4 3 2 1 241.021 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"240' UNLESS OTHERWISE STATED. 3 . ESTG 3-1.01, PARAGRAPH 4.8.1 AND FIGURES A-18 THRU A-21 FOR UTILITY STATION DETAILS. 4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE VALVED. TO V-24118 12717 NITROGEN TO V-24218 12713 NITROGEN 242.021 NOTES: D D NITROGEN 2"-GI-240018-ULB 12529 240.030 US-09-1 US-01-5 US-03-5 US-02-5 1"-AI-240015-ULB US-07-1 5114851 ? ? ? US-03-5 ? ? US-02-5 ? ? US-01-5 2"x1" 1"-GI-240024-ULB ? ? TO FLARE HEADER 5114851 ? 5114851 ? ? ? C ? ? 1"-AU-240016-ULB 1"-AU-242XXX2-ULB 1"-AU-242XXX3-ULB 2"-AU-242XXX1-ULB 2"-GI-240022-ULB 1"-GI-240021-ULB 1"-AU-240014-ULB 2"-GI-240020-ULB 1"-AU-241XXX3-ULB C 1"-AU-241XX2-ULB 2"-AU-241XXX1-ULB 1"-AI-240014-ULB 1"-AI-240013-ULB 5114851 ? 5114851 ? 2" ? ? NITROGEN 240.004 2"-GI-240018-ULB 2"x1" ? ? 5114851 ? 2" 5114851 ? 5114851 ? 5114851 ? ? ? ? ? FROM HEADER UTILITY AIR 2"-AU-240013-ULB ? ? 5114851 ? B 240.004 2"-AI-240012-ULB G 07/11/11 ISSUED FOR PHA III F 04/20/11 ISSUED FOR ESTIMATE E 03/01/11 ISSUED FOR PHA II D 01/10/11 ISSUED FOR CLIENT REVIEW C 12/02/10 ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW B FROM HEADER ISSUED DATE DESCRIPTION 1"-AU-242XXX4-ULB 2"-AU-240XXX5-ULB 2"-AU-242XXX6-ULB 1"-GI-240023-ULB 1"-AU-240015-ULB 1"-AU-241XXX4-ULB 1"-AU-241XXX5-ULB REV BY CKD PRS CS MC PDP APE PEM CLIENT APP SHELL CANADA QUEST CCS PROJECT US-06-5 US-05-5 US-04-5 US-08-1 US-06-5 US-05-5 A US-04-5 R PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 240 - HYDROGEN MANUFACTURING UNIT INSTR. AIR UTILITY AIR AND NITROGEN DISTRIBUTION SCALE: NONE SHELL DWG NO.: 4 3 2 240.0000.000.041.028 1 REV. G FILE:\\F:\1025\DRAWINGS\HMU\240\240.028.pid MODEL DATE:7/7/2011 11:29:05 PM BY:muk22296 INSTRUMENT AIR 2"-AU-241XXX6-ULB THIS DRAWING CONTAINS CONFIDENTIAL INFORMATION PROPRIETARY TO SHELL CANADA AND OTHER INFORMATION WHICH MAY BE CONFIDENTIAL OR PROPRIETARY TO FLUOR OR ITS AFFILIATES. THIS DRAWING AND THE INFORMATION CONTAINED HEREIN IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN ANY FORMAT BY ANY OTHER PARTY WITHOUT SHELL CANADA AND FLUOR PRIOR WRITTEN PERMISSION. ? ? 5114851 ? FROM HEADER 240.028 240.004 FROM V-24118 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"240' UNLESS OTHERWISE STATED. 3 . ESTG 3-1.01, PARAGRAPH 4.8.1 AND FIGURES A-18 THRU A-21 FOR UTILITY STATION DETAILS. 4 . SATURATED STEAM TRAP AT ALL LOW POINTS AND IN HEADERS PER ESTG, INCLUDING END OF RUNS. 5 . STEAM BLOW CONNECTION. 6 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE VALVED. 2"x1" TO V-24118 241.021 12716 CONDENSATE 241.021 12715 LP STEAM 1 D • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • NUMBER OF UTILITY STATIONS PER COLUMN TO BE DETERMINED IN DETAILED DESIGN. • STEAM LINE SIZING FOR STEAM-OUT. ET 10 38 H 38 H 38 ET 10 38 HOLDS: 2"-SL-242XXX1-SAB 1"-SL-242XXX2-SAB 2 2"x1" US-01-5 D 1"-SL-242XXX3-SAB 12712 TO V-24218 242.021 242.021 US-02-5 12711 LP STEAM US-03-5 FROM V-24218 3 CONDENSATE 4 2"x1" US-09-1 1"-SCL-240006-SAB 2"x1" D ? ? 5115227 ? 3/4" 5156863 ? 2"-SCL-241003-SAB H 38 LP STEAM ET 10 38 2"-SCL-240005-SAB 2"x1" ET 10 38 2"-WU-240015-UAB ? ? 2" ? ? ? ? 2" ? ? ? ? 2" H 50 4"-SL-240016-SAB 240.006 C 4"x3" ? ? 2" ? ? 2" ET 10 38 ET 10 38 3/4" D 5115227 ? ? ? 1"-SCL-240002-SAB T ? ? ? ? 2" FROM HEADER STEAM CONDENSATE 240.006 2"-SCL-240001-SAB ET 10 38 2"-WU-240011-UAB ET 10 38 UTILITY WATER 240.003 ? ? 1" ? ? 1" ? ? 1" TO V-24007 FROM HEADER G 07/11/11 ISSUED FOR PHA III F 04/20/11 ISSUED FOR ESTIMATE E 03/01/11 ISSUED FOR PHA II D 01/10/11 ISSUED FOR CLIENT REVIEW C 12/02/10 ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW US-01-5 US-06-5 US-05-5 US-04-5 US-06-5 US-05-5 US-04-5 ET 10 38 ET 10 38 2"-SCL-240004-SAB 2"-WU-240014-UAB ISSUED DATE DESCRIPTION 2"x1" 2"-SL-240021-SAB 1"-SCL-242002-SAB 1"-SL-242XX4-SAB 1"-SL-242XX5-SAB 2"-SL-242XX6-SAB 1"-SCL-241002-SAB 1"-SL-241XX4-SAB 1"-SL-241029-SAB 2"-SL-241028-SAB 1"-SCL-241001-SAB 1"-SL-241026-SAB US-02-5 REV BY CKD PRS CS MC PDP APE PEM CLIENT APP SHELL CANADA QUEST CCS PROJECT US-08-1 A R PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 240 - HYDROGEN MANUFACTURING UNIT LP STEAM COND. AND UTILITY WATER DISTRIBUTION SCALE: NONE SHELL DWG NO.: 4 3 2 240.0000.000.041.029 1 REV. G 240.029 US-03-5 2"-SL-241025-SAB H 38 B FILE:\\F:\1025\DRAWINGS\HMU\240\240.029.pid MODEL DATE:7/10/2011 9:23:55 PM BY:muk22296 ET 10 ET 10 ET 10 B 1"-SL-241027-SAB C ? ? 2" 5 2"-SL-240021-SAB US-07-1 2"-SL-240020-SAB 2"-WU-240013-UAB 2"-SCL-240003-SAB 2"-SL-240019-SAB 2"-SL-240018-SAB 2"-SCL-242001-SAB T 4 3 2 1 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"240' UNLESS OTHERWISE STATED. HOLDS: • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. D D H2 RAW GAS ET 10 38 6"-FL-242020-PAC FREE DRAINING 242.021 12063 FROM RV-242023 H2 RAW GAS ET 10 38 6"-FL-241020-PAC FREE DRAINING 241.021 12039 FROM RV-241023 C 5070551 ? ? ? 1-1/2" FI 075 NITROGEN 2"x1-1/2" 2"-GI-240018-ULB 240.028 5069816 ? 5119160 ? ? ? TO FLARE HEADER 1-1/2" 1-1/2" 3/4" 1-1/2"-GI-240019-PAC 5115273 ? 12529 FROM HEADER B H2 RAW GAS 10"-FL-241021-PAC FREE DRAINING 241.022 12061 FROM PV-241067 H2 RAW GAS ET 10 50 10"-FL-242021-PAC FREE DRAINING 242.022 G 07/11/11 ISSUED FOR PHA III F 04/20/11 ISSUED FOR ESTIMATE E 03/01/11 ISSUED FOR PHA II D 01/10/11 ISSUED FOR CLIENT REVIEW C 12/02/10 ISSUED FOR INTERNAL REVIEW 12707 FROM PV-242067 ISSUED FOR PRELIMINARY REVIEW B REV ISSUED DATE DESCRIPTION BY CKD PRS CS MC PDP APE PEM CLIENT APP SHELL CANADA QUEST CCS PROJECT A R PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 240 - HYDROGEN MANUFACTURING UNIT ABSORBER AREA RELIEF COLLECTION SCALE: NONE SHELL DWG NO.: 4 3 2 240.0000.000.041.030 1 REV. G FILE:\\F:\1025\DRAWINGS\HMU\240\240.030.pid MODEL DATE:7/4/2011 11:22:06 AM BY:ahm14887 ET 10 50 240.030 240.005 Slope 1:500 ET 10 50 10"-FL-240026-PAC 3/4" FLARE HEADER PAC ULB C 4 3 2 1 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . SEE 240.2315.000.050.011. 3 . STORM WATER FROM UNIT 246 "QUEST CAPTURE" TO BE ROUTED TO NEW CATCH BASIN IN HMU 1 & 2 ABSORBER AREA. 4 . NEW CATCH BASIN TO DRAIN TO TIE-IN AT MH #06. D D C C STORM WATER ET 10 2"-WW-246002-UAB 246.035 13164 FROM P-24612 3 MH #06 2 27"-DRC-240036-WAU TP-F MH #XX ABSORBER CATCHMENT 240-13 B 4 07/11/11 REV ISSUED DATE ISSUED FOR PHA III DESCRIPTION BY CKD PRS CS MC PDP APE PEM CLIENT APP SHELL CANADA QUEST CCS PROJECT A R PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT SCALE: NONE SHELL DWG NO.: 4 3 2 240.0000.000.041.032 1 REV. G 240.032 UNIT 240 - HYDROGEN MANUFACTURING UNIT STORM WATER DRAINAGE & POTENTIALLY OILY SWS FILE:\\F:\1025\DRAWINGS\HMU\240\240.032.pid MODEL DATE:7/10/2011 9:25:14 PM BY:muk22296 G Slope 1:500 ISSUED FOR ESTIMATE 11 Jul 2011 ISSUED FOR ESTIMATE 11 Jul 2011 ISSUED FOR ESTIMATE 11 Jul 2011 ISSUED FOR ESTIMATE 11 Jul 2011 ISSUED FOR ESTIMATE 11 Jul 2011 ISSUED FOR ESTIMATE 11 Jul 2011 ISSUED FOR ESTIMATE 11 Jul 2011 ISSUED FOR ESTIMATE 11 Jul 2011 ISSUED FOR ESTIMATE 11 Jul 2011 4 3 2 1 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"440' UNLESS OTHERWISE STATED. 3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND FIGURE 18-2 TO 18-5 FOR UTILITY STATION DETAILS. 4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE VALVED. US-02-5 D US-04-5 2"-AU-440XXX2-ULB 1"-GI-440XXX1-ULB 1"-AU-440XXX1-ULB US-08-1 1"-AU-440XXX3-ULB D INSTRUMENT AIR 440.016 2"-AI-440050-ULB FROM DISTRIBUTION UTILITY AIR 2"-AU-440055-ULB 5114851 ? 440.015 FROM DISTRIBUTION C C NITROGEN 5114851 ? ? ? US -03-1 ? ? US-01-1 1"-AU-440058-ULB 1"-GI-440073-ULB 5114851 ? 1"-GI-440071-ULB 1"-AU-440056-ULB FROM DISTRIBUTION 5114851 ? 2"-GI-440070-ULB 5114851 ? 1"-AI-440051-ULB 5114851 ? ISSUED FOR ESTIMATE B 11 Jul 2011 G 07/11/11 ISSUED FOR PHA III F 04/20/11 ISSUED FOR ESTIMATE E 03/01/11 ISSUED FOR PHA II D 01/10/11 ISSUED FOR CLIENT REVIEW C 12/02/10 ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW B REV ISSUED DATE DESCRIPTION BY CKD PRS CS MC PDP APE PEM CLIENT APP NITROGEN 12778 440.049 TO FLARE HEADER SHELL CANADA QUEST CCS PROJECT A NITROGEN 2"-GI-440072-ULB 13014 441.029 TO V-44118 R PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 440 - HYDROGEN MANUFACTURING UNIT INST. AIR, UTILITY AIR, AND NITROGEN DISTRIBUTION SCALE: NONE SHELL DWG NO.: 4 3 2 440.0000.000.041.046 1 REV. G FILE:\\F:\1025\DRAWINGS\HMU\440\440.046.pid MODEL DATE:7/6/2011 4:33:33 AM BY:muk22296 2"-GI-440070-ULB 440.046 440.016 3 3" STEAM CONDENSATE C 2" ? ? 1"-SL-440XX6-SAB ET 10 38 2"-SCL-440090-SAB 440.019 ? ? 1" ? ? 2" ? ? FROM DISTRIBUTION 1" 3"x1" 5156863 ? 440.018 4"x3" H 50 4"-SL-440100-SAB D ET 10 3" LP STEAM 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "440" UNLESS OTHERWISE NOTED. 3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND FIGURE 18-2 TO 18-5 FOR UTILITY STATION DETAILS. 4 . SATURATED STEAM TRAP AT ALL LOW POINTS AND IN HEADERS PER ESTG, INCLUDING END OF RUNS. 5 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE VALVED. US-04-5 2"-SL-440XX5-SAB 1"-WU-440XX1-SAB US-02-5 1 ? ? 1" ? ? 2" ET 10 1"-SCL-440XX2-SAB 1"-SL-440XX4-SAB US-08-1 2"-SL-440XX1-SAB 1"-SL-440XX3-SAB US-05-5 ET 10 D US-06-5 1"-SL-440XX2-SAB 1"-SCL-440XX1-SAB US-07-5 2 ? ? 4 C ET 10 38 TO HEADER ? ? ET 10 38 UTILITY WATER ET 10 38 2"-WU-440030-UAB ? ? 2"x1" 2"-SL-440101-SAB 2"-SCL-440094-SAB 2"x1" 2"-WU-440032-UAB 2"x1" 2"x1" 2"-WU-440031-UAB 2"-SCL-440XXX-SAB 2"x1" 2"x1" 2"-SL-440103-SAB ? ? FROM DISTRIBUTION US-03-1 US-01-1 ISSUED FOR ESTIMATE 1"-SCL-440095-SAB ? ? D T B 11 Jul 2011 1"-SL-440104-SAB ? ? ET 10 N/A G 07/11/11 ISSUED FOR PHA III F 04/20/11 ISSUED FOR ESTIMATE E 03/01/11 ISSUED FOR PHA II D 01/10/11 ISSUED FOR CLIENT REVIEW C 12/02/10 ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW B ISSUED DATE DESCRIPTION BY CKD PRS CS MC PDP APE PEM CLIENT APP 2"x1" ET 10 38 REV 3"-SL-440102-SAB 1"-SCL-441XXX-SAB SHELL CANADA QUEST CCS PROJECT A 4 PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT SCALE: NONE SHELL DWG NO.: 3 2 440.0000.000.041.047 1 REV. G 440.047 UNIT 440 - HYDROGEN MANUFACTURING UNIT LP STEAM, COND., AND UTILITY WATER DISTRIBUTION FROM V-44118 13016 CONDENSATE 441.029 TO V-44118 13015 441.029 LP STEAM R FILE:\\F:\1025\DRAWINGS\HMU\440\440.047.pid MODEL DATE:7/10/2011 10:06:16 PM BY:muk22296 ET 10 38 5115227 ? 