
11.8
3.5
4.5
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
ENVIRO-TEC MODEL SDR
20
20
20
20
20
25
25
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
25
20
25
20
20
20
25
25
MOTOR
RPM
FAN RPM MOTOR HP
1148
1448
1564
1206
EAT (°F)
1725
1750
1725
1725
FANS
MOTOR
BHP
0.1
0.15
0.03
0.41
ELEC.
120/60/1
120/60/1
120/60/1
120/60/1
MANUFACTURER
MODEL
GREENHECK
GREENHECK
GREENHECK
GREENHECK
CUE-99-A
SE1-12-432-A4
G-070-VG
QEI-15-1-5
TAG
NECK SIZE
EG-1
LRG
LSD-1
LSD-2
LSD-3
RG-1
RG-2
SD-1A
SD-1B
SD-1C
SD-1D
SD-2A
SD-2B
SD-2C
SD-2D
SD-3
SEE PLANS
SEE PLANS
12"ø
10"ø
6"ø
SEE PLANS
SEE PLANS
9"x9"-6"ø
18"x18"-6"ø
18"x18"-8"ø
18"x18"-12"ø
9"x9"-6"ø
18"x18"-6"ø
18"x18"-8"ø
18"x18"-10"ø
10"ø
24"x24"
60"
60"
60"
60"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
24"x24"
DESCRIPTION
BASIS OF DESIGN
REMARKS
LOUVERED ALUMINUM EXHAUST GRILLE
LINEAR RETURN GRILLE
LINEAR SLOT DIFFUSER
LINEAR SLOT DIFFUSER
LINEAR SLOT DIFFUSER
LOUVERED RETURN GRILLE
LOUVERED RETURN GRILLE
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
LOUVERED FACE DIFFUSER
PRICE 630
PRICE SDA100
PRICE AS230
PRICE AS220
PRICE AS210
PRICE 530
PRICE 530
PRICE SMX
PRICE SMX
PRICE SMX
PRICE SMX
PRICE SMD
PRICE SMD
PRICE SMD
PRICE SMD
PRICE SCD
SEE NOTE 2
SEE NOTE(S) 1, 2
SEE NOTE(S) 1, 2
SEE NOTE(S) 1, 2
SEE NOTE(S) 1, 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
NOTES:
1.
PROVIDE INSULATED UNIVERSAL TYPE PLENUM.
2.
FURNISH AND INSTALL SQUARE TO ROUND TRANSITION PRIOR TO
FINAL CONNECTION TO DIFFUSER.
LOBBY
KITCHEN
STORAGE
PAYROLL OPEN OFFICE
CONFERENCE ROOM
LOUNGE
MAIL/COPY
PAYROLL SUPERVISOR
OPEN OFFICE
DIRECTOR
FILE ROOM
OFFICE
OFFICE
WOMEN'S ROOM
FUTURE
CORRIDOR
MEN'S ROOM
CORRIDOR
ACC. SERVICES
DIRECTOR
ACC. SERVICES
ASSOCIATE DIRECTOR
BREAK ROOM
COPY
CONFERENCE ROOM
ACC. SERVICES
DIRECTOR
ACC. PAYABLE
MANAGER
RECEPTION
MEDIA/P.R.
MEDIA/P.R.
OFFICE
OFFICE
OFFICE
CORRIDOR
CONFERENCE ROOM
MEDIA/P.R.
MEDIA/P.R.
MEDIA/P.R.
OFFICE
OFFICE
BUDGET DIRECTOR
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
CORRIDOR
OFFICE
COPY ROOM
OFFICE
OFFICE
OFFICE/STORAGE
OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
LOBBY
VESTIBULE
LOBBY
FOYER
OFFICE
WAITING AREA
CORRIDOR
CONFERENCE ROOM
CORRIDOR
B
PRIMARY OA INTAKE
OA
FLOW
FRACTION
RATE
(ZP)
(VOT)
TOTAL AREA
(SQ. FT.)
POPULATI
ON(ZP)
PEOPLE
OA RATE
(RP)
130
45
80
860
270
195
77
130
315
150
130
165
500
160
150
500
80
280
140
1
1
1
6
8
1
1
1
2
1
1
1
5
5
5
5
5
5
5
5
5
5
5
5
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
16
10
12
102
70
21
12
16
36
18
16
19
50
100
100
1060
400
175
50
80
290
85
75
400
0.32
0.1
0.12
0.1
0.18
0.12
0.24
0.2
0.12
0.21
0.21
0.05
23
14
18
146
100
30
17
23
52
25
23
27
1
0
5
0
0.06
0.06
18
35
85
175
0.21
0.2
25
49
0
1
0
5
0.06
0.06
21
17
785
85
0.03
0.2
30
24
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
125
1
5
0.06
16
80
0.2
22
AHU-1
180
95
150
140
4
1
8
1
5
5
5
5
0.06
0.06
0.06
0.06
39
13
61
17
155
65
150
80
0.25
0.21
0.41
0.21
55
19
88
24
AHU-1
AHU-1
AHU-1
AHU-1
125
1
5
0.06
16
80
0.20
22
AHU-1
265
105
105
105
105
110
170
425
115
120
120
120
120
145
2280
155
250
135
165
90
155
205
115
125
155
75
120
435
65
205
75
415
215
225
165
85
145
100
156
120
3
1
1
1
1
1
0
22
1
1
1
1
1
1
19
1
2
1
1
1
1
2
1
1
1
1
1
0
0
0
0
0
3
3
0
1
0
0
8
0
5
5
5
5
5
5
0
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
0
0
5
5
5
0
0
0
0
0
5
5
0
5
5
5
5
5
NOTES:
1.
POPULATION BASED ON DEFAULT OCCUPANCY DENSITIES LISTED IN TABLE 403.3
FOR THE 2009 IMC.
2.
UNCORRECTED AIRFLOW RATE INCLUDES A ZONE DISTRIBUTION EFFECTIVENESS
OF 0.8 FOR CEILING SUPPLY OF WARM AIR AND CEILING RETURN.
3.
CORRECTED OA BASED ON A SYSTEM VENTILATION EFFICIENCY OF 0.7 BASED ON
MAX ZONE PRIMARY OUTDOOR AIR FRACTION.
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
39
14
14
14
14
15
13
169
15
15
15
15
15
17
290
18
31
16
19
13
18
28
9
9
18
12
15
33
5
15
6
31
35
36
12
13
11
8
62
9
145
65
65
65
65
65
40
520
360
350
340
345
355
360
3150
240
295
185
250
60
100
300
100
135
285
145
210
195
50
100
75
100
150
350
240
70
50
50
300
45
0.27
0.22
0.22
0.22
0.22
0.22
0.32
0.33
0.04
0.04
0.04
0.04
0.04
0.05
0.09
0.07
0.11
0.09
0.07
0.22
0.18
0.09
0.09
0.07
0.06
0.08
0.07
0.17
0.1
0.15
0.07
0.31
0.23
0.10
0.05
0.18
0.22
0.15
0.21
0.2
55
20
20
20
20
21
18
242
21
22
22
22
22
24
414
20
35
18
21
14
20
31
10
10
20
13
17
47
7
17
6
44
50
40
18
18
12
8
69
10
LAUREL
HALL
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
SYSTEM
NAME
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-1
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-2
AHU-1
AHU-1
AHU-2
AHU-2
AHU-1
AHU-1
AHU-2
AHU-1
AHU-1
AHU-2
AHU-2
AHU-2
HOLLYBUSH
PARKING
LOT R
KEY PLAN
1
12/3/2014 ISSUED FOR BID
No.
Date
Revision
ROWAN
UNIVERSITY
Project Title
BOLE HALL
RENOVATIONS
AIR DEVICES
NOMINAL
FACE SIZE
COMMENTS
REMARKS
117
118
119
120
121
122
124
125
125
126
127
128
129
130
131
200
201
202
203
204
205
205A
205B
206
207
208
209
H100
H102
H200
H201
L100
L101
L200
V100
W110
W200
W201
W202
W203
ROOM NAME
UNCORRE
CTED OA
RATE
PRIMARY
AREA OA REQUIRED AIRFLOW
(VOU)
(VPZ)
RATE (RA)
OAK
HALL
Drawing Title
SCHEDULES
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
M014
Printed: 12/3/2014 11:32:01 AM
G
CONSTRUCTION NOTES:
1.
2.
PATCH ALL EXISTING HOLES FROM REMOVING EXISTING PIPE. COORDINATE WITH
ARCHITECTURAL CONTRACT DRAWINGS.
PROVIDE VALVE, PIPING, AND FITTINGS TO PERFORM THE REMOVALS WORK AND
TO KEEP THE EXISTING PLUMBING SYSTEM OPERATIONAL WHERE THE
REMOVALS WORK IMPACTS OTHER PLUMBING FIXTURES.
ROWAN UNIVERSITY
REMOVE CW & HW UP
TO EXISTING LAV AND
WC
REMOVE EXISTING
CW UP TO FIRST
FLOOR TYPICAL
REMOVE EXISTING
HW BACK TO MAIN
2" CW
REMOVE EXISTING HW
& CW UP FOR FIRST
FLOOR LAV TYPICAL
IAL
ORL
M
ME HAL
REMOVE EXISTING HW
& CW UP FOR FIRST
FLOOR LAV TYPICAL
REMOVE EXISTING
CW UP TO FIRST
FLOOR WC'S AND
URI'S TYPICAL
G
1/2" CW
B
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
1/2" HW
PARKING
LOT R
UP
UP
1/2" HW ABOVE,
3/4" HW BELOW
KEY PLAN
REMOVE EXISTING
CW UP TO FIRST
FLOOR BATHROOM
TYPICAL
Room
H101
2
3
DP001 DP001
7
3/4" HW
2" CW
1
12/3/2014 ISSUED FOR BID
No.
7
2
Revision
ENLARGED DOMESTIC WATER PLAN
DP001
UP
Date
3/8" = 1'-0"
G
UP
5
CUT, CAP, AND ABANDON
EXISTING PIPE IN
CRAWL SPACE
REMOVE EXISTING 1-1/2" DOMESTIC
COLD WATER LINE FROM ENTERANCE
TO CRAWL SPACE BACK TO MAIN.
REMOVE EXISTING HANGERS,
SUPPORTS, AND PATCH EXISTING HOLES
1
DP001
(E)4" SAN
BASEMENT FLOOR PLAN
2" AND 3" SAN UP TO
EXISTING LAV AND FD
1/8" = 1'-0"
4" AND 2" SAN UP
TO EXISTING WC
AND LAV
ROWAN
UNIVERSITY
REMOVE
EXISTING SAN UP
TYP.
REMOVE
EXISTING VENT UP
(E)4" SAN
Project Title
BOLE HALL
RENOVATIONS
REMOVE EXISTING
SANITARY MAIN
CO
REMOVE EXISTING
SANITARY UP
REMOVE EXISTING
SAN UP
Drawing Title
BASEMENT
PLUMBING
REMOVALS
REMOVE EXISTING
SANITARY LINES UP TO
FD
(E)4" SAN
(E)CO
7
3
DP001
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
ENLARGED SANITARY PLAN
Job No:
3/8" = 1'-0"
Drawing No.
2014-064
DP001
Printed: 12/3/2014 11:31:24 AM
G
CONSTRUCTION NOTES:
DN
OFFICE
104B
W110
1.
2.
PATCH ALL EXISTING HOLES FROM REMOVING EXISTING PIPE. COORDINATE
WITH ARCHITECTURAL CONTRACT DRAWINGS.
REFER TO DP002 FOR EXTENT OF PIPING REMOVALS.
ROWAN UNIVERSITY
OFFICE
104C
OPEN
OFFICE AREA
104
FILE
ROOM
104A
W108
W109
LOUNGE
102
2
DP002
UP
IAL
ORL
M
ME HAL
3
DP002
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
UP
VESTIBULE
L101
H
H102
J
L
K
7
CH100
LE
BO LL
A
H
UP
S1
OFFICE
110A1
STAIR
OFFICE
109A
DN
FILE
ROOM
100G
B
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
KITCHEN
100H
W115
W116
OFFICE
110B
OFFICE
110C
OFFICE
110D
OFFICE
114
OFFICE
113
PARKING
LOT R
H100
CH101
SUPPLY
CLOSET
100I
OFFICE
109B
108
REFERENCE
AREA
111A
OPEN
OFFICE AREA
110A
W114
OFFICE
115
110H
OPEN
OFFICE AREA
109
5
OFFICE
111B
OFFICE
100F
W111
TELE/COM
COPY ROOM
108A
W107
W112
FILE
ROOM
116A
OFFICE
116
W113
KEY PLAN
OPEN
OFFICE AREA
111
TOILET
100C1
OFFICE
110E
OFFICE
110F
OFFICE
117
W105
OFFICE
100E
OFFICE
100D
COPY
ROOM
112
110
PAYROLL STORAGE
110G
W106
H101
3
W104
STORAGE
122
OPEN
OFFICE AREA
124
OFFICE
119
1
OPEN
OFFICE AREA
100
W103
LOBBY
L100
OFFICE
100C
CONFERENCE
ROOM
125
CONFERENCE
ROOM
100B
W102
12/3/2014 ISSUED FOR BID
No.
W100
W101
OFFICE
121
OFFICE
124A
OFFICE
124B
Revision
OPEN
OFFICE AREA
118
OFFICE
123
REMOVE EXISTING
DOMESTIC WATER FROM
CHASE WALL TO RISER UP
TO 2ND FLOOR BATHROOM
Date
OFFICE
120
OFFICE
123A
OFFICE
119A
1
OFFICE
100A
FOYER
V100
STAIR
S2
UP
CUT, CAP, AND ABANDON
EXISTING PIPE IN CHASE
1
DP002
FIRST FLOOR PLAN
1/8" = 1'-0"
REMOVE EXISTING
DOMESTIC WATER PIPING
TYPICAL FOR ALL FIXTURES
BEING REMOVED.
2" SAN
WOMEN
105
TOILET
103
WOMEN
105
TOILET
103
REMOVE EXISTING
SANITARY AND VENT PIPING
IN CHASE, TYPICAL
ROWAN
UNIVERSITY
REMOVE EXISTING
FLOOR DRAIN
Project Title
3" SAN
J.C.
106
JANITOR
101
J.C.
106
JANITOR
101
MEN
107
REMOVE EXISTING
DOMESTIC WATER PIPING
TYPICAL FOR ALL FIXTURES
BEING REMOVED.
BOLE HALL
RENOVATIONS
REMOVE EXISTING
VENT STACK. PATCH
EXISTING OPENING
MEN
107
REMOVE EXISTING
SANITARY PIPING
IN CHASE, TYPICAL
Drawing Title
REMOVE EXISTING
FLOOR DRAIN
2
DP002
ENLARGED DOMESTIC WATER PLAN
1/4" = 1'-0"
3
DP002
ENLARGED SANITARY PLAN
1ST FLOOR
PLUMBING
REMOVALS
Date:
12/3/2014
Scale
AS NOTED
1/4" = 1'-0"
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
DP002
Printed: 12/3/2014 12:01:55 PM
G
CONSTRUCTION NOTES:
1.
2.
CORE DRILL, SLEEVE, AND FIRESTOP ALL FLOOR PENETRATIONS BY
PLUMBING PIPING.
REFER TO RISER DIAGRAMS ON 1/P003 AND 2/P003 WHERE PIPE SIZES
AREN'T SHOWN FOR CLARITY.
ROWAN UNIVERSITY
REMOVE EXISTING 1-1/2" RIGID
INSULATION ON CEILING OF
EXISTING BASEMENT AREAS.
FURNISH AND INSTALL NEW
INSULATION AND
MECHANICALLY FASTEN TO
UNDERSIDE OF DECK TO
MATCH EXISTING.
(E) 2" CW FROM
SERVICE
1/2" CW & HW
UP TO 1ST
FLOOR LAV
1/2" HW & CW UP TO
1ST FLOOR LAV
G
1" CW UP TO
1ST FLOOR WC
IAL
ORL
M
ME HAL
1/2" CW
(E) 3/4" HW
1/2" HW
(E) 2" CW
B
2" CW
UP
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
1/2" HW
LE
BO LL
A
H
PARKING
LOT R
1/2" HW
2" CW
(E) 2" CW
(E) 1-1/2" CW ABOVE
2
P001
3
P001
UP
1/2" HW & 2" CW
UP TO 1ST FLOOR
BATHROOM CHASE
(E) 1/2" HW ABOVE
3/4" HW BELOW
KEY PLAN
7
UP
1-1/2" CW
4
P003
UP
1/2" CW ABOVE
1/2" HW BELOW
TYP. FOR ALL
PENETRATIONS
REFER TO 1/P001 FOR CONTINUATION
1/2" CW &
HW UP
(E) 3/4" HW
CO
2" SAN UP
1
7
1/2" HW
12/3/2014 ISSUED FOR BID
No.
Date
Revision
5
2
P001
ENLARGED DOMESTIC WATER PLAN
3/8" = 1'-0"
G
1
P001
BASEMENT FLOOR PLAN
1/8" = 1'-0"
4" SAN UP TO
1ST FLOOR WC
2" SAN UP TO
1ST FLOOR
2" SAN UP TO
1ST FLOOR LAV
3" SAN UP TO
1ST FLOOR FD
(E) CO
ROWAN
UNIVERSITY
(E) 1-1/2" SAN
FROM SUMP
Project Title
4" SAN
UP
BOLE HALL
RENOVATIONS
4" SAN UP TO
1ST FLOOR WC'S
3" SAN UP TO 1ST
FLOOR MOP SINK
Drawing Title
BASEMENT
PLUMBING
INSTALLATIONS
(E) 4" SAN
3" SAN UP TO
1ST FLOOR FD
(E)CO
2" SAN
REFER TO 1/P001
FOR CONTINUATION
7
3
P001
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
ENLARGED SANITARY PLAN
Checked By
JZ
3/8" = 1'-0"
Job No:
2014-064
Drawing No.
P001
Printed: 12/3/2014 11:32:02 AM
G
ROWAN UNIVERSITY
3
P002
IAL
ORL
M
ME HAL
2
P002
H
J
L
K
B
7
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
2" SAN DN
1/2" HW &
1-1/2"CW DN
REF.
5
4
P002
KEY PLAN
5
P002
2" SAN
3
1
12/3/2014 ISSUED FOR BID
No.
1-1/2" CW UP TO SERVE
SECOND FLOOR. CONNECT
TO EXISTING AT POINT
BELOW SECOND FLOOR SLAB
Date
Revision
1
1
P002
FIRST FLOOR PLAN
1/8" = 1'-0"
G
G
2" SAN DN,
2" V UP
2" SAN DN,
2" V UP"
4" SAN DN,
2" V UP
LAV
1/2" HW & CW UP TO
LAV FROM BASEMENT
LAV
LAV
LAV
WC
WC
3" V
3" V
1/2" HW & CW TO LAV
FROM BASEMENT
H
LAV
1-1/4" CW UP
FROM BASEMENT
FD
LAV
FD
2" SAN DN,
2" V UP
FURNISH AND
INSTALL WALL
CLEANOUT
WC
3" V UP"
WC
WC
WC
WC
2" PUMP
VENT
1-1/4" CW TO
WC TYP. OF 4
4" SAN,
3" V UP"
URI
4" VTR
LAV
P002
1/4" = 1'-0"
3" VTR
KS
KS
Drawing Title
WC
4" SAN DN
ENLARGED BATHROOM PLAN-SANITARY
FURNISH AND INSTALL DRAIN
PUMP BASIS OF DESIGN
LIBERTY PUMP 405 SERIES OR
APPROVED EQUAL
1/2" HW
1/2" CW
WC
2
BOLE HALL
RENOVATIONS
URI
MS
LAV
2" SAN DN,
2" V UP
Project Title
DEDICATED RECEPTACLE FOR
PUMP REFER TO ELECTRICAL
CONTRACT DRAWINGS
WC
4" SAN DN
TYP. OF 4
MS
ROWAN
UNIVERSITY
H
1/2" HW & CW
DN TO MS
FD
3
P002
1" CW TO URI
1/2" HW & CW
TO LAV
ENLARGED BATHROOM PLAN-DOMESTIC
1/4" = 1'-0"
1/2" HW &
CW DN
2" PUMPED
DISCHARGE
FD
4
P002
ENLARGED KITCHEN PLAN-SANITARY
1/4" = 1'-0"
5
P002
FIRST FLOOR
PLUMBING
INSTALLATIONS
Date:
12/3/2014
ENLARGED KITCHEN PLAN-DOMESTIC
Scale
AS NOTED
1/4" = 1'-0"
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
P002
Printed: 12/3/2014 11:32:04 AM
PLUMBING FIXTURES
WATER HAMMER
ARRESTER
WATER HAMMER
ARRESTER
TAG
PIPING RUN IN
BATHROOM CHASE
1/2" CW
1/2" HW
LAV
URI
WC
KS
MS
2ND FLOOR/ROOF
1/2" HW
1-1/2" CW TO 2ND
FLOOR BATHROOM
1-1/2" CW
2" CW
FIXTURE
LAVATORY
URINAL
WATER CLOSET
KITCHEN SINK
MOP SINK
SOIL/
WASTE VENT
2"
3"
4"
2"
3"
1-1/2"
2"
2"
1-1/2
2"
CW
1/2"
3/4"
1"
1/2"
1/2"
HW
1/2"
1/2"
1/2"
MANUFACTURER
MODEL
AM. STANDARD
AM STANDARD
AM. STANDARD
JUST MANUFACTURERING COMPANY
AM. STANDARD
OVALYN 0495.300
WASHBROOK 6590.001 (1.0 GPF)
AFWALL MILLENIUM-ELONGATED (1.28 GPF)
SL-2225-A-GR (TYPE 316 STAINLESS STEEL)
AKRON SERVICE SINK MODEL 7695.008
FAUCET/VALVE
DESCRIPTION
CHICAGO FAUCET MODEL 116.102.AB
ZURN ZEMS6003-IS
ZURN ZEMS6000AV-HET-IS
CHICAGO FAUCET MODEL 1102-E35ABCP
CHICAGO FAUCETS MODEL 305-VBRRCF
HARD WIRED ELECTRONIC FAUCET.
