Surface Mount | Ceiling/Wall/Bottom | Install Guide

advertisement
Surface Mount: F = Ceiling / R = Wall
/ O = Bottom
Installation Drawing
Applicable luminaires:
A 1 | A4 | ACL2 | A CL3 | ACL4 | B4 | D2 | D3 | D4 | E2 | E3 | E4 | G3 | G4 | O2 | O3 | X6
A
B
Rows:
1.
A
1
lens
2
2
1. When rows are ordered: row
sections will be labeled in
sequence. Position sections in
proper order prior to installation.
(ie: Place 1 next to 1).
2. Connect wiring between
housings using the provided quick
connects.
2.
3. Line up pins and bang extrusion
pieces together using a mallet until
no gap remains.
4
1
1
3
C
4. Secure extrusions with joiner
brackets using a threaded rod
or bolt with flange nuts (provided).
D
Gyp Ceilings:
1. Drill mounting and powerfeed
holes in top or side of extrusion,
near each end. Be cautious
of internal components. Secure
fixture to studs at a minimum of
two locations per extrusion, with
appropriate hardware (by others).
DRILL HERE
(CEILING OR BOTTOM)
GEAR TRAY
DRIVER
DRILL HERE
(WALL)
REFLECTOR
1
1. Reinstall LED or fluorescent
gear tray and lamps, if applicable
(by others).
* Do not rely on bare sheetrock for
fixture support. Always tie to
structure.
Powerfeed:
LENS
D3 LED Fixture Shown
2
1. Route power wires through
pre-drilled holes or drill holes in
top or side of extrusion (refer to
Powerfeed Location chart on
page 2). Fixture housing can be
used as a J-box. Wire per code.
2. Reinstall louver or lens.
Lens may have optical inserts.
Louver
or
Lens
D3 LED Fixture Shown
IDS Caddy Clip Option
ATTENTION:
IDS Caddy with stud
attached (by others),
surrounding T-Bar.
Ceiling Tile
Mounting Nut (by others-typically
packaged with the IDS Caddy)
Close-up of our housing
top attached to tile
ceiling.
*CONSULT LOCAL BUILDING CODE AUTHORITIES FOR
INSTALLATION REQUIREMENTS AND APPROVALS.
IDS
CADDY
T-bar Ceilings:
*WARNING: RISK OF FIRE AND ELECTRICAL SHOCK. FIXTURE
INSTALLATION REQUIRES KNOWLEDGE OF FLUORESCENT
LIGHTING ELECTRICAL SYSTEMS. IF NOT QUALIFIED, DO NOT
ATTEMPT INSTALLATION. CONTACT A QUALIFIED ELECTRICIAN.
1. Drill mounting and powerfeed
holes in top of extrusion,
being cautious of internal
components. Attach IDS Caddy
Clips (by others) around T-bar.
*WARNING: RISK OF FIRE AND ELECTRICAL SHOCK. FIXTURE
BALLAST WIRE, OR OTHER ELECTRICAL COMPONENTS MAY
BE DAMAGED WHEN DRILLING FOR INSTALLATION OF FIXTURE
TO WALL OR CEILING. CHECK FOR ENCLOSED WIRE AND
COMPONENTS.
2. Lift fixture into place and
fasten the Caddy Clips’ threaded
bolt through housing.
*WARNING: TO PREVENT WIRE DAMAGE OR ABRASION, DO NOT
EXPOSE WIRES TO EDGES OF SHEET METAL OR OTHER SHARP
OBJECT. DO NOT MAKE OR ALTER ANY OPEN HOLES IN AN
ENCLOSURE OF WIRE OR ELECTRIC COMPONENT DURING
FIXTURE INSTALLATION.
3728 maritime way oceans ide , ca 92056
p. 760.727.7675
f. 760.727.7695
a· light |
Jan 2015
/ O = Bottom
Surface Mount: F = Ceiling / R = Wall
Installation Drawing
Applicable luminaires:
A 1 | A4 | ACL2 | A CL3 | ACL4 | B4 | D2 | D3 | D4 | E2 | E3 | E4 | G3 | G4 | O2 | O3 | X6
Powerfeed Locations: Ceiling or Bottom Mount
Use pre-drilled powerfeed holes or drill at the following recommended locations :
1-3/8
TOP VIEW (OR BOTTOM VIEW FOR BOTTOM MOUNT)
TOP VIEW (OR BOTTOM VIEW FOR BOTTOM MOUNT)
ACL3 | ACL4 | B4 | D3 | D4 | G3 | G4 | O3 | X6
TOP VIEW
E3 | E4
Applicable Luminaires
Ceiling/Surface Mount (Downlight)
A1
ACL3
D3
G3
E3
X6
O2/O3
(Pre-drilled holes)
Bottom Mount (Uplight)
B4
ACL4
G4
D4
E4
Powerfeed Locations: Wall Mount
Use pre-drilled powerfeed holes or drill at the recommended locations for each fixture type shown below (measured from bottom of fixture) :
Applicable Luminaires
Wall Mount (Up/Downlight)
4.000
1.500
1.375
1.000
A4
ACL2
ACL3
1.750
1.000
1.000
ACL4
D2
B4
D3
LED Fixture Lengths
3.750
1.250
E2
D4
E3
G3
E4
3.500
2.500
2.500
ACL2 | ACL3 | ACL4 | B4 | D2
D3 | D4 | E2 | E3 | E4 | G3 | G4 | O3 | X6
3.125
2.250
G4
O3
Notes
Always consult submittal drawings (if applicable) for the most accurate dimensions and powerfeed locations.
Drivers and ballasts are typically located towards the center of each extrusion.
Be aware of driver/ballast locations before drilling any holes.
Factory-drilled powerfeed holes will be drilled and tapped for 1/2" chase nipple.
changing
the right to make
design or options wit
ts
tice
NOMINAL
LENGTH
LIGHTED
LENGTH
OVERALL
LENGTH
2
3
23.00
34.50
23.75
35.25
46.00
46.75
5
6
57.25
58.00
69.00
69.75
7
8
80.25
81.00
9
91.75
102.75
92.50
103.50
10
11
12
114.75
126.00
143.25
115.50
126.75
144.00
Download