Specifications of Requisition No. Q120206H Appendix 'A' Tender No. N0293 Sr. No PART II SCHDULE OF REQUIRMENT NATURE OF SUPPLIES 1 MOBILE PORTABLE ELECTRONICALLY CONTROLLED LOAD BANK CAPACITY 25KW, WITH CONTROLLER AS PER SPECIFICATIONS AT APPENDIX B 2 TROLLEY MOUNTED UNREGULATED DC POWER UNIT FOR TESTING CAPACITY 5 KW, 12V-24V-36V-48V DC SELECTABLE, TECHNICAL SPECIFICATIONS It consists a battery bank of rating 5kW and shall have terminals for 12V, 24V, 36V & 48V. The 12V and 24V terminals are necessary for tapping the voltages for starting TATRA vehicles/ DGF sets cranking etc at trial site, as such battery of 120AH or higher rating is necessary. 36V and 48V terminals are for special applications. Battery charger for 48V systems shall also be mounted on the trolley for charging the battery. The input of battery charger is 230V, AC, 50Hz supply. The battery charger also shall have necessary protections. Input - 440VAC/415AC +/-10%, 3PHASE, 50Hz Output - 12V-24V-36V-48V SELECTABLE, DC Output power- 5KW max, DC Instruments - Monitoring and measuring instruments shall indicate all necessary electrical parameters. suitable digital LED display with scrolling/ individual instruments shall be provided Protection - system shall be protected suitably on input side as well as on output side from short circuit and any other faults. Mounting- System shall be mounted on a suitable towable swing type trolley. Trolley shall have solid tyre/Teflon wheel suitable for movement on road. ACCEPTANCE TEST - i)The system shall be tested on rated load and at different selectable voltage for its functionality ii) Battery charger is tested for its functionality and measured the charging current. 3 REGULATED DC POWER SOURCE, 12V-24V-36V-48V DC, 30AMP MAXIMUM AS PER TECHNICAL SPECIFICATIONS INPUT - 440VAC/415AC +/-10%, 3PHASE, 50Hz OUTPUT - 12V-24V-36V-48V SELECTABLE OUTPUT CURRENT - 30Amp. MAX. LINE % LAOD REGULATION - BETTER THAN 0.5% RIPPLE - LESS THAN 10Mv rms PROTECTION - INPUT SIDE SINGLE PHASING AND OVER VOLTAGE PROTECTION SHALL BE PROVIDED. OUTPUT SHORT CIRCUIT/OVER LOAD PROTECTION SHALL BE PROVIDED WITH SUITABLE ARRANGEMENTS. MONITORING INSTRUMENTS -THREE & HALF DIGIT DPM PROVIDED FOR O/P VOLTAGE & CURRENT AND OTHER PARAMETERS. ACCEPTANCE TESTS - SYSTEM SHALL BE TESTED AT FULL LOAD FOR 8 HOUR CONTINUOUSLY WITHOUT ANY FAILURE. 1 Specifications of Requisition No. Q120206H APPENDIX ‘B TECHNICAL SPECIFICATIONS OF PORTABLE ELECTRONICALLY CONTROLLED LOAD BANK- 25kW 1. INTRODUCTION 1.1 The Portable Electronically controlled Load Bank (Automatic and programmable type) shall consist of stainless steel coil, inductive unit, air blowers, outlet flap and switch gear fitted on a mobile trolley structure. It shall have proper electronic controller for its operation. This Load bank will be used as a portable test facility. The system mounted on trolley shall be transportable by prime mover / tractor at any desired location. Height shall be less than 2.25m from ground level and shall have suitable solid tyre /Teflon wheel. The load bank shall be easily detachable from the trolley for any requirements. 1.2 Details of configuration and other technical parameters of the Load Bank are enumerated in succeeding paragraphs of this specification. 2. SCOPE OF WORK i) Electronic load bank 25 kW with control panel as per technical specifications ii) Load cable 4 core, 50 sq.mm, EPDM flexible copper conductor cable 100mtr length iii) Towable swing type Trolley with solid tyre/ teflon iv) Sound level meter of latest version to measure the sound level v) Tools vi) Approval of drawings and circuit / load diagrams vii) Integration, assembly and mounting of components on Trolley viii) Testing & Trials as per Acceptance Test Plan (ATP) at Firm’s premises ix) Delivery at R&DE(E) x) Final trials with DG set/ UPS for acceptance of equipment xi) Training. 3. TECHNICAL DESCRIPTION 3.1 It shall be designed to test the equipment of various capacity from 3kVA to 25 kVA. The construction shall be simple, easy to understand and operate. The facility of testing operation by local / remote shall exist in the system. It should be possible to carryout local operation on load bank and remote operation by Supervisory Control Data Acquisition System (SCADA) based through computer. 3.2 The Load Bank shall have facility to select the rating of Generator, Power Factor (PF), (i.e. 0.8 or 1) and gradual as well as direct loading. 