1601kstreet.info

advertisement
Property Group Partners
1601 K Street
Electronic Tenant® Handbook
Created on September 19, 2012
Building Amenities: Life Safety Program
Emergencies can and do occur in even the finest office buildings. The best we can do is to anticipate them
where we can, and be prepared so as to minimize their effect.
At 1601 K Street, NW, the life safety program centers around a “Floor Warden” program, where a few
individuals on each floor are trained to lead the other occupants through emergency situations. Tenants are
taught where to seek safety for different life-threatening situations. The program includes annual meetings
and drills, often with the involvement of the DC Fire Department.
It is in every company’s best interests to have its employees learn and understand the property’s
Emergency Preparedness guidelines, not only as a responsible employer, but to avoid OSHA fines for each
employee found to be untrained to deal with various emergencies.
Please review carefully the section in this Tenant Handbook on Emergency Preparedness.
Building Amenities: Parking
Parking is available at this building. Monument Parking operates the parking garage and they provide
service for daily and monthly parking.
Building Operations: Accounting
Lockbox remittance address
PPF OFF 1601 K Street, LLC
PO BOX 30101
New York, NY 10087-0101
Building Operations: Building Management
The staff of 1601 K Street is dedicated to making your work environment as safe and pleasant as possible.
The Building Office is located in Suite 160. Please do not hesitate to contact the management office at:
Phone:
Fax:
Address:
202 429-4370
202 429-4376
1601 K Street, NW
Washington, DC 20006
The following personnel are available to address your needs:
Dawn Redmond
Senior Property Manager
Phone Number:
E-Mail:
202 429-4370
Dredmond@jbg.com
Shanna Ruhl
Tenant Services Coordinator
Phone Number:
E-Mail:
202 429-4370
Sruhl@jbg.com
Lynne Long
Accounting Administrator
Phone Number:
E-Mail:
202 429-4370
LLong@jbg.com
Mario Simonis
Building Engineer
Phone Number:
E-Mail:
202 429-4373
Msimonis@jbg.com
Mark Riston
Building Engineer
Phone Number:
E-Mail:
202 429-4373
Mriston@jbg.com
Management and Engineering are available for emergencies on a 24 hour, 365 day-a-year basis; however,
all after-hours engineering requests will result in a charge of at least 4 hours overtime per engineer, plus
equipment and/or supply charges.
Some building services are provided through outside contractors who specialize in specific disciplines such
as janitorial, security monitoring and fire alarm repairs.
Building Operations: Landlord/Tenant Communication
For the purpose of effective Landlord-Tenant communication, two primary contacts are established within
each tenant company. The individual from a tenant company who interfaces with The JBG Commercial
Management office on day-to-day issues is referred to as the “Tenant Contact”. The individual from a tenant
company holding the most senior position (e.g. Managing Partner, President, Administrator) is referred to
as the “Principal Representative”. Kindly ensure that all official communications to the JBG Commercial
Management office come directly from either the Tenant Contact or the Principal Representative.
Building Operations: Holidays
The Building Holidays observed each year are listed below in order to aid your planning operations during
the year.
New Year's Day
Martin Luther King, Jr.
President’s Day
Memorial Day
Independence Day
Labor Day
Columbus Day
Veteran Day
Thanksgiving Day
Christmas Day
Certain services are not provided on weekends and the holidays listed above.
Should you require cleaning, heating, ventilation, air conditioning or other special services on any of the
above holidays, please contact Building Management at least 24 hours in advance. Building staff and
contractors observe these holidays; therefore, you will be charged for any building services rendered on
these days unless your lease stipulates otherwise. Management can provide you with an estimate for any of
the above services.
Building Operations: Leasing
This building is 100% occupied. Any inquires please contact the management office.
Building Operations: Insurance
Prior to moving into the building, and at all times during your suite’s tenancy, each tenant must have on file
in the Management Office a Certificate of Insurance evidencing the coverage types and amounts stipulated
in the lease agreement. PPF OFF 1601 K Street, LLC and JBG Commercial Management, LLC, must be
included as additional insureds. Building Management’s copy of your suite’s insurance certificate must be
current at all times while your lease is in effect.
Certificates representing current insurance coverage must also be on file in the Management Office for each
contractor (construction, remodeling, moving, etc.) that performs work in the building prior to the start of any
activity. Such coverage must remain in effect until all work is completed. Tenant contractors that have not
met this requirement will be removed from the premises.
Building Operations: Important Phone Numbers
Management Office- Phone
Management Office – Facsimile
Admiral Security Guard on duty
Police / Fire / Medical Emergency
Poison Control Center, Georgetown Hospital
Washington DC Fire Department,
Non-Emergency
Washington DC Police Department,
Non-Emergency
Metrobus and Metrorail
Schedule Information
Compliments, Complaints and Suggestions
Transit Police
Weather
Time
202 429-4370
202 429-4376
202 429-4339
911
202 625-3333
202 462-1762
311
202 637-7000
202 637-1328
202 962-2121
202 936-1212
202 844-4444
Building Security: Overview
Kastle Systems provides perimeter card access an Admiral Security provides security staff. A full time guard
is stationed at the main lobby desk 24 hours per day and 365 days per year. An additional loading dock
guard is posted from 9 am to 5 pm, Monday through Friday.
Building Security: After Hours Access
If visiting 1601 K Street after normal business hours, please see the front desk security guard to assist you
with your needs. If you are a tenant within the building you should have a key card or FOB that will allow you
to have access at all times.
Building Security: Building Access
During the hours of 8:00 am through 8:00 pm, Monday through Friday, and Saturdays from 9:00 am to 6:00
pm, 1601 K Street, NW is open to tenants, visitors and the general public. For the purpose of “access
control,” all other times are considered “after-hours.”
In order for an employee to access Tenant floors, the individual must be assigned an access card (at the
direction of the Tenant Contact). Once activated, the access card will enable access into the building.
IMPORTANT: DO NOT LET ANY UNKNOWN INDIVIDUALS “PIGGYBACK” OFF YOUR ACCESS
CARD. UNAUTHORIZED BUILDING ACCESS IS A SECURITY THREAT TO ALL PERSON(S) AND
BOTH BUILDING AND TENANT PROPERTY.
It is important that the Tenant Contact retrieves access cards from outgoing employees and return them to,
or promptly notify, the Management Office for deactivation of the card.
If you are expecting a visitor during security hours, please instruct them to check in with the security officer
on duty.
Building Security: Deliveries
General
All deliveries for tenants must take place through the loading dock and the service freight elevator. Tenants
must sign for and accept all deliveries; they must also arrange for immediate transport of those items to their
suite. Elevator scheduling is on a first-come, first-served basis. A representative from your firm must be
present to accept any delivery made after-hours.
