September 19, 2008 Northport - Norwalk Harbor Cable (NNC) Tie line Technical Assessment of Operating up to NNC Inter Tie STE Ratings Executive Summary Three (3) 138kV submarine cable circuits (Lines 601, 602, and 603) have been installed from Northeast Utilities’ (NU) Norwalk Harbor 6J Substation to Long Island Power Authorities’ (LIPA) Northport 6F Substation to replace the existing single 138kV circuit. The new cables were put in service on July 29, 2008. NNC single cable operation while switching has caused a concern with ISO-NE and the NYISO. The switching method presently agreed upon involves switching one cable at a time, each cable requiring approximately 45 minutes to properly operate disconnects, fuses and ground switches. The single cable operation scenario has caused transaction cuts between New England and New York and poses system reliability concerns. In order to prevent single cable operation from causing transaction cuts or having emergency states invoked, the NYISO is being requested to grant an exception to Normal Transfer Criteria and allow the NNC tie line to be solved to the post contingency STE rating instead of the LTE rating (for any one cable; 601, 602 or 603). Such an exception will benefit both ISOs as well as both Connecticut and New York state electric customers. Thermal and voltage analysis study results demonstrate that there will be no adverse impact on system reliability as a result of granting the exception by the NYISO / NYSRC to allow any one NNC cable to be solved to the post contingency STE rating instead of the LTE rating. Phase angle regulation capability is available at Northport to reduce NNC loading to the NNC LTE rating within 15 minutes without causing any other facility to be loaded beyond its LTE rating. Use of the STE rating rather than the LTE rating provides for a consistent operating practice with ISO-NE. References: New York State Reliability Council (NYSRC) Reliability Rule B-R1 and E-R1. Study Assumptions Study time period: Summer 2008 Load flow base case: - Summer 2008 peak load case - All lines in service - LIPA imports from NYISO via Y49 and Y50 maximized - 286 MW wheel to Jamaica - Shoreham CSC set at 330 MW import to Long Island - Neptune set at 660 MW import to Long Island 1 September 19, 2008 - NNC single cable operation thermal ratings: 155 / 192 / 430 MVA (normal / LTE / STE) for any individual cable - For reference: NNC three (3) cable operation thermal ratings for any individual cable: 100 / 112 / 175 MVA (norm / LTE / STE); respecting prior cables’ (#1385) thermal ratings Norwalk Harbor 115/138kV Auto Transformer Data - Thermal Ratings: 402/ 402/ 449 MVA (normal / LTE / STE) - Impedance: assume the impedance of the new replacement auto (data provided by ISO-NE), as this auto is scheduled for replacement in October/November 2008 Thermal and Voltage Technical Assessment Two main load flow base cases were set up for this technical assessment. These cases represent the bounds of flows for imports to and exports from LI at the present normal FERC scheduling limit of 100 MW. - - Import to LI from CT o Case 1 simulates a 100 MW flow from Connecticut to Long Island over the NNC