INSTALLATION SOLAR BLACKOUT CHANNELS
3
2
1
1"
2"
4
5
8
6
7
1. Idle End Fascia Bracket
2. Fascia
3. Side Channel with Synthetic
Pile Inset
4. Heat-Welded Hem Pocket
5. Sill Channel with Synthetic
Pile Inset
6. Side Channel with Synthetic
Pile Inset
7. Control End Fascia Bracket
8. Aluminum Roller Tube
• Install the shades prior to blackout channel installation
• Cut blackout channels to fit window opening
Note: Manual shade shown; blackout channels also used with line voltage motorized shades.
Back Side Channel
Figure 1
Figure 3
Crimp channel to set Pile
Front Channel
Figure 2
Figure 4
C- Channel
1. Crimp channel as shown to set pile. Pad surface of channel to prevent damage. (See figure 1)
Note: You must set the synthetic insert to prevent possible damage due to pile wrapping into the shade
2.
Slide the front channel into the
C–channel. (See figure 2)
3.
Snap channels together.
(See figure 3)
4.
Place the side channel in window, ensuring the shade will pass inside the side channel.
5.
Install fasteners through both channels into a suitable mounting surface. (See figure 4)
For product technical assistance, call 800-544-4749 ext. 3 technical.support@swfcontract.com
•
Architectural Website: www.swfcontract.com
79018-00 15-1890 (12/15)
INSTALLATION SOLAR BLACKOUT CHANNELS
Back Side Channel
Figure 1
Slightly crimp channel to set
Pile
Figure 2
1. Crimp channel as shown to set pile. Pad surface of channel to prevent damage. (See figure 1)
Note: You must set the synthetic insert to prevent possible damage due to pile wrapping into the shade
2.
Install fasteners along screw line on the back channel.
(See figure 2)
3.
Slide the front channel into the
C–channel.
(See figure 3)
4.
Snap channels together.
(See figure 4)
Figure 3
Figure 4
2
1
3
1"
2"
8
4
5
7
6
1. Control End Fascia Bracket
2. Fascia
3. Side Channel with Synthetic Pile Inset
4. Heat-Welded Hem Pocket
5. Sill Channel with Synthetic Pile Inset
6. Side Channel with Synthetic Pile Inset
7. Idle End Fascia Bracket
8. Aluminum Roller Tube
• Install the shades prior to blackout channel installation
• Cut blackout channels to fit window opening
Note: Manual shade shown; blackout channels also used with line voltage motorized shades.
For product technical assistance, call 800-544-4749 ext. 3 technical.support@swfcontract.com
•
Architectural Website: www.swfcontract.com
79018-00 15-1890 (12/15)
INSTALLATION SOLAR BLACKOUT CHANNELS
Front Channel
C-Receiver
Channel for
Pile Inserts
Figure 1
Back Channel
C-Joint
Figure 2
Fastener Line
Channel for
Pile Inserts
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
For product technical assistance, call 800-544-4749 ext. 3 technical.support@swfcontract.com
•
Architectural Website: www.swfcontract.com
1.
Crimp channel as shown to set pile. Pad surface of channel to prevent damage.
(See figure 1)
Note: You must set the synthetic insert to prevent possible damage due to pile wrapping into the shade
2.
Install back center channel through fastener-line .
(See figure 2)
3.
At an angle, line up the front
C-joint with the back channel
C-receiver.
(See figure 3)
4.
Press the front channel closed along its edge, snapping the two pieces together.
(See figure 4)
5.
For security, install a fastener through the C-receiver.
(See figure 5)
79018-00 15-1890 (12/15)
INSTALLATION SOLAR BLACKOUT CHANNELS
Solar shade fabric may be cleaned by occasional vacuuming. For stained shades, brush the fabric with a mild detergent and thoroughly rinse. Allow the shade to dry completely before raising. Do NOT completely immerse the fabric. If commercial spot cleaners or diluted bleach mixtures are used, they must first be tested and allowed to dry on an inconspicuous area to ensure compatibility.
For product technical assistance, call 800-544-4749 ext. 3 technical.support@swfcontract.com
•
Architectural Website: www.swfcontract.com
79018-00 15-1890 (12/15)