SECTION 00 0110
TABLE OF CONTENTS
Bid Issuance # 2
VOLUME 1 OF 2
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0107 - Seals and Signatures
00 0110 - Table of Contents
00 7200- General Conditions
00 7300 - Supplementary Conditions
Division 00 Front End Documents will be sent separately to Bidders by the Construction Manager:
DIVISION 01 - GENERAL REQUIREMENTS
01 1000 - Summary
01 1150 - Contract Responsibilities
01 2000 - Price and payment procedures
01 3000 - Administrative Requirements
01 3113- Project Management and Coordination
01 3250 - Construction Progress Schedule
01 4000 - Quality Requirements
01 4338 - Project Site Mock-ups.
01 6000 - Product Requirements
01 6001 - Substitution Request Form
01 7000 - Execution and Closeout Requirements
01 7800 - Closeout Submittals
DIVISION 02 -- EXISTING CONDITIONS (NOT USED)
DIVISION 03 – CONCRETE
03 3000 - Cast-in-Place Concrete
03 4100 - Precast Structural Concrete (Bid issuance #1)
03 4500 - Precast Architectural Concrete (Bid Issuance #1)
DIVISION 04 – MASONRY
04 2000 – Unit Masonry
04 2714 – Thin Brick Veneer Masonry
DIVISION 05 -- METALS
05 1200 - Structural Steel Framing (Bid Issuance #1)
05 3100 – Steel Decking (Bid Issuance #1)
05 4000 – Cold Form metal Framing
05 5000 – Metal Fabrications
05 5100 - Metal Stairs
05 5133 - Alternating Tread Steel Stairs
Staybridge Suites
Project # 14019
201 East Locust
Des Moines, Iowa
Bid Issuance # 2
00 01 10
TABLE OF CONTENTS
Page 1 of 6
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 1000 - Rough Carpentry
06 4100 - Architectural Wood Casework.
06 8216 – Glass Reinforced Polyester panels.
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 1300 - Sheet Waterproofing (Bid Issuance #1)
07 2100 - Thermal Insulation
07 2500 - Weather Barriers
07 2700 – Under-Slab Vapor Retarder
07 4220 - Metal Wall Panels
07 5300 - Elastomeric Membrane Roofing
07 6200 - Sheet Metal Flashing and Trim
07 7200 - Roof Hatches
07 8100 - Applied Fireproofing
07 8400 – Firestopping
07 9005 – Joint Sealers
DIVISION 08 – OPENINGS
08 1113 - Hollow Metal Doors and Frames
08 1416 - Flush Wood Doors
08 3100 – Access Doors and Panels
08 4229 – Sliding Automatic Entrances
08 4313 - Aluminum Framed Storefronts and Window Walls.
08 5113 - Aluminum Windows
08 7100 - Door Hardware
08 7113 – Automatic Door Operators
08 7200 – Guestroom Locking Systems
08 7913 - Fire Department Key Boxes
08 8000 - Glazing
08 8300 – Mirrors
08 9119 – Fixed Louvers
DIVISION 09 – FINISHES
09 2116 - Gypsum Board Assemblies
09 3000 - Tiling
09 5100 - Acoustical Ceilings
09 6500 - Resilient Flooring
09 6800 - Carpeting
09 7200 – Wall Coverings
09 9000 – Paints and Coatings
09 9616 – Specialty Ceiling Coatings
09 9600 - High Performance Coating
Staybridge Suites
Project # 14019
201 East Locust
Des Moines, Iowa
Bid Issuance # 2
00 01 10
TABLE OF CONTENTS
Page 2 of 6
DIVISION 10 – SPECIALTIES
10 2601 - Corner Guards
10 2800 - Toilet, Bath, Accessories
10 3100 – Manufactured Gas Fireplaces
10 4400 - Fire Protection Specialties
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS
12 2113 - Horizontal Louver Blinds
12 4813 - Entrance Floor Mats and Frames
DIVISION 13 -- SPECIAL CONSTRUCTION
13 1110 - Swimming Pools
DIVISION 14 -- CONVEYING EQUIPMENT
14 2100 - Passenger Elevators
14 9133 - Laundry and Linen Chutes
VOLUME 2 OF 2
DIVISION 16 – ELECTRICAL
Section 16010 General Requirements – Electrical
Section 16050 Basic Electrical Materials and Methods
Section 16111 Conduit
