INCA MODEL
FPC
FIRE PUMP CONTROL PANEL
(Star Delta/D.O.L)
USER MANUAL
Inca Reference FPC
Revision 1.0
Technical Support
Pumps & Mechanicals – Pump supplier
Controls – Inca Control Pty Ltd
Phone 02 9675 3815
FPC
Page 1
2
TABLE OF CONTENTS
1.0
2.0
3.0
4.0
5.0
6.0
Control Panel Overview……………………………………………….
1.1
Features…………………………………………………………
1.2
Description……………………………………………………...
Installation……………………………………………………………..
2.1
Mechanical installation…………………………………………
2.2
Electrical installation……………………………………………
2.3
Maintenance……………………………………………………..
Description
3.1
Battery Charger ………………………………………………..
3.2
Panel Facia ……………………………………………………
3.3
Battery current charging and voltage meters ……………
3.4
Ammeter selector switch ……………………………………..
3.5
Phase Failure Relay …………………………………………..
3.6
Audible alarm ………………………………………………..
Panel Connections
4.1
Power Supply …………..……………………………………..
4.2
Jacking pump ….……………………………………………….
4.3
Pump Wiring
…………………………………………..…..
4.4
F.I.B Voltage free contacts ………………………………..
Operation
6.1
System operation………………………………………………..
6.2
Jacking Pump …………………………………………………..
Warranty Statement……………………………………………………
3
3
3
5
5
5
5
6
6
6
6
6
7
8
8
8
8
9
9
10
Drawing supplied separately
FPC
Page 2
3
1.0 Control Panel Overview
1.1







Features
Complies to AS 2941/2008
Phase Failure Protection
12V Battery Charger for monitor battery
Controls for 240V Jacking Pump c/w Man/Off/Auto selector
Lamp Test
F.I.B relays
Audible alarm with mute for pump run and common faults
1.2
Description
The FPC Fire pump controller is designed to control a three (3) phase fire pump
unit. It can be operated manually via a push button on the panel facia or via a
remote pressure switch. The control panel complies with AS 2941-2008 (Australian
Standards 2941) and includes all switches and displays as required. The panel has
phase failure protection and a battery charger for the ‘Monitor battery’ which
monitors system status complete with terminals for a remote alarm.
User Interface
Display
Keypad
LED Signal Lights and Analog Current and
Voltage meters.
Nil
Inputs
Pressure Switch
When the pressure drops in the system, the
pump will start and can only be manually
stopped.
J/Pump Pressure Switch
Operates on and off automatically as set by the
pressure switch.
Outputs
Remote Alarm
Connection available for additional remote alarm
Power Supply
415V three (3) phase Active, neutral & earth
power supply.
12VDC supply from the battery is used to supply
power to the monitoring control circuit.
Mechanical Specification
Enclosure
Pump Unit
FPC
Mild steel powder coated ‘Signal Red’ IP54.
See Pumping detail by Pump supplier.
Page 3
4
Environmental Specification
Operating Temp
Relative Humidity
Vibration
FPC
-10 to 50deg C
Do not install in areas of high humidity.
Locate control panel internally where possible to
help reduce heat & weather damage & increase
mechanical life.
Do not install in a location that is subject to large
amounts of vibration.
Page 4
5
2.0
Installation
Note: If any damage to control panel if found, please notify Inca Control Pty
Ltd as soon as possible prior to installation.
The control panel can be wall mounted separately from the pumping unit; distance
is governed by the cable sizing.
It is recommended that the control panel is within view of the pumping unit for
safety reasons. If not in view, lockable ON isolating switches must be installed at
the pump motors.
2.1
Mechanical Installation
Mount the control panel via the mounting holes in each corner at the back of the
enclosure using minimum 6mm screws, nuts & locking washers, or masonry
anchors.
Install in a dry well ventilated location that matches with environmental specification
in 1.2 above.
The panel shall be securely mounted in a vibration free location that does not
subject operating personnel to unreasonable hazard from hot surfaces or moving
parts of the pump or power transmission equipment.
2.2
Electrical Installation
Note: All cable entries must enter via the bottom of the cabinet. If cables are
entered via the roof Inca Control Pty Ltd reserve the right to withdraw
warranty because of the possibility of shaving entering sensitive electronic
equipment.
2.3
Maintenance
Check that all connections are tight as copper is soft & can work loose.
Check that all controls are functioning as intended.
FPC
Page 5
6
3.0 Description
3.1
Battery Charger
The panel is equipped with an automatic battery charger that provides 4A
continuous boost charge when battery voltage is low and trickle charge when
maintaining battery float voltage.
The Battery Charger has an automatic in built current limiting facility and is capable
of fully recharging the battery from 50% capacity within a period of 24 hours.
The charger services the battery for the monitoring control circuit.
Note: If batteries Are dead flat (below 3 volts), the charger will not charge and the
battery will require a boost from a separate battery to bring voltage up to sensing
level above 3V.
3.2
Panel Facia
The front of the control panel houses the LED indicating lights, switches, ammeters,
voltmeters and push buttons that control the panel function.
Indication
AC Supply On/Off
Fire Pump Run
Alarm silenced
Battery Charger Power Fail
3.3
-indicates mains power status
-indicates when the pump is running.
-indicates when the alarm has been muted
-indicates that the battery charger supply has
failed
Battery current charging and Voltage Meters
On the panel facia display is an ammeter indicating the battery charge current for
the battery. A separate voltmeter indicates the battery voltage.
3.4
Ammeter Selector Switch
An ammeter selector switch is located on the panel facia and is used to monitor the
current in the respective phases (red, white and blue). By selecting a phase at the
ammeter with the switch, the motor current is indicated.
3.5
Phase Failure Relay
The Phase Failure Relay is designed to provide protection for motors or pumps
from the damaging effects of excessive negative sequence voltage resulting from
phase failure, phase unbalance and reversed phase sequence.
When connecting the 415V supply to the panel, the correct phase sequence will be
indicated by a visual alarm on the relay. If the alarm is indicative, then any two (2)
phases at the supply should be swapped or changed.
FPC
Page 6
7
If the phase sequence is correct at the relay and the pump motor is operating in
reverse, change phases at the contactors and NOT at the supply end (isolator) as
shown in section 4.3 (Panel Connections).
3.6
Audible alarm
The panel has an audible alarm that sounds when a fault condition has been
registered and is silenced when the mute button on the panel facia is pressed.
Alarm conditions are:

AC Supply fail

Fire pump running

Battery charger fail
FPC
Page 7
8
4 Panel Connections
4.1
415V Main Supply
Terminals L1 (Red), L2 (White) and L3 (Blue) on Isolator – 415VAC Supply
Neutral- Connect to Neutral link
Earth- connect to the link on base plate
4.2
Jacking Pump Connections
Terminals JPB & Neutral Link – 240V Jacking Pump
Terminal JPS & JPS – Jacking Pump Pressure Switch
4.3
Pump Wiring
Standard Connections
Reverse Direction Connections
Star Delta
Line Contactor- (LC)
Terminals
T1T2T3-
(u1)
(v1)
(w1)
Terminals
T1T2T3-
(v1)
(u1)
(w1)
(w2)
(u2)
(v2)
Terminals
T1T2T3-
(u2)
(w2)
(v2)
Red
White
Blue
Terminals
T1T2T3-
White
Red
Blue
Run Contactor- (RC)
Terminals
T1T2T3-
D.O.L (Direct on-line)
Contactor- (C)
Terminals
4.4
T1T2T3-
F.I.B Voltage Free Contacts (Fire Indicator Board)
Relay Terminal No’s (11 & 12 N/C) (11 & 14 N/O)
Relay 1 – AC Supply Fail
Relay 2 – Battery Charger Supply Fail
Relay 3 – Fire Pump Run
FPC
Page 8
9
5 Operation
6.1
System Operation
The FPC Fire pump controller is designed to control a 415VAC fire pump unit either
operated manually via a push button on the panel facia or automatically via a remote
pressure switch. The control panel when called upon will start the pump and sound an
aural alarm while running and suppling water to fire services within a building or property.
When the system requires to be stopped, the ONLY method is to press the stop
pushbutton located on the panel facia.
The monitoring battery maintains its charge by the use of a 12VDC 4A battery charger and
complies with AS 2941-2008 (Australian Standards 2941).
Throughout the duration of the system monitoring, a range of fault conditions when called
for, sound an aural alarm as specified in section 3.5 of this manual.
6.2
Jacking Pump (Automatic and Manual)
Jacking pumps are used to boost the installation pressure in automatic fire systems to a
pressure higher than the supply pressure to ensure that the system alarm valves do not
operate as a result of supply pressure fluctuations. They may operate in automatic or
manual mode.
FPC
Page 9
10
9.0 Warranty Statement
The Products manufactured by Inca Control Pty Ltd is guaranteed against faulty
workmanship for a period of 12 months from the date of delivery.
Our obligation assumed under this guarantee is limited to the replacement of parts which,
by our examination are proved to be defective & have not been misused, carelessly
handled, defaced or damaged. This guarantee is VOID where the purchaser has modified
or repairs have been made or attempted by anyone except an authorised representative
of Inca Control Pty Ltd.
Products for attention under guarantee (unless otherwise agreed) must be returned to the
factory freight paid and, if accepted for free repair, will be returned to the customers
address in Australia free of charge.
Equipment supplied by Inca Control Pty Ltd, but manufactured by others is covered by
their manufacturer’s warranty only.
When returning the product for service or repair, a full description of the fault must be
given and the mode of operation used when the product failed.
In addition to the above, equipment manufactured, installed & commissioned by Inca
Control Pty Ltd, within the Sydney Metropolitan Area, includes onsite replacement.
In any event Inca Control Pty Ltd has no other obligation or liability beyond replacement or
repair of this product.
NOTES: