Page Visual Inspection / Cleaning Meter Data Project INSPECTION FORM ANALOG METER Facility: Project Name: Area : Bid Opportunity: Location: Cell #: Manufacturer: Type: Accuracy ID: Range Cover Gasket: Good Acceptable Poor Cover Glass: Good Acceptable Poor Spiral Spring: Good Acceptable Poor Disc Clearance: Good Acceptable Poor Contacts: Good Acceptable Poor Case Shorting Contacts: Good Acceptable Poor Rotating Disc Movement: Good Acceptable Poor General Condition: Good Acceptable Poor Cleanliness (as found) Good Acceptable Poor Unit Cleaned: Yes Connections (as found) Good Acceptable Poor Connections Torqued: Yes Test Value Reading As Found Reading As Left N/A Units 0 Unit Calibrated: Final Analysis 1 of 1 Yes No Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-AM Rev.00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-AM.doc Breaker Data Project INSPECTION FORM AIR CIRCUIT BREAKER, 4160V Facility: Project Name: Area : Bid Opportunity: Location: Switchgear: Manufacturer: Type: Rated Voltage: V Momentary Fault Closing Amps: Visual Inspection / Cleaning Breaker ID Serial #: A Trip Unit Type: Breaker Identification Tag Installed: Interrupting Rating: Control Voltage: Yes 1 of 2 Cell #: Current Rating: A Page No kA V BIL Rating: Visual Signs of Overheating: Cleanliness (As Found): Good Acceptable Poor Support Insulators: Connections: Good Acceptable Poor Ground Connection: Good Acceptable Poor Arc Chutes: Door Mechanical: Good Acceptable Poor Cell Fit and Alignment: Good Racking Mechanism: Shutter: Yes Good Electro/Mechanical Interlock: Acceptable Poor Good Acceptable Poor Good Acceptable Poor Contact Alignment and Condition: Good Acceptable Poor Acceptable Poor Operating Mechanism: Good Acceptable Poor Good Acceptable Poor Contact Fingers: Good Acceptable Poor Good Acceptable Poor Arcing Contacts: Good Acceptable Poor Good Acceptable Poor Cables Supported Appropriately: Yes N/A No No Auxiliary Devices: Unit Cleaned: Yes Photograph Taken: Yes Comments: Test Preparation : Insulation Resistance Test Test Voltage Source: Cable Dest. / Load: Disconnected Note: Approval of City’s Representative is required, prior to Disconnected leaving cables connected during the test. Connected with Connected with Load Isolated Source Isolated Insulation Resistance (MΩ) Phase To GND (Breaker Closed) A B Temperature: o C C 2500 V Test Voltage Insulation Resistance (MΩ) Phase To Phase (Breaker Closed) A–B B–C A-C 2500 V Test Voltage Insulation Resistance (MΩ) Line to Load (Breaker Open) A B 2500 V Comments: Form F-BKR-AIR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-BKR-AIR-4160V.doc Test Summary C Test Passed Test Inconclusive Further Investigation Required. Test Failed Insulation Resistance (Control Wiring) INSPECTION FORM AIR CIRCUIT BREAKER, 4160V Wire Tag Insulation Resistance (MΩ) Page Breaker ID Insulation Resistance (MΩ) Wire Tag 2 of 2 Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: Contact/Pole Measurements A B C Test Summary Resistance (µΩ) Test Passed Test Inconclusive Further Investigation Required. Test Failed Arcing Contact Gap (mm) Arcing Contact Wipe (mm) Main Contact Gap (mm) Main Contact Wipe (mm) High Potential Test Comments: Test Preparation : Source: Disconnected Connected with Source Isolated Peak DC Test Voltage (1 minute duration) Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Test Summary (µA) A Test Summary B Test Passed Test Inconclusive Further Investigation Required. Test Failed C 12 kV Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-BKR-AIR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-BKR-AIR-4160V.doc Breaker Data Project INSPECTION FORM AIR CIRCUIT BREAKER, 600V Facility: Project Name: Area : Bid Opportunity: Location: Switchgear: Manufacturer: Type: Rated Voltage: V Momentary Fault Closing Amps: Visual Inspection / Cleaning Interrupting Rating: Trip Unit Type: Yes Breaker ID: Serial #: A Breaker Identification Tag Installed: 1 of 3 Cell #: Frame Size: A Page kA Control Voltage: No V Visual Signs of Overheating: Cleanliness (As Found): Good Acceptable Poor Support Insulators: Connections: Good Acceptable Poor Ground Connection: Good Acceptable Poor Arc Chutes: Door Mechanical: Good Acceptable Poor Cell Fit and Alignment: Good Racking Mechanism: Shutter: Yes Good Electro/Mechanical Interlock: Acceptable Poor Good Acceptable Poor Good Acceptable Poor Contact Alignment and Condition: Good Acceptable Poor Acceptable Poor Operating Mechanism: Good Acceptable Poor Good Acceptable Poor Contact Fingers: Good Acceptable Poor Good Acceptable Poor Arcing Contacts: Good Acceptable Poor Good Acceptable Poor Cables Supported Appropriately: Yes N/A No No Auxiliary Devices: Unit Cleaned: Yes Photograph Taken: Yes Comments: Test Preparation: Insulation Resistance Test Test Voltage Source: Cable Dest. / Load: Disconnected Note: Approval of City’s Representative is required, Disconnected prior to leaving cables connected during the test. Connected with Connected with Load Isolated Source Isolated Insulation Resistance (MΩ) Phase To GND (Breaker Closed) A B Temperature: o C C 1000 V Test Voltage Insulation Resistance (MΩ) Phase To Phase (Breaker Closed) A–B B–C A-C 1000 V Test Voltage Insulation Resistance (MΩ) Line to Load (Breaker Open) A B 1000 V Comments: Form F-BKR-AIR-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-BKR-AIR-600V.doc Test Summary C Test Passed Test Inconclusive Further Investigation Required. Test Failed Insulation Resistance (Control Wiring) INSPECTION FORM AIR CIRCUIT BREAKER, 600V Wire Tag Insulation Resistance (MΩ) Page Breaker ID: Test Summary Insulation Resistance (MΩ) Wire Tag 2 of 3 Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: Contact/Pole Measurements A B C Test Summary Resistance (µΩ) Test Passed Test Inconclusive Further Investigation Required. Test Failed Arcing Contact Gap (mm) Arcing Contact Wipe (mm) Main Contact Gap (mm) Main Contact Wipe (mm) Comments: Breaker Settings Plug Rating: A Sensor Tap Relay Setting (As Left) Ground Fault Setpoint 3W 4W Delay I2T Enabled Long Time X A = A sec Yes No On Off Short Time X A = A sec Yes No On Off Instantaneous X A = A Yes No Yes No On Off Ground Fault N/A A sec TCC NO: Time Band Breaker Test Test Test Current Long Time A Short Time A Instantaneous A Ground Fault A Min. (sec) Max. (sec) Form F-BKR-AIR-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-BKR-AIR-600V.doc A As-Found (sec) B As-Left (sec) As-Found (sec) C As-Left (sec) As-Found (sec) As-Left (sec) Final Analysis INSPECTION FORM AIR CIRCUIT BREAKER, 600V Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Page 3 of 3 Breaker ID: Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-BKR-AIR-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-BKR-AIR-600V.doc Breaker Data Project INSPECTION FORM MOLDED CASE CIRCUIT BREAKER, 600V Facility: Project Name: Area : Bid Opportunity: Location: Panelboard/MCC: Manufacturer: Type: Rated Voltage: V Interrupting Rating: kA 1 of 1 ID: Cell #: Serial #: Frame Size: A Trip Unit: Comments: Breaker Identification Tag Installed: Visual Inspection / Cleaning Page Yes No Visual Signs of Overheating: Cleanliness (As Found): Good Acceptable Poor Cables Supported Appropriately: Connections: Good Acceptable Poor Ground Connection: Good Acceptable Poor Exercise Circuit Breaker: Door Mechanical: Good Acceptable Poor Other: Electro/Mechanical Interlock: N/A Good Yes No Yes No Acceptable Poor Yes Contact Measurements Comments: A Breaker Settings Test Summary C Test Passed Test Inconclusive Further Investigation Required. Test Failed Resistance (mΩ) Comments: Trip Unit Rating: Final Analysis B A Trip Unit Type: Breaker Setting (As Left) None Thermal Magnetic Range