Folding Platform FB 180-3 The lightweight and completely pre

advertisement
Folding Platform FB 180-3
The lightweight and completely pre-assembled
platform system for concrete construction
Edition 04/2009
PERI GmbH
Formwork Scaffolding Engineering
P.O. Box 1264
89259 Weissenhorn
Germany
Tel +49 (0)73 09.9 50-0
Fax +49 (0)73 09.9 51-0
info@peri.com
www.peri.com
Important notes:
Without exception, current safety regulations must
be observed in those countries where our products
are used.
The illustrations in this brochure are photographs of
real site situations. Therefore, the safety aspects
and formwork tie details shown cannot cannot be
considered as final.
Safety instructions and load specifications must be
observed at all times. Any changes and deviations
require separate static verification.
We reserve the right to make technical changes in
the interests of progress.
Contents
2
PERI Folding Platform FB 180-3
Quick and easy to set up,
only 2 platforms required for each structure
4
Simple layout planning,
Intermediate Platform FBZ 240 for 4 applications
6
Corner Frame FBE, Roof edge protection scaffold
8
In concrete frame construction, as formwork
scaffold
10
Anchor points and suspension
12
Construction site-compliant detailed solutions,
storage and transport
14
Components
28
PERI International
1
PERI Folding Platform FB 180-3
Quick and easy to set up, only 2 platforms required
for each structure
PERI FB 180-3 folding platform, the
lightweight and completely pre-assembled platform system for concrete construction.
With the FB 180 system, even complicated ground plans can be scaffolded
with a minimum of effort. System components are also available for internal
and external corners. The corner platform can be used for both left and right
sides.
Attach 4-sling lifting gear to
the retractable crane eye
and then hoist.
Mount the compression
strut with the captive bolts.
Install the Compression Brace in the
right position - ready!
Release red safety coupler and fold out the
guardrail.
2
The non-slip platform decking is made
of multiple-layered bonded sheeting
and is resistant against the adverse
effects of the weather and mechanical damage.
Main Platform
Folding Platform FB 180-3
2,98
2,01
1,08
1,79
Corner Infill Platform
Intermediate Platform FBZ 240
2,41
1,07
1,68
The PERI Folding Platform FB 180-3
is a working scaffold according to
DIN EN 12811 and safety scaffold
accordingto DIN 4420.
2,38
Load Class 4
300 kg/m2 permissible load.
Load Class 5
450 kg/m2 permissible load.
Standard application
with main platforms, intermediate platforms and corner
platforms.
Special application
only with main platforms.
FB
FBZ
e.g. for reinforcement work with more than
500 kg of possible load per linear metre of platform.
FB
FB
FB
for special applications such as extension and
retraction platforms for machines and building
equipment; 450 kg/m2 corresponds to 2430 kg/
platform.
3
PERI Folding Platform FB 180-3
Simple layout planning, Intermediate Platform
FBZ 240 for 4 applications
Simple layout planning
The Folding Platform FB 180-3 and
Intermediate Platform FBZ 240 can
also be used on complicated ground
plans.
Guardrail boards
System components provide solutions
for internal and external corners without requiring any time-consuming special platforms.
The uniform anchor arrangement of
2.50 m as standard, makes the installation of anchors considerably easier.
FB
2,05
2,50
max. 2.50
FB
FBZ
2,50
max. 2.50
1,00
0,20
Formwork
panel
1,65
1,75
0,35
0,20
2,30
2,50
Handrail Post FBP
Suspension of the FB 180-3 allows lateral dimensional tolerances of ± 2.5 cm.
FBZ
2,50
3,00
Formwork panel
FB
FBZ
4
Internal corner solution
with FBZ and individual
brackets.
FB
FBZ
Compensation
area with intermediate platform
FEB
1,45
1,55
Cantilever
FB = folding platform
FBZ = intermediate platform
FEB = folding corner platform
(FB supplemented with the corner platform frame)
Intermediate Platform
FBZ 240
Provides system-compliant safety for
compensation areas and internal corners.
1. As corner platform
Uniform spacing of the anchor points.
No accumulation of dimension tolerances because the intermediate platform is
adjusted in each case accordingly.
