Unscreened separable connector systems for underground 24 kV

advertisement

Unscreened separable connector systems for underground 24 kV cable networks

exclusive distributor in Europe

U

nited

E

lectric

6/10(1)kV

6.35/11(1)kV

8.7/15 (17.5) kV

1/0 (4) kV

1.7/ (4) kV

185

Front T Connector

・ Meets the requirements of

standard IEC 60502-4,

CENELEC HD 629.1 S1

and GB/T 12706.4.

・ System voltage up to 24 kV

・ Rated current: 630A

・ Com pression / Mechanical cable lug : Cu./ Al.- Cu.

290/242

1

8

2

3

・ CJ20-630D is an unscreened,

bolted type Tee shape

separable cable connector

made of silicone rubber,

designed to connect the

polymeric cable to transformers,

switchgears, motors and other

equipment up to 24kV with

bushing type C accord ing to

EN 50180 & EN 50181.

4

5

1 Type ‘C’ (630A) bushing

as described by CENELEC

EN 50180 and 50181

2 Cable lug

3 Insulating layer "body"

4 Stress cone

5 Adapter

6 Insulating plug

7 Polymeric insulated cable

8 Ball pin

Selection guide

1.

Select in the table the kit model corresponding to the diameter over

insulation of cable.

For cables with reduced insulation thickness, please contact us.

Kit reference

(№)

CJ20-630D-1

CJ20-630D-2

CJ20-630D-3

CJ20-630D-4

CJ20-630D-5

Cable insulation

Dia. range(mm 2 )

17-25.8

23-28

Conductor size in mm 2

( for guidance only )

17.5kV(U m

) 24kV(U m

)

35 、 50 、 70 、 95

120 、 150 、 185 、 240

120 、 150 、 185

25 、 35 、 50 、 70

95 、 120 、 150

95 、 120 、 150

28-35

36-39

40-44

240 、 300

500

630

、 400 185 、

400

240

630

500

300

© 2014

7

.

Specify insulation voltage U m

in kV: 1, 17.5, 4

3.

Select suitable compression lug

3.1. Conductor size ___ mm 2

3.2. Conductor material " A " Aluminium

" C " Copper

3.3. Screw cable lug " SL "

EXAMPLE OF ORDER :

24kV polymeric cable, 1×300 sqmm, diameter over insulation 33.9mm, with copper wire screen, aluminium conductor, lug for compress or mechanical type: CJ0-630D-3-4-300A

4.

Optional assembly accessories

4.1. For cable with copper tape screened: order kit ERK.

4.2. For 3 -core cable: order kit TRK.

6/10(1)kV

6.35/11(1)kV

8.7/15 (17.5) kV

1/0 (4) kV

1.7/ (4) kV

U

nited

E

lectric

Front and Rear T Connector

・ Meets the requirements of

standard IEC 60502-4,

CENELEC HD 629.1 S1

and GB/T 12706.4.

・ System voltage up to 24 kV

・ Rated current: 630A

・ Com pression / Mechanical cable lug : Cu./ Al.- Cu.

280

290/242

1

8

6

2

・ CJK20-630D is a unscreened

coupling Tee connector made

of silicone rubber for double

cable connection. It is linked

directly to cable connector

CJ20-630.

3

4

5

7

1 Type ‘C’ (630A) bushing

as described by CENELEC

EN 50180 and 50181

2 Cable lug

3 Insulating layer "body"

4 Stress cone

5 Adapter

6 Insulating plug

7 Polymeric insulated cable

8 Ball pin

Selection guide

1.

Select in the table the kit model corresponding to the diameter over

insulation of cable.

For cables with reduced insulation thickness, please contact us.

Kit reference

(№)

CJK20-630D-1

CJK20-630D-2

CJK20-630D-3

CJK20-630D-4

CJK20-630D-5

Cable insulation

Dia. range(mm 2 )

17-25.8

23-28

Conductor size in mm 2

( for guidance only )

17.5kV(U m

) 24kV(U m

)

35 、 50 、 70 、 95

120 、 150 、 185 、 240

120 、 150 、 185

25 、 35 、 50 、 70

95 、 120 、 150

95 、 120 、 150

28-35

36-39

40-44

240 、 300

500

630

、 400 185 、

400

240

630

500

300

© 2014

.

