PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT

advertisement
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
TABLE G1 – SAINT JOHNS REST AREA MAJOR EQUIPMENT LIST
Model Number
Description
M87-024-05007-R23AALV
Exide Battery 23" rack mount
1
BACSKIT_B_III
BACS Webmanager Budget III
1
BACS_MNT_II
BACS Webmanager Mounting Kit
1
BACSC40
BACS C40 modules with temperature
sensor
24
BC4B-xxxxx
BACS measuring cables
24
B2BCRJx
BACS bus cables
*
LPSM002
2-pole Littelfuse Power-Safe LPSM CH
series Midget Fuse Holder
1
BACS_CS500 DC CT
BACS Current Sensor
1
TCL 024-112DC
TracoPower DC/DC Converter
1
ZB24540
Atlantic Scientific Ethernet SPD
2
Vendor Specify
23” DIN Rail to Mount BACS Battery
Management System
1
Vendor Specify
5A Fuse
2
Vendor Specify
Blue jacketed CAT5 Ethernet Cable
*
Vendor Specify
Battery Shield
1
Vendor Specify
Cable Management System
*
QTY.
* Assorted as needed
Page G4 of 8
500VA
UPS
MACBS
(North),
47 MHz,
RWIS
-48 VDC
Distribution
Rack
Channel Bank
Rack
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
Astron
RS-20A
Battery
Cabinet
DVM6-45XL
Radio
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
SAINT JOHNS REST AREA (2-2526)
SHELTER FLOOR PLAN
0
SCALE:
1/2" = 1'-0"
SEAN KANE
5/10/2007
MACBS
(South)
United Water
FILE PATH:
FIGURE
C:\Users\kntfisk\AppData\Local\Temp\Zeon511109788.vsd 10/26/15
G1
PAGE
G5 OF 8
Empty
2-Pole Fuse Block
Empty
Empty
Empty
DC/DC Converter
Ethernet SPD
BACS WebManager
DIN Rail
BACS DC Current Sensor
Negative Terminal
1
+
8
9
16
17
Positive Terminal
24
Absolyte GNB 6 Cells
2
7
10
15
18
23
Absolyte GNB 6 Cells
3
6
11
14
19
22
Absolyte GNB 6 Cells
4
5
12
13
20
21
Absolyte GNB 6 Cells
To be installed as
part of this project
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
SAINT JOHNS REST AREA (2-2526)
-48 VDC POWER DISTRIBUTION RACK
0
SCALE:
1 1/4" = 1'-0"
SEAN KANE
4/1/2011
FILE PATH:
FIGURE
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON511127338.VSD
G2
PAGE
G6 OF 8
VENDOR SHALL
REMOVE DC-DC
CONVERTER
VENDOR SHALL
INSTALL NEW
BATTERY IN
EXISTING RACK
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
8.5"X11"
LAST DATE EDITED
DRAWING TITLE
10/23/2015
SEAN KANE
FILE PATH:
SCALE:
N/A
REV
SAINT JOHNS REST AREA (2-2526)
BATTERY PLANT
FIGURE
0
T:\PUBLIC\ITS\TELECOMMUNICATIONS\FACILITIES\BATTERYPLANT_PHASEIV\
APPENDICIES\G_SAINTJOHNSRESTAREA\
FIG_G3_STJOHNS_BATTERYPLANT_20151022.VSD
G3
PAGE
G7 OF 8
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
SAINT JOHNS REST AREA (2-2526)
EXTERIOR ENTRANCE
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON511181611.VSD
G4
PAGE
G8 OF 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix H – SR 16
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix H – Table of Contents – Tables and Figures
Table H1 – SR 16 Major Equipment List .................................................................. H4 of 8
Figure H1 – SR 16 Shelter Floor Plan ...................................................................... H5 of 8
Figure H2 – SR 16 -48 VDC Power Distribution Rack .............................................. H6 of 8
Figure H3 – SR 16 Battery Plant Photo.................................................................... H7 of 8
Figure H4 – SR 16 Exterior Entrance Photo............................................................. H8 of 8
Page H2 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
SR 16 Site Requirements
The Vendor shall furnish and install the following equipment at the SR 16 site located at the
Northwest quadrant of I-95 and SR 16 (Exit 318) in Saint Augustine, FL.
Latitude: 29-55-1.51 N
Longitude: 81-24-44.74 W
A. One Exide Absolyte GP series battery plant model number M87-024-05007-R23AALV shall
be installed in accordance with this Appendix and Section 2.2 of this Technical Specification.
The new battery plant shall be installed in the same location as the removed battery plant.
The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable shall
be used for -48 VDC connections and black jacketed cable shall be used for return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Technical Specification. The Vendor is responsible for
removing and properly disposing the DC-DC Converter in the distribution rack to make room
for the Generex BACS battery management system. The Vendor shall mount a 23” DIN rail
on the distribution rack. The Vendor is responsible for all mounting hardware.
