NEPTUN – Synchronization

advertisement
05 NEPTUN – Synchronization
Your benefit
Optimal use:
by meeting high safety standards
NEPTUN – the comprehensive solution
for secondary systems can offer addi-
through ergonomic operations with password protection
tional notable advantages in step-by-
with different equipment models
step expansion of your plant.
by supporting different configurations
Synchronization
This gives you integrated advantages in
addition to the current benefits of your
synchronization system if additional
Reduced costs:
with easy integration into existing plants
through highly reliable synchronization based on
intelligent algorithm
with software support for rapid start-up
components are used (for example excitation, protection, automation and
control).
Efficient communication standard
(IEC 60870-5-104)
Comprehensive system concepts for
Increased earnings:
through faster synchronization
with longer life cycle thanks to equipment-friendly configuration
remote functions
Central engineering toolkit
Simplified plant configuration
Less engineering and documentation
required
Minimum of additional infrastructure
for signal communication
Minimum of spare parts required
Liquidation of previously tied capital
Fewer maintenance and service
assignments on site
www.andritz.com/NEPTUN
ANDRITZ HYDRO GmbH
Penzinger Strasse 76
1141 V ienna, P.O.B. 5, Austria
Phone: +43 (1) 89100
Fax: +43 (1) 8946046
e-mail: contact-hydro@andritz.com
MX6-001-1.71
HP.NEP_SYN 01.e.04.10
www.andritz.com/NEPTUN
02 NEPTUN – Synchronization
03 NEPTUN – Synchronization
04 NEPTUN – Synchronization
Synchronization
Strategic products
The comprehensive solution
Synchronizing a
SYN 3000
operating modes generator to a
SYN 3000
SYN-WIN
SICAM 1703 ACP
SYN 3000 features 5 synchronizing modes:
With the easy-to-use SYN-WIN software,
If the Al 6303 automation module from the
generator to grid or supply line
synchronization processes are displayed on-
SICAM 1703 ACP product line is used, the
synchronous or asynchronous grids or
line on a computer screen. The synchroni-
synchronization process can be integrated
supply lines
zing process can be tracked on analog mea-
directly into the automation and control sy-
synchronous or asynchronous systems
suring instruments (double voltmeter, double
stem.
or lines with dead bus or line de-
frequency meter, and synchronoscope) over-
With the direct transformer signal interface,
energized systems
laid on screen. The entire synchronizing pro-
there is no need for an additional interface
synchro-check for manual connections
cess is logged automatically and can be dis-
level. As an integrated component, this syn-
CB close command
synchro-check for high-speed busbar
played afterwards graphically for analysis
chronization tool has all the system proper-
transfer
and optimization purposes. This software al-
Paralleling of
two asynchronous
systems
Synchronizing
two asynchronous
systems
power system,
supply line or
busbars
Both
systems
energized
One
system
deenergized
One
system
deenergized
Both
systems
energized
One
system
deenergized
One
system
deenergized
yes
no
no
manual
yes
no
no
manual
no
single pulse*)
single pulse*)
single pulse*)
continuous*)
single pulse*)
Synchronization
time monitoring
yes
yes
yes
yes
yes
ties of the SICAM 1703 ACP product line
Frequency comparison
yes
Voltage comparison
yes
lows the parameters of the SYN 3000 to be
for project planning and visualization in ad-
Phase angle check
yes
As a special function, the circuit breaker (CB)
entered, modified and saved with password
dition to its own specific features.
closing time can be measured and stored
protection.
yes
no
yes
no
yes
yes
no
no
no
yes
no
no
no
numerous internal safety functions (double
Voltage measuring
voltage measuring circuits, fail-safe connec-
Nominal voltage
tions for the CB command outputs). To meet
Voltage measuring range 0 - 150 VAC
the highest of standards, a 2-channel unit
Nominal frequency
can be used.
Hz,
Measuring accuracy
100 VAC
1V
Frequency measuring
0,005 Hz
16.7, 50, 60
Setting ranges
All operating modes, commands and con-
depending on
straints are shown by means of LEDs and a
completion
Load impedance
Voltage measuring
1 VA
Selector inputs
2 oder 10,
depending on type
0,01 - 0,25 Hz
1 - 30 VAC
6 x 140 MVA, Birecik, Turkey
Permitted phase angle
0 - 15/45 deg.
