TRANSFORMERS City of Palo Alto Building Inspection Division 285 Hamilton Ave. Inspection Request: 650 329-2496 Revision Date:2011 General Requirements/Checklist for: Commercial Codes Enforced: 2010 CEC Palo Alto Municipal Code (PAMC) Building Division The information provided in this document is general and intended as a guide only. Each project is unique and additional requirements may be enforced as deemed appropriate. Determine size in KVA on engineer’s plans. Check the name plate on the transformer for KVA and primary and secondary voltage. (CEC 450.11) Verify primary circuit conductor gauge and over current protection (CEC table 450.3(b)) & 240.21 (c)(1) Verify room ventilation. (CEC 450.9) No storage is allowed on the transformer. Maintain working clearances. (CEC 110.26) Verify secondary circuit conductor gauge and overcurrent protection. (The secondary OCPD can not sized for the next higher rating. CEC 240.21(C)) Grounding electrode conductor connection (close as particle to a metal water pipe or structural metal. (CEC 250.30 (a)(7)) Bond metal water piping in nearest area being served by transformer. (CEC 250.104 (d)(1)) Provide a main bonding jumper from the xo terminal to the ground termination lug. (CEC 250.104 (a)) The equipment grounding conductor and the bonding strap will also terminate at this ground lug. Grounding electrode conductor (size) based on the derived phase conductors (output) (CEC 250-30 (a)(3)) Secondary conductor overcurrent protection shall comply with CEC 240.21 (c) (2-6) The secondary overcurrent protection device shall be within 10’ of the transformer. (CEC 240.21 (c)(2)) Verify main bonding jumper size (CEC 250.28 (d) & 250.66). Where phase (secondary) conductors are larger than 1100 kcmil the jumper shall be sized at 12 ½ % of the circular mil area of the phase conductors. Connection shall be at the source or the first system disconnecting means. Verify primary and secondary conductors are in flex conduit for vibration. Verify required clearance and ventilation openings as provided on the manufacturer’s nameplate. (CEC 450.11) Verify available short circuit current to determine suitability of panel board. Where transformers exceed 112 ½ kVA and where the insulation system is less than a Class 155, they shall be installed in a 1 hour rated room or enclosure. (CEC 450.21(B)) See Utilities Standard next page