IP Address: 172.16.146.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.146.19
Page H3 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
TABLE H1 – SR 16 MAJOR EQUIPMENT LIST
Model Number
Description
M87-024-05007-R23AALV
Exide Battery 23" rack mount
1
BACSKIT_B_III
BACS Webmanager Budget III
1
BACS_MNT_II
BACS Webmanager Mounting Kit
1
BACSC40
BACS C40 modules with temperature
sensor
24
BC4B-xxxxx
BACS measuring cables
24
B2BCRJx
BACS bus cables
*
LPSM002
2-pole Littelfuse Power-Safe LPSM CH
series Midget Fuse Holder
1
BACS_CS500 DC CT
BACS Current Sensor
1
TCL 024-112DC
TracoPower DC/DC Converter
1
ZB24540
Atlantic Scientific Ethernet SPD
2
Vendor Specify
23” DIN Rail to Mount BACS Battery
Management System
1
Vendor Specify
5A Fuse
2
Vendor Specify
Blue jacketed CAT5 Ethernet Cable
*
Vendor Specify
Battery Shield
1
Vendor Specify
Cable Management System
*
QTY.
* Assorted as needed
Page H4 of 8
MW
Repeater
Radio Rack
AK1
MW
Channel
Banks Rack
AK2
MAS
Call Box
Base Station
Rack
RWIS/
iFlorida
SWCM
Rack
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
SR 16 (2-2528)
SHELTER FLOOR PLAN
0
SCALE:
1/2" = 1'-0"
SEAN KANE
5/10/2007
-48 VDC
Distribution
Rack
FILE PATH:
FIGURE
C:\Users\kntfisk\AppData\Local\Temp\Zeon511210377.vsd 10/26/15
H1
PAGE
H5 OF 8
Empty
2-Pole Fuse Block
Empty
Empty
Empty
DC/DC Converter
Ethernet SPD
BACS WebManager
DIN Rail
BACS DC Current Sensor
Negative Terminal
1
+
8
9
16
17
Positive Terminal
24
Absolyte GNB 6 Cells
2
7
10
15
18
23
Absolyte GNB 6 Cells
3
6
11
14
19
22
Absolyte GNB 6 Cells
4
5
12
13
20
21
Absolyte GNB 6 Cells
To be installed as
part of this project
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
SR 16 (2-2528)
-48 VDC POWER DISTRIBUTION RACK
0
SCALE:
1 1/4" = 1'-0"
SEAN KANE
4/1/2011
FILE PATH:
FIGURE
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON511224698.VSD
H2
PAGE
H6 OF 8
VENDOR SHALL
REMOVE DC-DC
CONVERTER
VENDOR SHALL
INSTALL NEW
BATTERY IN
EXISTING RACK
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
SR 16 (2-2528)
BATTERY PLANT
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON511239752.VSD
H3
PAGE
H7 OF 8
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
8.5"X11"
LAST DATE EDITED
DRAWING TITLE
10/23/2015
SEAN KANE
FILE PATH:
SCALE:
N/A
REV
SR 16 (2-2528)
EXTERIOR ENTRANCE
FIGURE
0
T:\PUBLIC\ITS\TELECOMMUNICATIONS\FACILITIES\BATTERYPLANT_PHASEIV\
APPENDICIES\H_SR16\FIG_H4_SR16_EXTERIORENTRANCE_20151022.VSD
H4
PAGE
H8 OF 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix I – Gopher Ridge
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix I – Table of Contents – Tables and Figures
Table I1 – Gopher Ridge Major Equipment List........................................................ I4 of 8
Figure I1 – Gopher Ridge Shelter Floor Plan ........................................................... I5 of 8
Figure I2 – Gopher Ridge -48 VDC Power Distribution Rack.................................... I6 of 8
Figure I3 – Gopher Ridge Battery Plant Photo ......................................................... I7 of 8
Figure I4 – Gopher Ridge Exterior Entrance Photo .................................................. I8 of 8
Page I2 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Gopher Ridge Site Requirements
The Vendor shall furnish and install the following equipment at the Gopher Ridge site located at
the Northeast quadrant of I-95 and US 1 (Exit 298) in Saint Augustine, FL.
Latitude: 29-39-44.84 N
Longitude: 81-17-12.57 W
A. One Exide Absolyte GP series battery plant model number M87-024-05007-R23AALV shall
be installed in accordance with this Appendix and Section 2.2 of this Technical Specification.
The new battery plant shall be installed in the same location as the removed battery plant.
