APPENDIX D – MAJOR PHASE 1 CP PARKS & OPEN SPACE SCHEMATIC DESIGN (24” x 36” map set delivered/available under separate cover. 'LJLWDOÀOHRQHQFORVHG&' M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 123 MILL VALLEY SAN FRANCISCO DELHI 323 Geary Avenue, Suite 602, San Francisco, CA 94102 T 415 861 7900 F 415 861 7908 www.rhaa.com Lennar Urban Candlestick Major Phase 1 PROJECT NUMBER 08007b File Name: S:\Active Job Files\Candlestick Major Phase 1 08007b\CAD\SD\RHAA\Plots\L1.0 Context Plan - Existing Structures & Contours.dwg Plotted By: MASAHIRO Date Plotted: 12/16/2013 5:45 PM SUBMITTAL 124 Schematic Design DATE December 16, 2013 CONSULTANTS REVISIONS No. Date Description Drawn By: MI Checked By: NL REGISTRATION AND SIGNATURE SHEET TITLE Context Plan - Existing Structures and Contours N SCALE: 1"= 250'-0" 0 250 500 750 APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 L1.0 Major P h ase 1 CP A p p l i cati on MILL VALLEY SAN FRANCISCO DELHI 323 Geary Avenue, Suite 602, San Francisco, CA 94102 T 415 861 7900 F 415 861 7908 www.rhaa.com Lennar Urban Candlestick Major Phase 1 PROJECT NUMBER 08007b SUBMITTAL Schematic Design DATE December 16, 2013 File Name: S:\Active Job Files\Candlestick Major Phase 1 08007b\CAD\SD\RHAA\Plots\L1.1 Context Plan-2.dwg Plotted By: MASAHIRO Date Plotted: 12/16/2013 5:46 PM CONSULTANTS M a j o r P h a se 1 CP A pplic at io n REVISIONS No. Date Description Drawn By: MI Checked By: NL REGISTRATION AND SIGNATURE SHEET TITLE Context Plan - Future Infrastructure N SCALE: 1"= 250'-0" APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 0 250 500 750 L1.1 125 MILL VALLEY SAN FRANCISCO DELHI 323 Geary Avenue, Suite 602, San Francisco, CA 94102 T 415 861 7900 F 415 861 7908 www.rhaa.com Lennar Urban Candlestick Major Phase 1 PROJECT NUMBER 08007b File Name: S:\Active Job Files\Candlestick Major Phase 1 08007b\CAD\SD\RHAA\Plots\L1.2 Context Plan - Opportunities & Constraints.dwg Plotted By: MASAHIRO Date Plotted: 12/16/2013 5:47 PM SUBMITTAL 126 Schematic Design DATE December 16, 2013 CONSULTANTS REVISIONS No. Date Description Drawn By: MI Checked By: NL REGISTRATION AND SIGNATURE SHEET TITLE Context Plan Opportunities & Constraints N SCALE: 1"= 250'-0" 0 250 500 750 APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 L1.2 Major P h ase 1 CP A p p l i cati on MILL VALLEY SAN FRANCISCO DELHI 323 Geary Avenue, Suite 602, San Francisco, CA 94102 T 415 861 7900 F 415 861 7908 www.rhaa.com Lennar Urban Candlestick Major Phase 1 Plotted By: MASAHIRO Date Plotted: 12/16/2013 5:47 PM PROJECT NUMBER 08007b SUBMITTAL Schematic Design DATE December 16, 2013 File Name: S:\Active Job Files\Candlestick Major Phase 1 08007b\CAD\SD\RHAA\Plots\L2.0 Alice Griffith Neighborhood Park Site Plan - Illustrative.dwg M a j o r P h a se 1 CP A pplic at io n CONSULTANTS STORAGE 180 S.F. REVISIONS No. Date Description Drawn By: Checked By: REGISTRATION AND SIGNATURE SHEET TITLE Alice Griffith Neighborhood Park Site Plan Illustrative SCALE: 1"= 50'-0" APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 0 25 50 100 L2.0 127 128 APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 129 MILL VALLEY SAN FRANCISCO DELHI 323 Geary Avenue, Suite 602, San Francisco, CA 94102 T 415 861 7900 F 415 861 7908 www.rhaa.com 130 Candlestick Major Phase 1 7KH$OLFH*ULIÀWK&RPPXQLW\*DUGHQLVSODQQHG WREHUHORFDWHGWR-DPHVWRZQ:DONHU6ORSH7KH SODQVIRUWKHFRPPXQLW\JDUGHQDUHRPLWWHGLQWKLV VFKHPDWLFGHVLJQVHWDVWKHJDUGHQLVSURJUHVVLQJ ZLWKDVHSDUDWHFRPPXQLW\HQJDJHPHQWDQG GHVLJQSURFHVV2&,,ZLOOEHLQYROYHGWKURXJKRXW WKLVSURFHVV EL HARNEY WAY AR PROJECT NUMBER IO 08007b SUBMITTAL Schematic Design DATE December 16, 2013 W AL KE CONSULTANTS R JA ME ST OW AV E. REVISIONS Date Description WA Y No. EY N RN US HA File Name: S:\Active Job Files\Candlestick Major Phase 1 