Synchronizing with success
Residual voltage for de-
gorously tested technology. Our synchroni-
a steady hand and full concentration, and
zation equipment combines your stringent
this then set the pulse soaring. Nowadays,
reliability demands with our experience of
you can relax and perform this operation au-
over 40 years in this sector.
energized power systems 0-20 VAC
Product range
tomatically using state-of-the-art, technically
mature technology. Watch calmly as the
Convenience
needles move over your screen, all to the
What are your visions? Easy-to-learn screen
barely discernible sound of synchronization
visualizations, measurement of CB closing
coming from the machine room. All data are
time, plotting of curves, LAN capability with
logged, allowing you to analyze even the
Ethernet log to the other technological sy-
most complicated sequences afterwards in
stems, operator control via PC/laptop as
the office.
well as at the equipment itself? Do you want
2 x 84 MVA, Chimay, Peru
to simply forget about hex tables, operating
Safety
manuals, painstaking calibrating, and te-
Everything must run perfectly during syn-
sting?
chronization. What would you have done
That’s the reason why we’ve made it all as
previously at zero beat? Were you able to
easy for you as possible.
measure the breaker closing time at each
5 x 16.7 MVA, 5 de Noviembre, El Salvador
no
yes
yes
no
yes
no
yes
Supply
Voltage difference
only be met with reliable, redundant, and ri-
no
yes
yes
Difference frequency
cularly tricky undertaking. At one time, it took
yes
no
Technical data SYN 3000
based on IEC 60870-5-104 (in preparation).
or one power system to another is a parti-
Both
One
systems
system
dedeenergized energized
Voltage control
4-line LC display. LAN communication is
periodic inspection? These demands can
Both
systems
energized
Monitoring
of high-speed
busbar transfer
Speed control
as a parameter. The basic design contains
Paralleling of generators to power systems
Synchronism check
and
CB close interlock
SYN 3000 in use
Voltage
90 - 260 VAC
and DC
Optional
20 - 56 VDC
Power input
8W
Temperature range
0-50°C
02 NEPTUN – Synchronization
03 NEPTUN – Synchronization
04 NEPTUN – Synchronization
Synchronization
Strategic products
The comprehensive solution
Synchronizing a
SYN 3000
operating modes generator to a
SYN 3000
SYN-WIN
SICAM 1703 ACP
SYN 3000 features 5 synchronizing modes:
With the easy-to-use SYN-WIN software,
If the Al 6303 automation module from the
generator to grid or supply line
synchronization processes are displayed on-
SICAM 1703 ACP product line is used, the
synchronous or asynchronous grids or
line on a computer screen. The synchroni-
synchronization process can be integrated
supply lines
zing process can be tracked on analog mea-
directly into the automation and control sy-
synchronous or asynchronous systems
suring instruments (double voltmeter, double
stem.
or lines with dead bus or line de-
frequency meter, and synchronoscope) over-
With the direct transformer signal interface,
energized systems
laid on screen. The entire synchronizing pro-
there is no need for an additional interface
synchro-check for manual connections
cess is logged automatically and can be dis-
level. As an integrated component, this syn-
CB close command
synchro-check for high-speed busbar
played afterwards graphically for analysis
chronization tool has all the system proper-
transfer
and optimization purposes. This software al-
Paralleling of
two asynchronous
systems
Synchronizing
two asynchronous
systems
power system,
supply line or
busbars
Both
systems
energized
One
system
deenergized
One
system
deenergized
Both
systems
energized
One
system
deenergized
One
system
deenergized
yes
no
no
manual
yes
no
no
manual
no
single pulse*)
single pulse*)
single pulse*)
continuous*)
single pulse*)
Synchronization
time monitoring
yes
yes
yes
yes
yes
ties of the SICAM 1703 ACP product line
Frequency comparison
yes
Voltage comparison
yes
lows the parameters of the SYN 3000 to be
for project planning and visualization in ad-
Phase angle check
yes
As a special function, the circuit breaker (CB)
entered, modified and saved with password
dition to its own specific features.
closing time can be measured and stored
protection.
yes
no
yes
no
yes
yes
no
no
no
yes
no
no
no
numerous internal safety functions (double
Voltage measuring
voltage measuring circuits, fail-safe connec-
Nominal voltage
tions for the CB command outputs). To meet
Voltage measuring range 0 - 150 VAC
the highest of standards, a 2-channel unit
Nominal frequency
can be used.