The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable shall
be used for -48 VDC connections and black jacketed cable shall be used for return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Technical Specification. The Vendor is responsible for
removing and properly disposing the DC-DC Converter in the distribution rack to make room
for the Generex BACS battery management system. The Vendor shall mount a 23” DIN rail
on the distribution rack. The Vendor is responsible for all mounting hardware.
IP Address: 172.16.144.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.144.19
Page I3 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
TABLE I1 – GOPHER RIDGE MAJOR EQUIPMENT LIST
Model Number
Description
M87-024-05007-R23AALV
Exide Battery 23" rack mount
1
BACSKIT_B_III
BACS Webmanager Budget III
1
BACS_MNT_II
BACS Webmanager Mounting Kit
1
BACSC40
BACS C40 modules with temperature
sensor
24
BC4B-xxxxx
BACS measuring cables
24
B2BCRJx
BACS bus cables
*
LPSM002
2-pole Littelfuse Power-Safe LPSM CH
series Midget Fuse Holder
1
BACS_CS500 DC CT
BACS Current Sensor
1
TCL 024-112DC
TracoPower DC/DC Converter
1
ZB24540
Atlantic Scientific Ethernet SPD
2
Vendor Specify
23” DIN Rail to Mount BACS Battery
Management System
1
Vendor Specify
5A Fuse
2
Vendor Specify
Blue jacketed CAT5 Ethernet Cable
*
Vendor Specify
Battery Shield
1
Vendor Specify
Cable Management System
*
QTY.
* Assorted as needed
Page I4 of 8
DVM6-45 MW
Repeater
Rack (AL1)
Channel
Bank
Rack
MAS
Call Box
Base Station
Rack
RWIS/
iFlorida
SWCM
Rack
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
GOPHER RIDGE (2-2530)
SHELTER FLOOR PLAN
0
SCALE:
1/2" = 1'-0"
SEAN KANE
5/10/2007
-48 VDC
Distribution
Rack
FILE PATH:
FIGURE
C:\Users\kntfisk\AppData\Local\Temp\Zeon511485579.vsd 10/26/15
I1
PAGE
I5 OF 8
Empty
2-Pole Fuse Block
Empty
Empty
Empty
DC/DC Converter
Ethernet SPD
BACS WebManager
DIN Rail
BACS DC Current Sensor
Negative Terminal
1
+
8
9
16
17
Positive Terminal
24
Absolyte GNB 6 Cells
2
7
10
15
18
23
Absolyte GNB 6 Cells
3
6
11
14
19
22
Absolyte GNB 6 Cells
4
5
12
13
20
21
Absolyte GNB 6 Cells
To be installed as
part of this project
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
GOPHER RIDGE (2-2530)
-48 VDC POWER DISTRIBUTION RACK
0
SCALE:
1 1/4" = 1'-0"
SEAN KANE
4/1/2011
FILE PATH:
FIGURE
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON512844878.VSD
I2
PAGE
I6 OF 8
VENDOR SHALL
REMOVE DC-DC
CONVERTER
VENDOR SHALL
INSTALL NEW
BATTERY IN
EXISTING RACK
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
GOPHER RIDGE (2-2530)
SHELTER FLOOR PLAN
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON512865298.VSD
I3
PAGE
I7 OF 8
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
8.5"X11"
LAST DATE EDITED
DRAWING TITLE
10/23/2015
SEAN KANE
FILE PATH:
SCALE:
N/A
REV
GOPHER RIDGE (2-2530)
EXTERIOR ENTRANCE
FIGURE
0
T:\PUBLIC\ITS\TELECOMMUNICATIONS\FACILITIES\BATTERYPLANT_PHASEIV\
APPENDICIES\I_GOPHERRIDGE\
FIG_I4_GOPHERRIDGE_EXTERIORENTRANCE_20151022.VSD
I4
PAGE
I8 OF 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix J – US 1 Weigh Station
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix J – Table of Contents – Tables and Figures
Table J1 – US 1 Weigh Station Major Equipment List .............................................. J4 of 8
Figure J1 – US 1 Weigh Station Shelter Floor Plan.................................................. J5 of 8
Figure J2 – US 1 Weigh Station -48 VDC Power Distribution Rack .......................... J6 of 8
Figure J3 – US 1 Weigh Station Battery Plant Photo................................................ J7 of 8
Figure J4 – US 1 Weigh Station Exterior Entrance Photo......................................... J8 of 8
Page J2 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
US 1 Weigh Station Site Requirements
The Vendor shall furnish and install the following equipment at the US 1 Weigh Station site
located across from the weigh station on N. US Highway 1 in Bunnell, FL.
Latitude: 29-33-38.62 N
Longitude: 81-16-6.64 W
A. One Exide Absolyte GP series battery plant model number M87-024-05007-R23AALV shall
be installed in accordance with this Appendix and Section 2.2 of this Technical Specification.
The new battery plant shall be installed in the same location as the removed battery plant.