HARD WIRED FLUSH VALVE
HARD WIRED FLUSH VALVE
1.5 GPM W/ AERATER, ADDITIONAL SPRAY
FURNISH AND INSTALL MOP HANGER FIAT MODEL 889-CC
ROWAN UNIVERSITY
1-1/2" CW
1/2" HW
LAV
1/2"
1
WC
1"
5
LAV
1/2"
1
LAV
1/2"
1
MS
1/2"
3
WC
1"
5
LAV
1/2"
3
URI
3/4"
4
WC
1"
5
WC
1"
5
WC
1"
5
KS
1/2"
1.5
1ST FLOOR
1" CW
1/2" HW
1/2" CW
1/2" HW
(E)2" CW
(E)3/4" HW
(E)3/4" CW
(E)3/4" HW
IAL
ORL
M
ME HAL
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
BASEMENT
1
DOMESTIC WATER RISER DIAGRAM
1/8" = 1'-0"
P003
B
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
3" VTR
PARKING
LOT R
4" VTR
2ND FLOOR/ROOF
PLUMBING FIXTURE
2" V
4" V
4" V
1/8"/FT
2" V
2" PUMPED SAN
KS
1-1/2
3 DFU
LAV-1
1-1/2
1 DFU
SUMP
PIT
2" V
3" V
WC-1
4"
4 DFU
WC-1
4"
4 DFU
LAV-1
1-1/2
1 DFU
MS
2"
2 DFU
UR-1
2"
4 DFU
WC-1
4"
4 DFU
WC-1
4"
4 DFU
WC-1
4"
4 DFU
LAV-1
1-1/2
1 DFU
LAV-1
1-1/2
1 DFU
WCO
3 DFU'S
J.R. SMITH (2698) WATER
SAVER TRAP PRIMER
FD-1
4"
0 DFU
4" SAN
4" SAN
2" V
3" V
1/8"/FT
1/8"/FT
8 DFU'S
21 DFU'S
4" SAN
1/8"/FT
4" SAN
FD-1
4"
0 DFU
LAV SHIELD ADA COMPLIANT
"TOTAL ENCLOSURE"
WHERE REQUIRED
INSTALL FLOOR DRAIN IN
ACCORDANCE WITH
MANUFACTURER GUIDELINES
33 DFU'S
PIPE INSULATION
KEY PLAN
FIRESTOP SEALANT
ALL SIDES
1ST FLOOR
2 DFU'S
31 DFU'S
CMU WALL
TYPE "K" COPPER FOR
TRAP PRIMER PIPING
1/8"/FT
FLOOR DRAIN W/ TRAP
PRIMER CONNECTION
10 DFU'S
CORE DRILL
AND SLEEVE
(E) 4" SAN
CO
FURNISH AND INSTALL
RISER CLAMP BELOW
MINERAL WOOL
WHERE CLEARANCE
IS GREATER THAN 1/4"
REFER TO ARCHITECTURAL
CONTRACT DRAWINGS FOR
FLOOR DETAIL
1
12/3/2014 ISSUED FOR BID
No.
Date
Revision
BASEMENT
2
P003
GARAGE BUILDING SANITARY RISER DIAGRAM
1/8" = 1'-0"
3
P003
FLOOR DRAIN TRAP SEAL PRIMER
NO SCALE
4
P003
PIPE PENETRATION DETAIL
NO SCALE
ROWAN
UNIVERSITY
Project Title
BOLE HALL
RENOVATIONS
Drawing Title
RISER DIAGRAMS,
SCHEDULES, AND
DETAILS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
JD
Checked By
JZ
Job No:
2014-064
Drawing No.
P003
Printed: 12/3/2014 11:32:05 AM
NOTES
1.
2.
3.
4.
CONTRACTOR SHALL TAG ALL EXISTING CIRCUITS BEFORE DISCONNECTING OR REMOVING ANY
ELECTRICAL EQUIPMENT.
CONTRACTOR SHALL REMOVE EXISTING MAIN DISTRIBUTION PANEL. EXISTING CABLE AND CONDUITS
SHALL REMAIN TO BE RECONNECTED.
CONTRACTOR SHALL REMOVE CIRCUITS AS SHOWN ON REMOVALS SINGLE LINE AND POWER PLAN.
CONTRACTOR SHALL COORDINATE WITH ROWAN PROJECT MANAGER FOR SHUTDOWN OF BUILDING
POWER.
ROWAN UNIVERSITY
G
IAL
ORL
M
ME HAL
(E)PANEL A
B
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
STORAGE/
(E)MAIN SWITCH
(E)PANEL ITE
TELE/DATA
003
(E)METER
ELECTRICAL
ROOM
ELECTRICAL
001 (R)PANEL MDP
(E)PANEL AC-B
002
(E)FACP
(E)PANEL LP-B
UP
S3
KEY PLAN
004A
STAIR
STORAGE
004
H001
FROM CAMPUS
DISTRIBUTION
1
MECHANICAL
ROOM
12/3/2014 ISSUED FOR BID
No.
Date
Revision
007
(E)PADMOUNT
TRANSFORMER
(E)65A
(R)AIR HANDLING UNITS DISCONNECTS
AND CONTROLLERS. REMOVE CABLE
AND CONDUIT BACK TO PANEL.
(E)300kVA
4160-208/120V
UP
(E)MAIN SWITCH
(E)600A
CABLE SHALL REMAIN
TO BE REUSED
STORAGE
005
(R)MAIN DISTRIBUTION PANEL
EXISTING WIREWAY
100
12
150A
13
70A
11
CABLE SHALL
REMAIN TO BE
REUSED (TYP.
FOR EXISTING TO
REMAIN LOADS)
100
10
50A
9
20A
8
300A
14
35A
7
50A
6
70A
5
35A
4
7
20A
UP
CH001
STAIR
(E)PANEL
A
(E)
PANEL
AC-B
(E)PANEL
LP-1
MECHANICAL
ROOM
(E)PANEL
LP-2
(E)PANEL
LP-B
UP
006
7 1/2
2
75
CHWP
DUMB
WAITER
COMPRESSOR
(E)HOT WATER
HEATER
S1
(R)AIR COMPRESSOR
DISCONNECTS. REMOVE CABLE
AND CONDUIT BACK TO PANEL.
ROWAN
UNIVERSITY
(R)DUMB WAITER DISCONNECT AND
DUMB WAITER CONTROL.
(R)STAFF
RANGE
(R)AIR HANDLING UNITS
(E)PANEL
LP-3
(R)DISCONNECT
(R)HOT WATER PUMPS
DISCONNECTS AND CONTROLLERS.
REMOVE CABLE AND CONDUIT BACK
TO PANEL.
(E)HOT WATER
HEAT DISCONNECT
Project Title
5
3/4
3/4
3/4
1/2
1/3
5
5
5
5
HWP
HWP
HWP
TEMP.
CONT.
COMP.
COND.
PUMP
AHU 1
AHU 2
AHU 1
AHU 2
2
DE001
SINGLE LINE - REMOVALS
NO SCALE
BOLE HALL
RENOVATIONS
Drawing Title
1
DE001
BASEMENT POWER REMOVALS
BASEMENT - POWER - REMOVALS
1/4" = 1'-0"
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
Checked By
Job No:
MB
JWC
2014-064
Drawing No.
DE001
Printed: 12/3/2014 11:31:17 AM
REMOVAL KEYNOTES
1
CONTRACTOR SHALL REMOVE EXISTING LIGHTING FIXTURES AND POWER
DEVICES IN THIS SHADED AREA. ROWAN SHALL DISCONNECT AND PULL/COIL
EXISTING COMMUNICATION/DATA WIRES AND DATA DROPS FOR REUSE.
CONTRACTOR SHALL REMOVE EXISTING LIGHTING FIXTURES. EXISTING POWER
DEVICES LOCATED ON THE CEILING IN THIS SHADED AREA SHALL BE REMOVED
AND PROTECTED FOR REINSTALLATION. ALL EXISTING ELECTRICAL CIRCUITS
SHALL BE REUSED.
CONTRACTOR SHALL REMOVE EXISTING LIGHTING FIXTURES. EXISTING
ELECTRICAL CIRCUITS SHALL REMOVED BACK TO SOURCE. REMOVED CIRCUITS
SHALL BE MARKED AS SPARE OR REUSED FOR INSTALLATION WORK.
CONTRACTOR SHALL PROTECT EXISTING PANEL AND EXISTING CIRCUITS.
REMOVED CIRCUITS SHALL BE MARKED AS SPARE OR REUSED FOR
INSTALLATION WORK.
2
G
3
4
ROWAN UNIVERSITY
DN
OFFICE
104B
W110
IAL
ORL
M
ME HAL
OFFICE
104C
OPEN
OFFICE AREA
104
FILE
ROOM
104A
W108
W109
B
2
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
WOMEN
105
TOILET
103
LOUNGE
102
3
UP
1
UP
KEY PLAN
J.C.
106
JANITOR
101
MEN
107
VESTIBULE
L101
3
H
H102
2
J
L
K
M
7
CH100
UP
S1
OFFICE
109A
DN
FILE
ROOM
100G
KITCHEN
100H
W116
OFFICE
110B
OFFICE
110A1
STAIR
W115
OFFICE
110C
OFFICE
110D
1
OFFICE
114
OFFICE
113
12/3/2014 ISSUED FOR BID
No.
