ROWAN UNIVERSITY ROWAN UNIVERSITY DEPARTMENT OF FACILITIES MANAGEMENT BOLE HALL HVAC REPLACEMENT IAL ORL M ME HAL B OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN PARKING LOT R T BU HE GR RN OU S P N LE BO LL A H S T R E E T TEAM HOUSE RESIDENT LOT PARKING LOT B TENNIS COURT COMPLEX 50 BUI 0 LDIN G PRACTICE FOOTBALL SOFTBALL FIELD FIELD PARKING LOT D FOOTBALL STADIUM SOCCER FIELD 30 BUI 0 LDIN G STUDENT REC. CENTER MAGNOLIA HALL S ITIE L I G C FA ILDIN BU G RIN G E N H ATI E H T AN PL MIMOSA HALL R PA T EN D U R ST NTE E C 3 R PARKING LOT A H TO 55 I R A R E NC U B D O A BASEBALL FIELD LL HA D DAY CARE CENTER PROJECT LOCATION 1 CS001 LE BO LL HA MEP NOTES, SYMBOLS, AND ABBREVIATIONS BASEMENT HVAC REMOVALS FIRST FLOOR HVAC REMOVALS SECOND FLOOR HVAC REMOVALS BASEMENT HVAC INSTALLATIONS FIRST FLOOR HVAC DUCT INSTALLATIONS FIRST FLOOR HVAC PIPE INSTALLATIONS SECOND FLOOR HVAC DUCT INSTALLATIONS SECOND FLOOR HVAC PIPE INSTALLATIONS ENLARGED FIRST FLOOR DUCT INSTALLATIONS ENLARGED FIRST FLOOR PIPE INSTALLATIONS FLOW DIAGRAMS CONTROL IDENTIFICATION CONTROL DIAGRAMS SEQUENCE OF OPERATION P&ID DIAGRAMS DETAILS SCHEDULES DP001 DP002 P001 P002 P003 BASEMENT PLUMBING REMOVALS 1ST FLOOR PLUMBING REMOVALS BASEMENT PLUMBING INSTALLATIONS 1ST FLOOR PLUMBING INSTALLATIONS RISER DIAGRAMS, SCHEDULES, AND DETAILS 12/3/2014 ISSUED FOR BID Date DE001 BASEMENT POWER REMOVALS DE002 FIRST FLOOR POWER AND LIGHTING REMOVALS DE003 SECOND FLOOR POWER AND LIGHTING REMOVALS E001 BASEMENT POWER INSTALLATIONS E002 FIRST FLOOR POWER INSTALLATIONS E003 SECOND FLOOR POWER INSTALLATIONS E004 LIGHTING PLAN-REMOVALS AND INSTALLATIONS S001 S002 Revision ROWAN UNIVERSITY STRUCTURAL PLAN AND DETAILS DETAILS Y LL HA PARKING LE X O B LOT P NE AN PARKING LOT Z-1 R N A E G001 DM001 DM002 DM003 M001 M002 M003 M004 M005 M006 M007 M008 M009 M010 M011 M012 M013 M014 1 No. E E US O H EN E GR BOZORTH HALL G CARRIAGE HOUSE A A TRIAD E UT RO LAUREL HALL HOLLYBUSH B E L C A501 ARCHITECTURAL CONVENTIONS FIRST FLOOR DEMOLITION PLAN SECOND FLOOR DEMOLITION PLAN DOOR SCHEDULE AND DETAILS PARTIAL ENLARGED FIRST FLOOR PLAN PARTIAL ROOF PLAN AND DETAILS BUILDING SECTIONS FIRST FLOOR REFLECTED CEILING PLAN SECOND FLOOR REFLECTED CEILING PLAN ENLARGED TOILET ROOM PLANS AND INTERIOR ELEVATIONS INTERIOR ELEVATIONS AND MILWORK DETAILS N U L OAK HALL I T M L HAWTHORN HALL LL HA H LO T I C I L H L RIA O M ME HALL D E EVERGREEN HALL S N DE LIN P E W PA RK IN G L O A MULLICA HALL E G KIN R PA T LO 2 U LL HA WESTBY HALL TR IA D U SAVITZ HALL O 2 N E NC E I SC R T TITLE E B O W E LIBRARY U T LO ALUMNI CENTER V ROBINSON HALL ROWAN HALL G KIN PARKING LOT U OK BO RE O ST WILSON HALL AC000 D100 D101 A000 A101 A102 A300 A401 A402 A500 ABBOTT'S POND WILLOW HALL ALL PURPOSE FIELD NO. KEY PLAN CS001 COVER SHEET EDGEWOOD PARK APARTMENTS D N LL A RM HA NO FIELD HOCKEY DRAWING LIST CHESTNUT HALL PARKING LOT M ES JAM MAIN STR EET MANSION PARK APARTMENTS INTRAMURAL FIELD B O U L E V A R D NORTH HALLS PARKING 2 BUI 00 LDIN G PARKING LOT C TO 4 BUI 00 LDIN G TO ROUTE 47 C A R P E N T E R Project Title BOLE HALL RENOVATIONS PARKING LOT R Drawing Title COVER SHEET ROWAN UNIVERSITY CAMPUS MAP 1" = 160'-0" Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. CS001 Printed: 12/3/2014 11:31:16 AM CONVENTIONS ABBREVIATIONS ABV AFF ACOUST ACT ADH ADJ AGGR A/C ALUM ANCH ANOD APRX ARCH AVG ABOVE ABOVE FINISHED FLOOR ACOUSTICAL ACOUSTICAL TILE ADHESIVE ADJACENT AGGREGATE AIR CONDITIONING ALUMINUM ANCHOR, ANCHORAGE ANODIZED APPROXIMATE ARCHITECT (URAL) AVERAGE B BSMT BRG BLW BTW BVL BHP BIT BLK BLKG BD BO BLDG BASE CABINETS BASEMENT BEARING BELOW BETWEEN BEVELED BRAKE HORSE POWER BITUMINOUS BLOCK BLOCKING BOARD BOTTOM OF BUILDING CD CSMT CS CLG CH CEM CL CER CT CIR CO COL CONC CMU CONST CONT CONTR CORR CTR CU CFM CW CYD COIL CONDENSATE DRIP PIPING CASEMENT CAST STONE CEILING CEILING HEIGHT CEMENT CENTER LINE CERAMIC CERAMIC TILE CIRCLE CLEAN OUT COL CONCRETE CONCRETE MASONRY UNIT CONSTRUCTION CONTINUOUS OR CONTINUE CONTRACT(OR) CORRUGATED COUNTER CUBIC CUBIC FEET/MINUTE COLD WATER CUBIC YARD D DEMO DEPR DTL DIAG DIAM DIM DIV DN DR DH DS DB DWG DEEP/DEPTH DEMOLISH/DEMOLITION DEPRESSED DETAIL DIAGONAL DIAMETER DIMENSION DIVISION DOWN DOOR DOUBLE HUNG DOWNSPOUT DRAWER BASE CABINET DRAWING GENERAL NOTES E EA EAT ELEC EC EP EWC ELEV EQ EQUIP EXH EF ESP EXIST (E) (ER) EXP EXT EXISTING TO REMAIN EACH/EXHAUST AIR ENTERING AIR TEMPERATURE ELECTRIC (AL) ELECTRICAL CONTRACTOR ELECTRICAL PANELBOARD ELECTRIC WATER COOLER ELEVATION EQUAL EQUIPMENT EXHAUST EXHAUST FAN EXTERNAL STATIC PRESSURE EXISTING EXISTING EXISTING TO BE RELOCATED EXPOSED EXTERIOR FL. FD FIN FF FLSHG FLR FLUR FT FTG FOUND FPM FRMG FV FLOOR FLOOR DRAIN FINISH/FINISHED FINISHED FLOOR FLASHING FLOOR/FLOORING FLUORESCENT FOOT/FEET FOOTING FOUNDATION FEET PER MINUTE FRAME/FRAMING FIELD VERIFY GA GAL GALV GC GFP GL GPM GRD HB HDW HWD HDR HTG HVAC HT HM HORIZ HP HTW HW HWH HWR HWS GAGE/GAUGE GALLON(S) GALVANIZED GENERAL CONTRACT/CONTRACTOR GOVERNMENT FURNISHED PROPERTY GLASS/GLAZING GALLONS PER MINUTE GRADE/GRADING HOSEBIB HARDWARE HARDWOOD HEADER HEATING HEATING/VENTILATING/AIR COND. HEIGHT/HIGH HOLLOW METAL HORIZONTAL HORSE POWER HIGH TEMPERATURE WATER HOT WATER HOT WATER HEATER HOT WATER RETURN HOT WATER SUPPLY IN INCL ID INSUL INT INCH/INCHES INCLUDE(D)/INCLUDING INSIDE DIAMETER/DIMENSION INSULATE(D)/INSULATION INTERIOR JC JT JF J JANITOR'S CLOSET JOINT JOINT FILLER JOIST KIT KW KITCHEN KILOWATTS LAT LBL LAM LAV LH L LL LRA LT LF LEAVING AIR TEMPERATURE LABEL LAMINATE(D) LAVATORY LEFT HAND LENGTH/LONG REFRIGERANT LIQUID LINE LOCKED ROTOR AMPS LIGHT LINEAL FOOT MFR MAS MO MAT MAX MECH MC MTL M MIN MISC MR MT MANUFACTURE(R) MASONRY MASONRY OPENING MATERIAL(S) MAXIMUM MECHANIC(AL) MECHANICAL CONTRACTOR METAL METER(S) MINIMUM MISCELLANEOUS MOP RECEPTOR MOUNT(ED)/MOUNTING N NRC NOM NIC NTS NEW NOISE REDUCTION COEFFICIENT NOMINAL NOT IN CONTRACT NOT TO SCALE OC OPG OPP OD OA ON CENTER(S) OPENING OPPOSITE OUTSIDE DIAMETER/DIMENSION OVERALL/OUTSIDE AIR PRESSURE DROP PAINT/PAINTED PANEL PEDESTAL PERFORATE(ED) PERIMETER PLASTER PLATE PLUMBING CONTRACTOR PLYWOOD POINT POLYVINYL CHLORIDE POUNDS PER SQUARE INCH PRECAST PREFABRICATE(D) PD PTD PNL PED PERF PERIM PLAS PL PC PLYD PT PVC PSI PC PREFAB R RAD REF RFL REFR REINF RESIL REV RH RFG RM RO RPM RS REMOVE RADIUS REFERENCE REFLECT(ED) REFRIGERATOR REINFORCE(D)/REINFORCING RESILIENT REVISION(S)/REVISED RIGHT HAND ROOFING ROOM ROUGH OPENING REVOLUTIONS PER MINUTE REFRIGERANT SUCTION LINE SAN SECT SHT SB SPEC. SQ SI SF SQ. FT. SY SS STD STL STR SUSP SANITARY DRAIN SECTION SHEET SINK BASE CABINET SPECIFICATION(S) SQUARE SQUARE INCH SQUARE FOOT SQUARE FEET (FOOT) SQUARE YARD SERVICE SINK STANDARD STEEL STRUCTURAL SUSPENDED TDH THK TLT TO TYP TOTAL DYNAMIC HEAD THICK/THICKNESS TOILET TOP OF TYPICAL UR URINAL V VD VERT VCT VT VTR VENT VOLUME DAMPER VERTICAL VINYL COMPOSITION TILE VINYL TILE VENT THROUGH ROOF W WH WF WSCT WC WWF WB W. WDW W/ WO WD WP WALL CABINET WATER HEATER WASH FOUNTAIN WAINSCOT WATER CLOSET WELDED WIRE FABRIC WET BULB TEMPERATURE WIDTH/WIDE WINDOW WITH WITHOUT WOOD WEATHERPROOF YD YARD(S) DRAWING LABEL * * BUILDING SECTION Building Section 1/8" = 1'-0" A KEYNOTING SYSTEM IS USED ON THE DRAWINGS FOR MATERIALS REFERENCES AND NOTES. REFER TO THE KEYNOTE LEGEND ON THE DRAWING FOR THE INFORMATION WHICH RELATES TO EACH KEYNOTE ON THE RESPECTIVE DRAWING. 2. THE ORGANIZATION OF THE KEYNOTING SYSTEM ON THE DRAWINGS, WITH THE KEYNOTE REFERENCE NUMBERS, SHALL NOT CONTROL THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTOR'S OR IN ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE. 3. DO NOT SCALE DRAWINGS. EXISTING CONDITIONS MAY VARY. CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT THE BUILDING/SITE BEFORE BEGINNING WORK. 4. ALL WORK INDICATED ON THESE DOCUMENTS HAS BEEN DESIGNED TO MEET THE NEW JERSEY UNIFORM CONSTRUCTION CODE, ALL SUB-CODES, AND ICC/ANSI A117.1-2003. CONTRACTOR TO PERFORM ALL WORK IN ACCORDANCE WITH ABOVE MENTIONED CODES, THE NATIONAL STANDARD PLUMBING CODE, AND THE NATIONAL ELECTRICAL CODE. INDICATES DIRECTION OF CUTTING PLANE DIMENSION DIMENSION TO FACE (TYPICAL) DIMENSION ON PLAN = FACE OF CORE (STUD, CMU, ETC...) DRAWING NUMBER WHERE SECTION IS LOCATED (TYPICAL) (DRAWING NUMBER) INTERIOR ELEVATION * * * * DRAWING NUMBER WHERE ELEVATION IS LOCATED (TYPICAL) (DRAWING NUMBER) ROOM TAG INDICATES DIRECTION OF ELEVATION * DRAWING NUMBER WHERE ELEVATION IS LOCATED (TYPICAL) (DRAWING NUMBER) * * CALLOUT * * FINISH KEY CEILING HEIGHT EARTH ROOM NUMBER L RIA MO LL E M HA INSULATION KEYNOTING DIVISION NUMBER SUBDIVISION NUMBER NOTE IDENTIFIER INDICATES DIRECTION OF ELEVATION DRAWING NUMBER WHERE DETAIL IS LOCATED (TYPICAL) (DRAWING NUMBER) SYMBOL LEGEND ROOM NAME Office 108 A 9'-0" ALPHA-NUMERIC INDICATES LOCATION OF ELEVATION (SECTION NUMBER) DETAIL ROWAN UNIVERSITY DIMENSION TO CENTERLINE ALPHA-NUMERIC INDICATES LOCATION OF ELEVATION (SECTION NUMBER) BUILDING ELEVATION SCALE DRAWING NUMBER ALPHA-NUMERIC INDICATES LOCATION OF BUILDING SECTION (SECTION NUMBER) * * * 1. TITLE LEVEL LINE * ALPHA-NUMERIC INDICATES LOCATION ON DRAWING LAUREL HALL HOLLYBUSH CARRIAGE HOUSE ROUGH WOOD GRAVEL (SECTION) 092900.A1 BITUMINOUS PAVING FINISHED WD. CONCRETE PLYWOOD NOTE Note: Refer to drawing OAK HALL E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU INDICATES DIRECTION OF CUTTING PLANE ALPHA-NUMERIC INDICATES LOCATION OF DETAIL (SECTION NUMBER) DOOR TAG DRAWING NUMBER WHERE DETAIL IS LOCATED (TYPICAL) (DRAWING NUMBER) ALPHA-NUMERIC INDICATES LOCATION OF DETAIL (SECTION NUMBER) DOOR NUMBER RIGID INSULATION PANEL WITH NAILABLE BASE ACOUSTICAL TILE CONCRETE MASONRY UNIT GYPSUM WALLBOARD STEEL TILE ON CONCRETE LE BO LL HA PARKING LOT R 102 WINDOW TAG WINDOW TYPE A N METAL FRAMING NORTH ARROW PHASING LEGEND KEY PLAN BUILDING DATA CODE: SUBCHAPTER 6 - REHABILITATION SUBCODE, 6.6 ALTERATIONS WITHIN THE NEW JERSEY UNIFORM CONSTRUCTION CODE AND IN COMPLIANCE WITH THE INTERNATIONAL BUIDING CODE/ 2009 NJ EDITION CONSTRUCTION TYPE: USE GROUP: OCCUPANCY: BUILDING SQUARE FOOTAGE: 1ST FLOOR: 2ND FLOOR: BASEMENT: TOTAL: III B B, BUSINESS 199 PHASE 1 BOTH PHASE 1 PHASE 2 14,950 S.F. 3,790 S.F. 3,350 S.F. 22,090 S.F. BOLE HALL TOILET FIXTURE COUNT PHASE 2 1ST FLOOR "B" USE - 14,950 S.F. / 100 = 150 O.C.C. 2ND FLOOR "B" USE - 3,600 S.F. / 100 = 36 O.C.C. 2ND FLOOR "MECH" USE - 190 S.F. / 300 = 1 12/3/2014 No. Date ISSUED FOR BID Revision 1 O.C.C. BASEMENT "MECH" USE - 3,350 S.F. / 300 = 12 O.C.C. 199 O.C.C. X .667 X 132.667 .5 66.3 = 67/SEX OF OCCUPANT REQUIRED FIXTURES MEN'S FIXTURES: 3 WATERCLOSETS/URINALS 2 LAVATORIES WOMEN'S FIXTURES: 3 WATERCLOSETS 3 LAVATORIES DRINKING FOUNTAIN: 1/100 X 200 = 2 SERVICE SINK: 1/FLOOR X 2 FLOORS = 2 EXISTING FIXTURES MEN'S FIXTURES: 4 WATERCLOSETS/URINALS 2 LAVATORIES Architecture WOMEN'S FIXTURES: 5 WATERCLOSETS 5 LAVATORIES 2 1/16" = 1'-0" AC000 Second Floor Phasing Plan 1/16" = 1'-0" 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 1 WATERCLOSET 1 LAVATORY William P. Lammey AIA Anthony R. Giorgio AIA PROPOSED FIXTURES MEN'S FIXTURES: 3 WATERCLOSETS/URINALS 2 LAVATORIES WOMEN'S FIXTURES: 4 WATERCLOSETS 3 LAVATORIES UNISEX FIXTURES: NJ C6793 NJ 07626 ROWAN UNIVERSITY 1 WATERCLOSET 1 LAVATORY 1 A402 DR UNIT OF MAX EXPECTED OCC EGRESS OCC 36" 100/22" 163 1 A500 36 1 A101 1 A401 Project Title BOLE HALL RENOVATIONS 60' -0" 44' -0" 72' -0" 16' -0" 54' -0" 48' -0" 78' -0" 60' -0" Drawing Title ARCHITECTURAL CONVENTIONS 60' -0" 72' -0" 26' -0" AC000 First Floor Phasing Plan 35' -0" 1 UNISEX FIXTURES: Planning 48' -0" 90' -0" 70' -0" 70' -0" DR 10/24/2014 Scale AS NOTED Drawn By: UNIT OF MAX EXPECTED OCC EGRESS OCC 36" 100/22" 163 Date: Checked By 36 Job No: 3 AC000 First Floor Egress Plan 1/16" = 1'-0" SOUTHWING = 7,100 S.F. = 71 O.C.C 4 AC000 First Floor Key Plan 1/16" = 1'-0" 5 AC000 Second Floor Key Plan 1/16" = 1'-0" 2014-064 Drawing No. AC000 DEMOLITION NOTES 3 2 2 1 1 5 1 5 4 3 1 5 REMOVE EXISTING LIGHT FIXTURE AND SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION 3 REMOVE EXISTING SUPPLY AIR DIFFUSER. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION 4 REMOVE EXISTING RETURN AIR GRILL. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION 5 COORDINATE REMOVAL OF EXISTING FIRE ALARM DEVICES WITH OWNER 6 REMOVE INDICATED PORTION OF EXISTING WALL 7 REMOVE EXISTING DOOR, FRAME, AND ALL ASSOCIATED HARDWARE 8 OWNER TO REMOVE EXISTING WINDOW, FRAME, AND ALL ASSOCIATED HARDWARE. CONTRACTOR TO PATCH EXISTING FLOOR, WALL AND CEILING SURFACES. 9 REMOVE EXISTING FLOOR FINISH AND 2" THICK MUD BED. POUR NEW CONCRETE FLOWABLE FILL AND PREPARE SUBSTRATE FOR NEW FINISHES 10 REMOVE EXISTING CEILINGS, LIGHT FIXTURES, WALLS, WALL PANELS, WINDOW TREATMENTS AND FLOOR FINISHES IN ALL SPACES IN THIS AREA. REFER TO ASBESTOS ABATEMENT REPORT FOR FURTHER INFORMATION. PATCH ALL WALLS WITH MATERIALS TO MATCH EXISTING. S 3 6 1 28 11 REMOVE EXISTING ACOUSTIC CEILING TILES AND GRID. SAVE FOR REUSE. AFTER MECHANICAL AND ELECTRICAL WORK IS COMPLETED REINSTALL GRID. 12 REMOVE EXISTING WALL MOUNTED LAVATORY. SEE PLUMBING DRAWINGS FOR MORE INFORMATION 16 13 REMOVE EXISTING WATER CLOSET. SEE PLUMBING DRAWINGS FOR MORE INFORMATION 12 14 REMOVE EXISTING URINAL. SEE PLUMBING DRAWINGS FOR MORE INFORMATION 15 REMOVE EXISTING JANITOR SINK.SEE PLUMBING DRAWINGS FOR MORE INFORMATION 16 REMOVE EXISTING TOILET PARTITION 17 REMOVE AND REINSTALL ALL TOILET ROOM ACCESSORIES, UNLESS OTHERWISE NOTED. 18 REMOVE EXISTING SILL, PORTION OF BLOCK WALL AND PLASTER. SEE DETAIL 2/D100 FOR MORE INFORMATION 19 REMOVE EXISTING SILL. PROTECT EXISTING WINDOW SYSTEM FROM DAMAGE 20 REMOVE EXISTING PORTION OF BLOCK WALL AND STEEL ANGLE 21 REMOVE EXISTING PORTION OF PLASTER WALL 22 REMOVE EXISTING RETURN AIR GRILL 23 PROVIDE METAL PLATE OVER HOLES IN SLAB. CONTRACTOR TO ASSUME 24 HOLES @ 8" X 12". SEAL AROUND PLATES 24 CUT TRENCH INTO EXISTING SLAB SO THAT NEW FLOOR RECEPTACLES AND NEW ELECTRIC CAN BE INSTALLED 25 REMOVE EXISTING HVAC WINDOW UNIT. INSTALL NEW GLASS TO MATCH EXISTING 26 OWNER TO REMOVE ASBESTOS CONTAINING TRANSITE PANELS, WALLS AND DOORS AND DISPOSE OF AS ASBESTOS WASTE. CONTRACTOR TO PATCH EXISTING FLOOR, WALL AND CEILING SURFACES. 27 OWNER TO REMOVE EXISTING ASBESTOS CONTAINING FLOOR & MASTIC AND DISPOSE OF WASTE. CONTRACTOR TO PREPARE SUBSTRATE FOR NEW FINISHES 28 REMOVE EXISTING FLOOR FINISH & 2" THICK MUD BED, EXISTING WALL FINISHES AND EXISTING CEILING. POUR NEW CONCRETE FLOWABLE FILL AND PREPARE SUBSTRATE, WALLS AND CEIING FOR NEW FINISHES 29 REMOVE AND REPLACE PORTION OF EXISTING CHASE WALL TO ACCESS EXISTING DUCTWORK. SEE DETAIL 2/A401 - PIPE CHASE PHOTO DETAIL FOR MORE INFORMATION. 12 2 6 9 6 13 3 1 17 5 ROWAN UNIVERSITY 2 3 2 2 S 2 S 2 2 3 S 5 5 REMOVE EXISTING ACOUSTIC CEILING TILE SYSTEM IN IT'S ENTIRETY, INCLUDING BUT NOT LIMITED TO ACOUSTIC TILE, GRID, AND SUSPENSION WIRE. REMOVE EXISTING Z-TILE CEILING, PLASTER, AND METAL BAR SUPPORTS AND TIES ABOVE ACOUSTIC CEILING TILE SYSTEM. 3 2 S 1 S 28 12 2 10 13 7 12 9 L RIA MO LL E M HA OAK HALL LAUREL HALL 15 1 16 18 18 27 18 18 26 9 18 28 6 26 27 LE BO LL HA 26 1 26 26 18 2 26 29 1 26 2 26 27 26 26 1 8 24 2 26 26 27 KEY PLAN 26 27 26 26 11 PARKING LOT R 26 6 26 CARRIAGE HOUSE E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU 14 9 HOLLYBUSH 27 26 27 8 24 8 2 1 2 26 26 26 27 27 27 26 27 1 26 26 1 26 2 27 26 2 LEGEND 18 26 1 27 27 1 12/3/2014 ISSUED FOR BID No. Date Revision EXISTING CONSTRUCTION TO REMAIN. 26 EXISTING CONSTRUCTION TO BE REMOVED. 8 2 26 11 2 24 11 2 26 26 26 26 1. CONTRACTOR SHALL PROTECT EXISTING FURNITURE AND FINISHES IN OCCUPIED AREA DURING CONSTRUCTION. 7 1 1 2 2 18 GENERAL NOTE 25 27 18 18 27 18 27 18 Architecture 1 D100 Planning 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 First Floor Demolition Plan 1/8" = 1'-0" William P. Lammey AIA Anthony R. Giorgio AIA NJ C6793 NJ 07626 ROWAN UNIVERSITY 19 20 21 Project Title BOLE HALL RENOVATIONS 22 23 Drawing Title FIRST FLOOR DEMOLITION PLAN 2 D100 Window Sill Demolition Detail 1 1/2" = 1'-0" Date: 10/24/2014 Scale 1/4" = 1'-0" Drawn By: Checked By Job No: 2014-064 Drawing No. D100 DEMOLITION NOTES 1 REMOVE EXISTING ACOUSTIC CEILING TILE SYSTEM IN IT'S ENTIRETY, INCLUDING BUT NOT LIMITED TO ACOUSTIC TILE, GRID, AND SUSPENSION WIRE. REMOVE EXISTING Z-TILE CEILING, PLASTER, AND METAL SUPPORTS AND TIES ABOVE ACOUSTIC CEILING TILE SYSTEM. PROTECT EXISTING GYPSUM BOARD SOFFITS AT WINDOWS THAT WILL REMAIN. 2 REMOVE EXISTING LIGHT FIXTURE AND SAVE FOR REUSE. SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION 3 REMOVE EXISTING SUPPLY AIR DIFFUSER. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION 4 REMOVE EXISTING RETURN AIR GRILL. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION 5 COORDINATE REMOVAL OF EXISTING FIRE ALARM DEVICES WITH OWNER. 6 REMOVE EXISTING SPEAKER AND WIRE 7 REMOVE EXISTING PLASTER CEILING, AND METAL SUPPORTS AND TIES. PREPARE AREA TO RECEIVE NEW ACOUSTICAL TILE CEILING SYSTEM 8 REMOVE EXISTING WINDOW HVAC UNIT. REPLACE GLAZING IN EXISTING WINDOW FRAME WITH GLAZING TO MATCH EXISTING. ROWAN UNIVERSITY LEGEND L RIA MO LL E M HA EXISTING CONSTRUCTION TO REMAIN. OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE EXISTING CONSTRUCTION TO BE REMOVED. GENERAL NOTE 1. CONTRACTOR SHALL PROTECT EXISTING FURNITURE AND FINISHES IN OCCUPIED AREA DURING CONSTRUCTION. E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU LE BO LL HA PARKING LOT R 3 1 7 2 2 1 3 3 6 S 5 5 2 3 S A402 3 TYP. 4 3 S 5 2 2 1 8 SPEAKER 5 2 S KEY PLAN 2 S 8 2 7 S 4 5 2 2 4 1 S 5 S 3 S 3 2 SPEAKER 8 1 12/3/2014 ISSUED FOR BID No. Date Revision 1 S 5 2 4 2 TYP. S 6 4 2 3 A402 2 3 5 3 S 3 2 5 2 S 1 2 7 5 5 S 4 S 2 2 3 3 Architecture 2 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 1 1 1 D101 Planning William P. Lammey AIA Anthony R. Giorgio AIA 2 Second Floor Demolition Plan 1/8" = 1'-0" NJ C6793 NJ 07626 ROWAN UNIVERSITY Project Title BOLE HALL RENOVATIONS Drawing Title SECOND FLOOR DEMOLITION PLAN Date: 10/24/2014 Scale 1/4" = 1'-0" Drawn By: Checked By Job No: 2014-064 Drawing No. D101 DRAWING KEYNOTES No. Width Height Thickness Doors Material 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 2' - 6" 3' - 0" 3' - 0" 3' - 0" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD Door Schedule Frames Material Type Type Leaves Glass A A A A A A A A A A A A A A A A A A A A A A A A A A A A A 4 A A A 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 FIRE RATED TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP - HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM Buck B C A A B B D D D D D D B B C D D D D D D D D B D D D E E C E E C Hardware Set No. Saddle A A A A A A A A A A A A A A A A A A A A A A A A A A A B B A B B A 07 THERMAL AND MOISTURE PROTECTION 072100.F1 SOUND BATT INSULATION 079200.B1 SEALANT Fire Rating A A A A A 08 OPENINGS 081113.C1 HOLLOW METAL DOOR FRAME 081416.C1 SOLID CORE DOOR 088000.E2 CLEAR TEMPERED FLOAT GLASS 60 MIN. 1 1 2 2 1 2 2 2 2 2 2 3 1 1 3 2 2 2 2 2 2 2 2 1 2 2 2 3 4 5 4 6 4 B Remarks ROWAN UNIVERSITY 09 FINISHES 092216.E1 3 5/8" METAL STUD FRAMING 092900.E1 5/8" GYPSUM WALLBOARD 10 SPECIALTIES 101400.B1 SIGNAGE CONSTRUCTION NOTES 1 EXISTING WALL TO REMAIN L RIA MO LL E M HA 60 MIN. 60 MIN. PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER 60 MIN. 60 MIN. PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER PROVIDE NEW 4"H x 44"W x 3"D RBL OVER DOOR PATCH PLASTER OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU 079200.B1 079200.B1 1 081113.C1 LE BO LL HA 081113.C1 PARKING LOT R 092900.E1 1 15/16" 092216.E1 SEE SCHEDULE Door Type 1/4" = 1'-0" A000 SEE SCHEDULE 2" 2' - 0" 2" 2" SEE SCHEDULE 2" 5 7/8" SEE SCHEDULE 2" 3' - 5 1/2" 2" 5" 2" 072100.F1 092900.E1 5/8" 079200.B1 079200.B1 A B C D E HM HM HM HM HM KEY PLAN 8" 088000.E2 088000.E2 8" 088000.E2 081113.C1 081113.C1 SEE SCHEDULE 2" 3' - 5 1/2" 2" 5" 081113.C1 6" 2" 081113.C1 SEE SCHEDULE 2" 3' - 5 1/2" 2" 5" 2 2" 8" SEE SCHEDULE SEE SCHEDULE Wood SEE SCHEDULE 4" 2" 081113.C1 A A000 2" SEE SCHEDULE 081416.C1 1 2" SEE SCHEDULE 9" 2" 2" 2" 2" 2" 2" SEE SCHEDULE 1' - 6" 2" 2" Frame Types 3 1/4" = 1'-0" A000 A B 3 5/8" Mtl Stud/HM Frame Existing Wall/HM Frame Buck Type 3" = 1'-0" 1 12/3/2014 ISSUED FOR BID No. Date Revision 2 1 5" RESILIENT FLOOR 1/4" CARPET 1/4" 1/4" EPOXY FLOOR A B Marble Threshold 4 A000 CARPET TILE 31/32" Resilient Floor to Carpet Transition Saddle Types 12" = 1'-0" Architecture 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 7" FIN. FLR. 1/2" ROWAN UNIVERSITY 4 1/4" EQ 1/2" 3/4" 1/2" WOMEN EQ FIN. FLR. FIN. FLR. SIGN TYPE B INTERIOR INTERIOR 5/8" HIGH LETTERS (HELVETICA) TYPE II BRAILLE EQ Project Title SIGN TYPE C SIGN TYPE A NJ C6793 NJ 07626 101400.B1 7" EQ TYPE II BRAILLE MOUNTING HEIGHT 1/2" 6" REPLACEABLE TEXT SLEEVE TOILET 5/8" HIGH LETTERS (HELVETICA) 4' 6" 7 -1/8" FRAME 1/2" 1" 7" 5/8" HIGH NUMBERS (HELVETICA) 1/2" 1/2" OCCUPANT TEXT TEXT William P. Lammey AIA Anthony R. Giorgio AIA 1/2" 6" 101400.B1 4" TYPE II BRAILLE MOUNTING HEIGHT 1" 2 1/2" 7" MOUNTING HEIGHT - 6" 74'5/8" 1" 5" 1" HIGH NUMBERS (HELVETICA) 216 1/2" 1" 1/2" 1" 5" 4' 6" 7 -1/8" 1" 7" 101400.B1 1" 1 1/2" 1/2" 7" 1/2" Planning INTERIOR BOLE HALL RENOVATIONS 7" 1/2" 1/2" 101400.B1 Drawing Title 1/2" 6" DOOR SCHEDULE AND DETAILS EQ 4' - 6" 1/2" 1" 5/8" HIGH LETTERS (HELVETICA) MEN 1/2" MOUNTING HEIGHT 4' 6" 7 -1/8" 7" 4" 101400.B1 TYPE II BRAILLE EQ FIN. FLR. Date: 10/24/2014 Scale 1/4" = 1'-0" Drawn By: SIGN TYPE D INTERIOR SIGNAGE MOUNTING HEIGHT SCALE 1/4"=1'-0" Checked By Job No: 5 A000 Sign Details 3" = 1'-0" 2014-064 Drawing No. A000 Key A B C D E Floor Base Carpet Carpet Resilient Vinyl Carpet Epoxy Floor Walls Vinyl Vinyl Vinyl Vinyl Epoxy WALL LEGEND Finish Schedule Wall Fin. Existing/Gypsum Board Gypsum Board Gypsum Board Existing/Gypsum Board Existing/Gypsum Board Ceiling Paint Paint Paint Paint Ceramic Tile/Glass Tile Remarks ACT/Gypsum Board, Painted ACT ACT Gypsum Board, Painted ACT DRAWING KEYNOTES 03 CONCRETE 033000.H5 CAST-IN-PLACE CONCRETE FILL 033000.O2 6 MIL VAPOR BARRIER EXISTING WALL TO REMAIN. PATCH EXISTING PLASTER IN WORK AREAS. 