All oversized/large deliveries (those requiring more than one hour or involving pieces with any dimension
greater than 5 feet) need to be scheduled at least 24 hours in advance with Building Management, and shall
take place during non-business hours. All small, routine deliveries can be arranged during non-peak times
with Building Management (see scheduled times below).
All delivery companies must bring Masonite to protect lobby floors. Walls, corners, and doorframes must
also be treated with appropriate protection to avoid damage. Small weekday deliveries can be made on a
first come first serve basis from 9 am to 5 pm.
After-Hours
Building staff will not accept or allow after-hours deliveries without prior arrangement and approval through
the Building Management office. After-hours deliveries may not be scheduled before 6:00 pm Building staff
cannot accept any type of mail or packages (i.e., general mail, certified or registered mail, FedEx packages,
UPS packages, etc.) from couriers coming into or exiting tenant suites. Property insurance requirements
prohibit this activity. Incoming deliveries must be referred directly to the tenant’s premises.
Building Security: General Office Security
Overview
As our society seems to have grown more dangerous, so has the need for all of us to be more security
conscious - corporately and individually. It is important for tenants to recognize that 1601 K Street, NW
offers a level of security generally comparable to other first class office buildings in the Washington, DC
area. This means that we seek to secure the building, while tenants retain the responsibility for their space
and the safety of their employees. Your company and your employees must maintain a prudent level of
security. Each individual needs to be security conscious, responsible and aware of his or her belongings and
office area.
Tenant Precautions
Building security needs your full cooperation in order to effectively secure your premises. We recommend
that your company implement these simple, but effective policies:
1. Do not leave your reception area unattended. If the area must be left unmanned, keep suite entry
doors locked.
2. Keep valuables in secured areas (locked desks, file cabinets, etc.) when not attended and out of sight
when attended.
3. Keep safes locked when unattended, and don’t leave the combination information where it is likely to
be found.
4. Record serial numbers of all valuable office equipment.
5. Solicitation is not permitted within 1601 K Street, NW. Report all unauthorized or suspicious persons
immediately to the Security Guard on the first floor at 202 429-4339 or the JBG Commercial
Management office at 202 429-4370. Provide a full description of the person(s) and the last area in
which they were observed, and, if possible, the direction in which they were headed.
6. Require identification from repairmen who come to work in your office suite. Messengers must also be
prepared to show identification and delivery papers at all times.
Security experts have found that the receptionist position is the best line of defense against potential
perpetrators. The receptionist should be trained to be the best “security” employee in the company.
When an employee leaves your office space, his or her need for vigilance continues. Remind your
employees that whether leaving the building to go to a meeting, retrieving a car in the parking garage, or
walking about the public areas of the building, move with a purpose and be reasonably on guard. This is
particularly true during the dark hours.
Meanwhile, do what you can to heighten the level of security awareness, and remind everyone to keep
valuables locked and out of sight.
Security Checklist
The following is a list of general office security suggestions, which are offered to you as an aid in
establishing your internal security procedures:
Restrict office keys to those who actually need them.
Keep complete, up-to-date records of the distribution of all office keys.
Establish uniform procedures for collecting keys prior to the termination of employees.
Establish a rule that keys must never be left unguarded on desks or cabinets.
Require that filing cabinet keys be removed from locks and placed in a secure location after opening
cabinets.
Prevent unauthorized personnel from reporting a lost key and receiving a replacement.
Ensure that a responsible person is in charge of issuing all keys.
Store keys systematically in a secured wall cabinet of either your own design or one that conforms to
a commercial key control system.
Insist on identification from repairmen who come to work in your office.
Clear all desks of important papers.
When working alone in the office at night, lock the front door to prevent anyone else from entering.
Keep the police, fire department, and building security telephone numbers posted.
Double check to see that all doors are securely locked before you leave.
Suspicious Persons
If you see suspicious or offensive persons in the building, please call the Management immediately. If
possible, make note of appearance, clothing, etc. in order to assist building security in locating them.
Please be aware of strangers in your Tenant areas and halls. Quite often a question such as “May I help
you locate someone?” will be enough to deter a potential thief. Suspicious encounters of this type should be
reported to the Office of the Building immediately.
Building Security: Key and Lock Policy
For any key or lock requests, please find the form listed as “Key Request Form”, Please fill this out and
return it to the management office.
Building Security: Lost and Found
Please contact the Management Office at 202 429-4370 to claim items that have been lost or found in the
buildings.
Building Security: Solicitation
Solicitation is not permitted. If someone is soliciting in your suite, then please notify the Management Office
at 202 429-4370 and we will send appropriate personnel to escort them off of the premises.
Building Services: Building Signage and Directory
An effective directory & signage program with consistently applied standards creates the most professional
overall image for the building and its tenants. The Management Office will provide the initial signage for the
building directory; however, Tenant’s are responsible for future signage changes and all suite signs. A
Signage Change Request Form must be submitted to JBG for all signage changes.
All suite entry signage is building standard and consistent within the building. Any non-building standard
signage requires the prior written approval of Landlord and Property Management.
Building Services: Cleaning
All office spaces and common areas are cleaned on a nightly basis, Monday through Friday. Tenants should
contact the Management Office for any special cleaning needs, or to report any cleaning deficiencies.
In situations where a tenant would like a box of trash disposed of, please write “TRASH/ BASURA” on the
box. All empty moving boxes should be flattened.
If a small cleaning problem should arise during working hours, please contact the Building Management.
If you have any questions or comments regarding the cleaning services, please notify the Building
Management’s Office.
Building Services: Elevators
The building is equipped with (4) OTIS passenger elevators, which provide service to all floors. Each
elevator runs at a speed of 350 feet per minute and can accommodate 3,500 pounds. Elevators cabs are
fashioned of custom frosted glass and satin finished stainless steel with Italian white marble flooring. The
building also provides an OTIS freight elevator with 4,000 pound capacity located off the service corridor.
Building Services: Forms
For your convenience, we have included downloadable and printable PDF document forms that will expedite
various building management service requests. Hard copies of all forms are available from the Property
Management Office as well. To view and print PDF files, you need the Adobe Acrobat Reader software. If
not already installed on your computer, it can be obtained for free at www.adobe.com.
Contractor Rules & Regulations
Fitness Center Waiver
Insurance Certificate Information
Key Request Form
Overtime HVAC Request
Overtime Engineering Request
Signage Request Form
Building Services: HVAC
Heating, Ventilation and Air Conditioning (HVAC) provided by (2) 450-ton Trane cooling towers servicing
individual self-contained units (SCU) on each floor. Trane Variable Air Volume (VAV) system with exterior
electric heating and interior constant variable air-flow distribute conditioned air throughout the floors. CO
detectors monitor return air on each floor and increase or decrease outside air supply as needed. The
HVAC system is managed through a Tracer Summit Energy Management System, allowing Engineering
staff to monitor temperatures and conditions throughout the building.
