New York Air Brake CCB Brake System GE CONTRACT CCB BRAKE EQUIPMENT MAINTENANCE MANUAL IP-155-C For the METRO NORTH DUAL MODE LOCOMOTIVE Operated by METRO NORTH AUGUST 96 CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL INSERT LATEST CHANGED PAGES. DESTROY SUPERSEDED PAGES. LIST OF EFFECTIVE PAGES NOTE: The portion of the text effected by the changes is indicated by a vertical line in the outer margin of the page. The total number of pages in this Maintenance and Instruction Manual, is 360, consisting of: PAGE NO. CHANGE NO. ISSUE 1 2 2 0 1 1 0 0 3 1 2 2 2 2 2 2 3 2 2 2 3 1 4 1 1 1 3 1 1 1 1 1 1 August/96 December/97 December/97 December/95 December/97 August/96 August/96 January/83 June/96 April/94 October/95 October/95 October/95 October/95 October/95 June/96 June/96 June/96 June/96 June/96 June/96 April/94 June/96 April/94 April/94 April/94 June/96 March/95 June/95 August/95 August/95 August/95 December/95 Title A B i through viii 1-1 through 1-80 2-1 2-2 (Blank) C.W. 135 C.W. 217 C.W. 218 C.W. 219 C.W. 220 C.W. 221 C.W. 222 C.W. 223 C.W. 224 C.W. 226 C.W. 228 C.W. 229 C.W. 230 C.W. 231 C.W. 232 C.W. 233 C.W. 240 C.W. 241 C.W. 242 C.W. 243 C.W. 249 C.W. 250 C.W. 252 C.W. 253 C.W. 254 C.W. 255 ADDITIONAL COPIES OF THIS PUBLICATION MAY BE OBTAINED FROM: NEW YORK AIR BRAKE CORPORATION A KNORR BRAKE COMPANY 748 STARBUCK AVENUE WATERTOWN, NY 13601 Manual: IP-155-C The Change No. "0" indicate the Original Issue for Manual The Change No. "1" indicates the Original Issue for C.W. The Change No. "1" indicates the Original Issue for NYR A DEC/97 CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL INSERT LATEST CHANGED PAGES. DESTROY SUPERSEDED PAGES. LIST OF EFFECTIVE PAGES NOTE: The portion of the text effected by the changes is indicated by a vertical line in the outer margin of the page. The total number of pages in this Maintenance Manual, Vendor Information, is 360, consisting of: 3-1 through 3-3 3-4 (Blank) 4-1 4-2 through 4-4 4-3 5-1 through 5-27 5-28 (Blank) 6-1 through 6-6 7-1 7-2 (Blank) P/L - 1481 P/D - 1481 W/D - 1481 8-1 through 8-5 0 0 0 1 0 0 0 0 0 0 E D D 0 December/95 December/95 December/95 August/96 December/95 December/95 December/95 December/95 December/95 December/95 October/97 October/97 December/97 December/95 ADDITIONAL COPIES OF THIS PUBLICATION MAY BE OBTAINED FROM: NEW YORK AIR BRAKE CORPORATION A KNORR BRAKE COMPANY 748 STARBUCK AVENUE WATERTOWN, NEW YORK 13601 DEC/97 The Change No."0" indicates the Original Issue The Change No. "1" indicates the Original Issue for C.W. The Change No. "1" indicates the Original Issue for NYR B Manual: IP-155-C CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL TABLE OF CONTENTS CHAPT/SECT 1.0 TITLE PAGE OPERATING PROCEDURES ** 1-1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 AIR BRAKE EQUIPMENT AIR BRAKE EQUIPMENT IN AIR BRAKE COMPARTMENT BRAKE VALVE AIR BRAKE SET-UP LOSS OF POWER MODE POWER UP PENALTY 1-1 1-1 1-6 1-7 1-7 1-7 1.2 1.2.1 1.2.2 1.2.3 GENERAL INFORMATION CCB INTRODUCTION SYSTEM DESCRIPTION1-10 OPERATION A. RELEASE POSITION B. BRAKE CYLINDER PRESSURE CONTROL C. SERVICE APPLICATION-AUTOMATIC D. BRAKE CYLINDER CONTROL-AUTOMATIC E. SUPPRESSION POSITION F. HANDLE-OFF POSITION G. EMERGENCY APPLICATION-EMERGENCY H. EMERGENCY APPLICATION - TRAIN SEPARATION I. BLENDED BRAKE FUNCTIONAL DESCIPTION J. TRAIL POSITION - AUTOMATIC BRAKE K. TRAIL POSITION - ANY EMERG. APPLICATION AND RELEASE L. INDEPENDENT APPLICATION AND RELEASE M. TRAILING INDEPENDENT BRAKING N. LOSS OF POWER OR DEFAULT MODE O. SERVICE PENALTY DEFAULT P. INDEPENDENT - BACK UP TRAIL OPERATION Q. BACK UP BRAKE SYSTEM (DIT/DEAD - IN - TOW) 1-8 1-8 2.0 1-12 1-12 1-17 1-20 1-25 1-25 1-30 1-32 1-40 1-42 1-45 1-45 1-47 1-55 1-55 1-55 1-59 1-61 EQUIPMENT DESCRIPTION 2-1 COMPONENT DESCRIPTIONS 2-1 PREPARATION FOR MAINTENANCE 3-1 3.1 GENERAL INFORMATION 3-1 3.2 SAFETY PRECAUTIONS 3-1 3.3 COMPONENT ASSEMBLY PRECAUTIONS 3-3 2.1 3.0 i DEC/95 CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL TABLE OF CONTENTS (Contd.) CHAPT/SECT 4.0 4-1 4.1 GENERAL INFORMATION 4-1 4.2 INSPECTIONS 4-1 4.3 92 DAY INSPECTION 4-1 4.4 EQUIPMENT REPLACEMENT, REPAIR, AND OVERHAUL 4-4 CHECKOUT AND ANALYSIS 5-1 5.1 GENERAL INFORMATION 5-1 5.2 FUNCTION TESTING 5-1 5.2.1 Code of Tests For Testing Locomotive Computer Controlled 5-1 Brake Equipment Subsystem Procedure For GE/METRO NORTH (NYT-XXXX-C) 5.3 TROUBLESHOOTING 5.3.1 General Information 5.3.2 Troubleshooting Chart 6.0 6.1 6.2 7.0 7.1 DEC/95 PAGE SCHEDULED INSPECTION 5.0 8.0 TITLE 5-11 5-11 5-12 EQUIPMENT REPLACEMENT ** 6-1 General Information Replacement Procedures 6.2.1 General Procedures 6.2.2 Pneumatic Control Unit Replacement 6.2.3 DIT Valve Replacement 6.2.4 Refer to Carbuilders Manual NYR-332 NYR-353 NYR-372 6-1 6-1 6-1 6-2 6-2 6-6 SYSTEM EQUIPMENT 7-1 GENERAL INFORMATION 7-1 NYAB/KNORR CCB - GE FAULT CODES ii 8-1 CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL LIST OF ABBREVIATIONS 16AW4 .........................................Control Pipe Analog Converter 16E...............................................Exhaust Magnet Valve 16S...............................................Supply Magnet Valve 16T...............................................Control Pipe Transducer 20CP ............................................20 Pipe Control Portion 20T...............................................Independent Application .....................................................Pipe Transducer (20 Pipe) AA/PCB........................................Analog Output PCB AACB ...........................................Air Brake Circuit Breaker ACO .............................................Alerter Cut-Out AD/PCB........................................Analog To Digital Converter