2"x1" 3/4" 440.014 4 3 2 1 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "440" UNLESS OTHERWISE STATED. HOLDS: • RELIEF DISCHARGE PIPING SIZES. D D PV-441067 441.030 ET 10 50 10"-FL-441036-PAC FREE DRAINING FROM V-44119 RV-441025 & PV-441071 441.032 12776 C FREE DRAINING FROM V-44115 1-1/2" FI 075 RV-441023 FREE DRAINING ? ? 5069816 ? NITROGEN 2"-GI-440070-ULB 440.046 12778 FROM HEADER 5070551 ? FROM V-44118 3/4" ET 10 6"-FL-441035-PAC 1-1/2" 441.029 12777 ULB PAC 3/4" RELIEF HEADER ET 10 50 10"-FL-440030-PAC TO FLARE HEADER MIN. ISSUED FOR ESTIMATE B 11 Jul 2011 G 07/11/11 ISSUED FOR PHA III F 04/20/11 ISSUED FOR ESTIMATE E 03/01/11 ISSUED FOR PHA II D 01/10/11 ISSUED FOR CLIENT REVIEW C 12/02/10 ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW REV ISSUED DATE DESCRIPTION BY CKD PRS CS MC PDP APE PEM CLIENT APP SHELL CANADA QUEST CCS PROJECT A R PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 440 - HYDROGEN MANUFACTURING UNIT ABSORBER AREA RELIEF COLLECTION SCALE: NONE SHELL DWG NO.: 4 3 2 440.0000.000.041.049 1 REV. G FILE:\\F:\1025\DRAWINGS\HMU\440\440.049.pid MODEL DATE:7/6/2011 1:59:09 PM BY:ahm14887 B 440.049 440.003 5115273 ? ? ? 1-1/2" C ET 10 38 2"-FL-441038-PAC 5119160 ? 12775 4 3 2 1 6 )25*(1(5$/127(6$1'/(*(1'6((':*6 $1' 352&(6667($06,/(1&(5 '(6,*1357(03 0$7(5,$/ ,168/$7,217<3(7+. +($775$&(0(',$7(03 75,0 N3DJ#&# &6 +PP (7& ;76$* $//,167580(17/223$1',17(5/2&.180%(566+2:1 213,'6+$//+$9($35(),;81/(6627+(5:,6( ,'(17,),('213,' '8$/3/$7(&+(&.9$/9( )(('*$6&$5%21&20326,7,21$6680('&2167$17)256& 5$7,26+87'2:1 6$785$7('67($075$3$7$///2:32,176 7, /2$'6,*1$/,6)52029(5$//+<'52*(1&$3$&,7< 0$1$*(0(170$67(5/2$'&21752//(5/2$'6,*1$/,69,$ '$7$+,*+:$<1(7:25. )520,% +-* 3$* ( 563 +<( ( ( 7, 37 77 ;=7( $6 ;<( &62 37( 77( )2 + 762 )& 33$* +-* 3-* )9 =-* 3-* + )2% 6,6$* ,367($0 '/ ISSUED FOR ESTIMATE 11 Jul 2011 MASTER DRAWING AS BUILT INFORMATION REQUIRED 6+3-* 33 )& '/ + 121( *,8/% 3$* 8/% 37 77 3, 1,752*(1 37( 77( 7, 5G 7/11/11 ISSUED FOR PHA III )7 )7( )520',675,%87,21 +($'(5 ( B )256833/(0(17$5<5(9,6,21+,6725<2)7+,6'2&80(17 5()(5725(9,6,21/,675 1& )27 3-* 6$* [ 5 $6%8,/7:,7+12&+$1*( /:- 6/ 4 ,668(')25&216758&7,21 $% -6- '0 *76 3 ,668(')25&216758&7,21 +* &-& &-& <= '0 2 ,668(')25&216758&7,21 33 &-& +* /* 1 ,668(')25&216758&7,21 3' &-& +* 0 ,668(')25&216758&7,21 3' +* REV ISSUED DATE BY CKD DESCRIPTION 5( 3+ *+ 11 3% '0 *+ 11 3% /* '0 11 +9 3% 5&' /* '0 11 3* 3% PRS CS PDP MC APE PEM CLIENT APP )/2: ); &203 $ )& 563 / 6&0$67(5 5$7,2&21752/ ( ), // SHELL CANADA ENERGY )520)7( SCOTFORD UPGRADER EXPANSION 1 ))$// BECHTEL CANADA CO. A JOB NO. 25183 ); & )520), PIPING AND INSTRUMENT DIAGRAM SCOTFORD UPGRADER EXPANSION 1 HMU-UNIT 441 FEED / STEAM MIXING SCALE: NONE SHELL DWG NO.: 4 3 2 441.0000.000.041.004 1 REV. 5G 5 441.004 )520$; '/ )520( C '/ '/ 5 +6 $, & )/3$& ))& 6&5$7,2&$/& 21($1$/<=(508/7,3/(675($06 '5$,13,3(72%((/(&75,&$//<75$&('$1',168/$7(' 6((3,')25$1$/<=(56,*1$/6 )+&3529,'(6/2:6(/(&729(55,'($1'$/62)/2: &/$03)81&7,21 )&3529,'(6)((')25:$5'%,$6727&$& 37 (7 +& 3$& )& 0,1 3$* )256$03/(67$7,21'(7$,/65()(572 352&(6667($0 + 6+3-* + 6% )2% )& 762 +9 762 + )& (7 6+=-* 3$* +-* 3+-* + )9 $,7 & 39 + DO &6& 66 33$* $3 & )( + (7 )5209$% 215()250(56+87'2:1%<,17(5/2&.(&21752//(5 :,//%($8720$7,&$//<6(7720$18$/$1'28738772 0,1 33$* 0$/(3/$,1(1'+,/7$3:,7+&$3&:&+$,1 DO &62 +9 &21752/9$/9(3972%(2)0,1&/$66,96+872)) ;9 '(/(7(' 6$* =-* )7( + )7 ) s 3, '(/(7(' ,168/$7($1'75$&(83726833257%5$&.(7 6+=-* +& +=7( 3+-* ), 3529,'(;9:,7+3$57,$/6752.(7(67'(9,&( 3& 3-* =-* s 00 )$// (7 /2&$7(&21752/9$/9(&/26(7267($06,/(1&(5,1/(7 ); $ 52& )/$5( 67($06,/(1&(566+28/'%(/2&$7('68&+7+$7 67($0(;+$86772$70263+(5(,6$7$6$)(/2&$7,21 (7 + )/2:&203 C 9257(;)/2:0(7(572%($&&(66,%/( + FOR MOC 11457 PROJECT USE 352&(66*$6 ( );$ 9$/9(&/26('21/<'85,1*1,752*(1&,5&8/$7,21 )& To FX-051D 6,/(1&(56:,//%(6833/,('%<&21752/9$/9( 399(1'25 6 , Process Gas Flow 5G WORKING COPY OF MASTER DRAWING ASBUILT INFORMATION REQUIRED ));6,6&$/&8/$7,212)67($0&$5%215$7,2 /2:5$7,26+87'2:1))$// 441.009 FILE:\\F:\1025\DRAWINGS\HMU\441\441.004.pid MODEL DATE:30/09/2010 12:33:41 PM BY:wjliu )+& )(('67($0 72( (7 + 3& 33$* .; 6$* 3-* )5203, 6&/6$* + 6+6$* +<'52*(10$1$*(0(17 6<67(0 77 D /2&$7(0,1,080',$0(7(56'2:1675($02))(('67($0 0,;32,17 ),6,6&$/&8/$7,212)35(66$1'7(03&203(16$7(' )(('*$6)/2:&20%,1('/2:)/2:6+87'2:1)$// ,6%$6('216802)*$6),67($0), $1'%):), ),6,6&$/&2)35(66$1'7(03&203(16$7('67($0 )/2: 33 D %<3$666,=(')250,1,08067($0)/2:1250$//<)8//<23(1 4 E-44108 HP STEAM GENERATOR RATED DUTY: DESIGN TEMP: DESIGN PRESS: MATERIAL: 3 E-44109 FEED/ STEAM PREHEATER II RATED DUTY: DESIGN TEMP: DESIGN PRESS: MATERIAL: 16.23 MW 371 °C 5700.00 kPa-g INLET: C.S. OUTLET: C.S. COIL: C.S. 9 4400.00 kPa-g @ 545 °C & @ 9Cr-1Mo-V H/125 mm N/A 9 J-44104 STEAM SUPERHEATER SPRAY ATTEMPERATOR III TT 102 B DESIGN PR. & TEMP: MATERIAL: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: 9 H 150 TO H-44101 5 DESIGN PR. & TEMP: MATERIAL: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: 5600.00 kPa-g @ 420 °C & @ 1.25Cr-0.5Mo H/125 mm N/A 9 1. FOR GENERAL NOTES AND LEGEND SEE DWGS 400.0000.000.041.001, 002, 003, 004, 005 AND 006. 