147A & 147AA - 40 ft. x 40 ft. Floor Assembly Sales & Service Spieth Anderson International, Inc. Forestview Road, P.O. Box 40 Orillia, Ontario Canada L3V 6H9 Telephone: (705) 325-2274 Fax: (705) 325-1485 Toll Free: (800) 563-6479 Spieth Anderson U.S.A. Inc. 7879 Will Rogers Blvd. Fort Worth, Texas USA 76140 Telephone: (817) 536-3366 Fax: (817) 536-3006 Toll Free: (800) 331-8068 www.spieth anderson.com Spieth Anderson International Inc. 135 Forestview Road, P.O. Box 40 Orillia, ON Canada L3V 6H9 Phone: 1 (705) 325-2274 Fax: 1 (705) 325-1485 E-mail: info@spiethanderson.com NOTE: The exclamation mark symbol when seen in this booklet is used to indicate warnings or items that require special attention during the use or assembly of the apparatus. Qualified persons should only undertake assembly, set-up and adjustment of this equipment. At no time should children or other unqualified persons undertake the assembly, set-up, installation or adjustment of this equipment. 1. Spring/Panel Assembly onto Bottom Board (147A Only) See also written instructions on the next page. T-NUT #2 #1 #3 #4 147 A & 147AA– 40’x40’ Floor Assembly Instructions APR 25 2012 Pg. 2 1. Spring/Panel Assembly (147A Only) (Continued) 1. Lay floor panel flat on the floor with the T- Nuts on the bottom. 2. Attach spring holder cup (#1) using the screw and lock washer (#2). 3. Push springs into spring holder so that it locks into the spring holder. There are two tabs in the spring holder that will keep the spring from falling out; you must push the spring over these to lock the spring in. 4. Push the foot cup onto the spring using the same method described in the previous step 2. Floor Assembly Instructions, Diagrams and Drawings Included with this instruction sheet are layouts of both the top and bottom layers for reference, these may be found on pages six and seven. There is also a full assembly drawing on page eight. 2. a) Assemble Bottom Layer 1. Lay down all bottom layer boards (Springs/Foam facing down/ Velcro facing up). 2. Find the four boards with "L" shaped Velcro in the corner of the board (Velcro should "point to the outside). See below. CORNER BOARDS 147 A & 147AA– 40’x40’ Floor Assembly Instructions APR 25 2012 Pg. 3 2. a) Assemble Bottom Layer (Continued) 3. Set the first corner where you would like the corner of the floor to be. 4. Place six "non-corner" boards to the side of the first board. See top of next page for pictures. NON-CORNER BOTTOM BOARDS TOP VIEW BOTTOM VIEW 5. Place another corner board on the end of the row. 6. Lay down six more rows of standard bottom boards with eight boards on each row. 7. Repeat the first step for the final row. Make sure as the rows of "sprung" boards are set in place that there are no gaps between the boards. The seams between boards should be straight lines across the entire floor 147 A & 147AA– 40’x40’ Floor Assembly Instructions APR 25 2012 Pg. 4 2. b) Position Top Layer (Un-Sprung Layer) Refer to pictures at the bottom of the page for the following instructions 1. Begin by placing top corner board (small square board) on bottom corner board. 2. Place Perimeter boards (rectangular) along the edge of the bottom sheet in both directions (again making an "L"). 3. Place two more of the top sheet small square corner boards at the ends of the "L". 4. Starting in the corner where the first top sheet corner board was put down, fill in the "L" with large square sheets. 5. After all large squares are down, put in remaining perimeter boards (starting from the ends of the first "L". 6. Place the final top sheet small square corner board in place. Make sure to take care in board placement. Small gaps between boards in the beginning lead to larger gaps later. Corner Board (Small Square Board 2ft x 2ft Perimeter Half board (Rectangle Board) 2ft x 5ft 147 A & 147AA– 40’x40’ Floor Assembly Instructions APR 25 2012 Full Top Board 5ft. x 5ft Pg. 5 Bottom Panel Layout 147 A & 147AA– 40’x40’ Floor Assembly Instructions APR 25 2012 Pg. 6 Top Panel Layout 147 A & 147AA– 40’x40’ Floor Assembly Instructions APR 25 2012 Pg. 7 Spring Floor Assembly Carpet Backed Foam Top Plywood Panel (Top Layer) Plywood Panel (Bottom Layer) Foam Block Spring Assembly Velcro 147 A & 147AA– 40’x40’ Floor Assembly Instructions APR 25 2012 Pg. 8 ATTENTION - WARNING! READ AND UNDERSTAND THE FOLLOWING Any activity involving motion or height creates the possibility of serious injury including permanent paralysis and even death from landing or falling on the neck, head or other parts of the body. You assume the risk of serious injury in using this equipment. However, the risk can be reduced by strictly following these rules at all times: 1. Use this equipment only under the supervision of a trained and qualified instructor with a qualified spotter. 2. This equipment must be used only when protected by proper matting. If in doubt, do not use this equipment. 3. Know your own limitations and the limitations of this equipment. Follow progressive learning techniques and always consult an instructor. 4. Always inspect this equipment for proper stability and assembly before each use. 5. Always inspect this equipment for improper or unsafe installation. If in doubt, do not use this equipment. 147 A & 147AA– 40’x40’ Floor Assembly Instructions APR 25 2012 Pg. 9