Date
Revision
(R)TELEPHONE CABINET
H100
CH101
SUPPLY
CLOSET
100I
4
OFFICE
109B
108
REFERENCE
AREA
111A
OPEN
OFFICE AREA
110A
W114
OFFICE
115
110H
OPEN
OFFICE AREA
109
(E)LP-1
5
OFFICE
111B
2
OFFICE
100F
W111
TELE/COM
COPY ROOM
108A
W107
W112
FILE
ROOM
116A
OFFICE
116
W113
OPEN
OFFICE AREA
111
1
COPY
ROOM
112
110
PAYROLL STORAGE
110G
OFFICE
110F
OFFICE
110E
OFFICE
117
W105
OFFICE
100E
W106
H101
ROWAN
UNIVERSITY
3
W104
STORAGE
122
OPEN
OFFICE AREA
124
OFFICE
119
OPEN
OFFICE AREA
100
W103
LOBBY
L100
Project Title
CONFERENCE
ROOM
125
OPEN
OFFICE AREA
118
OFFICE
123
OFFICE
121
W102
OFFICE
124A
W100
OFFICE
124B
OFFICE
123A
OFFICE
120
BOLE HALL
RENOVATIONS
OFFICE
119A
W101
Drawing Title
1
1
DE002
FIRST FLOOR - POWER - REMOVALS
3/16" = 1'-0"
FIRST FLOOR POWER &
LIGHTING REMOVALS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
Checked By
Job No:
MB
JWC
2014-064
Drawing No.
DE002
Printed: 12/3/2014 11:31:19 AM
G
REMOVAL KEYNOTES
1
ROWAN UNIVERSITY
IAL
ORL
M
ME HAL
(R)HONEYWELL BOX
210
1
CONTRACTOR SHALL REMOVE LIGHTING FIXTURES. EXISTING POWER DEVICES
LOCATED ON THE CEILING IN THIS SHADED AREA SHALL BE REMOVED AND
PROTECTED FOR REINSTALLATION. ALL EXISTING ELECTRICAL CIRCUITS SHALL
BE REUSED.
(R)DISCONNECTS AND JUNCTION
BOX BACK TO SOURCE
7
B
OAK
HALL
LAUREL
HALL
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
UP
205B1
HOLLYBUSH
LE
BO LL
A
H
S1
PARKING
LOT R
DN
205A
205B
KEY PLAN
205
209
5
203
1
208
H200
12/3/2014 ISSUED FOR BID
No.
Date
Revision
207
H201
W202
202
204
3
W201
206
200
ROWAN
UNIVERSITY
200C
W200
200B
Project Title
200A
(E)PANEL LP-3
1
BOLE HALL
RENOVATIONS
DN
201
Drawing Title
L200
S2
SECOND FLOOR POWER &
LIGHTING REMOVALS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
1
DE003
SECOND FLOOR - POWER - REMOVALS
Checked By
MB
JWC
1/4" = 1'-0"
Job No:
2014-064
Drawing No.
DE003
Printed: 12/3/2014 11:31:20 AM
NOTES
1.
2.
3.
CONTRACTOR SHALL FURNISH AND INSTALL 208/120V, 600A, 3PH, 4W, DISTRIBUTION BOARD. REFER
TO SINGLE LINE DIAGRAM.
CONTRACTOR SHALL RECONNECT ALL EXISTING CIRCUITS.
FURNISH AND INSTALL CABLE AND CONDUIT AND MAKE ALL FINAL CONNECTIONS FROM DISCONNECT
SWITCH TO SERVED EQUIPMENT.
ROWAN UNIVERSITY
PANEL LP-B-2
VOLTS: 208V/120V
PHASES: 3
WIRES: 4
ROOM:
FED FROM: MDP
MOUNTING Surface
NEMA RATING: Type 1
CKT
Circuit Description
Conduit
A (kVA)
Size
Trip Poles Wire Size
1.7
1,3,5
25 A
HWP-1/2/3
3
B (kVA)
20 A
20 A
20 A
1
1
1
2#12 & 1#12G
2#12 & 1#12G
2#12 & 1#12G
3/4"
3/4"
3/4"
15 A
3
3#12 & 1 #12G
3/4"
1.7
0.5
0.2
20 A
3
0.9
0.0
0.0
25,27,29
20 A
SPARE
3
2.1
0.9
0.0
20 A
20 A
-----
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
1
1
-----
20 A CRU-1
3/4"
3/4"
3/4"
2#12 & 1#12G
2#12 & 1#12G
2#12 & 1#12G
1
1
1
20 A ATC PANEL
20 A BASEMENT EF-2
20 A ROOF EF-3
3/4"
2#12 & 1#12G
2
20 A HEAT TRACE
3/4"
2#12 & 1#12G
1
20 A AHU-2 LIGHTING
--
--
3
20 A SPARE
0.0
0.0
0.0
0.0
--
5.9 kVA
51 A
0.0
0.0
0.0 0.0
4.2 kVA
35 A
6.6 kVA
57 A
LAUREL
HALL
8
10
12
14,16
18
20,22,24
B
20 A
20 A
-----
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
(E)PANEL A
32
34
36
38
40
42
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
20 A SPARE
1
-1
---------TOTAL KVA: 16....
TOTAL 3PH AMPS: 46 A
0.0
0.0
3
--
-------
0.0
0.0
0.0
OAK
HALL
0.0
0.0
0.0
IAL
ORL
M
ME HAL
G
26,28,30
0.0
-------
-------
3
0.0
0.0
31
33
35
37
39
41
3#12&1#12G
0.0
--
--
3/4"
0.0
--
--
0.7
2.1
0.0
SPARE
1.2
0.7
0.9
CKT
0.2
0.5
0.5
19,21,23
Circuit Description
2,4,6
1.7
7
CONTROL PANEL
9
METER CKT
11
ROOF EF-1
13,15,17
CHWP-1
Conduit
Wire Size Poles Trip
Size
C (kVA)
0.2
3/4"
3#10 & 1#10G
AIC: 10KAIC
MAINS TYPE:
RATING: 125 A
MCB: 125 A
PARKING
LOT R
STORAGE/
(E)MAIN
SWITCH
(E)PANEL ITE
TELE/DATA
003
(E)METER
ELECTRICAL
ROOM
ELECTRICAL
001 PANEL MDP
(E)PANEL AC-B
002
Notes:
1. CKTS 1,3,5; WIRE SIZE AND QUANTITY TO FINAL EQUIPMENT CONNECTION SHALL BE 3#12 & 1#12G.
(E)FACP
(E)PANEL LP-B
UP
KEY PLAN
S3
004A
STAIR
FROM CAMPUS
DISTRIBUTION
STORAGE
004
H001
(E)PADMOUNT
TRANSFORMER
(E)65A
1
12/3/2014 ISSUED FOR BID
No.
(E)300kVA
4160-208/120V
Date
Revision
MECHANICAL
ROOM
ELECTRICAL
007COORDINATE
CONNECTION WITH FINAL ATC
FURNISH AND INSTALL
CABLE. MATCH
EXISTING CABLE SIZE
AND PROVIDE ILSCO
SPLICE.
PANEL LOCATION
(E)MAIN SWITCH
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
CONTROL PANEL LOCATION
(E)600A
MAIN DISTRIBUTION PANEL, 208/120V, 600A 3PH, 4W, 22KAIC FULLY RATED, SERVICE RATED
EXISTING WIREWAY
J
J
UP
1
3
150A
3P
4
70A
3P
5
100A
3P
100A
3P
6
100A
3P
7
8
45A
3P
9
100A
3P
35A
3P
10
20A
3P
11
12
20A
3P
20A
3P
LP-B-2;8
LP-B-2;7
STORAGE
LP-B-2;13,15,17
005
CHWP
1
(E)PANEL
LP-1
(E)PANEL
LP-2
3#8 & 1#10G, 3/4"C
(E)
PANEL
AC-B
3#4 & 1#8G, 1-1/4"C
J
(E)PANEL
A
4#2 & 1#8G, 1-1/4"C
FURNISH AND
INSTALL CABLE
LENGTH AS NEEDED
(TYP. 6). MATCH
EXISTING CABLE
SIZE AND PROVIDE
ILSCO SPLICE.
2
4#2 & 1#8G, 1-1/4"C
FURNISH AND
INSTALL
WIREWAY
100A
3P
7
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
EQUIPMENT LOCATION
STAIR
(E)HOT WATER
HEATER
MDP ;6
PANEL
LP-B-2
60A
30A
60A
15A
100A
35A
COORDINATE ELECTRICAL
CONNECTION WITH EF-2
FINAL LOCATION
90A
006
J
J
PANEL LP-B-2
S1
UP
ROWAN
UNIVERSITY
LP-B-2;9
LP-B-2;10
DS-AHU-1-SF
DS-AHU-1-RF
3#12 & 1#12G,
3/4"C
3#10 & 1#10G,
3/4"C
40A
DS-AHU-2-SF
DS-AHU-2-RF
MECHANICAL
ROOM
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
METER LOCATION
CRU
3#2 & 1#8G,
1-1/4"C
PANEL
LP-1-1
(E)PANEL
LP-3
3#8 & 1#10G,
3/4"C
(E)PANEL
LP-B
UP
CH001
7.5
0.75
5
15
AHU-2
SUPPLY
FAN
AHU-2
RETURN
FAN
AHU-1
RETURN
FAN
AHU-1
SUPPLY
FAN
HWP
HWP
HWP
3
2
1
1
Project Title
(E)HOT WATER
HEAT DISCONNECT
LP-B-2;2,4,6
BOLE HALL
RENOVATIONS
LP-B-2;1,3,5
INSTALL VFD. CONTRACTOR
SHALL MAKE FINAL
CONNECTION TO VFD AND
FROM VFD TO MOTORS.
(TYPICAL FOR ALL FANS)
J
J
J
J
PROVIDE WIREWAY. COORDINATE
ELECTRICAL CONNECTION WITH FINAL
EQUIPMENT LOCATION (TYP. 3)
5
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
EQUIPMENT LOCATION
Drawing Title
2
E001
SINGLE LINE - INSTALLATIONS
12" = 1'-0"
1
E001
BASEMENT - POWER - INSTALLATIONS
1/4" = 1'-0"
BASEMENT POWER INSTALLATIONS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
Checked By
Job No:
MB
JWC
2014-064
Drawing No.
E001
Printed: 12/3/2014 11:31:26 AM
INSTALLATION KEYNOTES
1
2
PANEL LP-1-1
ROOM:
FED FROM:
MOUNTING
NEMA RATING:
CONTRACTOR SHALL PROVIDE COMMUNICATIONS/DATA CONDUIT FROM DATA
DROP AND STUB 6" ABOVE CEILING. ROWAN SHALL REINSTALL WIRE AS
NEEDED (TYP. ALL DATA DROP LOCATIONS).