2. ALL INSTRUMENT LOOP AND INTERLOCK NUMBERS SHOWN ON P&ID SHALL HAVE APREFIX ''441'' UNLESS OTHERWISE IDENTIFIED ON P&ID. 3. CONTINUATION OF CONVECTION BANK. 4. DELETED. 5. THERMOWELL BY REFORMER PACKAGE VENDOR. TEMPERATURE ELEMENT & REMOTE MOUNTED TRANSMITTER BY BECHTEL. 6. REFRACTORY LINED. 7. DELETED. 8. VORTEX FLOW METER TO BE MADE ACCESSIBLE. 9. H-44102, E-44108, E-44109, E-44110, E-44111, E-44113, E-44119, J-44101, J-44102, J-44103 & J-44104, AND INLET / OUTLET LINES ARE UNDER REFORMER VENDOR'S SCOPE OF SUPPLY. ATTEMPERATOR SPRAY NOZZLES ARE BY BECHTEL. 10. VALVE IS DESIGNED FOR DESIGN CASE-I OPERATION. FOR DESIGN CASE-II (200 t/d HP STEAM EXPORT), VALVE WILL REQUIRE RESIZING. 11. DELETED. 12. NOZZLE WITH FLANGE BY REFORMER VENDOR, FIELD INSTRUMENTATION AND / OR VALVE BY BECHTEL. 13. MALE PLAIN END HIL TAP COUPLING WITH CAP (C / W CAP CHAIN.) 14. ACCESS DOOR. 15. INSPECTION NOZZLE WITH WELDED CAP. 16. CERAMIC THERMOWELL AND TEMPERATURE ELEMENT BY REFORMER PACKAGE VENDOR. REMOTE MOUNTED TRANSMITTER BY BECHTIL. 17. RELIEF VALVE INLET FLANGE PROVIDED BY EQUIPMENT VENDOR. RELIEF VALVE PROVIDED BY BECHTEL. 18. TIE-IN POINTS-SPG TIE-IN SHOWN AS TP 441-# AND FLUOR QUEST TIE-IN SHOWN AS TP-F-441-#. 5600.00 kPa-g @ 435 °C & @ 1.25Cr-0.5Mo H/125 mm N/A 9 RATED DUTY: DESIGN TEMP: DESIGN PRESS: MATERIAL: 9 E-44111 FEED/ STEAM PREHEATER I RATED DUTY: DESIGN TEMP: DESIGN PRESS: MATERIAL: 12.57 MW 470 °C 5600.00 kPa-g INLET: 1.25Cr-0.5Mo OUTLET: 1.25Cr-0.5Mo COIL: 1.25Cr-0.5Mo 9 E-44113 COMBUSTION AIR HEATER II 34.84 MW 590 °C 4400.00 kPa-g INLET: 9Cr-1Mo-V OUTLET: 9Cr-1Mo-V COIL: 9Cr-1Mo-V RETED DUTY: DESIGN TEMP: DIFFERENTIAL DESIGN PRESS: MATERIAL: 9 27.72 MW 400°C 15 kPa PLATES: SS 304 CASING: SS 304 9 H 100 16"-SH-44138613- TO V-44103 DESIGN PR. & TEMP: MATERIAL: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: E-44119 HP STEAM SUPERHEATER II 5600.00 kPa-g @ 445 °C & @ 2.25Cr-1.0Mo H/125 mm N/A TT 102 A STEAM / WATER 11.01 MW 505 °C 5600.00 kPa-g INLET: 1.25Cr-0.5Mo OUTLET: 2.25Cr-1Mo COIL: 2.25Cr-1Mo J-44102 STEAM SUPERHEATER SPRAY ATTEMPERATOR I 9 5 16"-P-44138623- RATED DUTY: DESIGN TEMP: DESIGN PRESS: MATERIAL: 1 J-44103 STEAM SUPERHEATER SPRAY ATTEMPERATOR II 9 TO H-44101 PREHEATED FEED/STEAM E-44110 HP STEAM SUPERHEATER III 9 H 150 16"-P-44138617- D DESIGN PR. & TEMP: MATERIAL: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: 9 PREHEATED FEED/STEAM H-44102 CONVECTION BANK J-44101 FEED/ STEAM PREHEATER SPRAY ATTEMPERATOR 10.25 MW 605 °C 4400.00 kPa-g INLET: 9Cr-1Mo-V OUTLET: 9Cr-1Mo-V COIL: 9Cr-1Mo-V 2 9 9 STEAM/ WATER 16"-SH-44138640- H 100 H TI 131 H TI 130 H TI 241 A H TI 241 B H TI 241 C D TO V-44103 24"x16" 3/4" PP 3/4" TT 131 12 MOC 11457 24"x16" TT 130 12 TT 241 A TT 241 B 14 E-44110 3 FLUE GAS E-44111 E-44119 16 16 • SIS INTERLOCK SEQUENCE NUMBER ADDED FOR QUEST. 14 E-44109 E-44108 HOLDS: TT 241 C E-44113 16 16 FLUE GAS 16 H-44102 3/4" 18"x16" 17 9 B31.3 B31.1 SAG ZDG H 100 TI 238 TT 237 5 1" 1" TT 238 1" H L B31.1 ASME 1 15 BECHTEL VENDOR SP. TC 237 13 13 12 SP. 5 TC 233 TT 233 L 15 SP. 002 001 TI 215 12 1" 15 TP 441-011 1" TC 219 WORKING COPY OF MASTER DRAWING ASBUILT INFORMATION REQUIRED AP 017 441-011 2" AE 017 1" 15 TT 215 4G H L 13 1" SP. 003 TI 231 TT 221 O2 AI 018 ATE 017 H 5 L O2 AI 017 TI 221 L E 010 TT 231 PP ATE 018 5 AP 018 004 1" 1" 13 1" 1" 13 B31.1 B31.3 ZDG SAG TC 102 TV 237 1" 1" 2" FC 1" TP 1" FQI 101 4"-WB-44138594-ZDG 4"x2" 9 13 B31.1 B31.3 H 100 HP STEAM 16"-SS-441002- FROM E-44112 4g 07/11/11 ISSUED FOR PHA III 4f 04/20/11 ISSUED FOR ESTIMATE 4 07/24/09 ISSUED FOR CONSTRUCTION REV ISSUED DATE DESCRIPTION TV 219 1" 1" FI 238 FT 238 8 1/2" 2" FC FI 235 PRS GTS BY CKD PRS CS RE PDP MC APE PH PEM CLIENT APP 13 1" 1" FT 235 8 1-1/2"-WB-44138641-SAG FQI 235 4"-WB-44138647-SAG ET 10 50 1" JSJ 2" 1" 1" SHELL CANADA ENERGY FI 214 1-1/2" 8 FT 214 ET 10 50 1" FQI 214 13 4"-WB-44138655-SAG ET 10 50 2 BECHTEL CANADA CO. A JOB NO. 25183 PIPING AND INSTRUMENT DIAGRAM SCOTFORD UPGRADER EXPANSION 1 UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3 CONVECTION BANK PART-I 1" 3 SCOTFORD UPGRADER EXPANSION 1 6"-WB-44038634-SAG SP. 035 1" INJECTION BOILER FEEDWATER FROM DISTRIBUTION HEADER ET 10 50 FQI 238 8 AB 1" 8 3"-WB-44138650-SAG 4 FEED/STEAM 18"-P-441010-PAG 20"-P-44138630- ET 10 38 TO FFX-441058 FT 101 TO H-44101 FROM V-44102 1" FI 101 COMBUSTION AIR 9 H 125 TO E-441004 B FOR SUPPLEMENTARY REVISION HISTORY OF THIS DOCUMENT, REFER TO REVISION LIST 441.0000.000.041.006R. AP-441004 TT 220 13 1" 1" H 100 5 2" 10 FROM E-44117 9 13 1" 2" FC 13 1" 1" 1-1/2" 13 FTE 101 4"x2" TV 233 AS BUILT INFORMATION REQUIRED AP-441014 9 TP-F MASTER DRAWING CONBUSTION AIR 441-012 13 1" H-A 100 TI 220 ZDG SAG B31.1 B31.3 H-A 75 12 2" AE 018 J-44102 1" 1" 13 ZDG SAG 1-1/2" FC 2" 1" 1" 13 13 TV 102 J-44103 NNF 1" J-44104 18"-SS-44138561- SIG SAG 4"-WB-44138587-ZDG 3"x2" J-44101 2"x1-1/2" 1-1/2"-WB-44138610-ZDG AVG ISSUED FOR ESTIMATE 11 Jul 2011 441-012 TX 102 FOR MOC 11457 PROJECT USE ONLY 13 SCALE: NONE SHELL DWG NO.: 441.0000.000.041.006 1 REV. 4g 441.006 12 TT 101 H 5 H BECHTEL VENDOR 1" 18"-SS-44138558- 12 H TP-F 5 