The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable shall
be used for -48 VDC connections and black jacketed cable shall be used for return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Technical Specification. The Vendor is responsible for
removing and properly disposing the DC-DC Converter in the distribution rack to make room
for the Generex BACS battery management system. The Vendor shall mount a 23” DIN rail
on the distribution rack. The Vendor is responsible for all mounting hardware.
IP Address: 172.16.142.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.142.19
Page J3 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
TABLE J1 – US 1 WEIGH STATION MAJOR EQUIPMENT LIST
Model Number
Description
M87-024-05007-R23AALV
Exide Battery 23" rack mount
1
BACSKIT_B_III
BACS Webmanager Budget III
1
BACS_MNT_II
BACS Webmanager Mounting Kit
1
BACSC40
BACS C40 modules with temperature
sensor
24
BC4B-xxxxx
BACS measuring cables
24
B2BCRJx
BACS bus cables
*
LPSM002
2-pole Littelfuse Power-Safe LPSM CH
series Midget Fuse Holder
1
BACS_CS500 DC CT
BACS Current Sensor
1
TCL 024-112DC
TracoPower DC/DC Converter
1
ZB24540
Atlantic Scientific Ethernet SPD
2
Vendor Specify
23” DIN Rail to Mount BACS Battery
Management System
1
Vendor Specify
5A Fuse
2
Vendor Specify
Blue jacketed CAT5 Ethernet Cable
*
Vendor Specify
Battery Shield
1
Vendor Specify
Cable Management System
*
QTY.
* Assorted as needed
Page J4 of 8
MAS
Call Box
Base Station
Rack
-48 VDC
Distribution
Rack
Channel
Bank
Rack
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
US 1 WEIGH STTAION (5-5921)
SHELTER FLOOR PLAN
0
SCALE:
1/2" = 1'-0"
SEAN KANE
5/10/2007
DVM6-45 MW
Repeater
Rack (AL1)
FILE PATH:
FIGURE
C:\Users\kntfisk\AppData\Local\Temp\Zeon512979164.vsd 10/26/15
J1
PAGE
J5 OF 8
Empty
2-Pole Fuse Block
Empty
Empty
Empty
DC/DC Converter
Ethernet SPD
BACS WebManager
DIN Rail
BACS DC Current Sensor
Negative Terminal
1
+
8
9
16
17
Positive Terminal
24
Absolyte GNB 6 Cells
2
7
10
15
18
23
Absolyte GNB 6 Cells
3
6
11
14
19
22
Absolyte GNB 6 Cells
4
5
12
13
20
21
Absolyte GNB 6 Cells
To be installed as
part of this project
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
US 1 WEIGH STATION (5-5921)
-48 VDC POWER DISTRIBUTION RACK
0
SCALE:
1 1/4" = 1'-0"
SEAN KANE
4/1/2011
FILE PATH:
FIGURE
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513000115.VSD
J2
PAGE
J6 OF 8
VENDOR SHALL
REMOVE DC-DC
CONVERTER
VENDOR SHALL
INSTALL NEW
BATTERY IN
EXISTING RACK
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
US 1 WEIGH STATION (5-5921)
BATTERY PLANT
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513014279.VSD
J3
PAGE
J7 OF 8
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
US 1 WEIGH STATION (5-5921)
EXTERIOR ENTRANCE
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513020317.VSD
J4
PAGE
J8 OF 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix K – Ormond Beach
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix K – Table of Contents – Tables and Figures
Table K1 – Ormond Beach Major Equipment List..................................................... K4 of 8
Figure K1 – Ormond Beach Shelter Floor Plan ........................................................ K5 of 8
Figure K2 – Ormond Beach -48 VDC Power Distribution Rack ................................ K6 of 8
Figure K3 – Ormond Beach Battery Plant Photo ...................................................... K7 of 8
Figure K4 – Ormond Beach Exterior Entrance Photo ............................................... K8 of 8
Page K2 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Ormond Beach Site Requirements
The Vendor shall furnish and install the following equipment at the Ormond Beach site located
at the East quadrant of I-95 and US 1 (Exit 278) in Ormond Beach, FL.
Latitude: 29-20-11.29 N
Longitude: 81-07-49.57 W
A. One Exide Absolyte GP series battery plant model number M87-024-05007-R23AALV shall
be installed in accordance with this Appendix and Section 2.2 of this Technical Specification.
The new battery plant shall be installed in the same location as the removed battery plant.
The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable shall
be used for -48 VDC connections and black jacketed cable shall be used for return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Technical Specification. The Vendor is responsible for
removing and properly disposing the DC-DC Converter in the distribution rack to make room
for the Generex BACS battery management system. The Vendor shall mount a 23” DIN rail
on the distribution rack. The Vendor is responsible for all mounting hardware.