FBZ
FBZ
FB
FB
2,50
2,50
FB
2,50
2,50
2. As closure platform
Continuous compensation between the
main platforms of 0 - 2 m means that
this scaffold system can be adapted to
any ground plan.
2,50
Building edge
FBZ
3. As end platform
The intermediate platform together with
one individual bracket as a moving unit
can also be used as an end platform.
With size dimensions up to 2.20 m.
0,00 - 2,02
FB
max. 2.50
2,50
FB
FB
2,50
2,50
FBZ
max. 2.10
max. 2.20 0,35
Internal corner platform:
Intermediate Platform FBZ
with individual bracket
With 2 x Screw Plate
DW 15/115.
Handrail post folded down.
Anchor points
2,50
1,65
0,35
Platform spacing
Formwork panel
from the contractor
FB
2,50
Anchor points
2,50
FBZ
Platform spacing
FB
1,75
2,05
3,00
3,00
4. As internal corner platform
Securely connected with the individual
bracket to form a moving unit, the intermediate platform is used as an internal
corner. The removable handrails of the
intermediate platform allow free access
to the internal corner.
5
PERI Folding Platform FB 180-3
Corner Frame FBE, Roof edge protection scaffold
Ground plan: FB 180-3 as folding
corner platform left
Corner Frame FBE
2,50
The Corner Frame FBE transforms
every folding platform into a universally used corner platform; can be
used on both the left and right sides.
The Folding Corner Platform FEB is
mounted together with the Corner
Frame and is delivered as one unit.
Furthermore, this means that the frequency of use as well as the cost-effectiveness of the folding platform is
increased, then:
1,0
0,20
0,20
– Mounting of the Corner Frame can
easily be done on the construction
site.
– Each Folding Corner Platform can also
be used on the straight wall section.
– The quick folding procedure is also
possible together with the Corner
Frame.
– The Folding Corner Platform can be
used on both the right and left sides.
Formwork panel
1,55
View of FB 180-3 as folding corner
platform left
Use as folding corner
platform on the right.
The Folding Corner Platform
with Frame is just as easy to
fold together as the standard
folding platfrom.
6
1,45
Cantilever
Folding Corner Platform
on a straight wall section.
Roof edge protection scaffold
With only a couple of steps, the
FB 180-3 is converted to roof edge
protection scaffold.
– The Handrail Extension FB is simply
inserted into the tube of the Handrail
Frame as far as it can go.
– The coupling for fixing the top horizontal scaffold tube with the attached
Protection Net is securely connected
with the Handrail Extension.
– The 2 m high Protection Net is installed in manageable 6 m lengths.
This means that the side protection
can comfortably carried out from the
folding platform.
2,00
Folding Platform
FB 180-3 with protection
net in use as roof edge
protection scaffold.
The Handrail Extension FB is
simply inserted into the handrail tube of the folding platform.
The Protection Net is simply
threaded onto a scaffold tube.
Used in accordance with DIN 4420.
Protection Net attached to scaffold
tube ø 48.3 mm.
7
PERI Folding Platform FB 180-3
In concrete frame construction, as formwork scaffold
In concrete frame construction
The support extension allows the
use of the folding platform without
any complicated support measures
of the bracket base point - the pressure point is adaptable to the height
of the storey.
– With the Support Extension 300 and
the Compression Strut, storey heights
up to 4.50 m can be bridged.
max. 4.50 m
– The Support Extension is only suspended and therefore pivots to a safe
position.
– The load-bearing capacity of the folding platform is fully maintained even
with the use of the suport extension.
Compression Strut
FB-2
– Alternatively, wall openings can also
be bridged with horizontally placed
timbers or steel walers.
In addition, a finishing platform can
also be attached to the the support
extension. From this safe working
position, all required finishing work
is carried out.
Support extensions
and finishing platforms
adapt to the wall openings in the concrete
frame.
Support Extension
300 FB-2
The handrail of the finishing platform is
also foldable. The advantages are less
space requirements during transport
and storage as well as faster assembly
and dismantling.
The robust multilayer boarding also ensures safe working conditions and a
long service life for the finishing platform.
The pressure point of
the Support Extension
300 FB is adjustable in
10 cm steps.
