SERVICE INSTRUCTIONS SI-61X0D Note with regard to the inner cable end SB-7S40 BL-IM40 CJ-7S40 7. Install the wire end hooking cover of the Revo-shift lever. Revo-shift Lever Wire end hooking cover Brake Lever OK Not OK Not OK If it is difficult to pass the inner cable through the wire end hooking cover hole, do it by the following procedure. Cassette Joint Before use‚ read these instructions carefully‚ and follow them for correct use. 1. Loosen the pulley cover fixing Pulley cover fixing screw screw and then remove the pulley cover. Be sure to read these service instructions in conjunction with the service instructions for the Inter-7 hub before use. the outer casing 8. Secure to the frame with the Pulley cover outer casing bands. 10 cm 15 cm 10 cm CAUTION Outer casing bands Be sure to shift the lever one gear at a time, and reduce the force being applied to the pedals during shifting. If you try to force operation of the shifting lever while the pedals are being turned strongly, your feet may come off the pedals and the bicycle may topple over, which could result in serious injury. 2. Pass the inner cable through the wire end hooking cover hole, and then pass it along the three pulleys and through the cable adjusting bolt hole. 3 Pass through the cable adjusting bolt hole. 2 Revo-shift lever operation Adjusting the cassette joint Pass along the pulleys. the Revo-shift lever to 4 . 1. Set Check to be sure that the red setting lines on the cassette joint bracket and pulley are aligned at this time. Turn the Revo-shift lever to shift to each of the seven gears. Pedaling becomes heavier 1 Indicator moves toward 7 Indicator Red setting lines Pass through the wire end hooking cover hole. 3. Replace the pulley cover and tighten it with the pulley cover fixing screw. Be careful not to clamp the inner cable between the pulleys and the pulley cover at this time. Set to 4 Revo-shift lever checking that the end of the outer casing is sitting securely 3. After in the cable adjusting bolt of the Revo-shift lever, attach the inner cable fixing bolt unit to the inner cable. The red setting lines on the cassette joint are located in two places. Use the one that is easiest to see. Inner cable fixing bolt unit Note: Do not use this inner cable fixing bolt unit with Pedaling becomes lighter When bicycle is upside down the CJ-4S30 cassette joint. Indicator moves toward 1 Should be straight Cassette joint pulley Inner cable fixing nut Inner cable fixing washer 10 mm (Black) Install the lever as shown in the illustration. Bracket 1 Attach to the straight section of the handlebars. Inner cable fixing bolt Pass the inner cable through the hole. Cassette joint bracket Handlebar 101 mm 3 When bicycle is standing up Should be straight 22.2 mm 2 Tighten 5 mm Alley key Cassette joint pulley Pull the inner cable while attaching the inner cable fixing bolt unit. LOCK Clamp bolt Leave a gap of 0.5 mm between the lever and the half grip. Tightening torque: 6 – 8 Nm {60 – 80 kgfcm} 2 LOCK Installation of the lever Tightening torque: 4 – 6 Nm {40 – 60 kgfcm} Half grip 1 Bracket 5 mm Alley key 3 22.2 mm Tighten Cassette joint bracket the cable around to the 4. Bring cassette joint pulley, hold so that Flats part of inner cable fixing washer the inner cable fixing nut is facing to the outside (toward the fork end), and then slide the flats part of the inner cable fixing washer into the gap in the pulley. Gap in pulley If the red setting lines are not aligned, turn the cable adjusting bolt of the Revo-shift lever to align the setting lines. After this, move the Revo-shift lever once more from 4 to 1 and then back to 4 , and then re-check to be sure that the red setting lines are aligned. Cable adjusting bolt Inner cable fixing nut LOCK Handlebar Clamp bolt Cassette joint pulley Grip Installation of the shifting cable 1. 5. Turn the cable 60 Set the Revo-shift lever to 1 . Next, slide the wire end hooking cover of the Revo-shift lever as shown in the illustration to remove it. counterclockwise and attach it to the hook. adjusting the cassette joint, cut off the excess length of 2. After inner cable and then install the inner end cap. Hook LOCK Wire end hooking cover Inner end cap Turn the cable 60 15 – 20 mm LOCK Set to 1 the inner cable to the pulley as shown in the illustration, 6. Attach pass the inner cable through the slit in the cassette joint bracket, and then insert the end of the outer casing securely into the outer casing holder. 2. Pass the inner cable through the wire end hooking cover hole. Outer casing holder Slit 1 Pass through the slit. 2 These service instructions explain how to use and maintain the Shimano bicycle parts which have been used on your new bicycle. For any questions regarding your bicycle or other matters which are not related to Shimano parts‚ please contact the place of purchase or the bicycle Please note: Specifications are subject to change for improvement without notice. (English) These service instructions are printed on recycled paper and can be recycled again. Insert into the outer casing holder. One Holland Irvine CA 92618 U.S.A. Phone 9 4 9 - 9 5 1 -5 0 0 3 Pass the inner cable through the hole. Industrieweg 24 NL- 8 0 7 1 CT Nunspeet‚ Holland Phone 3 1 -3 4 1 2 - 7 2 2 2 2 Inner cable Pulley Bracket 3 -7 7 Oimatsucho‚ Sakai‚ Osaka‚ Japan Phone 07 2 2 - 2 3 - 3 2 4 3 C May 1998 by Shimano Inc. PIT. SZK. Printed in Japan