3.3 The direct loading shall consist of increment in load 25%, 50%, 75% at 0.8 PF and 100% & 110% load at 1 PF. 3.4 The Programmable Logic Controller (PLC) will be provided in Load Bank shall give commands to respective contactors to get the required load to test equipment like Genset as per selected Load steps. 2 Specifications of Requisition No. Q120206H 3.5 The Load Bank shall have testing provision for gradual as well as direct step loading. Resistive or inductive load increment facility shall also be provided to test the generator at required power factors. 3.6 The system shall be transportable by prime mover / tractor at any desired location and height shall be less than 2.25m from ground level and shall have suitable solid tyre /Teflon wheel. The load bank shall be easily detachable from the trolley for any requirements. 4. TECHNICAL SPECIFICATION i) Capacity 25kW ii) Power factor Range i) 0.8 to unity iii) Test equipment Input supply -3 Ph, 415 V 10%, 50 Hz, 4 wire , AC or 230V, 50Hz iv) Auxiliary supply for 3 Ph, 415 V 10% 50 Hz supply or single cooling fans phase v) Control Supply 110V DC vi) Load fluctuations Not greater than 3% of applied load. vii) Humidity 95% R. H. viii) Ambient Temp (-)20C to 550C ix) Cooling Forced Air Cooled x) Operation Outdoor xi) Insulation Class ‘H’ xii) Duty Continuous xiii) SCADA Facility ASTRA Software based SCADA System to monitor and log of Load Parameters within 50 mtr of distance. xiv) Altitude 1500 mtr above Mean sea level (MSL) xv) Terrain Desert / hilly xvi) Size of system Overall height shall be less than 2000mm and shall be transportable in a truck xvii) Mobile Trolley The system shall be mounted on mobile towable trolley platform xviii) Current for loading – Resistive load of 10KW for each phase and Inductive load of 3.5KW for each phase. Total load 25kW Max. xix) Protections – Safety protection by MCB. Over temperature indication & alarm. xix) Local display – provided for Voltage, Current & power factor . xx) Controls – through Computer in step of 2Amp.for resistive & 4A for inductive load. 5. ESSENTIAL FUNCTIONS i) System to be designed in such a way that acceptability criteria for functioning of Genset / UPS shall automatically declared, such as it is acceptable or rejected. 3 Specifications of Requisition No. Q120206H ii) Software should have provision to note fuel Tank capacity and consumption of fuel per hour for given engine provision should be met to set alarm to indicate refueling of Genset with power advance notice. iii) Transient Voltage dip (TVD) /Transient Voltage Recovery time (TVR) to be mentioned in the system. Resolution should be 50 Millisecond. Sampling rate should be compatible for resolution of 50 Millisecond iv) System shall have provision for selection of Analog to Digital Converter (ADC) & Digital to Analog converter (DAC). v) Sampling time should be suitable for resolution of 50 Millisecond during TVD/TVR vi) It shall have outlet air flap at top. vii) Load in each section will be arranged in 1kVA, 2 kVA,5 kVA,10 kVA,20 kVA & 25 kVA as per requirement. The Load can also be selected automatically through SCADA. viii) Broadly system shall consist of load panel with manual controls, local displays, personal computer to interface with the panel, software & hardware required and one suitable printer. 6. TECHNICAL SPECFICATION FOR BROUGHTOUT ITEMS 6.1 COMPUTERISED CONTROL PANEL : - The computer is required for Installation of SCADA Software with printer Attachment, the technical particulars are as follows. 6.1.1 PROCESSOR i) Intel Pentium – IV 2.4 ii) Chip Set Intel 850 G suitable for DDRRAM iii) Cache Memory 256 kb iv) Clock Speed 533 MHz FSB v) Memory 1GB DD RAM vi) Hard Disk 500 GB Hard Disk Drive vii) Floppy Drive 1.44 MB viii) Zip Drive 1 GB equivalent ix) DVD ROM Drive 16 DVD ROM Drive / CD Compatible x) CD Writer Internal CD Writer (Compaq) xi) Key Board 107 keys key Board (Compaq) xii) Mouse Scroll Mouse xiii) Monitor Compaq 17” SVGA Colour Monitor xiv) Graphics 4 APG 64 MB RAM xv) NIC 10 /100 MB RAM xvi) Modem In – built / External (56 kbps) xvii) Multi Media Kit with Speakers & Microphone xviii) Disk Controller Integrated ultra ATA / 100 xix) Audio Integrated AC 97 Audio code xx) Windows latest supporting version 4 Specifications of Requisition No. Q120206H xxi) 6.1.2 Dust Cover for the Systems Latest version colour printer for taking the prints in A4 size, H P make 7 DRAWING / SKETCHES The contractor has to make final drawings / sketches / circuit and load diagram and same to be get approved from R&DE(E). The procurement