3-5/8" METAL STUD WALL WITH 5/8" GYPSUM WALLBOARD ON EACH SIDE AND 3 1/2" SOUND ATTENUATION BLANKET. Accent Tile @ Wall 06 WOOD, PLASTICS, AND COMPOSITES 064023.A1 SOLID SURFACE COUNTERTOP WITH 4" HIGH BACKSPLASH 064023.A2 SOLID SURFACE COUNTERTOP 066500.A1 SOLID SURFACE WINDOW SILL NEW 1-HR 3-5/8" METAL STUD WALL WITH 5/8" FIRE CODE GYPSUM WALLBOARD ON EACH SIDE AND 3 1/2" SOUND ATTENUATION BLANKET. WALL TO EXTEND TO THE UNDERSIDE OF FLOOR STRUCTURE ROWAN UNIVERSITY 08 OPENINGS 083313.B1 OVERHEAD COILING SECURITY SHUTTER 260533.A1 10 SPECIALTIES 101100.C1 MARKER BOARD 104413.B1 FIRE EXTINGUISHER CABINET 033000.H5 1' - 2" 11 4" 3/4" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" EQUIPMENT 113100.B1 REFRIGERATOR 12 FURNISHINGS 123530.B1 BASE CABINET 123530.B3 WALL CABINET 1 1/2" 6" 1" 7 5" 22 PLUMBING 224000.A1 ACCESSIBLE SINK 1 1/2" 132 130 260533.A2 Men's Toilet Room 135 E 9'-0" 129 033000.O2 Floor Patch Detail 2 A101 CONSTRUCTION NOTES 4" 1 A500 A101 1 2 3 4 5 6 7 8 066500.A1 Sill/Grille Hole Pattern 3 3" = 1'-0" L RIA MO LL E M HA 26 ELECTRICAL 260533.A1 FLOOR BOX 260533.A2 ELECTRIC CONDUIT 1" Women's Toilet Room 132 E 9'-0" 3" = 1'-0" OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU SYSTEMS FURNITURE BY OWNER FILE CABINET BY OWNER PATCH VERTICAL SHAFT WALL. SEE DETAIL PATCH EXISTING PLASTER WALLS WITH MATERIALS TO MATCH EXISTING PATCH CONCRETE FLOOR AT NEW ELECTRIC. SEE DETAIL 2/A101 REPLACE GLAZING TO MATCH EXISTING EXISTING CONCRETE SLAB SEE DETAIL 3/A101 FOR HOLE PATTERN. LENGTH TO MATCH RADIATOR BELOW LE BO LL HA PARKING LOT R 1 A300 128 12 A501 10 A501 5 A501 5 8 Janitor Closet 133 E 9'-0" 5 A501 8 12 A501 A501 8 8 12 A501 5 8 8 A501 8 2 5 A300 A501 10 A501 8 10 A501 4" 1' - 11" 4 20' - 1" 20' - 6" 1' - 11" 104 2 6' - 1" 13' - 1" 4 Corridor 107 D VARIES 1' - 11" 4 8" 7' - 1" 4 1 4 5 SIM. A501 8 103 105 106 107 1 14 Payroll SIM. Director 104 B 8'-0" Office 105 B 8'-0" 3 13' - 10" 10' - 5" 11' - 11" 12' - 4" 5' - 5" 5 Acc. Services Assoc. Director 109 B 8'-0" 11' - 5" 3' - 8" Payroll Assist. Supervisor 103 B 8'-0" Acc. Services Director 108 B 8'-0" 4 10' - 2" SIM. A501 8 1 12/3/2014 ISSUED FOR BID No. Date Revision 8" A501 12' - 4" 6' - 0" 102 12' - 4" 4 Mail/Copy 102 A 8'-0" KEY PLAN 8" 1' - 8" 8" 4 SIM. 8" 2' - 10" 12' - 7" 7' - 6 3/8" 2 20' - 6" 8" 4 3' - 8" 8" 8'-1" +/- 7' - 1" 4 1/8" 8" 4" 4" 20' - 6" 35' - 9 1/2" 4" Corridor 106 B 8'-0" 3' - 0" 13' - 10" 14' - 8" 7' - 8" 1' - 8" Conference Room/Office 112 B 8'-0" 1 Copy 111 B 8'-0" A501 064023.A1 5 1 2 064023.A1 Acc. Payable Manager 114 B 8'-0" 1 8 5 101100.C1 A501 114 Closet 116 B 8'-0" 11' - 2" Media/P.R. 118 B 8'-0" Media/P.R. 119 B 8'-0" 2' - 2 1/2" 11' - 5" 11' - 2" Office 120 B 8'-0" 11' - 8" Office 121 B 8'-0" 1' - 6 1/2" William P. Lammey AIA Anthony R. Giorgio AIA 12 A501 4 33' - 5" +/- Office 122 B 8'-0" 1 2' - 1" 1' - 6 1/2" 1 NJ C6793 NJ 07626 ROWAN UNIVERSITY 1' - 11" 113 11' - 6" 2' - 1" 5' - 4" 10' - 1" 4 Planning 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 5 2' - 6 1/2" Lobby 100 A 9'-0" 2' - 1" A501 Architecture 5' - 5" Corridor 106A B 8'-0" 108 5' - 5" 109 2' - 6 1/2" 4' - 7" 110 104413.B1 112 2' - 6 1/2" 100 064023.A2 2' - 1" 6' - 5" A300 123530.B3 2' - 1" 6' - 4" 3' - 0" 123530.B1 111 101 3 20' - 6" 224000.A1 3 SIM. A501 123530.B1 083313.B1 Acc. Services Director 113 B 8'-0" 12' - 4" 16' - 8 1/2" Break Room 110 C 8'-0" 2' - 6" 2' - 1" A501 123530.B3 7' - 7" Open Office 131 A VARIES 14 12' - 4" 113100.B1 Payroll Open Office 101 A VARIES 10 SIM. A501 2 2' - 5" 1' - 8" 15' - 8" 1' - 11" 2' - 1" 1' - 8" SIM. 1' - 1" 8'-2"+/- 1' - 2" A501 2 4 2' - 1" 2' - 1" 14 12' - 4" 1' - 3 1/4" 1' - 9" 8 5/8" 127 4" 2 10' - 10" A101 5 4 116 126 125 118 119 5 Corridor 124 B 8'-0" 123 124 122 121 SIM. A501 Project Title BOLE HALL RENOVATIONS 20' - 6" Corridor 123 B 8'-0" 117 5' - 5" 115 Reception 117 A 8'-0" 120 8 Media/P.R. 126 A VARIES Media/P.R. 127 A VARIES Office 128 A VARIES Office 129 A VARIES Budget Director 130 A VARIES 1' - 0" 2' - 1" 10' - 11" 8 10' - 6 3/4" 5 A501 1 A101 Partial Enlarged First Floor Plan 1/4" = 1'-0" 4 8 4 5 A501 SIM. 5 A501 SIM. 8 20' - 6" SIM. 12 A501 5 A501 SIM. Drawing Title PARTIAL ENLARGED FIRST FLOOR PLAN 4 4 8 1' - 11" 6 A501 13' - 1" 8 20' - 6" 12 A501 10' - 11" 8 1' - 11" SIM. SIM. 1' - 7" 10' - 11" ° 135 4 ° 135 4 10' - 11" 6 4 1 4" 10'-7"+/- 1 10' - 4" Media/P.R. 125 A VARIES 8 1' - 11" 6 A501 5 A501 20' - 6" SIM. SIM. 12 A501 5 A501 SIM. 8 1' - 11" 5 A501 SIM. 20' - 6" 12 A501 Date: 10/24/2014 Scale 1/4" = 1'-0" 8 5 A501 Drawn By: SIM. Checked By Job No: 2014-064 Drawing No. A101 DRAWING KEYNOTES 05 METALS 051200.A1 051200.D2 055000.A2 055000.A3 C8 FRAME AROUND OPENING. GALVINIZED STRUCTURAL STEEL COLUMN - SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION SET BOLT IN SEALANT GASKET 4 A102 24'-0"+- 06 WOOD, PLASTICS, AND COMPOSITES 061000.A1 PRESSURE TREATED WOOD BLOCKING 1 TYP. 07 THERMAL AND MOISTURE PROTECTION 075423.A1 POURABLE SEALER 075423.A2 TPO FLASHING HEAT WELDED IN PLACE 075423.A3 NON-SHRINK GROUT 075423.C2 TAPERED RIGID INSULATION 075423.C5 ONE PLY OF THERMOPLASTIC MEMBRANE TO MATCH EXISTING 8" ONTO EXISTING MEMBRANE 075423.C7 PRE-FABRICATED MECHANICAL EQUIPMENT CURB 075423.C8 CURB FLASHING FASTEN APROX. 8" O.C. 075423.C9 MEMBRANE FLASHING 075423.C10 GALVINIZED FASTENERS. HEAT-DUCT SEAM PLATES AROUND OPENING 079200.B1 SEALANT 2 A102 2 A102 3 A102 7 6 6 7 A102 A102 A102 A102 08 OPENINGS 089000.A1 MECHANICAL EQUIPMENT SCREEN CONSTRUCTION NOTES 25' - 0" 2 1 2 3 3 2 A102 3 A102 4 5 6 7 A102 4 A102 3 A102 2 A102 TYP. 8 9 10 11 12 15'-1"+- 8 A102 ROWAN UNIVERSITY 68' - 8" L RIA MO LL E M HA EXISTING ROOF TO REMAIN REFER TO MECHANICAL DRAWINGS FOR INFORMATION REGARDING HVAC EQUIPMENT PROVIDE PITCH POCKET AT NEW DUNNAGE COLUMNS- SEE DETAIL 4/A103 FOR FURTHER INFORMATION. EXISTING CONCRETE DECK MOUND POURABLE SEALER TO SHED WATER. POUR AT A MINIMUM DEPTH OF 2". 2" HEAT WELDED SEAM EXISTING ROOF INSULATION AND RECOVERY BOARD CUT BACK TO ACCOMMODATE NEW STRUCTURAL STEEL COLUMN EXISTING ROOF INSULATION EXISTING MEMBRANE ROOF ROOF EQUIPMENT MECHANICAL DUCTWORK VENT THRU ROOF OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU LE BO LL HA PARKING LOT R 32' - 2" 1 A102 1 A102 KEY PLAN Partial Roof Plan 1/8" = 1'-0" 051200.D2 Key Plan 089000.A1 089000.A1 12/3/2014 ISSUED FOR BID No. Date Revision 8'-0" +/- 1/32" = 1'-0" 5 075423.A1 075423.A2 055000.A2 2 1/2" 3 1 10 055000.A3 075423.C8 089000.A1 051200.D2 075423.C9 7 6 075423.C5 3 2" 075423.C2 8" MIN. 1 9 051200.D2 075423.A3 075423.C2 4 061000.A1 2 Mechanical Louver Plan Detail 3 1 1/2" = 1'-0" A102 8 075423.C2 Architecture 061000.A1 4 NOTE: NEW ROOF PENETRATIONS TO BE COORDINATED WITH ORIGINAL ROOFING MANUFACTURER TO MAINTAIN EXISTING ROOF WARRANTY 4 A102 A102 4 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 075423.C2 Mechanical Louver Section 4 1 1/2" = 1'-0" A102 Pitch Pocket Detail 1 1/2" = 1'-0" 6 A102 Planning William P. Lammey AIA Anthony R. Giorgio AIA Roof Mount Equipment Curb 1 1/2" = 1'-0" NJ C6793 NJ 07626 ROWAN UNIVERSITY 11 075423.C8 Project Title 061000.A1 BOLE HALL RENOVATIONS 075423.C7 075423.A2 12 075423.C5 079200.B1 9 079200.B1 Drawing Title 075423.A2 8 PARTIAL ROOF PLAN AND LOUVER DETAILS 075423.C10 4 079200.B1 6 075423.C2 061000.A1 2" MIN 2" MIN 8 051200.A1 NOTE: EXISTING ROOF IS FLEX FB 100 ELVALOY MEMBRANE SYSTEM BY FLEX MEMBRANE INTERNATIONAL, INC. CONTRACTOR SHALL COORDINATE WITH EXISTING ROOFING MANUFACTURER FOR PROPER EQUIPMENT CURB INSTALLATION. Date: 10/24/2014 Scale 1/4" = 1'-0" Drawn By: 075423.C2 4 075423.C2 Checked By 7 A102 Fan Curb Detail 1 1/2" = 1'-0" 8 A102 Vent Thru Roof 1 1/2" = 1'-0" Job No: 2014-064 Drawing No. A102 DRAWING KEYNOTES 3 06 WOOD, PLASTICS, AND COMPOSITES 066500.A1 SOLID SURFACE WINDOW SILL A300 07 THERMAL AND MOISTURE PROTECTION 072100.F1 SOUND BATT INSULATION 092216.A1 092216.E1 092216.E1 092216.E1 092216.E1 092216.E1 09 FINISHES 092216.A1 092216.E1 092900.E1 092900.O1 095123.B3 095400.B1 096513.C1 096519.B1 096813.B1 Parapet 15' - 6" 092216.E1 092900.E1 26 ELECTRICAL 265100.A1 LED PENDANT FIXTURE 2 15 A501 SIM. TYP. 9 A501 9 TYP. A501 9 TYP. A501 9 TYP. A501 9 TYP. A501 Top of Roof Deck 13' - 7" 3 9 TYP. A501 CONSTRUCTION NOTES 16 A501 092900.E1 092900.O1 1 2 3 092216.E1 265100.A1 095123.B3 092216.E1 Payroll Director 104 B 8'-0" 092900.E1 072100.F1 Break Room 110 C 8'-0" 066500.A1 Media/P.R. 118 B 8'-0" 096813.B1 096519.B1 1 Media/P.R. 126 A VARIES 092900.E1 096513.C1 EXISTING WINDOWS TO REMAIN EXISTING ROOF DECK PATCH EXISTING PLASTER WALLS WITH MATERIALS TO MATCH EXISTING L RIA MO LL E M HA OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE 095123.B3 10' - 5" Payroll Open Office 101 A VARIES 265100.A1 Corridor 123 B 8'-0" 096813.B1 E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU 5 A501 2' - 1" 1 095123.B3 3' - 6" 11' - 4" 5 SIM. A501 072100.F1 066500.A1 ROWAN UNIVERSITY 3 5/8" METAL COUNTOUR CEILING FRAMING 3 5/8" METAL STUD FRAMING 5/8" GYPSUM WALLBOARD CEILING SUPPORT SYSTEM 2X4 ACOUSTICAL TILE DECORATIVE COMPOSITE CEILING PANEL RESILIENT COVE BASE RESILIENT TILE FLOORING TILE CARPET First Floor 0' - 0" LE BO LL HA PARKING LOT R Building Section 1 A300 1/4" = 1'-0" KEY PLAN 3 A300 9 A501 9 A501 2 15 SIM. A501 4' - 9" 3 092900.E1 095123.B3 095400.B1 092900.E1 095400.B1 12/3/2014 ISSUED FOR BID No. Date Revision 15 A501 092216.E1 092216.E1 1 095400.B1 265100.A1 092216.A1 1 092216.A1 1 1 SIM. 5 A501 096813.B1 Open Office 131 A VARIES 096513.C1 096513.C1 096813.B1 2' - 1" 7' - 11" 10' - 0" 1 8' - 6" 066500.A1 Building Section 2 A300 Architecture Planning 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 1/4" = 1'-0" William P. Lammey AIA Anthony R. Giorgio AIA NJ C6793 NJ 07626 ROWAN UNIVERSITY 1 A300 2 A300 9 A501 7 A501 Parapet 15' - 6" 9 A501 9 A501 2 092216.E1 072100.F1 092216.E1 095400.B1 101 111 Lobby 100 A 9'-0" 092900.E1 110 109 092900.E1 108 Drawing Title 1 092900.E1 1 1 265100.A1 SIM. Open Office 131 A VARIES E BUILDING SECTIONS 11' - 4" 092900.E1 Corridor 106A B 8'-0" BOLE HALL RENOVATIONS 15 A501 092216.E1 092900.E1 Project Title 092216.A1 10' - 0" 092216.E1 SIM. 095123.B3 6' - 7" 095123.B3 3 095400.B1 265100.A1 072100.F1 Top of Roof Deck 13' - 7" 5 A501 096813.B1 096813.B1 096513.C1 096513.C1 096513.C1 096513.C1 066500.A1 2' - 1" 095123.B3 6' - 8" 11' - 4" 3 11' - 4" 092900.E1 265100.A1 First Floor 0' - 0" Date: 10/24/2014 Scale 1/4" = 1'-0" Drawn By: Checked By 3 A300 Partial Building Section 1/4" = 1'-0" Job No: 2014-064 Drawing No. A300 DRAWING LEGEND 2 x 4 ACOUSTIC CEILING TILE 1 2 x 2 ACOUSTIC CEILING TILE 1 ROWAN UNIVERSITY 1 GYPSUM WALLBOARD CEILING/SOFFIT Payroll Director 104 B 8'-0" 1 1 2 x 4 RECESSED LIGHT FIXTURE 1 1 Women's Toilet Rm. 132 E 9'-0" Break Room 110 C 8'-0" Office 105 B 8'-0" Payroll Assist. Supervisor 103 B 8'-0" 1 Acc. Services Director 108 B 8'-0" Conference Room/Office 112 B 8'-0" 1 Payroll Open Office 101 A VARIES 1 122413.B1 Unisex Toilet Room 134 E 8'-0" Janitor's Closet 133 E 9'-0" Corridor 106A B 8'-0" Corridor 106 B 8'-0" A300 083113.A1 Acc. Services Director 113 B 8'-0" Copy 111 B 8'-0" LED LINEAR PENDANT Corridor 107 D VARIES DRAWING KEYNOTES 08 OPENINGS 083113.A1 NEW ACCESS HATCH TO BE PLACED UNDER NEW VOLUME DAMPER Acc. Services Assoc. Director 109 B 8'-0" 09 FINISHES 095400.B1 DECORATIVE COMPOSITE CEILING PANEL Acc. Payable Manager 114 B 8'-0" Open Office 131 A VARIES A300 083113.A1 122413.B1 Men's Toilet Rm. 135 E 9'-0" 083113.A1 122413.B1 12 FURNISHINGS 122413.B1 ROLLER WINDOW SHADE 2 083113.A1 122413.B1 L RIA MO LL E M HA CONSTRUCTION NOTES 122413.B1 1 2 3 4 EXISTING LIGHT FIXTURE TO BE REPLACED - SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION EXISTING LIGHT FIXTURE TO REMAIN - SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION REMOVE AND REINSTALL EXISTING CEILING CONTRACTOR SHALL PATCH THE VERTICAL SHAFT WITH 3-5/8 METAL STUDS AND TWO LAYERS OF 5/8" TYPE 'X' GYPSUM BOARD AT OPENINGS. PROVIDE FIRE PENETRATION SEALANT AT ALL CONDUITS, EDGES AND PENETRATIONS. CONTRACTOR SHALL PATCH WALL FROM OPENING TO UNDERSIDE OF DECK. SEE DETAIL 2/A401. OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU LE BO LL HA PARKING LOT R 122413.B1 3 3 1 083113.A1 4 095400.B1 Mail/Copy 102 A 8'-0" KEY PLAN 3 122413.B1 1 095400.B1 083113.A1 3 3 A300 1 Lobby 100 A 9'-0" 083113.A1 095400.B1 Reception 117 A 8'-0" Media/P.R. 118 B 8'-0" Media/P.R. 126 A VARIES Media/P.R. 125 A VARIES 2 3 2 1 12/3/2014 ISSUED FOR BID No. Date Revision 122413.B1 083113.A1 083113.A1 3 2 122413.B1 083113.A1 122413.B1 Media/P.R. 127 A VARIES Corridor 123 B 8'-0" 1 A401 083113.A1 Office 128 A VARIES Office 120 B 8'-0" Media/P.R. 119 B 8'-0" 122413.B1 122413.B1 Office 129 A VARIES Budget Director 130 A VARIES Office 121 B 8'-0" Office 122 B 8'-0" 083113.A1 122413.B1 Corridor 124 B 8'-0" First Floor Reflected Ceiling Plan Architecture 1/8" = 1'-0" Planning 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 William P. Lammey AIA Anthony R. Giorgio AIA NJ C6793 NJ 07626 ROWAN UNIVERSITY PATCH AREA Project Title BOLE HALL RENOVATIONS Drawing Title FIRST FLOOR REFLECTED CEILING PLAN CONTRACTOR SHALL PATCH THE VERTICAL SHAFT WITH 3-5/8 METAL STUDS AND TWO LAYERS OF 5/8" TYPE 'X' GYPSUM BOARD AT OPENINGS. PROVIDE FIRE PENETRATION SEALANT AT ALL CONDUITS, EDGES AND PENETRATIONS. CONTRACTOR SHALL PATCH WALL FROM OPENING TO UNDERSIDE OF DECK. Date: 10/24/2014 Scale 1/4" = 1'-0" Drawn By: Checked By Job No: 2 A401 Pipe Chase Photo Detail NO SCALE 2014-064 Drawing No. A401 DRAWING LEGEND 2 x 4 ACOUSTIC CEILING TILE ROWAN UNIVERSITY 2 x 2 ACOUSTIC CEILING TILE 2 x 4 RECESSED LIGHT FIXTURE 2 x 2 RECESSED LIGHT FIXTURE DRAWING KEYNOTES 05 METALS 055000.A6 4" X 4" X 1/8" STEEL ANGLE. BEAR 4" ON EACH SIDE OF OPENING 06 WOOD, PLASTICS, AND COMPOSITES 061000.G9 2X6 PRESSURE TREATED WOOD BLOCKING 064023.H2 5/4X6 WOOD TRIM 07 THERMAL AND MOISTURE PROTECTION 078413.A1 FIRE STOPPING SEALANT 09 FINISHES 092216.C1 092900.E1 095123.B3 095123.G1 2 1/2" METAL STUD FRAMING @16" O.C. 5/8" GYPSUM WALLBOARD 2X4 ACOUSTICAL TILE WALL ANGLE CONSTRUCTION NOTES 1 2 3 4 5 6 1 3 1 EXISTING LIGHT FIXTURE TO BE REPLACED. SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION REPLACE EXISTING GLAZING TO MATCH EXISTING PATCH EXISTING PLASTER WALLS EXISTING CONSTRUCTION TO REMAIN EXISTING WALL TO REMAIN FIRE DAMPER. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION L RIA MO LL E M HA OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU LE BO LL HA PARKING LOT R 4 A402 1 3 A402 2 TYP. 2 1 1 1 3 4 A402 KEY PLAN 1 2 1 1 4 A402 1 3 TYP. 2 1 A402 1 1 3 4 1 A402 2 1 1 12/3/2014 ISSUED FOR BID No. Date Revision 4 1 A402 4 1 A402 1 1 1 A402 Second Floor Reflected Ceiling Plan 1/8" = 1'-0" Architecture Planning 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 William P. Lammey AIA Anthony R. Giorgio AIA NJ C6793 NJ 07626 ROWAN UNIVERSITY 5 078413.A1 055000.A6 078413.A1 061000.G9 5 078413.A1 078413.A1 Project Title 092900.E1 BOLE HALL RENOVATIONS 092216.C1 4 6 095123.B3 064023.H2 078413.A1 Drawing Title 078413.A1 5 078413.A1 078413.A1 2 A402 Fire Damper Detail 1 1/2" = 1'-0" NOTE: CONTRACTOR TO FILL IN OPENING LEFT BY DEMOLISHED DUCTWORK. CONTRACTOR TO ASSUME 24" X 24" SIZE PER OPENING. PROVIDE LINTELS & FIRE PENETRATION SEALANT @ ALL NEW FIRE DAMPERS. SEE MECHANICAL DRAWINGS FOR QUANTITY AND LOCATIONS AND MORE INFORMATION 3 A402 Lintel Detail 1 1/2" = 1'-0" NOTE: CONTRACTOR TO FILL IN OPENING LEFT BY DEMOLISHED DUCTWORK. CONTRACTOR TO ASSUME 24" X 24" SIZE PER OPENING. PROVIDE LINTELS & FIRE PENETRATION SEALANT @ ALL NEW FIRE DAMPERS. SEE MECHANICAL DRAWINGS FOR QUANTITY AND LOCATIONS AND MORE INFORMATION 095123.G1 4 A402 Window Head Detail 3" = 1'-0" SECOND FLOOR REFLECTED CEILING PLAN Date: 10/24/2014 Scale 1/4" = 1'-0" Drawn By: Checked By Job No: 2014-064 Drawing No. A402 102800.A1 102800.B1 5' - 3" DRAWING KEYNOTES 102800.B3 5' - 6" 06 WOOD, PLASTICS, AND COMPOSITES 061000.B1 BLOCKING 064023.A1 SOLID SURFACE COUNTERTOP WITH 4" HIGH BACKSPLASH 064023.A3 3/4" PLYWOOD SHEATHING 066500.A4 1" SOLID SURFACE COUNTER SUPPORT 224000.C2 09 FINISHES 093000.A1 093000.B1 095123.B3 096700.A1 36" DR 5" A D 102800.D3 C 5' - 0" CLEAR 102800.D2 B 3' - 1" 5' - 0" 131 2 A500 9'-11 1/2". 224000.C2 4 A500 3' - 1" 24" DR 132 SPECIALTIES 102113.B1 TOILET PARTITION 102800.A1 RECESSED HAND DRYER 102800.A2 UNDERCOUNTER LAVATORY GUARD 102800.B1 PAPER TOWEL DISPENSER 102800.B2 TOILET TISSUE DISPENSER 102800.B3 WASTE RECEPTACLE 102800.B5 SANITARY NAPKIN DISPOSAL UNIT 102800.B6 SOAP DISPENSER 102800.D2 36" GRAB BAR 102800.D3 42" GRAB BAR 102800.D4 18" GRAB BAR 102800.E2 ACCESSIBLE MIRROR Women's Toilet Room 132 E 9'-0" 11' - 2" 24" DR 224000.B2 4' - 11 3/4" 102800.B2 4' - 10" 130 4" 1 2 3 4 5 6 4'-1". 4" 224000.E3 102800.D2 3'-4". LAUREL HALL CONSTRUCTION NOTES 1'-3"+- 129 OAK HALL Men's Toilet Room 135 E 9'-0" 5' - 0" CLEAR HOLLYBUSH CARRIAGE HOUSE E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU 26 ELECTRICAL 265100.D1 WALL MOUNT FIXTURE 224000.B1 4" 224000.B2 L RIA MO LL E M HA 22 PLUMBING 224000.A2 ACCESSIBLE URINAL 224000.B1 WATER CLOSET 224000.B2 ACCESSIBLE WATER CLOSET 224000.C2 ACCESSIBLE LAVATORY 224000.E3 JANITOR SINK 102800.B5 3' - 7" ACCENT TILE GLAZED WALL TILE 2X4 ACOUSTICAL TILE EXPOXY FLOOR AND BASE 10 CLEAR Unisex Toilet Room 134 E 8'-0" 4'-9 3/4". 5'-1 1/2"+- 102113.B1 ROWAN UNIVERSITY LE BO LL HA REINSTALL EXISTING GRAB BAR REINSTALL EXISTING MIRROR REINSTALL EXISTING TOILET TISSUE DISPENSER REINSTALL EXISTING SOAP DISPENSER EXISTING WINDOW TO REMAIN INSTALL PIPE INSULATION AT ALL EXPOSED PIPING PARKING LOT R 224000.C2 5" 5' - 6" 224000.A2 102800.B1 102113.B1 224000.B2 B 3'-4 1/2". 102800.D3 128 102800.A1 A 3 A500 KEY PLAN 102800.B2 C 9" 36" DR Janitor Closet 133 E 9'-0" 5 5/8" 4'-2 3/4". 5" 6' - 7" 4'-11"+- 5" Enlarged Toilet Room Plan 1 A500 1/2" = 1'-0" 095123.B3 093000.A1 5 265100.D1 A500 093000.B1 095123.B3 102800.E2 102800.E2 093000.B1 224000.C2 093000.A1 095123.B3 102113.B1 093000.B1 1 12/3/2014 ISSUED FOR BID No. Date Revision 095123.B3 093000.A1 093000.A1 102800.B6 102800.D4 093000.B1 224000.C2 102800.D2 102800.D3 064023.A1 5 39"-41" 25" 12" 6" 7'-0" 7'-0" 102113.B1 36" MIN. 42" MIN. 18" MIN. 9'-0" 064023.A1 7'-0" 9'-0" 9'-0" 102800.D4 102800.B5 096700.A1 102800.B3 102800.B1 A 066500.A4 066500.A4 102800.A2 102800.A2 096700.A1 19" MAX. 4'-0" MIN. CLEAR FLOOR SPACE 102800.B2 B 224000.B2 102800.B2 102800.B2 224000.B1 224000.B1 224000.B2 C 1'-9" 36" MAX. 1'-5" 102800.B2 102800.B5 39"-41" 3'-0" MAX. 1'-9" 1'-5" 1'-9" 38" MAX. 11" MIN. 066500.A4 102113.B1 7"-9" 1'-5" 9" 102800.A1 MIN. 29" MIN. 8" MIN. 34" MAX. 3'-2" 2'-10" 2'-5" 4'-0" 3'-11" 7"-9" Architecture 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 096700.A1 224000.B2 D 102800.B2 William P. Lammey AIA Anthony R. Giorgio AIA 096700.A1 Women's Toilet Room Elevations 2 A500 102800.A1 061000.B1 095123.B3 095123.B3 102113.B1 093000.B1 093000.B1 095123.B3 093000.A1 265100.D1 093000.B1 102800.D4 224000.C2 093000.B1 095123.B3 064023.A1 093000.A1 102800.B6 102800.B1 064023.A3 102800.D4 102800.E2 Project Title 093000.A1 102800.D2 2 102800.D3 4 BOLE HALL RENOVATIONS 39"-41" 5 224000.C2 6" 8'-0" 128 42" MIN. 7'-0" 18" MIN. 7'-0" 7'-0" 12" 6'-6" 9'-0" 9'-0" 36" MIN. 9'-0" 1 6" 3 Drawing Title ENLARGED TOILET ROOM FLOOR PLANS & INTERIOR ELEVATIONS A500 096700.A1 6 224000.A2 B 224000.B2 102800.D2 224000.B2 102800.B2 2' - 5" C 102800.D3 096700.A1 224000.C2 096700.A1 224000.B2 1' - 1" 6 4 A500 2' - 10" 3'-0" MAX. 2'-5" 3'-2" 2'-10" 1'-5" 1'-9" 36" MAX. 39"-41" 1'-9" 1'-5" 1'-5" 2'-5" 2'-10" 3'-2" 4'-0" 38" MAX. 4'-0" 6 1'-6" MAX. 1" Toilet Room Elevation 11" 19" MAX. Men's Toilet Room Elevations 1/2" = 1'-0" 34" MAX. 11" MIN. 10" 10" Date: 10/24/2014 Scale 1/4" = 1'-0" 102800.A2 Drawn By: 066500.A4 Checked By 9" 3 A 102800.B2 MIN. 9" 096700.A1 29" MIN. 7"-9" 8" MIN. NJ C6793 NJ 07626 ROWAN UNIVERSITY 1/2" = 1'-0" 093000.A1 Planning 1/2" = 1'-0" Job No: 5 A500 Section Thru Lavatory 1 1/2" = 1'-0" 2014-064 Drawing No. A500 8 4 A501 095123.B3 A501 095123.B3 DRAWING KEYNOTES PAYROLL 05 METALS 055000.A1 9 06 WOOD, PLASTICS, AND COMPOSITES 061000.B1 BLOCKING 061600.E11 3/4" PLYWOOD SHEATHING 064023.A1 SOLID SURFACE COUNTERTOP WITH 4" HIGH BACKSPLASH 064023.A2 SOLID SURFACE COUNTERTOP 064023.A8 VENEER PLYWOOD 064023.A9 4" HIGH WOOD BASE 064023.A10 VENEER PLYWOOD SUPPORT 064023.H12 1X4 WOOD TRIM 066500.A1 SOLID SURFACE WINDOW SILL 8" 095123.B3 224000.A1 064023.A1 092900.E1 3' - 0" 21DB 096519.B1 24BC 096513.C1 24BC 123530.B1 30BC 3/4" 08 OPENINGS 083313.B1 OVERHEAD COILING SECURITY SHUTTER 064023.A8 3/4" 096513.C1 096813.B1 09 FINISHES 092216.A2 092216.E1 092900.D2 092900.E1 092900.J2 092900.O1 095123.B3 096513.C1 096519.B1 096813.B1 064023.A1 30BC 113100.B1 Breakroom 1 A501 096813.B1 3'-5 1/2". 1' - 1" 2' - 3" MIN. 2 1 1/2" 3'-5 1/2". 2 1/2" = 1'-0" A501 Copy Room Payroll Counter 3 1/2" = 1'-0" A501 ROWAN UNIVERSITY 07 THERMAL AND MOISTURE PROTECTION 072100.B3 R-13 BATT INSULATION 072100.F1 SOUND BATT INSULATION 079200.B1 SEALANT 064023.A2 123530.B1 1 096513.C1 123530.B3 2' - 10" 1' - 8" 2' - 10" 064023.A1 8' - 0" 092900.E1 3 5' - 11" 2442WC 9' - 0" 2442WC 1' - 6" 2142WC 123530.B3 3042WC 4' - 2" 3042WC 123530.B3 8' - 0" 092900.E1 3' - 6" 3624WC 3' - 6" 3624WC CONCEALED HANGERS 2" X 1 1/2" ALUMINUM ANGLES 1/2" = 1'-0" 11 L RIA MO LL E M HA OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE E US HO ALL N EE E H X PARKING L R G BO NNE LOT P A LL HA E NC BU EQUIPMENT 113100.B1 REFRIGERATOR 12 FURNISHINGS 122413.B1 ROLLER WINDOW SHADE 123530.B1 BASE CABINET 123530.B3 WALL CABINET 123530.B1 066500.A1 1/4" ALUMINUM REVEAL 3 5/8" METAL STUD FRAMING 1/2" TYPE X GYPSUM WALLBOARD 5/8" GYPSUM WALLBOARD J BEAD CEILING SUPPORT SYSTEM 2X4 ACOUSTICAL TILE RESILIENT COVE BASE RESILIENT TILE FLOORING TILE CARPET LE BO LL HA PARKING LOT R 22 PLUMBING 224000.A1 ACCESSIBLE SINK 26 ELECTRICAL 265100.A1 LED PENDANT FIXTURE 061000.B1 1'-1". 