IP Address: 172.16.140.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.140.19
Page K3 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
TABLE K1 – ORMOND BEACH MAJOR EQUIPMENT LIST
Model Number
Description
M87-024-05007-R23AALV
Exide Battery 23" rack mount
1
BACSKIT_B_III
BACS Webmanager Budget III
1
BACS_MNT_II
BACS Webmanager Mounting Kit
1
BACSC40
BACS C40 modules with temperature
sensor
24
BC4B-xxxxx
BACS measuring cables
24
B2BCRJx
BACS bus cables
*
LPSM002
2-pole Littelfuse Power-Safe LPSM CH
series Midget Fuse Holder
1
BACS_CS500 DC CT
BACS Current Sensor
1
TCL 024-112DC
TracoPower DC/DC Converter
1
ZB24540
Atlantic Scientific Ethernet SPD
2
Vendor Specify
23” DIN Rail to Mount BACS Battery
Management System
1
Vendor Specify
5A Fuse
2
Vendor Specify
Blue jacketed CAT5 Ethernet Cable
*
Vendor Specify
Battery Shield
1
Vendor Specify
Cable Management System
*
QTY.
* Assorted as needed
Page K4 of 8
iFlorida
(RWIS)
-48 VDC
Distribution
Rack
(DASH IV)
Channel
Bank Rack
(AP2)
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
DVM6-45
MW
Repeater
Rack (AP1)
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
ORMOND BEACH (5-5923)
SHELTER FLOOR PLAN
0
SCALE:
1/2" = 1'-0"
SEAN KANE
5/10/2007
MAS Call
Box Base
Station
Rack
FILE PATH:
FIGURE
C:\Users\kntfisk\AppData\Local\Temp\Zeon513057351.vsd 10/26/15
K1
PAGE
K5 OF 8
Empty
2-Pole Fuse Block
Empty
Empty
Empty
DC/DC Converter
Ethernet SPD
BACS WebManager
DIN Rail
BACS DC Current Sensor
Negative Terminal
1
+
8
9
16
17
Positive Terminal
24
Absolyte GNB 6 Cells
2
7
10
15
18
23
Absolyte GNB 6 Cells
3
6
11
14
19
22
Absolyte GNB 6 Cells
4
5
12
13
20
21
Absolyte GNB 6 Cells
To be installed as
part of this project
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
ORMOND BEACH (5-5923)
-48 VDC POWER DISTRIBUTION RACK
0
SCALE:
1 1/4" = 1'-0"
SEAN KANE
4/1/2011
FILE PATH:
FIGURE
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513073544.VSD
K2
PAGE
K6 OF 8
VENDOR SHALL
REMOVE DC-DC
CONVERTER
VENDOR SHALL
INSTALL NEW
BATTERY IN
EXISTING RACK
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
8.5"X11"
LAST DATE EDITED
DRAWING TITLE
10/23/2015
SEAN KANE
FILE PATH:
SCALE:
N/A
REV
ORMOND BEACH (5-5923)
BATTERY PLANT
FIGURE
0
T:\PUBLIC\ITS\TELECOMMUNICATIONS\FACILITIES\BATTERYPLANT_PHASEIV\
APPENDICIES\K_ORMONDBEACH\
FIG_K3_ORMONDBEACH_BATTERYPLANT_20151022.VSD
K3
PAGE
K7 OF 8
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
ORMOND BEACH (5-5923)
EXTERIOR ENTRANCE
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513140547.VSD
K4
PAGE
K8 OF 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix L – Deland DOT
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix L – Table of Contents – Tables and Figures
Table L1 – Deland DOT Major Equipment List ......................................................... L4 of 8
Figure L1 – Deland DOT Shelter Floor Plan............................................................. L5 of 8
Figure L2 – Deland DOT -48 VDC Power Distribution Rack ..................................... L6 of 8
Figure L3 – Deland DOT Battery Plant Photo........................................................... L7 of 8
Figure L4 – Deland DOT Exterior Entrance Photo.................................................... L8 of 8
Page L2 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Deland DOT Site Requirements
The Vendor shall furnish and install the following equipment at the Deland DOT site located at
719 S. Woodland Blvd. in Deland, FL.
Latitude: 29-01-0.40 N
Longitude: 81-18-9.36 W
A. One Exide Absolyte GP series battery plant model number M87-024-05007-R23AALV shall
be installed in accordance with this Appendix and Section 2.2 of this Technical Specification.
The new battery plant shall be installed in the same location as the removed battery plant.
The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable shall
be used for -48 VDC connections and black jacketed cable shall be used for return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Technical Specification. The Vendor is responsible for
removing and properly disposing the DC-DC Converter in the distribution rack to make room
for the Generex BACS battery management system. The Vendor shall mount a 23” DIN rail
on the distribution rack. The Vendor is responsible for all mounting hardware.
