WESTWOOD ESTATES/ST. MARY’S/STEEPLECHASE/ST. PETERS ESTATES SPECIAL SERVICE AREA SANITARY SEWER IMPROVEMENT PROJECT Alignment Design Memorandum January, 2016 TABLE OF CONTENTS Preliminary Design Memorandum ...............................................................................................1 A. Introduction ....................................................................................................................1 B. Record Data Search .......................................................................................................3 C. Utility Service Provider Coordination .........................................................................3 D. Schematic Design ...........................................................................................................4 1. Ingress-Egress ..............................................................................................................4 2. Easements and Property Owners .................................................................................5 E. Creek Evaluation ...........................................................................................................5 F. Additional Considerations ............................................................................................5 1. St. Peters Golf Course ..................................................................................................5 George Butler Associates, Inc. Page ii FIGURES Figure 1 Project Area George Butler Associates, Inc. Page iii ATTACHMENTS ATTACHMENT 1 - UTILITY COORDINATION LOG ATTACHMENT 2 - LIST OF POTENTIALLY AFFECTED PROPERTY OWNERS ATTACHMENT 3 – SIPHON LOCATION CREEK NOTES ATTACHMENT 4 – PRELIMINARY ALIGNMENT ATTACHMENT 5 - PRELIMINARY ENGINEER’S ESTIMATE OF PROBABLE COST AND QUANTITY TAKEOFFS George Butler Associates, Inc. Page iv PRELIMINARY DESIGN MEMORANDUM A. Introduction This Alignment Design Memorandum discusses and transmits work performed to date for the Westwood Estates/St. Mary’s/Steeplechase/St. Peters Estates Special Service Area Sanitary Sewer Improvement Project. The project is located in a residential area south of I-70, east of Highway 79 and the St. Peters Golf Course. George Butler Associates, Inc. (GBA) completed a Sanitary Sewer Evaluation Study (SSES) of this area in July 2015 and developed recommendations for sewer improvements. The recommended improvements include several larger diameter sewer pipes and a new inverted siphon where the sewer crosses Dardenne Creek to relieve basement backups and sanitary sewer overflows (SSOs) within the system. GBA has been assigned the task of completing the design of recommended improvements for the project. The project area is located in a residential area outside of city limits and is shown on Figure 1. The project reach is generally bounded by Westwood Estates Drive to the north, Hialeah Drive to the east, St. Peters Golf Course to the west, and common ground to the south. The majority of the project area development was built in the 1960’s and 1970’s as part of the Westwood Estates, St. Mary’s, Steeplechase and St. Peters Estates Subdivisions. This watershed has limited potential for additional development. George Butler Associates, Inc. Page 1 PRELIMINARY MEMORANDUM PROJECT AREA MAP FIGURE 1 PROJECT NUMBER 13347 NOV. 2015 Legend Project Location City Limits Site Access Parcels Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), MapmyIndia, © OpenStreetMap contributors, and the GIS User Community ³ Westwood Estates/ St. Mary's/ Steeplechase/ St. Peters Estates Special Service Area Sanitary Sewer Improvement Project GBA’s project approach entails increasing the capacity of the siphon and select sewers to accomplish the project goals. This submittal includes the following attachments: Utility Coordination Log List of Potentially Affected Property Owners Siphon Location Creek Notes Preliminary Alignment Sketch