7 7 092900.E1 4 8 064023.H12 092216.E1 4 A501 072100.B3 Cabinet Section- Typical CONSTRUCTION NOTES 1" = 1'-0" 1 2 3 4 5 6 7 8 9 10 5" 6 3". 5 & 3' - 4" +/- 2'-2" +\- 092216.A2 061000.B1 072100.F1 066500.A1 092900.E1 8" KEY PLAN 095123.B3 092216.E1 066500.A1 PROVIDE WOOD VALANCE TO MATCH ADJACENT CABINETS PROVIDE ADA COMPLIANT ANTI-SCALD PIPE INSULATION PROTECTION WOOD PRIVACY SCREEN EXISTING WALL EXISTING CONCRETE SLAB EXISTING RIGID INSULATION EXISTING WINDOW EXISTING ROOF DECK ENGRAVED WOOD VENEER PANEL PATCH EXISTING PLASTER WALLS WITH MATERIALS TO MATCH EXISTING 072100.F1 072100.F1 092900.D2 055000.A1 092216.E1 6° 5 A501 Window Sill Detail 6 A501 1 1/2" = 1'-0" Window Mullion Detail 7 1 1/2" = 1'-0" A501 1 hr Wall/Ceiling Detail 4' - 2" 12/3/2014 ISSUED FOR BID No. Date Revision 3/4" = 1'-0" 7 066500.A1 7 4 7 13 092216.E1 A501 4 7' - 0" 4 1 3 8 11 064023.A2 11 A501 A501 SIM. 10 092216.E1 9" 1' - 0" 092900.E1 092216.E1 096513.C1 092216.A2 092216.A2 092216.A2 092900.E1 092900.E1 092216.E1 092216.E1 092900.E1 092900.E1 3 5/8" 096513.C1 5 8" 066500.A1 096813.B1 5/8". 8" 066500.A1 4 3/4". 6" 10 072100.F1 055000.A1 4 092900.E1 10 095123.B3 2' - 10" 055000.A1 3 5/8". 2'-0". 072100.F1 055000.A1 092216.A2 3 5/8". 2'-0". 10 10 092216.E1 8" 055000.A1 10 092900.E1 092216.A2 Architecture 4 3/4". 092900.E1 2' - 0" 092900.E1 4 3/4". 215 Highland Ave. - Suite B Haddon Township, NJ 08108 (856) 833-0010 092216.A2 092216.E1 William P. Lammey AIA Anthony R. Giorgio AIA 066500.A1 092900.E1 096813.B1 8 A501 Payroll Counter Section 9 A501 Typical Wall/Ceiling Detail 10 3/4" = 1'-0" A501 Pipe Chase Plan Detail 11 1 1/2" = 1'-0" A501 Pipe Chase Detail 12 1 1/2" = 1'-0" A501 Planning Column Pipe Chase Plan Detail NJ C6793 NJ 07626 ROWAN UNIVERSITY 1 1/2" = 1'-0" 1" = 1'-0" 092216.E1 8 8 092216.E1 4 4 Project Title 092900.E1 BOLE HALL RENOVATIONS 092216.E1 066500.A1 095123.B3 2' - 4 1/2" 2' - 8 1/2" 061600.E11 072100.F1 072100.F1 092216.E1 7 135 ° 092216.E1 4 092900.O1 072100.F1 A501 1 1/2" = 1'-0" ° 092216.E1 14 A501 Soffit Detail 1 3/4" = 1'-0" 2' - 9" 092900.J2 092216.E1 095123.B3 092900.E1 9'-0" A.F.F. 15 A501 Soffit Detail 2 3/4" = 1'-0" 092900.E1 092900.E1 095123.B3 16 A501 Soffit Detail 3 3/4" = 1'-0" 9'-0" A.F.F. 265100.A1 6'-8" A.F.F. 092900.E1 Column Pipe Chase Detail INTERIOR ELEVATIONS AND MILLWORK DETAILS 092900.J2 2' - 6" 13 Drawing Title 079200.B1 072100.F1 079200.B1 8'-0" A.F.F. 096813.B1 092900.E1 092900.E1 45 092900.E1 5 122413.B1 095123.B3 10 072100.F1 2' - 4 1/2" 3' - 4" 092900.E1 092216.E1 096513.C1 2' - 8 1/2" ° 45 & 3'-4" +/- 2'-2" +/- 092216.E1 ° 135 2' - 4 1/2" 061000.B1 122413.B1 7 Date: 10/24/2014 Scale 1/4" = 1'-0" 265100.A1 Drawn By: Checked By Job No: 2014-064 Drawing No. A501 PHASING OF CONSTRUCTION: 1. 2. 3. 4. 5. 6. PORTIONS OF THE BUILDING WILL REMAIN OCCUPIED DURING THE WORK. REFER TO DRAWING AC000 FOR PHASING PLAN. CONTRACTOR SHALL MAINTAIN NECESSARY SYSTEMS AND COMPONENTS IN OPERATION AS LONG AS REQUIRED TO ACCOMPLISH THE WORK IN PHASES AND MAINTAIN HVAC SERVICES TO OCCUPIED AREAS. PHASING NOTES BELOW ARE NOT INTENDED TO ENCOMPASS ALL PORTIONS OF THE WORK AND WILL NOT RELIEVE THE CONTRACTOR FROM THE ENTIRE SCOPE OF WORK DESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS. CONTRACTOR SHALL BE RESPONSIBLE TO SUBMIT A PHASING PLAN AT THE BEGINNING OF THE PROJECT ALONG WITH THEIR CONSTRUCTION SCHEDULE FOR REVIEW AND APPROVAL BY THE OWNER AND ENGINEER PRIOR TO STARTING WORK. EXISTING HOT WATER PUMPS, HEAT EXCHANGERS, STEAM PIPING, ETC.. WILL REMAIN IN OPERATION UNTIL THE END OF THE HEATING SEASON (APPROX. APRIL 15) AND THE NEW SYSTEM SHALL BE FULLY OPERATIONAL BY THE START OF THE HEATING SEASON (APPROX. SEPT 15) UNLESS OTHERWISE DIRECTED BY THE OWNER. NEW CHILLED WATER SYSTEM WILL BE OPERATIONAL BY APRIL 15 UNLESS OTHERWISE DIRECTED BYTHE OWNER. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY PIPING AND DUCT CONNECTIONS AS REQUIRED BETWEEN PHASE 1 AND PHASE 2 AREAS OF WORK UNTIL PHASE 1 WORK IS COMPLETE AND REMAINING AREAS ARE UNOCCUPIED. PRESIDEN'TS OFFICE SUITE WILL REMAIN OCCUPIED DURING THE DURATION OF CONSTRUCTION SYMBOLS LIST: ELECTRICAL LEGEND: DEMOLITION NEW XX;YY XX;YY 2. 3. 4. 5. 6. 7. 8. CONNECTION TO FURNITURE POWER SUPPLY. MAKE FINAL CONNECTION TO EQUIPMENT. COORDINATE EQUIPMENT CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER. J CONNECTION TO EQUIPMENT. RUN CABLE AND CONDUIT PER CIRCUIT CALL-OUT. MAKE FINAL CONNECTION TO EQUIPMENT. COORDINATE EQUIPMENT CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER. CONNECTION TO HAND DRYER. MAKE FINAL CONNECTION TO EQUIPMENT. COORDINATE EQUIPMENT CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER. P DUPLEX RECEPTACLE FOR PROJECTOR, 4"x4"x2",120VAC, 20A, MOUNT IN CEILING COORDINATE FINAL LOCATION WITH ROWAN AND VENDOR. SIDE WIRE FOR CABLE LARGER THAN #10AWG. S CONNECTION TO SINK POWER SUPPLY. MAKE FINAL CONNECTION TO EQUIPMENT. COORDINATE EQUIPMENT CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER. CONNECTION TO TOILET POWER SUPPLY. MAKE FINAL CONNECTION TO EQUIPMENT. COORDINATE EQUIPMENT CONNECTION WITH DISCIPLINE CONTRACTOR AND MANUFACTURER. T GENERAL PURPOSE SIMPLEX RECEPTACLE, 120VAC, 20A MOUNT AT 18" AFF. TO CENTERLINE, UNLESS NOTED OTHERWISE. SIDE WIRE FOR CABLE LARGER THAN #10AWG. GENERAL PURPOSE DUPLEX RECEPTACLE, 120VAC, 20A MOUNT AT 18" AFF. TO CENTERLINE, UNLESS NOTED OTHERWISE. SIDE WIRE FOR CABLE LARGER THAN #10AWG. DUPLEX RECEPTACLE, GROUND FAULT CIRCUIT INTERRUPTER, 120VAC, 20A. SIDE WIRE FOR CABLE LARGER THAN #10AWG. NON-FUSED DISCONNECT SWITCH. REFER TO SCHEDULE ON DRAWING E006. + M 2. 3. 4. 5. 6. 7. 8. 9. REMOVE EXISTING AHU-1B AND ASSOCIATED DUCTWORK (INCLUDING REMAINING AHU-1A DUCTWORK) AS SHOWN ON THE DRAWINGS. REMOVE EXISTING AHU-2, DUCTWORK AND PIPING ON SECOND FLOOR INCLUDING CONDENSING UNIT IN SECOND FLOOR MECHANICAL ROOM. REMOVE EXISTING HOT WATER SYSTEM COMPONENTS AS SHOWN ON THE DRAWINGS INCLUDING BUT NOT LIMITED TO HEAT EXCHANGERS, STEAM PIPING, HOT WATER PIPING AND DIVERTING VALVES. UPON REMOVAL OF AHU-1B, AHU-2 AND EXISTING HOT WATER SYSTEM, EXISTING PNEUMATIC CONTROL PANEL AND AIR COMPRESSOR SHALL BE REMOVED. FURNISH AND INSTALL ALL NEW WORK ASSOCIATED WITH PHASE 2 AS DESCRIBED ON THE DRAWINGS ALONG WITH NEW HEATING SYSTEM COMPONENTS IN BASEMENT MECHANICAL ROOM AND CHILLED AND HOT WATER RISERS TO SECOND FLOOR. EXISTING AREAS IN PRESIDENT'S SUITE SERVED OFF EXISTING AHU-1B WILL REMAIN OCCUPIED DURING PHASE 2. PERFORM REMOVALS IN THESE AREAS ON NIGHTS OR WEEKENDS TO MINIMIZE DOWNTIME AND EXPEDITE INSTALLATION OF VAV BOX-100G AND ASSOCIATED DUCTWORK TO THESE AREAS. UPON COMPLETION OF PHASE 2 WORK, PERFORM STARTUP, TESTING AND BALANCING OF NEW AHU-2 LOCATED ON SECOND FLOOR MECHANICAL ROOM INCLUDING CONTROLS AND VERIFICATION OF OPERATIONAL CONTROL AT CAMPUS SCADA SYSTEM. BALANCE HOT WATER AND CHILLED WATER SYSTEMS FOR AHU-2 AND VAV BOXES. PERFORM FINAL BALANCING OF AHU-1 AIRFLOW AND HYDRONIC SYSTEMS AFTER ALL SYSTEMS AND COMPONENTS ARE OPERATIONAL IN THEIR FINAL CONFIGURATION. DEVICE MOUNTED 18" ABOVE COUNTERTOP. MOTOR RATED SWITCH SINGLE-LINE LEGEND: THERMAL MAGNETIC CIRCUIT BREAKER CONTACTOR, FULL VOLTAGE NON-REVERSING DISCONNECT SWITCH HEAVY DUTY, NEMA TYPE 1 ENCLOSURE, UNLESS OTHERWISE INDICATED. FUSED DISCONNECT SWITCH HEAVY DUTY, NEMA TYPE 1 ENCLOSURE, UNLESS OTHERWISE INDICATED. DUAL ELEMENT TIME DELAY FUSE PHASE 2 (FIRST FLOOR AND SECOND FLOOR): 1. HOME RUN TO SOURCE PANEL; 'XX' INDICATES PANEL NO. & 'YY' INDICATES CIRCUIT NO. F PHASE 1 (FIRST FLOOR NEW OFFICE WING AND RESTROOMS): CONTRACTOR SHALL PERFORM A PRE-CONSTRUCTION AIRFLOW AUDIT OF AHU-1A AND 1B AND ASSOCIATED DUCTWORK. AUDIT SHALL INCLUDE COMPLETE UNIT PROFILES AND DUCT TRAVERSES FOR MAIN DUCTWORK IN BASEMENT AND FOUR (4) MAIN DUCT BRANCHES ON THE FIRST FLOOR. RECORD TOTAL AIRFLOW AND STATIC PRESSURES AT THE TRAVERSE LOCATIONS. SUBMIT A BOUND REPORT TO THE ENGINEER FOR APPROVAL. AUDIT WILL BE USED FOR TEMPORARY BALANCING OF AHU 1-B TO PHASE 2 AREAS THAT WILL REMAIN OCCUPIED. UPON APPROVAL OF PRE-CONSTRUCTION AIRFLOW AUDIT, CONTRACTOR SHALL REMOVE AHU-1A WHILE MAINTAINING AHU-1B OPERATIONAL. NEATLY DEMOLISH AHU-1A AND FURNISH AND INSTALL TEMPORARY CASING PANELS FOR AHU-1B AS NECESSARY TO MAINTAIN OPERATION. IF AHU-1B REQUIRES TEMPORARY SHUTDOWN DURING WORK, ALL ASSOCIATED WORK WILL BE PERFORMED AT NIGHT OR ON WEEKENDS TO MINIMIZE IMPACT TO OCCUPIED AREAS. REMOVE AHU-1A DUCT RISER TO FIRST FLOOR CEILING. REMOVE AHU-1A AND AHU-1B DUCT BRANCHES IN PHASE 1 AREA OF WORK. CONTRACTOR SHALL PROVIDE TEMPORARY DUCTWORK AND BALANCING DAMPERS TO CONNECT AHU-1B RISER AT THE FIRST FLOOR TO EXISTING AHU-1A AND AHU-1B BRANCHES SERVING PHASE 2 AREA OF WORK. PERFORM WORK ASSOCIATED WITH TEMPORARY DUCTWORK AT NIGHT OR WEEKEND TO MINIMIZED IMPACT TO OCCUPIED AREAS. TEMPORARILY REBALANCE AHU-1B TO REQUIRED AIRFLOWS FOR THE REMAINING DUCT BRANCHES AS RECORDED DURING THE PRE-CONSTRUCTION AIRFLOW AUDIT. PERFORM REMOVALS AND INSTALL ALL NEW WORK IN PHASE 1 AREA AS DESCRIBED ON THE DRAWINGS INCLUDING INSTALLATION OF NEW DDC CONTROL SYSTEM WHILE MAINTAINING EXISTING PNEUMATIC SYSTEM OPERATION TO OCCUPIED PORTIONS OF THE BUILDING. SHUTDOWNS AND DRAINING OF PERIMETER HOT WATER SYSTEM FOR REPLACEMENT OF FINNED TUBE RADIATION SHALL BE PERFORMED BY THE CONTRACTOR UNDER THE SUPERVISION OF THE OWNER. CUT AND CAP SYSTEM IN THE BASEMENT DURING NIGHT OR WEEKEND HOURS AND REFILL SYSTEM TO MINIMIZE IMPACT TO OCCUPIED AREAS. REMOVE EXISTING CHILLED WATER PIPING IN BASEMENT DURING WINTER MONTHS AND AFTER REMOVAL OF AHU-1A. HAVE NEW CHILLED WATER PUMP, PRIMARY-SECONDARY CHILLED WATER INTERFACE AND PIPING INSTALLED, TESTED AND BALANCED PRIOR TO THE START OF THE COOLING SEASON (APPX. APRIL 15 OR AS DIRECTED BY THE OWNER). TEMPORARILY CONNECT NEW SECONDARY CHILLED WATER PIPING TO SECOND FLOOR (PHASE 2) CHILLED WATER RISERS. UPON COMPLETION OF PHASE 1 WORK PERFORM STARTUP OF AHU-1 AND PERFORM TEMPORARY TESTING AND BALANCING INCLUDING VERIFICATION OF OPERATIONAL CONTROL AT CAMPUS SCADA SYSTEM. TEMPORARILY BALANCE HOT WATER AND CHILLED WATER SYSTEMS FOR AHU-1 AND VAV BOXES REQUIRED. CIRCUIT CALL-OUT; 'XX' INDICATES PANEL NO. & 'YY' INDICATES CIRCUIT NO. TREAT AS HOMERUN PANELBOARD H 1. SYMBOLS MECHANICAL ABBREVIATIONS EXISTING MOTOR OVERLOADS DUAL ELEMENT TIME DELAY FUSE (DETD) TRANSFORMER COMBINATION MOTOR STARTER XX MOTOR XX DESIGNATES HP LIGHTING CONTROL LEGEND: V VACANCY SWITCH, 120V, 48" AFF TO CENTERLINE, UON SEE DETAIL 3 / E004 ELECTRICAL ABBREVIATIONS (E) (R) (RE) A AC ADA AF AFC AFF AMP ANSI AT AWG BAS BHP BLDG BTU BTU/HR C CAT CB CD CFM CKT CLG CND COMM CU DT EAT EC EG EMT ESP EWT FLA FLMC FMC G,GND GC GFCI HP HR JB KVA KW LAT LRG LSD LWT MBH MC MCB MLO MTD NEC NL OA P PD PH PVC RECP RG RGS RM RPM SCH SPD SPEC STP TEMP TYP UON V VFD W XFMR EXISTING TO REMAIN REMOVE RELOCATE EXISTING AMPERE ALTERNATING CURRENT AMERICAN DISABILITIES ACT AMPERE FRAME ABOVE FINISHED CEILING ABOVE FINISHED FLOOR AMPERE AMERICAN NATIONAL STANDARDS INSTITUTE AMPERE TRIP AMERICAN WIRE GAUGE BUILDING AUTOMATION SYSTEM BRAKE HORSEPOWER BUILDING BRITICH THERMAL UNIT BRITISH THERMAL UNITS PER HOUR CONDUIT CATEGORY CIRCUIT BREAKER CANDELA CUBIC FEET PER MINUTE CIRCUIT CEILING CONDUIT COMMUNICATION COPPER DUAL TECHNOLOGY ENTERING AIR TEMPERATURE ELECTRICAL CONTRACTOR EXHAUST GRILLE ELECTRICAL METALLIC TUBING EXTERNAL STATIC PRESSURE ENTERING WATER TEMPERATURE FULL LOAD AMPS FLEXIBLE LIQUIDTIGHT METALLIC CONDUIT FLEXIBLE METALLIC CONDUIT GROUND GENERAL CONTRACTOR GROUND FAULT CIRCUIT INTERRUPTER HORSE POWER HOUR' JUNCTION BOX KILOVOLT-AMPERE KILOWATT LEAVING AIR TEMPERATURE LINEAR RETURN GRILLE LINEAR SLOT DIFFUSER LEAVING WATER TEMPERATURE THOUSAND BTU/HR MECHANICAL CONTRACTOR MAIN CIRCUIT BREAKER MAIN LUG ONLY MOUNTED NATIONAL ELETRICAL CODE NIGHT LIGHTING OUTSIDE AIR POLE PRESSURE DROP PHASE POLYVINYL CHLORIDE RECEPTACLE RETURN GRILLE RIGID GALVANIZED STEEL ROOM ROTATIONS PER MINUTE SCHEDULE SURGE PROTECTIVE DEVICE SPECIFICATION SHIELDED TWISTED PAIR TEMPORARY TYPICAL UNLESS OTHERWISE NOTED VOLT VARIABLE FREQUENCY DRIVE WATT TRANSFORMER (G) AD AFMS AHU AS BF BFP BHP BOD BOP BOS BTU C CFM CHWR CHWS COND CU CW DN DWG EA EAT EF EFF EJ ESP FD FG FT OR ' FTR GAL GPM HHWR HHWS HP HR HW HWR HWRHR HWRHS IM KW LAT LRG LSD OA PC PCHWR PCHWS RA RL RR RS S SA SD SH SP SS STD TEMP THRU TON TSTAT TYP UR V VD VEL VFD WMB WMS XP °F Ø INDICATES GLYCOL ACCESS DOOR AIRFLOW MEASURING STATION AIR HANDELING UNIT AIR SEPERATOR BELOW FLOOR BACKFLOW PREVENTOR BRAKE HORSEPOWER BASIS OF DESIGN OR BOTTOM OF DUCT BOTTOM OF PIPE BOTTOM OF STEEL BRITISH THERMAL UNITS CONDENSATE CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY CONDENSATE CONDENSING UNIT DOMESTIC COLD WATER DOWN DRAWING EXHAUST AIR ENTERING AIR TEMPERATURE EXHAUST FAN EFFICIENCY EXPANSION JOINT EXTERNAL STATIC PRESSURE FLOOR DRAIN FUEL GAS INDICATES FEET FINNED TUBE RADIATION GALLON GALLONS PER MINUTE HOT WATER RETURN HOT WATER SUPPLY HORSEPOWER HOUR DOMESTIC HOT WATER DOMESTIC HOT WATER RETURN HOT WATER REHEAT HYDRONIC RETURN HOT WATER REHEAT HYDRONIC SUPPLY ICE MAKER KILOWATT LEAVING AIR TEMPERATURE LINEAR RETURN GRILLE LINEAR SLOT DIFFUSER OUTSIDE AIR PUMPED CONDENSATE PRIMARY CHILLED WATER RETURN PRIMARY CHILLED WATER SUPPLY RETURN AIR REFRIGERANT LIQUID RETURN REGISTER REFRIGERANT SUCTION STEAM OR SANITARY SUPPLY AIR SUPPLY DIFFUSER SHOWER STATIC PRESSURE STAINLESS STEEL STANDARD TEMPERATURE OR TEMPORARY THROUGH TONS OF AC THERMOSTAT TYPICAL URINAL VENT VOLUME DAMPER VELOCITY VARIABLE FREQUENCY DRIVE WASHING MACHINE BOX WIRE MESH SCREEN EXPLOSION PROOF DEGREES FARENHEIT DIAMETER ROWAN UNIVERSITY PIPE RISING UP PIPE DROPPING DOWN UNION PUMP M MOTOR VERTICAL CO CLEAN-OUT CO FLR. MTD. NC NO IAL ORL M ME HAL OAK HALL LAUREL HALL GATE VALVE VAV BOX CONTROL VALVE B HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN BUTTERFLY VALVE LE BO LL A H CONTINUATION/BREAK PARKING LOT R BALL VALVE 3-WAY VALVE (MOTOR OPERATED) 2-WAY VALVE (MOTOR OPERATED) RELIEF VALVE CHECK VALVE Y-TYPE STRAINER KEY PLAN FLOOR DRAIN PRESSURE GUAGE THERMOMETER BALANCING VALVE T THERMOSTAT REDUCER (CONCENTRIC) 1 12/3/2014 ISSUED FOR BID No. Date Revision PITCH OF PIPING DIRECTION OF DIFFUSER FLOW DIRECTION OF FLOW LINEAR DIFFUSER/RETURN SQUARE DIFFUSER SQUARE RETURN GRILLE SQUARE EXHAUST GRILLE VOLUME DAMPER GENERAL ELECTRICAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. PROVIDE RACEWAYS, CABLES, ASSOCIATED BOXES, FITTINGS, AND CONNECTORS FOR ALL BRANCH CIRCUITS FROM THE OVERCURRENT PROTECTIVE DEVICES TO FINAL TERMINATIONS AT EQUIPMENT, DEVICES, AND FIXTURES INCLUDING LOCAL CONTROL DEVICE(S) AS REQUIRED FOR A COMPLETE INSTALLATION, U.O.N. INSTALL ALL ELECTRICAL WIRING IN METAL CONDUIT UNLESS OTHERWISE NOTED. MINIMUM CONDUIT SIZE SHALL BE 3/4" FOR POWER AND 1" FOR COMMUNICATIONS. PROVIDE A GREEN INSULATED EQUIPMENT GROUND CONDUCTOR WITH ALL BRANCH CIRCUITS AND FEEDERS. COORDINATE ALL WORK WITH ARCHITECTURAL DRAWINGS, ELEVATIONS, AND DETAILS. CEILING MOUNTED DEVICES SHALL BE LOCATED PER REFLECTED CEILING PLANS. WALL MOUNTED DEVICES SHALL BE LOCATED PER ELEVATIONS AND DETAILS. COORDINATE LOCATIONS OF EQUIPMENT DISCONNECTS AND CONNECTION REQUIREMENTS WITH THE RESPECTIVE TRADE CONTRACTOR/VENDOR. COORDINATE, VERIFY, AND CONFIRM ELECTRICAL RATINGS OF EQUIPMENT, MOTORS, AND APPLIANCES WITH THE RESPECTIVE INSTALLER/VENDOR BEFORE INSTALLING RESPECTIVE BRANCH CIRCUITS, DISCONNECTS, CONTROLLERS, AND OVERCURRENT PROTECTIVE DEVICES. PROVIDE THE CORRECT SIZES AND CIRCUITS AS REQUIRED FOR THE FURNISHED EQUIPMENT. OUTLET BOXES FOR TELECOMMUNICATION DEVICES, SECURITY DEVICES AND MISCELLANEOUS ELECTRONIC SYSTEMS SHALL BE 4"SQ x 2 1/8"D MINIMUM WITH SINGLE GANG DEVICE RING U.O.N. MOUNT DEVICES PER ARCHITECTURAL DRAWINGS. ALL CLEARANCES SHALL BE MAINTAINED PER NEC, NESC AND UL. ALL PARTS, DEVICES, EQUIPMENT, ETC. WHICH REQUIRE MAINTENANCE, ADJUSTMENT, OPERATION OR EXAMINATION DURING NORMAL OPERATION SHALL BE ARRANGED SO AS TO BE ACCESSIBLE BY THE PROVISION OF ADEQUATE WORKING SPACES, WORKING FACILITIES AND CLEARANCES. ALL DIMENSIONS INDICATED IN THESE DOCUMENTS ARE FOR REFERENCE AND COORDINATION PURPOSES ONLY. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS IN THE FIELD. THE CONTRACTOR SHALL COORDINATE WITH OTHER TRADES FOR THE ACTUAL EQUIPMENT TO BE INSTALLED AND SHALL SECURE DIMENSIONAL DATA THAT WILL ASSIST IN DETERMINING ADEQUATE SPACE REQUIREMENTS FOR INSTALLING ALL ELECTRICAL EQUIPMENT, LUMINARES, DEVICES, ROUGH-IN REQUIREMENTS, ETC. ADJUST ACTUAL LOCATION OF ELECTRICAL PROVISIONS ACCORDINGLY. ADVISE ALL TRADES THAT THE INSTALLATION OF HVAC DUCT WORK, PIPING, DEVICES, ETC., ABOVE ELECTRICAL EQUIPMENT IS NOT ALLOWED. NAMEPLATE DATA OR MANUFACTURER'S WRITTEN DATA OF ACTUAL EQUIPMENT INSTALLED SHALL BE USED TO DETERMINE EXACT UNIT OR DEVICE PROTECTION, CONDUCTOR TERMINATION REQUIREMENTS, ETC. ALL DEVICES SHALL BE COORDINATED FOR THE PROPER VOLTAGE, OPERATION, CONTACT RATINGS, COLOR CODING, ETC. ALL WALL BOXES FOR SWITCHES, RECEPTACLES, DEVICES, ETC., SHALL BE INSTALLED FLUSH WITH THE FINISHED WALL SURFACE. COORDINATE WITH ALL TRADES FOR THE FINAL ADJUSTMENT AND INSTALLATION TO ALLOW FOR WALL THICKNESS, EXTENSION RINGS, ETC. ALL NON-CURRENT CARRYING METALLIC PARTS OF DEVICES AND SYSTEMS, ENCLOSURES, OUTLET BOXES, SUPPORTS, ETC., SHALL BE BONDED THROUGH THE INTERIOR GROUNDING SYSTEM. FACE PLATES AND COVERS SHALL BE EFFECTIVELY GROUNDED PER MANUFACTURER'S UL LISTING. CONTRACTOR SHALL PROVIDE ALL PANEL SCHEDULES WITH TYPED SCHEDULES. PP DT LIGHTING CONTROL POWER PACK, 277V, 20A; MOUNT ABOVE CEILING SEE DETAIL 4 / E004 DUAL TECHNOLOGY OCCUPANCY SENSOR, LOW VOLTAGE, CEILING MOUNTED W - DENOTES WALL MOUNT FLEXIBLE DUCT EG 2 INDICATES EQUIPMENT ABBREVIATION INDICATES EQUIPMENT NUMBER TELECOMMUNICATIONS LEGEND: INDICATES SECTION NUMBER X TELEDATA DROP, MOUNT IN CEILING COORDINATE FINAL LOCATION WITH ROWAN AND VENDOR M-115 INDICATES DRAWING ON WHICH SECTION APPEARS ROWAN UNIVERSITY POINT OF CONNECTION BETWEEN NEW AND EXISTING POINT OF CONNECTION BETWEEN EXISTING TO REMAIN AND EXISTING TO BE REMOVED Project Title BOLE HALL RENOVATIONS Drawing Title MEP GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. G001 Printed: 12/3/2014 11:31:35 AM G REMOVAL KEYNOTES 3/4" HWR 1 2 1" HWS REMOVE EXISTING HEAT EXCHANGER, MOUNTS, BRACKETS, TRIM, ETC. CONTRACTOR SHALL SHUT DOWN EXISTING AIR COMPRESSOR TO VERIFY IF ANY EXISTING SYSTEMS TO REMAIN ARE ON PNEUMATIC CONTROLS. REMOVE EXISTING AIR COMPRESSOR, PNEUMATIC TUBING, AND ALL ASSOCIATED PNEUMATIC CONTROLS, INCLUDING THERMOSTATS, AND CONTROL VALVES. TURN COMPRESSORS OVER TO ROWAN UNIVERSITY OR DISCARD. REMOVE EXISTING PNEUMATIC CONTROL PANEL AND ALL ASSOCIATED COMPONENTS. REMOVE EXISTING HOT WATER PUMPS AND ALL ASSOCIATED COMPONENTS. REMOVE EXISTING AIR HANDLING UNITS, AND ALL ASSOCIATED COMPONENTS. REMOVE EXISTING EXPANSION TANKS, HANGERS, SUPPORTS, AND ALL ASSOCIATED COMPONENTS. REMOVE EXISTING 4" CHWS/R FROM FURTHEST POINT BACK TO SHUT OFF VALVE IN BASEMENT AS INDICATED. COORDINATE WITH THE UNIVERSITY FOR SHUT DOWN OF CHILLED WATER SERVICE TO BUILDING AT MANHOLE. REMOVE EXISTING INTAKE LOUVER AND OA DUCTWORK TO AHU'S. EXISTING 3-WAY DIVERTING VALVES. SUPPLY CONNECTION NOT SHOWN FOR CLARITY. REFER TO SINGLE LINE DIAGRAM FOR DETAILS. 1" HWR 3/4" HWR ELECTRICAL ROOM UP TO EXISTING RADIATOR ON FIRST FLOOR (TYP.) 3/4" HWR 002 3 4 5 6 1" HWR STEAM SERVICE ENTRANCE 1" HWR 3/4" PC 7 5" LPS 8 9 1-1/4" HWS Room ROWAN UNIVERSITY 001 1/2" HWS UP GENERAL NOTES IAL ORL M ME HAL STORAGE 004A 1. 2. CORRIDOR EXISTING RADIATOR (TYP.) 1" HWR H001 CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO STARTING WORK. REFER TO PHASING OF CONSTRUCTION NOTES AND PHASE REMOVALS IN A MANNER TO MAINTAIN HVAC AND HYDRONIC SERVICES TO OCCUPIED SPACES DURING CONSTRUCTION. B OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN 2-1/2" HWR LE BO LL A H PARKING LOT R ZONE A 1-1/4" HWR ZONE J 1" HWR 1" PC 5" LPS 1-1/4" HWS 2-1/2" HWS 1-1/4" HWR ZONE J T KEY PLAN UP 3 5 4" CHWS TO AHU COILS STORAGE 1-1/2" HWR 4" CHWR FROM AHU COILS 2" HWS 005 4" HWS TO AHU COILS 8 72" x 36" INTAKE LOUVER ABANDON PIPING IN CHASE 2-1/2" HWR 2-1/2" CHWS/R UP TO 2ND FLOOR AHU 1 7 1A (E)CHWR TO CAMPUS CHW LOOP UP 2" HWS UP 2" HWR (ZONE I) 1-1/4" HWR (ZONE G) 4" CHWR 7 4" CHWR 4" CHWS 006 2-1/2" CHWR FROM AHU-1-B 2-1/2" CHWS FROM AHU-1A (E)CHWS FROM CAMPUS CHW LOOP 3" CHWR 2-1/2" CHWS TO AHU-1 36X28" UP 48X18 SA 3" HWR 4" HWS 4" CHWS 2 36X28" UP 4" HWR 48X18 SA 2" HWS 1-1/4" HWR (ZONE C) 3-1/2" HWS TYPICAL 4" HWS 3" LPS DN TO HX 1 3" LPS DN TO HX 2" HWS INTO MECH RM 1-1/4" HWR FROM ZONE "D" 208.5MBH 79.0 MBH FROM HWS TO ZONE "F" 5 1-1/4" HWR FROM ZONE "C" 1" RELIEF PIPING 6 9 2" HWR FROM AHU 1-B 2-1/2" HWR 4" HWR DM001 1" HWR FROM ZONE "F" 1-1/2" HWR 2" HWS SUPPLY TO ZONE "C" AND "D" 1" HWS 1-1/4" HWR (ZONE D) 1 72.0 MBH FROM HWS TO ZONE "F" 1-1/4" HWR 1" PC REMOVE EXISTING 72X36 DAMPER AND LOUVER 1 2-1/2" CHWS FROM AHU-1A PIPING TO FIRST FLOOR RADIATIONS IN CRAWLSPACE 36x28 4 3" CHWS 2" HWS 1B 1/2" HWS 1" HWR (ZONE F) Revision 2-1/2" CHWS FROM AHU-1B AHU PIPING TO FIRST FLOOR RADIATIONS IN CRAWLSPACE Date 2-1/2" CHWR FROM AHU-2 UP MECHANICAL ROOM 12/3/2014 ISSUED FOR BID No. 2" HWR FROM AHU 1-A 1-1/2" HWR FROM ZONES "A" AND "J" 1-1/2" HWR 3" HWR 2-1/2" HWR BASEMENT FLOOR PLAN 3-1/2" HWS ROWAN UNIVERSITY 1/4" = 1'-0" 4" HWS 52.0 MBH EXPANSION TANK TYPICAL OF 2 2" HWR FROM ZONE "G" AND AHU-2 64.0 MBH (E)1" CW MAKEUP 4" HWR HOT WATER PUMP TYPICAL OF 3 1" RELIEF PIPING 1-1/4" HWR FROM ZONE "I" 2" HWS 2" HWS 2" HWS TO ZONES "G", "I" AND AHU-2 5" LPS P-1 P-2 P-3 1'-1/4" HWS SUPPLY TO ZONE "A" AND "J" 3-1/2" HWS TYP. OF 2 3-1/2" LPS (TYP.2) BOLE HALL RENOVATIONS 2" HWS TO AHU 1-A 3" HWS Project Title 1" HWS TO ZONE F Drawing Title 2" HWS TO AHU 1-B 3-1/2" HWS 1" PC 2-1/2" HWS 1" PC CONDENSATE RECEIVER 3-1/2" HWS HX-1 T HX-2 T DIVERTING VALVES FOR ZONES "A" AND "J" T 2-1/2" HWS OUTSIDE MECH. RM TO ZONES "C" AND "D" 1" HWR FROM ZONE "A" 60.0 MBH 1-1/2" HWR 84.0 MBH GRAVITY CONDENSATE 2 DM001 PIPING FLOW DIAGRAM Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: NO SCALE 2014-064 Drawing No. 1-1/4" HWR FROM ZONE "J" Printed: 12/3/2014 11:31:21 AM BASEMENT HVAC REMOVALS DM001 REMOVAL KEYNOTES 1 REMOVE EXISTING DUCTWORK IN MECHANICAL SHAFT. COORDINATE WITH GC FOR SHAFT REMOVAL. REMOVE EXISTING FINNED TUBE RADIATORS, PIPING AND SUPPORTS. CUT AND CAP EXISTING 1/2" SUPPLY AND RETURN RISERS ABOVE 1ST FLOOR SLAB. EXISTING BRANCH DUCTWORK TO ALL DIFFUSERS WAS NOT ABLE TO BE FIELD VERIFIED. CONTRACTOR SHALL REMOVE ALL EXISTING DIFFUSERS AND ASSOCIATED BRANCH DUCTWORK BACK TO MAIN. REMOVE EXISTING THERMOSTAT ASSOCIATED WITH EXISTING RTU-1 SERVING PRESIDENT'S SUITE. 