inter tie (single cable operation) Export from LI to CT o Case 2 simulates a 100 MW flow from Long Island to Connecticut over the NNC inter tie (single cable operation) To determine the impact of operating to the post contingency STE rating, a severe system contingency was simulated for each of the above cases. For testing Long Island imports, case 1, the loss of the Shoreham Cross Sound Cable (CSC) HVDC (loss of 330 MW) was simulated. For testing Long Island exports, case 2, the loss of Millstone Unit #3 (loss of approximately 1200 MW) was simulated. Pre and post contingency PSS/E load flow plots for a portion of the power system in the vicinity of Northport (Long Island) and Norwalk Harbor (Connecticut) are provided in the attached Appendix for reference. These plots summarize pre and post contingency line flows and bus voltages. Discussion of Results Case 1 - Import to LI of 100 MW No normal overloads are observed in this case. Assuming operation to post contingency LTE ratings, the following contingency overload(s) were observed: Table 1 2008 Summer Peak Load Flow Analysis Results – NNC single cable operation Pre-contingency flow = 100 MW to L.I. PERCENT Limiting Element Loss of LOADING NNC (LTE = 192 MVA) Shoreham CSC 115% of LTE 2 September 19, 2008 Since the post contingency flow is well below the single cable STE rating of 430 MVA, solving to the STE rating will mitigate this overload. The Northport phase angle regulator (PAR) associated with NNC is available to reduce NNC loading to the NNC LTE rating within 15 minutes without causing any other facility to be loaded beyond its LTE rating. No pre or post contingency voltage violations were detected. Case 2 - Export to CT of 100 MW No normal overloads are observed in this case. Assuming operation to post contingency LTE ratings, the following contingency overload(s) were observed: Table 2 2008 Summer Peak Load Flow Analysis Results – NNC single cable operation Pre-contingency flow = 100 MW to CT. PERCENT Limiting Element Loss of LOADING NNC (LTE = 192 MVA) Millstone #3 128% of LTE Since the post contingency flow is well below the single cable STE rating of 430 MVA, solving to the STE rating will mitigate this overload. The Northport phase angle regulator (PAR) associated with NNC is available to reduce NNC loading to the NNC LTE rating within 15 minutes without causing any other facility to be loaded beyond its LTE rating. No pre or post contingency voltage violations were detected. Conclusions This technical assessment demonstrates that there will be no adverse impact on system reliability as a result of granting the exception by the NYISO / NYSRC to allow the NNC tie line to be solved to the post contingency STE rating instead of the LTE rating (for any one cable; 601, 602 or 603). Phase angle regulation capability is available at Northport to reduce NNC loading to the NNC LTE rating within 15 minutes without causing any other facility to be loaded beyond its LTE rating. For single cable operation, it is expected that the maximum post contingency phase angle regulator adjustment will be on the order of 50 to 60 MW. 3 September 19, 2008 This exception will not adversely impact existing