VENDOR BECHTEL TI 101 12 5 BECHTEL VENDOR H TT 219 16"-SS-44138592-ZDG 13 PP 9 9 22"x18" PP 9 H 100 H 125 PP BECHTEL VENDOR 9 CSO TO FX-441013 / 441061 3/4" 22"x20" 16"-SS-44138591- SUPERHEATED EXPORT HP STEAM 16"-SS-44138670-SAG TI 102 A 20"x18" BECHTEL VENDOR 9 H 20"x18" 3/4" 12 10"-VA-44138582-PAC 12 TI 102 B 3/4" 3/4" FILE:\\F:\1025\DRAWINGS\HMU\441\441.006.pid MODEL DATE:7/10/2011 11:17:13 PM BY:muk22296 20"x18" 3/4" H 100 3/4" 12 12 H 100 FROM V-44103 VA 12 H 100 12"-WB-44138668- 3/4" 14 22"x20" 9 BFW 16"x12" 18"-SS-44138564- FROM V-44103 16"x12" 12 12 RV 066 H 125 H 100 20"-P-44138584- 12"-WB-44138667- 4N6 SET@ 5400.00 kPa-g SAFE LOCATION BECHTEL VENDOR 12 BFW 14 14 6 C TO E-44112 3 3"-WB-44138676-SIG C FROM H-44101 TP-F 441-010 441 010 FLUE GAS AP-441XXX 441.008 6G FOR MOC 11457 PROJECT USE ONLY FROM C-44105 WORKING COPY OF MASTER DRAWING ASBUILT INFORMATION REQUIRED 16. Tie-in points - SPG tie-in shown as TP 441-# and Fluor Quest Tie-in shown as TP-F-441-# 6G ISSUED FOR ESTIMATE 11 Jul 2011 6G 07/11/11 ISSUED FOR PHA III 6F 04/20/11 ISSUED FOR ESTIMATE 6G 4 3 2 S-44104 7 FLUE GAS SILENCER S-44103 STACK SIZE: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: 1 7 1 . FOR GENERAL NOTES AND LEGEND SEE DWGS 400.0000.000.041.001, 002, 003, 004, 005 AND 006. 2 . ALL INSTRUMENT LOOP AND INTERLOCK NUMBERS SHOWN ON P&ID SHALL HAVE A PREFIX "441" UNLESS OTHERWISE IDENTIFIED ON P&ID. 4500 mm ID x 55000 mm 250°C C.S. H/100mm 3 . DELETED. 4 . THREE SETS OF NOZZLES: SET1 - MANUAL SAMPLE PORTS, 4", 150# FFWN C/W BLIND AND 4" NPT CAPPED NIPPLE. 4 @ 90º SET2 - CEMS SAMPLE PORTS, 6", 150# FFWN. 2 @ 180º SET3 - ANNUBAR PORT, 6", 150# FFWN. 2 @ 180º SAMPLE POINTS SHALL BE AS PER ALBERTA STACK SAMPLING CODE. 5 . ONE LUBE OIL SYSTEM FOR BOTH FANS (C-44101 & C-44102) REFER TO P&ID NUMBER 441.024 & 441.026. D D 6 . ACCESS DOOR. 7 . C-44102, S-44103, S-44104 AND ASSOCIATED PIPING UNDER REFORMER VENDOR'S SCOPE OF SUPPLY. 8 . CEMS ENCLOSURE. 9 . NOZZLE WITH FLANGE BY REFORMER PACKAGE VENDOR. FIELD INSTRUMENTATION AND/OR VALVE BY BECHTEL. 10. SEE P&ID 440.024 FOR ANALYZER SIGNAL DETAILS. 11. TOTAL CONVECTION SECTION FLOW. 12. FLUE GAS RECYCLE FLOW. 13. TI-330 USED TO TEMPERATURE COMPENSATE FX-073C. 14. TOTAL FGR AND COMBUSTION AIR FLOW. 15. AX-330 IS FOR THE OPERATOR TO MANUALLY BIAS THE CONTROLLER OUTPUT TO OPTIMISE NOx EMISSIONS. 16. FX-051D DETERMINES THE SETPOINT FOR THE CONVECTION SECTION FLOW BASED ON THE HMU LOAD. 17. TIE-IN POINTS- SPG TIE-IN SHOWN AS TP-441-# AND FLUOR QUEST TIE-IN SHOWN AS TP-F-441-#. FROM PC-441133 R/S HIS 327 BECHTEL VENDOR START PERMISSIVE HOA E 008 I 008 L HS 327 16 E 004 E C DRAFT AP DRAFT 9 PZTE 133A PROCESS GAS FLOW FX 051D 005 FROM FC-051 FI 062 008 FX 073B FC 073B PP AX 330 C 15 11 PV 133A BECHTEL VENDOR TO FX-441062 10 7 H 150 6 FL CEMS FIELD PANEL LINKAGE FL FROM E-44117 2" PV 133B 5 C-44102 6 (TYP) 9 PP AP-441015 PT 330 7 DRAFT AIT 330 TE 331 AE 330 9 8 ISSUED FOR ESTIMATE S-44103 O/C XHIS 022 FT 062 4" 4 9 H 9 PP 9 E 010 6" EXTERNAL INSULATION E MASTER DRAWING AS BUILT INFORMATION REQUIRED CL B 010 L XYE 022 S H 150 TI 330 START PERMISSIVE A/S XZTE 022 TT 330 FOR SUPPLEMENTARY REVISION HISTORY OF THIS DOCUMENT, REFER TO REVISION LIST 441.0000.000.041.008R. F 800X1000 MANWAY H C-44105 TP 7 H 441-009 4" 441-009 FEED FORWARD CONTROL OF CO2 CAPTURE f(x) XV 022 07/11/11 ISSUED FOR PHA III 4f 04/20/11 ISSUED FOR ESTIMATE 4e 03/14/11 ISSUED FOR PHA II 4d 01/10/11 ISSUED FOR CLIENT REVIEW 4c 12/02/10 ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW 4b FC TP-F 4g VFD FAULT XA 021 LOCAL/ REMOTE XL 021 FX 073D VFD 441.030 13171 4 09/30/10 AS BUILT WITH NO CHANGE LWJ SL REV ISSUED DATE DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT APP FROM FFC-073D E I 010 SI XXX FI 073A HOA E 005 I 010 HS 021 14 FOR MOC 11457 PROJECT USE ONLY E WORKING COPY OF MASTER DRAWING ASBUILT INFORMATION REQUIRED 004 HIS 021 R/S 12 FI 073C COMBUSTION AIR FLOW FX 073A 441.009 SHELL CANADA ENERGY 13073 FROM FC-441316 SCOTFORD UPGRADER EXPANSION 1 f(x) 13 BECHTEL CANADA CO. FX 073C 7 C-44102 INDUCED DRAFT (FLUE GAS) FAN RATED FLOW: DIFF PRESSURE: DRIVER : INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: 4 391599.6 nm^3/hr 6.40 kPa 2650.00 kW H/150 mm N/A 3 RATED FLOW: DIFF PRESSURE: DRIVER : INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: JOB NO. 25183 PIPING AND INSTRUMENT DIAGRAM SCOTFORD UPGRADER EXPANSION 1 FT 073 C-44105 FLUE GAS RECYCLE FAN 42316.0 kg/hr 3.79 kPa H H/ FLUE GAS -AP-441XXX- 13067 TO E-44113 2 A 441.007 UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3 ID FAN AND FLUE GAS STACK SCALE: NONE SHELL DWG NO.: 441.0000.000.041.008 1 REV. 4G 441.008 4F FILE:\\F:\1025\DRAWINGS\HMU\441\441.008.pid MODEL DATE:7/8/2011 4:02:36 PM BY:ahm14887 S-44104 -AP-441XXX- FLUE GAS • PCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST. 441.004 SP E I MOC 11457 HOLDS: f(x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v) ($ ( 33 $3 77 77( 77( 33 // )7( 77( MASTER DRAWING ( )7( %(&+7(/ 9(1'25 )7( )( )7 ); $ 7, $ 7(03(5(':$7(5 11 Jul 2011 / FOR MOC 11457 PROJECT USE ONLY WORKING COPY OF MASTER DRAWING AS BUILT INFORMATION