Disassembling the arm Setting the rotational stop O Q R BUTTON X TM 180° 4 W BUTTON 360° b BUTTON CATCH 1 b BUTTON located at the lower There is a 4 (Static-LIMB) ARM can be used for rotation setting as well. The factory setting is for 360° rotation. To set it to 180° rotation, push-in the BUTTON on the Right-side of the lower (Static-LIMB) ARM. Rotating the monitor S 180° The MONITOR can be positioned in either Landscape or Portrait orientation by simply pivoting it 90° in either direction. A lock-out feature stops the MONITOR from pivoting beyond the limits. Removing the side panels U To remove, use the FINGER-TABS at each end to disengage the UPPER-CLIPS of the SIDE-PANEL. To switch the arm back to 360° of rotation press the BUTTON in from the left side of the lower arm. To detach the FRONT-PIVOT from the ARM, push forward the CATCH to disengage and then Lift-Off the FRONT-PIVOT from the ARM. a UNIVERSAL CLAMP To remove the ARM, push-in the BUTTON on the lower (Static-LIMB) ARM and Up-Lift a the entire ARM from the 1 BASE- SHAFT. Attaching the side panels T Mount the LOWER-CLIPS at the bottom of the SIDE-PANEL on the GROOVES of each LIMB of the ARM. Complete the mounting by snapping on the UPPER-CLIPS of the SIDE-PANEL. Changing the monitor V BUTTON To detach the MONITOR from the ARM, Press and Hold the BUTTON at the top of the DISPLAY-MOUNT and Lift-Off the MONITOR from the ARM. For more information visit: For more information visit: www.zgonic.com www.zgonic.com © Copyright 2011 zgo ™ is a trademark of zgonic Pty Ltd Adjusting the spring tension F E 6 1 BUTTON 1 4 L b 4 1 d 1 c 1 a c 3 7 TM K BUTTON 1 5 To install the a 2 Push-in the BUTTON at the top of the BASESHAFT and slide the USB-HUB down the c 1 BASE-SHAFT Tabs beneath the USB-HUB d will align itself with the 1 BASE-PLATE. Monitor Arm you will need the following parts: 1 BASE 5 FRONT PIVOT 2 CLAMP 3 USB-HUB (OPTIONAL) 6 DISPLAY-MOUNT 7 SIDE PANELS (X4) a Push-in the BUTTON at the top of the BASEa SHAFT and replace the 1 BASE-PLASTICb SLEEVE and 1 BASE-METAL-SLEEVE onto c the 1 BASE-SHAFT. Pull the 4 SPRING-COMPRESSION-HANDLE outward from its stowed position in the upper (Dynamic-LIMB) ARM. Ensure the ARM is in the highest-position before adjusting the tension. H G M K N 4 ARM Please note that all user interface parts are coloured light grey for easy identification. Installing the base Mounting the monitor B A G (-) 4 BUTTON a CLIP 1 c 4 (+) Place the BASE flat on the desk-surface and align it with the table-edge. The ARM is able to tolerate desk-surfaces that are not on level ground up to 3.5°. Attach the CLAMP to the BASE underneath the desk. For thinner desk mount the pins in the top holes and for thicker desk mount them in the lower holes. D C 1 1 To mount the ARM to the BASE assembly (with or without USB-HUB, push-in the c BUTTON at the top of the 1 BASE- SHAFT and slide the ARM down the c 1 BASE-SHAFT. I a a 2 + Rotate the 4 SPRING-COMPRESSION-HANDLE clockwise if MONITOR is too heavy and anti-clockwise if too light. Continue adjusting until the MONITOR “hanged” itself at the highest-position. The User should be able to move the MONITOR to stop at any height thereafter. This completes the Spring-Tension adjustment. To save time when installing large b quantities, the 4 INDICATOR in the upper (Dynamic-LIMB) ARM can be used as a guide for the required tension. J M O P b 4 c a a free- hanging Tighten the CLAMP to the desk by hand a winding the 2 HANDWHEEL in an anti-clockwise direction. Alternatively for multiple installations, user may use a battery screwdriver with a 5mm hex bit. Ensure the driver is on a low torque setting. Push-in the BUTTON at the top of the BASE- SHAFT and remove the a 1 BASE-PLASTIC-SLEEVE and b 1 BASE-METAL-SLEEVE from the c 1 BASE- SHAFT. Screw the DISPLAY-MOUNT onto the rear of the MONITOR. The DISPLAY-MOUNT accommodates both 75mm and 100mm VESA hole-spacing. - Slide the CLIP of the FRONT-PIVOT into the opening SLOT of the ARM. BUTTON 1 b To mount the MONITOR, slide the DISPLAY-MOUNT down the FRONT-PIVOT till it clicks. a Push the 4 SPRING-COMPRESSIONHANDLE back into its stowed position. Route the cables around the hooks on both sides of the lower (Static-LIMB) and upper (Dynamic-LIMB) ARM. Ensure sufficient “free-hanging” cable below the MONITOR and between the LIMBS to enable full movement in all positions.