8
FB 180 as formwork
scaffold. In practice,
supporting the formwork to the outside
has proved to be an
advantage.
As formwork scaffold
If the folding platform is used as
formwork scaffold, higher loads have
to be carried. Even at great heights,
work equipment and materials must
be available.
Formwork up to 5.40 m high has been
taken into consideration in the Assembly Instructions for standard configuration.
With the tension bracing, external wind forces are reliably transferred.
For reinforcement work done from the
outside, a service load of 300 kg/m² is
available. This is more than half a tonne
per linear metre of scaffold. For special
applications, this can even be raised to
450 kg/m².
This also allows the setting up of reinforcement scaffolding, e.g. PERI UP.
The formwork is supported using pushpull props. The base plates are fixed to
the multi-purpose connector of the folding platform.
Folding Platform
FB 180-3 with finishing
platform and supported formwork.
9
PERI Folding Platform FB 180-3
Anchor points and suspension
Less anchor points with the
PERI Folding Platform 180-3
Whether using a Mounting Head or Loop
Mounting Head, the maximum anchor
spacing of 2.50 m considerably reduces
the work involved for the anchor points
compared to the standard spacing of
1.50 m for individual brackets with planking.
This results in 40% less labour costs and
material requirements for anchor points.
The Mounting Head FB
The standard anchorage for the use
as formwork or working scaffold.
Stirrup
With the use of the Mounting Head FB,
the Folding Platform can be used for
applications with up to 450 kg/m².
Formwork up to 5.40 m high can assembled on it.
The Mounting Head FB
The Loop Mounting Head-2 FB
The ideal anchoring for use as working scaffold.
Tie stirrup in the
reinforcement
With the Loop Mounting Head, applications up to Scaffold Group 5 as well as
assembeld formwork up to 2.70 m high
is possible.
Centre line of bracket
2 loops per anchoring point.
The Loop Mounting Head FB
8 cm
10
2,5 cm
Centre line of bracket
Wall Scaffold Hinge FB
In connection with the Wall Scaffold
Hinge FB which is mounted beforehand, lateral dimensional tolerances of
± 2,5 cm are adjusted. This means the
anchor points can also be moved with a
high degree of reinforcement.
2,5 cm
The Wall Scaffold Hinge FB allows lateral dimensional tolerances of ± 25 cm at the anchor
point.
Suspension
variant
Reusable components
Mounting Head FB
Item no. 026632
Hex. Bolt M24 x
70-10.9
Item no. 026430
Wall Scaffold
Hinge FB
Item no. 026990
Anchor Positioning
M24
Item no. 026420
Mounting Head FB
Item no. 026632
Hex Bolt M24 x
120 10.9
Item no. 029560
Scaffold Mounting
Ring M24
Item no. 029470
Anchor Positioning
M24
Item no. 026420
Screw-On Cone-2
M24 / DW 20
Item no. 114158
Threaded Anchor
Plate DW 20
Item no. 030860
Mounting Head FB
Item no. 026632
Hex. Bolt M24 x
120-10.9
Item no. 029560
Scaffold Mounting
Ring M24
Item no. 029470
Anchor Positioning
M24
Item no. 026420
Climbing Cone 2
M24 / DW 15
Item no. 031220
Tie Rod DW 15
Item no. 030030
Loop Mounting
Head 2 FB
Item no. 026645
Lost components
Cone for Anchor
Sleeve M24
Item no. 026240
Attention: safety instructions
Anchor Sleeve
M24
Item no. 026230
Threaded Anchor
Plate DW 15
Item no. 030840
Anchor Loop
Item-no. 026636
Always use in pairs!
Only use the parts indicated by PERI for
scaffold anchoring.
11
PERI Folding Platform FB 180-3
Detailed practical solutions, storage and transport
45 mm thick platform decking
made of bonded multilayered
plywood boarding.
Detailed practical solutions
PERI folding platforms offer more
than just safety with system components.
The handrail frames of the main platform have integrated nail holes. Conventionally closed compensation areas
can therefore be easily secured with
handrail planks.
Higher handrails made of scaffold tubes
and couplers can be fixed to the handrail posts of the brackets and Handrail
Post FBP.