Electronic Setpoint LI LSI Delay LSIG I2T Long Time Fixed Adj. - X A = A sec On Off Short Time Fixed Adj. - X A = A sec On Off Instantaneous Fixed Adj. - X A = A Ground Fault Fixed Adj. - On Off Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name A N/A sec Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-BKR-MC-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-BKR-MC-600V.doc Breaker Data Project INSPECTION FORM VACUUM CIRCUIT BREAKER, 4160V Facility: Project Name: Area : Bid Opportunity: Location: Switchgear: Manufacturer: Type: Rated Voltage: V Momentary Fault Closing Amps: Visual Inspection / Cleaning Breaker ID Serial #: A Trip Unit Type: Breaker Identification Tag Installed: Interrupting Rating: Control Voltage: Yes 1 of 2 Cell #: Current Rating: A Page No A V BIL Rating: Visual Signs of Overheating: Cleanliness (As Found): Good Acceptable Poor Support Insulators: Connections: Good Acceptable Poor Ground Connection: Good Acceptable Door Mechanical: Good Cell Fit and Alignment: Yes Good Electro/Mechanical Interlock: Acceptable Poor Good Acceptable Poor Poor Contact Fingers: Good Acceptable Poor Acceptable Poor Vacuum Bottle Good Acceptable Poor Good Acceptable Poor Contact Erosion Indicator Good Acceptable Poor Racking Mechanism: Good Acceptable Poor Operating Mechanism: Good Acceptable Poor Shutter: Good Acceptable Poor Arcing Contacts: Good Acceptable Poor Auxiliary Devices: Good Acceptable Poor Cables Supported Appropriately: Counter Reading: As-Found Yes No Unit Cleaned: N/A No Yes Photograph Taken: Yes As-Left Comments: Test Preparation: Insulation Resistance Test Test Voltage Source: Cable Dest. / Load: Disconnected Note: Approval of City’s Representative is required, Disconnected Connected with prior to leaving cables connected during the test. Connected with Load Isolated Source Isolated Insulation Resistance (MΩ) Phase To GND (Breaker Closed) A B Temperature: o C C 2500 V Test Voltage Insulation Resistance (MΩ) Phase To Phase (Breaker Closed) A–B B–C A-C 2500 V Test Voltage Insulation Resistance (MΩ) Line to Load (Breaker Open) A B 2500 V Comments: Form F-BKR-VAC-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-BKR-VAC-4160V.doc Test Summary C Test Passed Test Inconclusive Further Investigation Required. Test Failed Insulation Resistance (Control Wiring) INSPECTION FORM VACUUM CIRCUIT BREAKER, 4160V Wire Tag Insulation Resistance (MΩ) Wire Tag Insulation Resistance (MΩ) Page 2 of 2 Breaker ID Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: Contact/Pole Measurements A B C Test Summary Pole Resistance (µΩ) Test Passed Test Inconclusive Further Investigation Required. Test Failed Contact Resistance (µΩ) Contact Travel (mm) High Potential Test Comments: Test Preparation: Peak DC Test Voltage (1 min. duration) Source: Disconnected Connected with Source Isolated Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Test Summary (µA) A Test Summary B Test Passed Test Inconclusive Further Investigation Required. Test Failed C 12 kV Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-BK-VAC-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-BKR-VAC-4160V.doc Capacitor Bank Data Project INSPECTION FORM CAPACITOR BANK, 600V Facility: Project Name: Area : Bid Opportunity: Location: Switchgear/MCC: Manufacturer: Model: Size: VAR Configuration: Rated Voltage: Delta Visual Inspection/ Cleaning Insulation Resistance Test 1 of 1 ID: Cell #: Serial #: V Wye-Ungrounded Capacitor Identification Tag Installed: Page Capacitance: µF Wye-Grounded Yes No Cables Supported Appropriately: Yes No Cleanliness (As Found): Good Acceptable Poor Anchorage, alignment: Good Acceptable Poor Connections: Good Acceptable Poor Required Clearances: Good Acceptable Poor Ground Connection: Good Acceptable Poor Unit Cleaned: Source Cables: Disconnected Connected with Source Isolated Test Preparation: A (A-B) B (B-C) Photograph Taken: Yes Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Insulation Resistance (MΩ) Phase To GND Test Voltage Yes Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed C (C-A) 1000 V Comments: Capacitance Capacitance (µF) A (A-B) B (B-C) Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed C (C-A) Comments: Discharge Resistance Resistance (Ω) A (A-B) Test Summary B (B-C) Test Passed Test Inconclusive Further Investigation Required. Test Failed C (C-A) Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-CAP-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-CAP-600V.doc Project INSPECTION FORM CAPACITOR BANK, MEDIUM VOLTAGE Facility: Project Name: Area : Bid Opportunity: Capacitor Bank Data Cell #: Manufacturer: Model: Size: VAR Configuration: Visual Inspection/ Cleaning 1 of 1 ID: Location: Rated Voltage: Delta Serial #: V Wye-Ungrounded Capacitor Identification Tag Installed: Insulation Resistance Test Page Capacitance: µF Wye-Grounded Yes No Cables Supported Appropriately: Yes No Cleanliness (As Found): Good Acceptable Poor Anchorage, alignment: Good Acceptable Poor Connections: Good Acceptable Poor Required Clearances: Good Acceptable Poor Ground Connection: Good Acceptable Poor Unit Cleaned: Source Cables: Disconnected Connected with Source Isolated Test Preparation: A (A-B) Photograph Taken: Yes Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Insulation Resistance (MΩ) Phase To GND Test Voltage Yes B (B-C) Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed C (C-A) 2500 V Comments: Capacitance Capacitance (µF) A (A-B) Test Summary B (B-C) C (C-A) Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: Discharge Resistance Resistance (Ω) A (A-B) Test Summary B (B-C) C (C-A) Test Passed Test Inconclusive Further Investigation Required. Test Failed Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-CAP-MV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-CAP-MV.doc Project INSPECTION FORM POWER CABLE, 4160V Facility: Project Name: Area : Bid Opportunity: Source: Cable Data Cable ID: Type: No. of Conductors: V Conductor: AWG MCM Size: Rated Voltage: Installation: Visual Inspection 1 of 3 Dest. / Load: Manufacturer: Operating Voltage: Cable Tray Strapped Length: V m Copper Measured Jacket Markings Aluminum Previous Data TDR Date Installed: EMT Steel Conduit Alum. Conduit PVC Conduit Direct Buried Underground Duct Other: Physical Damage on Exposed Ends: Yes No Cable Identification Tag Installed: Yes No Visual Signs of Overheating/Corona: Yes No Cable Supported Appropriately: Yes No Damage to Splices/Terminations: Yes No Shield Grounded: Yes No Bend Radius Acceptable: Yes No Comments: Test Preparation: Insulation Resistance Test Page Cable Dest. / Load: Source: Disconnected Disconnected Connected with Source Isolated Connected with Load Isolated Cable Temperature: o C Ground all conductors not under test for each reading. Temperature Correction Factor for 20oC: Insulation Resistance (MΩ) Test Voltage A-GND Reading 2500V Corrected to 20oC Comments: Form CBL-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-CBL-4160V.doc B-GND Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Test Summary C-GND Test Passed Test Inconclusive Further Investigation Required. Test Failed INSPECTION FORM 4160V POWER CABLE Source: Disconnected Connected with Source Isolated High Potential Very Low Frequency (VLF) Test Test Preparation: Frequency: 0.1 Hz Test Voltage (RMS) Elapsed Time (min) 7000V 0 7000V 1 7000V 2 7000V 3 7000V 4 7000V 5 7000V 6 7000V 7 7000V 8 7000V 9 7000V 10 7000V 11 7000V 12 7000V 13 7000V 14 7000V 15 Page 2 of 3 Cable ID: Cable Dest. / Load: Disconnected Note: Approval of City’s Representative is required, prior to Connected with leaving cables connected during the test. Load Isolated Waveform: sinusoidal Ground all conductors