2 3 4 ROWAN UNIVERSITY IAL ORL M ME HAL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE G ZONE A DN B OFFICE 104B OAK HALL SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN W110 LE BO LL A H PARKING LOT R OFFICE 104C W109 12X10 W108 12X10 12X10 ZONE "A" WOMEN 105 TOILET 103 LOUNGE 102 T KEY PLAN 12X10 UP ZONE D UP J.C. 106 JANITOR 101 2-1/2" CHWS/R UP TO 2ND FLOOR EXISTING RADIATOR (TYP.) MEN 107 1-1/2" HWS/R UP & 2"DN 1-1/4" HWR DN EXISTING 12X6 LOW RETURN TO PIPE CHASE TO BE CLOSED BY G.C. (TYP.) 1 VESTIBULE L101 H H102 J T UP ZONE "C" S1 H100 20X16 W116 36X18 W115 OFFICE 110D 110C OFFICE 114 OFFICE 113 1 26X18 ZONE D CH101 36X18 SUPPLY CLOSET 100I 32X18 OFFICE 109B 108 REFERENCE AREA 111A OPEN OFFICE AREA 110A W114 12X12 5 W111 W113 30X18 OFFICE 110F OFFICE 110E 3 TYP. FOR ALL OFFICE 117 W106 W104 ZONE F COPY ROOM 112 W105 OFFICE 100E FILE ROOM 116A OFFICE 116 24X18 20X16 H101 18X16 14X16 3 STORAGE 122 OPEN OFFICE AREA 124 OFFICE 119 OPEN OFFICE AREA 100 W103 4 T LOBBY L100 12X12 OFFICE 100C OFFICE 111B 18X16 ZONE D OFFICE 100D 20X18 110 PAYROLL STORAGE 110G TOILET 100C1 22X18 OPEN OFFICE AREA 111 16X12 W107 W112 24X18 32X18 30X18 ZONE F 36X28 DN ("B" DUCT) TELE/COM COPY ROOM 108A Revision OFFICE 115 36X28 DN ("A" DUCT) OFFICE 100F Date 110H OPEN OFFICE AREA 109 12X8 12/3/2014 ISSUED FOR BID No. 12X10 OFFICE 109A DN T OFFICE AHU-1A OFFICE 110B OFFICE 110A1 STAIR KITCHEN 100H L K 7 CH100 FILE ROOM 100G ZONE C 2 ZONE C FILE ROOM 104A OPEN OFFICE AREA 104 CONFERENCE ROOM 100B CONFERENCE ROOM 125 OPEN OFFICE AREA 118 OFFICE 123 OFFICE 121 W102 OFFICE 124A W100 W101 OFFICE 124B OFFICE 120 OFFICE 123A ZONE "D" AHU-1B ZONE D OFFICE 119A ROWAN UNIVERSITY T T 1 ZONE F OFFICE 100A FOYER V100 STAIR S2 UP Project Title ZONE D 1 DM002 FIRST FLOOR PLAN BOLE HALL RENOVATIONS 1/8" = 1'-0" Drawing Title FIRST FLOOR HVAC REMOVALS Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. DM002 Printed: 12/3/2014 11:31:22 AM REMOVAL KEYNOTES 1 2 G 3 4 5 REMOVE STEEL SUPPORTS TYP. OF 2 REMOVE EXISTING RELIEF VENT AND CURB. CAP EXISTING CURB PER DETAIL 13 ON M-013 COORDINATE WITH GC FOR PATCHING OF ALL EXISTING DUCT OPENINGS IN CORRIDOR WALLS TO MAINTAIN FIRE RATING. RE-USE EXISTING DUCTWORK FROM BRANCH TO DIFFUSER IN THE STAIRWELL. REMOVE EXISTING 24" Ø EXHAUST FAN, ROOF CURB, AND ASSOCAITED COMPONENTS SERVING FIRST FLOOR BATHROOMS. CUT AND REMOVE EXISTING EQUIPMENT IN PIECES TO FIT THROUGH EXISTING DOORWAY. PROTECT ROOF DURING REMOVAL AND NEW WORK. ROWAN UNIVERSITY 3'-0" DOOR TO MECHANICAL ROOM 5 4 REMOVE COOLING TOWER 1ST FLOOR ROOF 210 IAL ORL M ME HAL 2" CWS/R DN 2-1/2" CHWS/R DN REMOVE AHU-2 7 B UP 205B1 OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN S1 LE BO LL A H 1-1/2" HWS/R DN PARKING LOT R DN 205A 205B 1 36x26 OAI UP THRU ROOF AHU-2 8X10 T 36x10 TRANSFER OPENING TYP. OF 2 KEY PLAN 205 209 5 26X26 36X6 203 8X6 208 1 12/3/2014 ISSUED FOR BID No. H200 2 Revision 207 TYP. FOR ALL H201 EXISTING RADIATOR (TYP.) W202 9X10 24X26 ZONE G Date 202 ZONE "I" T ZONE I 36X6 204 3 36X6 7X10 20X26 W201 206 200 ROWAN UNIVERSITY 200C W200 T ZONE "G" 20X16 200B 3 8X10 14X10 20X16 Project Title 200A 1 BOLE HALL RENOVATIONS DN 201 L200 ZONE G 1 DM003 SECOND FLOOR PLAN 1/4" = 1'-0" S2 Drawing Title SECOND FLOOR HVAC REMOVALS Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. DM003 Printed: 12/3/2014 11:31:23 AM G INSTALLATION KEYNOTES 1 3/4" HWR 2 1" HWS 3 1" HWR 3/4" HWR 3/4" HWR 3/4" PC UP TO EXISTING RADIATOR ON FIRST FLOOR (TYP.) 4 5 1" HWR STEAM SERVICE ENTRANCE 1" HWR 6 5" LPS ELECTRICAL ROOM 1-1/4" HWS 7 002 8 Room 5" STEAM SHUTOFF VALVE 001 FURNISH AND INSTALL REMOTE FLOW CONVERTERS AND TEMPERATURE/PRESSURE INDICATING TRANSMITTERS ON THE WALL FOR CHILLED WATER AND STEAM METERS. FURNISH AND INSTALL ADAMS TRIPLE OFFSET VALVE FOR BUILDING LOW PRESSURE STEAM ISOLATION. COORDINATE WITH UNIVERSITY FOR SHUTDOWN OF STEAM SERVICE TO BUILDING. FURNISH AND INSTALL NEW DDC CONTROL PANEL AND FLOW COMPUTER FOR CHILLED WATER AND STEAM METERS. FURNISH AND INSTALL HOUSEKEEPING PAD AND INERTIA BASE FOR PUMPS. CORE DRILL, SLEEVE, AND FIRESTOP NEW PIPING PENETRATIONS AT MECH. ROOM WALL. REMOVE EXISTING 1-1/2" RIGID INSULATION ON CEILING OF EXISTING MECHANICAL ROOM M006 AND FURNISH AND INSTALL NEW INSULATION. MECHANICALLY FASTEN TO UNDERSIDE OF DECK IN MECHANICAL ROOM TO MATCH EXISTING. FURNISH AND INSTALL DUPLEX CONDENSATE PUMP AND CONTROL PANEL BASIS OF DESIGN ITT MODEL 62.5CC, 6GPM, 25PSIG, 14 GALLON CAST IRON RECIEVER, 0.5HP, 3500 RPM, ODP, 208/2/60. PANEL MOUNTING NEMA TYPE 2 CONTROL PANEL WITH FUSED DISCONNECT. FURNISH AND INSTALL NEW THREE WAY DIVERTING VALVE. CONNECT TO EXISTING PIPING. FURNISH AND INSTALL FITTINGS AS REQUIRED. ROWAN UNIVERSITY 2 IAL ORL M ME HAL 1/2" HWS UP OAK HALL LAUREL HALL STORAGE 004A CORRIDOR 1" HWR H001 B EXISTING RADIATOR (TYP.) 2-1/2" HWS HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H Room PARKING LOT R 1" PC 8 ZONE A 8 ZONE J HWS H101 1-1/4" HWR 5" LPS 1-1/4" HWS 2-1/2" HWS 1-1/4" HWR 1" HWR HWR ZONE J T 5"X4" REDUCING EL BOP = 8'-2" HWS KEY PLAN 2" HWR 3 1-1/2" HWS 1-1/2" CHWS/R UP 5 BAS MTRS UP 4 M013 CHWP 3" CHWS&R BOP=8'-8" 1 1-1/2" CHWS STORAGE 1-1/2" CHWR 005 HWR 4 5 2" HWS BOP=8'-8" 2-1/2" CHWR (BOP=7'-8") 1 2-1/2" CHWS (BOP=7'-8") 1 T 1-1/2" HWRHS/R UP EF-2 Date Revision 7 CAP CHWS&R M 3" CHWS&R BOP=6'-8" 12/3/2014 ISSUED FOR BID No. 3" MAGNETIC FLOW METER FOR CHILLED WATER CHOKE VALVE M 8 M 24"X24" MOTOR OPERATED INTAKE DAMPER UP 2" HWS 4" VORTEX STEAM METER MECHANICAL ROOM 006 72"x36" LOUVER. SAFE OFF UN-USED PORTION WITH INSULATED METAL PANEL (TYP. 2). UP 2" HWR (BOP=8'-8") 1-1/2" HWS (BOP=8'-8") 2" HWS UP TO FTR (ZONE C & D) 1-1/4" HWR DN FROM FTR (ZONE C) 2" HWR (ZONE I) 1-1/4" HWR (ZONE G) 6 2" HWRHR (BOP=7'-8") 2-1/2" CHWS/R UP 1-1/2" VENT UP 1/2" HW UP TO RAD (TYP.) 2" HWRHS (BOP=7'-8") 3" HWR 2" HWRHS/R UP 4" PCHWS&R 1" PC (BOP=8'-2") 4" LPS (BOP=8'-2") 3/4" CR 1-1/4" HWR DN FROM FTR (ZONE D) SHOT FEEDER CAP 2 M001 DIVERTING VALVE (ZONE D) 5 EF 2 1/2" HWS 1" HWR (ZONE F) 1" HWS 1-1/4" HWR (ZONE D) CRU HWP HWP HWP HX 3 2 1 1 EXPANSION TANK BASIS OF DESIGN B&G MODEL D-40V 3/4" CW MAKE-UP 2" HWRHS TO VAV 2-1/2 HWS TO FTR 1 M001 AIR SEPERATOR BASIS OF DESIGN B&G MODEL RL-2-1/2N 1 7 DIVERTING VALVE (ZONE C) 1-1/2" VENT DN 1-1/2" CR BELOW 1-1/2" VENT ABOVE ROWAN UNIVERSITY BASEMENT FLOOR PLAN 1/4" = 1'-0" COLD WATER MAKEUP AND BACKFLOW PREVENTER. REFER TO 1/M-008 SINGLE LINE PIPING DIAGRAM EXPANSION TANK STRAINER TYPICAL 4" STEAM 3" HWS HWR FOM ZONES D & F PUMPED CONDENSATE CEILING (9'-3" AFF) 3/4" CR FROM LPS HEADER DRIP LEG Project Title 3" HWR 3" HWS ISOLATION VALVE TYPICAL 3/4" 1-1/2" V TO ROOF 2-1/2" HWS TO FINNED TUBE SYSTEMS (62 GPM) RELIEF VALVE 3/4" TO HWR SHOT FEEDER 1/3-2/3 STEAM CONTROL VALVE STATION HWP HWP HWP 1 2 3 BOLE HALL RENOVATIONS 2" HWRHS TO VAV SYSTEMS (30 GPM) Drawing Title 12 M013 3/4" HWS CONNECT 3/4" VENT TO EXISTING VENT LINE AIR SEPERATOR CRU 1 LOW PRESSURE CONDENSATE TYP.3 BASEMENT HVAC INSTALLATIONS FLOOR STEAM TRAP TYPICAL HX 1 HEAT EXCHANGER SUPPORTS INCLUDE SADDLE SUPPORTS AND ATTACH TO STEEL SUPPORT 6 S002 ISOLATION VALVE TYPICAL Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2 M001 Printed: 12/3/2014 11:31:36 AM ELEVATION NO SCALE 2014-064 Drawing No. M001 ZONE A SD-1B SD-1 RG-1 VAV SD-2B 200 CFM 360 CFM 104B 210 CFM G RG-1 450 CFM INSTALLATION KEYNOTES SD-1C SD-2A 8ø VD VD 8ø 250 CFM 100 CFM 1 SD-2A 8ø 10x10 SD-2A 100 CFM 2 VD 8x10 RG-1 10x12 6ø 10x10 EG-1 3 325 CFM 14ø VD 65 CFM RG-1 10ø 6ø 75 CFM VD 4 5 6 8ø 75 CFM REFER TO STRUCTURAL DRAWINGS FOR NEW ROOF OPENING SIZES AND LOCATIONS. MECHANICAL CONTRACTOR TO FURNISH AND INSTALL NEW ROOF CURB. REFER TO DETAIL 3/S002. ROOFING TO BE PERFORMED BY G.C. MAINTAIN FIRE RATING AT ALL WALL PENETRATIONS TO RENOVATED OFFICE SUITE. COORDINATE WITH ARCHITECTURAL PLANS FOR WALL SECTIONS. REFER TO DETAIL 11/M013 FOR FIRE DAMPER INSTALLATION. FURNISH AND INSTALL NEW EQUIPMENT SUPPORT CURB FOR AHU. ROOFING TO BE PERFORMED BY G.C. CONNECT TO EXISTING DIFFUSER. REBALANCE TO PROVIDE 100 CFM. CONNECT TO EXISTING DIFFUSER. REBALANCE TO PROVIDE 200 CFM. CONNECT TO EXISTING DIFFUSER. REBALANCE TO PROVIDE 260 CFM. ROWAN UNIVERSITY SD-1C 8ø 245 CFM 8ø 18x14 VD SD-2C VAV EG-1 VAV 104A RG-1 225 CFM 104C 8ø 10ø VD 160 CFM 2 M002 10x10 IAL ORL M ME HAL 8ø VD ZONE D 175 CFM 18x14 10x12 SD-1D 12x12 EA UP VAV 360 CFM EG-1 102 ZONE C 50 CFM EG-1 EG-1 VD H 150 CFM 18x14 18x14 75 CFM J L K M B 7 OAK HALL LAUREL HALL LE BO LL A H 8ø VD VD 4 2 8ø 14x10 10ø VD ZONE D ZONE C 6ø 18x14 5 VD 5ø 2 14x10 6ø VD VAV 4 H100 5 2 30x24 KEY PLAN 10ø 5 VAV VD 100G 2 20x16 SD-1D RG-1 360 CFM 400 CFM 24x24 ZONE F PARKING LOT R 20x16 10ø VD 540 CFM CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN 12ø RG-1 HOLLYBUSH 14ø 2 M006 VAV 12x12 1 M007 3 3 VAV-125 L100 VD ZONE F 2 T VAV ZONE D 125 1 VD 4 12/3/2014 ISSUED FOR BID No. Date Revision VD 4 VD VD 6 TYP. OF 3 1 ZONE D ZONE F G ZONE D 1 M002 H FIRST FLOOR PLAN J L K M 7 1/8" = 1'-0" 1-1/2" VENT PIPE THROUGH ROOF, REFER TO DETAIL 8/A102 1-1/2" GOOD NECK, TERMINATE AT 24" ABOVE ROOF DECK. PROVIDE S.S. WIRE MESH SCREEN ROWAN UNIVERSITY 5 RELIEF AIR HOOD AHU 34X34 RETURN AIR DN 1 1 Project Title 18x14 RA DUCT BOD=10'-6" 6"Ø EA DUCT BOD=10'-10" 6"Ø EA DUCT BOD=9'-3" 1 S001 ROOF SUPPORT BOLE HALL RENOVATIONS 3 3 18x14 SA DUCT BOD=9'-2" 34X34 SUPPLY AIR DN CEILING 1 SCREEN WALL SERVICE CLEARANCE TYPICAL OUTSIDE AIR INTAKE HOOD 14 M013 Drawing Title DUCT ROOF SUPPORT TYPICAL FIRST FLOOR HVAC DUCT INSTALLATIONS PIPING VESTIBULE CORRIDOR WALLS 1 Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2 M002 Printed: 12/3/2014 11:31:40 AM 1ST FLOOR CORRIDOR 1/4" = 1'-0" 3 M002 FIRST FLOOR ROOFPLAN 1/8" = 1'-0" 2014-064 Drawing No. M002 INSTALLATION KEYNOTES 1 FURNISH AND INSTALL NEW COMMUNICATING THERMOSTAT FOR PRESIDENT'S WING RTU FOR INTEGRATION INTO NEW DDC CONTROL SYSTEM AND FRONT END. BASIS OF DESIGN HONEYWELL MODEL TB7600. CORE DRILL AND SLEEVE ALL PIPE PENETRATIONS AT FLOOR. EXTEND SLEEVE 1" ABOVE TOP OF SLAB. PACK ANNULAR SPACE WITH MINERAL WOOL AND FIRESTOP. 2 ROWAN UNIVERSITY IAL ORL M ME HAL G B OAK HALL LAUREL HALL LE BO LL A H OFFICE OFFICE VAV-104B T VAV CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN OFFICE 104B HOLLYBUSH PARKING LOT R 104C W110 T VAV-104C 104B 1/2" HWRHS & R OPEN OFFICE VAV FILE ROOM 104 104A VAV 104A 104C VAV-104 T LOUNGE TYP. 3/4" HWRHS & R 1/2" HWRHS & R VAV 102 102 KEY PLAN 2 WOMEN'S ROOM M002 105 VAV-102 2 8 M013 3/4" HWRHS & R T 1/2" HWRHS & R 1-1/2" CHWS/R & 1-1/4" HWRHS/R UP TO 2ND FLR MECH. ROOM MEN'S ROOM 107 VESTIBULE CORR. L100 H100 1-1/2" HWRHS/R & 1-1/2" CHWS/R DN TO BASEMENT H 2 J K L M 7 T 1 12/3/2014 ISSUED FOR BID No. Date Revision VAV-100G CONFERENCE ROOM KITCHEN VAV 100H H100 101G STORAGE 100I 5 1/2" HWRHS & R VAV 100G 1/2" HWRHS & R 1/2" HWRHS & R 3/4" HWRHS & R 1/2" HWRHS & R 1/2" HWRHS & R VAV 125 3 T T VAV-125 VAV VAV-L100 L100 CONFERENCE ROOM ZONE F T 1 T 125 LOBBY ROWAN UNIVERSITY L100 1 FOYER V100 Project Title BOLE HALL RENOVATIONS 1 M003 FIRST FLOOR PLAN 1/8" = 1'-0" Drawing Title FIRST FLOOR HVAC PIPE INSTALLATIONS Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. M003 Printed: 12/3/2014 11:31:41 AM INSTALLATION KEYNOTES 1 G 2 3 4 78"X12" INTAKE LOUVER BASIS OF DESIGN GREENHECK EHH-701 EF 54X12 AND 24"X12" MOTOR OPERATED DAMPER AT INTERIOR SECTION OF LOUVER 6 1 5 6 UH 7 1 M M 14"X14" RELIEF UP TO ROOF MOUNTED LOUVERED PENTHOUSE BASIS OF DESIGN GREENHECK WRH 6 SERIES 14"X14"X12" AHU 7 2 6 UH-1 EF-3 MOD T EF 3 30x18 4 3 RF 9 3'-0" DOOR TO MECHANICAL ROOM 5 M013 1 8 9 OAT SAW CUT EXISTING CORRIDOR AND MECHANICAL ROOM MASONRY WALLS. FURNISH AND INSTALL FIRE DAMPER PER 11/M013 AND FIRE STOP. CONNECT TO EXISTING DUCTWORK THAT SERVES DIFFUSER IN STAIRWELL. REBALANCE ASSOCIATED DIFFUSER TO 200 CFM. FURNISH AND INSTALL EXHAUST FAN ON THE ROOF OF THE EXISTING MECHANICAL ROOM. REFER TO ARCHITECTURAL AND STRUCTURAL CONTRACT DRAWINGS FOR ROOFING AND SUPPORT DETAILS. FURNISH AND INSTALL THERMOSTAT TO OPEN INTAKE DAMPER AND START EXHAUST FAN UPON RISE OF SPACE TEMPERATURE ABOVE 85°F (ADJ.) START UNIT HEATER AND MODULATE HW COIL UPON DROP OF SPACE TEMPERATURE BELOW 50°F (ADJ.) SAW CUT OPENING IN EXISTING BRICK WALL. REFER TO DETAIL 1/S001. FURNISH AND INSTALL NEW ROOF CURB FOR ROOF MOUNTED EQUIPMENT. ROOFING TO BE PERFORMED BY G.C. CONTRACTOR SHALL BREAKDOWN INDIVIDUAL AHU MODULES AND COMPONENTS AS REQUIRED TO FIT THROUGH EXISTING MECHANICAL ROOM DOORWAY AND RE-ASSEMBLE IN PLACE. RE-ASSEMBLY SHALL BE SUPERVISED FULLTIME BY AHU MANUFACTURER TO ENSURE COMPLIANCE WITH ASSEMBLY INSTRUCTIONS. FURNISH AND INSTALL DUCT STATIC PRESSURE SENSOR. REFER TO CONTROL DRAWINGS ON M010 AND M011 FOR ADDITIONAL INFORMATION. FURNISH AND INSTALL OUTDOOR AIR TEMPERATURE SENSOR IN SHIELD. IAL ORL M ME HAL FIRST FLOOR ROOF AHU COIL PULLS TYPICAL 7 SD-1B SD-1C ROWAN UNIVERSITY B OAK HALL LAUREL HALL LE BO LL A H UP 205A 205A COPY ROOM 205B 6ø PARKING LOT R 1 24x16 VAV 26x14 OFFICE CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN 100 CFM 300 CFM HOLLYBUSH DN VD 10ø VD VD RG-1 18x14 RG-1 24x10 190 CFM 270 CFM 6ø SD-1B OFFICE 18x14 VD 24x12 210 CFM KEY PLAN 209 6ø VD RG-1 8ø 90 CFM SD-1B 100 CFM 12x8 VD RG-1 CORRIDOR 2 VD 8ø M004 6ø 250 CFM OFFICE SD-1B 208 RA 5 VD VAV 209 12x8 90 CFM 205 VD SD-1C VD 8ø 203 24x12 OFFICE 225 CFM 1 145 CFM RG-1 12/3/2014 ISSUED FOR BID No. Date Revision 8ø 135 CFM 8ø H201 8x12 6ø 300 CFM 18x14 8ø 203 SD-1 8ø VD 255 CFM VD RA H200 TYP. FOR ALL VD 12x10 W202 10x10 VAV 10ø SD-2B W202 75 CFM 8ø VD 4ø VD OFFICE VD 202 200 CFM 3 SD-2B SD-2B STORAGE 60 CFM VD RG-1 125 CFM 204 14x12 RG-1 100 CFM 20x16 SD-1B 285 CFM VD CONFERENCE RM. 180 CFM SD-1C 207 CORR. 1 8ø OFFICE 10ø CORR. VAV 270 CFM 8ø RG-1 20x18 VD RG-1 20x10 VD VD OFFICE RG-1 55 CFM 6ø 215 CFM VD SD-1C 240 CFM SD-2B 206 8 VD 135 CFM SP CORR. SD-2B W201 100 CFM 12x10 6ø 8ø VD 200 FURNISH AND INSTALL 10"Ø SOUND TRAP BASIS OF DESIGN PRICE MODEL CMTX36/10A 8ø VAV 200 9x9 12x8 10ø 12x8 12x8 ROWAN UNIVERSITY VAV 16x14 OFFICE 6ø 14x10 VD VD 207 14x14x12 LOUVERED PENTHOUSE BASIS OF DESIGN GREENHECK WRH OR APPROVED EQUAL 8ø VD WAITING AREA W200 2' DEEP CONCRETE BEAM 16x12 VD 201 VD 8ø VAV VD 12x10 RG-1 5 200 CFM VAV 270 CFM 200B 1 RETURN AIR (BEHIND) SUPPLY AIR M 78X12 INTAKE LOUVER DESIGN GREENHECK EHH-701 OR APPROVED EQUAL 350 CFM BOLE HALL RENOVATIONS 16x24 14x26 EXISTING 10X8 2'-0" CLEAR MIN 18" VD 201 Project Title 1 DN OFFICE 5 ROOF DECK SD-1C 12x8 RG-1 2 7 RF FIELD INSTALLED MOTOR OPERATED DAMPER SD-1C 300 CFM Drawing Title AHU LOBBY 2 L200 ROOF DECK FULL HEIGHT CMU WALL 7 S002 1 M004 SECOND FLOOR PLAN 1/4" = 1'-0" 2 M004 FULL HEIGHT CMU WALL AHU-2 AND DUCT MAINS DROP CEILING SECOND FLOOR HVAC DUCT INSTALLATIONS Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 1/4" = 1'-0" Drawing No. M004 Printed: 12/3/2014 11:31:43 AM G INSTALLATION KEYNOTES 1 2 3 4 UH 4 1 2 CORE DRILL AND SLEEVE ALL PIPE PENETRATIONS AT FLOOR. EXTEND SLEEVE 1" ABOVE TOP OF SLAB. PACK ANNULAR SPACE WITH MINERAL WOOL AND FIRESTOP. 1/2" HWS&R TO UNIT HEATER. 1-1/2" CHWS&R TO AHU-1. TRAP CONDENSATE AND PIPE TO EXISTING FLOOR DRAIN BELOW UNIT. ROWAN UNIVERSITY AHU 2 9 M013 3 M013 CHWS 1 1-1/2" & R DN IAL ORL M ME HAL 3 1-1/4" HWRHS 1 & R DN 7 OFFICE VAV 205A 205A LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H UP 1 M013 1/2" HWRHS & R B OAK HALL PARKING LOT R 1" HWRHS & R COPY ROOM DN 205B 1 M013 1/2" HWRHS & R VAV-205A T OFFICE TYP. ALL CORRIDOR WALL PENETRATIONS KEY PLAN 209 VAV-209 T VAV OFFICE 209 203 5 CORRIDOR 2 205 1" HWRHS & R M004 OFFICE VAV-203 T VAV-W202 1 208 1/2" HWRHS & R 12/3/2014 ISSUED FOR BID No. Date Revision T CORR. VAV H201 203 OFFICE T CORR. 207 VAV-207 H200 T CONFERENCE RM. ZONE I ZONE I ZONE G W202 VAV W202 1" HWRHS & R OFFICE 3 202 8 M013 STORAGE 204 T ZONE G CORR. W201 VAV-200 T TYP. FOR ALL 1/2" HWRHS & R 3/4" HWRHS & R 1/2" HWRHS & R 3/4" HWRHS & R 1/2" HWRHS & R OFFICE 206 ROWAN UNIVERSITY VAV OFFICE VAV 200 207 200 1/2" HWRHS & R WAITING AREA W200 3/4" HWS & R CAPPED FOR FUTURE. VAV 201 T VAV-201 Project Title T VAV-200B BOLE HALL RENOVATIONS VAV 1 200B DN OFFICE Drawing Title 201 LOBBY L200 ZONE G 1 M005 SECOND FLOOR PLAN SECOND FLOOR HVAC PIPE INSTALLATIONS Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ 1/4" = 1'-0" Job No: 2014-064 Drawing No. M005 Printed: 12/3/2014 11:31:44 AM INSTALLATION KEYNOTES 1 H SCREEN WALL J K SCREEN WALL L MAINTAIN FIRE RATING AT ALL WALL PENETRATIONS TO RENOVATED OFFICE SUITE. COORDINATE WITH ARCHITECTURAL PLANS FOR WALL SECTIONS. REFER TO DETAIL 11/M013 FOR FIRE DAMPER INSTALLATION. COORDINATE WITH G.C. FOR ACCESS DOORS AT ALL BALANCING DAMPER LOCATIONS ABOVE HARD CEILINGS. FURNISH AND INSTALL ADDITIONAL REINFORCING (10"W.G.)FOR 34"x34" DUCT RISER AND MAIN DUCT BRANCHES ABOVE CORRIDOR TO MINIMIZE BREAKOUT SOUND FROM AHU. FURNISH AND INSTALL 2" THICK (6LB/CF) RIGID BOARD INSULATION FOR THESE SECTIONS OF DUCT. FURNISH AND INSTALL STATIC PRESSURE SENSOR. REFER TO CONTROL DRAWINGS M010 AND M011 FOR MORE INFORMATION. CONNECT TO EXISTING LINEAR SLOT DIFFUSER PLENUM BOX. BALANCE SYSTEM TO LISTED CFM'S 2 3 34X34 DUCT THRU ROOF 4 AHU 40x40 1 36x36 5 ROOF ROWAN UNIVERSITY VAV 131B 20x28 16x16 16x20 20x30 26x30 IAL ORL M ME HAL 16x18 OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE 26x32 B SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H 1ST FLOOR 1 1ST FLOOR SECTION 1/4" = 1'-0" M006 G RG-1 H 75 CFM J LRG LRG 215 CFM 215 CFM L LRG LRG 315 CFM K 315 CFM 7 LRG LRG 240 CFM 235 CFM VD VD LSD-1 SD-2C 300 CFM 300 CFM 215 CFM 6ø 475 CFM 6ø 111 113 5ø SD-2B 120 CFM VD VD 8ø 12ø 20x16 115 VD VD VD RG-1 RG-1 75 CFM 75 CFM SD-3 390 CFM 131A 390 CFM 34X34 UP TO ROOF VD LRG 315 CFM 8ø 22x12 8ø 22x12 3 6ø 30x26 32x26 32x20 3 Open Office VAV LRG 131 131B 350 CFM 30x20 18x16 SD-3 1 65 CFM VD 70 CFM 65 CFM 260 CFM VD 120 RG-1 6ø VD VAV 65 CFM Office VAV 122 121 VD RG-1 Project Title 65 CFM 10x10 118 10ø 20x18 VD 8x8 RG-1 6ø 6ø 117 3 VD VD VD Office LSD-2 22x12 70 CFM SD-2A 6ø 12x12 VD Reception 700 CFM SD-1 10ø 70 CFM RG-1 121 VD 10ø 70 CFM 70 CFM 6ø SD-1 VD VD 6ø SD-2A SD-2A ROWAN UNIVERSITY 390 CFM VD Office 6ø 28x16 RG-2 119 118 6ø 6ø Media/P.R. VD 6ø VD Media/P.R. VD 50 CFM 6ø SD-2B 100 SD-3 390 CFM 6x8 Lobby 6ø M006 16x16 16x16 VD 5 115 CFM 3 28x20 SD-3 VAV 6ø VAV VD 114 80 CFM 10x8 RG-1 140 CFM 315 CFM Acc. Payable Manager SD-2A 6ø REFER TO M002 VD VD VD VD 112 RG-1 34X34 UP TO ROOF VD 108 80 CFM Conference Room/Office VD 60 CFM 8ø 20x16 390 CFM VAV VD SD-2A 130 CFM RG-1 VAV 110 117 6x8 12x12 Copy VD 390 CFM 22x12 80 CFM Acc. Services Director 112 1 SA VD Corridor SD-1A Break Room BOLE HALL RENOVATIONS 5 VD SD-1A 260 CFM 125 LSD-1 LSD-1 360 CFM 350 CFM 340 CFM 5 10ø LSD-2 Media/P.R. 260 CFM 125 2 126 VD Media/P.R. Media/P.R. 126 127 SD-3 390 CFM 390 CFM VD VD 10ø VD VD 130 VD LSD-1 VD SD-2E 360 CFM 10ø Office 128 12x12 Drawing Title ENLARGED FIRST FLOOR DUCT INSTALLATIONS VAV 350 CFM VD SD-3 16x16 LSD-1 12x12 VD VAV 350 CFM 124 16x14 VD LSD-1 VD VD VD LRG Corridor 100 CFM 10ø LSD-2 SD-2B 20x14 VD 10ø 150 CFM CONFERENCE ROOM VD VD 10ø 5 140 CFM Office Budget Director 129 130 VD 10ø 24x14 16x12 16x12 RG-1 8ø 10ø VD 355 CFM 1 LRG LRG LRG LRG LRG LRG LRG LRG 325 CFM 320 CFM 310 CFM 315 CFM 320 CFM 325 CFM 350 CFM 350 CFM Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2 M006 Printed: 12/3/2014 11:31:48 AM Revision 6ø 155 CFM RG-1 SD-3 VD 22x20 5ø 107 8ø SD-1A Date VAV 106 101 VAV 85 CFM VD Payroll Open Office SD-3 SD-2A 6ø VD 65 CFM 32x26 12/3/2014 ISSUED FOR BID LRG 20x14 SD-2A SD-2A 110 REF. 230 CFM 1 109 VD 6ø 8ø 8ø 230 CFM VAV VD 80 CFM SD-2A 85 CFM 80 CFM 10ø 1 SD-2D 24x14 8x8 20x24 SD-2D 104 12x12 No. VD SD-2A VD 105 12x14 VD 108 Director 104 102 VD 6ø VD VD 12x12 10x12 10x8 VAV VD Office VD Acc. Services Assoc. Director Acc. Services Director 6ø VD SP Mail/Copy VD VD 16x14 VD VD 103 VD 75 CFM 6ø 4 1 Supervisor 6ø 101 75 CFM RG-1 VD 28x14 50 CFM VD 6ø VAV 10x10 1 VD RG-1 VD VD 12x12 LSD-1 14x12 12x10 SD-2A 215 CFM 107 14x12 12x10 18x14 SD-2C Corridor VD KEY PLAN 8ø VD 1 PARKING LOT R DUCTWORK PLAN 1/4" = 1'-0" 2014-064 Drawing No. M006 FINNED TUBE SCHEDULE TAG CAPACITY (BTU/LF) EWT (°F) LWT (°F) TUBE SIZE FINS PER FT FIN SIZE FTR-1 1290 190 170 3/4" 40 4-1/4" X 3-5/8" FTR-2 1520 190 170 3/4" 50 4-1/4" X 3-5/8" ENCLOSURE TYPE BASIS OF DESIGN CUSTOM REFER TO DETAILS CUSTOM REFER TO DETAILS STERLING INSTALLATION KEYNOTES NOTES STERLING 1 CORE DRILL, SLEEVE, AND FIRESTOP PIPE PENETRATIONS AT CHASE WALL. CORE DRILL, SLEEVE, AND WATERSTOP PENETRATION AT ROOF BELOW PIPING VESTIBULE. CONNECT TO EXISTING PIPING SERVING FINNED TUBE ELEMENT IN CONFERENCE ROOM 125. EXISTING RETURN PIPING IN CONFERENCE ROOM TO BELOW SLAB RETURN PIPING TO REMAIN. CONNECT TO EXISTING CONVECTOR RISER SUPPLY PIPING AT POINT ABOVE FIRST FLOOR SLAB TO SERVE TWO EXISTING AREAS TO REMAIN ON BELOW SLAB DISTRIBUTION: STAIRWELL S2, AND OFFICE 100A CORE DRILL, SLEEVE, AND WATERSTOP PENETRATION AT ROOF BELOW PIPING VESTIBULE. 