IP Address: 172.16.136.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.136.19
Page L3 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
TABLE L1 – DELAND DOT MAJOR EQUIPMENT LIST
Model Number
Description
M87-024-05007-R23AALV
Exide Battery 23" rack mount
1
BACSKIT_B_III
BACS Webmanager Budget III
1
BACS_MNT_II
BACS Webmanager Mounting Kit
1
BACSC40
BACS C40 modules with temperature
sensor
24
BC4B-xxxxx
BACS measuring cables
24
B2BCRJx
BACS bus cables
*
LPSM002
2-pole Littelfuse Power-Safe LPSM CH
series Midget Fuse Holder
1
BACS_CS500 DC CT
BACS Current Sensor
1
TCL 024-112DC
TracoPower DC/DC Converter
1
ZB24540
Atlantic Scientific Ethernet SPD
2
Vendor Specify
23” DIN Rail to Mount BACS Battery
Management System
1
Vendor Specify
5A Fuse
2
Vendor Specify
Blue jacketed CAT5 Ethernet Cable
*
Vendor Specify
Battery Shield
1
Vendor Specify
Cable Management System
*
QTY.
* Assorted as needed
Page L4 of 8
Generator Room
MW Repeater
Rack
-48 VDC
Distribution
Rack
Empty Rack
Channel Bank
Rack
MACBS Rack
GE MASTR II
GE MASTR II
?
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
DELAND DOT (5-5939)
SHELTER FLOOR PLAN
0
SCALE:
1/2" = 1'-0"
SEAN KANE
5/10/2007
FILE PATH:
FIGURE
C:\Users\kntfisk\AppData\Local\Temp\Zeon513186739.vsd 10/26/15
L1
PAGE
L5 OF 8
Empty
2-Pole Fuse Block
Empty
Empty
Empty
DC/DC Converter
Ethernet SPD
BACS WebManager
DIN Rail
BACS DC Current Sensor
Negative Terminal
1
+
8
9
16
17
Positive Terminal
24
Absolyte GNB 6 Cells
2
7
10
15
18
23
Absolyte GNB 6 Cells
3
6
11
14
19
22
Absolyte GNB 6 Cells
4
5
12
13
20
21
Absolyte GNB 6 Cells
To be installed as
part of this project
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
ORMOND BEACH (5-5923)
-48 VDC POWER DISTRIBUTION RACK
0
SCALE:
1 1/4" = 1'-0"
SEAN KANE
4/1/2011
FILE PATH:
FIGURE
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513201839.VSD
L2
PAGE
L6 OF 8
VENDOR SHALL
REMOVE DC-DC
CONVERTER
VENDOR SHALL
INSTALL NEW
BATTERY IN
EXISTING RACK
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
DELAND DOT (5-5939)
BATTERY PLANT
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513223196.VSD
L3
PAGE
L7 OF 8
COMMUNICATIONS DOOR
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
DELAND DOT (5-5939)
EXTERIOR ENTRANCE
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513247594.VSD
L4
PAGE
L8 OF 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix M – Sanlando Springs
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix M – Table of Contents – Tables and Figures
Table M1 – Sanlando Springs Major Equipment List ................................................ M4 of 8
Figure M1 – Sanlando Springs Shelter Floor Plan.................................................... M5 of 8
Figure M2 – Sanlando Springs -48 VDC Power Distribution Rack............................ M6 of 8
Figure M3 – Sanlando Springs Battery Plant Photo ................................................. M7 of 8
Figure M4 – Sanlando Springs Exterior Entrance Photo .......................................... M8 of 8
Page M2 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Sanlando Springs Site Requirements
The Vendor shall furnish and install the following equipment at the Sanlando Springs site
located at the I-4 Eastbound rest area (MP 96) in Longwood, FL.
Latitude: 28-43-37.68 N
Longitude: 81-22-21.46 W
A. One Exide Absolyte GP series battery plant model number M87-024-05007-R23AALV shall
be installed in accordance with this Appendix and Section 2.2 of this Technical Specification.
The new battery plant shall be installed in the same location as the removed battery plant.
The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable shall
be used for -48 VDC connections and black jacketed cable shall be used for return.
B. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Technical Specification. The Vendor is responsible for
removing and properly disposing the DC-DC Converter in the distribution rack to make room
for the Generex BACS battery management system. The Vendor shall mount a 23” DIN rail
on the distribution rack. The Vendor is responsible for all mounting hardware.