The end-to-end 45 mm thick platform
decking is made of bonded multilayered
plywood boarding with rounded corners
and edges, and is non-slip, high loadbearing and robust. Compared to individual planks, it is less susceptible to
damage.
All safety components are marked red
and permanently attached.
Easy and simple connection of
scaffold tubes ø 48.3 mm by
means of the Swivel Coupling DK 1.
12
Nail holes in the handrail frame
allow easy fixing of the handrail
planks.
The Handrail Post FBP for supporting
the handrail planks (supplied by the
contractor) is screwed in the MultiPurpose Connector (DW 15).
Storage and transport
With only 27 cm effective stacking
height, PERI folding platforms require a
minimum of space during transport, on
the construction site or building yard.
Due to the externally-positioned crane
eyes, stacks containing up to 10 folding
platforms can be attached at any one
time.
Due to its 2.40 m width, the Intermediate Platform FBZ can be
loaded crosswise thus saving on
space. The stacking height is only
9 cm.
9 9 9 cm
Stacking height of intermediate
platforms
9 Intermediate
Platforms
FBZ 240
Height = 81 cm
26 cm 26 cm 26 cm
Stacking height of folding platforms
39 cm
9 Folding
Platforms
FB 180-3
Height = 247 cm
Folding corner platforms can be
immediately recognised in stacks
because the corner frames are
marked red. The space-saving
stacking dimensions remain unchanged.
On a truck loading area of 2.50 x
5.00 m, up to 45 linear metres of
platfoms can be loaded. With 9
folding platforms stacked on top
of each other, the permissible
height loading dimensions can be
fully utilised.
13
FB 180 Folding Platform System
Item no. Weight kg
026648 318,000
Folding Platform FB 180/300
For working and safety scaffold according to DIN
EN 12811 and DIN 4420. With continuous 45 mm
thick platform lining and foldable handrail frame.
Technical Data
Permissible load 300 kg/m².
For special applications up to 450 kg/m2.
240
2500
240
2980
2055
1040
Ø48,3
2000
478,000
Folding Corner Platform FB 180/300
The corner platform can be used for both left and
right hand corners. Assembled using the Folding
Platform and Corner Frame FBE.
Technical Data
Permissible load 300 kg/m².
240
2500
2980
14
240
2056
1040
026649
FB 180 Folding Platform System
Item no. Weight kg
026622 113,000
Intermediate Platform FBZ 240
Can be used as intermediate platform, or with
accessories as end platform. With continuous
45 mm thick platform lining and foldable handrail
frame.
Technical Data
Permissible load 300 kg/m².
1800
1080
1030
2407
1641
126
1420
1740
Folding Bracket FB 180, galv.
For assembly of special platforms in connection
with Intermediate Platform FBZ as telescopic end
platform.
Ø48,3
385
316
2010
18 x 50 = 900
1120
1085
Ø9
2055
Ø17
95
2000
180
82,000
160
026652
40
18 x 80 = 1440
15
FB 180 Folding Platform System
Item no. Weight kg
026625 116,000
Finishing Platform FBN-2
With continuous 45 mm thick platform lining and
foldable handrail frame.
Technical Data
Permissble load capacity of 150 kg/m².
1260
1041
2980
806
900
026624
42,300
026631
16,100
Accessories
Support Extension 300 FB-2, galv.
Finishing Bracket FBN-2, galv.
For assembly of special finishing platforms.
1085
Ø9
175
Ø48,3
885
Support Extension 300 FB-2, galv.
For extending the bottom compression point.
Hints
Adjustable from 1.30 to 3.00 m in 100 mm steps.
175
3013
42,300
17 x 100 = 1700
026624
170
238
433
16
80
120
200
FB 180 Folding Platform System
Compression Strut FB-2, galv.
For use with Support Extension 300 FB-2.
152
Item no. Weight kg
026627
21,200
180
3234
177,000
Corner Frame FBE
Allows Folding Platform FB 180-3/300 to be used
as corner platform on left and right hand building
corners.
Complete with
6 x 710225 Hex. Bolt ISO 4017 M16 x 45-8.8, galv.
6 x 070890 Nut ISO 7042 M16-8, galv.
500
1000
1928
1000
2400
120
Handrail Post FBP
For assembling a lateral guardrail to the FB 180.
Screwed on from above.
1005
503
Ø 48,3
382
6,990
438
90
026628
2137
026626
120
DW 15
17
FB 180 Folding Platform System
End Guardrail Frame 55
Guardrail frame for clamping to all PERI platforms
and climbing systems.
max 417
1360
1020
Item no. Weight kg
065066
15,100
560
2,330
Scaffold Tube Connector, galv.
For connecting Scaffold Tubes Ø 48.3 mm to
Folding Bracket FB 180 on special platforms.
Complete with
2 x 710225 Hex. Bolt ISO 4017 M16 x 45-8.8, galv.
2 x 070890 Nut ISO 7042 M16-8, galv.
30
100
260
100
30
026644
400
60
159
026635
3,690
Handrail Extension FB
For extending handrails up to h = 2.00 m when
using the FB 180 as safety scaffold.
Ø 38
18
1141
991
Ø48,3
M 16x45
FB 180 Folding Platform System
Protection Net 6.0 x 2.0 m
Side protection net made of high-strength polypropylene for safety scaffold. 5 mm thick, without
knots.
Technical Data
Net type A2 according to DIN EN 1263-1. Energy
absorption 4.2 kj. Colour: green Certified.
100
2000
Item no. Weight kg
026530
2,400
100
6000
026646
199,000
Transportation Fork 180-2, galv.
For moving complete platform units.
Safety instructions
Load capacity 750 kg.
Follow Instruction for Use!
1301
2889
4589
120
1621
1500
1260
80
705
Ø25x180
1756
Screw Plate DW 15/115, galv.
For connecting and assembling of TRP, FB 180 and
RUNDFLEX Plus platforms.
15
100
60
0,673
115
026647
19
FB 180 Folding Platform System
Item no. Weight kg
051250
2,790
Tension Belt l = 5.70 m, 25 kN
Technical Data
Permissible tension force 25.0 kN.
1000
min 1600
1,620
Belt Connector Wall
For securing against tilting through wind loads
with Tension Belt.
0
051270
12
Ø50
80
Ø25
100
026430
0,334
Accessories
Hex. Bolt ISO 4014 M24 x 70-10.9
715357
0,243
Hex. Bolt Ø 16 x 150, galv.
12
150
120
Ø5
018060
0,030
Ø16
Cotter Pin 4/1, galv.
For pins up to Ø 25 mm.
Ø4
030070
0,222
Nut DW 15 SW 30/50, galv.
For anchoring with Tie Rod DW 15.
Hints
Spanner size SW 30.
Technical Data
Permissible load 90 kN.
50
SW 30
DW 15
20
max 5700
FB 180 Folding Platform System
Item no. Weight kg
030740
030050
030150
1,550
0,000
0,420
Tie Rod B 15
Tie Rod B 15 Special Length
Cutting Costs DW 15, B 15
Tie Rod B 15 l = 0.30 m
Hints
Weldable! Observe construction approval!
Technical Data
Permissible load 85 kN.
B 15
6,250
Mouning Head FB, galv.
For mounting the Folding Platform to the Wall
Scaffold Hinge FB or Mounting Ring M24.
329
026632
46
125
55
70
35
75
Wall Scaffold Hinge FB
For mounting the Folding Platform FB 180 to the
Mounting Head FB. Allows mounting point to be
moved ± 25 mm laterally.
200
2,870
25
026990
130
39
26
65
026430
0,334
026430
0,334
110
130
Accessories
Hex. Bolt ISO 4014 M24 x 70-10.9
Hex. Bolt ISO 4014 M24 x 70-10.9
High strength bolt for anchoring climbing systems.
Hints
Spanner size SW 36.
70
SW 36
M24
21
FB 180 Folding Platform System
Item no. Weight kg
026230
1,010
Anchor Sleeve M24
For anchoring of platform systems.
Hints
Permissible load see PERI product info.
100
68
8
120
15
Ø 31
12
DW 20
026240
026250
0,013
0,005
026240
0,013
Accessories
Cone for Anchor Sleeve M24
Plug Ø 26 mm for Anchor Sleeve M24
Cone for Anchor Sleeve M24
Results in a concrete cover of 24 mm.