CONTRACTOR SHALL COORDINATE SIMPLEX RECEPTACLE UNDERCOUNTER
WITH FINAL EQUIPMENT LOCATION.
CONTRACTOR SHALL PROVIDE RECEPTACLE AND TELEDATA DROP
UNDERCOUNTER.
CONTRACTOR SHALL PROTECT EXISTING PANEL AND EXISTING CIRCUITS.
CONTRACTOR SHALL PROVIDE CEILING MOUNTED DUPLEX RECEPTACLE FOR
POWER AND DATA FOR FUTURE PROJECTOR.
CONTRACTOR SHALL MAKE ELECTRICAL CONNECTION TO FURNITURE.
COORDINATE WITH FINAL FURNITURE LOCATION. (TYP. ALL CUBICLE TYPE
FURNITURE)
CONTRACTOR SHALL MAKE ELECTRICAL CONNECTION TO DESK FURNITURE.
COORDINATE LOCATION WITH FINAL FURNITURE LOCATION AND ELECTRICAL
KNOCKOUT. (TYP. ALL PRIVATE OFFICE DESKS)
CONTRACTOR SHALL RUN CONDUIT DOWN COLUMNS TO FLOOR BOXES.
Mail/Copy 102
MDP
Surface
Type 1
VOLTS: 208V/120V
PHASES: 3
WIRES: 4
3
AIC: 10KAIC
MAINS TYPE:
RATING: 125 A
MCB: 125 A
4
5
6
7
CKT
Circuit Description
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
LIGHTING
LIGHTING
EXIT SIGNS
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
CORR107/OFFICE131 RECEPT
RM101/105 RECEPT
RM108/109 RECEPT
RM 101,110&112 RECEPT
RM113/114 RECEPT
RM118/119 RECEPT
RM117/CORR123 RECEPT
RM127/128 RECEPT
RM129/130 RECEPT
BATHROOM LIGHTING
110 UNDERCOUNTER PUMP
MEN/WOMENS SINKS
TOILET
43,45
CONTRACTOR SHALL
MAKE FINAL ELECTRICAL
CONNECTIONS TO ALL
HAND DRYERS.
S
H
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Conduit
A (kVA)
Size
0.8
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#12G
2#10 & 1#10G
2#10 & 1#10G
2#8 & 1#8G
2#8 & 1#8G
2#10 & 1#10G
2#12 & 1#12G
2#10 & 1#10G
2#12 & 1#12G
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#10G
2#10 & 1#10G
2#12 & 1#12G
2#12 & 1#12G
2#12 & 1#12G
2#12 & 1#12G
HAND DRYERS
20 A
2
2#12 & 1#12G
3/4"
SPARE
SPARE
SPARE
SPARE
20 A
20 A
20 A
20 A
1
1
1
1
-----
-----
S
C (kVA)
1.0
1.1
0.1
0.5
0.7
1.0
0.9
1.7
1.1
0.4
0.5
0.7
0.3
0.4
0.5
0.7
1.4
0.2
0.7
0.5
0.7
0.2
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
1.0
1.0
0.7
0.5
0.7
0.3
2.5
1.5
1.6
0.5
0.7
1.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
14.2 kVA
123 A
LP-1-1;41
LP-1-1;40
B (kVA)
1.0
CONTRACTOR SHALL MAKE
FINAL ELECTRICAL
CONNECTIONS FOR ALL
PLUMBING DEVICES.
T
S
47
49
51
53
Trip Poles Wire Size
0.0
12.8 kVA
111 A
9.1 kVA
76 A
Conduit
Wire Size Poles Trip
Size
1
2#10 & 1#10G
1
2#8 & 1#8G
1
2#10 & 1#10G
1
2#10 & 1#10G
1
2#10 & 1#10G
1
2#10 & 1#10G
1
2#8 & 1#8G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#10 & 1#10G
1
2#10 & 1#10G
1
2#12 & 1#12G
1
2#10 & 1#10G
1
2#8 & 1#8G
1
2#12 &1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
2#12 & 1#12G
1
-1
-1
-1
-1
-TOTAL KVA: 36....
TOTAL 3PH AMPS: 100 A
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
------
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
Circuit Description
LIGHTING
LTG - OPEN OFFICE
NIGHT LIGHTING
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
OPEN OFFICE CUBES
RM100/101 RECEPT
RM100 RECEPT
RM103/104 RECEPT
RM110 FRIDGE
RM111 COPIER
CORR115/OFFICE122
RM120/121 RECEPT
RM125/126 RECEPT
OPEN OFFICE COLUMN...
NIGHT LIGHTING
110 COUNTERTOP
MEN/WOMENS TOILETS
BATHROOM FAUCET
FUTURE CONF. RM. POWER
RESTROOM RECEPTACLES
SPARE
SPARE
SPARE
SPARE
SPARE
CKT
8
ROWAN UNIVERSITY
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
IAL
ORL
M
ME HAL
B
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
44
46
48
50
52
54
Notes:
KEY PLAN
T
H
T
T
S
LP-1-1;39
LP-1-1;44
T
T
LP-1-1;38
LP-1-1;43,45
G
L
H
J
M
K
1
7
Date
Revision
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE RFB4-CI-1-NA WITH
CAT5/6 OUTLETS (TYP. 2)
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE EFBFF (TYP. 2)
LP-1-1;19
12/3/2014 ISSUED FOR BID
No.
LP-1-1;17
F
F
MDP ;5
LP-1-1;18
LP-1-1;20
LP-1-1;12
PANEL LP-1-1
LP-1-1;11
7
J
J
J
J
LP-1-1;21
LP-1-1;13
F
F
4
(E)LP-1
F
8
LP-1-1;32
LP-1-1;22
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE EFBFF (TYP. 2)
LP-1-1;25
LP-1-1;24
F
LP-1-1;36
+
F
1
5
+
F
6
LP-1-1;16
P
LP-1-1;23
LP-1-1;10
LP-1-1;42
LP-1-1;23
3
LP-1-1;37
5
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE RFB4-CI-1-NA WITH
CAT5/6 OUTLETS (TYP. 2)
J
J
J
J
LP-1-1;9
2
LP-1-1;14
F
ROWAN
UNIVERSITY
LP-1-1;26
LP-1-1;27
LP-1-1;28
SAWCUT CONCRETE
LP-1-1;32
F
3
8
Project Title
LP-1-1;15
BOLE HALL
RENOVATIONS
F
LP-1-1;29
LP-1-1;8
LP-1-1;31
LP-1-1;7
LP-1-1;33
LP-1-1;30
J
J
J
J
F
Drawing Title
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE EFBFF (TYP. 2)
LP-1-1;32
FURNISH AND INSTALL
WIREMOLD FLOOR BOX
TYPE RFB4-CI-1-NA WITH
CAT5/6 OUTLETS (TYP. 2)
FIRST FLOOR POWER INSTALLATIONS
1
MARKERBOARD TYP.
OVER RETURN
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
1
E002
FIRST FLOOR - POWER - INSTALLATIONS
3/16" = 1'-0"
Checked By
Job No:
MB
JWC
2014-064
Drawing No.
E002
Printed: 12/3/2014 11:31:30 AM
G
EF
1
DS-UH-1
J
UH
M
INSTALLATION KEYNOTES
ELECTRICAL EQUIPMENT SCHEDULE - NON-FUSED DISCONNECTS
NEMA
FRAME
NAME
VOLTAGE RATING PHASES WIRES RATING
DS-AHU-1-120V
DS-AHU-1-RF
DS-AHU-1-SF
DS-AHU-2-120V
DS-AHU-2-RF
DS-AHU-2-SF
DS-UH-1
2
3
1
LP-B-2;11
120 V
208 V
208 V
120 V
208 V
208 V
120 V
30
60
100
30
30
60
30
1
3
3
1
3
3
1
2
3
3
2
4
4
2
1
4X
4X
4X
1
1
1
1
EXISTING POWER DEVICES LOCATED ON THE CEILING IN THIS SHADED AREA
SHALL BE REINSTALLED. ALL EXISTING ELECTRICAL CIRCUITS SHALL BE
REUSED.
EXHAUST FAN LOCATED ON ROOF ABOVE. CONTRACTOR SHALL PROVIDE 20A,
SINGLE POLE, NEMA 4X, MOTOR RATED DISCONNECT SWITCH AND MOUNT
DIRECTLY TO FAN.
REFER TO ROOF PENETRATION DETAIL.
PROVIDE CABLE AND CONDUIT TO HEAT TRACE CONTROLLER. UNISTRUT
MOUNT CONTROLLER TO AHU, COORDINATE LOCATION WITH MANUFACTURER
CLEARANCES. COORDINATE ELECTRICAL CONNECTION WITH MANUFACTURER
AND FINAL EQUIPMENT LOCATION. BASIS OF DESIGN: CHROMALOX MODEL SRL
CABLE WITH INTELLITRACE MODEL HTLS23041 CONTROL PANEL, 208V 1PH, 2
INDEPENDENT LOOP OF HEAT TRACE CONTROL, NEMA 4 ENCLOSURE WITH
ENCLOSURE HEATER AND ALARM, OR APPROVED EQUAL.
2
3
4
MDP
AHU
2
6 DS-AHU-2-120V
1
5
AHU-2 RETURN FAN.
COORDINATE ELECTRICAL
CONNECTION WITH FINAL
EQUIPMENT LOCATION.
LP-B-2;18,8,10,12
3
MDP ;7
EF
M
LP-B-2;12
3
SELF-REGULATING HEAT TRACE CABLE, 208V 1PH, 5W PER LF. BASIS OF
DESIGN: SRL5-2C, 20LF PER LOOP (2 LOOPS). REFER TO MECHANICAL
DRAWINGS FOR PIPE SIZES AND LOCATION.
CONTRACTOR SHALL PROVIDE 120V POWER TO EACH SWITCH WITHIN THE
UNIT. COORDINATE WITH MANUFACTURER FOR SWITCH LOCATIONS AND
QUANTITY.
6
H
J
ROWAN UNIVERSITY
K
2
7
J
IAL
ORL
M
ME HAL
DS-AHU-2-RF
ELECTRIC HEAT TRACING NOTES
DS-AHU-2-SF
1.
2.
3.
4.
S
5.
6.
PROVIDE ELECTRIC HEAT TRACING AND ACCESSORIES. HEATING CABLES SHALL BE SELFREGULATING AND SHALL VARY THE OUTPUT IN RESPONSE TO TEMPERATURE VARIATIONS
ALONG THE LENGTH OF A TRACED PIPE.