transfer capabilities between New England and New York and is expected to improve overall system reliability by: - relieving existing restrictions on New York – New England transfer limits which may arise in real time due to: o loss of Millstone Unit #3 o loss of Pleasant Valley – Long Mountain 398 line o loss of Shoreham CSC o other NY or CT system contingencies - mitigating the need for transaction curtailments 4 September 19, 2008 APPENDIX NNC One Line Diagram & Pre and Post Contingency Load Flow Summary Plots 5 DRAFT 48.6R 129329 ELWOOD 2 1.035 119.0 103171 NWLK HAR 129027 NRTPTG4 102.5 251.7 254.3 250.0 46.6R 27.0 103169 RYTN J A 1 121.9 32.2 1.024 141.3 103168 GLNBROOK 43.3 1.024 141.3 250.0 112.4 254.7 53.7 252.1 SW 129026 NRTPTG3 140.6 28.7 35.2 109.0 35.0 123.8 132.7 185.0 CASE 1: NNC - one cable I/S 100 MW Import to LI 129342 NRTHPRT2 1 129328 ELWOOD 1 129024 NRTPTG1 103172 NORWALK 123.4 SW 35.2 0.0 316.2 250.0 249.8 251.2 24.5R 129343 NRTHPT P 369.0 73.5 72.3 373.9 369.1 73.6 72.3 250.1 251.5 140.8 69.3 68.5 63.5 64.2 31.4 31.6 103166 NORHR138 1.030 118.5 250.0 27.4R 1 373.0 139.9 NNC Inter tie (one cable I/S) 129025 NRTPTG2 129344 NRTHPT1 99.3 100.4 100.4 62.0 62.4 24.0 0.9937 71.7 1.0000 129355 PILGRIM 71.7 1.026 141.6 1 314.6 100.6 24.2 103237 ELYAVE 103173 SASCO CR 140.6 15.6 1.038 143.3 99.3 170.4 61.3R 1 205.7 33.4 34.9 67.5 67.5 1.034 118.9 103271 RYTN J B 112.0 103552 NORHAR#2 Bus - VOLTAGE (KV/PU) Branch - MVA/% OF RATE A Equipment - MW/MVAR 100.0%RATEA 1.050OV0.950UV 2.5 165.0 1.015 18.3 1.031 142.3 168.0 178.4 2 1.026 141.5 1.0530 159.0 60.0H 1.014 20.3 1.0530 67.7 207.3 1.025 117.9 1.0000 68.9 72.6 103551 NORHAR#1 1 172.5 69.4 21.4 1.033 142.5 174.6 1.0000 21.4 1.0000 99.1 1.0000 -7.70 53.7 172.9 154.9 155.8 63.2 63.8 1.035 119.0 103207 FLAX HIL 43.3 85.3 84.9 37.5 1.030 118.4 37.5 62.7 62.3 28.6 28.7 1.014 116.7 1.025 117.8 129026 NRTPTG3 107.1 129329 ELWOOD 2 44.4 1.035 119.0 103171 NWLK HAR 128.2 1.021 140.8 250.0 60% I 63.1R 25.8 257.8 117.3 254.4 N/A 103168 GLNBROOK 1 19.7 SW 25% I 24.6 36.4 133.2 185.0 CASE 1a: NNC - one cable I/S Post Contingency loss of Shoreham CSC 129342 NRTHPRT2 106.3 129328 ELWOOD 1 129027 NRTPTG4 94.3 22% I 253.8 N/A 17.4 257.2 250.0 60% I 60.3R 103169 RYTN J A 1 117.1 21.6 1.021 140.9 103172 NORWALK 116.9 129024 NRTPTG1 26% I SW 25.8 0.0 251.8 N/A 254.4 250.0 59% I 47.1R 106.7 65.7 N/A 255.2 252.6 N/A 64.7 432.3 250.0 59% I 51.4R 78.1 30% I 30.1 36% I 103166 NORHR138 1.030 118.5 N/A 427.5 222.8 64.7 113.3 66% I 65.8 30.0 NNC Inter tie (one cable I/S) 1 427.6 66% I 79.1 38.6 37.8 129025 NRTPTG2 431.4 108.7 39% I 129343 NRTHPT P 228.1 228.1 114.9 54.9 115% I 129344 NRTHPT1 N/A 0.9937 61.4 1 334.9 1.0000 129355 PILGRIM 333.9 61% I 61.4 1.023 141.2 44 229.7 55% I 55.2 % I 103237 ELYAVE 103173 SASCO CR 128.1 N/A 15.6 40% I 40.3 1.0000 223.2 1.0000 -7.70 1.034 142.7 222.8 125.6 250.1 46.2 63.3 46% I 63.3 1.024 117.8 103551 NORHAR#1 199.8 178.0 N/A 1.0530 159.0 102% I 80.0H 1.0000 1 60.1 1.034 118.9 170.6 103271 RYTN J B 105.9 1.025 18.5 1.026 141.6 103552 NORHAR#2 Bus - VOLTAGE (KV/PU) Branch - MVA/% OF RATE B Equipment - MW/MVAR 178.4 N/A 1.014 20.3 1.0530 168.0 102% I 60.0H 1.0000 