not under test for each reading. Peak Leakage Current (uA) A-GND Comments: Form CBL-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-CBL-4160V.doc B-GND Test Summary C-GND Test Passed Test Inconclusive Further Investigation Required. Test Failed INSPECTION FORM 4160V POWER CABLE Frequency: Dissipation Factor (Tangent Delta) Test A Tan Delta 3 of 3 Cable ID: Waveform: sinusoidal 0.1 Hz Test Voltage (RMS) Page B Capacitance (nF) Current (µA) Tan Delta C Capacitance (nF) Current (µA) Tan Delta Capacitance (nF) Current (µA) 2400V 4800V Difference Test Summary Comments: Test Passed Test Inconclusive Further Investigation Required. Test Failed Termination Connection Resistance (µΩ) - As Left Connection Resistance A B Torque Check C Source OK Dest. / Load OK Final Analysis Comments: Cable Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form CBL-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-CBL-4160V.doc Project INSPECTION FORM POWER CABLE < 1000V Facility: Project Name: Area : Bid Opportunity: Source: Cable Data Cable ID: Type: No. of Conductors: Rated Voltage: V Conductor: AWG MCM Size: Operating Voltage: Cable Tray Strapped Installation: Visual Inspection 1 of 1 Dest. / Load: Manufacturer: V EMT Steel Conduit Length: m Copper Aluminum Measured Jacket Markings Previous Data TDR Date Installed: Alum. Conduit PVC Conduit Direct Buried Underground Duct Other: Physical Damage on Exposed Ends: Yes No Cable Identification Tag Installed: Yes No Visual Signs of Overheating: Yes No Cable Supported Appropriately: Yes No Bend Radius Acceptable: Yes No Comments: Test Preparation: Insulation Resistance Test Page Cable Dest. / Load: Source: Disconnected Disconnected Connected with Source Isolated Connected with Load Isolated Cable Temperature: o C Ground all conductors not under test for each reading. Temperature Correction Factor for 20oC: Insulation Resistance (MΩ) Test Voltage A-GND B-GND C-GND Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Test Summary N-GND Reading 1000V Corrected to 20oC Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: Final Analysis Connection Resistance Note: Torque check required for all cables. Connection Resistance Test required for cables 4/0 AWG or larger. Connection Resistance (µΩ) - As Left Termination A B C Torque Check N Source OK Dest. / Load OK Comments: Cable Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Performed By Checked By Form CBL-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-CBL-600V.doc Comments: Signature Date (yyyy/mm/dd) PT Data Project INSPECTION FORM CONTROL POWER TRANSFORMER, 4160V Facility: Project Name: Area : Bid Opportunity: Visual Inspection 1 of 1 ID: Location: Pri. Voltage Rating: Sec. Voltage Rating: Manufacturer: Pri. Fuse Size: Sec. Fuse Size: Size: Insulation Resistance Test Page Type: Other: Physical Damage: Yes No Defective Connections/Wiring: Yes No Visual Signs of Overheating: Yes No Grounding and Shorting Connections Provide Contact: Yes No Verify Ground Connection: Yes No Verify Withdrawal Mechanism Function: Yes No Fuse Sizes Match Drawings: Yes No Comments: Test Preparation: Source: Disconnected Connected with Source Isolated Test Voltage Primary To GND 2500 VDC Secondary To GND 500 VDC Primary To Secondary 2500 VDC Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Insulation Resistance (MΩ) Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-CPT-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-CPT-4160V.doc PT Data Project INSPECTION FORM CONTROL POWER TRANSFORMER, 600V Facility: Project Name: Area : Bid Opportunity: Visual Inspection 1 of 1 ID: Location: Pri. Voltage Rating: Sec. Voltage Rating: Manufacturer: Pri. Fuse Size: Sec. Fuse Size: Size: Insulation Resistance Test Page Type: Other: Physical Damage: Yes No Defective Connections/Wiring: Yes No Visual Signs of Overheating: Yes No Grounding and Shorting Connections Provide Contact: Yes No Verify Ground Connection: Yes No Verify Withdrawal Mechanism Function: Yes No Fuse Sizes Match Drawings: Yes No Comments: Test Preparation: Source: Disconnected Connected with Source Isolated Test Voltage Primary To GND 1000 VDC Secondary To GND 500 VDC Primary To Secondary 1000 VDC Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Insulation Resistance (MΩ) Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-CPT-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-CPT-600V.doc Insulation Resistance Test Visual Inspection CT Data Project INSPECTION FORM CURRENT TRANSFORMER Facility: Project Name: Area : Bid Opportunity: Location: Current Ratio: Manufacturer: Model No.: Burden Rating: BIL: : Page ID: A Type: kV 1 of 1 Voltage Class: Bar V Window (Solid) Split Core Accuracy Class: Physical Damage: Yes No Clean and Inspect Insulators: Yes No Visual Signs of Overheating: Yes No Verify Connections are Correct: Yes No Adequate Mounting Support: Yes No Comments: Test Preparation: Source: Disconnected Connected with Source Isolated Test Insulation Resistance (MΩ) Voltage A Primary To GND 1000 V Secondary To GND 500 V Primary To Secondary 1000 V Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Cable Dest. / Load: Disconnected Connected with Load Isolated B Temperature: C o C Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Final Analysis Turns Ratio, Excitation, Saturation and Polarity Tests Comments: Note: Attach supporting data and saturation curve. Phase A Test Summary B C N Test Passed Test Inconclusive Further Investigation Required. Test Failed Calculated Ratio Measured Ratio Exciting Current (mA) Polarity Correct Yes No Yes No Yes No Yes No CT Saturation Test Performed: Yes No Yes No Yes No Yes No CT Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-CT Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-CT.doc Page Visual Inspection / Cleaning Meter Data Project INSPECTION FORM DIGITAL METER Facility: Project Name: Area : Bid Opportunity: Location: Cell #: Manufacturer: Model: ID: Cover Gasket: Good Acceptable Poor General Condition: Good Acceptable Poor Cleanliness (as found) Good Acceptable Poor Unit Cleaned: Yes Connections (as found) Good Acceptable Poor Connections Torqued: Yes Test Value (V) Voltage Phase A Reading As Found (V) Cover Glass: Good Phase B Reading As Left (V) Reading As Found (V) 1 of 1 Reading As Left (V) Acceptable Poor Phase C Reading As Found (V) Reading As Left (V) Accuracy Accuracy 0 Test Value (A) Current Phase A Reading As Found (A) Phase B Reading As Left (A) Reading As Found (A) Reading As Left (A) Phase C Reading As Found (A) Reading As Left (A) 0 Final Analysis Unit Calibrated: Yes No Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-DM Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-DM.doc Visual Inspection Project INSPECTION FORM GROUNDING SYSTEM Facility: Project Name: Area : Bid Opportunity: Connection to Ground Electrode is Visible: Connecting Conductor: Size: Yes No Qty: Visual signs of Corrosion: Yes Page 1 of 3 ID: Facility Contains a Main Ground Bus: Yes No Torque Ground Connections: Yes No No Soil Type: Soil Condition: Dry Damp Wet Comments: Date of Test: Time of Test: Weather and Temperature: Terrain: Grounding System Connection Point: UTM GPS Coordinate: E N Current Probe Injection Point: UTM GPS Coordinate: E N Test Conditions: Fall Of Potential Test #1 Voltage Probe Distance (meters) Test Layout: Test Current (mA) UTM GPS Coordinate: E N E N E N E N E N E N E N E N E N E N E N E N Comments: Form F-GROUNDING Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-GROUNDING.doc Test Voltage (mV) Resistance @ Hz (Ω) Resistance @ Hz (Ω) INSPECTION FORM GROUNDING SYSTEM Page ID: Date of Test: Time of Test: Weather and Temperature: Terrain: Grounding System Connection