Preliminary Engineers Estimate of Probable Cost and Quantity Takeoffs B. Record Data Search Preliminary investigations were performed to assist in the preliminary design. Existing information was reviewed and field investigations were performed. The field investigations focused on constructability issues and an evaluation of stream impacts at the siphon location. GBA received parcel and utility data from the City at the beginning of the project. These data files were reviewed and in some cases additional data was requested. In cases where data gaps were identified additional information was requested and utilized as needed. The following data was provided by the City: City GIS (including parcels, utilities, etc.) Project Aerials C. Utility Service Provider Coordination A list of utility providers in the project area was obtained from Missouri One Call. The utilities were contacted by GBA. Some of the utilities responded by providing utility mapping or highlighting utility conflicts between their infrastructure and the proposed project area. Based on the mapping provided, significant utility conflicts are not anticipated. GBA will provide copies of the Preliminary 60% Design Plans to the utilities for review when available. Initial contact information was recorded in a Utility Coordination Log. A copy of the Utility Coordination Log is included as Attachment 1. Information was obtained from the following utility providers: Ameren Missouri Electric AT&T Charter Communications Laclede Gas Company CenturyLink Missouri American Water City of St. Peters George Butler Associates, Inc. Page 3 In, addition, GBA’s surveyor sub-consultant for this project, BAX Engineering, Inc. has surveyed utilities while performing the topographic survey field work. Detailed costs for potential utility conflicts are not included in the preliminary cost opinion section at this time. This includes irrigation piping and sprinklers at the City golf course which have not been surveyed at this time. D. Schematic Design Preliminary investigations were performed to assist in the proposed design. Existing information was reviewed and field investigations were performed. The field investigations focused on an evaluation of stream impacts at the siphon location. The preliminary alignment was presented as the recommended alternative in GBA’s July 2015 SSES Report. Adjustments were made to incorporate notes from GBA’s Stream Team field investigation efforts from September 9, 2015. The proposed alignment includes upsizing several existing sewers and the inverted siphon at the creek crossing. To relieve the SSO and basement backups in the Westwood and Steeplechase areas, the sewer carrying flow from Churchill Downs Dr. to Elm Ct. will be abandoned, along with two existing manholes. Instead, new sewer will be constructed south along the rear lot lines and turn westward, connecting to an existing manhole south of 14 Elm Ct. Furthermore, the existing overloaded siphon will be replaced by a quadruple barrel (one 8-inch and three 12-inch diameter pipes) siphon to provide adequate capacity and velocity. Based on notes from the Stream Team evaluation, the new siphon crossing will be located approximately 30 feet upstream of the existing crossing, which will require construction of new manholes and abandonment of the existing siphon components. The gravity sewer will then discharge to an existing manhole in the golf course along the 42-inch Golf Course interceptor. A preliminary design alignment is included as Attachment 4. The proposed sewer is planned to be constructed in a manner such that the existing sewers can be abandoned in place, the amount of bypass pumping can be minimized, and existing easements can be utilized as much as possible. This could be achieved by offsetting new sewers by a few feet on one side parallel to existing sewers. 