2 3 4 5 ZONE C G H L 15 M013 J K TYPICAL 7 FTR-1 8'-0" 10.3 1/2" HWR 1/2" HWS FTR-2 FTR-2 FTR-2 FTR-2 6'-0" 9.12 6'-0" 9.12 6'-0" 9.12 6'-0" 9.12 5/8" HWR 16 5/8" HWS T ZONE C Corridor M013 FTR-2 FTR-2 6'-0" 9.12 6'-0" 9.12 FTR-1 6'-0" 7.74 1/2" HWS 1/2" HWR 5/8" HWR 107 1-1/2" HWRHS 1-1/4" HWR 1-1/2" HWS 1-1/2" HWRHR 1-1/2" HWRHS 1-1/4" HWRHS 1" HWRHS 1-1/2" HWRHR 1-1/4" HWRHR 1" HWRHR FTR-1 5/8" HWS 3'-0" 3.87 2" HWS DN 1-1/2" HWR DN 2-1/2" CHWS DN T 1-1/2" VENT UP THROUGH ROOF ZONE C VAV-101 T T VAV-107 VAV-104 T VAV-108 8 M013 1" HWR 2-1/2" CHWR DN 1-1/2" HWRHR DN 1-1/2" HWRHS DN 1-1/2" HWR DN 1 VAV Supervisor 104 TYP. FOR ALL 105 104 103 VAV Office Director 1" HWRHR 1/2" HWR 3/4" HWRHR 3/4" HWRHS 1/2" HWRHR 1" HWRHS VAV 1/2" HWRHS 101 Acc. Services Assoc. Director Acc. Services Director 3'-0" 3.87 TYP. FOR ALL 108 VAV 1/2" HWR 108 1/2" HWS VAV-131A 1/2" HWR T 3/4" HWRHR Payroll Open Office 101 1/2" HWRHR 5 1/2" HWRHS REF. 1/2" HWRHS KEY PLAN 109 107 3/4" HWRHS FTR-1 5/8" HWR 2 1/2" HWRHR VAV 1" HWRHS Conference Room/Office 110 1" HWRHR 1-1/2" HWR Acc. Payable Manager Acc. Services Director 3/4" HWRHR T 131A VAV Open Office T 3/4" HWRHS Revision VAV 106 VAV-112 112 Date 6'-0" 9.12 114 Corridor VAV VAV-110 No. FTR-2 113 117 12/3/ ISSUED FOR BID 2014 3/4" HWRHR 115 VAV 1 3/4" HWRHS VAV 111 110 1/2" HWRHS 1/2" HWRHR 1" HWRHR 112 Copy Break Room 1" HWRHS 131B 131 T FTR-2 VAV-115 M006 VAV 5/8" HWRHS 5/8" HWRHR 6'-0" 9.12 2 Lobby 3/4" HWRHS 100 125 Closet Media/P.R. 116 119 3/4" HWRHR 3/4" HWS 3/4" HWR 2-1/2" CHWS/R UP TO RTU-1 VAV-131B 3/4" HWRHR Media/P.R. 3/4" HWRHS 1/2" HWRHR 118 1/2" HWRHS Office 1/2" HWRHS 120 Office T Office 121 1/2" HWRHR ZONE D 1 2 M013 3 122 1-1/2" HWR 1-1/4" HWS 1/2" HWRHS VAV-118 Reception VAV VAV 1/2" HWRHR 126 118 T VAV-121 T 117 1" HWR VAV 121 FTR-2 VAV 5/8" HWRHS Corridor 130 5/8" HWRHR 6'-0" 9.12 Corridor 124 123 T 3/4" CAPPED AND VALVED FOR FUTURE VAV-126 1/2" HWS 1/2" HWR EXISTING FTR T T 3/4" HWS VAV-130 ZONE D 1-1/4" HWR 5/8" HWS 5/8" HWR Media/P.R. Media/P.R. Media/P.R. Office Office Budget Director 125 126 127 128 129 130 FTR-2 FTR-2 FTR-2 FTR-2 FTR-2 FTR-2 FTR-2 4'-0" 6.08 6'-0" 9.12 6'-0" 9.12 6'-0" 9.12 6'-0" 9.12 6'-0" 9.12 6'-0" 9.12 3 1/2" DN TO RETURN PIPING BELOW SLAB CALIBRATED BALANCING VALVE, TYP. ALL RAD. 5 1" HWS 1-1/4" HWR ROWAN UNIVERSITY 5/8" HWS 5/8" HWR ZONE D T FTR-2 6'-0" 9.12 FTR-2 FTR-2 6'-0" 9.12 6'-0" 9.12 Project Title 1 4 BOLE HALL RENOVATIONS ZONE D 1/2" DN TO FTR SUPPLY PIPING BELOW SLAB Drawing Title 1 M007 PIPING PLAN 1/4" = 1'-0" ENLARGED FIRST FLOOR PIPE INSTALLATIONS Date: 12/2/2014 Scale 1/4" = 1'-0" Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. M007 Printed: 12/3/2014 11:31:50 AM ROWAN UNIVERSITY IAL ORL M ME HAL (E)CHWR TO CAMPUS CHW LOOP CHOKE VALVE 3" CHWR LAUREL HALL NO 3" CHWS 1-1/2" CHWS TO AHU-1 B NO LE BO LL A H (E)CHWS FROM CAMPUS CHW LOOP 1-1/4" HWR FROM ZONE "C" PIPING IN FIRST FLOOR CEILING 2" HWS PIPING TO ZONE "C" AND "D" RUN IN FIRST FLOOR CEILING 72.0 MBH 1-1/4" HWR FROM HWS TO ZONE "F" 2" HWR 1" HWR FROM ZONE "F" 1-1/2" HWR 2" HWS TO CRAWLSPACE 79.0 MBH 97.5 MBH 1-1/4" HWR FROM ZONE "D" FROM HWS TO ZONE "F" 2" HWS KEY PLAN (A) 1-1/4" HWR FROM ZONE "C" IN CRAWLSPACE 111.0 MBH 1-1/2" HWR FROM PROVOST AREA & 2ND FLOR VAV'S 1-1/2" HWR FROM RENOVATED WING VAV'S 1-1/2" HWR FROM ZONES "A" AND "J" 1-1/2" HWR 3" HWR 3" HWR 1-1/2 HWRHS TO RISER SERVING FIRST AND SECOND FLOOR VAV BOXES 2-1/2" HWR 3" HWS 2" HWRHS TO RISER SERVING FIRST FLOOR VAV BOXES 3" HWS 1" RPZ. PIPE RELIEF TO FD. (E)1" CW MAKEUP HW EXPANSION TANK 1 52.0 MBH 3" HWR 2" HWS HOT WATER PUMP TYPICAL OF 3 1" RELIEF PIPING PARKING LOT R 1-1/2" HWR FROM ZONE "D" PIPING IN FIRST FLOOR CEILING 1-1/2" HWR 2" HWS INTO MECH RM CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN 2-1/2" CHWS TO RTU-1 CHWP-1 HOLLYBUSH 1-1/2" CHWR FROM AHU-1 2-1/2" CHWR FROM RTU-1 NO OAK HALL 12 M013 4" LPS. REFER TO 2/M012 FOR STEAM METER INSTALLATION. 12/3/2014 ISSUED FOR BID No. Date Revision 2" HWR FROM ZONE "G" 64.0 MBH 3-1/2" LPS 1-1/4" HWR FROM ZONE "I" HWP-1 1/2-2/3 STEAM CONTROL VALVE ASSEMBLY WITH BYPASS 1" PC 3" HWS HWP-3 2" HWS 2" HWS TO ZONES "G" AND "I" 1'-1/4" HWS SUPPLY TO ZONE "A" AND "J" AT WALL OF MECH RM. 3" HWS 1" PC HWP-2 2" HWS 3/4" DRIP LEG 1" HWS TO ZONE F 3" HWS 2-1/2" HWS CONDENSATE RECEIVER 2-1/2" HWS 2-1/2" HWS OUTSIDE MECH. RM TO ZONES "C" AND "D" HX-1 T T DIVERTING VALVES FOR ZONES "A" AND "J" AIR SEPERATOR 60.0 MBH 1" HWR FROM ZONE "A" 1-1/2" HWR 84.0 MBH GRAVITY CONDENSATE ROWAN UNIVERSITY 1-1/4" HWR FROM ZONE "J" 1 M008 PIPING FLOW DIAGRAM NO SCALE Project Title BOLE HALL RENOVATIONS Drawing Title FLOW DIAGRAMS Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. M008 Printed: 12/3/2014 11:31:51 AM LETTER INSTRUMENT TAGGING AND IDENTIFICATION MEASURED OR INITIATING READOUT OR PASSIVE VARIABLE FUNCTION MODIFIER INSTRUMENT SYMBOLS OUTPUT OPTION MODIFIER FLOW METERING: A B ANALYSIS BURNER COMPONENT - ALARM USER'S CHOICE USER'S CHOICE C D E USER'S CHOICE USER'S CHOICE VOLTAGE (EMF) DIFFERENTIAL - CONTROL - F FLOW - - G USER'S CHOICE RATIO (FRACTION) - PRIMARY ELEMENT (SENSOR) - USER'S CHOICE - GLASS VIEWING DEVICE INDICATE - - - CONTROL STATION HIGH - LIGHT - - H I J K L M HAND CURRENT (ELECTRICAL) POWER SCAN TIME OR TIME SCHEDULE TIME RATE OF CHANGE LEVEL USER'S CHOICE MONETARY N USER'S CHOICE - USER'S CHOICE USER'S CHOICE O P USER'S CHOICE PRESSURE OR VACUUM - - Q QUANTITY - - R S T U RADIATION SPEED OR FREQUENCY TEMPERATURE MULTIVARIABLE INTEGRATE OR TOTALIZE SAFETY - ORIFICE RESTRICTION POINT (SET) CONNECTION - LOW MIDDLE INTERMED IATE USER'S CHOICE - RECORD MULTIFUNCTION SWITCH TRANSMIT MULTIFUNCTION V VIBRATION MECH ANALYSIS WEIGHT OR FORCE UNCLASSIFIED - - X-AXIS WELL UNCLASSIFIED VALVE, DAMPER OR LOUVER UNCLASSIFIED MULTIFUN CTION - W X Y Z EVENT, STATEOR PRESENCE POSITION, DIMENSION Y-AXIS - Z-AXIS - RELAY, COMPUTE, OR CONVERT DRIVE, ACTUATOR, UNCLASSIFIED FINAL CONTROL ELEMENT ROWAN UNIVERSITY FIELD MOUNTED GAUGE OR TRANSMITTER WITH ROOT VALVE NON DIFFERENTIAL TYPE FLOW TRANSMITTER CORIOLIS TYPE PRIMARY PANEL MOUNTED, FRONT ORIFICE ASSEMBLY & DIFFERENTIAL TYPE FLOW GAUGE OR TRANSMITTER WITH SEAL PCS CONTROL IAL ORL M ME HAL VENDOR PLC TEMP GAUGE OR XMITTER WITH THERMOWELL NON ORIFICE DP FLOW ASSEMBLY UNDEFINED INTERLOCK LOGIC B OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R GAUGE WITH PIGTAIL INTERNAL PCS SOFTWARE FUNCTION OR CALCULATION UNCLASSI FIED - INSTRUMENTS SHARING COMMON HOUSING LEVEL GAUGE KEY PLAN - VISUAL FLOW GAUGE 1 12/3/2014 ISSUED FOR BID No. BULB TYPE TEMPERATURE SENSING ELEMENT FAN VAPOR TENSION TEMPERATURE SENSING ELEMENT (LOW LIMIT) BULB TYPE TEMPERATURE SENSING ELEMENT LOCATED INSIDE SEPARABLE SOCKET/WELL DUCT SMOKE DETECTOR COMBINATION BULB TYPE TEMPERATURE SENSING ELEMENT AND HUMIDITY SENSOR (DUCT MOUNTED) Revision ATC ABBREVATIONS ATC LEGEND AVERAGING TYPE TEMPERATURE SENSING ELEMENT Date A AC ADJ AFF AHU ALM ALT AUTO AUX AVG BLDG BTU C CC CB CFM CHP CHW CHWR CHWS CIRC CKT CL CLG COM CON CV ALARM AIR CONDITIONING ADJUST ABOVE FINISHED FLOOR AIR HANDLING UNIT ALARM ALTERNATE AUTOMATIC AUXIILLIARY AVERAGE BUILDING BRITISH THERMAL UNITS COMMAND / CONTROL COOLING COIL CIRCURIT BREAKER CUBIC FEET PER MINUTE CHILLED WATER PUMP CHILLED WATER CHILLED WATER RETURN CHILLED WATER SUPPLY CIRCULATING CIRCUIT CLOSE COOLING COMMON CONTRACTOR FLOW COEFFICIENT DA DB DIR DPR DPS DX E EA E.C. EF EN EP F FCU FLG FLTR FPM FTG F.W.E. GA GL GHR GHS GPM GND H H/C HL HOA HTG DISCHARGE AIR DRY BULB DIRECT ACTING DAMPER DIFFERENTIAL PRESSURE SENSOR DIRECT EXPANSION ENABLE EXHAUST AIR ELECTRICAL CONTRACTOR EXHAUST FAN ENCLOSURE ELECTRO-PNEUMATIC FAHRENHEIT FAN COIL UNIT FLANGE FILTER FEET PER MINUTE FITTING FURNISHED WITH EQUIPMENT GAGE GLOBE GLYCOL HEATING RETURN GLYCOL HEATING SUPPLY GALLONS PER MINUTE GROUND HUMIDITY HEATING COIL HIGH LIMIT HAND-OFF-AUTO HEATING HTR HWP HX Hz I JB KW LL LPS LT MA mA MAN MAX MBH MCC M.C. MECH MFR MIN NC NEG NO NPT O O.D. OA OCC OP OWS HEATER HOT WATER PUMP HEAT EXCHANGER HERTZ INSIDE DIAMETER JUNCTION BOX KILOWATT LOW LIMIT LOW PRESSURE STEAM LOW TEMPERATURE MIXED AIR MILLIAMP MANUAL MAXIMUM 1000BTU PER HOUR MOTOR CONTROL CENTER MECHANICAL CONTRACTOR MECHANICAL MANUFACTURER MINIMUM NORMALLY CLOSED NEGATIVE NORMALLY OPEN NATIONAL PIPE THREAD OUTPUT OUTSIDE DIAMITER OUTSIDE AIR OCCUPIED OPEN OPERATOR WORKSTATION PE PH PNEU PS PROP PRV PSI PSIG R RA REV RF RPM S SA SET SD SF SP SPEC STD STM SUM SW T TC TDR TE UN UNOCC PRESSURE ELECTRIC PREHEAT PNEUMATIC PRESSURE SENSOR PROPORTIONAL PRESSURE REDUCING VALVE POUNDS PER SQUARE INCH PSI (GAGE) RELAY RETURN AIR REVERSE ACTING RETURN FAN REVOLUTIONS PER MINUTE STATUS SUPPLY AIR SETPOINT SMOKE DAMPER SUPPLY FAN STATIC PRESSURE SPECIFICATION STANDARD STEAM SUMMER SWITCH TEMPERATURE TEMPERATURE CONTROLLER TIME DELAY RELAY TEMPERATURE ELEMENT UNION UNOCCUPIED V VA VAC VAV VDC VEL VSD VOL VP W/ WC W/O WB WG WIN XFR ZN %OPN %CLS %CMD VOLT VOLT AMPERES VOLTS ALTERNATING CURRENT VARIABLE AIR VOLUME VOLTS DIRECT CURRENT VELOCITY VARIABLE SPEED DIRVE VOLUME VELOCITY PRESSURE WITH WARMER / COOLER WITHOUT WET BULB WATER GAGE WINTER TRANSFORMER ZONE PERCENT OPEN PERCENT CLOSE PERCENT COMMAND ROWAN UNIVERSITY Project Title BOLE HALL RENOVATIONS HUMIDIFIER PUMP C COILING COIL Drawing Title CONTROL IDENTIFICATION C Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. M009 Printed: 12/3/2014 11:31:52 AM OUTSIDE AIR TEMPERATURE/HUMIDITY SENSOR MOUNTED IN SHIELD RF-C EAD-O EAD-FBK RF-A RELIEF AIR VFD-C OA-TH ROWAN UNIVERSITY NC SMOKE DETECTOR RAD-O RAD-FBK CONTROLS CONTRACTOR SHALL FURNISH AND INSTALL CONDUIT AND WIRING TO CONNECT TO STARTER CIRCUIT AND DDC CONTROLLER. WIRING TO FACP BY ROWAN FIRE ALARM CONTRACTOR. (TYP. 2) SD-2 VFD-A AFMS (AHU-1 ONLY) RA-TH SP-A RETURN AIR FROM BUILDING NO FURNISHED AND INSTALLED BY ROWAN FIRE ALARM CONTRACTOR. (TYP. 2) RETURN FAN (INLINE FOR AHU-2) SF-C IAL ORL M ME HAL SF-A VFD-C CONNECT SWITCHES TO SAFETY CIRCUIT SF-S VFD-A TO DIGITAL CONTROLLER MIN. OA (PARALLEL BLADE) 0-100F AFMS (AHU-1 ONLY) (2 ACTUATORS) OAD-O OAD-FBK MA-T AFMS (AHU-1 ONLY) LT-A B SD-1 SA-T SMOKE DETECTOR C LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H SP-A PARKING LOT R SUPPLY AIR SD-1 OA OAK HALL C MAX. OA (OPPOSED BLADE) (AHU-1 ONLY) NC SUPPLY FAN CLGV-O CLGV-FBK LOCATE 2/3 DISTANCE IN DUCT RUN SCHWR SUM-WIN SA-SP SCHWS KEY PLAN SAT-RESET SUPPLY AIR SA IN CEILING BELOW ROOF (FOR AHU-1) 1 M010 AHU-1 & AHU-2 ATC DIAGRAM NO SCALE HWP1-DP HWP1-C TYPICAL FOR 3 PUMPS HWP1-A 1 12/3/2014 ISSUED FOR BID No. Date Revision VFD1-C HWR-T VFD1-A HWR HWS TO FTR N.O. N.O. HWP-1 HWP2-DP SA-T PHT N.C. N.C. C HWP-2 (STANDBY) H ) L) HWP3-DP VAV-O VAV-FB FLOW-S ZN-T HTGV-0 HTGV-FB HWS TO VAV RH N.O. N.O. ROWAN UNIVERSITY HWP-3 HWR SUM-WIN LPS OA - T HWS N.C. C HWS FROM PUMPS HWR TO HX STMV1-0 STMV2-FB STMV2-0 STMV2-FB HWS-T RADV-0 RADV-FB Project Title BOLE HALL RENOVATIONS EXISTING ZONE RADIATOR N.O. Drawing Title HWS TO ZONE RADIATORS CONTROL DIAGRAMS HX-1 HWR FROM ZONE RADIATORS 2 M010 VAV AND FINNED TUBE NO SCALE 3 M010 HEATING HOT WATER Date: 12/3/2014 NO SCALE Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. M010 Printed: 12/3/2014 11:31:53 AM AHU-1 AND AHU-2 VAV AND FINNED TUBE RADIATION HEATING HOT WATER SYSTEM BASEMENT AND 2ND FLOOR MECHANICAL ROOM HEATING AND VENTILATION GENERAL: GENERAL: GENERAL: GENERAL: THE VARIABLE VOLUME AIR HANDLING UNIT(S) CONSISTS OF A MIXED AIR SECTION WITH OUTDOOR AIR DAMPERS AND RETURN AIR CONNECTION, FILTER SECTION, HOT WATER COIL, CHILLED WATER COOLING COIL, RETURN FAN AND SUPPLY FAN. THE UNIT IS DDC CONTROLLED USING ELECTRIC ACTUATION. THE UNIT SHALL BE COMMANDED ON BY THE BUILDING'S OCCUPANCY SCHEDULE OR MANUALLY BY THE BUILDING OPERATOR. THE SINGLE DUCT VARIABLE VOLUME AIR BOXES CONSISTS OF A VOLUME DAMPER AND FLOW SENSING RING. ZONE HEATING IS PERFORMED BY EITHER EXISTING PERIMETER FIN TUBE RADIATION OR REHEAT COILS LOCATED IN THE VAV BOX. THE HEATING HOT WATER SYSTEM CONSISTS OF ONE LOW PRESSURE STEAM TO HOT WATER SHELL AND TUBE HEAT EXCHANGER AND THREE PARALLEL INLINE CIRCULATION PUMPS (2 OPERATING/1STANDBY). ONE PUMP SERVING VAV BOX REHEAT COILS AND UNIT HEATERS, WITH THE SECOND PUMPS SERVING THE PERIMETER FINNED TUBE RADIATION. THE HEATING HOT WATER SYSTEM INCLUDES VARIABLE FREQUENCY DRIVES FOR REDUCED VOLTAGE STARTING AND BALANCING, HOWEVER, THE SYSTEM SHALL OPERATE AS A CONSTANT VOLUME SYSTEM. THE BASEMENT MECHANICAL ROOM CONSISTS OF ONE INTAKE LOUVER AND ONE EXHAUST FAN (EF-2) FOR VENTILATION COOLING. THE 2ND FLOOR MECHANICAL ROOM CONSISTS OF ONE INTAKE LOUVER, ONE EXHAUST FAN (EF-3)FOR VENTILATION COOLING AND ONE HOT WATER TYPE UNIT HEATER(UH-1). OPERATION: THE BASEMENT EXHAUST FAN (EF-2) SHALL BE NORMALLY OFF. UPON A RISE IN SPACE TEMPERATURE ABOVE 85°F (ADJ.), THE MOTOR OPERATED DAMPER SHALL OPEN. ONCE PROVEN OPEN, EF-2 SHALL RUN. UPON A DROP IN SPACE TEMPERATURE BELOW SETPOINT, THE REVERSE SHALL OCCUR. ROWAN UNIVERSITY THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW CONTROL PANEL TO BE LOCATED IN THE BASEMENT MECHANICAL ROOM ADJACENT TO THE EXISTING PANEL TO ALLOW FOR A PHASED TRANSITION. EXISTING CONTROL PANEL, DEVICES, TUBING, WIRING ETC.. SHALL BE REMOVED IN ITS ENTIRETY AFTER NEW SYSTEM IN COMMISSIONED AND OPERATIONAL. ALL SAFTEY DEVICES SHALL BE HARDWIRED. SAFTEY FUNCTIONS SHALL NOT BE PERFORMED VIA LOGIC CONTROL. SMOKE DETECTORS TO BE FURNISH AND INSTALLED BY THE UNIVERSITY'S THIRD PARTY FIRE ALARM CONTRACTOR.. ALL CONTROL WIRING AND CONDUIT TO UNIT'S SHUTDOWN CIRCUIT AND BAS PANEL SHALL BE BY THE CONTROLS CONTRACTOR.. ALL WIRING AND CONDUIT TO FIRE ALARM SYSTEM TO BE INSTALLED BY THE FIRE ALARM CONTRACTOR.. AIRFLOW MEASURING STATIONS SHALL BE FURNISHED AND INSTALLED FOR AHU-1 AT SUPPLY AND RETURN FANS AND OUTSIDE AIR INTAKE OPENINGS. RETURN FAN SHALL TRACK SUPPLY FAN VOLUME TO MAINTAIN SCHEDULE DIFFERENTIAL AIR VOLUME. OUTSIDE AIR DAMPER AND RELIEF DAMPER POSITIONS SHALL MODULATE TO MAINTAIN SCHEDULED OUTSIDE AIR AMOUNTS THROUGH ECONOMIZER OPERATION. AHU-2 DOES NOT HAVE ECONOMIZER. THE VAV BOX SHALL BE INDEXED TO THE HEATING OR COOLING MODE BASED ON OUTSIDE AIR TEMPERATURE AND IN CONJUNCTION WITH ITS RESPECTIVE AHU. WHEN THE COOLING MODE IS ENGAGED, THE HOT WATER REHEAT COIL SHALL BE MAINTAINED CLOSED TO ELIMINATE SIMULTANEOUS HEATING AND COOLING UNTIL THE BOX REACHES ITS SUMMER MINIMUM POSITITION (30% OF MAX.) IN ACCORDANCE WITH THE ENERGY CODE. THE BOX SHALL MODULATE BETWEEN ITS RESPECTIVE WINTER AND SUMMER MIN. AND MAX. POSITIONS AS NOTED IN THE EQUIPMENT SCHEDULE. ALL CONTROLS SHALL BE FURNISHED AND INSTALLED BY THE CONTROLS VENDOR/CONTRACTOR. OCCUPIED: BUILDING START-UP WHEN INDEXED TO THE BUILDING STARTUP MODE BASED ON THE OPERATION OF ITS RESPECTIVE AHU OR RTU, THE VAV BOXES SHALL OPERATE IN THE OCCUPIED MODE AS DESCRIBED BELOW. OCCUPIED MODE: OCCUPIED: BUILDING START-UP THE UNIT SHALL BE COMMANDED ON 1 HOUR (ADJ.) PRIOR TO THE BUILDING'S REGULAR OCCUPANCY SCHEDULE. THE UNIT SHALL BE STARTED IN FULL RE-CIRCULATION MODE. THE OUTSIDE AIR DAMPER(S) SHALL BE FULLY CLOSED, RETURN AIR DAMPER FULLY OPEN AND CHILLED WATER VALVE SHALL OPERATE AS DESCRIBED BELOW. UPON PROVING THE RETURN AIR DAMPER IS OPEN, THE RETURN AND SUPPLY FANS SHALL BE ENERGIZED. IF EITHER DAMPER OR FAN IS NOT PROVEN TO BE OPEN/STARTED, AN ALARM SHALL BE SENT TO THE CAMPUS OPERATION CONTROL CENTER (OCC). COOLING/ECONOMIZER MODE (OAT ABOVE 40F (ADJ.)): ON A RISE IN SPACE TEMPERATURE ABOVE 78F (ADJ.) AS SENSED BY THE ZONE THERMOSTAT, THE VAV BOX SHALL MODULATE FROM COOLING MIN. SETPOINT TO 100% OPEN. UPON A FALL IN SPACE TEMPERATURE BELOW SETPOINT, THE REVERSE SHALL OCCUR. IF SPACE TEMPERATURE CONTINUES TO FALL BELOW SETPOINT AND THE BOX IS AT MINIMUM POSTITION, THE REHEAT COIL SHALL BE ENGAGED. PUMP P-3 SERVING VAV BOX REHEAT COILS SHALL OPERATE CONTINUOUSLY. PUMP P-1 SERVING PERIMETER FINNED TUBE RADIATION SHALL BE ENGAGED ONLY WHEN THE OUTSIDE AIR TEMPERATURE DROPS BELOW 40F (ADJ.) ISOLATION VALVES FOR HOT WATER PUMPS P-1 AND P-3 AND STANDBY PUMP P-2 SHALL BE MANUALLY OPERATED. WHEN ANY PUMP IS INDEXED TO START, FLOW SHALL BE PROVEN BASED ON THE PUMPS RESPECTIVE DP SENSOR. IF FLOW IS NOT PROVEN, THE PUMP SHALL BE DE-ENERGIZED AND AN ALARM SENT BY THE OCC. UPON CONFIRMATION OF FLOW AT THE HEAT EXCHANGERS BASED ON THEIR RESPECTIVE FLOW SWITCH, THE HEAT EXHANGERS STEAM CONTROL VALVES SHALL BE ALLOWED TO MODULATE TO MAINTAIN THE SYSTEM HOT WATER SUPPLY TEMPERATURE BASED ON THE PREPROGRAMMED HOT WATER SUPPLY TEMPERATURE RESET SCHEDULE. THE 2ND FLOOR EXHAUST FAN (EF-3) SHALL BE NORMALLY OFF. UPON A RISE IN SPACE TEMPERATURE ABOVE 85°F(ADJ.), THE MOTOR OPERATED DAMPER SHALL OPEN. ONCE PROVEN OPEN, EF-3 SHALL RUN. ONCE PROVEN OPEN, EF-2 SHALL RUN. UPON A DROP IN SPACE TEMPERATURE BELOW SETPOINT, THE REVERSE SHALL OCCUR. THE 2ND FLOOR UNIT HEATER (UH-1) SHALL BE NORMALLY OFF. UPON A DROP IN SPACE TEMPERATURE BELOW 55° (ADJ.) THE UNIT HEATER SHALL ENERGIZE AND THE CONTROL VALVE SHALL OPEN. IAL ORL M ME HAL FAILURE MORE: UPON A FAILURE OF THE MOTOR OPERATED DAMPER TO OPEN, THE EXHAUST FAN TO START, THE UNIT HEATER TO START, A RISE IN TEMPERATURE ABOVE 95 (ADJ) DEGREES, OR A DROP IN TEMPERATURE BELOW 45 DEGREES (ADJ), AN ALARM SHALL BE SENT TO THE OCC. FAILURE MORE: UPON A FAILURE OF THE SYSTEM TO MAINTAIN THE PROGRAMMED SUPPLY WATER TEMPERATURE WITHIN 10 DEG F (ADJ.) AN ALARM SHALL BE SENT TO THE OCC. B NORMAL OCCUPIED MODE: HEATING MODE (OAT BELOW 40F (ADJ.)): THE VAV BOX SHALL MAINTAIN CONSTANT AIRFLOW AT ITS HEATING MIN. SETPOINT. UPON A DROP IN SPACE TEMPERATURE FOR INTERIOR ZONES CONTAINING A HOT WATER REHEAT COIL, THE CONTROL VALVE SHALL MODULATE OPEN TO MAINTAIN SPACE TEMPERATURE SETPOINT OF 72F, (ADJ.). UPON A RISE IN SPACE TEMPERATURE ABOVE SETPOINT, THE REVERSE SHALL OCCUR. FOR EXTERIOR ZONES, THE VAV BOX REHEAT COIL SHALL BE MODULATED TO MAINTAIN A CONSTANT SUPPLY AIR TEMPERATURE OF (72F ADJ.). THE UNIT SHALL BE COMMANDED TO THE OCCUPIED MODE BY THE BUILDING'S REGULAR OCCUPANCY SCHEDULE. WHEN INDEXED TO THE OCCUPIED MODE THE MIN. OUTSIDE AIR DAMPER SHALL BE OPENED TO ITS MINIMUM POSITION AND RETURN AIR DAMPER CLOSED PROPORTIONALLY. IF THE OUTSIDE AIR DAMPER IS NOT PROVEN TO BE OPEN, AN ALARM SHALL BE SENT TO THE OCC. EXTERIOR ZONE HEATING SHALL BE PERFORMED BY FINNED TUBE RADIATORS. UPON A DROP IN SPACE TEMPERATURE BELOW SETPOINT AS SENSED BY THE MASTER THERMOSTAT FOR THE HYDRONIC LOOP, THE THREE WAY DIVERTING VALVE SHALL MODULATE OPEN TO MAINTAIN SPACE TEMPERATURE SETPOINT. UPON A DROP IN SPACE TEMPERATURE THE REVERSE SHALL OCCUR. THE MASTER THERMOSTAT FOR THE HYDRONIC ZONE SHALL BE SELECTABLE AT THE BAS. IN THE OCCUPIED MODE, THE UNIT SHALL BE OPERATED TO MAINTAIN A SUPPLY AIR TEMPERATURE OF 55F (ADJ.) AS SENSED BY SUPPLY AIR TEMPERATURE SENSOR, SA-T. IN THE COOLING MODE, WHEN THE SAT RISES ABOVE 55F (ADJ.), THE CHILLED WATER CONTROL VALVE SHALL BE MODULATED OPEN. UPON A DROP IN SUPPLY AIR TEMPERATURE, THE REVERSE SHALL OCCUR. UNOCCUPIED (NORMAL OFF): THE UNIT SHALL BE INDEXED TO THE ECONOMIZER MODE (AHU-1 ONLY) WHEN THE OUTSIDE AIR DEW POINT TEMPERATURE DROPS BELOW 55F(ADJ.) AND THE OUTDOOR AIR ENTHALPY IS LOWER THAN THE RETURN AIR ENTHALPY. THE ECONOMIZER CONTROLLER SHALL MODULATE THE MAXIMUM OUTSIDE AIR DAMPER AND RETURN AIR DAMPER TO MAINTAIN 55F (ADJ.) SUPPLY AIR TEMPERATURE AS SENSED BY, SA-T. THE HEATING HOT WATER SYSTEM SHALL OPERATE CONTINUOUSLY TO MAINTAIN A 190F SUPPLY WATER TEMPERATURE (ADJ.) OPERATION: OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R UNOCCUPIED MODE: WHEN INDEXED TO THE UNOCCUPIED MODE BY THE BUILDING'S REGULAR OCCUPANCY SCHEDULE, THE VAV BOX HOT WATER REHEAT COILS FAIL INTO THEIR NORMALLY OPEN POSITION. UNOCCUPIED HEATING SETPOINTS FOR EXTERIOR ZONES SHALL BE RESET TO 65F (ADJ.) AT THE BAS. DIVERTING VALVES FOR PERIMETER HOT WATER RADIATION SYSTEM SHALL MODULATE TO MAINTAIN ZONE TEMPERATURE AS SENSED BY THE MASTER THERMOSAT FOR THE ZONE. KEY PLAN FAILURE MODE: THE SUPPLY FAN SHALL VFD SHALL MODULATE THE FAN SPEED TO MAINTAIN DUCT STATIC PRESSURE SETPOINT IN THE SUPPLY DUCTWORK. UPON A FAILURE OF THE PRIMARY AHU SERVING THE ZONE, THE VAV BOX HOT WATER REHEAT COILS SHALL FAIL IN THEIR NORMALLY OPEN POSITION. UNOCCUPIED (NORMAL OFF): UNOCCUPIED MODE: WHEN INDEXED TO THE UNOCCUPIED MODE BY THE BUILDING'S REGULAR OCCUPANCY SCHEDULE, THE SUPPLY FAN SHALL BE COMMANDED OFF, THE COOLING COIL VALVE AND HOT WATER HEATING COIL VALVES ARE CLOSED AND THE OUTSIDE AIR DAMPERS ARE CLOSED. SAFETY: SMOKE DETECTORS IN THE SUPPLY AND RETURN AIR STREAMS SHALL DE-ENERGIZE THE SUPPLY FAN AND RETURN FAN UPON ACTIVATION, THE COOLING COIL VALVE SHALL CLOSE AND SMOKE DAMPERS IN THE RETURN AND SUPPLY AIR STREAMS SHALL BE CLOSED. THE HOT WATER HEATING SUPPLY VALVE SHALL OPERATE IN THE FREEZE PROTECTION MODE AS DESCRIBED BELOW. 1 12/3/2014 ISSUED FOR BID No. Date Revision LOW TEMPERATURE ALARM, LT-A SHALL DE-ENERGIZE THE SUPPLY FAN WHEN TEMPERATURES BELOW 38 DEG F (ADJ.) ARE SENSED. THE CHILLED WATER VALVE SHALL OPEN, THE BUILDING CHILLED WATER PUMP SHALL START IN FULL RECIRCULATION MODE, THE OUTSIDE AIR DAMPER(S) SHALL CLOSE AND AN ALARM SHALL BE SENT TO THE OCC. WHEN THE STATIC PRESSURE ACROSS THE FILTER BANK EXCEEDS 2.5"W.C. (ADJ.) AN ALARM SHALL BE SENT TO THE OCC. WHEN THE STATIC PRESSURE ACROSS THE FILTER BANK EXCEEDS 3.0"W.C. THE SUPPLY FAN AND RETURN FANS SHALL BE COMMANDED OFF, OUTSIDE AIR DAMPER(S) SHALL CLOSE AND A SECOND, SEPERATE ALARM SHALL BE SENT TO THE OCC. WHEN THE STATIC PRESSURE IN THE SUPPLY OR RETURN DUCTWORK EXCEEDS 3.0" W.C.