Specify insulation voltage U m

in kV: 1, 17.5, 4

3.

Select suitable compression lug

3.1. Conductor size ___ mm 2

3.2. Conductor material " A " Aluminium

" C " Copper

3.3. Screw cable lug " SL "

EXAMPLE OF ORDER :

20kV polymeric cable, 1×300 sqmm, diameter over insulation 33.9mm, with copper wire screen, aluminium conductor, lug for compress or mechanical type: CJK0-630D-3-4-300A

4.

Optional assembly accessories

4.1. For cable with copper tape screened: order kit ERK.

4.2. For 3 -core cable: order kit TRK.

3

U

nited

E

lectric

4

IEH - Department High-Voltage Dielectric Testing

Tests: Test volume, chronological order and requirements conform to CENELEC HD 629.1 S2 02/2006 test sequence E1,

E2 and E3, table 8 and table 10.For test sequence E1,no load cycles in water were performed,the cycles in water were replaced by load cycles in air. The PD-test was performed at 2 U

0 methods described in IEC 61442 03/2005.

. The tests were carried out in accordance with the test

Test sequence E1:

Pos.1.

Pos.2.

Pos.3.

DC voltage withstand test

U = 6 U

0

= - 72 kV ; t = 15 min

AC voltage withstand test

û /

2

= 4,5 U

0

= 54 kV; t = 5 min

Partial discharge test

û / 2 = 2,0 U

0

= 24 kV ; PD ≤ 10 pC

Pos.4.

Pos.5.

Pos.10.

Pos.11.

Impulse voltage withstand test at elevated temperature

û = 125 kV; positive and negative polarity each 10 impulses

Electrical heat cycling in air each loading cycle had a 5 hour heating period and a 3 hour no-load cooling period; test voltage: û / 2 =30 kV number of cycles: 126

Disconnection / Connection

5 complete operation, no visible damage to contact

Partial discharge test at ambient temperature and high temperature

û / 2 = 2,0 U

0

= 24 kV ; PD ≤ 10 pC

Pos.12.

Pos.13.

Pos.15.

Impulse voltage withstand test,

û = 125 kV; positive and negative polarity each 10 impulses

AC voltage withstand test

û / 2 = 2,5 U

0

= 30 kV; t = 15 min

Examination

Test sequence E:

Pos.1.

Pos.2.

DC voltage withstand test

U = 6 U

0

= - 72 kV ; t = 15 min

AC voltage withstand test

û / 2 = 4,5 U

0

= 54 kV; t = 5 min

Pos.8.

Pos.10.

Thermal short circuit test, conductor

θ

Sc

= 250°C; 2 stresses

Disconnection / Connection

5 complete operation, no visible damage to contact

Pos.12.

Impulse voltage withstand test

û = 125 kV; positive and negative polarity each 10 impulses

Pos.13. AC voltage withstand test

û / 2 = 2,5 U

0

= 30 kV; t = 15 min

Pos.15.

Examination

Test sequence E3:

Pos.13. AC voltage withstand test

û / 2 = 2,5 U

0

= 30 kV; t = 15 min

Pos.14. Humidity test

û / 2 = 15 kV; t = 300 h

Pos.15.

Examination

Conclusion:

The unscreened separable connectors, type CJ20-630D and CJK20-630D, manufacturer GCA Co. Ltd / United Electric

Co. Ltd passed all tests described in clause 2 successfully. The test object fulfilled the requirements according CENELEC

HD 629.1 S2 02/2006, Table 8, test sequences E1, E2 and E3 and table 10.

Karlsruhe, 13.01.2013

Contact us:

U

nited

E

lectric Co., Ltd.

Address

Tel

Fax

E-mail

Website

702, North Jinke Building, No. 8 Qiongyu Road, Hi-tech

Industry Park, Nanshan District, Shenzhen 518057, China

0086-755-26419390 / 26419370

0086-755-26414580 export@ueaccessory.com www.ueaccessory.com

Address

Tel

Fax

E-mail

Website

Adm. Helfrichweg 2a,2901 AM

Capelle aan den ljssel

0031-10-2580888

0031-10-2580899 info -energietechniek @ batenburg .nl

www.

batenburg-energietechniek .nl

© 2014

Download