1. Ingress-Egress In the portion of the project within the golf course (west of Dardenne Creek), the City owns the access points and temporary construction easements (TCE) are not anticipated to be a significant concern. A significant portion of the project will be constructed within subdivision common ground and existing easement along the rear property lines of parcels between Elm Ct. and Churchill Downs Dr. The upgraded existing sewers will generally follow the same alignment, while the new sewers will extend along the rear property lines to the common ground behind the properties at the end of Elm Ct. A likely access point is through the Westwood Estates common ground/existing 50-foot Missouri American George Butler Associates, Inc. Page 4 Water utility easement between 122 and 124 Oak Dr. There is also an access point to the common ground from Elm Ct. between 14 and 16 Elm Ct. 2. Easements and Property Owners In general, it appears that sewer construction may be mostly confined within existing City property, subdivision common ground and existing utility easements. Some new permanent utility easements and TCEs are anticipated between Elm Ct. and Churchill Downs Dr. A list of potentially affected property owners is included as Attachment 2. E. Creek Evaluation GBA’s Stream Team evaluated the reach of Dardenne Creek where the new inverted siphon is planned to cross beneath the creek. The purpose of this evaluation was to locate any existing hydraulic features and to identify possible stabilization measures to ensure the proposed crossing won’t interfere with existing creek hydraulics. As a result of this evaluation, it was recommended that the proposed siphon be moved a minimum of 30 feet upstream of the existing riffle, which is located at the site of the existing sewer crossing. It was also recommended that a rock toe be placed on the right slope, upstream of the existing riffle. The existing riprap present on the right bank, 2 feet above the water surface, should not be disturbed. The Stream Team also added that the slopes should be revegetated with Zone 1 plantings following construction. Notes and sketches from the creek evaluation are included as Attachment 3. Additionally, GBA performed a preliminary on-site delineation of the waters of the United States and identified impacts on the channel and anticipated permitting issues. Two potential jurisdictional waters were identified within the project corridor including 1) Dardenne Creek and 2) emergent wetland swale. Project construction is anticipated to result in only temporary fill impacts within these two waters; therefore, the project should qualify for a U.S. Army Corps of Engineers Section 404 Nationwide Permit 12 “Utility Line Activities”. While agencies including U.S. Fish & Wildlife Service, Missouri Department of Conservation, and the State Historic Preservation Office have not been contacted at this phase of the project, GBA does not anticipate any potential issues with endangered/threatened species or historic resources. F. Additional Considerations 1. St. Peters Golf Course A new sewer line is proposed through the golf course, connecting the new siphon to the existing 42-inch golf course interceptor. Golf course sprinkler locations have not been surveyed at this time. Based on a previous project that went through the golf course, GBA understands that construction should be staged to keep the course playable, preferably during the winter months (December 1st to March 1st). George Butler Associates, Inc. Page 5 ATTACHMENT 1 UTILITY COORDINATION LOG George Butler Associates, Inc. 225 S. MAIN, SUITE 200 O'FALLON, MO 63366 (636) 240-2444 UTILITY COORDINATION LOG (version 1.1) PROJECT SUMMARY UTILITY COMPANY CONTACT Beverly Wilson Ameren Missouri Electric (314) 554-2570 AT&T Distribution ANTICIPATED SCHEDULE Steeplechase Sewer Improvements 13347 Matt Auld Kierstyn Lorince City of St. Peters, MO PROJECT: JOB NUMBER: PROJECT MANAGER: UTIL COORDINATOR: CLIENT: Address 1901 Chouteau, PO