(ADJ.) AN ALARM SHALL BE SENT TO THE OCC AND THE SUPPLY AND RETURN FANS SHALL BE COMMANDED OFF AND THE OUTSIDE AIR DAMPER(S) SHALL CLOSE FAILURE MODE: THE UNIT SHALL NOT BE ALLOWED TO START BASED ANY OF THE ALARMS DESCRIBED ABOVE. WHEN THE UNIT IS RESET FROM OCC BY THE BUILDING OPERATOR, THE ALARMS WILL CLEAR, AND THE UNIT WILL RESTART. ROWAN UNIVERSITY Project Title BOLE HALL RENOVATIONS Drawing Title SEQUENCE OF OPERATION Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. M011 Printed: 12/3/2014 11:31:54 AM ZC PIT SEQUENCE OF OPERATION NOTES: TIT TIT ZIC SENSING LINE, TYP. ROWAN UNIVERSITY OPERATION: TE THE CHILLED WATER SYSTEM SHALL BE CONTROLLED THROUGH THE LOCAL BUILDING AUTOMATION SYSTEM (BAS). THE BAS WILL ENGAGE THE SECONDARY CHILLED WATER PUMPS TO START WHEN THE BUILDING PRESSURE DIFFERENTIAL IS 2PSI (ADJ.) BELOW THE PREDEFINED SETPOINT (ADJ.) TE M 4" PCHWR WHEN THE SECONDARY PUMP IS ENGAGED, THE PUMP SHALL START AT MINIMUM SPEED (30% ADJ.). UPON A DROP IN BUILDING PRESSURE DIFFERENTIAL, THE SECONDARY PUMP SPEED SHALL BE INCREASED THROUGH ITS RESPECTIVE VFD. UPON AN INCREASE IN BUILDING PRESSURE DIFFERENTIAL, THE REVERSE SHALL OCCUR. N.O. REMOTE MOUNT ON NEAREST WALL. 5'-6" OFF FLOOR. FURNISH AND INSTALL SENSING LINES AND WIRING (TYP. ALL INDICATING TRANSMITTERS) PIT UTILITY ISOLATION VALVES TIT THE PUMP SHALL BE DE-ENERGIZED WHEN THE BUILDING PRESSURE DIFFERENTIAL IS 3PSI (ADJ.) ABOVE SETPOINT FOR A PERIOD OF 5 MINS. (ADJ.). LOCATE AT HYDRAULICALLY MOST REMOTE AHU THE BAS WILL MODULATE THE CHILLED WATER CONTROL (CHOKE) VALVE TO MAINTAIN A 15 DEGREE CHILLED WATER DIFFERENTIAL ON THE PRIMARY SYSTEM. THE CHOKE VALVE WILL ALSO MODULATE TO MAINTAIN THE MAXIMUM BUILDING PRESSURE (PB) BELOW THE BUILDING SET-POINT PRESSURE (ADJ.) AS FOLLOWS: - DELTA T < 15 DEG. F (ADJ.) - CHOKE VALVE CLOSES - DELTA T > 15 DEG. F (ADJ.) - CHOKE VALVE OPENS - DELTA PB > SETPOINT (ADJ.) - CHOKE VALVE CLOSES. - DELTA PB < SETPOINT (ADJ.) - VFD MODULATES PUMP SPEED PDT TIT THE PRIMARY CHILLED WATER RETURN WATER TEMPERATURE SHALL NOT EXCEED 60F (ADJ.) TE TE IAL ORL M ME HAL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE CHOKE VALVE MINIMUM NORMAL OPERATING POSITION SHALL BE 30% (ADJ.) N.0. SECONDARY PUMPS SHALL BE DISABLED AT OUTSIDE AIR TEMPERATURE BELOW 48F (ADJ.) 4" PCHWS THE BAS SYSTEM SHALL ALTERNATE SECONDARY CHILLED WATER PUMPS TO EQUALIZE RUNTIME. 30' SIGNAL WIRE (FURNISHED BY FLOWMETER VENDOR) SAFETY: B SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN SECONDARY CHILLED WATER PUMP SHALL RUN IN FULL BUILDING RECIRCULATION MODE (I.E. CHOKE VALVE FULLY CLOSED) WHEN INDEXED TO THE FREEZE PROTECTION MODE BY EITHER THE BUILDING AHU OR RTU. THE AIR HANDLING UNIT CHILLED WATER COILS SHALL MODULATE TO THE FULLY OPEN POSITION AND THE SECONDARY PUMPS SHALL RUN AT 100%. MAGNETIC FLOWMETER REMOTE MOUNT ON NEAREST WALL. 5'-6" OFF FLOOR) FIT EXCITATION WIRE (FURNISHED BY CONTRACTOR AND INSTALLED IN SEPERATE CONDUIT. BELDEN 8720 OR EQUAL) OAK HALL LE BO LL A H PARKING LOT R FAILURE MODE: SIC UPON A FAILURE OF A PUMP TO START AN ALARM SHALL BE SENT TO THE CAMPUS OPERATIONS CONTROL CENTER (OCC). , THE ALTERNATE PUMP SHALL BE INDEXED TO START MANUALLY BY THE OCC. YI UPON A FAILURE OF THE CHOKE VALVE TO MAINTAIN A MAXIMUM 60F PRIMARY CHILLED WATER RETURN TEMPERATURE OR TO MAINTAIN THE BUILDING PRESSURE (PB) BELOW SETPOINT, AN ALARM SHALL BE SENT TO THE OCC. HS ENERGY METERING: FY THE BUILDING CHILLED WATER ENERGY METERING SYSTEM CONSISTS OF A MAGNETIC FLOWMETER, REMOTE MOUNTED FLOW CONVERTER, RTD/TEMPERATURE INDICATING TRANSMITTERS MOUNTED ON THE PRIMARY SUPPLY AND CHILLED WATER RETURN PIPING AND FLOW COMPUTER. SIC RS-485 TO BAS BRIDGE CONTROLLER KEY PLAN THE STEAM ENERGY METERING SYSTEM CONSISTS OF A VORTEX FLOWMETER, REMOTE MOUNTED FLOW CONVERTER, RTD/TEMPERATURE INDICATING TRANSMITTER AND PRESSURE INDICATING TRANSMITTER. THE FLOW COMPUTERS SHALL BE HOUSED IN A NEMA 4X ENCLOSURE AND SHALL EACH BE WIRED TO THE BAS. REFER TO SPECIFICATION SECTION 130219 FOR GRAPHICS AND COMMUNICATIONS REQUIREMENTS AT THE UNIVERSITY SCADA SYSTEM. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR STRAIGHT RUN AND OTHER INSTALLATION REQUIREMENTS. REFER TO ELECTRICAL DRAWING E-XXX FOR NEW ELECTRICAL SERVICE METER. FURNISH AND INSTALL NEW RS-485 COMMUNICATION TO BAS PANEL. REFER TO SPECIFICATION SECTION XXXXXX FOR GRAPHICS AND COMMUNICATIONS REQUIREMENTS AT THE UNIVERSITY SCADA SYSTEM. 1 12/3/2014 ISSUED FOR BID No. 1 M012 Date Revision PRIMARY AND SECONDARY CHILLED WATER INTERFACE AND METERING NO SCALE PIT REMOTE MOUNT ON NEAREST WALL. 5'-6" OFF FLOOR. FURNISH AND INSTALL SENSING LINES AND WIRING SENSING LINE TIT TE 5" LPS 5" LPS 30' SIGNAL WIRE (FURNISHED BY FLOWMETER VENDOR) VORTEX FLOWMETER REMOTE MOUNT ON NEAREST WALL. 5'-6" OFF FLOOR FIT ROWAN UNIVERSITY FY Project Title BOLE HALL RENOVATIONS RS-485 TO BAS BRIDGE CONTROLLER DESIGNATION TYPE BILL OF MATERIALS QUANTITY BASIS OF DESIGN COMMENTS Drawing Title - 2 M012 STEAM ENERGY METERING NO SCALE FIC PDIT TE TTT MAGNETIC FLOW METER (CHILLED WATER) VORTEX FLOW METER (STEAM) FLOW CONVERTER PRESSURE DIFFERENTIAL INDICATING TRANSMITTER 1 YOKOGAWA AXF100 1 YOKOGAWA DY100 2 1 YOKOGAWA AXF SERIES YOKOGAWA EJA 530E TEMPERATURE ELEMENT TEMPERATURE INDICATING TRANSMITTER 5 5 YOKOGAWA TSE-200 YOKOGAWA YTA-110 FURNISH WITHIN 30 FEET OF SENSING LINE AND TERMINATION KIT FURNISH WITHING 30 FEET OF SENSING LINE AND TERMINATION KIT. FURNISH WITH ANDERSON GREENWOOD INSTRUMENT POWER MANIFULD - P&ID DIAGRAMS Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. M012 Printed: 12/3/2014 11:31:55 AM COIL AIR VENT VALVE W/ PLUG AIR VENT (3/4" BALL VALVE WITH CAP) DIFFERENTIAL PRESSURE SENSOR THERMOMETER W/ SEPARABLE SOCKET THERMOMETER BUTTERFLY VALVE (TYP.) COIL AIR VENT VALVE W/ PLUG PIPE INSULATION BUTTERFLY VALVE ROWAN UNIVERSITY TRIPLE DUTY VALVE CHWR PIPING CMU WALL FIRESTOP SEALANT ALL SIDES DISCHARGE REDUCER AIR VENT (3/4" BALL VALVE WITH CAP) TYPICAL SUCTION COOLING COIL 2-WAY MODULATING VALVE COOLING COIL PRESSURE GAUGE DPS BRAIDED STEEL COVERED ISOLATION FITTING BASE MOUNTED PUMP MOTOR PRESSURE GAUGE W/ BALL VALVE CHWS PIPING MINERAL WOOL WHERE CLEARANCE IS GREATER THAN 1/4" CORE DRILL AND SLEEVE SUCTION DIFFUSER CALIBRATED BALANCING AND FLOW MEASURING VALVE CONCRETE PAD ADJUSTABLE SUPPORT IAL ORL M ME HAL FLOOR OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE PRESSURE GAUGE W/ BALL VALVE 1 PIPE PENETRATION DETAIL 3/4" DRAIN W/BALL VALVE & HOSE COUPLING 2-WAY MODULATING VALVE NO SCALE M013 4 3/4" COIL DRAIN VALVE W/ HOSE COUPLING (TYPICAL FOR BOTH COILS) NO SCALE M013 REDUCER DIFFERENTIAL PRESSURE SENSOR BASE MOUNTED PUMP DETAIL B CALIBRATED BALANCING AND FLOW MEASURING VALVE BUTTERFLY VALVE (TYP.) LE BO LL A H DPS 3/4" COIL DRAIN VALVE W/ HOSE COUPLING (TYPICAL FOR BOTH COILS) 3 3/4" DRAIN W/ BALL VALVE BASIS OF DESIGN APOLLO MODEL 77-204-01 & HOSE COUPLING TYPICAL 2 M013 CHILLED WATER COIL NO SCALE M013 CHILLED WATER COIL MIN. 3 DUCT DIAMETERS (NO FLEX DUCT) VAV BOX CONTROLS CHWS PIPING FASTEN TO ROOF/DECK ABOVE VOLUME DAMPER NO SCALE SUPPLY DUCT 1 AAV 1 KEY PLAN HOT WATER REHEAT COIL BALANCING VALVE SHEETMETAL DUCT 1" MIN SPRING ISOLATOR DUCT MAIN NC P/T 1" MIN ADJUSTABLE ELBOW RINGS BALL VALVE C METAL BAND SUPPORT MOUNT TO STEEL OR CONCRETE DECK 3-WAY ELECTRIC CONTROL VALVE ° 45 ° 45 FULL LENGTH AND WIDTH OF BRANCH DUCT SEAL AROUND TAKEOFF LAY-IN SUPPLY AIR DIFFUSER WITH ROUND NECK. 3/4" HWS&R CONSTRUCTION NOTES: MAINTAIN ADEQUATE SERVICE CLEARANCE FOR HOT WATER COIL, PIPING 1 AND VAV BOX CONTROLS. T-BAR TYPE SUSPENDED CEILING VOLUME DAMPER 8 INLINE RETURN 6 NO SCALE M013 7 DUCT TAKEOFF DETAIL NO SCALE Revision NO SCALE NO SCALE PROVIDE INDEPENDENT SUPPORT FOR PUMP CLEARANCE BETWEEN FIRE DAMPER AND WALL SHALL BE 1/8" PER FOOT OF PERIMETER. 6" MAXIMUM WALL Date FLEXIBLE DUCT TO DIFFUSER DETAIL M013 MINIMUM 24 GA SHEET METAL ESCUTCHEON PLATE ON BOTH SIDES OF WALL ALL AROUND 12/3/2014 ISSUED FOR BID No. VAV BOX WITH REHEAT M013 RETURN FAN DETAIL 1 1 VOLUME DAMPER FULL DIAMETER OF BRANCH DUCT DUCT MAIN STRAINER AIRFLOW SEAL AROUND TAKEOFF M013 HW S P/T DUCT MAIN AIRFLOW 5 HW R N0 1/4" DUCT WIDTH BUT MINIMUM 10" DRAIN VALVE W/ HOSE CONNECTION FLEXIBLE DUCT PARKING LOT R CHWR PIPING THERMOMETER W/ SEPARABLE SOCKET MOTOR SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN 1-1/2" X 1-1/2" X 10 GUAGE MINIMUM ANGLE IRON AROUND DISCHARGE MIN 1" LAP AROUND ENTIRE OPENING SUCTION SEE NOTE 1-1/2" ANGLE 1" MIN. BOLTS FOT DUCT HOT WATER SUPPLY 3-WAY CONTROL VALVE HOT WATER RETURN MANUAL AIR VENT WITH GLOBE VALVE NUT OR BOLT OR WELDED DUCT SEE PLANS FOR PIPE SIZES UNIT HEATER WILL BE SECURED TO BLDG. WITH A MINIMUM OF TWO BRACKETS FLANGED CONNECTIONS OR UNIONS DUCT LINER (AS SPECIFIED) NOTE: SHEET METAL SCREW PROVIDE BALANCING VALVE AND FLOW SENSOR AS REQUIRED BY PIPE SIZE AND SPECIFICATION SECTION 15180. INSTALL FLOW SENSOR PER MANUFACTURER'S REQUIREMENTS FOR STRAIGHT RUN OF PIPE DIAMETERS. HINGED ACCESS DOOR WITH CAM FASTENER AND NEOPRENE GASKET MINIMUM SIZE 6 X 6 UNIT HEATER MOTOR HOUSING CALIBRATED BALANCE VALVE ON LINE SIZED BYPASS INSULATION AS SPECIFIED APPLY HEAVY BEAD OF FIRE CAULK SEALANT ALL AROUND OPENING 5 PIPE DIAMETERS MINIMUM STRAIGHT PIPE 12 M013 "S" SLIP TYPE WITH SHEET METAL SCREWS INLINE CIRCULATING PUMP ROWAN UNIVERSITY NO SCALE UNION, TYPICAL 22 GA SHEET METAL WALL SLEEVE ISOLATION VALVE PACK SPACE BETWEEN DUCT AND SHEET METAL SLEEVE WITH HIGH DENSITY FIBERGLASS INSULATION STRAINER 10 GAUGE SLEEVE NOTES: 1. 2. 9 HYDRONIC WALL MOUNTED UNIT HEATER M013 NO SCALE 10 M013 DUCT PENETRATION(CMU) PROVIDE FIRE DAMPER FOR ROUND DUCT OR USE TRANSITIONS FOR ROUND TO SQUARE DUCT. FURNISH AND INSTALL SIGNAGE COMPLIANT WITH IMC-2012 FOR IDENTIFYING FIRE DAMPERS 11 NO SCALE M013 FIRE DAMPER Project Title NO SCALE BOLE HALL RENOVATIONS EXISTING ROOF CURB SET BOLT IN SEALANT GASKET 8" MIN. SHEET METAL COVER M013 NO SCALE Printed: 12/3/2014 11:31:58 AM FTR SUPPLY (BELOW) MEMBRANE FLASHING EXISTING CONCRETE DECK NEW 1/2" RIGID INSULATION BY G.C. FTR RETURN (ABOVE) NEW PIPE CHASE BY G.C. ROOF MOUNT DUCT SUPPORT CURB NO SCALE FTR (SEE PLANS FOR DIMS.) 5/8" FTR RETURN DRAIN VALVE (TYP.) PRESSURE TREATED WOOD BLOCKING, TYP. M013 PERFORATED OPENING IN SILL BY GC. (MIN 50% FREE AREA; 6" WIDER THAN ELEMENT) RETURN 5/8" FTR SUPPLY 14 Drawing Title DETAILS 2 PLY ROOFING MEMBRANE 8" MIN. ONTO EXISTING ROOFING EXISTING INSULATION EXIST. CONCRETE DECK ROOF CURB REPLACEMENT AND PATCHING EXISTING COLUMN 5-1/2" EXISTING BUILT UP ROOFING NOTE: LARGE SIZE OPENINGS WILL NEED SUPPLEMENTAL BRACING UNDER THE PLYWOOD DECK. CONTRACTOR SHALL CONSULT WITH THE CURB MANUFACTURER, FOR REQUIREMENTS. BRACING, AND FASTENING TO BE PROVIDED BY ROOD CURB MANUFACTURER. 13 FASTEN APPROX. 8" O.C. EXISTING COLUMN BEYOND 6-1/2" VARIES NEW PIPE CHASE BY G.C. L2 "x2"x3/8" LEG TO SUPPORT DUCT SEE PLAN VIEW FOR LOCATIONS 1'-4" 12" MIN 3/4" EXTERIOR GRADE PLYWOOD DECK WITH SHEETMETAL COVER TO BE PROVIDED BY CURB MANUFACTURER. SEE DETAIL NOTE. CAP SECURED AT 24" O.C. WITH SS SCREWS AND NEOPRENE GASKETS. 15 M013 M-FINNED TUBE-PLAN NO SCALE 16 M013 4" RETURN GRILLE (6" WIDER THAN ELEMENT) FINNED TUBE SECTION NO SCALE Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. M013 ROWAN UNIVERSITY AIR HANDLING UNIT SUPPLY FAN RETURN FAN FAN TAG LENGTH WEIGHT OA MAX/MIN (IN) (LBS) (CFM) AHU-1 390 9635 2,000/12,100 AHU-2 90 1855 400/400 MOTOR CHILLED WATER COIL FAN PANEL FILTER MOTOR SENSIBLE TOTAL EAT-DB EAT-WB LAT-DB LAT-WB FV APD EWT LWT WPD FAN ESP TSP ESP TSP (°F) (°F) (°F) (FT/MIN) (INH2O) (°F) (°F) GPM (INH20) ROWS FPI TYPE TYPE QTY. CLASS CFM RPM BHP (INH20) (INH20) ELEC. HP RPM CTRL TYPE QTY. CLASS CFM RPM BHP (INH2O) (INH2O) ELEC. HP RPM CTRL (BTU/HR) (BTU/HR) (°F) 30" PLENUMDIRECT DRIVE 16" PLENUMDIRECT DRIVE 1 2 12100 1339 12.34 1 2 3500 2665 3.86 1 4.58 1.1 4.68 208/60/3 15 1160 VFD 30" PLENUM -DIRECT DRIVE 208/60/3 7.5 3500 NONE - QTY. CLEAN DIRTY PD PD DEPTH EFF. (INH2O) (INH2O) TYPE QTY. CLEAN DIRTY PD BD DEPTH EFF. (INH2O) (INH2O) COMMENTS 1 2 10890 872 3.08 0.85 1.01 208/60/3 5 1160 VFD 325,676 431,599 78 65 53 53 427 0.63 45 60 57.1 8.7 8 9 PLEATED (4)-12X24 (MERV 8) (8)-20X24 2 30 0.25 1 VARICEL II MH (4)-12X24 CARTRIDGE (8)-20X24 4 85 .047 1.5 SEE NOTE(S) 2,3,4 - - - - - - - - - - - 90,260 113,910 80 64 55 53 467 0.79 45 60 15.2 5.7 8 10 PLEATED (1)-24X12 (MERV 8) (2)-24X20 2 30 0.31 1 VARICEL II MH (1)-24X12 CARTRIDGE (2)-24X20 4 85 0.57 1.5 SEE NOTE(S) 1,3,5 NOTES: 1. VFD FOR AHU-2 FAN SHALL BE FURNISHED BY AHU MANUFACTURER AND FIELD INSTALLED/WIRED IN MECHANICAL ROOM BY E.C.(REFER TO ELECTRICAL DRAWINGS). 2. VFD'S FOR AHU-1 SUPPLY AND RETURN FANS SHALL BE FACTORY INSTALLED BY THE AHU MANUFACTURER. 3. REFER TO SPECIFICATIONS FOR ADDITIONAL UNIT REQUIREMENTS SUCH AS MARINE LIGHTS, MIXING BOXES, DAMPERS, AND BLENDERS. 4. BASIS OF DESIGN DAIKIN MODEL OAH OR APPROVED EQUAL. (REFER TO SPEC SECTION 237413). 5. BASIS OF DESIGN DAIKIN MODEL CAH OR APPROVED EQUAL. (REFER TO SPEC. SECTION 237313). TAG LOCATION DESCRIPTION UH-1 2ND FLOOR WALL MOUNTED TAG CHWP-1 HWP-1 HWP-2 HWP-3 SERVICE MBH UNIT HEATER WATER EWT LWT GPM 180 IAL ORL M ME HAL VENTILATION SCHEDULE CFM AIR EAT LAT VOLTAGE PHASE HZ MODEL 65 95 120 1 60 HSB-HC 160 PUMP VOLTAGE PHASE REMARKS FLOW (GPM) FT HD HP RPM TYPE HZ MANUFACTURER MODEL COMMENTS AHU 1 & 2 100 40 2 1750 BASE MOUNTED 208 3 60 BELL AND GOSSETT SERIES 1510 2AD-ES 100 GPM INCLUDES ADDITIONAL 25 GPM FOR FUTURE LOAD OF PRESIDENT'S SUITE. FINNED TUBE RADIATION STANDBY VAV REHEAT 62 35 0.5 1750 INLINE 208 3 60 BELL AND GOSSETT SERIES E-901.5AB 62 30 35 35 0.5 1 1750 1750 INLINE INLINE 208 208 3 3 60 60 BELL AND GOSSETT BELL AND GOSSETT SERIES E-901.5AB SERIES E-901.5AB HEAT EXCHANGER SHELL TUBE TAG LOCATION SYSTEM FLUID LBS/HOUR PSIG FLUID GPM LWT MAX PRESSURE DROP (PSIG) BASIS OF DESIGN HX-1 BASEMENT MECHANICAL ROOM HOT WATER STEAM 936 5 WATER 92 180 0.5 BELL AND GOSSETT SU-84-2 ROOM NUMBER 100 100H 100I 101 101G 102 102 103 104 104 104A 104B 104C 105 105 106 107 107 108 109 REMARKS 110 111 112 113 114 VAV BOX TAG MAX CFM MIN CFM (WINTER) VAV-100G VAV-101 VAV-102 VAV-104 VAV-104A VAV-104B VAV-104C VAV-107 VAV-108 VAV-110 VAV-112 VAV-115 VAV-117 VAV-118 VAV-121 VAV-125 VAV-126 VAV-130 VAV-131A VAV-131B VAV-200 VAV-200B VAV-201 VAV-203 VAV-205A VAV-207 VAV-209 VAV-H100 VAV-L100 VAV-W202 600 1055 170 250 355 475 495 785 325 155 130 280 200 140 210 780 1050 1060 1560 1560 425 450 300 450 475 420 355 770 150 285 300 530 85 125 180 240 250 390 165 80 65 140 100 70 100 390 525 530 780 780 215 225 150 225 240 210 180 385 75 145 TAG CFM ESP EF-1 EF-2 EF-3 RF-1 550 500 250 2550 0.4 in. wg. 0.5 in wg. 0.3 in. wg. 0.5 in. wg. MIN CFM (SUMMER) INLET SIZE MAX NC LEVEL 180 315 50 75 105 150 150 235 100 50 40 85 60 45 65 235 315 320 470 470 130 135 90 135 145 125 106 230 45 85 8 10 4 5 6 6 6 8 6 4 4 5 4 4 4 8 10 10 12 12 6 6 5 6 6 6 6 8 4 5 1/4 1/4 1/6 3/4 LAT(°F) EWT(°F) LWT(°F) GPM REHEAT MBH BASIS OF DESIGN 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 55 55 55 55 55 55 55 55 55 55 84 86 93 87 92 88 87 83 94 94 97 86 91 94 89 86 86 86 86 86 84 83 84 83 83 84 84 83 97 84 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 160 160 160 158 160 160 160 157 159 160 160 158 159 159 160 160 160 160 160 160 156 156 155 156 156 156 156 156 160 155 1.1 2.1 0.4 0.5 .0.8 1.0 1.0 1.3 0.8 0.4 0.4 0.5 0.4 0.8 0.4 1.4 2.1 2.1 3.1 3.1 0.6 0.6 0.4 0.6 0.6 0.6 0.5 1.0 0.4 0.4 11.2 20.7 4.0 5.1 8.2 9.8 10.0 14.1 7.7 3.75 3.3 5.5 4.4 7.7 8.8 13.2 20.6 20.7 30.1 30.1 6.6 6.9 4.8 6.9 7.25 6.5 5.6 11.8 3.5 4.5 ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR ENVIRO-TEC MODEL SDR 20 20 20 20 20 25 25 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 25 20 25 20 20 20 25 25 MOTOR RPM FAN RPM MOTOR HP 1148 1448 1564 1206 EAT (°F) 1725 1750 1725 1725 FANS MOTOR BHP 0.1 0.15 0.03 0.41 ELEC. 120/60/1 120/60/1 120/60/1 120/60/1 MANUFACTURER MODEL GREENHECK GREENHECK GREENHECK GREENHECK CUE-99-A SE1-12-432-A4 G-070-VG QEI-15-1-5 TAG NECK SIZE EG-1 LRG LSD-1 LSD-2 LSD-3 RG-1 RG-2 SD-1A SD-1B SD-1C SD-1D SD-2A SD-2B SD-2C SD-2D SD-3 SEE PLANS SEE PLANS 12"ø 10"ø 6"ø SEE PLANS SEE PLANS 9"x9"-6"ø 18"x18"-6"ø 18"x18"-8"ø 18"x18"-12"ø 9"x9"-6"ø 18"x18"-6"ø 18"x18"-8"ø 18"x18"-10"ø 10"ø 24"x24" 60" 60" 60" 60" 24"x24" 24"x24" 24"x24" 24"x24" 24"x24" 24"x24" 24"x24" 24"x24" 24"x24" 24"x24" DESCRIPTION BASIS OF DESIGN REMARKS LOUVERED ALUMINUM EXHAUST GRILLE LINEAR RETURN GRILLE LINEAR SLOT DIFFUSER LINEAR SLOT DIFFUSER LINEAR SLOT DIFFUSER LOUVERED RETURN GRILLE LOUVERED RETURN GRILLE LOUVERED FACE DIFFUSER LOUVERED FACE DIFFUSER LOUVERED FACE DIFFUSER LOUVERED FACE DIFFUSER LOUVERED FACE DIFFUSER LOUVERED FACE DIFFUSER LOUVERED FACE DIFFUSER LOUVERED FACE DIFFUSER LOUVERED FACE DIFFUSER PRICE 630 PRICE SDA100 PRICE AS230 PRICE AS220 PRICE AS210 PRICE 530 PRICE 530 PRICE SMX PRICE SMX PRICE SMX PRICE SMX PRICE SMD PRICE SMD PRICE SMD PRICE SMD PRICE SCD SEE NOTE 2 SEE NOTE(S) 1, 2 SEE NOTE(S) 1, 2 SEE NOTE(S) 1, 2 SEE NOTE(S) 1, 2 SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 NOTES: 1. PROVIDE INSULATED UNIVERSAL TYPE PLENUM. 2. FURNISH AND INSTALL SQUARE TO ROUND TRANSITION PRIOR TO FINAL CONNECTION TO DIFFUSER. LOBBY KITCHEN STORAGE PAYROLL OPEN OFFICE CONFERENCE ROOM LOUNGE MAIL/COPY PAYROLL SUPERVISOR OPEN OFFICE DIRECTOR FILE ROOM OFFICE OFFICE WOMEN'S ROOM FUTURE CORRIDOR MEN'S ROOM CORRIDOR ACC. SERVICES DIRECTOR ACC. SERVICES ASSOCIATE DIRECTOR BREAK ROOM COPY CONFERENCE ROOM ACC. SERVICES DIRECTOR ACC. PAYABLE MANAGER RECEPTION MEDIA/P.R. MEDIA/P.R. OFFICE OFFICE OFFICE CORRIDOR CONFERENCE ROOM MEDIA/P.R. MEDIA/P.R. MEDIA/P.R. OFFICE OFFICE BUDGET DIRECTOR OPEN OFFICE OFFICE OFFICE OFFICE OFFICE STORAGE CORRIDOR OFFICE COPY ROOM OFFICE OFFICE OFFICE/STORAGE OFFICE CORRIDOR CORRIDOR CORRIDOR CORRIDOR LOBBY VESTIBULE LOBBY FOYER OFFICE WAITING AREA CORRIDOR CONFERENCE ROOM CORRIDOR B PRIMARY OA INTAKE OA FLOW FRACTION RATE (ZP) (VOT) TOTAL AREA (SQ. FT.) POPULATI ON(ZP) PEOPLE OA RATE (RP) 130 45 80 860 270 195 77 130 315 150 130 165 500 160 150 500 80 280 140 1 1 1 6 8 1 1 1 2 1 1 1 5 5 5 5 5 5 5 5 5 5 5 5 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 16 10 12 102 70 21 12 16 36 18 16 19 50 100 100 1060 400 175 50 80 290 85 75 400 0.32 0.1 0.12 0.1 0.18 0.12 0.24 0.2 0.12 0.21 0.21 0.05 23 14 18 146 100 30 17 23 52 25 23 27 1 0 5 0 0.06 0.06 18 35 85 175 0.21 0.2 25 49 0 1 0 5 0.06 0.06 21 17 785 85 0.03 0.2 30 24 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 125 1 5 0.06 16 80 0.2 22 AHU-1 180 95 150 140 4 1 8 1 5 5 5 5 0.06 0.06 0.06 0.06 39 13 61 17 155 65 150 80 0.25 0.21 0.41 0.21 55 19 88 24 AHU-1 AHU-1 AHU-1 AHU-1 125 1 5 0.06 16 80 0.20 22 AHU-1 265 105 105 105 105 110 170 425 115 120 120 120 120 145 2280 155 250 135 165 90 155 205 115 125 155 75 120 435 65 205 75 415 215 225 165 85 145 100 156 120 3 1 1 1 1 1 0 22 1 1 1 1 1 1 19 1 2 1 1 1 1 2 1 1 1 1 1 0 0 0 0 0 3 3 0 1 0 0 8 0 5 5 5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 0 0 5 5 5 0 0 0 0 0 5 5 0 5 5 5 5 5 NOTES: 1. POPULATION BASED ON DEFAULT OCCUPANCY DENSITIES LISTED IN TABLE 403.3 FOR THE 2009 IMC. 2. UNCORRECTED AIRFLOW RATE INCLUDES A ZONE DISTRIBUTION EFFECTIVENESS OF 0.8 FOR CEILING SUPPLY OF WARM AIR AND CEILING RETURN. 3. CORRECTED OA BASED ON A SYSTEM VENTILATION EFFICIENCY OF 0.7 BASED ON MAX ZONE PRIMARY OUTDOOR AIR FRACTION. 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 39 14 14 14 14 15 13 169 15 15 15 15 15 17 290 18 31 16 19 13 18 28 9 9 18 12 15 33 5 15 6 31 35 36 12 13 11 8 62 9 145 65 65 65 65 65 40 520 360 350 340 345 355 360 3150 240 295 185 250 60 100 300 100 135 285 145 210 195 50 100 75 100 150 350 240 70 50 50 300 45 0.27 0.22 0.22 0.22 0.22 0.22 0.32 0.33 0.04 0.04 0.04 0.04 0.04 0.05 0.09 0.07 0.11 0.09 0.07 0.22 0.18 0.09 0.09 0.07 0.06 0.08 0.07 0.17 0.1 0.15 0.07 0.31 0.23 0.10 0.05 0.18 0.22 0.15 0.21 0.2 55 20 20 20 20 21 18 242 21 22 22 22 22 24 414 20 35 18 21 14 20 31 10 10 20 13 17 47 7 17 6 44 50 40 18 18 12 8 69 10 LAUREL HALL CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H SYSTEM NAME AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-1 AHU-2 AHU-2 AHU-2 AHU-2 AHU-2 AHU-2 AHU-2 AHU-2 AHU-2 AHU-2 AHU-2 AHU-2 AHU-1 AHU-1 AHU-2 AHU-2 AHU-1 AHU-1 AHU-2 AHU-1 AHU-1 AHU-2 AHU-2 AHU-2 HOLLYBUSH PARKING LOT R KEY PLAN 1 12/3/2014 ISSUED FOR BID No. Date Revision ROWAN UNIVERSITY Project Title BOLE HALL RENOVATIONS AIR DEVICES NOMINAL FACE SIZE COMMENTS REMARKS 117 118 119 120 121 122 124 125 125 126 127 128 129 130 131 200 201 202 203 204 205 205A 205B 206 207 208 209 H100 H102 H200 H201 L100 L101 L200 V100 W110 W200 W201 W202 W203 ROOM NAME UNCORRE CTED OA RATE PRIMARY AREA OA REQUIRED AIRFLOW (VOU) (VPZ) RATE (RA) OAK HALL Drawing Title SCHEDULES Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. M014 Printed: 12/3/2014 11:32:01 AM G CONSTRUCTION NOTES: 1. 2. PATCH ALL EXISTING HOLES FROM REMOVING EXISTING PIPE. COORDINATE WITH ARCHITECTURAL CONTRACT DRAWINGS. PROVIDE VALVE, PIPING, AND FITTINGS TO PERFORM THE REMOVALS WORK AND TO KEEP THE EXISTING PLUMBING SYSTEM OPERATIONAL WHERE THE REMOVALS WORK IMPACTS OTHER PLUMBING FIXTURES. ROWAN UNIVERSITY REMOVE CW & HW UP TO EXISTING LAV AND WC REMOVE EXISTING CW UP TO FIRST FLOOR TYPICAL REMOVE EXISTING HW BACK TO MAIN 2" CW REMOVE EXISTING HW & CW UP FOR FIRST FLOOR LAV TYPICAL IAL ORL M ME HAL REMOVE EXISTING HW & CW UP FOR FIRST FLOOR LAV TYPICAL REMOVE EXISTING CW UP TO FIRST FLOOR WC'S AND URI'S TYPICAL G 1/2" CW B OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H 1/2" HW PARKING LOT R UP UP 1/2" HW ABOVE, 3/4" HW BELOW KEY PLAN REMOVE EXISTING CW UP TO FIRST FLOOR BATHROOM TYPICAL Room H101 2 3 DP001 DP001 7 3/4" HW 2" CW 1 12/3/2014 ISSUED FOR BID No. 7 2 Revision ENLARGED DOMESTIC WATER PLAN DP001 UP Date 3/8" = 1'-0" G UP 5 CUT, CAP, AND ABANDON EXISTING PIPE IN CRAWL SPACE REMOVE EXISTING 1-1/2" DOMESTIC COLD WATER LINE FROM ENTERANCE TO CRAWL SPACE BACK TO MAIN. REMOVE EXISTING HANGERS, SUPPORTS, AND PATCH EXISTING HOLES 1 DP001 (E)4" SAN BASEMENT FLOOR PLAN 2" AND 3" SAN UP TO EXISTING LAV AND FD 1/8" = 1'-0" 4" AND 2" SAN UP TO EXISTING WC AND LAV ROWAN UNIVERSITY REMOVE EXISTING SAN UP TYP. REMOVE EXISTING VENT UP (E)4" SAN Project Title BOLE HALL RENOVATIONS REMOVE EXISTING SANITARY MAIN CO REMOVE EXISTING SANITARY UP REMOVE EXISTING SAN UP Drawing Title BASEMENT PLUMBING REMOVALS REMOVE EXISTING SANITARY LINES UP TO FD (E)4" SAN (E)CO 7 3 DP001 Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ ENLARGED SANITARY PLAN Job No: 3/8" = 1'-0" Drawing No. 2014-064 DP001 Printed: 12/3/2014 11:31:24 AM G CONSTRUCTION NOTES: DN OFFICE 104B W110 1. 