PCB AE1 ..............................................Automatic Emergency Switch NO. 1, N.C. AE2 ..............................................Automatic Emergency Switch NO. 2, N.C. AP ................................................Automatic Variable Handle Potentiometer AR ................................................Automatic Release Switch, N.O. BA ................................................Battery BAN..............................................Battery Negative BAP..............................................Battery Positive BB/PCB........................................Blended Brake I/O PCB BBR..............................................Blended Brake Relay BBWS ..........................................Blended Brake Wheelslip BC ................................................Brake Cylinder BCCO...........................................Brake Cylinder Cut-Out BCT..............................................Brake Cylinder Transducer BEA..............................................Digital I/O PCB BEA/PCB .....................................Input/Output PCB BG................................................Blending Signal BLD/BRK......................................Blended Brake Enable BO................................................Bail Off Switch, N.O. BP ................................................Brake Pipe BPCO...........................................Brake Pipe Cut-Out Switch BPPB ...........................................Brake Pipe Push Button BPT ..............................................Brake Pipe Transducer BRPB ...........................................Brake Release Push Button BVJ1-BVJ2...................................Brake Valve External Connectors CAM-F.........................................."F" Cam In Controller CCB .............................................Computer Controlled Brake °C .................................................Degree Centigrade COM/PCB ....................................Communication PCB CP ................................................Centeal Processor CRU .............................................Computer Relay Unit CRU .............................................Computer Relay Unit CS ................................................Continuous Service iii DEC/95 CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL LIST OF ABBREVIATIONS (Cont.) CSCO...........................................Cab Signal Cut-Out DB1/PCB......................................Magnet Valve Driver Board DB2 ..............................................Relay Driver Board dc .................................................Direct Current DCV .............................................Double Check Valve DI .................................................Digital Input DO................................................Digital Output ELV ..............................................Emergency Limiting Valve EMER...........................................Emergency EPA1/PCB ...................................Automatic Application Analog .....................................................Converter Driver PCB EPA2............................................Analog Converter Driver Board EPA2/PCB ...................................Control Pipe (16) Analog .....................................................Converter 16 AW4 Driver PCB ER ................................................Equalizing Reservoir ERAW4 ........................................Equalizing Reservoir Analog Converter ERE..............................................Exhaust Magnet Valve ERS..............................................Supply Magnet Valve ERT..............................................Equalizing Reservoir Transducer ES ................................................Emergency Sanding ESR..............................................Emergency Sanding Relay EXC..............................................Excitation Controller Fig ................................................Figure FL1/PCB ......................................24 VDC Filter FOJ1 ............................................Automatic Fiber Optic External Connector FOJ2 ............................................Independent Fiber Optic External Connector FOR .............................................Fiber Optic Receiver FS ................................................Full Service ft-lbs .............................................Foot Pounds GFB..............................................Generator Field Breaker GFTL............................................Generator Field Trainline HO................................................Handle Off HSLR ...........................................Hostler Relay IBS ...............................................Independent Brake Switch IFC ...............................................Integrated Function Control IM .................................................Independent Maximum Applied Switch, N.O. IND...............................................Independent IP..................................................Independent Variable Handle Potentiometer IR .................................................Independent Release Switch, N.O. J1-J11 ..........................................PCB Internal Connectors K1ES............................................Sanding Relay K2IBS...........................................Extended Dynamic Range Cut-Out .....................................................Relay (Not Used) DEC/95 iv CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL K3BCPS.......................................Dynamic Brake Cut-Out Relay LIST OF ABBREVIATIONS (Cont.) K4HSP .........................................Hostler Power Relay K5COR.........................................PCR