MISO Reliability Subcommittee Frequency Response Update Terry Bilke April 2016 Overview • Purpose – Report on MISO’s preparation for NERC’s new Frequency Response Standard (BAL-003-1) – Work with LBAs and generators to boost governor response where appropriate • Key Takeaways – – – – Current state of governor settings and performance Interpreting the scorecard tool output Recommended deadband settings Plan for and support needed from LBAs and generators to meet the BAL-003-1 standard as the MISO fleet evolves 2 Recent and Upcoming Activity • Eighteen governor surveys returned to date (BREC, Cleco, CONS, DPC, DTE, Duke, Entergy, GRE, LAGN, MDU, MGE, MP, MPW, NIPS, SIGE, WEC, Xcel, MEC) – Most surveys have gaps – Other Regions have completed this survey exercise • • • • • MISO submitted 2015 BAL-003-1 performance data Scorecards sent to LBAs for period of 12/1/15 through 3/1/16 Governor collaboration call 3/25/16 FERC NOI on Frequency Response (comments due April 25) DOE supported effort to identify impediments to providing frequency response 3 2015 Balancing Authority Beta Estimated Performance -475 MW/0.1HZ Obligation -211 MW/0.1HZ 4 FERC NOI on Primary Frequency Response • Comments are due April 25 • NOI suggests changes to pro forma generator interconnection agreements (GIA) to require working governors and common settings for new generators • Asks about requirements and penalties for existing generators • Asks whether nonsynchronous generators should provide response • Asks about costs and compensation and whether ISOs should specifically establish markets 5 Individual Generator Performance (1st Quarter) No Response OK Response Harming MISO Performance Theoretical “Perfect” Performance 6 1st Quarter Observations by LBA LBA# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Ave B% of Capacity -2.11 -1.98 -1.02 -0.98 -0.97 -0.86 -0.81 -0.63 -0.63 -0.61 -0.57 -0.44 -0.42 -0.42 -0.37 -0.34 -0.28 -0.27 -0.26 -0.26 -0.26 -0.24 -0.23 -0.20 -0.18 -0.11 -0.02 -0.01 -0.01 0.12 0.21 0.23 0.35 1.15 * StDev B% * 2.08 2.68 2.82 1.94 1.22 1.42 1.79 2.56 1.41 1.74 1.10 1.07 0.76 1.89 1.55 1.55 0.90 1.72 0.75 0.98 0.34 0.01 1.01 0.49 1.39 0.57 1.91 1.02 0.63 0.16 0.70 1.15 2.16 * # Generators <10 <10 10 to 20 <10 >40 10 to 20 21 to 40 21 to 40 >40 >40 >40 10 to 20 10 to 20 <10 21 to 40 >40 <10 <10 21 to 40 10 to 20 >40 10 to 20 <10 >40 10 to 20 10 to 20 10 to 20 >40 21 to 40 <10 <10 <10 10 to 20 <10 <10 Beta % is the average contribution as a % of capacity per 0.1 Hz. If you’d like to know which LBA is yours, send a note to tbilke@misoenergy.org 7 Focus Tips • Check for positive “% beta” values, particularly for units > 75 MW – There are quite a few generators in the 75-200MW range units with a % beta > +5% – A 100MW generator with a % beta = +5% deducts 5MW/0.1Hz from MISO’s frequency response • Units > 100 MW that typically have headroom that provide no response • Check for squelch (where beta60% is significantly less negative than beta24%) • Make sure those units that you’re planning to use for restoration (blackstart or cranking-path units) are providing response 8 NERC Generator Governor Frequency Response Advisory Contact List Vendor Name April 7, 2015 ABB Black & Veatch Emerson Fluor GE North American Generator Forum NERC Resource Subcomittee Schneider Electric Siemens Contact Information pspmarketing@us.abb.com Douglas Butcher or David Loesh ButcherDC@bv.com LoeschDL@bv.com Thor Honda thor.honda@emerson.com Jeremy Shook jeremy.shook@fluor.com http://www2.gepower.com/knowledgeconnect/selfservice/ Chairman – Allen Schriver allen.schriver@nexteraenergy.com Balancing@nerc.com Don Weeden don.weeden@invensys.com Steve Leibbrandt steven.leibbrandt@siemens.com DOE/CERTS Supported Project • The DOE, though the Consortium for Electric Reliability Technology Solutions (CERTS) is doing a project to identify Generator Operators’ reliability issues, ongoing costs, and concerns in providing frequency response • Information gathered via a one hour telephone interview with plant operators • Would like representation from all plant types • Participants will get a copy of the report • If interested, contact Mike Potishnak – mpot@charter.net – 413-323-8834 10 More Information • General: Terry Bilke tbilke@misoenergy.org and Rodney Hamblen rhamblen@misoenergy.org • Collaboration Site: Terry Bilke tbilke@misoenergy.org and Shannon Weaver sweaver@misoenergy.org • Tool and scorecard distribution changes: Terry Bilke tbilke@misoenergy.org and Nina Zheng nzheng@misoenergy.org • MISO website (includes links to ERCOT’s spreadsheets for evaluating generator response) https://www.misoenergy.org/MarketsOperations/Pages/FrequencyResp onse.aspx 11