100.0%RATEB 1.050OV0.950UV 123.8 122.0 103207 FLAX HIL 36.5 80.0 40% I 2 1.020 140.7 2.5 63% I 45.3 61% I 61.1 247.8 40.3 1.024 141.3 201.9 123.2 1 44.4 172.9 38.9 79.4 31% I 39.7 85.0 84.6 30.5 30.6 29% I 1.035 119.0 29.1 1.030 118.4 1.013 116.5 29.1 1.024 117.7 129026 NRTPTG3 116.2 129329 ELWOOD 2 45.5 1.035 119.0 103171 NWLK HAR 131.3 1.021 140.8 250.0 60% I 63.5R 25.9 257.9 117.7 254.5 N/A 103168 GLNBROOK 1 21.4 SW 26% I 25.9 36.6 140.4 185.0 129342 NRTHPRT2 106.7 129328 ELWOOD 1 CASE 1b: NNC - one cable I/S Post Contingency loss of Shoreham CSC NNC flow reduced to LTE rating 129027 NRTPTG4 102.4 23% I 253.8 N/A 18.9 257.2 250.0 60% I 60.6R 103169 RYTN J A 1 123.8 22.8 1.021 140.9 103172 NORWALK 117.3 26% I 129024 NRTPTG1 SW 25.9 0.0 313.9 116.9 62.8 N/A 255.6 252.9 N/A 61.6 413.2 250.0 59% I 53.0R 103166 NORHR138 406.6 191.2 61.6 97.2 63% I 63.0 75.0 29% I 28.9 1.030 118.5 N/A 1 406.7 63% I 28.8 NNC Inter tie (one cable I/S) 129025 NRTPTG2 412.2 76.0 42.2 41.4 37% I 254.7 118.5 42% I 129343 NRTHPT P 195.2 195.2 98.3 46.9 98% I 129344 NRTHPT1 N/A 0.9937 252.0 N/A 250.0 59% I 48.7R 1.0000 57.5 1 129355 PILGRIM 313.0 58% I 57.5 1.023 141.1 45 196.5 47% I 47.2 % I 103237 ELYAVE 103173 SASCO CR 131.2 N/A 15.6 35% I 34.5 1.0000 191.3 1.0000 -12.79 1.035 142.8 191.2 116.0 243.4 42.7 61.6 43% I 61.7 1.024 117.8 103551 NORHAR#1 190.0 178.0 N/A 1.0530 159.0 102% I 80.0H 1.0000 1 57.2 1.034 118.9 170.6 103271 RYTN J B 106.3 1.025 18.5 1.026 141.5 103552 NORHAR#2 Bus - VOLTAGE (KV/PU) Branch - MVA/% OF RATE B Equipment - MW/MVAR 178.4 N/A 1.014 20.3 1.0530 168.0 102% I 60.0H 1.0000 100.0%RATEB 1.050OV0.950UV 133.7 132.2 103207 FLAX HIL 36.6 74.3 43% I 2 1.019 140.6 2.5 62% I 41.7 58% I 58.4 241.2 34.5 1.025 141.5 193.0 113.5 1 45.5 172.9 42.2 73.7 28% I 42.9 85.5 85.1 28.3 28.4 29% I 1.035 119.0 29.2 1.030 118.4 1.013 116.5 29.3 1.024 117.7 300.0 129027 NRTPTG4 145.4 300.9 38.3 304.0 300.0 49.4R 103169 RYTN J A 1 158.4 41.8 1.024 141.3 1.035 119.0 103171 NWLK HAR 44.8 51.2R 129329 ELWOOD 2 103168 GLNBROOK 116.4 304.3 60.8 301.1 1.023 141.2 SW 129026 NRTPTG3 159.3 40.8 36.4 154.9 45.2 128.2 171.2 185.0 CASE 2: NNC - one cable I/S 100 MW EXPORT to CT 129342 NRTHPRT2 1 129328 ELWOOD 1 129024 NRTPTG1 103172 NORWALK 127.8 SW 36.5 0.0 315.1 300.0 71.5 29.7R 129343 NRTHPT P 64.6 335.5 329.7 66.1 64.6 301.8 299.9 94.9 43.6 43.7 1.031 118.5 300.0 33.0R 129344 NRTHPT1 98.4 99.7 99.7 61.5 62.8 24.2 1.0187 65.9 96.2 93.0 1 329.6 204.1 92.7 103166 NORHR138 129025 NRTPTG2 334.4 204.3 NNC Inter tie (one cable I/S) 301.5 299.6 1.0000 129355 PILGRIM 71.5 1.026 141.5 1 313.8 98.9 23.8 103237 ELYAVE 103173 SASCO CR 159.2 15.6 1.024 141.4 98.4 164.4 41.9R 1 160.1 10.7 13.6 52.5 52.5 1.034 118.9 103271 RYTN J B 116.0 103552 NORHAR#2 Bus - VOLTAGE (KV/PU) Branch - MVA/% OF RATE A Equipment - MW/MVAR 100.0%RATEA 1.050OV0.950UV 2.5 160.8 1.005 18.1 1.030 142.2 168.0 173.1 2 1.025 141.5 1.0530 159.0 41.9R 1.004 20.1 1.0530 60.5 1.0000 61.8 161.2 103551 NORHAR#1 1 154.1 28.3 1.026 118.0 1.031 142.3 156.6 22.3 21.2 1.0000 21.2 1.0000 98.3 1.0000 -17.09 60.9 169.4 218.6 218.4 89.1 89.5 1.035 119.0 103207 FLAX HIL 44.9 121.9 53.6 1.030 118.5 121.3 78.1 77.5 35.6 35.7 1.015 116.7 