Point: UTM GPS Coordinate: E N Current Probe Injection Point: UTM GPS Coordinate: E N Test Conditions: Fall Of Potential Test #2 Voltage Probe Distance (meters) 2 of 3 Test Layout: Test Current (mA) UTM GPS Coordinate: E N E N E N E N E N E N E N E N E N E N E N E N Comments: Form F-GROUNDING Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-GROUNDING.doc Test Voltage (mV) Resistance @ Hz (Ω) Resistance @ Hz (Ω) INSPECTION FORM GROUNDING SYSTEM Resistance Checks (Ductor Test) Point A Resistance (mΩ) Point B Facility Ground Electrode Main Ground Bus Facility Ground Electrode 4160V Switchgear GND Bus Facility Ground Electrode System Neutral Facility Ground Electrode 600V Switchgear GND Bus Facility Ground Electrode MCC : GND Bus Facility Ground Electrode MCC : GND Bus Facility Ground Electrode Other : Facility Ground Electrode Other : Facility Ground Electrode Other : Monitoring / Inspection Required: Yes No Repair / Replacement Required: Yes No Page 3 of 3 ID: Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Final Analysis Comments: Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-GROUNDING Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-GROUNDING.doc Page Visual Inspection / Cleaning MCC/CDP Data Project INSPECTION FORM MCC/CDP, 600V Facility: Project Name: Area : Bid Opportunity: # of Cells: Manufacturer: Model: Rated Voltage: V Copper Serial #: Main Bus Rating: Aluminum A Main Bus Neutral Rating: Current Withstand Rating: A A Identification Tag Installed: Yes No Visual Signs of Overheating: Yes No Visual Signs of Moisture: Yes No Visual Signs of Corona: Yes No Fuse/Breaker Sizes Match Drawings: Yes No PT and CT ratios match drawings: Yes No Elevation Drawings Correct: Yes No Cables Supported Appropriately: Yes No Cleanliness (As Found): Good Acceptable Poor Insulators Condition: Connections: Good Acceptable Poor Ground Connection: Good Acceptable Poor Vents/Filters: Doors Mechanical: Good Acceptable Poor Exercise Active Components: Cell Fit and Alignment: Good Acceptable Poor Required Clearances are Met: Good Acceptable Poor Indicating mechanisms: Good Acceptable Poor Unit Cleaned: Type: Incoming Power ID: Location: Bus Conductor: 1 of 6 Electro/Mechanical Interlock System: Acceptable Poor Good Acceptable Poor Good Acceptable Poor Yes Photograph Taken: No Yes Inspection Main Breaker Complete appropriate breaker inspection form. Disconnect Complete appropriate disconnect inspection form. Main Lugs Yes Good Visual Inspection: Good Connections Torqued: Yes Connection Resistance (µΩ) As Left A Form F-MCC-CDP-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MCC-CDP-600V.doc Acceptable Poor B C N Page INSPECTION FORM MCC/CDP, 600V Insulation Resistance Test (Buswork) Test Preparation: Source: Disconnected Connected with Source Isolated Cable Dest. / Load: Disconnected Connected with Load Isolated Insulation Resistance (MΩ) Phase To Phase Test Voltage (dc) A-B B-C 2 of 6 ID: Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Test Summary C-A 1000 V Test Passed Test Inconclusive Further Investigation Required. Test Failed Insulation Resistance (MΩ) Phase To GND Test Voltage A - GND B - GND C - GND 1000 V Ground Resistance Checks (Ductor Test) Comments: Resistance (µΩ) Point A Point B MCC/CDP GND Bus Facility Ground Electrode MCC/CDP GND Bus MCC/CDP Enclosure MCC/CDP GND Bus System Neutral Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: Feeder Breakers Visual Inspect Requirements: Note: G=Good, A=Acceptable, P=Poor Comments are required for all items identified in Poor condition. 1. Confirm identification tag / lamacoid is installed. 2. Look for visual signs of overheating. 3. Inspect and torque connections. 4. Inspect and test any electro/mechanical interlocks. 5. Confirm disconnect operation. 6. Check door mechanical condition. 7. Exercise circuit breaker. 8. Confirm cables are supported and routed appropriately. 9. Visually assess the general condition of the installation. Complete an appropriate Breaker Inspection Form for all breakers with separate adjustable Long and Short trip settings, Ground trip settings, or > 400A frame size. Continued on next page Form F-MCC-CDP-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MCC-CDP-600V.doc Page INSPECTION FORM MCC/CDP, 600V 3 of 6 ID: Model General Comments: Form F-MCC-CDP-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MCC-CDP-600V.doc Trip Unit Type Inst Setting Cleaned Manuf. Visual Inspection Trip Rating (A) Loc./ Cell Feeder Breakers ID Frame Rating (A) Continued from previous page Comments Page INSPECTION FORM MCC/CDP, 600V 4 of 6 ID: B=Breaker (Thermal Magnetic), M=breaker(Motor Circuit Protector), F=Fuse Overload Protection Type: T=Thermal, SS=Solid State Visual Inspect Requirements: G=Good, A=Acceptable, P=Poor Comments are required for all items identified in Poor condition. Motor Starters Overcurrent Protection Type: Confirm identification tag / lamacoid is installed. 2. Look for visual signs of overheating. 3. Inspect and torque connections. 4. Inspect and test any electro/mechanical interlocks. 5. Confirm disconnect operation. 6. Check door mechanical condition. 7. Exercise circuit breaker. 8. Confirm cables are supported and routed appropriately. 9. Visually assess the general condition of the installation. Complete a Motor Starter Inspection Form for all Motor Starters Size 4 or larger, with VFDs, or with Soft Starters. Model General Comments: Form F-MCC-CDP-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MCC-CDP-600V.doc Size / Rating Overload Model Cleaned Manuf. Contactor Visual Insp. Rating (A) Loc./ Cell Motor Starters ID Type Overcurrent Protection Type Note: 1. Comments Page INSPECTION FORM MCC/CDP, 600V General Comments: Form F-MCC-CDP-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MCC-CDP-600V.doc Size / Rating Overload Model Cleaned Model ID: Visual Insp. Manuf. Contactor Type Rating (A) Loc./ Cell Motor Starters ID Type Overcurrent Protection 5 of 6 Comments Final Analysis INSPECTION FORM MCC/CDP, 600V Returned to Service: Yes No Monitoring / Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Page 6 of 6 ID: Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-MCC-CDP-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MCC-CDP-600V.doc Page Project INSPECTION FORM MOTOR STARTER, FVNR, 4160V Facility: Project Name: Area : Bid Opportunity: Load: Starter Data Cell #: Model: Size: Rated Voltage: Interrupting Rating: kA @ Fused Disc. Current Transformer: Serial #: V Current Rating: Rating: Fuse Size: A Voltage: Primary Fuse: Ratio: A Control Voltage: V A Fuse Mfg. Cat. #: V Manufacturer: Cat. #: Secondary Fuse: Type: Starter Identification Tag Installed: A kV kVA: Control Power Transformer: Visual Inspection / Cleaning ID Starter Location: Manufacturer: Isolation: 1 of 4 A Manufacturer: Yes No Cat. #: Visual Signs of Overheating: Yes No Cleanliness (As Found): Good Acceptable Poor Support Insulators: Good Acceptable Poor Connections Good Acceptable Poor Electro/Mechanical Interlock: Good Acceptable Poor Ground Connection: Good Acceptable Poor Contactor Condition: Good Acceptable Poor Door Mechanical Good Acceptable Poor Contact Alignment: Good Acceptable Poor Good Acceptable Poor Racking Devices Good Acceptable Poor Shutter N/A Cables Supported Appropriately: Yes Comments: Form F-MS-FVNR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MS-FVNR-4160V.doc No Unit Cleaned: N/A Yes Photograph Taken: Yes Page INSPECTION FORM MOTOR STARTER, 4160V Test A B ID C Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Contact Resistance (µΩ) Disconnect / Breaker/MCP Resistance (µΩ) Contact/Pole Measurements 2 of 4 Fuse Resistance (µΩ) Air Contactor: Arcing Contact Gap (mm) Arcing Contact Wipe (mm) Main Contact Gap (mm) Main Contact Wipe (mm) Vacuum Contactor: Contact Travel (mm) Comments: Insulation Resistance Test Test Preparation: Source: Isolated Open Contactor: Test Cable Dest. / Load: Note: Approval of City’s Representative is required, Disconnected prior to leaving cables connected during the test. Connected with Load Isolated Insulation Resistance (MΩ) Voltage A Disc. To Contactor Stabs 2500 VDC Contactor Line To GND 2500 VDC Contactor Load To GND 2500 VDC Contactor Line to Load 2500 VDC Load Buswork 2500 VDC B C Ground all phases not under test! Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Insulation Resistance (Control Wiring) Comments: Wire Tag Insulation Resistance (MΩ) Wire Tag Comments: Form F-MS-FVNR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MS-FVNR-4160V.doc Insulation Resistance (MΩ) Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Page INSPECTION FORM MOTOR STARTER, 4160V High Potential Test Test Preparation: Voltage (kV DC) Time (Minutes) Disconnect – Contactor Stabs 12 1 Contactor - Line 12 1 Contactor - Load 12 1 Load Buswork 12 1 Test ID Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Load Cables: Disconnected Connected Source: Isolated 3 of 4 Test Summary (µA) A B C Ground all phases not under test! Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: Manufacturer: Model Verify Relay Set Points Configured Correctly: Yes No Verify Input Current Readings Match Test Current: Yes No Verify the following relay settings: Relay Setting Setpoint FLA – Full Load Amps Motor Protection Relay UTC – Ultimate Trip Current JMA – Jam Alarm Level JMT – Jam Trip Level JAMS – Jam Start Delay JAMR – Jam Run Delay LRC – Locked Rotor Current LRT – L.R. Stall Time IOC – Inst. Overcurrent GFT – Ground Fault Trip PUA – Phase Unbalance Alarm PURD – P.U. Run Delay Phase Unbalance Trip ST/T – Starts per Time Allowed ULT – Under-load Trip Form F-MS-FVNR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MS-FVNR-4160V.doc Secondary Amps Test Result Final Analysis INSPECTION FORM MOTOR STARTER, 4160V Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Page 4 of 4 ID Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-MS-FVNR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MS-FVNR-4160V.doc Page Project INSPECTION FORM MOTOR STARTER, FVNR, 600V Facility: Project Name: Area : Bid Opportunity: Load: Serial #: Rated Voltage: Circuit Protection: Overload Protection: Cell #: Type: Size: Starter Data ID: Starter Location: Manufacturer: V Current Rating: A Control Voltage: V Fused Disc. Rating: A Fuse Size: A Fuse Mfg. Cat. #: Breaker MCP Rating: A Inst. Setting A Manufacturer: Cat. #: Manufacturer: Cat. #: Thermal Electronic Current Transformer: Class: 10 20 Rating: 30 Not displ. A Sec. Voltage: V VA: Control Power Transformer: Primary Fuse: Ratio: A Secondary Fuse: A Type: Starter Identification Tag Installed: Visual Inspection / Cleaning 1 of 2 Yes No Visual Signs of Overheating: Yes Cleanliness (As Found): Good Acceptable Poor Support Insulators: Good Acceptable Poor Connections Good Acceptable Poor Electro/Mechanical Interlock: Good Acceptable Poor Ground Connection: Good Acceptable Poor Contactor Condition: Good Acceptable Poor Door Mechanical Good Acceptable Poor Contact Alignment: Good Acceptable Poor Verify O/L element is correctly sized for the load: Yes No Exercise Circuit Breaker/MCP/Disconnect Cables Supported Appropriately: Yes No Unit Cleaned: Yes Photograph Taken: Comments: Test Contact/Pole Measurements No A Contact Resistance (µΩ) Disconnect / Breaker / MCP Resistance (µΩ) Fuse Resistance (µΩ) Comments: Form MS-FVNR-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MS-FVNR-600V.doc B C Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Yes Yes Page INSPECTION FORM MOTOR STARTER, FVNR, 600V Insulation Resistance Test Test Preparation: Source: Isolated Open Contactor: Test 2 of 2 ID: Cable Dest. / Load: Note: Approval of City’s Representative is required, Disconnected prior to leaving cables connected during the test. Connected with Load Isolated Insulation Resistance (MΩ) Voltage A Contactor Line To GND 1000 VDC Contactor Load To GND 1000 VDC Contactor Line to Load 1000 VDC B C Ground all phases not under test! Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form MS-FVNR-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MS-FVNR-600V.doc Project INSPECTION FORM AC MOTOR, 4160V Facility: Project Name: Area : Bid Opportunity: Motor Data Size: kW / HP Voltage: Visual Inspection / Cleaning V R.P.M: Model: Serial Number: Frame Type: Service Factor: Other: Air Fan Winding Material: # Cooling Fans: Motor Identification Tag Installed: Yes No Visual Signs of Overheating: Yes Connections: Good Acceptable Poor Air Baffles: Paint: Good Acceptable Poor Filter Media: Good Acceptable Poor Fan Controls: Anchorage/Alignment: Good Acceptable Poor Brushes: Ground Connection: Good Acceptable Poor Slip Ring Wear Within Tolerances: Cooling Fans: N/A Mechanical/Electrical Noise During Operation: Yes Cleanliness (As Found): Good Stator Winding Insulation Resistance ID: Manufacturer: Cooling: Acceptable Poor Unit Cleaned: 2500 Phase B – GND 2500 Phase C – GND 2500 A-B B–C Comments: Form F-MTR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MTR-4160.doc Acceptable Poor N/A Good Acceptable Poor N/A Good Acceptable Poor Good Acceptable Poor Photograph Taken: Resistance (MΩ) 30 Sec Phase A – GND Yes 1 min. Yes No Yes No Yes Polarization Index 10 min. Test Summary A-C No Good No Lubrication Required: Test Voltage (Vdc) Resistance (µΩ) Stator Resistance Page: 1 of 2 Test Passed Test Inconclusive Further Investigation Required. Test Failed INSPECTION FORM AC MOTOR, 4160V Source: Disconnected Connected with Source Isolated Test Preparation: Elapsed Time (min) 7 0 7 1 7 2 7 3 7 4 7 5 7 6 7 7 7 8 7 9 7 10 High Potential Test Max Test DC Voltage (kV) Page: 2 of 2 ID: Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Test Summary A B C Test Passed Test Inconclusive Further Investigation Required. Test Failed Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-MTR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-MTR-4160.doc Visual Inspection / Cleaning Panelboard Data Project INSPECTION FORM PANELBOARD, LOW VOLTAGE Facility: Project Name: Area : Bid Opportunity: Location: Fed From: Manufacturer: Model: Rated Voltage: V 3 Phase, 3 Wire Main Lugs Main Breaker: 3 Phase, 4 Wire A Withstand Rating: A Neutral Bonded to Ground Manufacturer: Yes No Model: Identification Tag Installed: Yes No Visual Signs of Overheating: Yes No Visual signs of Moisture: Yes No Visual Signs of Corona: Yes No Fuse/Breaker Sizes Match Drawings: Yes No Cables Supported Appropriately: Yes No Cleanliness (As Found): Good Acceptable Poor Connections: Good Acceptable Poor Door Mechanical: Good Acceptable Poor Ground Connection: Good Acceptable Poor Exercise Circuit Breakers: Insulation Resistance Test ID: Serial No: A Rating: 1 of 1 No. of Circuits: Current Rating: Single Phase Page Yes Source: Disconnected Connected with Source Isolated Test Preparation: No Comments: Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Insulation Resistance (MΩ) Ground all Phases not under test! Test Voltage A-GND RDG Test Voltages: 20°C B-GND RDG RDG 120-300V ! 500 VDC Test Voltage N-GND 20°C °C Temperature Correction Factor to 20°C: Test Summary C-GND 20°C Equipment Temperature: RDG 20°C Test Passed Test Inconclusive Further Investigation Required. Test Failed 301-600V ! 