2. PATCH ALL EXISTING HOLES FROM REMOVING EXISTING PIPE. COORDINATE WITH ARCHITECTURAL CONTRACT DRAWINGS. REFER TO DP002 FOR EXTENT OF PIPING REMOVALS. ROWAN UNIVERSITY OFFICE 104C OPEN OFFICE AREA 104 FILE ROOM 104A W108 W109 LOUNGE 102 2 DP002 UP IAL ORL M ME HAL 3 DP002 OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE UP VESTIBULE L101 H H102 J L K 7 CH100 LE BO LL A H UP S1 OFFICE 110A1 STAIR OFFICE 109A DN FILE ROOM 100G B SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN KITCHEN 100H W115 W116 OFFICE 110B OFFICE 110C OFFICE 110D OFFICE 114 OFFICE 113 PARKING LOT R H100 CH101 SUPPLY CLOSET 100I OFFICE 109B 108 REFERENCE AREA 111A OPEN OFFICE AREA 110A W114 OFFICE 115 110H OPEN OFFICE AREA 109 5 OFFICE 111B OFFICE 100F W111 TELE/COM COPY ROOM 108A W107 W112 FILE ROOM 116A OFFICE 116 W113 KEY PLAN OPEN OFFICE AREA 111 TOILET 100C1 OFFICE 110E OFFICE 110F OFFICE 117 W105 OFFICE 100E OFFICE 100D COPY ROOM 112 110 PAYROLL STORAGE 110G W106 H101 3 W104 STORAGE 122 OPEN OFFICE AREA 124 OFFICE 119 1 OPEN OFFICE AREA 100 W103 LOBBY L100 OFFICE 100C CONFERENCE ROOM 125 CONFERENCE ROOM 100B W102 12/3/2014 ISSUED FOR BID No. W100 W101 OFFICE 121 OFFICE 124A OFFICE 124B Revision OPEN OFFICE AREA 118 OFFICE 123 REMOVE EXISTING DOMESTIC WATER FROM CHASE WALL TO RISER UP TO 2ND FLOOR BATHROOM Date OFFICE 120 OFFICE 123A OFFICE 119A 1 OFFICE 100A FOYER V100 STAIR S2 UP CUT, CAP, AND ABANDON EXISTING PIPE IN CHASE 1 DP002 FIRST FLOOR PLAN 1/8" = 1'-0" REMOVE EXISTING DOMESTIC WATER PIPING TYPICAL FOR ALL FIXTURES BEING REMOVED. 2" SAN WOMEN 105 TOILET 103 WOMEN 105 TOILET 103 REMOVE EXISTING SANITARY AND VENT PIPING IN CHASE, TYPICAL ROWAN UNIVERSITY REMOVE EXISTING FLOOR DRAIN Project Title 3" SAN J.C. 106 JANITOR 101 J.C. 106 JANITOR 101 MEN 107 REMOVE EXISTING DOMESTIC WATER PIPING TYPICAL FOR ALL FIXTURES BEING REMOVED. BOLE HALL RENOVATIONS REMOVE EXISTING VENT STACK. PATCH EXISTING OPENING MEN 107 REMOVE EXISTING SANITARY PIPING IN CHASE, TYPICAL Drawing Title REMOVE EXISTING FLOOR DRAIN 2 DP002 ENLARGED DOMESTIC WATER PLAN 1/4" = 1'-0" 3 DP002 ENLARGED SANITARY PLAN 1ST FLOOR PLUMBING REMOVALS Date: 12/3/2014 Scale AS NOTED 1/4" = 1'-0" Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. DP002 Printed: 12/3/2014 12:01:55 PM G CONSTRUCTION NOTES: 1. 2. CORE DRILL, SLEEVE, AND FIRESTOP ALL FLOOR PENETRATIONS BY PLUMBING PIPING. REFER TO RISER DIAGRAMS ON 1/P003 AND 2/P003 WHERE PIPE SIZES AREN'T SHOWN FOR CLARITY. ROWAN UNIVERSITY REMOVE EXISTING 1-1/2" RIGID INSULATION ON CEILING OF EXISTING BASEMENT AREAS. FURNISH AND INSTALL NEW INSULATION AND MECHANICALLY FASTEN TO UNDERSIDE OF DECK TO MATCH EXISTING. (E) 2" CW FROM SERVICE 1/2" CW & HW UP TO 1ST FLOOR LAV 1/2" HW & CW UP TO 1ST FLOOR LAV G 1" CW UP TO 1ST FLOOR WC IAL ORL M ME HAL 1/2" CW (E) 3/4" HW 1/2" HW (E) 2" CW B 2" CW UP OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN 1/2" HW LE BO LL A H PARKING LOT R 1/2" HW 2" CW (E) 2" CW (E) 1-1/2" CW ABOVE 2 P001 3 P001 UP 1/2" HW & 2" CW UP TO 1ST FLOOR BATHROOM CHASE (E) 1/2" HW ABOVE 3/4" HW BELOW KEY PLAN 7 UP 1-1/2" CW 4 P003 UP 1/2" CW ABOVE 1/2" HW BELOW TYP. FOR ALL PENETRATIONS REFER TO 1/P001 FOR CONTINUATION 1/2" CW & HW UP (E) 3/4" HW CO 2" SAN UP 1 7 1/2" HW 12/3/2014 ISSUED FOR BID No. Date Revision 5 2 P001 ENLARGED DOMESTIC WATER PLAN 3/8" = 1'-0" G 1 P001 BASEMENT FLOOR PLAN 1/8" = 1'-0" 4" SAN UP TO 1ST FLOOR WC 2" SAN UP TO 1ST FLOOR 2" SAN UP TO 1ST FLOOR LAV 3" SAN UP TO 1ST FLOOR FD (E) CO ROWAN UNIVERSITY (E) 1-1/2" SAN FROM SUMP Project Title 4" SAN UP BOLE HALL RENOVATIONS 4" SAN UP TO 1ST FLOOR WC'S 3" SAN UP TO 1ST FLOOR MOP SINK Drawing Title BASEMENT PLUMBING INSTALLATIONS (E) 4" SAN 3" SAN UP TO 1ST FLOOR FD (E)CO 2" SAN REFER TO 1/P001 FOR CONTINUATION 7 3 P001 Date: 12/3/2014 Scale AS NOTED Drawn By: JD ENLARGED SANITARY PLAN Checked By JZ 3/8" = 1'-0" Job No: 2014-064 Drawing No. P001 Printed: 12/3/2014 11:32:02 AM G ROWAN UNIVERSITY 3 P002 IAL ORL M ME HAL 2 P002 H J L K B 7 OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R 2" SAN DN 1/2" HW & 1-1/2"CW DN REF. 5 4 P002 KEY PLAN 5 P002 2" SAN 3 1 12/3/2014 ISSUED FOR BID No. 1-1/2" CW UP TO SERVE SECOND FLOOR. CONNECT TO EXISTING AT POINT BELOW SECOND FLOOR SLAB Date Revision 1 1 P002 FIRST FLOOR PLAN 1/8" = 1'-0" G G 2" SAN DN, 2" V UP 2" SAN DN, 2" V UP" 4" SAN DN, 2" V UP LAV 1/2" HW & CW UP TO LAV FROM BASEMENT LAV LAV LAV WC WC 3" V 3" V 1/2" HW & CW TO LAV FROM BASEMENT H LAV 1-1/4" CW UP FROM BASEMENT FD LAV FD 2" SAN DN, 2" V UP FURNISH AND INSTALL WALL CLEANOUT WC 3" V UP" WC WC WC WC 2" PUMP VENT 1-1/4" CW TO WC TYP. OF 4 4" SAN, 3" V UP" URI 4" VTR LAV P002 1/4" = 1'-0" 3" VTR KS KS Drawing Title WC 4" SAN DN ENLARGED BATHROOM PLAN-SANITARY FURNISH AND INSTALL DRAIN PUMP BASIS OF DESIGN LIBERTY PUMP 405 SERIES OR APPROVED EQUAL 1/2" HW 1/2" CW WC 2 BOLE HALL RENOVATIONS URI MS LAV 2" SAN DN, 2" V UP Project Title DEDICATED RECEPTACLE FOR PUMP REFER TO ELECTRICAL CONTRACT DRAWINGS WC 4" SAN DN TYP. OF 4 MS ROWAN UNIVERSITY H 1/2" HW & CW DN TO MS FD 3 P002 1" CW TO URI 1/2" HW & CW TO LAV ENLARGED BATHROOM PLAN-DOMESTIC 1/4" = 1'-0" 1/2" HW & CW DN 2" PUMPED DISCHARGE FD 4 P002 ENLARGED KITCHEN PLAN-SANITARY 1/4" = 1'-0" 5 P002 FIRST FLOOR PLUMBING INSTALLATIONS Date: 12/3/2014 ENLARGED KITCHEN PLAN-DOMESTIC Scale AS NOTED 1/4" = 1'-0" Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. P002 Printed: 12/3/2014 11:32:04 AM PLUMBING FIXTURES WATER HAMMER ARRESTER WATER HAMMER ARRESTER TAG PIPING RUN IN BATHROOM CHASE 1/2" CW 1/2" HW LAV URI WC KS MS 2ND FLOOR/ROOF 1/2" HW 1-1/2" CW TO 2ND FLOOR BATHROOM 1-1/2" CW 2" CW FIXTURE LAVATORY URINAL WATER CLOSET KITCHEN SINK MOP SINK SOIL/ WASTE VENT 2" 3" 4" 2" 3" 1-1/2" 2" 2" 1-1/2 2" CW 1/2" 3/4" 1" 1/2" 1/2" HW 1/2" 1/2" 1/2" MANUFACTURER MODEL AM. STANDARD AM STANDARD AM. STANDARD JUST MANUFACTURERING COMPANY AM. STANDARD OVALYN 0495.300 WASHBROOK 6590.001 (1.0 GPF) AFWALL MILLENIUM-ELONGATED (1.28 GPF) SL-2225-A-GR (TYPE 316 STAINLESS STEEL) AKRON SERVICE SINK MODEL 7695.008 FAUCET/VALVE DESCRIPTION CHICAGO FAUCET MODEL 116.102.AB ZURN ZEMS6003-IS ZURN ZEMS6000AV-HET-IS CHICAGO FAUCET MODEL 1102-E35ABCP CHICAGO FAUCETS MODEL 305-VBRRCF HARD WIRED ELECTRONIC FAUCET. HARD WIRED FLUSH VALVE HARD WIRED FLUSH VALVE 1.5 GPM W/ AERATER, ADDITIONAL SPRAY FURNISH AND INSTALL MOP HANGER FIAT MODEL 889-CC ROWAN UNIVERSITY 1-1/2" CW 1/2" HW LAV 1/2" 1 WC 1" 5 LAV 1/2" 1 LAV 1/2" 1 MS 1/2" 3 WC 1" 5 LAV 1/2" 3 URI 3/4" 4 WC 1" 5 WC 1" 5 WC 1" 5 KS 1/2" 1.5 1ST FLOOR 1" CW 1/2" HW 1/2" CW 1/2" HW (E)2" CW (E)3/4" HW (E)3/4" CW (E)3/4" HW IAL ORL M ME HAL OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE BASEMENT 1 DOMESTIC WATER RISER DIAGRAM 1/8" = 1'-0" P003 B SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H 3" VTR PARKING LOT R 4" VTR 2ND FLOOR/ROOF PLUMBING FIXTURE 2" V 4" V 4" V 1/8"/FT 2" V 2" PUMPED SAN KS 1-1/2 3 DFU LAV-1 1-1/2 1 DFU SUMP PIT 2" V 3" V WC-1 4" 4 DFU WC-1 4" 4 DFU LAV-1 1-1/2 1 DFU MS 2" 2 DFU UR-1 2" 4 DFU WC-1 4" 4 DFU WC-1 4" 4 DFU WC-1 4" 4 DFU LAV-1 1-1/2 1 DFU LAV-1 1-1/2 1 DFU WCO 3 DFU'S J.R. SMITH (2698) WATER SAVER TRAP PRIMER FD-1 4" 0 DFU 4" SAN 4" SAN 2" V 3" V 1/8"/FT 1/8"/FT 8 DFU'S 21 DFU'S 4" SAN 1/8"/FT 4" SAN FD-1 4" 0 DFU LAV SHIELD ADA COMPLIANT "TOTAL ENCLOSURE" WHERE REQUIRED INSTALL FLOOR DRAIN IN ACCORDANCE WITH MANUFACTURER GUIDELINES 33 DFU'S PIPE INSULATION KEY PLAN FIRESTOP SEALANT ALL SIDES 1ST FLOOR 2 DFU'S 31 DFU'S CMU WALL TYPE "K" COPPER FOR TRAP PRIMER PIPING 1/8"/FT FLOOR DRAIN W/ TRAP PRIMER CONNECTION 10 DFU'S CORE DRILL AND SLEEVE (E) 4" SAN CO FURNISH AND INSTALL RISER CLAMP BELOW MINERAL WOOL WHERE CLEARANCE IS GREATER THAN 1/4" REFER TO ARCHITECTURAL CONTRACT DRAWINGS FOR FLOOR DETAIL 1 12/3/2014 ISSUED FOR BID No. Date Revision BASEMENT 2 P003 GARAGE BUILDING SANITARY RISER DIAGRAM 1/8" = 1'-0" 3 P003 FLOOR DRAIN TRAP SEAL PRIMER NO SCALE 4 P003 PIPE PENETRATION DETAIL NO SCALE ROWAN UNIVERSITY Project Title BOLE HALL RENOVATIONS Drawing Title RISER DIAGRAMS, SCHEDULES, AND DETAILS Date: 12/3/2014 Scale AS NOTED Drawn By: JD Checked By JZ Job No: 2014-064 Drawing No. P003 Printed: 12/3/2014 11:32:05 AM NOTES 1. 2. 3. 4. CONTRACTOR SHALL TAG ALL EXISTING CIRCUITS BEFORE DISCONNECTING OR REMOVING ANY ELECTRICAL EQUIPMENT. CONTRACTOR SHALL REMOVE EXISTING MAIN DISTRIBUTION PANEL. EXISTING CABLE AND CONDUITS SHALL REMAIN TO BE RECONNECTED. CONTRACTOR SHALL REMOVE CIRCUITS AS SHOWN ON REMOVALS SINGLE LINE AND POWER PLAN. CONTRACTOR SHALL COORDINATE WITH ROWAN PROJECT MANAGER FOR SHUTDOWN OF BUILDING POWER. ROWAN UNIVERSITY G IAL ORL M ME HAL (E)PANEL A B OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R STORAGE/ (E)MAIN SWITCH (E)PANEL ITE TELE/DATA 003 (E)METER ELECTRICAL ROOM ELECTRICAL 001 (R)PANEL MDP (E)PANEL AC-B 002 (E)FACP (E)PANEL LP-B UP S3 KEY PLAN 004A STAIR STORAGE 004 H001 FROM CAMPUS DISTRIBUTION 1 MECHANICAL ROOM 12/3/2014 ISSUED FOR BID No. Date Revision 007 (E)PADMOUNT TRANSFORMER (E)65A (R)AIR HANDLING UNITS DISCONNECTS AND CONTROLLERS. REMOVE CABLE AND CONDUIT BACK TO PANEL. (E)300kVA 4160-208/120V UP (E)MAIN SWITCH (E)600A CABLE SHALL REMAIN TO BE REUSED STORAGE 005 (R)MAIN DISTRIBUTION PANEL EXISTING WIREWAY 100 12 150A 13 70A 11 CABLE SHALL REMAIN TO BE REUSED (TYP. FOR EXISTING TO REMAIN LOADS) 100 10 50A 9 20A 8 300A 14 35A 7 50A 6 70A 5 35A 4 7 20A UP CH001 STAIR (E)PANEL A (E) PANEL AC-B (E)PANEL LP-1 MECHANICAL ROOM (E)PANEL LP-2 (E)PANEL LP-B UP 006 7 1/2 2 75 CHWP DUMB WAITER COMPRESSOR (E)HOT WATER HEATER S1 (R)AIR COMPRESSOR DISCONNECTS. REMOVE CABLE AND CONDUIT BACK TO PANEL. ROWAN UNIVERSITY (R)DUMB WAITER DISCONNECT AND DUMB WAITER CONTROL. (R)STAFF RANGE (R)AIR HANDLING UNITS (E)PANEL LP-3 (R)DISCONNECT (R)HOT WATER PUMPS DISCONNECTS AND CONTROLLERS. REMOVE CABLE AND CONDUIT BACK TO PANEL. (E)HOT WATER HEAT DISCONNECT Project Title 5 3/4 3/4 3/4 1/2 1/3 5 5 5 5 HWP HWP HWP TEMP. CONT. COMP. COND. PUMP AHU 1 AHU 2 AHU 1 AHU 2 2 DE001 SINGLE LINE - REMOVALS NO SCALE BOLE HALL RENOVATIONS Drawing Title 1 DE001 BASEMENT POWER REMOVALS BASEMENT - POWER - REMOVALS 1/4" = 1'-0" Date: 12/3/2014 Scale AS NOTED Drawn By: Checked By Job No: MB JWC 2014-064 Drawing No. DE001 Printed: 12/3/2014 11:31:17 AM REMOVAL KEYNOTES 1 CONTRACTOR SHALL REMOVE EXISTING LIGHTING FIXTURES AND POWER DEVICES IN THIS SHADED AREA. ROWAN SHALL DISCONNECT AND PULL/COIL EXISTING COMMUNICATION/DATA WIRES AND DATA DROPS FOR REUSE. CONTRACTOR SHALL REMOVE EXISTING LIGHTING FIXTURES. EXISTING POWER DEVICES LOCATED ON THE CEILING IN THIS SHADED AREA SHALL BE REMOVED AND PROTECTED FOR REINSTALLATION. ALL EXISTING ELECTRICAL CIRCUITS SHALL BE REUSED. CONTRACTOR SHALL REMOVE EXISTING LIGHTING FIXTURES. EXISTING ELECTRICAL CIRCUITS SHALL REMOVED BACK TO SOURCE. REMOVED CIRCUITS SHALL BE MARKED AS SPARE OR REUSED FOR INSTALLATION WORK. CONTRACTOR SHALL PROTECT EXISTING PANEL AND EXISTING CIRCUITS. REMOVED CIRCUITS SHALL BE MARKED AS SPARE OR REUSED FOR INSTALLATION WORK. 2 G 3 4 ROWAN UNIVERSITY DN OFFICE 104B W110 IAL ORL M ME HAL OFFICE 104C OPEN OFFICE AREA 104 FILE ROOM 104A W108 W109 B 2 OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R WOMEN 105 TOILET 103 LOUNGE 102 3 UP 1 UP KEY PLAN J.C. 106 JANITOR 101 MEN 107 VESTIBULE L101 3 H H102 2 J L K M 7 CH100 UP S1 OFFICE 109A DN FILE ROOM 100G KITCHEN 100H W116 OFFICE 110B OFFICE 110A1 STAIR W115 OFFICE 110C OFFICE 110D 1 OFFICE 114 OFFICE 113 12/3/2014 ISSUED FOR BID No. Date Revision (R)TELEPHONE CABINET H100 CH101 SUPPLY CLOSET 100I 4 OFFICE 109B 108 REFERENCE AREA 111A OPEN OFFICE AREA 110A W114 OFFICE 115 110H OPEN OFFICE AREA 109 (E)LP-1 5 OFFICE 111B 2 OFFICE 100F W111 TELE/COM COPY ROOM 108A W107 W112 FILE ROOM 116A OFFICE 116 W113 OPEN OFFICE AREA 111 1 COPY ROOM 112 110 PAYROLL STORAGE 110G OFFICE 110F OFFICE 110E OFFICE 117 W105 OFFICE 100E W106 H101 ROWAN UNIVERSITY 3 W104 STORAGE 122 OPEN OFFICE AREA 124 OFFICE 119 OPEN OFFICE AREA 100 W103 LOBBY L100 Project Title CONFERENCE ROOM 125 OPEN OFFICE AREA 118 OFFICE 123 OFFICE 121 W102 OFFICE 124A W100 OFFICE 124B OFFICE 123A OFFICE 120 BOLE HALL RENOVATIONS OFFICE 119A W101 Drawing Title 1 1 DE002 FIRST FLOOR - POWER - REMOVALS 3/16" = 1'-0" FIRST FLOOR POWER & LIGHTING REMOVALS Date: 12/3/2014 Scale AS NOTED Drawn By: Checked By Job No: MB JWC 2014-064 Drawing No. DE002 Printed: 12/3/2014 11:31:19 AM G REMOVAL KEYNOTES 1 ROWAN UNIVERSITY IAL ORL M ME HAL (R)HONEYWELL BOX 210 1 CONTRACTOR SHALL REMOVE LIGHTING FIXTURES. EXISTING POWER DEVICES LOCATED ON THE CEILING IN THIS SHADED AREA SHALL BE REMOVED AND PROTECTED FOR REINSTALLATION. ALL EXISTING ELECTRICAL CIRCUITS SHALL BE REUSED. (R)DISCONNECTS AND JUNCTION BOX BACK TO SOURCE 7 B OAK HALL LAUREL HALL CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN UP 205B1 HOLLYBUSH LE BO LL A H S1 PARKING LOT R DN 205A 205B KEY PLAN 205 209 5 203 1 208 H200 12/3/2014 ISSUED FOR BID No. Date Revision 207 H201 W202 202 204 3 W201 206 200 ROWAN UNIVERSITY 200C W200 200B Project Title 200A (E)PANEL LP-3 1 BOLE HALL RENOVATIONS DN 201 Drawing Title L200 S2 SECOND FLOOR POWER & LIGHTING REMOVALS Date: 12/3/2014 Scale AS NOTED Drawn By: 1 DE003 SECOND FLOOR - POWER - REMOVALS Checked By MB JWC 1/4" = 1'-0" Job No: 2014-064 Drawing No. DE003 Printed: 12/3/2014 11:31:20 AM NOTES 1. 2. 3. CONTRACTOR SHALL FURNISH AND INSTALL 208/120V, 600A, 3PH, 4W, DISTRIBUTION BOARD. REFER TO SINGLE LINE DIAGRAM. CONTRACTOR SHALL RECONNECT ALL EXISTING CIRCUITS. FURNISH AND INSTALL CABLE AND CONDUIT AND MAKE ALL FINAL CONNECTIONS FROM DISCONNECT SWITCH TO SERVED EQUIPMENT. ROWAN UNIVERSITY PANEL LP-B-2 VOLTS: 208V/120V PHASES: 3 WIRES: 4 ROOM: FED FROM: MDP MOUNTING Surface NEMA RATING: Type 1 CKT Circuit Description Conduit A (kVA) Size Trip Poles Wire Size 1.7 1,3,5 25 A HWP-1/2/3 3 B (kVA) 20 A 20 A 20 A 1 1 1 2#12 & 1#12G 2#12 & 1#12G 2#12 & 1#12G 3/4" 3/4" 3/4" 15 A 3 3#12 & 1 #12G 3/4" 1.7 0.5 0.2 20 A 3 0.9 0.0 0.0 25,27,29 20 A SPARE 3 2.1 0.9 0.0 20 A 20 A ----- SPARE SPARE SPACE SPACE SPACE SPACE 1 1 ----- 20 A CRU-1 3/4" 3/4" 3/4" 2#12 & 1#12G 2#12 & 1#12G 2#12 & 1#12G 1 1 1 20 A ATC PANEL 20 A BASEMENT EF-2 20 A ROOF EF-3 3/4" 2#12 & 1#12G 2 20 A HEAT TRACE 3/4" 2#12 & 1#12G 1 20 A AHU-2 LIGHTING -- -- 3 20 A SPARE 0.0 0.0 0.0 0.0 -- 5.9 kVA 51 A 0.0 0.0 0.0 0.0 4.2 kVA 35 A 6.6 kVA 57 A LAUREL HALL 8 10 12 14,16 18 20,22,24 B 20 A 20 A ----- SPARE SPARE SPACE SPACE SPACE SPACE (E)PANEL A 32 34 36 38 40 42 HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H 20 A SPARE 1 -1 ---------TOTAL KVA: 16.... TOTAL 3PH AMPS: 46 A 0.0 0.0 3 -- ------- 0.0 0.0 0.0 OAK HALL 0.0 0.0 0.0 IAL ORL M ME HAL G 26,28,30 0.0 ------- ------- 3 0.0 0.0 31 33 35 37 39 41 3#12&1#12G 0.0 -- -- 3/4" 0.0 -- -- 0.7 2.1 0.0 SPARE 1.2 0.7 0.9 CKT 0.2 0.5 0.5 19,21,23 Circuit Description 2,4,6 1.7 7 CONTROL PANEL 9 METER CKT 11 ROOF EF-1 13,15,17 CHWP-1 Conduit Wire Size Poles Trip Size C (kVA) 0.2 3/4" 3#10 & 1#10G AIC: 10KAIC MAINS TYPE: RATING: 125 A MCB: 125 A PARKING LOT R STORAGE/ (E)MAIN SWITCH (E)PANEL ITE TELE/DATA 003 (E)METER ELECTRICAL ROOM ELECTRICAL 001 PANEL MDP (E)PANEL AC-B 002 Notes: 1. CKTS 1,3,5; WIRE SIZE AND QUANTITY TO FINAL EQUIPMENT CONNECTION SHALL BE 3#12 & 1#12G. (E)FACP (E)PANEL LP-B UP KEY PLAN S3 004A STAIR FROM CAMPUS DISTRIBUTION STORAGE 004 H001 (E)PADMOUNT TRANSFORMER (E)65A 1 12/3/2014 ISSUED FOR BID No. (E)300kVA 4160-208/120V Date Revision MECHANICAL ROOM ELECTRICAL 007COORDINATE CONNECTION WITH FINAL ATC FURNISH AND INSTALL CABLE. MATCH EXISTING CABLE SIZE AND PROVIDE ILSCO SPLICE. PANEL LOCATION (E)MAIN SWITCH COORDINATE ELECTRICAL CONNECTION WITH FINAL CONTROL PANEL LOCATION (E)600A MAIN DISTRIBUTION PANEL, 208/120V, 600A 3PH, 4W, 22KAIC FULLY RATED, SERVICE RATED EXISTING WIREWAY J J UP 1 3 150A 3P 4 70A 3P 5 100A 3P 100A 3P 6 100A 3P 7 8 45A 3P 9 100A 3P 35A 3P 10 20A 3P 11 12 20A 3P 20A 3P LP-B-2;8 LP-B-2;7 STORAGE LP-B-2;13,15,17 005 CHWP 1 (E)PANEL LP-1 (E)PANEL LP-2 3#8 & 1#10G, 3/4"C (E) PANEL AC-B 3#4 & 1#8G, 1-1/4"C J (E)PANEL A 4#2 & 1#8G, 1-1/4"C FURNISH AND INSTALL CABLE LENGTH AS NEEDED (TYP. 6). MATCH EXISTING CABLE SIZE AND PROVIDE ILSCO SPLICE. 2 4#2 & 1#8G, 1-1/4"C FURNISH AND INSTALL WIREWAY 100A 3P 7 COORDINATE ELECTRICAL CONNECTION WITH FINAL EQUIPMENT LOCATION STAIR (E)HOT WATER HEATER MDP ;6 PANEL LP-B-2 60A 30A 60A 15A 100A 35A COORDINATE ELECTRICAL CONNECTION WITH EF-2 FINAL LOCATION 90A 006 J J PANEL LP-B-2 S1 UP ROWAN UNIVERSITY LP-B-2;9 LP-B-2;10 DS-AHU-1-SF DS-AHU-1-RF 3#12 & 1#12G, 3/4"C 3#10 & 1#10G, 3/4"C 40A DS-AHU-2-SF DS-AHU-2-RF MECHANICAL ROOM COORDINATE ELECTRICAL CONNECTION WITH FINAL METER LOCATION CRU 3#2 & 1#8G, 1-1/4"C PANEL LP-1-1 (E)PANEL LP-3 3#8 & 1#10G, 3/4"C (E)PANEL LP-B UP CH001 7.5 0.75 5 15 AHU-2 SUPPLY FAN AHU-2 RETURN FAN AHU-1 RETURN FAN AHU-1 SUPPLY FAN HWP HWP HWP 3 2 1 1 Project Title (E)HOT WATER HEAT DISCONNECT LP-B-2;2,4,6 BOLE HALL RENOVATIONS LP-B-2;1,3,5 INSTALL VFD. CONTRACTOR SHALL MAKE FINAL CONNECTION TO VFD AND FROM VFD TO MOTORS. (TYPICAL FOR ALL FANS) J J J J PROVIDE WIREWAY. COORDINATE ELECTRICAL CONNECTION WITH FINAL EQUIPMENT LOCATION (TYP. 3) 5 COORDINATE ELECTRICAL CONNECTION WITH FINAL EQUIPMENT LOCATION Drawing Title 2 E001 SINGLE LINE - INSTALLATIONS 12" = 1'-0" 1 E001 BASEMENT - POWER - INSTALLATIONS 1/4" = 1'-0" BASEMENT POWER INSTALLATIONS Date: 12/3/2014 Scale AS NOTED Drawn By: Checked By Job No: MB JWC 2014-064 Drawing No. E001 Printed: 12/3/2014 11:31:26 AM INSTALLATION KEYNOTES 1 2 PANEL LP-1-1 ROOM: FED FROM: MOUNTING NEMA RATING: CONTRACTOR SHALL PROVIDE COMMUNICATIONS/DATA CONDUIT FROM DATA DROP AND STUB 6" ABOVE CEILING. ROWAN SHALL REINSTALL WIRE AS NEEDED (TYP. ALL DATA DROP LOCATIONS). CONTRACTOR SHALL COORDINATE SIMPLEX RECEPTACLE UNDERCOUNTER WITH FINAL EQUIPMENT LOCATION. CONTRACTOR SHALL PROVIDE RECEPTACLE AND TELEDATA DROP UNDERCOUNTER. CONTRACTOR SHALL PROTECT EXISTING PANEL AND EXISTING CIRCUITS. CONTRACTOR SHALL PROVIDE CEILING MOUNTED DUPLEX RECEPTACLE FOR POWER AND DATA FOR FUTURE PROJECTOR. CONTRACTOR SHALL MAKE ELECTRICAL CONNECTION TO FURNITURE. COORDINATE WITH FINAL FURNITURE LOCATION. (TYP. ALL CUBICLE TYPE FURNITURE) CONTRACTOR SHALL MAKE ELECTRICAL CONNECTION TO DESK FURNITURE. COORDINATE LOCATION WITH FINAL FURNITURE LOCATION AND ELECTRICAL KNOCKOUT. (TYP. ALL PRIVATE OFFICE DESKS) CONTRACTOR SHALL RUN CONDUIT DOWN COLUMNS TO FLOOR BOXES. Mail/Copy 102 MDP Surface Type 1 VOLTS: 208V/120V PHASES: 3 WIRES: 4 3 AIC: 10KAIC MAINS TYPE: RATING: 125 A MCB: 125 A 4 5 6 7 CKT Circuit Description 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 LIGHTING LIGHTING EXIT SIGNS OPEN OFFICE CUBES OPEN OFFICE CUBES OPEN OFFICE CUBES OPEN OFFICE CUBES OPEN OFFICE CUBES CORR107/OFFICE131 RECEPT RM101/105 RECEPT RM108/109 RECEPT RM 101,110&112 RECEPT RM113/114 RECEPT RM118/119 RECEPT RM117/CORR123 RECEPT RM127/128 RECEPT RM129/130 RECEPT BATHROOM LIGHTING 110 UNDERCOUNTER PUMP MEN/WOMENS SINKS TOILET 43,45 CONTRACTOR SHALL MAKE FINAL ELECTRICAL CONNECTIONS TO ALL HAND DRYERS. S H 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Conduit A (kVA) Size 0.8 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 2#10 & 1#10G 2#10 & 1#10G 2#10 & 1#10G 2#10 & 1#12G 2#10 & 1#10G 2#10 & 1#10G 2#8 & 1#8G 2#8 & 1#8G 2#10 & 1#10G 2#12 & 1#12G 2#10 & 1#10G 2#12 & 1#12G 2#10 & 1#10G 2#10 & 1#10G 2#10 & 1#10G 2#10 & 1#10G 2#10 & 1#10G 2#12 & 1#12G 2#12 & 1#12G 2#12 & 1#12G 2#12 & 1#12G HAND DRYERS 20 A 2 2#12 & 1#12G 3/4" SPARE SPARE SPARE SPARE 20 A 20 A 20 A 20 A 1 1 1 1 ----- ----- S C (kVA) 1.0 1.1 0.1 0.5 0.7 1.0 0.9 1.7 1.1 0.4 0.5 0.7 0.3 0.4 0.5 0.7 1.4 0.2 0.7 0.5 0.7 0.2 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 1.0 1.0 0.7 0.5 0.7 0.3 2.5 1.5 1.6 0.5 0.7 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.2 kVA 123 A LP-1-1;41 LP-1-1;40 B (kVA) 1.0 CONTRACTOR SHALL MAKE FINAL ELECTRICAL CONNECTIONS FOR ALL PLUMBING DEVICES. T S 47 49 51 53 Trip Poles Wire Size 0.0 12.8 kVA 111 A 9.1 kVA 76 A Conduit Wire Size Poles Trip Size 1 2#10 & 1#10G 1 2#8 & 1#8G 1 2#10 & 1#10G 1 2#10 & 1#10G 1 2#10 & 1#10G 1 2#10 & 1#10G 1 2#8 & 1#8G 1 2#12 & 1#12G 1 2#12 & 1#12G 1 2#12 & 1#12G 1 2#12 & 1#12G 1 2#12 & 1#12G 1 2#10 & 1#10G 1 2#10 & 1#10G 1 2#12 & 1#12G 1 2#10 & 1#10G 1 2#8 & 1#8G 1 2#12 &1#12G 1 2#12 & 1#12G 1 2#12 & 1#12G 1 2#12 & 1#12G 1 2#12 & 1#12G 1 -1 -1 -1 -1 -TOTAL KVA: 36.... TOTAL 3PH AMPS: 100 A 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" ------ 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A Circuit Description LIGHTING LTG - OPEN OFFICE NIGHT LIGHTING OPEN OFFICE CUBES OPEN OFFICE CUBES OPEN OFFICE CUBES OPEN OFFICE CUBES RM100/101 RECEPT RM100 RECEPT RM103/104 RECEPT RM110 FRIDGE RM111 COPIER CORR115/OFFICE122 RM120/121 RECEPT RM125/126 RECEPT OPEN OFFICE COLUMN... NIGHT LIGHTING 110 COUNTERTOP MEN/WOMENS TOILETS BATHROOM FAUCET FUTURE CONF. RM. POWER RESTROOM RECEPTACLES SPARE SPARE SPARE SPARE SPARE CKT 8 ROWAN UNIVERSITY 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 IAL ORL M ME HAL B OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R 44 46 48 50 52 54 Notes: KEY PLAN T H T T S LP-1-1;39 LP-1-1;44 T T LP-1-1;38 LP-1-1;43,45 G L H J M K 1 7 Date Revision FURNISH AND INSTALL WIREMOLD FLOOR BOX TYPE RFB4-CI-1-NA WITH CAT5/6 OUTLETS (TYP. 2) FURNISH AND INSTALL WIREMOLD FLOOR BOX TYPE EFBFF (TYP. 2) LP-1-1;19 12/3/2014 ISSUED FOR BID No. LP-1-1;17 F F MDP ;5 LP-1-1;18 LP-1-1;20 LP-1-1;12 PANEL LP-1-1 LP-1-1;11 7 J J J J LP-1-1;21 LP-1-1;13 F F 4 (E)LP-1 F 8 LP-1-1;32 LP-1-1;22 FURNISH AND INSTALL WIREMOLD FLOOR BOX TYPE EFBFF (TYP. 2) LP-1-1;25 LP-1-1;24 F LP-1-1;36 + F 1 5 + F 6 LP-1-1;16 P LP-1-1;23 LP-1-1;10 LP-1-1;42 LP-1-1;23 3 LP-1-1;37 5 FURNISH AND INSTALL WIREMOLD FLOOR BOX TYPE RFB4-CI-1-NA WITH CAT5/6 OUTLETS (TYP. 2) J J J J LP-1-1;9 2 LP-1-1;14 F ROWAN UNIVERSITY LP-1-1;26 LP-1-1;27 LP-1-1;28 SAWCUT CONCRETE LP-1-1;32 F 3 8 Project Title LP-1-1;15 BOLE HALL RENOVATIONS F LP-1-1;29 LP-1-1;8 LP-1-1;31 LP-1-1;7 LP-1-1;33 LP-1-1;30 J J J J F Drawing Title FURNISH AND INSTALL WIREMOLD FLOOR BOX TYPE EFBFF (TYP. 2) LP-1-1;32 FURNISH AND INSTALL WIREMOLD FLOOR BOX TYPE RFB4-CI-1-NA WITH CAT5/6 OUTLETS (TYP. 2) FIRST FLOOR POWER INSTALLATIONS 1 MARKERBOARD TYP. OVER RETURN Date: 12/3/2014 Scale AS NOTED Drawn By: 1 E002 FIRST FLOOR - POWER - INSTALLATIONS 3/16" = 1'-0" Checked By Job No: MB JWC 2014-064 Drawing No. E002 Printed: 12/3/2014 11:31:30 AM G EF 1 DS-UH-1 J UH M INSTALLATION KEYNOTES ELECTRICAL EQUIPMENT SCHEDULE - NON-FUSED DISCONNECTS NEMA FRAME NAME VOLTAGE RATING PHASES WIRES RATING DS-AHU-1-120V DS-AHU-1-RF DS-AHU-1-SF DS-AHU-2-120V DS-AHU-2-RF DS-AHU-2-SF DS-UH-1 2 3 1 LP-B-2;11 120 V 208 V 208 V 120 V 208 V 208 V 120 V 30 60 100 30 30 60 30 1 3 3 1 3 3 1 2 3 3 2 4 4 2 1 4X 4X 4X 1 1 1 1 EXISTING POWER DEVICES LOCATED ON THE CEILING IN THIS SHADED AREA SHALL BE REINSTALLED. ALL EXISTING ELECTRICAL CIRCUITS SHALL BE REUSED. EXHAUST FAN LOCATED ON ROOF ABOVE. CONTRACTOR SHALL PROVIDE 20A, SINGLE POLE, NEMA 4X, MOTOR RATED DISCONNECT SWITCH AND MOUNT DIRECTLY TO FAN. REFER TO ROOF PENETRATION DETAIL. PROVIDE CABLE AND CONDUIT TO HEAT TRACE CONTROLLER. UNISTRUT MOUNT CONTROLLER TO AHU, COORDINATE LOCATION WITH MANUFACTURER CLEARANCES. COORDINATE ELECTRICAL CONNECTION WITH MANUFACTURER AND FINAL EQUIPMENT LOCATION. BASIS OF DESIGN: CHROMALOX MODEL SRL CABLE WITH INTELLITRACE MODEL HTLS23041 CONTROL PANEL, 208V 1PH, 2 INDEPENDENT LOOP OF HEAT TRACE CONTROL, NEMA 4 ENCLOSURE WITH ENCLOSURE HEATER AND ALARM, OR APPROVED EQUAL. 2 3 4 MDP AHU 2 6 DS-AHU-2-120V 1 5 AHU-2 RETURN FAN. COORDINATE ELECTRICAL CONNECTION WITH FINAL EQUIPMENT LOCATION. LP-B-2;18,8,10,12 3 MDP ;7 EF M LP-B-2;12 3 SELF-REGULATING HEAT TRACE CABLE, 208V 1PH, 5W PER LF. BASIS OF DESIGN: SRL5-2C, 20LF PER LOOP (2 LOOPS). REFER TO MECHANICAL DRAWINGS FOR PIPE SIZES AND LOCATION. CONTRACTOR SHALL PROVIDE 120V POWER TO EACH SWITCH WITHIN THE UNIT. COORDINATE WITH MANUFACTURER FOR SWITCH LOCATIONS AND QUANTITY. 6 H J ROWAN UNIVERSITY K 2 7 J IAL ORL M ME HAL DS-AHU-2-RF ELECTRIC HEAT TRACING NOTES DS-AHU-2-SF 1. 2. 3. 4. S 5. 6. PROVIDE ELECTRIC HEAT TRACING AND ACCESSORIES. HEATING CABLES SHALL BE SELFREGULATING AND SHALL VARY THE OUTPUT IN RESPONSE TO TEMPERATURE VARIATIONS ALONG THE LENGTH OF A TRACED PIPE. THE CONTRACTOR SHALL TEST THE TRACING BEFORE PIPING IS INSULATED, DURING THE INSTALLATION AND AFTER THE WORK IS COMPLETE. FOLLOW HEAT TRACE MANUFACTURERS RECOMMENDATION ON SIZING AND INSTALLATION REQUIREMENTS. HEAT TRACING CIRCUITS SHALL BE EQUIPPED WITH GROUND FAULT EQUIPMENT PROTECTION IN ACCORDANCE WITH NEC AND ANY APPLICABLE NATIONAL OR LOCAL CODE REQUIREMENTS. MANUFACTURER SHALL BE CHROMALOX OR APPROVED EQUAL. NOTIFY OWNER/ENGINEER UPON INSTALLATION OF HEAT TRACE FOR INSPECTION PRIOR TO THE INSTALLATION OF INSULATION. TEMPERATURE SENSOR AND HEATING CABLE SHALL BE SEPARATED BY 90 DEGREES ON PIPE WALL. B OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R S SPEAKER S S 5 KEY PLAN S S 1 AHU S J S Date Revision J 1 S 12/3/2014 ISSUED FOR BID No. S 3 MDP ;8 5 LP-3;16 3 4 S DS-AHU-1-120V DS-AHU-1-SF DS-AHU-1-RF SPEAKER 6 LP-B-2;14,16 S S S ROWAN UNIVERSITY S (E)PANEL LP-3 1 EXISTING PANEL LP-3 VOLTS: 208V/120V PHASES: 3 WIRES: 4 ROOM: FED FROM: MOUNTING Recessed NEMA RATING: Type 1 1 E003 SECOND FLOOR - POWER - INSTALLATIONS 1/4" = 1'-0" CKT Circuit Description 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD SPARE EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD Trip Poles Wire Size 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ---------------- Conduit A (kVA) Size ---------------- 0.0 1. USE EXISTING SPARE BREAKERS FOR CIRCUITS 16 AND 24. C (kVA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Conduit Wire Size Poles Trip Size -------3/4" ---3/4" -------2#12 & 1#12G ---2#12 & 1#12G 1 1 1 1 1 1 1 1 1 1 1 1 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A 20 A PREFABRICATED ROOF CURB SUPPLIED AND INSTALLED BY CONTRACTOR. THE PATE COMPANY PART PC-1. SIZE TO ACCOMMODATE SPACE AVAILABLE ON ROOF AND ADJUST TO FIT. EXISTING BOILER STACK IS DIRECTLY ADJACENT TO STACK, SEAL WATER TIGHT WHERE POSSIBLE Circuit Description CKT EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD EXISTING LOAD RTU-1 RECEPT & LIGHTS EXISTING LOAD EXISTING LOAD EXISTING LOAD AHU-1 LTG 2 4 6 8 10 12 14 16 18 20 22 24 26,28,30 0.0 0.0 0.0 kVA 0A -- 0.0 0.0 0.1 kVA 1A -- 3 TOTAL KVA: 0.1... TOTAL 3PH AMPS: 0 A 30 A EXISTING LOAD Project Title CONDUIT BOOT BY CONTRACTOR. THE PATE COMPANY PART B. PREFABRICATED ROOF CURB COVER SUPPLIED AND INSTALLED BY CONTRACTOR. THE PATE COMPANY PART PCC-C. SIZE TO ACCOMMODATE VENT PIPES AND CORRESPONDING ROOF CURB. EPDM FLASHING 0.0 0.0 kVA 0A NOTES: B (kVA) kAIC: MAINS TYPE: RATING: 100 A MCB: LAP SEALANT EPDM ROOF MEMBRANE 8" ONTO EXISTING ROOF MEMBRANE PRESSURE TREATED WOOD LAP SEALANT EXISTING EPDM ROOFING MEMBRANE INSTALL NEW INSULATION, MATCH EXISTING 1/4" GALV. STEEL PLATE 2 E003 Drawing Title SECOND FLOOR POWER INSTALLATIONS Date: 12/3/2014 PRESSURE TREATED WOOD BLOCKING. Scale AS NOTED EXISTING STEEL CHANNELS Drawn By: ROOF PENETRATION DETAIL NO SCALE BOLE HALL RENOVATIONS Checked By Job No: MB JWC 2014-064 Drawing No. E003 Printed: 12/3/2014 11:31:32 AM INSTALLATION KEYNOTES 1 CONTRACTOR SHALL MATCH EXISTING LIGHTING FIXTURES AND PROVIDE NEW. PROVIDE 4000K COLOR TEMPERATURE FLUORESCENT 32W T8 LAMPS. EXISTING CIRCUITS SHALL BE REUSED. REINSTALL ANY EXISTING POWER OR DATA DEVICES LOCATED IN CEILING REMOVED AND PROTECTED DURING REMOVAL PHASE. CONTRACTOR SHALL MATCH EXISTING 'L200 LOBBY' FIXTURES. PROVIDE NEW AND REUSE EXISTING CIRCUITS. REINSTALL ANY EXISTING POWER OR DATA DEVICES LOCATED IN CEILING REMOVED AND PROTECTED DURING REMOVAL PHASE. 2 ROWAN UNIVERSITY IAL ORL M ME HAL G G E E LP-3;24 7 B OAK HALL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R S S SPEAKER S S 5 I I V 1 S I V S A LP-1-1;35 A KEY PLAN A LP-1-1;35 A J a D C NL LP-1-1;4 LP-1-1;2 D LP-1-1;2 e V C NL LP-1-1;2 e D LP-1-1;2 PP PP PP PP g g g g 7 F LP-1-1;5 DT G W LP-1-1;5 NL B V A C A A A A A V A A A A A g a g A A A C C a LP-1-1;1 A F PP B LP-1-1;5 b DT b LP-1-1;5 F NL B LP-1-1;2 V LP-1-1;1 LP-1-1;5 F dd PP PP A A LP-1-1;2 V A LP-1-1;2 NL A DT C W A LP-1-1;2 A W g C A LOBBY C A d G LP-1-1;5 A A g LP-1-1;5 A LP-1-1;3 c A LP-1-1;3 V c F DT LP-1-1;3 V A A A LP-1-1;3 V A A LP-1-1;3 V A LP-1-1;3 B V PP LP-1-1;1 F NL LP-1-1;5 V LP-1-1;3 A LP-1-1;3 V f V A V g B LP-1-1;3 C C DT DT CW W C NL C C C C C C C g C C g C C C C C C NL g NL C D C DT E004 W FIRST FLOOR DECORA TYPE ODS10-IDW OR APPROVED EQUAL SET TO MANUAL ON MODE 1/8" = 1'-0" E004 A B C D E F G H I 2' X 4' LED 2' X 4' LED LINEAR DIRECT/INDIRECT LINEAR DIRECT/INDIRECT STEEL HOUSING HARSH ENVIRONMENT FLUORESCENT FRONT FACE LED EXIT SIGN FRONT/BACK LED EXIT SIGN OUTDOOR EMERGENCY LIGHT 2' OVER MIRROR LED MANUFACTURER CORELITE CORELITE PRUDENTIAL LIGHTING PRUDENTIAL LIGHTING LITHONIA DUALLITE DUALLITE DUALLITE COOPER LIGHTING FIXTURE SCHEDULE LAMP TYPE MODEL R3WL1L401UNV24 R3WL1L401BUNV24 WAVE2 04 WA YGW D3 SC UNV 144 WAVE2 04 WA YGW D3 SC UNV 144 EMH DMS 2 32 120 WLF LX U R W I LX U R W I PG Z-HTR S22DW-1L40-SR-2-U-SI-S92HT-W ROWAN UNIVERSITY Hot 3 DESCRIPTION L o a d Neutral C 1 1 1/8" = 1'-0" 3 C C C E004 SECOND FLOOR g LP-1-1;3 C 2 g C A V D g g G NL V D g f LP-1-1;5 DT D A LP-1-1;3 C g g g g B DT A C C NL g F PPc NL C C LP-1-1;1 LP-1-1;5 L200 g NL V DT NL 1 g C C C 5 C LED LED LED LED 32W T8 LED LED LED LED LAMP QUANTITY VOLTAGE VA 1 1 1 1 2 1 1 1 1 120 V 120 V 120 V 120 V 120 V 120 V 120 V 120 V 120 V 46 VA 46 VA 34 VA 34 VA 64 VA 4 VA 4 VA 15 VA 8 VA S g LP-1-1;2 LP-1-1;5 F B g A A V d DT NL B V d B NL A (E)PANEL LP-3 NL DT g LP-1-1;5 Revision S g A DT Date g g D DT a 12/3/2014 ISSUED FOR BID No. C g g LP-1-1;1 a a 1 S g d A SPEAKER S NL V V DT A (E)PANEL LP-1 S g LP-1-1;2 V PP PP D 3 C a LP-1-1;1 DT e e LP-1-1;5 a S M LP-1-1;5 H LP-1-1;4 PP a L K LP-1-1;5 F DT LP-1-1;5 F PANEL LP-1-1 2 S A H TYPE S S V LP-1-1;35 1 1 V LP-1-1;35I I MOUNTING RECESSED RECESSED SUSPENDED SUSPENDED SURFACE WALL CEILING WALL WALL WALL OCCUPANCY SENSOR SWITCH CEILING MOUNT DT SENSOR: LEVITON OSC10-RMW OR APPROVED EQUAL QUANTITY AS SHOWN PER PLAN DRAWINGS WALL MOUNT DT SENSOR: LEVITON OSW12-RMW OR APPROVED EQUAL QUANTITY AS SHOWN PER PLAN DRAWINGS NO SCALE Project Title BOLE HALL RENOVATIONS COMMENTS LOAD BATTERY OPTION Drawing Title BATTERY OPTION BLUE Neutral WHITE Hot BLACK BLUE YELLOW/ORANGE LEVITON OPP20-RD4 OR APPROVED EQUAL SET TO AUTO ON (QUANTITY AS SHOWN PER PLAN DRAWINGS) WHITE/BLUE LIGHTING PLAN REMOVALS AND INSTALLATIONS BLUE RED BLACK Date: 12/3/2014 Scale AS NOTED Drawn By: 4 E004 POWER PACK - AUTOMATIC ON WITH NO SWITCH Checked By NO SCALE Job No: MB JWC 2014-064 Drawing No. E004 Printed: 12/3/2014 11:31:35 AM G GENERAL STRUCTURAL NOTES GENERAL CONSTRUCTION WORK THE FOLLOWING GENERAL STRUCTURAL NOTES ARE APPLICABLE TO THE STRUCTURAL DRAWINGS ONLY. THESE NOTES ARE PROVIDED FOR CONVENIENCE AND ARE SUPPLEMENTAL TO THE SPECIFICATIONS. IN THE EVENT OF DISCREPANCIES BETWEEN GENERAL NOTES AND SPECIFICATIONS, THE MORE STRINGENT SHALL GOVERN. H J L K 22' - 2 29/32" M 23' - 2" 22' - 9 3/32" EXISTING 7'-6"x7'6"x4" DROP PANELS, TYP. 15' - 0" 2. 4' - 0" EXISTING 3'-0" DIA. COLUMN CAPITAL, TYP. 20' - 7" 22' - 6" 3. 49' - 2" OPENING 209 5 208 14 DUCT SUPPORT, M013 4 3' - 0" 13' - 4" 3' - 0" 3' - 0" 6' - 1" 5' - 7 1/2" 24' - 6" 3' - 0" 66' - 3" TYP OF 2 S002 207 EXISTING 16" DIA. COLUMN, TYP. 22' - 6" 207 OPENINGS AND EMBEDDED ITEMS - ALL CURBED AND OTHER OPENINGS, EQUIPMENT BASES, DEPRESSIONS, FRAMES, CASTINGS, PIPE SLEEVES, CONDUITS, INSERTS, EDGE PROTECTION, ANCHOR BOLTS AND SIMILAR ITEMS SHALL BE PROVIDED, LOCATED AND INSTALLED AS SHOWN ON APPROVED SHOP DRAWINGS FOR MANUFACTURED ITEMS AND OTHER TRADES. THE CONTRACTOR SHALL COORDINATE NEW EQUIPMENT STRUCTURES SHOWN ON THE CONTRACT DRAWINGS WITH MANUFACTURER'S APPROVED SHOP DRAWINGS. ALL DIMENSIONS, DETAILS AND STRUCTURAL DESIGN REVISIONS REQUIRED TO ACCOMMODATE APPROVED EQUIPMENT SHALL BE MADE BY THE CONTRACTOR AT NO COST TO OWNER. 4. JOB SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. STRUCTURAL DESIGN CRITERIA 1. PROPOSED BUILDING STRUCTURE AND FOUNDATION ARE DESIGNED IN CONFORMANCE WITH THE FOLLOWING CODES AND STANDARDS: a. INTERNATIONAL BUILDING CODE 2009, NEW JERSEY EDITION WITH AMENDMENTS b. INTERNATIONAL BUILDING CODE 2009 (IBC). c. ACI BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, 318-08. d. AISC MANUAL OF STEEL CONSTRUCTION, ALLOWABLE STRESS DESIGN, 13TH EDITION. e. AWS STRUCTURAL WELDING CODES - D1.1 AND D1.4, LATEST EDITIONS. f. APPLICABLE STATUTES AND REGULATIONS OF FEDERAL, STATE AND LOCAL JURISDICTIONS. 209 208 2. 3 DESIGN LOADS: A. LIVE LOAD: ROOF.................................................................20 PSF. B. 4 S002 CUT OPENING IN EXISTING CONCRETE SLAB 68' - 2" 200C 200C CUT OPENING IN EXISTING CONCRETE SLAB C. 23' - 2" 206 206 VISION BARRIER SCREEN WALL, SEE ARCH. DWG'S FOR ADDTIONAL INFORMATION D. 200A 200A 1 NOTES: 1 SAWCUT OPENING IN EXISTING ROOF SALB AS SHOWN. AVOID OVER-CUTTING THE OPENING S001 SNOW LOAD: GROUND SNOW (Pg)........................................25 PSF + DRIFTING SNOW EXPOSURE Ce......................................1.0 SNOW LOAD IMPORTANCE FACTOR Is.........1.0 THERMAL FACTOR, Ct.....................................1.0 WIND LOAD BASIC WIND SPEED, V....................................100 MPH (3 SECOND GUST) OCCUPANCY CATEGORY...............................II EXPOSURE CATEGORY..................................B IMPORTANCE FACTOR, Iw............................1.0 SEISMIC LOAD: SITE CLASS.....................................................D SPECTRAL RESPONSE ACCELERATION: Ss.........................................................0.24 S1........................................................0.056 IMPORTANCE FACTOR, Iw...........................1 SEISMIC DESIGN CATEGORY....................B EXISTING CONDITIONS 1. EXAMINE AND FIELD VERIFY ALL EXISTING AND GIVEN DIMENSIONS AND CONDITIONS PRIOR TO COMMENCEMENT OF THE WORK AND FABRICATION OF CONSTRUCTION MATERIALS. REPORT VARIANCES FROM THE DRAWINGS AND SPECIFICATIONS AND POTENTIAL INTERFERENCES PROMPTLY TO OWNER'S PROJECT MANAGER. INCORPORATE ACTUAL FIELD CONDITIONS AND DIMENSIONS IN THE WORK AND INDICATE CHANGES AND ADJUSTMENTS ON DRAWINGS SUBMITTED FOR APPROVAL. ROOF FRAMING PARTIAL PLAN 1/8" = 1'-0" 2. ROOF PATCHING AND ASSOCIATED WORK TO BE DONE IN ACCORDANCE WITH EXISTING ROOF WARRANTY CONSTRUCTION OPERATIONS 1. ASSUME AN ABSOLUTE OBLIGATION TO PROTECT EXISTING STRUCTURES AND EQUIPMENT, NEW WORK AND ALL FACILITY EMPLOYEES FROM DAMAGE, LOSS OR INJURY RESULTING FROM THE CONTRACTOR'S OPERATIONS. IN THE EVENT OF SUCH DAMAGE OR LOSS, PROMPTLY REPLACE OR RESTORE THE WORK TO AN EQUIVALENT QUALITY TO THE SATISFACTION OF THE PROJECT MANAGER AND AT NO EXPENSE TO OWNER. E GENERAL: 1. FOR DETAILED REQUIREMENTS AND SPECIFIED PRODUCTS SEE SPECIFICATIONS. CAST-IN-PLACE CONCRETE : 1. ALL CONCRETE SHALL BE NORMAL WEIGHT AGGREGATE UNLESS NOTED OTHERWISE. 2. GENERAL 1. TYPICAL SECTIONS AND DETAILS - ALL SECTIONS, DETAILS AND NOTES ARE INTENDED TO BE TYPICAL UNLESS OTHERWISE DETAILED. SHOP AND ERECTION DRAWINGS SUBMITTED BY THE CONTRACTOR SHALL SHOW APPLICATION OF TYPICAL SECTIONS AND DETAILS FOR SIMILAR SITUATIONS. 7 21' - 10" MATERIALS OF CONSTRUCTION ROWAN UNIVERSITY CONCRETE SHALL CONFORM TO THE FOLLOWING TABLE: USAGE MISCELLANEOUS PADS AND CONCRETE REPAIRS 28-DAY STRENGTH (PSI) MAX WATER/ CEMENT RATIO 4000 CONCRETE SPECIFICATION .50 NORMAL WT. 3. WORKABILITY ADMIXTURES MAY BE UTILIZED, PROVIDED THAT BATCH PROPORTIONS ARE DETERMINED IN THE MANNER DESCRIBED IN THE SPECIFICATIONS. 4. ALL CEMENT SHALL BE PORTLAND TYPE I OR II. 5. CHAMFER EXPOSED CONCRETE EDGES 1"x1". CONCRETE REINFORCEMENT : 1. REINFORCING BARS - ASTM A615, GRADE 60, EPOXY COATED FINISH, UNLESS OTHERWISE NOTED, OR SPECIFIED. 2. IAL ORL M ME HAL LAUREL HALL HOLLYBUSH CARRIAGE HOUSE WELDED WIRE FABRIC - ASTM A185, DEFORMED EPOXY COATED FINISH UNLESS OTHERWISE NOTED OR SPECIFIED. 3. DETAIL AND FABRICATE REINFORCEMENT IN ACCORDANCE WITH ACI 315 DETAILING MANUAL. REINFORCING BARS AT SPLICES SHALL BE LAPPED IN ACCORDANCE WITH THE TABLE SHOWN ON THE CONTRACT DRAWINGS. 4. MINIMUM CONCRETE COVER FOR REINFORCEMENT (INCHES): A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH.......................3 B. CONCRETE EXPOSED TO EARTH, FLUIDS OR WEATHER PRINCIPAL REINFORCEMENT.............................................................................................2 STIRRUPS, TIES AND SPIRALS.....................................................................................1 1/2 C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND PRINCIPAL REINFORCEMENT.......................................................................................1 1/2 STIRRUPS, TIES AND SPIRALS.....................................................................................1 1/2 5. ALL REINFORCEMENT, SHALL BE ADEQUATELY SECURED IN POSITION PRIOR TO CONCRETE PLACEMENT. 6. REINFORCING BARS AND ACCESSORIES SHALL NOT BE IN CONTACT WITH ANY METAL PIPE, PIPE FLANGE, METAL CONDUIT OR OTHER METAL PARTS EMBEDDED IN CONCRETE. A MINIMUM CLEARANCE OF 2 INCHES SHALL BE PROVIDED. B SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R EMBEDMENT : 1. DOWELS, ANCHOR BOLTS, PIPES AND OTHER EMBEDDED ITEMS SHALL BE HELD SECURELY IN POSITION WHILE CONCRETE IS BEING PLACED. 2. CONDUITS AND OTHER SIMILAR ITEMS EMBEDDED IN OR PENETRATING THROUGH CONCRETE SHALL BE SPACED ON CENTER NOT LESS THAN 3 TIMES THEIR OUTSIDE DIMENSION, BUT NOT LESS THAN 2 1/2" CLEAR. SUCH ITEMS SHALL NOT EXCEED 1/3 OF THE MEMBER THICKNESS. KEY PLAN STRUCTURAL STEEL: 1. WIDE FLANGE SHAPES: ASTM A992; ASTM A572, GRADE 50. 2. ALL OTHER ROLLED SHAPES AND PLATES TO BE A36. 3. STRUCTURAL STEEL TUBING: ASTM A500, GRADE B (Fy = 46ksi). 4. STEEL PIPE: ASTM A53, TYPE S, GRADE B, EXTRA STRONG, BLACK UNLESS NOTED OTHERWISE. 5. DO NOT PAINT STEEL SURFACES WHICH ARE TO BE WELDED OR FIELD BOLTED OR ARE TO BE ENCASED IN CONCRETE OR RECEIVE CEMENTITIOUS FIREPROOFING. 6. SHOP CONNECTIONS MAY BE BOLTED OR WELDED; FIELD CONNECTIONS SHALL BE BOLTED UNLESS DETAILED OR NOTED OTHERWISE ON THE DRAWINGS. 7. ALL STEEL EXPOSED TO WEATHER AND STEEL LINTELS SHALL BE HOT-DIP GALVANIZED IN ACCORDANCE WITH ASTM A123. 1 12/3/2014 ISSUED FOR BID No. Date Revision STRUCTURAL FASTENERS: 1. HIGH STRENGTH BOLTS: ASTM A325, MINIMUM 3/4"∅ UNLESS NOTED OTHERWISE. 2. ANCHOR RODS: ASTM F1554, GRADE 55, NONHEADED, HOT-DIPPED GALVANIZED. WELDING : 1. WELDING ELECTRODES: E70XX (AWS A5.1 OR A5.5). USE LOW HYDROGEN ELECTRODES FOR FIELD WELDING. 2. ALL GROOVE AND BUTT WELDS SHALL BE FULL PENETRATION. 3. FILLET WELD SIZES SHALL BE THE MINIMUM SIZE REQUIRED BY AISC CODE FOR PLATE SIZES TO BE CONNECTED AND SHALL BE APPLIED TO THE ENTIRE JOINT CONTACT LENGTH, BUT NOT LESS THAN 3/16". F 54"x12" OPENING IN EXISTING CMU WALL, COORDINATE LOCATION OF OPENING WITH MECHANICAL DWG'S EXISTING 12"x8" DEEP CONC BEAM 8 ROWAN UNIVERSITY W8x13 3 SAW CUT OPENING IN EXISTING CONCRETE ROOF SLAB FOR DUCT PENETRATION, COORDINATE WITH MECH. DWGS. FOR LOCATION AND SIZE S001 C8x11.5 1/4 TYP. EXISTING 5" CONCRETE SLAB (ROOFING NOT SHOWN) W8x13 3 EXISTING 5" CONCRETE SLAB OAK HALL . TYP. ROOF OPENING C8x11.5, COPE AS REQUIRED TYP. S001 C8x11.5, TYP. Project Title 12' - 7" (2)L3"x3"x1/4" V.I.F (4)1/2" HILTI HIT-HY 70 MASONRY ANCHORS OR APPROVED EQUAL 7 EXISTING 8" CMU WALL BOLE HALL RENOVATIONS PACK +/-3" GAP WITH HIGH PRECISION, NONSHRINK GROUT MASTERFLOW 928 GROUT OR APPROVED EQUAL W8x13 1/4 . TYP. Drawing Title 2 S001 HIGH ROOF PARTIAL FRAMING PLAN 1/4" = 1'-0" 3 S001 CONNECTION DETAIL 1" = 1'-0" STRUCTURAL PLAN AND DETAILS Date: 12/3/2014 Scale AS NOTED Drawn By: Checked By Job No: ABT JZ 2014-064 Drawing No. S001 Printed: 12/3/2014 11:32:06 AM ROWAN UNIVERSITY MECHANICAL VENT OR DUCT CURB FLASHING 1/4 . FASTEN APPROX. 8" O.C. L3x3x1/2" GALV. STEEL, TYP. PRE-FABRICATED MECH. EQUIPMENT CURB ROOF MEMBRANE FLASHING REPAIR ROOFING. REFER TO ARCH. DRAWINGS FOR ADDITIONAL INFORMATION +/- 8" V.I.F EXISTING BRICK WALL WIDTH TO BE V.I.F GROUT AND SEAL AROUND ANGLES EXISTING ROOF MEMBRANE EXISTING INSULATION SEE MECH. DWGS NOTE: SAWCUT HORIZONTAL KERFS IN WALL, INSTALL ANGLES, PROVIDE 8" MINIMUM BEARING ON EACH SIDE OF OPENING 0' - 4" 1/4 2 LINTEL AT EXISTING WALL 1 1/2" = 1'-0" HOLLYBUSH CARRIAGE HOUSE S002 B REPAIR TAPERED INSULATION, MATCH EXISTING TYP. SE OU LL H HA PARKING EN E E L GR LOT P BO NNEX A ALL EH C UN LE BO LL A H PARKING LOT R C8 FRAME AROUND OPENING, GALV. NOTE: EXISTING ROOF IS FLEX FB 100 ELVALOY MEMBRANE SYSTEM BY FLEX MEMBRANE INTERNATIONAL, INC. CONTRACTOR SHALL COORDINATE WITH EXISTING ROOFING MANUFACTURER FOR PROPER EQUIPMENT CURB INSTALLATION. NOTE: COORDINATE WITH MECHANICAL DRAWINGS FOR LENGTH OF MEMBERS AND LOCATIONS OF SUPPORTS #4@12" O.C. BOTH WAYS S002 LAUREL HALL SUPPORT CONNECTION TO SLAB/WALL ROUGHEN SURFACE AND APPLY BONDING AGENT 1 . EXISTING CONCRETE SLAB PRESSURE TREATED WOOD BLOCKING (4)1/2" DIA . EXPANSION ANCHORS W/3" EMBEDMENT MIN. #4 BARS @12" O.C. W/4" MIN. EMBEDMENT EPOXY GROUT INTO EXISTING SLAB EXISTING CONC. SLAB . 3/4" CHAMFER, TYP. 0' - 4" 1/4" PLATE WELDED TO ANGLES, WIDTH TO BE COORDINATED W/WALL THICKNESS 1/4 OAK HALL SUPPORT - SECTION INSTALL (2)3 1/2"x3 1/2"x1/4" ANGLES W/(2) 1/2" DIA. THREADED ROD @12" O.C ALL AROUND 3 SIDES IAL ORL M ME HAL 6 CONCRETE PAD 1" = 1'-0" S002 3 PIPE/EQUIPMENT SUPPORT DETAIL 1 1/2" = 1'-0" S002 FAN CURB/DUCT PENETRATION DETAIL 1 1/2" = 1'-0" KEY PLAN 1 12/3/2014 ISSUED FOR BID No. Date Revision HSS 6x3x1/2" GALV. VISION BARRIER GRILL, SEE ARCHITECTURAL FOR ADDTIONAL INFORMATION. COORDINATE WITH MANUFACTURER FOR ATTACMENT 8'-0"+/. HSS2x2x1/4" STAND COLUMN, TYP. SHEET METAL PITCH PAN SOLDERED /WELDED WATERTIGHT 4" ABOVE ROOFING MIN. HEIGHT 8 S002 5' - 2" 6' - 4" HSS 6x6x1/2" GALV. STEEL COLUMN W6x25 BEAM FRAME, TYP. ROOF CEMENT HSS 6x3x1/2" GALV. EXISTING BUILT UP ROOFING 5 S002 2" MIN. . 1 PLY CAP FLASHING 8" ONTO EXISTING ROOF MEMBRANE (4)1/2" DIA. EXPANSION ANCHOR BOLTRS WITH 3.75" MIN. EMBEDMENT, TYP POURABLE SEALANT 1/4" AHU 4" CONCRETE PAD COORDINATE LIMITS WITH EQUIPMENT SIZE. TYP. W6 BEAM, TYP. EXISTING TAPERED INSULATION 12"x12"x1/2" GALV. STEEL BASE PLATE 8' - 4" HSS6x6x1/2" GALV. STEEL COLUMN, TYP HSS2x2x1/4", TYP. 9' - 4" 12"x12"x1/4" BASE PLATE EXISTING 7" CONC. SLAB PRESSURE TREATED BLOCKING . . 1/4 . TYP. ROWAN UNIVERSITY 6"x6"x1/4" PLATE W/(4) 3/4" DIA. BOLTS NOTE: COORDINATE SIZE OF EQUIPMENT STAND, CONCRETE PAD AND LOCATION OF MID SUPPORT STEEL (IF REQUIRED) WITH FINAL APPROVED EQUIPMENT SHOP DRAWINGS 2' - 6" 1 PLY BASE FLASHING PLY 6" ONTO EXISTING ROOF MEMBRANE 4" CONCRETE PAD NON-SHRINK GROUT 4 S002 AHU SCREEN WALL SECTION 1" = 1'-0" 5 S002 SCREEN WALL POST CONNECTION DETAIL 1 1/2" = 1'-0" 7 S002 AHU SUPPORT STAND DETAIL 3/4" = 1'-0" 8 S002 AHU SUPPORT STAND SECTION 3/4" = 1'-0" Project Title BOLE HALL RENOVATIONS Drawing Title DETAILS Date: 12/3/2014 Scale AS NOTED Drawn By: Checked By Job No: ABT JZ 2014-064 Drawing No. S002 Printed: 12/3/2014 11:32:07 AM