THE CONTRACTOR SHALL TEST THE TRACING BEFORE PIPING IS INSULATED, DURING THE
INSTALLATION AND AFTER THE WORK IS COMPLETE.
FOLLOW HEAT TRACE MANUFACTURERS RECOMMENDATION ON SIZING AND
INSTALLATION REQUIREMENTS.
HEAT TRACING CIRCUITS SHALL BE EQUIPPED WITH GROUND FAULT EQUIPMENT
PROTECTION IN ACCORDANCE WITH NEC AND ANY APPLICABLE NATIONAL OR LOCAL
CODE REQUIREMENTS. MANUFACTURER SHALL BE CHROMALOX OR APPROVED EQUAL.
NOTIFY OWNER/ENGINEER UPON INSTALLATION OF HEAT TRACE FOR INSPECTION PRIOR
TO THE INSTALLATION OF INSULATION.
TEMPERATURE SENSOR AND HEATING CABLE SHALL BE SEPARATED BY 90 DEGREES ON
PIPE WALL.
B
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
S
SPEAKER
S
S
5
KEY PLAN
S
S
1
AHU
S
J
S
Date
Revision
J
1
S
12/3/2014 ISSUED FOR BID
No.
S
3
MDP ;8
5
LP-3;16
3
4
S
DS-AHU-1-120V
DS-AHU-1-SF
DS-AHU-1-RF
SPEAKER
6
LP-B-2;14,16
S
S
S
ROWAN
UNIVERSITY
S
(E)PANEL LP-3
1
EXISTING PANEL LP-3
VOLTS: 208V/120V
PHASES: 3
WIRES: 4
ROOM:
FED FROM:
MOUNTING Recessed
NEMA RATING: Type 1
1
E003
SECOND FLOOR - POWER - INSTALLATIONS
1/4" = 1'-0"
CKT
Circuit Description
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
SPARE
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
Trip Poles Wire Size
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
----------------
Conduit
A (kVA)
Size
----------------
0.0
1. USE EXISTING SPARE BREAKERS FOR CIRCUITS 16 AND 24.
C (kVA)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Conduit
Wire Size Poles Trip
Size
-------3/4"
---3/4"
-------2#12 & 1#12G
---2#12 & 1#12G
1
1
1
1
1
1
1
1
1
1
1
1
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
20 A
PREFABRICATED ROOF CURB SUPPLIED
AND INSTALLED BY CONTRACTOR. THE
PATE COMPANY PART PC-1. SIZE TO
ACCOMMODATE SPACE AVAILABLE ON
ROOF AND ADJUST TO FIT. EXISTING
BOILER STACK IS DIRECTLY ADJACENT TO
STACK, SEAL WATER TIGHT WHERE POSSIBLE
Circuit Description
CKT
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
RTU-1 RECEPT & LIGHTS
EXISTING LOAD
EXISTING LOAD
EXISTING LOAD
AHU-1 LTG
2
4
6
8
10
12
14
16
18
20
22
24
26,28,30
0.0
0.0
0.0 kVA
0A
--
0.0 0.0
0.1 kVA
1A
--
3
TOTAL KVA: 0.1...
TOTAL 3PH AMPS: 0 A
30 A
EXISTING LOAD
Project Title
CONDUIT
BOOT BY CONTRACTOR.
THE PATE COMPANY PART
B.
PREFABRICATED ROOF CURB
COVER SUPPLIED AND INSTALLED
BY CONTRACTOR. THE PATE
COMPANY PART PCC-C. SIZE
TO ACCOMMODATE VENT PIPES
AND CORRESPONDING ROOF
CURB.
EPDM FLASHING
0.0
0.0 kVA
0A
NOTES:
B (kVA)
kAIC:
MAINS TYPE:
RATING: 100 A
MCB:
LAP SEALANT
EPDM ROOF MEMBRANE
8" ONTO EXISTING ROOF
MEMBRANE
PRESSURE TREATED WOOD
LAP SEALANT
EXISTING EPDM
ROOFING MEMBRANE
INSTALL NEW INSULATION,
MATCH EXISTING
1/4" GALV. STEEL PLATE
2
E003
Drawing Title
SECOND FLOOR POWER INSTALLATIONS
Date:
12/3/2014
PRESSURE TREATED WOOD
BLOCKING.
Scale
AS NOTED
EXISTING STEEL CHANNELS
Drawn By:
ROOF PENETRATION DETAIL
NO SCALE
BOLE HALL
RENOVATIONS
Checked By
Job No:
MB
JWC
2014-064
Drawing No.
E003
Printed: 12/3/2014 11:31:32 AM
INSTALLATION KEYNOTES
1
CONTRACTOR SHALL MATCH EXISTING LIGHTING FIXTURES AND PROVIDE
NEW. PROVIDE 4000K COLOR TEMPERATURE FLUORESCENT 32W T8
LAMPS. EXISTING CIRCUITS SHALL BE REUSED. REINSTALL ANY EXISTING
POWER OR DATA DEVICES LOCATED IN CEILING REMOVED AND
PROTECTED DURING REMOVAL PHASE.
CONTRACTOR SHALL MATCH EXISTING 'L200 LOBBY' FIXTURES. PROVIDE
NEW AND REUSE EXISTING CIRCUITS. REINSTALL ANY EXISTING POWER
OR DATA DEVICES LOCATED IN CEILING REMOVED AND PROTECTED
DURING REMOVAL PHASE.
2
ROWAN UNIVERSITY
IAL
ORL
M
ME HAL
G
G
E
E
LP-3;24
7
B
OAK
HALL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
S
S
SPEAKER
S
S
5
I
I
V
1
S
I
V
S
A
LP-1-1;35
A
KEY PLAN
A
LP-1-1;35
A
J
a
D
C
NL
LP-1-1;4
LP-1-1;2
D
LP-1-1;2
e
V
C
NL
LP-1-1;2
e
D
LP-1-1;2
PP
PP
PP
PP
g
g
g
g
7
F
LP-1-1;5
DT G
W
LP-1-1;5
NL
B
V
A
C
A
A
A
A
A
V
A
A
A
A
A
g
a
g
A
A
A
C
C
a
LP-1-1;1
A
F
PP
B
LP-1-1;5
b
DT b
LP-1-1;5
F NL
B
LP-1-1;2
V
LP-1-1;1 LP-1-1;5
F
dd
PP
PP
A
A
LP-1-1;2
V
A
LP-1-1;2
NL
A
DT
C
W
A
LP-1-1;2
A
W
g
C
A
LOBBY
C
A
d
G
LP-1-1;5
A
A
g
LP-1-1;5
A
LP-1-1;3
c
A
LP-1-1;3
V
c
F
DT
LP-1-1;3
V
A
A
A
LP-1-1;3
V A
A
LP-1-1;3
V
A
LP-1-1;3
B
V
PP
LP-1-1;1
F
NL
LP-1-1;5
V
LP-1-1;3
A
LP-1-1;3
V
f
V
A
V
g
B
LP-1-1;3
C
C
DT
DT
CW
W
C
NL
C
C
C
C
C
C
C
g
C
C
g
C
C
C
C
C
C
NL
g
NL
C
D
C
DT
E004
W
FIRST FLOOR
DECORA TYPE ODS10-IDW
OR APPROVED EQUAL
SET TO MANUAL ON MODE
1/8" = 1'-0"
E004
A
B
C
D
E
F
G
H
I
2' X 4' LED
2' X 4' LED
LINEAR DIRECT/INDIRECT
LINEAR DIRECT/INDIRECT
STEEL HOUSING HARSH ENVIRONMENT FLUORESCENT
FRONT FACE LED EXIT SIGN
FRONT/BACK LED EXIT SIGN
OUTDOOR EMERGENCY LIGHT
2' OVER MIRROR LED
MANUFACTURER
CORELITE
CORELITE
PRUDENTIAL LIGHTING
PRUDENTIAL LIGHTING
LITHONIA
DUALLITE
DUALLITE
DUALLITE
COOPER
LIGHTING FIXTURE SCHEDULE
LAMP
TYPE
MODEL
R3WL1L401UNV24
R3WL1L401BUNV24
WAVE2 04 WA YGW D3 SC UNV 144
WAVE2 04 WA YGW D3 SC UNV 144 EMH
DMS 2 32 120 WLF
LX U R W I
LX U R W I
PG Z-HTR
S22DW-1L40-SR-2-U-SI-S92HT-W
ROWAN
UNIVERSITY
Hot
3
DESCRIPTION
L
o
a
d
Neutral
C
1
1
1/8" = 1'-0"
3
C
C
C
E004
SECOND FLOOR
g
LP-1-1;3
C
2
g
C
A
V
D
g
g
G
NL
V
D
g
f LP-1-1;5
DT
D
A
LP-1-1;3
C
g
g
g
g
B
DT
A
C
C
NL
g
F PPc
NL
C
C
LP-1-1;1
LP-1-1;5
L200
g
NL
V
DT
NL
1
g
C
C
C
5
C
LED
LED
LED
LED
32W T8
LED
LED
LED
LED
LAMP
QUANTITY
VOLTAGE
VA
1
1
1
1
2
1
1
1
1
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
46 VA
46 VA
34 VA
34 VA
64 VA
4 VA
4 VA
15 VA
8 VA
S
g
LP-1-1;2
LP-1-1;5
F
B
g
A
A
V
d
DT
NL
B
V
d
B
NL
A
(E)PANEL LP-3
NL
DT
g
LP-1-1;5
Revision
S
g
A
DT
Date
g
g
D
DT
a
12/3/2014 ISSUED FOR BID
No.
C
g
g
LP-1-1;1
a
a
1
S
g
d
A
SPEAKER
S
NL
V
V
DT
A
(E)PANEL LP-1
S
g
LP-1-1;2
V
PP PP
D
3
C
a
LP-1-1;1
DT
e
e
LP-1-1;5
a
S
M
LP-1-1;5
H
LP-1-1;4
PP
a
L
K
LP-1-1;5
F
DT
LP-1-1;5
F
PANEL LP-1-1
2
S
A
H
TYPE
S
S
V
LP-1-1;35
1
1
V LP-1-1;35I
I
MOUNTING
RECESSED
RECESSED
SUSPENDED
SUSPENDED
SURFACE
WALL
CEILING
WALL
WALL
WALL OCCUPANCY SENSOR SWITCH
CEILING MOUNT DT SENSOR: LEVITON OSC10-RMW
OR APPROVED EQUAL QUANTITY AS SHOWN PER
PLAN DRAWINGS
WALL MOUNT DT SENSOR: LEVITON OSW12-RMW
OR APPROVED EQUAL QUANTITY AS SHOWN PER
PLAN DRAWINGS
NO SCALE
Project Title
BOLE HALL
RENOVATIONS
COMMENTS
LOAD
BATTERY OPTION
Drawing Title
BATTERY OPTION
BLUE
Neutral
WHITE
Hot
BLACK
BLUE
YELLOW/ORANGE
LEVITON OPP20-RD4
OR APPROVED EQUAL
SET TO AUTO ON
(QUANTITY AS SHOWN PER
PLAN DRAWINGS)
WHITE/BLUE
LIGHTING PLAN REMOVALS AND
INSTALLATIONS
BLUE
RED
BLACK
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
4
E004
POWER PACK - AUTOMATIC ON WITH NO SWITCH
Checked By
NO SCALE
Job No:
MB
JWC
2014-064
Drawing No.