53.6 1.025 117.9 129026 NRTPTG3 136.0 129329 ELWOOD 2 1.035 119.0 103171 NWLK HAR 60.3 300.0 71% I 52.2R 174.1 1.023 141.2 30.9 304.5 140.2 301.2 N/A 103168 GLNBROOK 1 25.0 SW 29% I 28.5 43.8 154.9 185.0 CASE 2a: NNC - one cable I/S Post Contingency loss of Millstone #3 129342 NRTHPRT2 127.8 129328 ELWOOD 1 129027 NRTPTG4 125.5 26% I 300.9 N/A 23.0 304.2 300.0 71% I 50.3R 103169 RYTN J A 1 141.0 25.9 1.024 141.3 129024 NRTPTG1 103172 NORWALK 139.8 31% I SW 30.9 0.0 300.0 70% I 27.7R 241.1 43.4 113.1 43% I 103166 NORHR138 129025 NRTPTG2 43.5 1.031 118.5 284.3 44.2 293.1 N/A 299.8 42.8 N/A 301.6 284.3 300.0 70% I 30.9R N/A 255.6 44% I 44.4 249.4 128% I 42.8 128.5 129344 NRTHPT1 N/A 126.7 249.4 61% I 60.5 1.0187 44% I 1 291.9 114.6 85.5 85.4 NNC Inter tie (one cable I/S) 301.3 299.5 N/A 240.6 86% I 129343 NRTHPT P 44% I 65.3 1 358.3 1.0000 129355 PILGRIM 356.5 65% I 65.3 1.025 141.5 60 247.1 59.4 % I 103237 ELYAVE 103173 SASCO CR 174.0 N/A 15.6 46% I 45.7 1.0000 254.2 1.0000 -17.09 78.3 28.4 28.8 25.6 25.6 1.027 118.2 132.9 168.0 N/A 1.0530 159.0 96% I 54.2R 1.0000 1 39.8 1.034 118.9 163.2 103271 RYTN J B 127.3 1.011 18.2 1.031 142.2 103552 NORHAR#2 Bus - VOLTAGE (KV/PU) Branch - MVA/% OF RATE B Equipment - MW/MVAR 254.2 254.8 103207 FLAX HIL 43.8 95.2 176.5 N/A 1.011 20.2 1.0530 81% I 168.0 101% I 54.2R 1.0000 100.0%RATEB 1.050OV 0.950UV 2.5 103551 NORHAR#1 2 1.026 141.6 100.6 26% I 41% I 41.2 101.1 29% I 45.7 1.036 143.0 136.8 77.4 1.025 141.5 255.6 1 60.3 171.6 81.3 94.5 36% I 81.4 141.4 140.8 36.3 36.3 48% I 1.035 119.0 48.3 1.030 118.5 1.016 116.8 48.4 1.025 117.9 129026 NRTPTG3 155.3 129329 ELWOOD 2 58.5 1.035 119.0 103171 NWLK HAR 168.8 1.024 141.3 300.0 71% I 49.5R 30.8 304.0 139.8 301.0 N/A 1 28.5 SW 32% I 31.5 103168 GLNBROOK 43.7 171.4 185.0 129342 NRTHPRT2 127.4 129328 ELWOOD 1 CASE 2b: NNC - one cable I/S Post Contingency loss of Millstone #3 NNC flow reduced to LTE rating 129027 NRTPTG4 144.2 29% I 300.7 N/A 26.5 303.8 300.0 71% I 47.8R 103169 RYTN J A 1 157.2 28.9 1.024 141.4 129024 NRTPTG1 103172 NORWALK 139.3 31% I SW 30.8 0.0 300.0 70% I 26.5R 299.5 N/A 220.9 98.3 78.4 37.3 97.1 37% I 78.2 37.3 NNC Inter tie (one cable I/S) 301.2 103166 NORHR138 129025 NRTPTG2 1.031 118.5 291.2 45.1 299.2 N/A 299.8 43.9 N/A 301.5 291.2 300.0 70% I 29.6R N/A 195.3 45% I 45.3 191.1 191.1 97.1 46.4 98% I 43.9 98.3 129344 NRTHPT1 N/A 1.0187 45% I 1 297.9 220.6 78% I 129343 NRTHPT P 44% I 57.6 1 315.9 1.0000 129355 PILGRIM 314.4 58% I 57.6 1.026 141.6 % 58 189.4 46% I 45.5 I 103237 ELYAVE 103173 SASCO CR 168.8 N/A 15.6 35% I 34.9 1.0000 194.5 1.0000 -13.60 1.025 141.5 195.3 23.5 28.2 110.7 28% I 28.2 1.027 118.1 136.1 165.8 N/A 1.0530 159.0 95% I 46.9R 1.0000 1 40.7 1.034 118.9 161.7 103271 RYTN J B 127.0 1.007 18.1 1.031 142.3 103552 NORHAR#2 Bus - VOLTAGE (KV/PU) Branch - MVA/% OF RATE B Equipment - MW/MVAR 234.3 234.7 103207 FLAX HIL 43.7 79.7 168.0 100% I 46.9R 174.4 N/A 1.007 20.1 1.0530 75% I 1.0000 100.0%RATEB 1.050OV0.950UV 2.5 103551 NORHAR#1 2 1.026 141.6 111.3 23% I 23.0 42% I 42.0 63.9 34.9 1.035 142.8 139.6 62.5 1 58.5 170.2 74.9 79.2 30% I 75.1 124.6 124.0 30.4 30.4 43% I 1.035 119.0 42.6 1.030 118.5 1.016 116.8 42.6 1.025 117.9