Building Services: After Hours HVAC
The HVAC system at 1601 K Street, NW consists of eighteen water-cooled variable-air-volume air
conditioning units, four air-cooled packaged air conditioning units and four split-system air conditioners.
Heating and air conditioning is only provided during normal building hours. After-hours and holiday HVAC
services can be provided for an additional cost. To request overtime services, return a signed Overtime
HVAC Request form to the Management office during the work week allowing at least 24 hours prior to the
date the services are needed.
Building Services: Mail Service
Mail is delivered once a day from the mailboxes in the service corridor by a US Postal Service mail carrier.
All outgoing mail is collected twice daily from the same location. U.S. Postal Service Carriers are not
required to pick up any mail that is not deposited in an official U.S. mailbox. Any mail placed on the floor will
be left on the floor and will not be collected or delivered. Oversized and large quantity mailings must be
taken to the Post Office. A branch is conveniently located at 1050 Connecticut Avenue.
Address Format
For best mail service results, incoming mail should be formatted as follows:
**YOUR COMPANY NAME**
1601 K Street, NW
SUITE ___
WASHINGTON, DC 20006
Building Services: Maintenance Requests
For your convenience this Handbook includes an Electronic Tenant® Service Request System. Use this
system to submit routine maintenance requests directly to the engineering department; to track the status of
previously submitted requests; to download important documents; and to communicate with the property
management office.
1. Simply click on the link below,
2. Enter your username and password
3. Choose the action you would like to complete
Click here to log into the Electronic Tenant Service Request System
Once you have logged into the system, you will be presented with four options:
Complete a Maintenance Request Form
Update User Information
View Electronic Maintenance Request Log
Download Miscellaneous Administrative Forms
For detailed instructions for using the Electronic Tenant® Service Request System please see the following
pages or contact the Building Office.
Completing a Service Request Form
After logging in, click on the "Electronic Maintenance Request Form" Link. Users will be taken to a service
request form.
Step One - Confirm or complete all contact information.
Step Two - Choose the nature or type of request being submitted.
Step Three - If applicable, provide details of the contractor to be used.
Step Four - Review all information thoroughly. Click submit.
You will receive conformation via e-mail that your request was submitted to the management office.
Updating User Information
Personalized user information is used to auto-fill the Electronic Maintenance Request Form for quick and
easy submission. In addition, accurate contact information will assist the management staff in expediting all
maintenance requests. Each user should check regularly to ensure that accurate information is on file.
Electronic Maintenance Request Log
This feature allows users to track and monitor all service requests submitted through the Electronic Tenant®
Service Request System. Service requests are sorted by month and will have the current month displayed
upon entry.
Miscellaneous Forms
Here users can download and print various administrative forms, reports and documents. In order to access
the forms and documents contained in this section, users must have Adobe Acrobat Reader 5.0 or higher
installed on their computers. This software is free and can be obtained by clicking here.
Questions regarding the Electronic Tenant Services Request System should be directed to the Management
Office.
Building Services: Telecommunications
Locate System within Leased Space: Each tenant’s phone system is situated within its leased space, and
NOT in the building’s core and shell telephone or electrical rooms. This allows for easier access, reduces
the chance of damage due to overheating and alleviates overcrowding of the core telephone closet. The
telephone closets are intended only to accept the main cable “feed” which extends from the building’s riser
cables to your system.
Code Issues: “Plenum Rated” Cable and Independent Supports for Cable: As with most other modern
office buildings, the space above your ceiling is used as a return-air plenum. Various code requirements
affect plenum spaces. It is therefore essential that you instruct your cabling company (phone, data and
other) to use “plenum rated” cable for all cabling which will run above the ceiling. The building code also
requires that cables be independently supported, rather than sharing plumbing supports or wires installed to
hold ceiling systems or electrical conduits. Many cabling companies do not abide by this requirement
without specific instructions and follow-up by the tenant. Remedial work to correct improper installation can
be costly and have serious time delay considerations.
No Alternative Access Provider without Landlord’s Approval: Technological advances in
telecommunications have a profound impact on office buildings throughout the country. Tenant’s demands
for more sophisticated building provisions such as fiber optics and competition among access providers
places a greater burden on buildings to keep pace with this modernizing industry. Most buildings are limited
by the space available for providers to establish a “minimum point of presence,” in each floor’s telephone
closet and risers. Other issues include access to equipment, safety and security. It is important for all
tenants to recognize that no alternative access provider may be permitted a point of presence or riser cable
space in the building without the Landlord’s prior written approval.
Emergency Procedures: Emergency Action Procedures
Please click here to download a copy of the Emergency Action Procedures
Emergency Procedures: Floor Warden Procedures
Please click here to download a copy of the Floor Warden Procedures
Introduction: Welcome
The tenant information provided in this Electronic Tenant® Handbook is meant to provide you with a better
understanding of 1601 K Street and to facilitate your company’s operations. There is a great deal of
information contained within this handbook; take the time to familiarize yourself with this handbook and it will
become a valuable resource for you and your company. Please note that the Building Management Office is
available to help in any way possible. Your first call for any problem or question can always be directed to
the Building Management Office, and we will assist you from there.
Every attempt has been made to provide current and accurate information in this handbook, but it is
possible that some items will change over time. The Building Management Office will promptly notify you of
any such changes. Please feel free to contact the Building Management Office with any questions you may
have. We are here to serve you.
Welcome to 1601 K Street, a premier JBG Companies property.
Introduction: About 1601 K Street
1601 K Street's uncompromising location and elegant design are complimented by a building infrastructure
and amenity package that is equally superlative. State-of-the-art building systems are combined with
gracious attention to comfort, convenience and service to create a true address of distinction. This trophy
caliber Class “A” project designed by Weihe Design Group and RTKL, features an undeniable Washington
power address, extraordinary design and finishes, state-of-the-art building systems, superior regional
access, and exceptional views of Washington landmarks. Moreover, the White House is located just two
blocks away, and Washington’s most influential elected officials, business leaders, policy makers, and
events surround 1601 K Street.
Introduction: Operating Instructions
Navigation
You move through The Electronic Tenant® Handbook just as you would a traditional Internet site. It’s as
simple as pointing and clicking. The main page features a Table of Contents that provides links to each
Chapter. Upon entering a Chapter, you will find links to the specific information provided in that chapter’s
Sub-Sections. You may return to the Table of Contents or Chapter Overview at any time by clicking the
clearly labeled link on every page.
Special Features
This Electronic Tenant® Handbook has special features, such as a Service Request Module and Search
engine. In order to take advantage of these useful features, you must have Adobe Acrobat Reader installed
on your computer. This software is free and easy to use, and can be obtained by clicking here.
