Silver Cloud Harbor Marina The Marina at Tall Oaks Wilbert's Marina Spring Commissioning BOAT NAME BOAT TYPE OWNERS NAME ENGINE TYPE DAYTIME TELEPHONE NUMBER WORK TELEPHONE CELL PHONE E-MAIL BOAT LENGTH KEYS/COMBO APPROX. LAUNCH DATE DATE RECEIVED SLIP NUMBER WET/DRY Please indicate all commissioning work you wish performed by completing this form. Authorize any work by signing your initials in the appropriate boxes, and by signing the Authorization at the bottom of the form (see TERMS and AUTHORIZATION sections below). Return the top (white) copy to Silver Cloud Marine Engines. ***CHARGES LISTED ARE FOR LABOR ONLY UNLESS OTHERWISE SPECIFIED. CHARGES DO NOT INCLUDE MATERIALS.*** All Flat Rates assume vessel is in operating condition. Dead batteries or inoperative engines will require additional charges. These rates are for boats on premises only. REINSTALL OUTDRIVES Grease U-Joints, bearings, check bellows, install zinc. COVER REMOVAL Shrink Wrap: No charge for removal. Included with original shrink wrap order. LABOR CHARGE NON SHRINK WRAP PREP & PAINT BOTTOM Scuff, tape and paint bottom of hull. LABOR CHARGE Paint Type: TOTAL INITIALS Time & Materials (T&M) INITIALS Merc 150.00 Each + material OMC 165.00 Each + material Volvo T&M Clean & Paint T&M CHANGE ENGINE OIL AND FILTER 9.00 per ft. + material LABOR CHARGE Paint Color: REPLACE EXTERNAL ZINC ANODES TOTAL INITIALS Single Shaft 50.00 + zincs Two Shafts 100.00 + zincs Rudder & Trim Tabs Gas 150.00 + material Diesel up to 25 150.00 + material Diesel over 25 200.00 + material 4 Stroke Outboard 150.00 + material Check and Advise, Per Engine T&M Engine Alignment, If Needed T&M WAXING BOAT LENGTH TOTAL CHARGE COMPOUND (Waterline to Rail) 9.00 / ft. X + materials = WAX (Waterline to Rail) 9.00 / ft. X + materials = T&M = COMPOUND & WAX (Waterline to Rail) DULL/FADED HULLS CLEAN & WAX ABOVE RAIL 50.00 / hr. + materials CLEAN & OIL TEAK 50.00 / hr. + materials INITIALS Launch Dinghy 100.00 Launch Dinghy and Small outboard 150.00 COMMISSION DOMESTIC SYSTEMS Commission Water System & Head(s): Drain & Initial Flush Out Antifreeze, Fill Tanks, Prime Pump. (Call for Clarification) LABOR CHARGE 30.00 each GAS ENGINE TUNE UP PACKAGE Change Fuel Filters, Spark Plugs and Warn Ignition Parts. Check All Engine Fluids. Set Timing, Adjust Idle and Belts. Test Run at Dock plus Materials. LABOR CHARGE Up to & Including 4 Cylinders, Per Engine 250.00 + parts 6 or 8 Cylinders, Per Engine 300.00 + parts Generator 250.00 + parts INITIALS Additional Sink, Shower or Head, Per Unit 50.00 Commission Ice Maker 50.00 Commission Hot Water Tank 50.00 Commission Refrigeration 50.00 Commission A/C Units, Per Unit 50.00 LABOR CHARGE INITIALS INITIALS TOTAL INITIALS MISCELLANEOUS Tow Boat To Slip 100.00 Reinstall Electronics T&M Reinstall Dodger 100.00 Reinstall Bimini 200.00 Test Run T&M SAIL: RESTEP MAST Reattach Spreaders, Step Mast, Static Tune. Reinstall Masthead Instruments, Hook up Wiring and Check Lights. NOTE: Frozen turnbuckles extra T & M OUTBOARD MOTOR COMMISSIONING - TUNE UP PACKAGE Replace Fuel Filter, Spark Plugs, Sacrificial Zincs. Check and Adjust Idle Speed Timing, Carburetor. Check Temp, Thermostats, Replace if Needed. Check and Service Controls. Test and Run Engine. TOTAL 100.00 DIESEL ENGINE COMMISSIONING PACKAGE Change Fuel Filters (Primary & Secondary), Check All Engine Fluids, Bleed Fuel, Adjust Idle and Belts, Replace or Clean Air Filters, Test Run at Dock plus Materials. Per Foot of Mast Length Per Tumbuckle ft. X X No.: 6.50 = T&M = 2 Cylinder - Each 150.00 Rig Boom & Main Sheet 100.00 3 Cylinder - Each 100.00 150.00 Cutter Rig 4 Cylinder - Each 200.00 Ketch Rig & Triatic Stay 5 and 6 Cylinder - Each 200.00 4 Stroke - Each 200.00 INITIALS 200.00 SAIL: OTHER Put On Sails Main____________ Jib____________ T&M SAFETY SYSTEMS WATER PUMP IMPELLER LABOR CHARGE T&M Check & Service Bilge Pump(s) #_______ RISERS & MANIFOLDS LABOR CHARGE RISERS & MANIFOLDS - Recommended every 5-7 Years INITIALS DINGHIES & OUTBOARDS 2 Sinks & 1 Head Remove and Replace (Recommended every 2 years) + material TOTAL INITIALS SERVICE & INSTALL BATTERIES Charge, Load Test, Service Terminals and Install. How Many _____ INITIALS TOTAL Time & Materials (T&M) LABOR CHARGE QUANTITY ENGINE ALIGNMENT 50.00 + zincs CLEAN UNDERWATER HARDWARE INITIALS INITIALS Check & Service Navigation Lights Service Fire Extinguisher TOTAL CHARGE INITIALS 100.00 each 100.00 Outside Service T&M Vessel must be in normal operating condition for Flat Rate conditions to apply. LABOR RATE: $100.00 on site, Road call $115.00/hr. AUTHORIZATION: I authorize Silver Cloud Marine Engines to perform the work indicated above by my initials. Signature________________________________. o Enclosed is my check payable to Silver Cloud Marine Engines for $______________________ o Please charge my credit card: o Mastercard o Visa o Discover o Credit card on file Name on Card_____________________________________ Exp. Date_________________ Remarks, additional work to be performed, quotations required, etc. _____________________________________________________________________ ___________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________ Silver Cloud Marine Engines, 107 Bay Avenue, Forked River, NJ 08731 • 609-693-2145 • Fax 609-971-3345 • www.forkedrivermarinas.com White copy - Marina Yellow copy - Boat Owner