39
Ø31
50
24
026250
0,005
Plug Ø 26 mm for Anchor Sleeve M24
For closing Cones for Anchor Sleeve M24.
Ø 26
Ø 23
27
0,723
Mounting Ring M24, galv.
Anchoring System M24.
For anchoring of climbing systems.
Hints
Permissible load see PERI product info.
Ø73
029470
73
029560
0,535
029560
0,535
Accessories
Hex. Bolt ISO 4014 M24 x 120-10.9
Hex. Bolt ISO 4014 M24 x 120-10.9
High strength bolt for anchoring climbing systems.
Hints
Spanner size SW 36.
120
M24
SW 36
22
FB 180 Folding Platform System
Item no. Weight kg
114158
1,030
Screw-On Cone-2 M24/DW 20, galv.
Anchoring system M24.
For anchoring of climbing systems.
Hints
Permissible load see PERI product info.
Spanner size SW 36.
150
M 24
030860
0,801
030860
0,801
70
65
DW 20
SW 36
Accessories
Threaded Anchor Plate DW 20
Threaded Anchor Plate DW 20
For the use with Tie Rod DW 20, B 20 or ScrewOn Cone-2 M24/DW 20. For anchoring into the
concrete.
Hints
Permissible load see PERI product info.
Lost anchor component.
65
DW 20
029270
0,331
Advancing Bolt M24, galv.
For connecting the anchor system M24 if the
formlining can be drilled through.
32
100
Ø6
Hints
Spanner size SW 19.
70
M 24
SW 19
029280
0,196
029280
0,196
Accessories
Anchor Positioning Plate M24, galv.
Anchor Positioning Plate M24, galv.
For connecting the anchor system M24 if the
formlining can be drilled through.
80
Ø7
Ø25
60
029440
0,005
6
Accessories
Hex. Wood Screw DIN 571 6 x 20, galv.
23
FB 180 Folding Platform System
Item no. Weight kg
026420
0,123
Anchor Positioning Stud M24, galv.
For connecting the anchor system M24 if the
formlining can not be drilled through.
Hints
Allen Key SW 14.
60
SW 14
Ø5
M 24
40
0,445
0,005
026645
5,460
Accessories
Allen Key SW 14, long
Wire Nails 3 x 80
Loop Mounting Head-2 FB, galv.
For mounting the Folding Platform FB 180 to pair
of Anchor Loops.
375
027212
710312
146
146
17,800
Height Extension FB for Loop
For hanging the Folding Platform FB 180 by 60 cm
to 70 cm lower.
200
985
700
026638
124
24
117
FB 180 Folding Platform System
Item no. Weight kg
026636
1,140
Anchor loop
For anchoring of platform systems.
Hints
Always use in pairs.
Permissible load see PERI product info.
740
80
120
10
224
031480
2,460
Socket Spanner SW 36, chrome-plated
For diverse uses.
510
027212
0,445
Allen Key SW 14, long
To remove the Anchor Positioning Studs
M24, M30 and M36.
SW 14
230
25
26
27
PERI International
42
19
20
22
32
34
18
38
11
52
6
01 PERI GmbH
Rudolf-Diesel-Strasse
89264 Weissenhorn
info @ peri.com
www.peri.com
21
1
5
17
2
46
30
3
16
13
29
28
9
53
24
48
4
41
61
33
02 France
PERI S.A.S.
77109 Meaux Cedex
peri.sas@peri.fr
www.peri.fr
09 Italy
PERI S.p.A.
20060 Basiano (MI)
info@peri.it
www.peri.it
16 Austria
PERI Ges.mbH
3134 Nußdorf ob der Traisen
office@peri.at
www.peri.at
23 Korea
PERI (Korea) Ltd.
Seoul 135-080
info@perikorea.com
www.perikorea.com
29 Slovania
PERI SLOWENIEN
2000 Maribor
peri.slo@triera.net
www.peri.de
03 Switzerland
PERI AG
8472 Ohringen
info@peri.ch
www.peri.ch
10 Japan
PERI Japan K.K.
Tokyo 103-0015
info@perijapan.jp
www.perijapan.jp
17 Czech Republic
PERI spol. s r.o.
252 42 Jesenice
info@peri.cz
www.peri.cz
24 Portugal
PERIcofragens Lda.