1000 VDC Test Voltage Final Analysis Comments: Returned to Service: Yes No Monitoring / Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-PNL-LV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-PNL-LV.doc Project INSPECTION FORM POTENTIAL TRANSFORMER, 4160V Facility: Project Name: Area : Bid Opportunity: PT Data PT Location or Designation: Manufacturer: Catalogue #: Visual Inspection Size: VA 1 of 2 ID: Pri. Voltage Rating: Sec. Voltage Rating: Pri. Fuse Size: Sec. Fuse Size: Type: Other: Physical Damage: Yes No Verify Connections are Correct: Yes No Visual Signs of Overheating: Yes No Grounding and Shorting Connections Provide Contact: Yes No Verify Ground Connection: Yes No Verify Withdrawal Mechanism Function: Yes No Fuse Sizes Match Drawings: Yes No Comments: Test Preparation: Insulation Resistance Test Page Source: Disconnected Connected with Source Isolated Test Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Insulation Resistance (MΩ) Voltage PT 1 Primary To GND 2500 V Secondary To GND 500 V Primary To Secondary 2500 V PT 2 o Temperature: PT 3 C Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Turns Ratio and Polarity Tests Comments: Test Preparation: Source: Disconnected Connected with Source Isolated Phase PT 1 Test Summary PT 2 Test Passed Test Inconclusive Further Investigation Required. Test Failed PT 3 Calculated Ratio Measured Ratio Polarity Correct Yes No Yes No Yes No Final Analysis Comments: PT Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Form F-PT-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-PT-4160V.doc Comments: Signature Date (yyyy/mm/dd) INSPECTION FORM POTENTIAL TRANSFORMER, 4160V Page 2 of 2 ID: Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-PT-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-PT-4160V.doc Project INSPECTION FORM POTENTIAL TRANSFORMER, 600V Facility: Project Name: Area : Bid Opportunity: PT Data PT Location or Designation: Manufacturer: Catalogue #: Visual Inspection Size: VA 1 of 2 ID: Pri. Voltage Rating: Sec. Voltage Rating: Pri. Fuse Size: Sec. Fuse Size: Type: Other: Physical Damage: Yes No Verify Connections are Correct: Yes No Visual Signs of Overheating: Yes No Grounding and Shorting Connections Provide Contact: Yes No Verify Ground Connection: Yes No Verify Withdrawal Mechanism Function: Yes No Fuse Sizes Match Drawings: Yes No Comments: Test Preparation: Insulation Resistance Test Page Source: Disconnected Connected with Source Isolated Test Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Insulation Resistance (MΩ) Voltage PT 1 Primary To GND 1000 V Secondary To GND 500 V Primary To Secondary 1000 V PT 2 o Temperature: PT 3 C Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Turns Ratio and Polarity Tests Comments: Test Preparation: Source: Disconnected Connected with Source Isolated Phase PT 1 Test Summary PT 2 Test Passed Test Inconclusive Further Investigation Required. Test Failed PT 3 Calculated Ratio Measured Ratio Polarity Correct Yes No Yes No Yes No Final Analysis Comments: PT Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Form F-PT-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-PT-600V.doc Comments: Signature Date (yyyy/mm/dd) INSPECTION FORM POTENTIAL TRANSFORMER, 600V Page 2 of 2 ID: Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-PT-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-PT-600V.doc Relay Data Project INSPECTION FORM TIME OVERCURRENT PROTECTION RELAY Facility: Project Name: Area : Bid Opportunity: Location: Cell #: Manufacturer: Model: Style: Serial No: Page 1 of 3 ID: Electro-mechanical Electronic Type: CT Data Comments: Current Ratio: : A Visual Inspection A B C N A Moisture/Rust: Relay Cleaned: Spiral Spring: Screws Tightened: Disk Clearance: Trip Indicator & Reset Over-heating: Zero Adjustment Check: Cover/Case: Magnet: Paddle: Jewel Bearing: B C Trip Function Test: Legend: A-Acceptable C-Corrected N-Needs Repair NA-Not Applicable Comments: Phase Relay Settings Parameter Setting (As Found) Neutral Setting (As Left) Parameter Curve Curve TOC Tap TOC Tap TOC Multiplier TOC Multiplier Time Dial/Delay Time Dial/Delay Inst. Tap Inst. Tap Seal-in Seal-in Setting (As Found) Setting (As Left) N INSPECTION FORM TIME OVERCURRENT PROTECTION RELAY Parameter Calculated Value Page 2 of 3 ID: Measured Pick-Up (Amps) Phase A Neutral N B C TOC Pick-up Relay Pick-up Tests Seal-in Pick-up IOC Pick-up TOC Pick-up Seal-in Pick-up IOC Pick-up Comments: Parameter x PU Test Value (Amps) Calculated Value (sec.) Measured Timing (sec.) Phase A Neutral N Relay Timing Tests TOC TOC IOC TOC TOC IOC Comments: Form F-RELAY-TOC Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-RELAY-TOC.doc B C Insulation Resistance Test INSPECTION FORM TIME OVERCURRENT PROTECTION RELAY Test Preparation: 3 of 3 ID: Source: Note: Approval of City’s Representative is required, prior to Disconnected leaving cables connected during the test. Connected with Source Isolated Test Summary Insulation Resistance (MΩ) Test Voltage Page A-GND B-GND C-GND Test Passed Test Inconclusive Further Investigation Required. Test Failed N-GND 500V Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-RELAY-TOC Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-RELAY-TOC.doc Relay Data Project INSPECTION FORM UNDER-VOLTAGE PROTECTION RELAY Facility: Project Name: Area : Bid Opportunity: Location: Cell #: Manufacturer: Model: Style: Serial No: Page 1 of 2 ID: Electro-mechanical Electronic Type: PT Data Comments: Voltage Ratio: : V Visual Inspection A B C A Moisture/Rust: Relay Cleaned: Spiral Spring: Screws Tightened: Disk Clearance: Trip Indicator & Reset Over-heating: Zero Adjustment Check: Cover/Case: Magnet: Paddle: Jewel Bearing: B Trip Function Test: Legend: A-Acceptable C-Corrected N-Needs Repair NA-Not Applicable Relay Settings Comments: Phase Parameter Setting (As Found) Setting (As Left) U.V. Pick-up Relay Timing Tests Relay Pick-up Tests U.V. Delay Parameter Calculated Value Phase Measured Pick-Up (Volts) A B C U.V. Pick-up Comments: Parameter Injected Value (Voltage) Calculated Value (sec.) Phase U.V. Delay Form F-RELAY-UV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-RELAY-UV.doc Measured Timing (sec.) A B C C Insulation Resistance Test INSPECTION FORM UNDER-VOLTAGE PROTECTION RELAY Test Preparation: 2 of 2 ID: Source: Note: Approval of City’s Representative is required, prior to Disconnected leaving cables connected during the test. Connected with Source Isolated Insulation Resistance (MΩ) Test Voltage Page A-GND B-GND Test Summary C-GND Test Passed Test Inconclusive Further Investigation Required. Test Failed 500V Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-RELAY-UV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-RELAY-UV.doc Project INSPECTION FORM SURGE ARRESTOR, MEDIUM VOLTAGE Facility: Project Name: Area : Bid Opportunity: Arrestor Data Switchgear: Manufacturer: Catalogue #: Housing: Rated Voltage: RMS Current Rating: A Material: Polymer Porcelain Visual Inspection / Cleaning 1 of 1 ID: Location: Cell: Type: Serial #: V Arrestor Class: Rated MCOV: Station Distribution V Intermediate Other: Identification Tag Installed: Yes No General Condition: Good Acceptable Poor Cleanliness (As Found): Good Acceptable Poor Anchorage, alignment: Good Acceptable Poor Connections: Good Acceptable Poor Required Clearances: Good Acceptable Poor Ground Connections: Good Acceptable Test Preparation: Poor Unit Cleaned: Source: Disconnected Connected with Source Isolated A Yes Photograph Taken: Yes Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Insulation Resistance (MΩ) Phase To GND Test Voltage B Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed C 1000 V Comments: Point A Resistance Check Insulation Resistance Test Page Ground Terminal Resistance (µΩ) Point B Facility Ground Electrode Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Visual Inspection / Cleaning Switchgear Data Project INSPECTION FORM SWITCHGEAR, 4160V Facility: Project Name: Area : Bid Opportunity: ID: Location: Manufacturer: Type: Rated Voltage: 1 of 2 ID: # of Cells: Serial #: Current Rating: A Withstand Rating: A Identification Tag Installed: Yes No Visual Signs of Overheating: Yes No Visual signs of Moisture: Yes No Visual Signs of Corona: Yes No Fuse/Breaker Sizes Match Drawings: Yes No PT and CT ratios match drawings: Yes No Elevation Drawings Correct: Yes No Cables Supported Appropriately: Yes No Cleanliness (As Found): Good Acceptable Poor Insulators Condition: Connections: Good Acceptable Poor Ground Connection: Good Acceptable Poor Vents/Filters: Doors Mechanical: Good Acceptable Poor Cell Fit and Alignment: Good Acceptable Poor Required Clearances are Met: Good Acceptable Poor Indicating mechanisms: Good Acceptable Poor Unit Cleaned: Test Preparation: Insulation Resistance Test (Buswork) V Page Test Voltage Electro/Mechanical Interlock Systems: Acceptable Poor Good Acceptable Poor Good Acceptable Poor Photograph Taken: Yes Source: Cable Dest. / Load: Disconnected Note: Approval of City’s Representative is required, Disconnected Connected with prior to leaving cables connected during the test. Connected with Load Isolated Source Isolated Insulation Resistance (MΩ) Phase To GND A B Temperature: C 2500 V Test Voltage Yes Good Insulation Resistance (MΩ) Phase To Phase A–B B–C 2500 V Comments: Form F-SGR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-SGR-4160V.doc A-C o C Ground Resistance INSPECTION FORM SWITCHGEAR, 4160V Point A Page ID: Test Summary Resistance (µΩ) Point B Switchgear GND Bus Facility Ground Electrode Switchgear GND Bus Switchgear Enclosure Switchgear GND Bus System Neutral 2 of 2 Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: To Resistance (mΩ) From B C Test Passed Test Inconclusive Further Investigation Required. Test Failed Connection Resistance A Test Summary Comments: High Potential Test Test Preparation: Source: Disconnected Connected with Source Isolated Peak DC Test Voltage (1 minute duration) Note: Approval of City’s Representative is required, prior to leaving cables connected during the test. Test Summary (mA) A Test Summary B Test Passed Test Inconclusive Further Investigation Required. Test Failed C 12 kV Final Analysis Comments: Returned to Service: Yes No Monitoring / Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-SGR-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-SGR-4160V.doc Visual Inspection / Cleaning Switchgear Data Project INSPECTION FORM SWITCHGEAR, 600V Facility: Project Name: Area : Bid Opportunity: Location: No. of Cells: Manufacturer: Type: Rated Voltage: 1 of 2 ID: Serial #: Current Rating: A Interrupting Rating: A Identification Tag Installed: Yes No Visual Signs of Overheating: Yes No Visual signs of Moisture: Yes No Visual Signs of Corona: Yes No Fuse/Breaker Sizes Match Drawings: Yes No PT and CT ratios match drawings: Yes No Elevation Drawings Correct: Yes No Cables Supported Appropriately: Yes No Cleanliness (As Found): Good Acceptable Poor Insulators Condition: Connections: Good Acceptable Poor Ground Connection: Good Acceptable Poor Vents/Filters: Doors Mechanical: Good Acceptable Poor Exercise Active Components: Cell Fit and Alignment: Good Acceptable Poor Required Clearances are Met: Good Acceptable Poor Indicating mechanisms: Good Acceptable Poor Unit Cleaned: Test Preparation: Insulation Resistance Test V Page Test Voltage Electro/Mechanical Interlock System: Acceptable Poor Good Acceptable Poor Good Acceptable Poor Yes Photograph Taken: No Yes Source: Cable Dest. / Load: Disconnected Note: Approval of City’s Representative is required, Disconnected Connected with prior to leaving cables connected during the test. Connected with Load Isolated Source Isolated Insulation Resistance (MΩ) Phase To GND A B Temperature: C 1000 V Test Voltage Yes Good Insulation Resistance (MΩ) Phase To Phase A–B B–C 1000 V Comments: Form F-SGR-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-SGR-600V.doc A-C o C Ground Resistance INSPECTION FORM SWITCHGEAR, 600V Point A Page ID: Test Summary Resistance (µΩ) Point B Switchgear GND Bus Facility Ground Electrode Switchgear GND Bus Switchgear Enclosure Switchgear GND Bus System Neutral 2 of 2 Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: To Resistance (µΩ) From B C Test Passed Test Inconclusive Further Investigation Required. Test Failed Connection Resistance A Test Summary Final Analysis Comments: Returned to Service: Yes No Monitoring / Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-SGR-600V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-SGR-600V.doc Project Location: Switchgear: Manufacturer: Model: Fuse Data Facility: Disconnect Data INSPECTION FORM SWITCH, AIR, METAL-ENCLOSED, 4160V Project Name: Area : Bid Opportunity: Rated Voltage: V Momentary Fault Closing Amps: Current Rating: Visual Inspection / Cleaning Serial #: Interrupting Rating: A BIL Rating: Type: V Current Rating: Disconnect Identification Tag Installed: Switchblade Resistance ID: Type of Operating Mechanism: A Cat. #: A Yes No Holder: Visual Signs of Overheating: Yes No Cleanliness (As Found): Good Acceptable Poor Support Insulators: Good Acceptable Poor Connections Good Acceptable Poor Electro/Mechanical Interlock Good Acceptable Poor Ground Connection: Good Acceptable Poor Blade Condition: Good Acceptable Poor Door Mechanical Good Acceptable Poor Blade Alignment: Good Acceptable Poor Good Acceptable Poor Fit Plumb & Square: Yes No Verify Blade Mechanical Operation Cables Supported Appropriately: Yes No Fuse Holder Support and Contact Integrity Phase Barrier Intact: Yes No Unit Cleaned: Indicating and Control Devices are Working Correctly Yes No Other: Resistance (µΩ) (As Left) A B Yes Good Unit Lubricated: Test Summary C Test Passed Test Inconclusive Further Investigation Required. Test Failed Comments: Fuse Resistance 1 of 2 Cell #: A Manufacturer: Rated Voltage: Page Resistance (µΩ) (As Left) A B Test Summary C Comments: Form F-SW-AIR-ME-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-SW-AIR-ME-4160V.doc Test Passed Test Inconclusive Further Investigation Required. Test Failed Acceptable Yes Poor INSPECTION FORM SWITCH, AIR, METAL-ENCLOSED, 4160V Insulation Resistance Test Test Preparation: Source: Isolated Disconnect: Open Test Page 2 of 2 ID Cable Dest. / Load: Note: Approval of City’s Representative is required, Disconnected prior to leaving cables connected during the test. Connected with Load Isolated Insulation Resistance (MΩ) Voltage A Disconnect Line To GND 2500 VDC Disconnect Load To GND 2500 VDC Disconnect Line to Load 2500 VDC B C Ground all phases not under test! Test Summary Test Passed Test Inconclusive Further Investigation Required. Test Failed Final Analysis Comments: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Signature Comments: Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-SW-AIR-ME-4160V Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-SW-AIR-ME-4160V.doc Page: 1 of 3 Project INSPECTION FORM TRANSFORMER, DRY TYPE, MEDIUM VOLTAGE Facility: Project Name: Area : Bid Opportunity: Transformer Data KVA: Phase: Primary Voltage: Manufacturer: Secondary Winding: ∆ Υ Cooling: ANN # Cooling Fans: ANF No Load Tap Changer Tap 1 ∆ Υ Serial Number: Impedance: %Z Temp Rise: 3 4 °C K Factor: 5 Tap Setting (As Found): Voltage Yes No Visual Signs of Overheating: Bushings: Good Acceptable Poor Support Insulators: Paint: Good Acceptable Poor No Load Tap Changer: Fans: N/A Good Acceptable Poor Fan Controls: Temp. Gauge: N/A Good Acceptable Poor Connections: Ground Connection: Good Acceptable Poor Ground Conductor