E004
Printed: 12/3/2014 11:31:35 AM
G
GENERAL STRUCTURAL NOTES
GENERAL CONSTRUCTION WORK
THE FOLLOWING GENERAL STRUCTURAL NOTES ARE APPLICABLE TO THE
STRUCTURAL DRAWINGS ONLY. THESE NOTES ARE PROVIDED FOR
CONVENIENCE AND ARE SUPPLEMENTAL TO THE SPECIFICATIONS. IN THE EVENT
OF DISCREPANCIES BETWEEN GENERAL NOTES AND SPECIFICATIONS, THE
MORE STRINGENT SHALL GOVERN.
H
J
L
K
22' - 2 29/32"
M
23' - 2"
22' - 9 3/32"
EXISTING 7'-6"x7'6"x4"
DROP PANELS, TYP.
15' - 0"
2.
4' - 0"
EXISTING 3'-0" DIA.
COLUMN CAPITAL,
TYP.
20' - 7"
22' - 6"
3.
49' - 2"
OPENING
209
5
208
14
DUCT SUPPORT,
M013
4
3' - 0"
13' - 4"
3' - 0"
3' - 0"
6' - 1"
5' - 7 1/2"
24' - 6"
3' - 0"
66' - 3"
TYP OF 2
S002
207
EXISTING 16" DIA.
COLUMN, TYP.
22' - 6"
207
OPENINGS AND EMBEDDED ITEMS - ALL CURBED AND OTHER OPENINGS,
EQUIPMENT BASES, DEPRESSIONS, FRAMES, CASTINGS, PIPE SLEEVES,
CONDUITS, INSERTS, EDGE PROTECTION, ANCHOR BOLTS AND SIMILAR
ITEMS SHALL BE PROVIDED, LOCATED AND INSTALLED AS SHOWN ON
APPROVED SHOP DRAWINGS FOR MANUFACTURED ITEMS AND OTHER
TRADES.
THE CONTRACTOR SHALL COORDINATE NEW EQUIPMENT STRUCTURES
SHOWN ON THE CONTRACT DRAWINGS WITH MANUFACTURER'S APPROVED
SHOP DRAWINGS. ALL DIMENSIONS, DETAILS AND STRUCTURAL DESIGN
REVISIONS REQUIRED TO ACCOMMODATE APPROVED EQUIPMENT SHALL BE
MADE BY THE CONTRACTOR AT NO COST TO OWNER.
4. JOB SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
STRUCTURAL DESIGN CRITERIA
1. PROPOSED BUILDING STRUCTURE AND FOUNDATION ARE DESIGNED IN
CONFORMANCE WITH THE FOLLOWING CODES AND STANDARDS:
a.
INTERNATIONAL BUILDING CODE 2009, NEW JERSEY EDITION WITH
AMENDMENTS
b.
INTERNATIONAL BUILDING CODE 2009 (IBC).
c.
ACI BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE,
318-08.
d.
AISC MANUAL OF STEEL CONSTRUCTION, ALLOWABLE STRESS
DESIGN, 13TH EDITION.
e.
AWS STRUCTURAL WELDING CODES - D1.1 AND D1.4, LATEST
EDITIONS.
f. APPLICABLE STATUTES AND REGULATIONS OF FEDERAL, STATE AND
LOCAL JURISDICTIONS.
209
208
2.
3
DESIGN LOADS:
A.
LIVE LOAD:
ROOF.................................................................20 PSF.
B.
4
S002
CUT OPENING IN EXISTING
CONCRETE SLAB
68' - 2"
200C
200C
CUT OPENING IN EXISTING
CONCRETE SLAB
C.
23' - 2"
206
206
VISION BARRIER SCREEN
WALL, SEE ARCH. DWG'S
FOR ADDTIONAL
INFORMATION
D.
200A
200A
1
NOTES:
1
SAWCUT OPENING IN EXISTING ROOF SALB AS SHOWN.
AVOID OVER-CUTTING THE OPENING
S001
SNOW LOAD:
GROUND SNOW (Pg)........................................25 PSF + DRIFTING
SNOW EXPOSURE Ce......................................1.0
SNOW LOAD IMPORTANCE FACTOR Is.........1.0
THERMAL FACTOR, Ct.....................................1.0
WIND LOAD
BASIC WIND SPEED, V....................................100 MPH (3 SECOND GUST)
OCCUPANCY CATEGORY...............................II
EXPOSURE CATEGORY..................................B
IMPORTANCE FACTOR, Iw............................1.0
SEISMIC LOAD:
SITE CLASS.....................................................D
SPECTRAL RESPONSE ACCELERATION:
Ss.........................................................0.24
S1........................................................0.056
IMPORTANCE FACTOR, Iw...........................1
SEISMIC DESIGN CATEGORY....................B
EXISTING CONDITIONS
1. EXAMINE AND FIELD VERIFY ALL EXISTING AND GIVEN DIMENSIONS AND
CONDITIONS PRIOR TO COMMENCEMENT OF THE WORK AND FABRICATION OF
CONSTRUCTION MATERIALS. REPORT VARIANCES FROM THE DRAWINGS AND
SPECIFICATIONS AND POTENTIAL INTERFERENCES PROMPTLY TO OWNER'S
PROJECT MANAGER. INCORPORATE ACTUAL FIELD CONDITIONS AND
DIMENSIONS IN THE WORK AND INDICATE CHANGES AND ADJUSTMENTS ON
DRAWINGS SUBMITTED FOR APPROVAL.
ROOF FRAMING PARTIAL PLAN
1/8" = 1'-0"
2.
ROOF PATCHING AND ASSOCIATED WORK TO BE DONE IN ACCORDANCE WITH
EXISTING ROOF WARRANTY
CONSTRUCTION OPERATIONS
1. ASSUME AN ABSOLUTE OBLIGATION TO PROTECT EXISTING STRUCTURES
AND EQUIPMENT, NEW WORK AND ALL FACILITY EMPLOYEES FROM
DAMAGE, LOSS OR INJURY RESULTING FROM THE CONTRACTOR'S
OPERATIONS. IN THE EVENT OF SUCH DAMAGE OR LOSS, PROMPTLY
REPLACE OR RESTORE THE WORK TO AN EQUIVALENT QUALITY TO THE
SATISFACTION OF THE PROJECT MANAGER AND AT NO EXPENSE TO
OWNER.
E
GENERAL:
1. FOR DETAILED REQUIREMENTS AND SPECIFIED PRODUCTS SEE SPECIFICATIONS.
CAST-IN-PLACE CONCRETE :
1. ALL CONCRETE SHALL BE NORMAL WEIGHT AGGREGATE UNLESS NOTED OTHERWISE.
2.
GENERAL
1. TYPICAL SECTIONS AND DETAILS - ALL SECTIONS, DETAILS AND NOTES ARE
INTENDED TO BE TYPICAL UNLESS OTHERWISE DETAILED. SHOP AND
ERECTION DRAWINGS SUBMITTED BY THE CONTRACTOR SHALL SHOW
APPLICATION OF TYPICAL SECTIONS AND DETAILS FOR SIMILAR SITUATIONS.
7
21' - 10"
MATERIALS OF CONSTRUCTION
ROWAN UNIVERSITY
CONCRETE SHALL CONFORM TO THE FOLLOWING TABLE:
USAGE
MISCELLANEOUS PADS AND
CONCRETE REPAIRS
28-DAY
STRENGTH (PSI)
MAX WATER/
CEMENT RATIO
4000
CONCRETE
SPECIFICATION
.50
NORMAL WT.
3.
WORKABILITY ADMIXTURES MAY BE UTILIZED, PROVIDED THAT BATCH PROPORTIONS ARE
DETERMINED IN THE MANNER DESCRIBED IN THE SPECIFICATIONS.
4.
ALL CEMENT SHALL BE PORTLAND TYPE I OR II.
5.
CHAMFER EXPOSED CONCRETE EDGES 1"x1".
CONCRETE REINFORCEMENT :
1. REINFORCING BARS - ASTM A615, GRADE 60, EPOXY COATED FINISH, UNLESS OTHERWISE
NOTED, OR SPECIFIED.
2.
IAL
ORL
M
ME HAL
LAUREL
HALL
HOLLYBUSH
CARRIAGE HOUSE
WELDED WIRE FABRIC - ASTM A185, DEFORMED EPOXY COATED FINISH UNLESS
OTHERWISE NOTED OR SPECIFIED.
3.
DETAIL AND FABRICATE REINFORCEMENT IN ACCORDANCE WITH ACI 315 DETAILING
MANUAL. REINFORCING BARS AT SPLICES SHALL BE LAPPED IN ACCORDANCE WITH THE
TABLE SHOWN ON THE CONTRACT DRAWINGS.
4.
MINIMUM CONCRETE COVER FOR REINFORCEMENT (INCHES):
A.
CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH.......................3
B.
CONCRETE EXPOSED TO EARTH, FLUIDS OR WEATHER
PRINCIPAL REINFORCEMENT.............................................................................................2
STIRRUPS, TIES AND SPIRALS.....................................................................................1 1/2
C.
CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND
PRINCIPAL REINFORCEMENT.......................................................................................1 1/2
STIRRUPS, TIES AND SPIRALS.....................................................................................1 1/2
5.
ALL REINFORCEMENT, SHALL BE ADEQUATELY SECURED IN POSITION PRIOR TO CONCRETE
PLACEMENT.
6.
REINFORCING BARS AND ACCESSORIES SHALL NOT BE IN CONTACT WITH ANY METAL PIPE,
PIPE FLANGE, METAL CONDUIT OR OTHER METAL PARTS EMBEDDED IN CONCRETE. A
MINIMUM CLEARANCE OF 2 INCHES SHALL BE PROVIDED.