of components / manufacturing of load bank will commence only after approval of respective drawings / diagrams 8 TOOLS The following tools shall be supplied by the vendor along with the system i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) Star screwdriver set complete - 1 No Allen key set - 1 No Soldering gun 25kW - 1No Soldering gun 60W - 1No Soldering Gun 100W - 1No Cutting Plier 12 inch - 1No Nose Plier 6 inch - 1 No Hacksaw 18 inch - 1No Hacksaw 6 inch - 1No Hammer 1 kg - 1 No Double ended Spanner set (5mm- 24mm) – 1 set 9. INSTALLATION / COMMISSIONING / TRIALS The contractor has to arrange manpower with necessary facilities required for Installation of system at R&DE(E) and trials with Power sources. 10. TRAINING Training is to be imparted to minimum 3 persons on total system including testing. The training material has to be arranged by the contractor. 11. WARRANTY The contractor has to provided warranty for the period of one year from the date of acceptance of the system. If any deficiencies are found in the system, the same has to be rectified by the contractor during the warranty period. 5 Specifications of Requisition No. Q120206H 12. ACCEPTANCE TEST PLAN FOR LOAD BANK 25kVA The Acceptance Test Plan is enclosed, contractor has to prepare his own QA plan and submit the same for approval Sr. No. Types of Test 1. Material Ref. / standard Critical Parameters to be tested Locatio n/ Sample size 100% Acceptan ce Level Instrumentatio n/ Test Method Remarks As per standard Authorised Test Laboratory Checking Copper BUS Bar sizes as per diagram for auxiliary and generator supply It shall be transportable in truck after removing the trolley. Toad bank shall be easily removable from trolley. Ht – less tha 2250mm From ground level. Necessary clearance to be given for transportation. 100% As per standard Calibrated Tape or Vernier Test Certificate of bought out components shall be supplied by vendor before installation of same in the system It will be verified for RYB and Neutral Bus 100% 5mm Calibrated Tape b) Minimum line & Line to & Line to Earth clearance – 20 mm 100% 2mm Calibrated Tape Brought out components 2. Visual inspection 3. Dimensional inspection As per drawing 6 Measured for resistive grid and contactor terminals qt, RE, YE,BE and RY,YB,BR respectively Specifications of Requisition No. Q120206H 4. Insulation Testing Total installed Load Units ’’ 5. Megger Testing ’’ 6. Resistance of resistive check ’’ 7. Inductive Testing ’’ Aux supply Bus Bars / Generator supply Bus bars a) Megger Test: It will be carried out prior to High voltage test for RE, YE, BE, RY,YB &BR phases b) High voltage test: It will be carried out for RYB-E, RY, YB & BR phases. Test voltage will be 2.5 kV Megger Test – After high voltage test : It will be carried out for all six phases like RE, YE, BE, RY,YB ,BR Resistance of resistive load will be measured with 50 Hz supply and variable voltage dimmer stat check. It will measure voltage. Current and necessary resistance will be calculated. 100% 10M Megger Shall be carried out with 1000 V Megger before HV test 100% Shall sustain 2.5kv at 1 minute 10M Through High Voltage Testing It shall be carried out at 50 cycles for one minute Megameter It shall be carried out with 1000 V Megger for Auxiliary as well as Generator supply Bus Bars Voltmeter & Ammeter It shall be carried out from Taps 1 – 2 to 13 – 14 100% Party checking as per Load diagram The impendance of inductive load shall be measured with 50 Hz supply and variable voltage dimmer stat check. The inductive load shall be measured in voltage, current and impendance. It shall be carried for section 1,2,3 and 4 respectively. ’’ 7 -- ’’ Specifications of Requisition No. Q120206H 8. Load Testing Endurance Test as per IS Rated Load, Voltage, Current and Power Factor 100% As per standard Actual load bank will be utilised of carrying out necessary testing The load bank will be connected to generator. Test procedure will be carried out for the period of 14 hours. i) Start ii) 0.5 hour – Warm up at 25% rated load iii) 3.5 hour – 100% rated load iv) 3 hour – 50% rated load v) 1 hour – 110% rated load vi) 0.5 hour – No load vii) 3.5 hour – 100% rated load viii) 2 hour – 50% rated load 9. Load Testing Endurance Test as per IS (Through SCADA) Rated Load, Voltage, Current and Power Factor 100% As per standard Actual load bank will be utilised of carrying out necessary testing The procedure as per Sr. No. 8 will be carried through SCADA based Software 8