Updates
The Electronic Tenant® Handbook is updated on a regular basis, so please be sure to periodically check for
updates and new information. In order to keep you abreast of your property’s operations, we have included
a monthly Building Calendar and Announcement Board. Here, you will find information regarding
scheduled maintenance and events taking place at the property.
If you are having trouble accessing the Electronic Tenant® Handbook or need assistance, please e-mail or
call the Management Office.
Policies and Procedures: Americans With Disabilities Act (ADA)
The JBG Companies is striving to maintain ADA building compliance at 1601 K Street, NW. Tenants are
reminded that they are responsible for ADA compliance within their premises.
In the interest of meeting the intent of the ADA, all tenants are advised of the following four policies
designed to make 1601 K Street, NW as accessible and safe as possible where the property may not
physically be in compliance with the ADA:
1601 K Street, NW ADA Policy #1: General
1601 K Street, NW Building Management continues to evaluate the building with respect to the Americans
with Disabilities Act, and take measures to be in compliance. It is policy at this property that the building’s
staff will assist disabled individuals as reasonably needed in the building’s public areas. Such assistance is
to be provided upon request, or where observed to be needed by building staff.
1601 K Street, NW ADA Policy #2: Rescue Assistance
Out of concern for life safety, 1601 K Street, NW tenants must notify Building Management of any and all
physically challenged persons using the tenant’s premises. Notification must include the nature of the
disability and the normal location (floor and general area) of each individual.
As changes occur (e.g. in the event that the individual’s office is reassigned or use of the premises is
terminated, or a new physically challenged person begins to use the premises) Building Management must
be notified accordingly.
Strict adherence to this policy will help enhance proper, timely and efficient rescue assistance in the event of
an emergency. Without proper adherence, a disabled individual is at significantly higher risk with respect to
life safety.
1601 K Street, NW ADA Policy #3: Rescue Assistance Education
To be safely prepared for a building emergency (e.g. fire, tornado, etc.), physically challenged individuals
must receive special advance education/training. The nature of a person’s specific disability is likely to
dictate a particular response based on the physical nuances of 1601 K Street, NW and its emergency
reaction plan. It is each tenant’s responsibility to ensure that their employees, both the physically challenged
and those who may assist the physically challenged, are properly educated in this regard.
Concerned tenants should contact 1601 K Street, NW Building Management to
request help with rescue assistance education. Tenants are responsible for ensuring that this education is
reviewed periodically, and is welcome to request Building Management’s assistance in this regard. This
policy applies to physically challenged employees within the tenant office space, as well as physically
challenged visitors.
1601 K Street, NW ADA Policy #4: Elevator Access
In order to meet the intent of the ADA, it is policy at 1601 K Street, NW that the building’s staff will assist
physically challenged persons where they are restricted by elevator accessibility. Such assistance is to be
provided upon request or where observed to be needed by building staff.
Policies and Procedures: Contractors
Building Standard Conformance – The Contractor must be certain that all ceiling tiles, window shades,
and door hardware conform to the building standards. Door locks should be keyed to the building master
and to the floor master. Contractor is to furnish 2 copies of each key to the Lead Engineer. The Building
Manager should be consulted before ordering these items.
Protection of Non-Construction Areas – The Contractor shall protect all walls, floors, carpet, furniture and
fixtures and shall repair or replace damaged property without cost to the Owner. Masonite (or plywood)
must be placed as a walkway on the public corridors from service elevator to the construction site and to the
Public Restrooms to protect the floor finish from drywall dust, etc. Common area carpet protection is to be
removed daily and the carpet vacuumed daily.
Painting – All painting, staining and varnishing work when other tenants are in occupancy, must be
performed after hours. There will be no exceptions to this rule. This work must be scheduled with the Lead
Engineer or Building Manager in order that arrangements can be made to run the HVAC system while work
is being performed.
Dusty Work – Contractor shall notify the Building Engineer prior to commencement of very dusty work such
as sheet rock cutting, sanding, extensive broom cleaning, etc., so that additional filtering capacity can be
arranged for the affected HVAC equipment. Contractor’s failure to notify the Building Engineer will result in
absorption of costs to return the equipment to its proper condition. In buildings with a ceiling plenum air
system, all lights and smoke detectors shall be covered during high dust construction. All smoke detectors to
be uncovered at the culmination of each day’s work.
Restrooms – Only restrooms designated by the Building Manager or Lead Engineer may be used.
Restroom sinks may not be used to clean tools, paintbrushes, etc. Access to slop sink should be
coordinated with the Lead Engineer or Building Manager. All paints, varnishes, thinners, etc. should be
disposed of properly. Contractor will clean all slop sink areas daily to the satisfaction of Lead Engineer or
Property Manager.
Loading Docks – Unless specific arrangements are made with building management, contractor must use
the loading dock for the delivery of all construction materials and removal of debris from the building. Use of
the loading dock must be scheduled with the Lead Engineer or Building Manager in advance and materials
must be transported to and from the service corridor (if applicable). All materials unloaded at the dock will be
moved to area of use immediately and shall not impact use of this facility in any way.
Blinds & Draperies – During construction, contractor shall protect window shades to prevent damage.
Trash & Debris – Contractors will remove their trash and debris daily or as often as necessary to maintain
cleanliness in the building. Contractors will coordinate dumpster size, placements and timing with the
Building Manager. The building trash containers are not to be used for construction debris. Contractors shall
be responsible for daily removal of waste foods, milk and soft drink containers. Failure to properly clean up
debris will necessitate a cleaning charge of $500.00 per day to Contractor.
Work Schedule – Building Manager and Lead Engineer shall be provided with names and phone numbers
of subcontractors. When occupied by other tenant(s) the Lead Engineer or Building Manager will be notified
of all work schedules for all workmen on the job and will be given 48 hours notice, in writing, of names of
those who may be working in the building before or after standard building operating hours as set forth in
the Lease Agreement.
Service Elevator –The designated service elevator is the only elevator to be used for moving
materials/tools and construction personnel. All surfaces of the service elevator shall be properly protected
with temporary plywood. Use of the elevator is to be scheduled with the Building Manager or Lead Engineer.
When the building is occupied by tenant(s), the service elevator may not be used from 8:00 am – 9:30 am,
11:30 am to 1:00 pm, and 4:30 pm to 6:00 pm, and any deliveries requiring more than one trip will have to be
scheduled in advance through building management. The service elevator is to be locked on independent
service for the hauling of materials. Do not hold doors open by propping or wedging materials in their
tracks. This can cause serious damage. The elevator will be inspected before and after use for damage.