Linda-a-Pastora
2790-326 Queijas
info@peri.pt
www.peri.pt
30 Slovakia
PERI spol. s r.o.
903 01 Senec
info@peri.sk
www.peri.sk
04 Spain
PERI S.A. Sociedad
Unipersonal
28110 Algete/Madrid
info@peri.es
www.peri.es
11 United Kingdom/Ireland
PERI Ltd.
Rugby, CV23 0AN
info@peri.ltd.uk
www.peri.ltd.uk
18 Denmark
PERI Danmark A/S
2670 Greve
peri@peri.dk
www.peri.dk
05 Belgium/Luxembourg
N.V. PERI S.A.
1840 Londerzeel
info@peri.be
www.peri.be
12 Turkey
PERI Kalıp ve İskeleleri
Kıraç - Büyükçekmece/
Istanbul 34500
info@peri.com.tr
www.peri.com.tr
19 Finland
PERI Suomi Ltd. Oy
05460 Hyvinkää
info@perisuomi.fi
www.perisuomi.fi
06 Netherlands
PERI B.V.
5480 AH-Schijndel
info@peri.nl
www.peri.nl
13 Hungary
PERI Kft..
1181 Budapest
info@peri.hu
www.peri.hu
14 Malaysia
07 USA
PERI Formwork Malaysia
PERI Formwork Systems, Inc.
43300 Seri Kembangan,
Elkridge, MD 21075
Selangor DE
info@peri-usa.com
info@perimalaysia.com
www.peri-usa.com
www.perimalaysia.com
08 Indonesia
PT Beton Perkasa Wijaksana 15 Singapore
PERI ASIA Pte. Ltd
Jakarta 10210
Singapore 387355
bpw@betonperkasa.com
pha@periasia.com
www.peri.de
www.periasia.com
28
20 Norway
PERI NORGE AS
3036 Drammen
info@peri.no
www.peri.no
21 Poland
PERI Polska Sp. z o.o.
05-860 Płochocin
info@peri.pl.pl
www.peri.pl.pl
22 Sweden
PERIform SVERIGE AB
30013 Halmstad
peri@periform.se
www.periform.se
25 Argentina
PERI S.A.
(1625) Escobar/Prov. Bs. As.
info@peri.com.ar
www.peri.com.ar
26 Brazil
PERI Formas e
Escoramentos Ltda.
CEP 06730-000
Vargem Grande Paulista
São Paulo
info@peribrasil.com.br
www.peribrasil.com.br
27 Chile
PERI Chile Ltda.
Colina, Santiago de Chile
perich@peri.cl
www.peri.cl
28 Romania
PERI România SRL
077015 Baloteşti - ILFOV
info@peri.ro
www.peri.ro
31 Australia
PERI Australia Pty. Ltd.
Glendenning NSW 2761
info@periaus.com.au
www.periaus.com.au
32 Estonia
PERI AS
76401 Saku vald
Harjumaa
peri@peri.ee
www.peri.ee
33 Greece
PERI Hellas Ltd.
194 00 Koropi
info@perihellas.gr
www.perihellas.gr
34 Latvia
PERI SIA
1057 Riga
info@peri-latvija.lv
www.peri-latvija.lv
35 United Arab Emirates
PERI (L.L.C.)
Dubai
perillc@perime.com
www.perime.com
12
44
36
43
7
50
39
60
49
47
23
51
37
40 57
56
54
58
59
35
10
55
63
14
15
8
26
62
27
31
45
25
42 Iceland
36 Canada
MEST ltd.,
PERI Formwork Systems, Inc.
220 Hafnarfjordur
Bolton, Ontario
mest@mest.is
L7E 1K1
www.mest.is
info@peri.ca
www.peri.ca
43 Kazakhstan
TOO PERI Kazakhstan
37 Libanon
050010 Almaty
PERI GmbH
peri@peri.kz
Beirut
www.peri.kz
P.O. Box 90 416 Jdeidet
lebanon@peri.de
44 Russian Federation
www.peri.de
OOO PERI
142403 Noginsk
38 Lithuania
moscow@peri.ru
PERI UAB
www.peri.ru
02300 Vilnius
info@peri.lt
45 South Africa
www.peri.lt
PERI Wiehahn (Pty.) Ltd.