B
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
EMBEDMENT :
1. DOWELS, ANCHOR BOLTS, PIPES AND OTHER EMBEDDED ITEMS SHALL BE HELD
SECURELY IN POSITION WHILE CONCRETE IS BEING PLACED.
2.
CONDUITS AND OTHER SIMILAR ITEMS EMBEDDED IN OR PENETRATING THROUGH
CONCRETE SHALL BE SPACED ON CENTER NOT LESS THAN 3 TIMES THEIR OUTSIDE
DIMENSION, BUT NOT LESS THAN 2 1/2" CLEAR. SUCH ITEMS SHALL NOT EXCEED 1/3
OF THE MEMBER THICKNESS.
KEY PLAN
STRUCTURAL STEEL:
1. WIDE FLANGE SHAPES: ASTM A992; ASTM A572, GRADE 50.
2.
ALL OTHER ROLLED SHAPES AND PLATES TO BE A36.
3.
STRUCTURAL STEEL TUBING: ASTM A500, GRADE B (Fy = 46ksi).
4.
STEEL PIPE: ASTM A53, TYPE S, GRADE B, EXTRA STRONG, BLACK UNLESS NOTED
OTHERWISE.
5.
DO NOT PAINT STEEL SURFACES WHICH ARE TO BE WELDED OR FIELD BOLTED OR ARE
TO BE ENCASED IN CONCRETE OR RECEIVE CEMENTITIOUS FIREPROOFING.
6.
SHOP CONNECTIONS MAY BE BOLTED OR WELDED; FIELD CONNECTIONS SHALL BE
BOLTED UNLESS DETAILED OR NOTED OTHERWISE ON THE DRAWINGS.
7.
ALL STEEL EXPOSED TO WEATHER AND STEEL LINTELS SHALL BE HOT-DIP GALVANIZED
IN ACCORDANCE WITH ASTM A123.
1
12/3/2014 ISSUED FOR BID
No.
Date
Revision
STRUCTURAL FASTENERS:
1. HIGH STRENGTH BOLTS: ASTM A325, MINIMUM 3/4"∅ UNLESS NOTED OTHERWISE.
2.
ANCHOR RODS: ASTM F1554, GRADE 55, NONHEADED, HOT-DIPPED GALVANIZED.
WELDING :
1. WELDING ELECTRODES: E70XX (AWS A5.1 OR A5.5). USE LOW HYDROGEN ELECTRODES
FOR FIELD WELDING.
2.
ALL GROOVE AND BUTT WELDS SHALL BE FULL PENETRATION.
3.
FILLET WELD SIZES SHALL BE THE MINIMUM SIZE REQUIRED BY AISC CODE FOR PLATE
SIZES TO BE CONNECTED AND SHALL BE APPLIED TO THE ENTIRE JOINT CONTACT
LENGTH, BUT NOT LESS THAN 3/16".
F
54"x12" OPENING IN EXISTING CMU
WALL, COORDINATE LOCATION OF
OPENING WITH MECHANICAL DWG'S
EXISTING 12"x8" DEEP
CONC BEAM
8
ROWAN
UNIVERSITY
W8x13
3
SAW CUT OPENING IN EXISTING
CONCRETE ROOF SLAB FOR
DUCT PENETRATION,
COORDINATE WITH MECH.
DWGS. FOR LOCATION AND SIZE
S001
C8x11.5
1/4
TYP.
EXISTING 5"
CONCRETE SLAB
(ROOFING NOT
SHOWN)
W8x13
3
EXISTING 5"
CONCRETE SLAB
OAK
HALL
.
TYP.
ROOF OPENING
C8x11.5, COPE
AS REQUIRED
TYP.
S001
C8x11.5,
TYP.
Project Title
12' - 7"
(2)L3"x3"x1/4"
V.I.F
(4)1/2" HILTI HIT-HY 70
MASONRY ANCHORS
OR APPROVED
EQUAL
7
EXISTING 8"
CMU WALL
BOLE HALL
RENOVATIONS
PACK +/-3" GAP WITH HIGH
PRECISION, NONSHRINK
GROUT MASTERFLOW 928
GROUT OR APPROVED EQUAL
W8x13
1/4
.
TYP.
Drawing Title
2
S001
HIGH ROOF PARTIAL FRAMING PLAN
1/4" = 1'-0"
3
S001
CONNECTION DETAIL
1" = 1'-0"
STRUCTURAL
PLAN AND DETAILS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
Checked By
Job No:
ABT
JZ
2014-064
Drawing No.
S001
Printed: 12/3/2014 11:32:06 AM
ROWAN UNIVERSITY
MECHANICAL VENT OR DUCT
CURB FLASHING
1/4
.
FASTEN APPROX.
8" O.C.
L3x3x1/2" GALV.
STEEL, TYP.
PRE-FABRICATED MECH. EQUIPMENT CURB
ROOF MEMBRANE
FLASHING
REPAIR ROOFING. REFER TO ARCH.
DRAWINGS FOR ADDITIONAL
INFORMATION
+/- 8"
V.I.F
EXISTING BRICK WALL
WIDTH TO BE V.I.F
GROUT AND
SEAL AROUND
ANGLES
EXISTING ROOF
MEMBRANE
EXISTING
INSULATION
SEE MECH. DWGS
NOTE: SAWCUT HORIZONTAL KERFS
IN WALL, INSTALL ANGLES, PROVIDE
8" MINIMUM BEARING ON EACH SIDE
OF OPENING
0' - 4"
1/4
2
LINTEL AT EXISTING WALL
1 1/2" = 1'-0"
HOLLYBUSH
CARRIAGE HOUSE
S002
B
REPAIR TAPERED
INSULATION, MATCH
EXISTING
TYP.
SE
OU
LL
H
HA
PARKING
EN
E
E
L
GR
LOT P
BO NNEX
A
ALL
EH
C
UN
LE
BO LL
A
H
PARKING
LOT R
C8 FRAME AROUND OPENING, GALV.
NOTE: EXISTING ROOF IS FLEX FB 100 ELVALOY MEMBRANE SYSTEM BY
FLEX MEMBRANE INTERNATIONAL, INC. CONTRACTOR SHALL COORDINATE
WITH EXISTING ROOFING MANUFACTURER FOR PROPER EQUIPMENT CURB
INSTALLATION.
NOTE: COORDINATE WITH MECHANICAL
DRAWINGS FOR LENGTH OF MEMBERS AND
LOCATIONS OF SUPPORTS
#4@12" O.C. BOTH WAYS
S002
LAUREL
HALL
SUPPORT CONNECTION TO SLAB/WALL
ROUGHEN SURFACE AND
APPLY BONDING AGENT
1
.
EXISTING CONCRETE SLAB
PRESSURE TREATED
WOOD BLOCKING
(4)1/2" DIA . EXPANSION
ANCHORS W/3"
EMBEDMENT MIN.
#4 BARS @12" O.C. W/4" MIN.
EMBEDMENT EPOXY GROUT
INTO EXISTING SLAB
EXISTING CONC. SLAB
.
3/4" CHAMFER, TYP.
0' - 4"
1/4" PLATE WELDED TO
ANGLES, WIDTH TO BE
COORDINATED W/WALL
THICKNESS
1/4
OAK
HALL
SUPPORT - SECTION
INSTALL (2)3 1/2"x3 1/2"x1/4"
ANGLES W/(2) 1/2" DIA.
THREADED ROD @12" O.C
ALL AROUND
3 SIDES
IAL
ORL
M
ME HAL
6
CONCRETE PAD
1" = 1'-0"
S002
3
PIPE/EQUIPMENT SUPPORT DETAIL
1 1/2" = 1'-0"
S002
FAN CURB/DUCT PENETRATION DETAIL
1 1/2" = 1'-0"
KEY PLAN
1
12/3/2014 ISSUED FOR BID
No.
Date
Revision
HSS 6x3x1/2" GALV.
VISION BARRIER GRILL, SEE
ARCHITECTURAL FOR ADDTIONAL
INFORMATION. COORDINATE WITH
MANUFACTURER FOR ATTACMENT
8'-0"+/.
HSS2x2x1/4" STAND
COLUMN, TYP.
SHEET METAL PITCH PAN
SOLDERED /WELDED
WATERTIGHT 4" ABOVE
ROOFING MIN. HEIGHT
8
S002
5' - 2"
6' - 4"
HSS 6x6x1/2" GALV. STEEL COLUMN
W6x25 BEAM FRAME, TYP.
ROOF CEMENT
HSS 6x3x1/2" GALV.
EXISTING BUILT UP
ROOFING
5
S002
2" MIN.
.
1 PLY CAP FLASHING 8"
ONTO EXISTING ROOF
MEMBRANE
(4)1/2" DIA. EXPANSION
ANCHOR BOLTRS WITH 3.75"
MIN. EMBEDMENT, TYP
POURABLE SEALANT
1/4"
AHU
4" CONCRETE PAD COORDINATE
LIMITS WITH EQUIPMENT SIZE.
TYP.
W6 BEAM, TYP.
EXISTING TAPERED INSULATION
12"x12"x1/2" GALV. STEEL
BASE PLATE
8' - 4"
HSS6x6x1/2" GALV.
STEEL COLUMN, TYP
HSS2x2x1/4",
TYP.
9' - 4"
12"x12"x1/4"
BASE PLATE
EXISTING 7" CONC. SLAB
PRESSURE TREATED
BLOCKING
.
.
1/4
.
TYP.
ROWAN
UNIVERSITY
6"x6"x1/4" PLATE
W/(4) 3/4" DIA. BOLTS
NOTE: COORDINATE SIZE OF EQUIPMENT STAND,
CONCRETE PAD AND LOCATION OF MID SUPPORT STEEL
(IF REQUIRED) WITH FINAL APPROVED EQUIPMENT SHOP
DRAWINGS
2' - 6"
1 PLY BASE FLASHING
PLY 6" ONTO EXISTING
ROOF MEMBRANE
4" CONCRETE
PAD
NON-SHRINK GROUT
4
S002
AHU SCREEN WALL SECTION
1" = 1'-0"
5
S002
SCREEN WALL POST CONNECTION DETAIL
1 1/2" = 1'-0"
7
S002
AHU SUPPORT STAND DETAIL
3/4" = 1'-0"
8
S002
AHU SUPPORT STAND SECTION
3/4" = 1'-0"
Project Title
BOLE HALL
RENOVATIONS
Drawing Title
DETAILS
Date:
12/3/2014
Scale
AS NOTED
Drawn By:
Checked By
Job No:
ABT
JZ
2014-064
Drawing No.
S002
Printed: 12/3/2014 11:32:07 AM
Download