The elevator will also be inspected before installation and after removal of the temporary plywood for
damage. A punch list from each inspection is to be submitted to the Owner’s Representative or Building
Manager. Contractor is to restore all elevator components (shafts, system re-calibration, etc.) to clean
original condition. The elevator must be cleaned after each use, including vacuuming, cleaning of any debris
in the door track, and wiping down of the door and interior panels. Note: No elevator will be available until
after 6:00 am at the earliest.
Passenger Elevators – Passenger elevators shall not be used for moving materials/tools and construction
personnel. Any contractor personnel found using passenger elevators for transportation of materials, tools
or themselves will be fined $5,000 per incident plus repair, cleaning, and/or damage charges if required.
Mechanical, Electrical, Plumbing – Prior to and upon completion of work to be performed on mechanical,
electrical or plumbing systems, the Building Manager or Lead Engineer must be notified. If any mechanical,
electrical or plumbing devices are already turned off when you go to turn them off, find out why – it may be
turned on while you are working. When occupied by other tenants, permission to enter other tenant spaces
must be arranged through the Building Manager. All electrical junction boxes will be marked to indicate
circuit(s) contained within box. All shut off/isolation valves shall be properly tagged as to device they are
controlling.
Utility Charges – Contractors may be charged for utility consumption at the discretion of building
management. The Contactor should consult the Building Manager about what, if any, utility charges apply
and the method of calculating consumption.
Cutting, Core Drilling – Before any cutting, drilling, core boring or other structural work is performed, the
Contractor must submit plans to the Owner via the Building Manager. GC must submit written approval to
the Building Manager and Construction Manager prior to commencement of work. GC must verify the
locations of the building’s utility lines so as not to damage them. All costs associated with reviews will be at
the sole cost of the tenant. X-ray work may require special scheduling.
Utilities - No utilities (electric, water, gas or oil) or services to tenants are to be cut off or interrupted without
first having requested and secured, in writing, the permission of the Building Manager. All electrical or
plumbing tie-ins or shutdowns will be scheduled in advance, with a minimum of 48 hours notice, with the
building management.
Base Building Tie-Ins – The Building Manager must receive 48 hours notice for all tie-ins to the buildings
plumbing, electrical or sprinkler systems. In the event Contractor’s work requires a shutdown of these
systems of fire alarm tie-in, the Building Manager reserves the right to set specific after-hours times when
such work may be performed, require that the Building Engineer be present, and charge the Contractor for
overtime cost for engineer time. Prior to connection to the Base Building condenser water of chilled water
system, Contractor must perform a hydrostatic pressure test and a thorough cleaning and flushing of the
Tenant’s water lines and mechanical unit. A member of the Building Manager’s engineering staff will review
the results of such attesting and cleaning.
Fire Alarm System – Final tie in of any fire alarm devices must be done by Varco Mac at 301 953-3924
contact Jim Hessler/ Simplex Grinnell at 800 388-1758 Contact Willy Cook in order to maintain system
warranty and integrity.
Building EMS System for VAV’s - The building VAV system has electronic controls, which are tied into
the building EMS system. Boland Trane (301 984-2400, contact Herraldo Malena) must do the building
tie-in and control work in order to maintain system warranty and integrity.
Electrical Breaker Panels – Contractor shall supply a typed panel schedule indicating location and function
of all circuits upon completion of work. During construction a hand written sheet must be posted on panel
indicating location of all connected circuits.
Utilities – All utility tie ins that may adversely affect an existing tenant must be performed prior to 8:00 am or
after 6:00 pm and upon completion shall not leave any other tenant with out services.
Air Balance – Submit approved air balance report to the Building Manager at completion of work. The air
balancing is under warranty and must be performed by Boland Trane at 301 984-2400, contact Herraldo
Malena.
Security Monitoring – All security monitoring devices must be installed by Kastle Systems, Contact Tony
Pina at 703 524-7911
Keying System – To secure maintain building security we require that you use Dissin Locksmith Company,
Contact Alan Dissin at 301 921-4616. They have our master key system on file.
Operating Hours – When occupied by other tenants, no work is to be performed during standard building
operating hours that will disturb or inconvenience other occupants of the building without the written
permission of the Owner’s agent (including work creating noise or odor). All work involving drilling or boring
of concrete will only be allowed prior to 8:00 am and after 8:00 pm Monday through Friday, and prior to 8:00
am and after 3:00 pm on Saturday unless otherwise approved in advance. X-ray work may require special
scheduling.
Temporary Keys – Whenever it is deemed necessary by the Building Manager to temporarily issue any key
to the Contractor, the Contractor will be responsible for controlling possession and use of it until returned
daily to the issuing party.
Security – Contractor will be responsible for re-locking any areas made available for necessary access
whenever that area(s) is unattended, and also when work or work hours are completed. Contractors are
responsible for the security of their own job site at all times. Should the Contractor need to work on an
overtime basis in an area that is open to the building and unsecured, the Contractor shall provide security
through the landlord’s security agent and shall reimburse the landlord for such time that is utilized during the
overtime period. If double shifts are performed and such shifts go beyond the normal working hours of the
security personnel, then the Contractor shall also make arrangements with the Building Manager to provide
security during these hours and shall reimburse the managing agent for this time. All costs of the provision
of security personnel will be borne by the Contractor. It is recommended that electronic security in the suite
under construction be deactivated during construction. Activation of the electronic security system for the
suite should be scheduled well in advance to ensure completion by the time of tenant occupancy.
Safety – Contractor shall be aware of all life safety issues and shall provide a list of emergency contacts in
the event that a representative of the Contractor’s organization must be contacted after hours. In addition to
this contact list, Contractors shall provide fire extinguishers at a ratio of one (1) for each 1,000 square feet
of construction area and such fire extinguishers shall be mounted in a visible area marked properly.
Contractors shall comply with all OSHA regulations as well as all federal, state and city or county codes
relating to workers’ safety. The Contractor shall review the job site and the job organization for total
compliance to these rules and regulations on a weekly basis and provide a report to the Owner that such
review has been performed and any infractions that were observed during this review. The Contractor shall
provide MSDS sheets to the Building Manager for all chemicals prior to use on the premises. The use of
such Volatile Organic compounds is restricted to non-business hours.
Life Safety Devices – Contractor, under no circumstances, will be allowed to disconnect, tamper with,
delete, obstruct, relocate add any life safety, fire detection, notification, suppression unit or devices except
as indicated on the drawings approved by the Fire Department Authority having jurisdiction. In the event
contractor’s work requires electrical, plumbing or sprinkler system shutdown or fire alarm tie-in, building
management reserves the right to prohibit such during building hours. Arrangements must be made with the
Building Manager as to the hours when such work can be performed, to have an engineer present, and to
pay the cost, if any, for such engineering time. In taking over an area, the Contactor shall maintain, repair,
or improve as necessary all safety requirements of that area. Contractor will be charged $1,000 plus
associated building management costs per incident.
Accidental Alarm – Contractor shall take all necessary precautions to prevent accidental alarm of
automatic fire system devices (smoke and/or heat detectors), etc. Smoke detectors in areas under
construction must be “bagged” during construction hours and “unbagged” at the end of the day. Before any
unit or device is temporarily incapacitated, the Building Engineer shall able advised to allow notification of
the Fire Department and then the device shall be red-tagged “Out of Service.” Every effort must be made to
reactivate “Out of Service” devices as soon as possible. Please note that The District of Columbia charges
the Building Owner for each false alarm. Therefore any contractor who sets off a building fire or security
alarm will be assessed at $1,000 plus associated building management costs per incident.
Engineering Overtime – If the Contractor performs any work, which, in the sole estimation of Building
Manager, requires the Building Engineer to be on duty during non-standard working hours, the Tenant shall
be responsible for the cost of such services at the rate of $75 per hour with a minimum charge for 4 hours.
Such charge shall be payable by Contractor.
Posting of Rules and Regulations – A copy of these rules and regulations, acknowledged and accepted
by the Contractor, must be posted on the job site in a manner allowing easy access by all workers. It is the
Contractor’s responsibility to instruct all workers, including subcontractors, to familiarize themselves with
these rules.
Signage – Contractor or subcontractor signage may not be displayed in the building common areas or any
of the window glass.
Housekeeping – Daily cleaning is to be performed in the work area before leaving the premises including
but not limited to the clean up of (vacuuming of) floor covering, exposed surfaces, janitors’ closet and any
other affected areas. Workmen are to use only restroom facilities designated by building management and
will maintain the single restroom in an acceptable fashion. Materials and/or supplies, which must remain on
the premises overnight, are to be consolidated daily and stored in a location out of Tenant view if possible. If
building staff designates a better location for storage than originally chosen, the contractor is to have
materials relocated. In preparation for substantial completion inspection or occupancy, the Contractor shall
perform a final cleaning of Contractor’s Work, including any adjacent areas that have been soiled by such
work.
Parking – Parking in the loading dock area by the contractors and/or or their personnel is strictly prohibited
other than for unloading materials. Onsite parking is not available.
Supervision – the contractor is required to have a person of authority (supervisor) on the job at all times
who will always be accessible to building management.
Radios – No radios shall be played (including, restrooms, and stairwells).
Conduct – While workmen are in the building, they will conduct themselves in a quiet and efficient manner
and demonstrate courtesy to Tenants and staff. Proper attire must be worn at all times including shoes and
shirts; no cutoff shirts or ragged clothes will be permitted at any time. Workmen are not to congregate in any
public area for lunch or for reasons other than work. Noon break is to be taken away from access and
egress areas of the building. All lunch trash is to be properly disposed of by the workmen. The Contractor
shall be responsible for the actions of his employees on site as well as those of his subcontractors, agents
and visitors.
Exterior Appearance – The contractor shall paper all exterior windows at the ground or street level to avoid
viewing such areas from any side of the building exterior. This paper shall remain in good condition until
approval is issued to remove.
Smoking – Smoking is not permitted inside any area of the building. Failure to comply will result in a $500
fine to GC and immediate removal of offender from job site. The workmen will take care to properly
extinguish and place used smoking materials in the ashtrays outside of the building. Smoking is only
permitted in the designated area of the loading dock.
Access – Wherever possible, no vendors or materials are to block loading dock or elevator assess on any
floor or to block restrooms, stairwells or suite access. Work materials may not obstruct access way for
Tenants. Building materials may not be brought into the building through the lobbies or stored in the lobbies
or corridors at any time.
Cabling – Abandoned telephone or data cabling shall be removed from the ceiling and any new
communication cabling separately supported from the slab above (not hanging from ceiling supports).
Outlets – Electrical outlets being abandoned shall have the BX removed to junction box or the panel.
Inspection Notice and Approval – The Building Engineer must be notified 24 hours in advance of all
scheduled inspections. Copies of the inspections, building finals (ie. Plumbing, electrical) must be submitted
to Property Manager at time of inspection (not at completion of project).
Close Out Documents - Contractors must provide the Property Management Office with the following
documents at completion of project: Certificate of Occupancy, Permit Set of Drawings, As-built drawings,
electronic files, Operation/Maintenance Manuals and Final Lien Releases.
Any significant breach of guidelines by a Contractor that adversely affects a Tenant, or embarrasses the
Owner’s Agents, will not be tolerated and will be cause for dismissal from the premises. The contracting
company may also be expelled from the building for disregard for the aforementioned instruction.
Policies and Procedures: Electrical Requirements
Prior to any alterations of electrical wiring, specifications must be submitted to Building Management, for
review and approval by the building electrician to avoid any code violations.
Policies and Procedures: Floor Load
Code requirements restrict placing loads upon floors that exceed the load per square foot for which the floor
was designed. The floor load for 1601 K Street, NW is 100 pounds per square foot – 80 pounds per square
foot live load, plus 20 pounds per square foot partition load. Should you find it necessary to utilize
equipment that exceeds this rating, you must receive prior written approval from Building Management. The
Landlord’s structural engineer shall review documentation provided by the tenant, and shall have the right to
prescribe the weight, size and position of all equipment, materials, furniture or other property brought into
the Building.
Tenants will be invoiced for the structural engineer’s services. Heavy objects shall stand on such platforms
as determined by Landlord to be necessary to properly distribute weight.
Policies and Procedures: Floor Covering
All floor coverings should be approved through Building Management. In particular, please be aware that
sponge or rubber-backed carpeting is not allowed.
Policies and Procedures: Insurance Protection
Prior to moving into the building, and at all times during your suite’s tenancy, each tenant must have on file
in the Management Office a Certificate of Insurance evidencing the coverage types and amounts stipulated
in the lease agreement. PPF OFF 1601 K Street, LLC and JBG Commercial Management, LLC, must be
included as additional insureds. Building Management’s copy of your suite’s insurance certificate must be
current at all times while your lease is in effect.
Certificates representing current insurance coverage must also be on file in the Management Office for each
contractor (construction, remodeling, moving, etc.) that performs work in the building prior to the start of any
activity. Such coverage must remain in effect until all work is completed. Tenant contractors that have not
met this requirement will be removed from the premises.
Policies and Procedures: Moving Procedures
General
In an effort to act in the best interest of the tenants and to protect the property, the following policies
regarding movement of office furniture and equipment into or out of the Building must be strictly adhered to.
Before engaging a moving or Delivery Company, please contact the Building Management Office in writing
no later than one week prior to any move to discuss your arrangements. All correspondence concerning
your move is to be directed to:
JBG Commercial Management Office
c/o Dawn Redmond, Senior Property Manager
1601 K Street, NW, Suite 160
Washington, DC 20006
Fax: 202 429-4376
A pre-move and follow-up walk-through should be coordinated with the Building Management Office in order
to document the condition of the affected areas of the building before and after the move. Any damage
caused by the movers will be repaired by a contractor of the Building Management’s choice, and paid for
promptly by the tenant or the moving contractor. To help
avoid such damage, movers must protect all flooring with Masonite, and walls, corners and doorframes are
to be treated with appropriate protection.
The actual relocation of a tenant’s offices begins with the tenant’s ideas on how the space is to function.
Relocation ends when the Building Engineer hands the tenant the keys to the front door of the premises. In
the interim, there is a tremendous amount of planning, estimating, and decision-making that must be
completed within the time frame set forth in the lease. Many different people are involved in the process.
Building Management will assist in every way possible to ensure a smooth and efficient relocation.
Moving Into the Building
All tenant move-ins must be coordinated with Building Management. Information concerning move-in
procedures is included later in this section. Building Management should also be notified at least twenty-four
(24) hours in advance regarding any arrangements made for various trades, such as telephone installation,
copier installation, etc. Many of the items needing to be addressed prior to a move are listed below:
1. Change of address information to the U.S. Post Office.
2. Contact Phone Company to arrange for installation of new phones and equipment.
3. Provide Building Management with Certificates of Insurance for all contractors (i.e., movers, general
contractors) providing services on behalf of the tenant.
4. All Certificates of Insurance should contain the information below:
1. Certificates should list as additional insured:
PPF OFF 1601 K Street, LLC and JBG Commercial Management, LLC.
2. Certificate Holder information should read:
PPF OFF 1601 K Street, LLC
c/o JBG Commercial Management, LLC
1601 K Street, NW, Suite 160
Washington, DC 20006
202 429-4370/Phone
202 429-4376/Fax
5. As soon as a move-in date has been determined, provide Building Management as soon as possible,
with the information referenced in New Tenant Move-In Information in the Exhibits Section of this
manual.
6. Adherence of the Moving Procedures discussed later in this section.
Moving Out of the Building
All tenants moving out of the building should do the following:
1. Contact Verizon to discontinue tenant telephone service at the building.
2. Turn over all keys and building access cards to Building Management prior to leaving the building.
3. Follow the Moving Procedures discussed later in this section.
Move Procedures At A Glance
The following procedures are provided for quick reference to help facilitate all tenant moves into or out of
the building. Please be sure to provide a copy of these procedures to all moving companies bidding on your
move:
1. The Building Management office must be notified in writing, at least one week in advance of any
intended moves into or out of the building so that the freight elevator can be reserved.
2. Provide Building Management with a Certificate of Insurance from the moving company evidencing
the coverage’s in effect, and naming the building owner, PPF OFF 1601 K Street, LLC, and building
manager, JBG Commercial Management, LLC as additional insured.
3. Weekday deliveries requiring the freight elevator are scheduled on a first come, first served basis.
The freight car cannot be reserved or used exclusively during the week, except before or after normal
business hours. Only small moves are permitted during weekdays. Use of the freight elevator on
weekdays is prohibited for any moves or large deliveries between the hours of 8 am – 6:00 pm.
4. Larger moves (those requiring more than one hour or involving pieces of furniture or equipment with
dimensions greater than 5 feet) must be scheduled after 6:00 pm weekdays or on weekends.
Move Procedures at a Glance (Continuted)
1. Masonite must be placed on all lobby floors, and walls, corners and door fames must also be treated
with appropriate protection.
2. The tenant is responsible for taking every precaution to safeguard the building from damage (i.e.,
through means of crating and padding). In addition, materials should be removed from shelves, and
file cabinets and desks should be emptied with drawer’s taped shut.
3. Moving or delivery companies and tenants are responsible for leaving the building and premises
clean by removing all cartons and other trash generated during the move. If clean-up assistance is
needed, building personnel can be provided on a time and material basis. To arrange for this service,
please contact the Building Management office at least 48 hours in advance.
4. Should tenant’s wish to dispose of waste material or large, bulky items in the building dumpster,
arrangements are to be made through the Building Management office at least 48 hours in advance.
Again, any costs related to special use of the dumpster or removal of such materials will be charged
to the tenant.
5. Any and all damage to the building, including lobbies, hallways, elevator, loading areas, and grounds,
which is caused by the tenant, moving company or its employees or agents will be the responsibility
of tenant. The Landlord will perform required repairs and all costs associated with such repair will be
billed to the tenant for reimbursement.
Please click here to download additional move out information
Policies and Procedures: Regulatory Conformance
It is in the best interest of the building and its tenants that all federal, state and local regulations governing
1601 K Street, NW are in practice at this property. Compliance with building codes, fire codes, health codes
and other ordinances often seems too inconvenient, difficult or costly, but in fact is essential for life safety
and well-being. 1601 K Street, NW is operated so as to abide with regulations to the best of Building
Management’s knowledge, and it is important that each tenant acts in the same fashion to avoid
jeopardizing the safety of the other tenants.
Asbestos
1601 K Street, NW will be carefully monitored to ensure that any possible presence of Asbestos Containing
Material “ACM” will be handled in full accordance with EPA regulation.
The “18-Inch Rule”
The “18 inch rule” is commonly overlooked in office buildings. In order for fire detection and suppression
systems to perform properly, nothing may be placed within 18 inches of the ceiling. This typically involves
items stored on high shelving. Please monitor this carefully to prevent this occurrence in your premises.
These two regulatory issues (and many others as well) are inherently relevant to your safe occupancy in
this building. Please call Building Management if you have questions in this regard.
Policies and Procedures: Remodeling Procedures
Before Construction:
Remodeling/redecorating work can be either minor or major, and may include any of the following:
Installing electrical or phone outlets
Installing or relocating light fixtures
Relocating doors
Repairing carpets
Installing new carpet
Adding or moving walls
Painting or wallcovering
Telephone or computer system cabling
As your office contemplates remodeling work for your suite at 1601 K Street, NW, several factors involving
the Landlord’s interface should be considered.
1. The Landlord must evaluate even the smallest change for its impact on the building. Written design
approval by Building Management is required prior to the commencement of work. For most projects
this can be accomplished in five (5) business days or less.
2. Be sure to provide two (2) copies of all applicable plans and specifications, so that we can return one
copy to you with our comments, and keep one copy for our files. The Landlord’s review helps ensure
that the proposed project will conform to the building’s core and shell systems, as well as the
standard construction practices and appropriate materials for the building.
3. The scope of various projects will require that the Tenant engage a licensed architect and/or
engineer. Check with Building Management to discuss our requirements in a specific instance.