08007b\CAD\SD\RHAA\Plots\L3.0 Bay View Hillside Open Space l Jamestown Walker Slope Site Plan - Illustrative.dwg Plotted By: MASAHIRO Date Plotted: 12/16/2013 5:48 PM Lennar Urban Drawn By: MI Checked By: NL REGISTRATION AND SIGNATURE SHEET TITLE Bayview Hillside Open Space / Jamestown Walker Slope Site Plan Illustrative SCALE: 1"= 60'-0" APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 L3.0 Major P h ase 1 CP A p p l i cati on MILL VALLEY SAN FRANCISCO DELHI 323 Geary Avenue, Suite 602, San Francisco, CA 94102 T 415 861 7900 F 415 861 7908 www.rhaa.com M a j o r P h a se 1 CP A pplic at io n Candlestick Major Phase 1 AR EL IO US W AL KE HARNEY WAY R PROJECT NUMBER 08007b SUBMITTAL Schematic Design DATE December 16, 2013 CONSULTANTS JA ME ST OW N AV E. REVISIONS Date Description RN EY WA Y No. HA File Name: S:\Active Job Files\Candlestick Major Phase 1 08007b\CAD\SD\RHAA\Plots\L3.1 Bay View Hillside Open Space l Jamestown Walker Slope Site Plan - Circulation.dwg Plotted By: MASAHIRO Date Plotted: 12/16/2013 5:49 PM Lennar Urban Drawn By: MI Checked By: NL REGISTRATION AND SIGNATURE SHEET TITLE Bayview Hillside Open Space / Jamestown Walker Slope Site Plan Circulation SCALE: 1"= 60'-0" APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 L3.1 131 Plotted By: MASAHIRO Date Plotted: 12/16/2013 5:50 PM DELHI Lennar Urban Candlestick Major Phase 1 PROJECT NUMBER 08007b SUBMITTAL Schematic Design NATIVE PLANTING AR EL IO DATE HARNEY WAY W AL KE R December 16, 2013 CONSULTANTS JA ME ST OW N AV E. REVISIONS Date Description WA Y No. EY NATIVE PLANTING RN US HA File Name: S:\Active Job Files\Candlestick Major Phase 1 08007b\CAD\SD\RHAA\Plots\L3.2 Bay View Hillside Open Space l Jamestown Walker Slope Site Plan - Grading, Hardscape & Furnishings.dwg 132 MILL VALLEY SAN FRANCISCO 323 Geary Avenue, Suite 602, San Francisco, CA 94102 T 415 861 7900 F 415 861 7908 www.rhaa.com Drawn By: MI Checked By: NL REGISTRATION AND SIGNATURE SHEET TITLE Bayview Hillside Open Space / Jamestown Walker Slope Site Plan Grading, Hardscape & Furnishings SCALE: 1"= 60'-0" APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 L3.2 Major P h ase 1 CP A p p l i cati on M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 133 134 APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 135 APPENDIX E – MAJOR PHASE 1 CP GEOTECHNICAL REPORT &RPSUHKHQVLYHVLWHVSHFLÀFJHRWHFKQLFDOLQYHVWLJDWLRQFRYHULQJJHRORJLFDOFRQGLWLRQVRI0DMRU 3KDVH&3LQWZRVHSDUDWHUHSRUWV$OLFH*ULIÀWKLQFOXGLQJ6XE3KDVHV&3DQG&3DQG&3 &HQWHULQFOXGLQJ6XE3KDVHV&3&3DQG&3SUHSDUHGE\(1*(2,QFRUSRUDWHG 'RFXPHQWGHOLYHUHGDYDLODEOHXQGHUVHSDUDWHFRYHU'LJLWDOÀOHRQHQFORVHG&' 136 APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on APPENDIX F – PRELIMINARY CONSTRUCTION PHASING LENNAR URBAN// CP CENTER CONSTRUCTION PHASING M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 137 Grading and Surcharge Permit 1 DBI Grading Permit# 201411252500 Stage 1 Start: July 2015 Placement Complete: Nov 2015 Surcharge Complete: Mar 2016 Stage 2 (Block by Block Sequence) Start: Dec 2015 Placement Complete: 2016 Surcharge Complete: 20162017 Permit 2 DPW Excavation Permit# TBD 138 Permit Received: Mar 2016 Start: Mar 2016 Complete: Nov 2016 APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Onsite Borrow Plan Phasing Details M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Contractor to use subgrade excavation material for podium structure for Stage 2 surcharge. Infrastructure contractor to turn over site to vertical contractor with subgrade rough grading completed 139 DPW Surcharge Phasing Details 140 Plans to be submitted by Fehr & Peers to address interim crosswalk and maintenance of traffic over surcharge Installation of wicks and surcharge in existing roadway will require a 1 week shut down of the intersection Utility relocation work required