Box 66149 MC 700 bwilson@ameren.com St. Louis, MO 63166 Joe Pippin 402 N. 3rd (636) 949-1328 St. Charles, MO 63301 CONTACT FOR SURVEY LOCATES PRELIMINARY PLANS: RIGHT-OF-WAY PLANS: FINAL CHECK PLANS: FINAL PLANS: INITIAL CONTACT mapping not available; GBA to submit plans for review mapping not available; GBA to submit plans for review jp8512@att.com Lisa Ward Charter Communications (636) 387-6633 Laclede Gas Company 941 Charter Commons Town & Country, MO 63017 lisa.ward@charter.com mapping-design@charter.com Laura Bandy 4118 Shrewsbury Ave laura.bandy@thelacledegroup.com St. Louis, MO 63119 maprequest@lacledegas.com City of St. Peters (Sewer) David Bear One St. Peters Centre Blvd (636) 477-6600 ext. 1312 St. Peters, MO 63376 (E) request for maps 9/18/15; received maps 9/21/15; GBA to submit plans for review (E) request for maps 9/18/15; received maps 9/24/15; GBA to submit plans for review GIS sewer mapping provided by City at start of project dbear@stpetersmo.net Marcia Gay CenturyLink (E) request for maps 9/21/15; Maps received 11/9/15; GBA to submit plans for review (636) 332-7261 marcia.gay@centurylink.com Missouri American Water Company Katie Stimetz 727 Craig Rd St. Louis, MO 63141 katherine.stimetz@amwater.com (E) to Jamie Richardson 9/21/15; reply 9/21/15 indicates that Katie is now contact for plan review; GBA to submit plans for review (VM) Voice Mail; (T) Telephone; (E) Email; (L) Letter; (M) Meeting GENERAL NOTES PRELIMINARY PLAN SUBMITTAL PRELIMINARY PLAN NOTIFICATION OF SUBMITTAL COORDINATION FOLLOW-UP MEETING COORDINATION MEETING LETTING: BEGIN CONSTRUCTION: PROJECT COMPLETION: - RECEIVED VERIFICATION OF UTILITIES 3RD FOLLOW-UP FINAL CHECK PLAN SUBMITTAL FINAL CHECK PLAN SUBMITTAL FOLLOW-UP - RECEIVED UTILITY PLAN OF ADJUSTMENT EXECUTED AGREEMENT FINAL PLAN SUBMITTAL ATTACHMENT 2 LIST OF POTENTIALLY AFFECTED PROPERTY OWNERS George Butler Associates, Inc. Potentially Affected Property Owners Westwood Estates/St. Mary's/Steeplechase/St. Peters Estates Special Service Area Sanitary Sewer Improvement Project Property Impact Ingress / Egress X X X Property Owner Information X X X X X X X X X X X X X X X X Permanent Easement X X X X X X X X X X X X X X X X X X X X X X X X TCE November 18, 2015 Owner Name Address RICHARD L CARR & AVERIL E CARR WALTER E BOYD & MARY E BOYD JOHN W BORGMEYER & WANZA J BORGMEYER AARON WOOLSEY BENJAMIN R JUNG DOUG W HOLLINGSHEAD & DONNA S HOLLINGSHEAD RICHARD A SCHROER & PHYLLIS A SCHROER MATTHEW EHMAN JOHN C RAY JR S&S KELLER COMPANY IV LLC FRED J MOSES & JEAN M MOSES CITY OF ST. PETERS OLIVIA A LINDSEY & KEITH A LINDSEY & EMILY N LINDSEY STANLEY T SCHOTT & JUDY K SCHOTT, REVOC INTER VIVOS TRUSTS TARAM HERTLEIN GREGORY LARAMIE & SAVANNAH P BALTIMORE THOMAS SCHWEITZER, KATELYN NELSON, JAMES ANDREW NELSON & KELLY L NELSON WESTWOOD ESTATES TRUSTEES OF RECORD WESTWOOD ESTATES TRUSTEES OF RECORD CITY OF ST. PETERS Page 1 of 1 County Parcel ID 5 ELM COURT 7 ELM COURT 9 ELM COURT 11 ELM COURT 13 ELM COURT 15 ELM COURT 17 ELM COURT 14 CHURCHILL DOWNS DRIVE 16 CHURCHILL DOWNS DRIVE 18 CHURCHILL DOWNS DRIVE 20 CHURCHILL DOWNS DRIVE 22 CHURCHILL DOWNS DRIVE 24 CHURCHILL DOWNS DRIVE 26 CHURCHILL DOWNS DRIVE 28 CHURCHILL DOWNS DRIVE 30 CHURCHILL DOWNS DRIVE 2-062A-4969-00-0108 2-062A-4969-00-0107 2-062A-4969-00-0106 2-062A-4969-00-0105 2-062A-4969-00-0104 2-062A-4969-00-0103 2-062A-4969-00-0102 2-062A-4428-00-0311 2-062A-4428-00-0310 2-062A-4428-00-0309 2-062A-4428-00-0308 2-062A-4428-00-0307 2-062A-4428-00-0306 2-062A-4428-00-0305 2-062A-4428-00-0304 2-062A-4428-00-0303 32 CHURCHILL DOWNS DRIVE ELM COURT OAK DRIVE GOLF COURSE/ELM CT 2-062A-4428-00-0302 2-062A-4969-00-0111 2-055D-4969-00-0112 2-062A-4969-00-0111 ATTACHMENT 3 SIPHON LOCATION CREEK NOTES George Butler Associates, Inc. Job No._______________ BP Date architects By engineers ?S - - AJ.7 Cc-Z/1J- ,%— 14 T?E f 4 ,.s 6e111 S7 4Vr,q-V &4rz2 214’l ,yre 1s — . > ‘C’ ZZ - ‘ ‘ TO ,12rjt’ -2 Ic ,14iJ4r’ fZcM4 rc E/)7,4IJ 2/ ,4i oi á )r S4Di’ P 7cTJM1 /O ‘- ‘ cfrLr -AV C,eZTrCI4 L 4/4[EL.