4. Obtain approval of all contractors who will be working on your project by completing a Request for
Approved Contractors form. Landlord reserves the right to withhold the approval of any contractor who
cannot provide insurance coverage; is not licensed; or has previously caused problems.
During Construction:
The Landlord will require that all work that takes place comply with all governmental authorities with
jurisdiction over the project. It tends to simplify matters if contractors are selected from a Management’s
Approved Contractor List, though the tenant may still go through whatever process it feels necessary to
ensure that the contractor is qualified for the work.
1. No contractor will be allowed to begin work, until a Certificate of Insurance naming the additional
insureds has been received by the Management Office, and contractor has returned a sign copy of
the back page of the Contractor Rules and Regulations acknowledging that it has read and agrees to
all terms and conditions.
Please refer to: Contractor Rules and Regulations in the Exhibits Section.
2. A pre-construction meeting with the contractor, tenant, Building Management, and engineer is
strongly encouraged to ensure all parties are clear on the work to be performed and fully understand
the rules and regulations.
3. All work must be performed in accordance with the Site-Work Rules for the Board of Trade Building
(is this for both 1101 and Board of Trade? If so, you may want to change the header).
4. No loud noise is to take place during normal business hours, from 8:00 a.m. to 8:00 p.m., Monday
through Friday. If a construction project is deemed to be disruptive to existing tenants and/or the
Landlord, the General Contractor shall reschedule work so as to eliminate disruption to the
satisfaction of Landlord at no additional cost to the Landlord.
After Construction:
Upon completion of the work, and depending on the nature of the project, the contractor must be required to
furnish certain items to the Landlord to assist with the Landlord’s future maintenance of the suite; to help
prove that the work was completed satisfactorily; and, to demonstrate that the property will remain free of
liens. We suggest that final payment be withheld from the contractor until the applicable project close-out
items have been obtained from the contractor and forwarded to the Landlord to ensure suitability (not all of
these will be required for many small projects - ask Building Management).
1. Final Inspection Approval Certificate and Certificate of Occupancy from DC Government.
2. As-built drawings depicting accurate field conditions in areas affected by the work.
3. Updated electrical panel schedules.
4. Lien releases from the General Contractor, subcontractors and suppliers.
5. Operating and Maintenance (O&M) Manuals.
6. HVAC Test & Balance Reports.
7. Written one (1) year warranty on all completed work and installed equipment.
Policies and Procedures: Seasonal Decorations
Holiday decorations (including trees and wreaths) set up in any place of public assembly, or lobby shall be
in conformance with the following specifications:
1. For safety purposes, only artificial trees may be displayed in 1601 K Street, NW
2. Artificial trees shall not be set up before December 1st, and must be removed by January 2nd or the
first business day after the holiday.
3. Trees must be placed so they do not in any way block an exit door, nor obscure an exit sign.
4. Only decorations of non-flammable material are to be used.
5. Electrical wiring shall NOT be used on metallic Christmas trees. Metallic trees may be illuminated by
use of spotlights placed a safe distance away.
6. Any electric lights used on trees must conform to electric code and be U.L. approved.
7. All artificial trees must be flame retardant to the satisfaction of the DC Fire Marshall.
8. Use of any candle or flame decorations is prohibited.
Policies and Procedures: Smoking
All public aspects of 1601 K Street, NW have been declared “Non-Smoking Areas.” This includes
restrooms, stairways, surrounding area, corridors, lobbies, and elevators, etc. Smokers may use areas on
the exterior of the property that from time-to-time may be designated “smoking areas.” These areas are
subject to change, and Building Management will notify tenants accordingly. We ask all smokers’
cooperation in properly extinguishing and disposing of cigarette butts in the ash urns provided for this
purpose. This will help Building Management maintain the cleanliness of the exterior of the property, and
make for more pleasant surroundings for everyone.
Currently, the loading dock is the designated smoking area, subject to change at Building Management’s
discretion. Smoking is prohibited by the main lobby and K Street entrances and in the common area along
16th Street.
Tenants’ assistance in self-enforcing this policy is important in order for meaningful regulation. This sort of
arrangement is generally consistent with the other first class office buildings in the Washington, DC area.
Policies and Procedures: Soliciting
In order to relieve tenants of the burden of uninvited soliciting on the premises, soliciting is prohibited at
1601 K Street, NW. If someone is soliciting on your floor or in your suite, please notify the Security
Personnel at 202 429-4339 or the JBG Commercial Management Office at 202 429-4370 and the
appropriate personnel will be sent to encourage the solicitor’s departure.
Policies and Procedures: Utility Closet Access
For vendor access to any Utility Closet please contact the JBG Management Office.
Click here to download a Utility Access Request Form.
Policies and Procedures: Visitors
If you are expecting a visitor during security hours, please instruct them to check in with the security officer
on duty.
Policies and Procedures: Window Covering
1601 K Street, NW is equipped with building standard blinds in all office suites. While blinds are provided
initially to all tenants, repair or replacement of blinds is provided through Building Management at an
additional charge. The blinds serve an insulating function both in the retention of heat in the winter months,
and the exclusion of heat in the summer months. We recommend blinds be kept drawn at all times.
The Neighborhood: Transportation
1601 K Street is located in close proximity to the Farragut North Metro Station which is served by the Red
line. Entrances to the station are located at NE corner Conn. Ave. & K St. NW, SW corner Conn. & L St. and
NE corner Conn. & L St.
Farragut North is serviced by a number of Metrobus routes including, 11Y (inbound on I St.; outbound on H
St.), 16Y (on K St.), 30, 32, 34, 35, 36 (w/b on I St.; e/b on H St.), 38B (on 17th St. E north of I St., on K St.
west of Connecticut/17th), 3Y (on K St.), 42 (on Connecticut Ave., 17th St. W; 42/ on 17th St. E), 80 (on K
St.), D1, D3, D6 (on K St.), D5 (on K St. west of Connecticut/17th; AM, on 17th St. E north of I St.; PM, on
17th St. south of I St.), G8 (on 17th St. E north of I St.), L2 (on K St.), N2, N4, N6 (s/b on Connecticut Ave.;
on 17th St. E north of I St.; n/b on 18th St.), P17, P19 (inbound on I St. at 17th; outbound on 17th St. south
of H, on H St. east of 17th), S1 (on K St.), W13 (inbound on I St. at 17th; outbound on 17th St. south of H,
on H St. east of 17th). Farragut North is also serviced by the Loudoun County Commuter Bus: Loudoun and
the OmniRide Commuter Bus: OmniRid
For your convenience we have included a Metro Rail system map. Click on the icon below. If you need
more detailed information please visit the Washington Metropolitan Area Transit Authority at
www.wmata.com
METRO MAP ( click to enlarge)
Download