IP Address: 172.16.138.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.138.19
Page M3 of 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
TABLE M1 – SANLANDO SPRINGS MAJOR EQUIPMENT LIST
Model Number
Description
M87-024-05007-R23AALV
Exide Battery 23" rack mount
1
BACSKIT_B_III
BACS Webmanager Budget III
1
BACS_MNT_II
BACS Webmanager Mounting Kit
1
BACSC40
BACS C40 modules with temperature
sensor
24
BC4B-xxxxx
BACS measuring cables
24
B2BCRJx
BACS bus cables
*
LPSM002
2-pole Littelfuse Power-Safe LPSM CH
series Midget Fuse Holder
1
BACS_CS500 DC CT
BACS Current Sensor
1
TCL 024-112DC
TracoPower DC/DC Converter
1
ZB24540
Atlantic Scientific Ethernet SPD
2
Vendor Specify
23” DIN Rail to Mount BACS Battery
Management System
1
Vendor Specify
5A Fuse
2
Vendor Specify
Blue jacketed CAT5 Ethernet Cable
*
Vendor Specify
Battery Shield
1
Vendor Specify
Cable Management System
*
QTY.
* Assorted as needed
Page M4 of 8
Channel
Bank Rack
DVM6-45
MW
Terminal
Rack (BA1)
District 5 Fiber/
Video Rack #2
MAS Call
Box Base
Station
Rack
-48 VDC
Distribution
Rack
District 5
Fiber/Video
Rack #1
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
SANLANDO SPRINGS (5-5937)
SHELTER FLOOR PLAN
0
SCALE:
1/2" = 1'-0"
SEAN KANE
5/10/2007
FILE PATH:
FIGURE
C:\Users\kntfisk\AppData\Local\Temp\Zeon513337139.vsd 10/26/15
M1
PAGE
M5 OF 8
Empty
2-Pole Fuse Block
Empty
Empty
Empty
DC/DC Converter
Ethernet SPD
BACS WebManager
DIN Rail
BACS DC Current Sensor
Negative Terminal
1
+
8
9
16
17
Positive Terminal
24
Absolyte GNB 6 Cells
2
7
10
15
18
23
Absolyte GNB 6 Cells
3
6
11
14
19
22
Absolyte GNB 6 Cells
4
5
12
13
20
21
Absolyte GNB 6 Cells
To be installed as
part of this project
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
10/26/2015
SANLANDO SPRINGS (5-5937)
-48 VDC POWER DISTRIBUTION RACK
0
SCALE:
1 1/4" = 1'-0"
SEAN KANE
4/1/2011
FILE PATH:
FIGURE
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513363846.VSD
M2
PAGE
M6 OF 8
VENDOR SHALL
REMOVE DC-DC
CONVERTER
VENDOR SHALL
INSTALL NEW
BATTERY IN
EXISTING RACK
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
SANLANDO SPRINGS (5-5937)
BATTERY PLANT
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513416029.VSD
M3
PAGE
M7 OF 8
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
8.5"X11"
10/26/2015
SCALE:
N/A
SEAN KANE
DRAWING TITLE
REV
SANLANDO SPRINGS (5-5937)
EXTERIOR ENTRANCE
FILE PATH:
FIGURE
0
C:\USERS\KNTFISK\APPDATA\LOCAL\TEMP\ZEON513434593.VSD
M4
PAGE
M8 OF 8
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix N – Port Orange
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix N – Table of Contents – Tables and Figures
Table N1 – Port Orange Major Equipment List ......................................................... N4 of 6
Figure N1 – Port Orange Shelter Floor Plan............................................................. N5 of 6
Figure N2 – Port Orange -48 VDC Battery Plant ...................................................... N6 of 6
Page N2 of 6
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Port Orange Site Requirements
The Vendor shall furnish and install the following equipment at the Port Orange site located at
the abandoned Northbound Rest Area on I-95 (MP 254) in Port Orange, FL.
Latitude: 29-05-5.75 N
Longitude: 81-00-59.17 W
A. The Generex BACS battery management system shall be installed in accordance with this
Appendix and Section 2.3 of this Technical Specification. The Vendor is responsible for all
mounting hardware.
IP Address: 172.16.22.22
Subnet Mask: 255.255.254.0
Gateway: 172.16.22.19
Page N3 of 6
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
TABLE N1 – PORT ORANGE MAJOR EQUIPMENT LIST
Model Number
Description
BACSKIT_B_III
BACS Webmanager Budget III
1
BACS_MNT_II
BACS Webmanager Mounting Kit
1
BACSC40
BACS C40 modules with temperature
sensor
24
BC4B-xxxxx
BACS measuring cables
24
B2BCRJx
BACS bus cables
*
LPSM002
2-pole Littelfuse Power-Safe LPSM CH
series Midget Fuse Holder
1
BACS_CS500 DC CT
BACS Current Sensor
1
TCL 024-112DC
TracoPower DC/DC Converter
1
ZB24540
Atlantic Scientific Ethernet SPD
2
Vendor Specify
DIN Rail to Mount BACS Battery
Management System
1
Vendor Specify
5A Fuse
2
Vendor Specify
Blue jacketed CAT5 Ethernet Cable
*
Vendor Specify
Battery Shield
1
Vendor Specify
Cable Management System
*
QTY.