Bellville 7535
39 Marocco
ask@wiehahn.co.za
PERI S.A.
www.periwiehahn.co.za
Tanger
peri25@menara.ma
46 Ukraine
www.peri.de
TOW PERI Ukraina
02002 Kiew
40 Israel
peri@peri.ua
PERI Formwork
www.peri.ua
Engineering Ltd
49002 Israel
47 Egypt
info@peri.co.il
PERI GmbH
www.peri.co.il
11361 Heliopolis
Cairo
41 Bulgaria
info@peri.com.eg
PERI BULGARIA EOOD
www.peri.com.eg
1839 – Sofia
peri.bulgaria@peri.bg
48 Serbia
www.peri.bg
PERI Oplate d.o.o.
11070 Novi Beograd
office@peri.co.yu
www.peri.co.yu
49 Mexico
PERI Cimbras y Andamios,
S.A. de C.V.
Estado de México,
C.P. 54680
info@peri.com.mx
www.peri.com.mx
50 Azerbaijan
PERI Kalıp ve İskeleleri
Baku
peribaku@peri.com.tr
www.peri.com.tr
51 Turkmenistan
PERI Kalıp ve İskeleleri
744035 Aşgabat
periashgabat@peri.com.tr
www.peri.com.tr
52 Belorussia
PERI Belarus
220030 Minsk
peri@mail.belpak.by
www.peri.com.tr
53 Croatia
PERI oplate i skele d.o.o.
10 250 Donji Stupnik/
Zagreb
info@peri.com.hr
www.peri.com.hr
54 Iran
PERI GmbH
Building No. 4
P.O. Box 1939793669
Teheran-Iran
iran@peri.ir
www.peri.ir
55 India
PERI (India) Pvt Ltd
Mumbai – 400064
info@peri.in
www.peri.in
56 Jordan
PERI Jordan
11947 Amman
jordan@peri.de
www.peri.de
62 Peru
PERI Peruana SAC
Lima/Peru
jeanpierre.saux@peri.com.pe
63 Panama
PERI Panama Inc.
587 Panama City
johny.fernandezc@gmail.com
www.peri.com
57 Kuwait
PERI Kuwait
13011 Kuwait
kuwait@peri.de
www.peri.de
58 Saudi Arabia
PERI Saudi Arabia
Jeddah - 21463
K.S.A
saudi-arabia@peri.de
www.peri.de
59 Qatar
PERI Qatar LLC
Doha
qatar@peri.de
www.peri.de
60 Algeria
Société PERI S.A.S.
Kouba - Alger
peri.alger@peri.fr
www.peri.fr
61 Albania
Autostrada TIRANE-DURRES
Tirane / ALBANIA
info@peri.com.tr
www.peri.com.tr
29
Wall Formwork
Panel Formwork
Girder Formwork
Circular Formwork
Facade Formwork
Brace Frame
Climbing Systems
Climbing Scaffold
Self-Climbing System
Climbing Protection Panel
Platform Systems
Column Formwork
Square
Rectangular
Circular
Scaffold, Stairways,
Working Platforms
Facade Scaffold
Working Platform
Weather Protection Roof
Stairway Access
Slab Formwork
Panel Formwork
Beam Grid Formwork
Girder Formwork
Slab Table
Beam Formwork
Bridge and Tunnel
Formwork
Cantilevered Parapet Carriage
Cantilevered Parapet Platform
Engineer’s Construction Kit
Shoring Systems
Steel Slab Props
Aluminium Slab Props
Tower Systems
Heavy-Duty Props
Services
Formwork Assembly
Cleaning / Repairs
Formwork Planning
Software
Statics
Special Constructions
Additional Systems
Plywood
Formwork Girders
Stopend Systems
Pallets
Transportation Containers
PERI GmbH
Formwork Scaffolding Engineering
P.O. Box 1264
89259 Weissenhorn
Germany
Tel +49 (0)73 09.9 50- 0
Fax +49 (0)73 09.9 51- 0
info@peri.com
www.peri.com
D e 04/2009 5ma Art.-Nr.: 790973 © Copyright by PERI GmbH
PERI Product Range
Download