Cut-Out Relay K7SUPP.......................................Cab Signal Suppression Relay K9BVPS .......................................Brake Valve Cut-Off Switch Relay K11BBE .......................................Blended Brake Enable Relay K12VA..........................................Brake Failure Alarm Relay KN ................................................Kilo Newtons lbs ................................................Pounds LCN..............................................Lcoc Control Negative LCP ..............................................Loco Control Positive LT1...............................................Lead/Trail #1 Switch LT2...............................................Lead/Trail #2 Switch LT3...............................................Lead/Trail #3 Switch MC-TH .........................................Master Controller - Throttle MM ...............................................Millimeter MIN ..............................................Minimum MR ...............................................Main Reservoir MRT .............................................Main Reservoir Transducer MV13E .........................................Bail Off Exhaust Magnet Valve MV13S .........................................Bail Off Supply Magnet Valve MV16T .........................................Control Pipe (16 Pipe) Default Magnet Valve MV20E .........................................Independent Application Exhaust Magnet Valve MV20M.........................................Independent Application Maintaining Magnet .....................................................Valve MV20S .........................................Independent Application Supply Magnet Valve MV53............................................Brake Pipe Cut-Out Magnet Valve MVEM ..........................................Emergency Magnet Valve MVER...........................................Equalizing Reservoir Default Magnet Valve N ..................................................Newtons Nm ...............................................Newton Meters PARA ...........................................Paragraph PCB..............................................Printed Circuit Board PCR .............................................Power Cut-Out Relay PCU .............................................Pneumatic Control Unit Pg.................................................Page PS13 ............................................Bail Off Pressure Switch PSBP ...........................................Brake Pipe Pressure Switch PSC..............................................Propulsion System Controller psig ..............................................Pounds Per Square Inch, Gauge PVEM...........................................Emergency Pilot Air Valve Qty ...............................................Quantity v DEC/95 CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL R1 ................................................Resistor R2 ................................................Resistor LIST OF ABBREVIATIONS (Cont.) REL ..............................................Release REV TL ........................................Reverse Trainline SC1 ..............................................Signal Conditioning PCB SC2 ..............................................Signal Conditioning PCB SG................................................Signal Trainline SS8 ..............................................Digital I/O PCB SS9 ..............................................Digital I/O PCB SV2 ..............................................Power Supply PCB SVJ ..............................................Power Supply Jumper PCB TB1 ..............................................Terminal Board 1 TB5 ..............................................Terminal Board 5 TH-IDLE .......................................Throttle - Idle TJB/PCB ......................................Transducer Jumper Board PCB TPBP............................................Brake Pipe Test Fitting TPER ...........................................Equalizing Reservoir Test Fitting TPMR...........................................Main Reservoir Test Fitting TP13 ............................................Actuation Pipe Test Fitting TP20 ............................................20 Pipe Test Fitting V...................................................Volts VA ................................................Visual Alarms VCU .............................................Voltage Conditioning Unit VO1..............................................Voltage Out-Put 1 VO2..............................................Voltage Out-Put 2 DEC/95 vi CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL Introduction The Purpose of this Manual is to provide necessary information pertaining to the CCB Brake System for performing an on and off locomotive equipment check out and analysis of the brake system. Sufficient information of the introductory overview nature is also included to inform the maintenance personnel of the nature and function of each of the components in the CCB Brake System. 1. The information contained within this manual summarizes the features of the CCB brake equipment and its application to the METRO NORTH DUAL MODE vehicle. 2. Ensure that you are thoroughly familiar with the instructions for a component and are familiar with all precautionary notes prior to attempting a sequence, operation or maintenance. Failure to follow procedures and precautionary notes in this publication, could cause loss of or serious injury to personnel and/or malfunction or equipment damage. vii DEC/95 CCB METRO NORTH DUAL MODE CONTRACT LOCOMOTIVE MAINTENANCE MANUAL THIS PAGE LEFT BLANK INTENTIONALLY DEC/95 viii