-r i/ / 1Jh’OL L)ZC Chk’d______ M’Z/Z/ %W rro,V4L ZW2 G ç 44 TL SiA- ‘Z- 6’6s6 S f’c41 MVk S• ‘ 74- ‘? 72 . , ,4e çi 4:r cV ÷ o ( /efr of z U. Dardenne Creek 438 437 . 436 I 432 431 I I i - — I 0 100 .. . I 400 300 200 • bed I water srf 500 Channel Distance (ft) • ban kfull t x-section o I I 600 700 riffle crest • pool • run glide x 1000 900 800 --- + --- - --- Linear (---) cJ O S 4k. lb.’ ATTACHMENT 4 PRELIMINARY ALIGNMENT George Butler Associates, Inc. ! ! ! ! ! ! 122 126 128 12 394' IN PV C ! 4 5 14 12 6 135 Dr 139 130 2 141 ! 134 136 ! 32 12IN 8' PVC ! 34 18IN 1' PVC ' 120 VC NP 18I ( ! Legend ! ( ! ! 30 ! ! 23 ! 28 Elm 38 t 17 19 Dr Elm aic a 23 42 12 14 46 10 ! 1 7 2 ! 11 7440 9 ! 7430 7 5 17 Ct ! 21 12 14 19 1 3 23 14 25 ! 10 12 13 15 NOV. 2015 8 11 52 4 Santa Anita ! 5 ! 50 6 13347 3 10 8 ! 13 48 PROJECT NUMBER 31 9 ! 44 44 Dr! ! 40 ! 46 6 21 ! 51 ! 4 6 ! 53 2 8 15 55 33 8 13 50 48 35 4 52 r 50 37 5 45 54 57 3 tC se D Ja m ! 11 36 Existing Manhole Abandonment Existing Sewer 2 ! 34 Proposed Manhole Existing Manhole Ch es tnu ! 32 ( ! Existing Sewer Abandonment ! ! !!! ! ! 28 cha 52 39 1 30 Proposed Siphon ! 32 223' 18IN PV C 17 56 12 390' IN PV C 9 26 47 59 54 ( ! 18 24 15 Proposed Sewer ! Ste ep le ! 5 ( ! ! ( ! 16 20 ! ( ( ! 11 13 14 16 49 3 14 7 9 12 ( ! 12 228' IN PV C 33 18IN 9' PVC ! ( ! ! 10 ( ! ! ! ( 15 145 IN ' PV C Ch u rc hill D ! 1 r 6 18 333' IN PV C PROPOSED ( (! ! (! SIPHON ( ! ( ! 61' 140' 12IN PVC 3-12 IN DIP ( ( ! ! 1-8 IN DIP 10 5 8 36 476 IN ' PV C 4 12 Ct ! 60 6 3 ! 44 ! 8 4 ! 64 2 ! 2 45 e Dr 62 32 1 142 St Lu k 66 ! 30 138 140 ! ! 46 28 ! ( ! St 26 145 143 ! 47 24 ! 4 137 18 48 1 8 17 ! 2 25 3 ! 10 133 132 Ma ple ow ns D ! 9 131 Oa k 6 7 129 ! 124 200 ! 11 ! 16 127 120 Dr ! 8 18 125 118 tes 10 13 16 PRELIMINARY ALIGNMENT 116 ! 20 15 18 ! 12 15 ATTACHMENT 4 114 od Es ta 17 13 16 r r 119 two 15 16 Hialeah D ! 22 19 Dr 112 117 We s ! 24 115 110 ! 26 ! 18 Elm 113 21 dD 111 28 ste a 108 30 Ho me 109 ! 14 16 18 20 22 24 ³ Westwood Estates/ St. Mary's/ Steeplechase/ St. Peters Estates Special Service Area Sanitary Sewer Improvement Project ! ATTACHMENT 5 PRELIMINARY ENGINEER’S ESTIMATE OF PROBABLE COST AND QUANTITY TAKEOFFS George Butler Associates, Inc. Task Relief Sewers Mobilization Excavation Class "C" Dewatering Bypass Pumping Seeding Protection and Restoration of Site Street Pavement - Asphaltic Concrete Remove & Replace Street Pavement - Concrete Remove & Replace Granular Backfill Manhole Cover Seals Manhole Frame Seals Manhole-Standard Construction Pipe Sewer 12 inch (Sanitary/Combined) Pipe Sewer 15 inch (Sanitary/Combined) Pipe Sewer 18 inch (Sanitary/Combined) Pipe Sewer 36 inch (Sanitary/Combined) Bentonite Plug Abandonment-Pipe Fill Abandon Structure Siphon Ductile Iron Pipe Sewer 08 inch Class 50 Ductile Iron Pipe Sewer 12 inch Class 52 Junction Box Encasement- Class "A" Concrete Zone 1 Plantings Class I Rock Toe Total Average Unit Cost Estimated Cost Capital Cost(1) Units Quantity LS CY AL LS SY LS SY SY CY EA EA LF LF LF LF LF EA CY EA 1 6116 1 1 547 1 15 32 43 13 13 155 1401 254 1372 476 15 15 5 $25,000 $25 $8,000 $12,000 $2 $55,000 $67 $68 $36 $145 $360 $350 $95 $105 $120 $320 $250 $190 $1,100 $25,000 $152,900 $8,000 $12,000 $1,094 $55,000 $1,005 $2,176 $1,548 $1,885 $4,680 $54,250 $133,095 $26,670 $164,640 $152,320 $3,750 $2,850 $5,500 $31,250 $191,125 $10,000 $15,000 $1,368 $68,750 $1,256 $2,720 $1,935 $2,356 $5,850 $67,813 $166,369 $33,338 $205,800 $190,400 $4,688 $3,563 $6,875 LF LF EA CY SY SY 140 420 2 50 50 60 $150 $190 $25,000 $250 $15 $95 $21,000 $79,800 $50,000 $12,500 $750 $5,700 $978,113 $26,250 $99,750 $62,500 $15,625 $938 $7,125 $1,222,641 Notes: (1) Capital costs include 25% contingency (2) Cost does not include property acquisition, easement preparation, rock excavation or bid period/construction phase services.