Size: Cleanliness (As Found): Good Acceptable Poor Unit Cleaned: Yes Yes Acceptable Poor N/A Good Acceptable Poor N/A Good Acceptable Poor Good Acceptable Poor Photograph Taken: Operational Inspection Primary Voltage: H1:H2: V H2:H3: V H3:H1: V Measured at: Secondary Voltage: X1:X2: V X2:X3: V X3:X1: V Measured at: Current: Ph A: A Ph B: A Ph C: A Measured at: Appears Satisfactory Further Monitoring Recommended. Recommend Changing Tap. Thermographic Inspection Performed: Yes Attach report separately Form F-XFMR-DRY-MV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-XFMR-DRY-MV.doc Results: No Good Operational Conditions / Notes: Tap Setting: V Winding Material: 2 Transformer Identification Tag Installed: Visual Inspection / Cleaning V Secondary Voltage: Model: Primary Winding: ID: Tap Setting (As Left): No Issues Found Potential Issue Identified. Yes Page: 2 of 3 TRANSFORMER INSPECTION FORM DRY TYPE, MEDIUM VOLTAGE o Winding Temperature: ID: Temperature Correction Factor (20oC): C Resistance (MΩ) PRI-GND SEC-GND Test Voltage: Time Test Voltage: Corrected to 20oC Reading PRI-SEC Test Voltage: Corrected to 20oC Reading Corrected to 20oC Reading Insulation Resistance 1 min. 2 min. 3 min. 4 min. 5 min. 6 min. 7 min. 8 min. 9 min. 10 min. Turns Ratio Test Winding Resistance Polarization Index Winding Temperature: Winding o C Winding Resistance (mΩ) Winding H2 – H1 X0 – X1 H3 – H2 X0 – X2 H3 – H1 X0 – X3 Tap (Designated) Primary Voltage (V) Secondary Voltage (V) Calculated Ratio Winding Resistance (mΩ) Measured Ratios H3 H1 / X0 X1 H1 H2 / X0 X2 H2 H3 / X0 X3 Connection Resistance Note: Torque check required for all cables. Connection Resistance Test required for cables 250MCM or larger. Connection Resistance (µΩ) - As Left Termination A B C Torque Check N Source OK Dest. / Load OK Form F-XFMR-DRY-MV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-XFMR-DRY-MV.doc Final Analysis TRANSFORMER INSPECTION FORM DRY TYPE, MEDIUM VOLTAGE Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Page: 3 of 3 ID: Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-XFMR-DRY-MV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-XFMR-DRY-MV.doc Page: Project INSPECTION FORM TRANSFORMER, LIQUID-FILLED, MEDIUM VOLTAGE Facility: Project Name: Area : Bid Opportunity: KVA: / / Phase: Primary Voltage: Transformer Data Manufacturer: Secondary Winding: ∆ Υ Cooling: ONAN ONAF ∆ Υ %Z Temp Rise: Winding Material: 1 2 3 4 °C K Factor: Oil Type: Oil Capacity: 5 Tap Setting (As Found): Voltage Transformer Identification Tag Installed: Visual Inspection / Cleaning Impedance: BIL Rating Secondary: Tap Yes No Visual Signs of Overheating: Bushings: Good Acceptable Poor Support Insulators: Paint: Good Acceptable Poor No Load Tap Changer: Fans: N/A Good Acceptable Poor Fan Controls: Temp. Gauge: N/A Good Acceptable Poor Connections: Good Acceptable Poor Liquid Level Correct: Ground Connection: Ground Conductor Size: Good Acceptable Poor Unit Cleaned: Yes Acceptable Poor N/A Good Acceptable Poor N/A Good Acceptable Poor Good Acceptable Poor Yes Good Yes Operational Inspection Primary Voltage: H1:H2: V H2:H3: V H3:H1: V Measured at: Secondary Voltage: X1:X2: V X2:X3: V X3:X1: V Measured at: Current: Ph A: A Ph B: A Ph C: A Measured at: Appears Satisfactory Further Monitoring Recommended. Recommend Changing Tap. Tap Setting (As Left): Cooling Temperature: Gauges: o C Current Maximum: o Pressure/Vacuum: Thermographic Inspection Performed: Yes Coolant Level: C Other: Attach report separately Form F-XFMR-LIQ-MV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-XFMR-LIQ-MV.doc Results: No Issues Found Potential Issue Identified. No Acceptable Photograph Taken: Operational Conditions / Notes: Tap Setting: No Good Radiators: Cleanliness (As Found): V Serial Number: # Cooling Fans: BIL Rating Primary: No Load Tap Changer ID: V Secondary Voltage: Model: Primary Winding: 1 of 3 Yes Poor TRANSFORMER INSPECTION FORM TRANSFORMER, LIQUID-FILLED, MEDIUM VOLTAGE o 2 of 3 ID: Temperature Correction Factor (20oC): C Winding Temperature: Page: Resistance (MΩ) PRI-GND SEC-GND Test Voltage: Time Reading PRI-SEC Test Voltage: Corrected to 20oC Test Voltage: Corrected to 20oC Reading Corrected to 20oC Reading Insulation Resistance 1 min. 2 min. 3 min. 4 min. 5 min. 6 min. 7 min. 8 min. 9 min. 10 min. Turns Ratio Test Winding Resistance Polarization Index o Winding Temperature: Winding Winding Resistance (mΩ) C Winding H2 – H1 X0 – X1 H3 – H2 X0 – X2 H3 – H1 X0 – X3 Tap (Designated) Primary Voltage (V) Secondary Voltage (V) Calculated Ratio Winding Resistance (mΩ) Measured Ratios H3 H1 / X0 X1 H1 H2 / X0 X2 H2 H3 / X0 X3 Connection Resistance Note: Torque check required for all cables. Connection Resistance Test required for cables 250MCM or larger. Connection Resistance (µΩ) - As Left Termination A B C Torque Check N Source OK Dest. / Load OK Form F-XFMR-LIQ-MV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-XFMR-LIQ-MV.doc Final Analysis Insulating Liquid Tests TRANSFORMER INSPECTION FORM TRANSFORMER, LIQUID-FILLED, MEDIUM VOLTAGE Dielectric Breakdown Voltage: Colour: Acid Neutralization Number: Visual Condition: Specific Gravity: Power Factor or Dissipation Factor: Dissolved Gas Analysis: Other: Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Page: 3 of 3 ID: Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-XFMR-LIQ-MV Rev 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-XFMR-LIQ-MV.doc Page Project INSPECTION FORM TRANSFORMER, DRY TYPE, LOW VOLTAGE Facility: Project Name: Area : Bid Opportunity: Transformer Data KVA: Phase: Primary Voltage: Manufacturer: Type: Primary Winding: ∆ Υ Copper Tap ID: Secondary Voltage: V Serial Number: Impedance: %Z Temp Rise: °C K Factor: Aluminum 1 2 3 4 5 Tap Setting (As Found): Voltage Transformer Identification Tag Installed: Visual Inspection / Cleaning ∆ Υ Secondary Winding: Winding Material: No Load Tap Changer V 1 of 2 Yes No Visual Signs of Overheating: Bushings: Good Acceptable Poor Support Insulators: Paint: Good Acceptable Poor No Load Tap Changer: Fans: N/A Good Acceptable Poor Fan Controls: Temp. Gauge: N/A Good Acceptable Poor Connections: Ground Connection: Good Acceptable Poor Cleanliness (As Found): Good Acceptable Poor Unit Cleaned: Yes Yes No Good Acceptable Poor N/A Good Acceptable Poor N/A Good Acceptable Poor Good Acceptable Poor Photograph Taken: Yes Operational Inspection Operational Conditions / Notes: Primary Voltage: H1:H2: V H2:H3: V H3:H1: V Measured at: Secondary Voltage: X1:X2: V X2:X3: V X3:X1: V Measured at: Current: Ph A: A Ph B: A Ph C: A Measured at: Appears Satisfactory Further Monitoring Recommended. Recommend Changing Tap. Tap Setting: Insulation Resistance Thermographic Inspection Performed: Yes Winding Attach report separately Test Voltage (Vdc) Primary to Ground, Secondary Guarded Secondary to Ground, Primary Guarded Primary to Secondary, Ground Guarded Form F-XFMR-LV 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-XFMR-LV.doc Results: Tap Setting (As Left): No Issues Found Potential Issue Identified. Resistance (MΩ) 30 sec 60 sec. Dielectric Absorption Ratio 60s/30s Final Analysis INSPECTION FORM TRANSFORMER, DRY TYPE, LOW VOLTAGE Returned to Service: Yes No Monitoring / Further Inspection Required: Yes No Repair / Replacement Required: Yes No Company Name Page 2 of 2 ID: Comments: Signature Date (yyyy/mm/dd) Performed By Checked By Note: The person(s) performing the check is responsible for ensuring that the data is transcribed from the handwritten form correctly, and that the analysis results are correct. Form F-XFMR-LV 00, Created by SNC-Lavalin Inc. M:\113099\4ENG\47ELE\RA - Misc Reports & Forms\Forms\F-XFMR-LV.doc