* Assorted as needed
Page N4 of 6
DVM6-45
Terminal
Rack (AQ1)
MAS Call
Box Base
Station
Rack
DVM6-45
Terminal
Rack (AQ2)
NMS Rack
DVM6-45
Terminal
Rack (AQ3)
Channel
Bank Rack
-48 VDC
Distribution
Rack
-
To be used as
part of this project
+
-48VDC
Battery
Plant
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
3/7/2016
PORT ORANGE (5-5925)
SHELTER FLOOR PLAN
0
SEAN KANE
5/10/2007
FILE PATH:
SCALE:
1/2" = 1'-0"
FIGURE
T:\Public\ITS\Telecommunications\Facilities\BatteryPlant_PhaseIV\Appendicies\
N_PortOrange\Fig_N1_PortOrange_ShelterFloorPlan_20160307.vsd 03/07/16
N1
PAGE
N5 OF 6
SPD
2-Pole Fuse Block
BACS WebManager
DIN Rail
BACS DC Current Sensor
Negative Terminal
DC/DC Converter
-
+
Positive Terminal
1
8
9
16
17
24
Absolyte GNB 6 Cells
2
7
10
15
18
23
Absolyte GNB 6 Cells
3
6
11
14
19
22
Absolyte GNB 6 Cells
4
5
12
13
20
21
Absolyte GNB 6 Cells
To be installed as
part of this project
FLORIDA DEPARTMENT
OF TRANSPORTATION
DRAWN BY:
ISSUED:
SIZE
LAST DATE EDITED
DRAWING TITLE
REV
8.5"X11"
3/7/2016
PORT ORANGE (5-5925)
-48 VDC BATTERY PLANT
0
SEAN KANE
7/9/2015
FILE PATH:
SCALE:
1 1/4" = 1'-0"
FIGURE
T:\PUBLIC\ITS\TELECOMMUNICATIONS\FACILITIES\BATTERYPLANT_PHASEIV\APPENDICIES\
N_PORTORANGE\FIG_N2_PORTORANGE_-48VDCBATTERYPLANT_20160307.VSD
N2
PAGE
N6 OF 6
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix O – Spares
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Spares Requirements
The Vendor shall furnish and deliver the following equipment to the FDOT Statewide
Telecommunications Network Maintenance Contractor.
TABLE O1 – SPARES EQUIPMENT LIST
Model Number
Description
QTY.
BACSKIT_B_III
BACS Webmanager Budget III
1
BACSC40
BACS C40 Modules with temperature
sensor
12
BC4B-xxxxx
BACS measuring cables
12
BACS_CS500 DC CT
BACS Current Sensor
1
TCL 024-112DC
TracoPower DC/DC Converter
1
ZB24540
Atlantic Scientific Ethernet SPD
10
Vendor Specify
5A Fuse
8
Page O2 of 2
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix P – ITS Facility Management System Form
FLORIDA DEPARTMENT OF TRANSPORTATION
PHASE IV: I-75, I-95 AND I-4 BATTERY PLANT REPLACEMENT
Appendix P – Table of Contents – Figures and Drawings
Figure P1 – ITSFM Electric DC Power Attribute Form.............................................. P3 of 3
Page P2 of 3
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
ITS Facility Management System
Electric DC Power Attribute Form
ITSFM054
Page 1 of 1
Rev. 01/14
Date:
Inspector:
Site Identification Name:
Information for DC Power Installed at this Site
DC Power Distribution Equipment
Manufacturer:
Input Voltage:
Model:
120 VAC
Serial Number:
12 VDC
240 VAC
Yes
No
120 VAC
POE
12 VDC
Output Voltage:
NIC Card Installed:
24 VDC
POE
- 48 VDC
Unknown
24 VDC
- 48 VDC
Unknown
IP Address:
Load/Draw (Amp):
MAC Address:
Number of Rectifier Positions:
Number of Breaker Positions:
DC-DC Converter
PL
E
Rectifier
Rectifier Type:
DC-DC Converter Shelf Installed:
Number of Rectifier(s):
Yes
No
Number of Converter(s):
Number of Converter Positions:
Number of Converter Positions:
Manufacturer:
Manufacturer:
Model:
AM
Model:
Control Panel
Manufacturer:
Battery
Battery Pack Installed:
Battery Type:
Model:
No
AGM
Gel
Date Battery Installed / Replace:
EX
Serial Number:
Flooded
Yes
Manufacturer:
Model/Size:
Qty:
Notes & Comments:
Page P3 of 3
Page A-128: ITB-DOT-15/16-9026-DC
Download