REQUIRED ISSUED FOR ESTIMATE :&3$% [ )520( 67$573(50,66,9( 7& 33 '5$)7 +$ 33 77 )9 )=7( $3 $ 4G 07/11/11 ISSUED FOR PHA III 4F 04/20/11 ISSUED FOR ESTIMATE 4 $6%8,/73(5352-(&712 /:- 6/ 3 ,668(')25&216758&7,21 $% -6- '0 *76 2 ,668(')25&216758&7,21 33 &-& +* /* '0 1 ,668(')25&216758&7,21 3' &-& +* /* 0 ,668(')25&216758&7,21 3' +* 5&' REV ISSUED DATE BY CKD PRS DESCRIPTION 5( 3+ *+ 11 3% '0 *+ +9 3% /* '0 11 3* 3% CS PDP MC APE PEM CLIENT APP & (% 33 33 + SHELL CANADA ENERGY 56 )2 9(1'25 %(&+7(/ )2% 56 + &62 [ & )25&(''5$)7&20%867,21 $,5)$1 5$7(')/2: ',))35 '5,9(5 ,168/$7,217<3(7+. +($775$&(0(',$7(03 75,0 3 :53$% 7(03(5(':$7(5 SCOTFORD UPGRADER EXPANSION 1 729 4 / / '5$)7 B )256833/(0(17$5<5(9,6,21+,6725<2)7+,6'2&80(17 5()(5725(9,6,21/,675 ( 79 )2% AS BUILT INFORMATION REQUIRED 2 VPAKU PAKU N3D N: +PP 1$ BECHTEL CANADA CO. A JOB NO. 25183 PIPING AND INSTRUMENT DIAGRAM SCOTFORD UPGRADER EXPANSION 1 HMU-UNIT 441 COMBUSTION AIR HEATING AND FD FAN SCALE: NONE SHELL DWG NO.: 441.0000.000.041.009 1 REV. 4G 4 FILE:\\F:\1025\DRAWINGS\HMU\441\441.009.pid MODEL DATE:30/09/2010 10:03:29 AM BY:wjliu 441.008 TO FX-441073A )4, ( + )& :53$% )520$& , 441.009 ); % ISSUED FOR ESTIMATE 11 Jul 2011 4 3 2 V-44118779 PROCESS CONDENSATE SEPARATOR E-44118778 FINAL COOLER TUBE 2850.00 kPa-g/65 kPa-a 75 °C/150 °C SS304L ; CHANEL: CS ; TS: CS W/SS304L OVERLAY (SHELL SIDE) NONE/ N/A ET-441013-PAD 2400 mm ID x 5800 mm T/T 3450.00 kPa-g @ 185 °C & 65 kPa-a @ 150 °C CS W/SS304L CLAD H/50 mm ET 10 °C,TO HHLL VT-441009-HJG START-UP NITROGEN RETURN ET 10 50 8"-GI-441009-PAB TO V-44004 D FLARE ET 10 75 20"-FL-441006-PAC TI 349 TT 349 PROCESS GAS (TWO PHASE FLOW) DO NOT POCKET 3/4" PV 376 NC WORKING COPY OF MASTER DRAWING ASBUILT INFORMATION REQUIRED AP 374 FT 377 FE 377 016 XZTE 379 XV 379 SLOPE SLOPE 441-004 441-005 ET 35 88 5134292 ? 14 7 H2 RAW GAS 441.030 11 TI 394 SP 010 5134292 ? H C L RAW H2 TO HMU PSA UNIT HAF HAD 443.003 441 004 ? ? ? NC 441 005 20"-P-441023-HAF TO S-44301 20"-P-441071-HAD FTE 377 TT 372 12111 TT 394 SLOPE 5134292 ? 12" SS 010 3/4" 1" ET 35 88 FC 441.029 12077 S-4A 18 1" ET 35 88 8 443.003 TO E-443003 3/4" FLARE ET 10 75 20"-FL-441013-PAC ET 10 75 20"-FL-441015-PAC CSO RS 6R8 SET@ 3400.00 kPa-g 3/4" 2" 2" RV 375 B 3/4" FLARE ISSUED FOR ESTIMATE 11 Jul 2011 CSO CSO 20" 10" 3/4" ET 10 63 HAF HJG 6R8 RV SET@ 3400.00 kPa-g 375 A V-44118779 CSC 14"-P-441042-HJG HJG PAC ET 10 38 20"-P-441023-HAF 20"-P-441022-HJG FREE DRAINING 016 TP-F HAF E S-4A A/S TP-F HJE (0.4) 004 XYE 379 H2 RAW GAS FROM V-44119 FLUOR SPG s ET 35 75 E E 3/4" (TWO PHASE FLOW) TO E-44106 TC-441XXX H 10"-P-441027-HAF TC 372 PT 376 SS 009 11 ET 35 88 ? ? E R-44006 ? ? CSO ET 35 63 RAW H2 TEMP 8"-P-441082-HAF UAB PAD 6" FROM XS-443001 20"-P-441098-HJE(0.4) 004 ET 10 14"x12" 50 FOB 12"-CWS-440011-UAB AIT 374 RS 12"-CWS-441006-PAD CWS 443 TO V-44118 5242898 ? NC SLOPE NONE ET 10 15 3/4" 20" MOC 11457 443.003 FOR MOC 11457 PROJECT USE ONLY AI 374 14" 2" FROM DISTRIBUTION HEADER CO FLARE REQUEST 20"-P-441094-HJE(0.4) 5242898 ? 3/4" XA 001 4G 13 HAF 20"x10" E-44118778 3/4" 2"-CWS-441003-UAB 14" RSP 5134292 20" FC 377 20"x16" ET 10 38 ET 10 PAB ET 35 HAF 300# PC 376 1" RS 300# MASTER DRAWING AS BUILT INFORMATION REQUIRED 2" 24" ET 10 63 24"x20" 2" 4" 2" 2" PP B FOR SUPPLEMENTARY REVISION HISTORY OF THIS DOCUMENT, REFER TO REVISION LIST 441.0000.000.041.016R. 14"-P-441045-HJG PP FREE DRAINING 4"-PC-441008-PJG 2" 2" 2" 2" 5 HH LTE 373 016 DP E 016 10 LTE 372 LG 372 12 LTE 370 MAG E 017 LL HH LHS 371 TO LC-441371A 2" 2" 2" 2" LLLL=150mm 04/20/11 ISSUED FOR ESTIMATE 4e 03/01/11 ISSUED FOR PHA II 4d 01/11/11 ISSUED FOR CLIENT REVIEW 4c 12/02/10 ISSUED FOR INTERNAL REVIEW 4b 11/04/10 ISSUED FOR INFORMATION 4 09/30/10 AS BUILT PER PROJECT NO 25183 REV ISSUED DATE DESCRIPTION SL BY CKD PRS CS PDP MC APE PEM CLIENT APP FROM P-44101A/B 12 3/4" TUBING HH DO 016 10 E 017 ET 10 50 LL TO P-44101A/B 2" BECHTEL CANADA CO. 4" ET 10 50 ET 10 50 HOT CONDENSATE 4"-PC-441017-PJG FROM V-44108 PIPING AND INSTRUMENT DIAGRAM SCOTFORD UPGRADER EXPANSION 1 UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3 FINAL COOLER & PROC. COND. SEPARATOR SCALE: NONE SHELL DWG NO.: 3 2 A JOB NO. 25183 2"-PC-441020-HJG DO SCOTFORD UPGRADER EXPANSION 1 8"-PC-441003-PJG 3/4" DO SHELL CANADA ENERGY PROCESS CONDENSATE 2" 4 LWJ 2" E TUBING 4f 4"-PC-441013-PJG 2" 2" 5 3/4" ISSUED FOR PHA III PUMP MIN. FLOW ET 10 38 4"x3" 3" 2" 2" 07/11/11 HJG PJG LL 10 LI 371 MAG NLL=1390mm DP LT 371 4g ET 10 50 017 5 E HJG PJG E LG 371 MW 24" 2" LX 370 12 HLL=3250mm 2300 C PX 376 FC TSO HJG PAC NONE ET 10 16" 2" 12"-CWR-441003-PAD 441.030 TO FX-074B 18 HJE (0.4) 20"-P-441093-HJE CSO TO DISTRIBUTION HEADER RAW H2 GAS FLOW 6 3/4" 12"-CWR-441001-UAB MOC 11457 12714 14"x12" ET 10 50 FLOW COMP PHS 376 CSO HJG PAC UAB PAD CWR H TI 357 TT 357 ET 35 ET 10 HAF PAC FROM E-44106A/D FX 377 1.5M MIN 20"-P-441021-HJG D 441.0000.000.041.016 1 REV. 4g 441.016 DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THIK: HEAT TRACE MEDIA/TEMP: TRIM: SIZE: DESIGN PR. & TEMP: MATERIAL: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: 1 . FOR GENERAL NOTES AND LEGEND SEE DWGS 400.0000.000.041.001, 002, 003, 004, 005 AND 006. 