to remove existing lines from under surcharge APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Arelious Walker Soil Nail Wall Permit 3 DBI Shoring & Excavation Permit# 201511172873 M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Filed: Nov 17, 2015 Permit Expected: Feb 2016 Construction Start: Mar 2016 Construction Complete: Dec 2016 141 Arelious Walker Grading & Utility Relocate Phasing Details Existing water line to be removed after grading and new line is installed 142 Interim excavation of new AW alignment not to enter existing ROW Removal of St. Francis required APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Main Infrastructure Permit Permit 4 DPW Street Improvement Permit# TBD M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Permit Anticipated: March 2016 Construction Start: March 2016 Backbone Streets Complete: Dec 2017 Side Streets Complete: Phased with vertical development in respective block 143 Jamestown Grading Sequence Phasing Details Shut down of Jamestown Ave will be required to perform grading. 144 Utility Reroute around cut area will be required To be completed after opening of retail center Interim connection between exiting Jamestown alignment and new AW will be required APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Wedge Park Plaza Permit 5 Open Space Permit# TBD M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Permit Anticipated: Spring 2017 Construction Start: June 2017 Completed: Nov 2017 Scope of improvements in Wedge Park 2 area to be determined 145 Harney Way Offsites Permit 6 DPW Street Improvement Permit# TBD 146 Permit Anticipated: Sep 2016 Construction Start: Sep 2016 Construction Complete: Dec 2017 State Parks ROE needed to begin geotechnical investigations to determine surcharging requirements APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Storm Drain Outfall# 2 Permit 7 DPW Street Improvement Permit# TBD SFPUC Outfall Permit# TBD RWQCB Permit #TBD M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Detention Basin designed to accommodate SD flows until SD line can be accepted 147 Gilman Ave Offsite Permit 8 DPW Street Improvement Permit# TBD 148 Permit Anticipated: June 2016 Construction Start: June 2016 Construction Complete: Oct 2017 Traffic phasing to be contractor submittal based on final improvement plans APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Gilman / CP-01 / CP-03 Intersection Coordination Phasing Details Phasing of improvements shown in 3 different plan sets to be coordinated M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Curb Ramps installed in CP-01 to be removed and replaced Match line of CP-03 and Gilman offsite to be designed for connection 149 Hillside Open Space Permit 9 Open Space Permit# TBD 150 Permit plan submittal TBD Open space improvements to have separate permit Rough grading to be done under Infrastructure permit Community Garden may require separate permit APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Harney/Jamestown Intersection Overlay of proposed grading onto existing conditions. M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 151 Harney Way Widening New surface improvements at Harney Way 152 APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Existing Pedestrian Access M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 153 Proposed Pedestrian Access 154 APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Proposed Interim Crosswalk M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 155 Traffic Plan During CP-0234 Construction 156 APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 Major P h ase 1 CP A p p l i cati on Proposed Traffic Plan at Completion of CP-0234 M a j o r P h a se 1 CP A pplic at io n APPROVED - RESOLUTION NO. 1-2014 - JANUARY 7, 2014 - UPDATED: FEBRUARY 16, 2016 157