Section 16120 Wires and Cables
Section 16130 Pull & Junction Boxes, Wireways & Gutters
Section 16132 Floor Boxes
Section 16134 Outlet Boxes
Section 16141 Wall Switches
Section 16145 Receptacles
Section 16147 Plate Covers
Section 16155 Main Panelboard
Section 16160 Panelboards
Section 16170 Disconnect Switches
Section 16181 Fuses
Section 16190 Supporting Devices
Section 16402 Underground Electric Service
Section 16430 Metering
Staybridge Suites
201 East Locust
Des Moines, Iowa
Project # 14019
Bid Issuance # 2
00 01 10
TABLE OF CONTENTS
Page 3 of 6
Section 16450 Grounding
Section 16501 Lamps
Section 16502 Ballasts and Accessories
Section 16510 Interior Building Lighting
Section 16520 Exterior Lighting
Section 16580 Lighting Accessories
Section 16720 CCTV System
Section 16721 Fire Alarm System
Section 16722 Carbon Monoxide Detection System
Section 16741 Telephone Raceway System
Section 16743 Wireless Network
Section 16921 Miscellaneous Mechanical Equipment
DIVISION 17 – LOW VOLTAGE CABLE
Section 17010 Voice/Data/Video Cabling System
APPENDIX – IHG STANDARDS
Section A1 IHG Cabling Guidelines
Section A2 IHG Technical Specifications for High-Speed Internet
Access for compliance with all IHG brand standards
DIVISION 21 -- FIRE SUPPRESSION
Section 21 05 00 - Common Work Results For Fire Suppression
Section 21 10 00 - Fire Suppression Systems
DIVISION 22 – PLUMBING
Section 22 05 00 - Common Work Results For Plumbing
Section 22 05 19 - Meters And Gauges For Plumbing Piping
Section 22 05 23 - General Duty Valves For Plumbing Piping
Section 22 05 29 - Hangers And Supports For Plumbing Piping And Equipment
Section 22 05 53 - Identification For Plumbing Piping And Equipment
Section 22 07 00 - Plumbing Insulation
Section 22 11 16 - Domestic Water Piping
Section 22 11 23 - Domestic Water Pumps
Section 22 13 16 - Sanitary Waste And Vent Piping
Section 22 30 00 - Plumbing Equipment
Section 22 31 00 - Domestic Water Softeners
Section 22 34 00 - Fuel-Fired, Domestic Water Heaters
Section 22 40 00 - Plumbing Fixtures
Staybridge Suites
201 East Locust
Des Moines, Iowa
Project # 14019
Bid Issuance # 2
00 01 10
TABLE OF CONTENTS
Page 4 of 6
DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
Section 23 05 00- Common Work Results For HVAC
Section 23 05 53 - Identification For HVAC Piping And Equipment
Section 23 05 93 - Testing, Adjusting, And Balancing For HVAC
Section 23 07 00 - HVAC Insulation
Section 23 09 00 - Instrumentation And Control For HVAC
Section 23 09 93 - Sequence Of Operations For HVAC Controls
Section 23 11 23 - Facility Natural-Gas Piping
Section 23 23 00 - Refrigerant Piping
Section 23 31 13 - Metal Ducts
Section 23 33 00 - Air Duct Accessories
Section 23 34 23 - HVAC Power Ventilators
Section 23 37 00 - Air Outlets And Inlets
Section 23 41 00 - Particulate Air Filtration
Section 23 81 00 - Variable Capacity Heat Pump
Section 23 81 13.- Packaged Terminal Air-Conditioning Units
Section 23 81 26 - Split-System Air-Conditioners
Section 23 82 16 - Air Coils
DIVISION 26 – ELECTRICAL (See “Division 16” for this division.)
DIVISION 27 -- COMMUNICATIONS (See “Division 17” for this division.)
DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY (NOT USED)
DIVISION 31 – EARTHWORK
31 6330 – Auger Cast Piles (Bid Issuance #1)
DIVISION 32 -- EXTERIOR IMPROVEMENTS
DIVISION 33 -- UTILITIES
END OF TABLE OF CONTENTS 14019
Staybridge Suites
201 East Locust
Des Moines, Iowa
Project # 14019
Bid Issuance # 2
00 01 10
TABLE OF CONTENTS
Page 5 of 6
Download