2 . ALL INSTRUMENT LOOP AND INTERLOCK NUMBERS SHOWN ON P&ID SHALL HAVE A PREFIX "441" UNLESS OTHERWISE IDENTIFIED ON P&ID. 3 . DELETED. 4 . DELETED. 5 . PROCESS CONDENSATE SEPARATOR HI HI LEVEL SHUTDOWN REQUIRES A 2 OUT OF 3 TRIP. VOTING DONE IN THE SIS. 6 . ACTUATOR SPEED SAME AS XV-441379. 7 . DUAL PLATE CHECK VALVE. 8 . VORTEX FLOW METER TO BE MADE ACCESSIBLE. 9 . DELETED. MOC 11457 10. PROCESS CONIDENSATE SEPARATOR LOW LOW LEVEL SHUTDOWN REQUIRES A 2 OUT OF 3 TRIP. VOTING DONE IN THE SIS. 11. FOR SAMPLE STATION DETAIL REFER TO 440.042. 12. FOR VALVE SIZE AND TYPE REFER TO PIPING STANDARD DRAWING # 400.0311.000.053.012. 13. DUAL STREAMS TO ONE ANALYZER (DUAL BRANCH). SEE P&ID 440.024 FOR ANALYZER DETAILS. 14. XV-441379 IS PROVIDED WITH PARTIAL STROKE TEST DEVICE. 15. SEE P&ID 440.024 FOR ANALYZER DETAILS. 16. DELETED. 17. TIE-IN POINTS- SPG TIE-IN SHOWN AS TP-441-# AND FLUOR QUEST TIE-IN SHOWN AS TP-F-441. 18. CHAIN OPERATOR REQUIRED ON VALVE. FILE:\\F:\1025\DRAWINGS\HMU\441\441.016.pid MODEL DATE:7/6/2011 3:58:03 PM BY:ahm14887 5.72 MW 493.0 m^2 AEU SHELL 3700.00 kPa-g /65 kPa-a 95 °C/150 °C CS W/SS304L CLAD NONE/ N/A ET-441012-HJG RATED DUTY: SURFACE AREA: TEMA TYPE: 1 3 BECHTEL VENDOR 4 H 38 A-44103 INNER ROW BURNERS DESIGN DUTY (EACH): 1.452 MW DESIGN DUTY (EACH): 2.079MW MOC 11457 H 38 VA MOC 11457 NONE ET 10 ROW 1 D 6 PP 12 H 100 ET 10 38 AP-441005 BT 441 A BT 441 B DETAIL "A" PP ET 10 50 A-44102 H NONE FROM PSA OFFGAS & FG 16"-P-441032- TO ATM AT SAFE LOCATION PP 14 14 1 . FOR GENERAL NOTES AND LEGEND SEE DWGS 400.0000.000.041.001, 002, 003, 004, 005 AND 006. 2 . ALL INSTRUMENT LOOP AND INTERLOCK NUMBERS SHOWN ON P&ID SHALL HAVE A PREFIX "441" UNLESS OTHERWISE IDENTIFIED ON P&ID. 3 . DELETED. 4 . DELETED. 5 . OUTER ROW DUTY 70% OF INNER ROWS. 6 . SPECIAL LOCKABLE SINGLE BLADE DAMPER FOR COMBUSTION AIR SUPPLIED BY BURNER VENDOR (TYPICAL). 7 . LOW POINT BLEED. 8 . REFORMER SHUT-DOWN LOGIC REQUIRES 13 OUT OF 27 FLAME SCANNERS TO ACKNOWLEDGE LOSS OF FLAME BEFORE INITIATING A REFORMER TRIP. 9 . REFORMER START-UP PERMISSIVE REQUIRES 23 OUT OF 27 FLAME SCANNERS TO ACKNOWLEDGE A FLAME TO RESET THE REFORMER I-441021 INTERLOCK. 10. DELETED. 11. PIPING UNDER REFORMER VENDOR SCOPE. 12. COMBUSTION AIR SUB-HEADER SIZE REDUCES GRADUALLY FROM 1820 MM TO 300 MM AT THE END OF SUB-HEADER. 13. PLANT AIR SUPPLIED VIA 2"-AU-440025-ULB (SEE P&ID 440.015) TO MANIFOLD NO. M-AU440.015-1 FOR H-44101 FLAME SCANNERS. H 38 18"-P-441033- BT 441 C DETAIL "A" PP DETAIL "A" NONE ET 10 ET 10 63 ROW 2 11 COMBUSTION AIR A-44103 H NONE AP-441004 6 12 H 100 ET 10 38 AP-441006 H 38 18"-P-441034- DETAIL "A" BT 442 B DETAIL "A" BT 442 C PP ROW 3 H NONE A-44103 ET 10 63 SEE P&ID 441.020 PP 12 6 H 100 BT 443 A TG 443 A DETAIL "A" BT 443 B TG 443 B DETAIL "A" BT 443 C A-44103 TG 444 A DETAIL "A" BT 444 B TG 444 B DETAIL "A" BT 444 C TG 444 C REFORMER WALL NONE ET 10 ROW 5 A-44103 H NONE AP-441004 18"-P-441036- BT 444 A BI TG C 13 DETAIL "A" ET 10 38 DETAIL "A" 6 LP BL FLAME OUT PP AP-441008 H 38 BALL TYPICAL DETAIL FOR BURNER MANAGEMENT SYSTEM 12 H 100 E FAULT BT ET 10 63 ROW 4 H NONE H 38 H 150 18"-P-441035- BSE PP TG 443 C NONE ET 10 6 BSL BA 004 AP-441007 H 38 I 021 ET 10 38 DETAIL "A" C 9 8 NONE ET 10 ET 10 38 DETAIL "A" BT 442 A 4"-VA-441010- FROM E-44113 PP D 14. EXISTING BURNER LANCES TO BE REPLACED WITH LANEMARK LOW NOx BURNERS. FOR MOC 11457 PROJECT USE ONLY PP 1G ET 10 63 WORKING COPY OF MASTER DRAWING ASBUILT INFORMATION REQUIRED PP PP 12 H 100 ET 10 38 AP-441009 DETAIL "A" BT 445 A TG 445 A DETAIL "A" BT 445 B TG 445 B DETAIL "A" BT 445 C TG 445 C ISSUED FOR ESTIMATE PP 11 Jul 2011 NONE ET 10 H 38 18"-P-441037- ET 10 63 ROW 6 MASTER DRAWING H NONE A-44103 6 AS BUILT INFORMATION REQUIRED PP B 12 H 100 AP-441010 DETAIL "A" H 38 18"-P-441038- FOR SUPPLEMENTARY REVISION HISTORY OF THIS DOCUMENT, REFER TO REVISION LIST 441.0000.000.041.021R. ET 10 38 BT 446 A TG 446 A DETAIL "A" BT 446 B TG 446 B DETAIL "A" BT 446 C TG 446 C PP NONE ET 10 ROW 7 H NONE A-44103 ET 10 63 PP 12 6 H 100 ET 10 38 AP-441011 DETAIL "A" BT 447 A TG 447 A DETAIL "A" BT 447 B TG 447 B DETAIL "A" BT 447 C TG 447 C 1g 07/11/11 ISSUED FOR PHA III 1f 04/20/11 ISSUED FOR ESTIMATE 1e 03/01/11 ISSUED FOR PHA II 1d 01/11/11 ISSUED FOR CLIENT REVIEW 1c 12/02/10 ISSUED FOR INTERNAL REVIEW 1b 11/04/10 ISSUED FOR INFORMATION 1 07/24/09 ISSUED FOR CONSTRUCTION REV ISSUED DATE DESCRIPTION AB JSJ DM GTS BY CKD PRS CS RE PDP MC APE PH PEM CLIENT APP PP NONE ET 10 H 38 18"-P-441039- ET 10 63 ROW 8 H NONE A-44103 6 PP ET 10 38 12 H 100 AP-441012 DETAIL "A" H 38 16"-P-441040- BT 448 A DETAIL "A" BT 448 B DETAIL "A" NONE ET 10 ROW 9 A-44102 H NONE 6 H 100 SCOTFORD UPGRADER EXPANSION 1 ET 10 50 BECHTEL CANADA CO. PP ET 10 38 REFORMER WALL DETAIL "A" DETAIL "A" BT 449 B DETAIL "A" 3/4" PIPING AND INSTRUMENT DIAGRAM SCOTFORD UPGRADER EXPANSION 1 UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3 PREFORMER BURNER LAYOUT BT 449 C SCALE: NONE SHELL DWG NO.: 4 3 A JOB NO. 25183 7 12 BT 449 A SHELL CANADA ENERGY PP BT 448 C 2 441.0000.000.041.021 1 REV. 1g FILE:\\F:\1025\DRAWINGS\HMU\441\441.021.pid MODEL DATE:7/6/2011 1:44:10 PM BY:ahm14887 36"-P-441001-PAB 5 A-44102 OUTER ROW BURNERS 1 441.021 FUEL REFORMER WALL 2 4 3 S- 18780 HMU PSA SILENCER - I DESIGN PR. & TEMP: MATERIAL: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: 700.00 kPa-g @ 200 °C & @ C.S. H/75 mm ET 27 °C XT- 002-HAB FLARE SIZE: DESIGN PR. & TEMP: MATERIAL: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: 700.00 kPa-g @ 200 °C & @ C.S. H/75 mm ET 27 °C XT- 003-HAB 3810 mm ID x 30000 mm T/T 700.00 kPa-g @ 200 °C & @ C.S. H/75 mm ET 27 °C,BTM HEAD 4 VT- 015-HAB SIZE: RATED FLOW: DESIGN PR. &TEMP: PRESSURE DROP [CLEAN/DIRTY]: PARTICLE RETENTION: MATERIAL: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: 1D2 SET@ 3400.00 kPa-g TO RELIEF INSTRUMENT AIR 3/4" E 441 HMU PSA REMOTE SHUTDOWN HLD PAC HS 101 CSO 016 2"-AU-440024-ULB AI 040 3/4" 441 E UTILITY AIR 3"-FL- 005-PAC CSO 005 2"-GI-440002-ULB FLARE ET 10 38 004 NITROGEN H PDI 397 E FROM FTE-441377 PSA ALARM XA 103 2"-GH- 030-HLD XA 101 PSA SHUTDOWN 443 NONE ET 10 FROM FI-441074 UOP BECHTEL HLD ? 8"x6" 12 FOR MOC 11457 PROJECT USE ONLY SS 012 BECHTEL 11 2" 3G AP 040 S-4A FROM XS-443001 12"-GH- 001-HLD HMU PSA ADSORBER SKID PSA FEED ET 35 88 20"-P-441071-HAD FROM V-44106 20"x14" 9 10 FOB UC 001 WORKING COPY OF MASTER DRAWING ASBUILT INFORMATION REQUIRED HMU PSA PRODUCT H2 12"-GH- 210-HLD 441.016 SS INSIDE OUTSIDE BLDG BLDG 12" 3/4" 10 12" V- 18783 SS 3/4" HOLDS: 2" 13 FOB D R-44006 PDT 397 441.030 H2 N2 CO CO2 AIT 040 2" 003 1 . FOR GENERAL NOTES AND LEGEND SEE DWGS 400.0000.000.041.001, 002, 003, 004, 005, AND 006. 2 . ALL INSTRUMENT LOOP AND INTERLOCK NUMBERS SHOWN ON P&ID SHALL HAVE A PREFIX "443" UNLESS OTHERWISE IDENTIFIED ON P&ID. 3 . ELECTRIC TRACE & INSULATE UP TO 2 METERS INSIDE BUILDING (CUSTOMER SCOPE OF SUPPLY). 4 . OFF GAS DRUM SHOULD HAVE BOTTOM HEAD ELECTRICALLY HEAT TRACED AND SHALL BE INSULATED TO 1.8m ABOVE TANGENT. 5 . OFF SKID INSULATION AND ELECTRIC HEAT TRACING TO BE SUPPLIED AND INSTALLED BY BECHTEL. 6 . INLET RV NOZZLE SHALL HAVE 300# FLANGE RATING. 7 . OFF GAS DRUM INLET AND OUTLET NOZZLES SHALL BE 300# FLANGE RATING. 8 . WHEN THE FLARE HEADER PRESSURE MEASURED BY PT-440028 IS HIGHER THAN HMU OFF GAS INLET PRESSURE, CONTROLLER PC-443161 WILL BE SET TO MANUAL AND OUTPUT 0% TO CLOSE PV-443161. 9 . FOR HMU PSA ADSORBER SKID DETAILS, REFER TO UOP P&ID DRAWING NUMBER 943543-D-102. 10. EQUIPMETN DESIGNED AND SUPPLIED BY UOP. 11. FOR SAMPLE STATION DETAIL REFER TO 440.042. 12. SEE P&ID 440.024 FOR ANALYZER DETAILS. 13. LOGIC CHANGES REQUIRED FOR SWITCHING BETWEEN LEAN AND RICH CO2 CASES. 508 mm ID x 1753 mmT/T 175729.04 m^3/hr 166261.0 nm^3/hr 3400.00 kPa-g @ 150 °C & @ 7.00 kPa/ 5 MICRONS C.S. NONE/ N/A VT- 016-HLD NONE ET 10 HLD PAC RV 032 E 2"-AI-440004-ULB 1 V- 18783 HMU PSA HYDROGEN PRODUCT FILTER ET 10 50 8"-FL- 001-PAC D V- 18782 HMU-PSA OFF GAS DRUM S- 18781 HMU PSA SILENCER - II DESIGN PR. & TEMP: MATERIAL: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP: TRIM: 2 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. MOC 11457 SS NC 12" ? 6 10 ET 27 H 30"-P- 401-HAB RV 129 UOP BECHTEL HAB PAC 3/4" ET 10 63 16"-FL- 018-PAC 3/4" 8T10 SET@ 700.00 kPa-g 6 ET 35 75 FLARE RV 115 CSC OUTSIDE INSIDE BLDG BLDG 16"-FL- 096-PAC CSO FOT 3 FLARE ET 10 63 10 FLARE UOP BECHTEL HAB PAC 16"-FL- 017-PAC CSO FOT PAB PAC PV FC 12" PC 160 ET 10 63 8T10 SET@ 735.00 kPa-g ET 27 ET 10 FOB 2" 16"-P- 041-PAB PV 160 6 L 10 ET 10 FOB 3/4" ET 27 RV 116 BECHTEL UOP PAB HAB 3/4" ET 10 63 CSO 3/4" FLARE 3/4" 16"-FL- 022-PAC 8T10 SET@ 700.00 kPa-g FROM PC-443160 C BECHTEL UOP PAB HAB BECHTEL BECHTEL UOP PAB HAB 14"-P- 020-HAD UOP BECHTEL HAB PAC FOT ISSUED FOR ESTIMATE 11 Jul 2011 CSO MASTER DRAWING 3/4" AS BUILT INFORMATION REQUIRED 3/4" 3/4" CSO MIN B ET 35 HAD ET 27 HAB 8 5 10 ET 27 88 S- 18781 30"-P- 401-HAB 5 006 ET 27 88 10 HAB PAB UOP BECHTEL V- 18782 SP. 30"-P- 011-HAB ET 27 88 30" 7 UOP ET 27 88 ET 27 ET 10 3g 07/11/11 ISSUED FOR PHA III 3f 04/20/11 ISSUED FOR ESTIMATE 3e 03/01/11 ISSUED DOR PHA II 3d 01/11/11 ISSUED FOR CLIENT REVIEW 3c 10/02/10 ISSUED FOR INTERNAL REVIEW 3b 10/04/10 ISSUED FOR INFORMATION 3 07/24/09 ISSUED FOR CONSTRUCTION REV ISSUED DATE DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT APP PSA OFF GAS 36"-P- 001-PAB 30" 2" HIGH POINT VENT XXXXXXX ? BECHTEL UOP BECHTEL PT 160 36" 10 24" MW S- 18780 PT 161 16"-P- 022-PAB 16"-P- 019-PAB 30"-P- 402-HAB TSO ET 27 75 ET 27 88 PHS 161 ET 27 75 006 24"-P- 128-HAB 2" 3/4" 16"-P- 012-PAB SP. 30"-P- 017-HAB FC 16" PV ET 27 75 ET 27 88 MIN. BECHTEL SHELL CANADA ENERGY 4 SCOTFORD UPGRADER EXPANSION 1 2450 FROM PT-440028 PAB H MIN PC 161 PAB PAC PV 161 PAC PX 161 FOR SUPPLEMENTARY REVISION HISTORY OF THIS DOCUMENT, REFER TO REVISION LIST 443.0000.000.041.003R. 2" BECHTEL CANADA CO. XXXXXXX ? A JOB NO. 25183 PIPING AND INSTRUMENT DIAGRAM SCOTFORD UPGRADER EXPANSION 1 UNIT 443 - HMU PSA OFFGAS & H2 FEED/PRODUCT HMU PSA OFFGAS & H2 FEED/PRODUCT SCALE: NONE SHELL DWG NO.: 4 3 2 443.0000.000.041.003 1 REV. 3g 443.003 C HAB FILE:\\F:\1025\DRAWINGS\HMU\443\443.003.pid MODEL DATE:7/6/2011 1:47:59 PM BY:ahm14887 ?