Hz,
Measuring accuracy
100 VAC
1V
Frequency measuring
0,005 Hz
16.7, 50, 60
Setting ranges
All operating modes, commands and con-
depending on
straints are shown by means of LEDs and a
completion
Load impedance
Voltage measuring
1 VA
Selector inputs
2 oder 10,
depending on type
0,01 - 0,25 Hz
1 - 30 VAC
6 x 140 MVA, Birecik, Turkey
Permitted phase angle
0 - 15/45 deg.
Synchronizing with success
Residual voltage for de-
gorously tested technology. Our synchroni-
a steady hand and full concentration, and
zation equipment combines your stringent
this then set the pulse soaring. Nowadays,
reliability demands with our experience of
you can relax and perform this operation au-
over 40 years in this sector.
energized power systems 0-20 VAC
Product range
tomatically using state-of-the-art, technically
mature technology. Watch calmly as the
Convenience
needles move over your screen, all to the
What are your visions? Easy-to-learn screen
barely discernible sound of synchronization
visualizations, measurement of CB closing
coming from the machine room. All data are
time, plotting of curves, LAN capability with
logged, allowing you to analyze even the
Ethernet log to the other technological sy-
most complicated sequences afterwards in
stems, operator control via PC/laptop as
the office.
well as at the equipment itself? Do you want
2 x 84 MVA, Chimay, Peru
to simply forget about hex tables, operating
Safety
manuals, painstaking calibrating, and te-
Everything must run perfectly during syn-
sting?
chronization. What would you have done
That’s the reason why we’ve made it all as
previously at zero beat? Were you able to
easy for you as possible.
measure the breaker closing time at each
5 x 16.7 MVA, 5 de Noviembre, El Salvador
no
yes
yes
no
yes
no
yes
Supply
Voltage difference
only be met with reliable, redundant, and ri-
no
yes
yes
Difference frequency
cularly tricky undertaking. At one time, it took
yes
no
Technical data SYN 3000
based on IEC 60870-5-104 (in preparation).
or one power system to another is a parti-
Both
One
systems
system
dedeenergized energized
Voltage control
4-line LC display. LAN communication is
periodic inspection? These demands can
Both
systems
energized
Monitoring
of high-speed
busbar transfer
Speed control
as a parameter. The basic design contains
Paralleling of generators to power systems
Synchronism check
and
CB close interlock
SYN 3000 in use
Voltage
90 - 260 VAC
and DC
Optional
20 - 56 VDC
Power input
8W
Temperature range
0-50°C
02 NEPTUN – Synchronization
04 NEPTUN – Synchronization
03 NEPTUN – Synchronization
The comprehensive solution
Synchronization
SYN 3000
SYN-WIN
SYN 3000 features 5 synchronizing modes:
With the easy-to-use SYN-WIN software,
Synchronizing a
SYN 3000
operating modes generator to a
generator to grid or supply line
synchronization processes are displayed on-
synchronous or asynchronous grids or
line on a computer screen. The synchroni-
supply lines
zing process can be tracked on analog mea-
synchronous or asynchronous systems
suring instruments (double voltmeter, double
or lines with dead bus or line de-
frequency meter, and synchronoscope) over-
energized systems
laid on screen. The entire synchronizing pro-
synchro-check for manual connections
cess is logged automatically and can be dis-
CB close command
synchro-check for high-speed busbar
played afterwards graphically for analysis
transfer
Both
systems
energized
One
system
deenergized
One
system
deenergized
Both
systems
energized
One
system
deenergized
One
system
deenergized
no
no
manual
yes
no
no
manual
no
single pulse*)
single pulse*)
single pulse*)
continuous*)
single pulse*)
Synchronization
time monitoring
yes
yes
yes
yes
yes
and optimization purposes. This software al-
Frequency comparison
yes
Voltage comparison
yes
lows the parameters of the SYN 3000 to be
Phase angle check
yes
closing time can be measured and stored
protection.
yes
no
yes
no
yes
yes
no
no
no
yes
no
no
no
numerous internal safety functions (double
Voltage measuring
voltage measuring circuits, fail-safe connec-
Nominal voltage
tions for the CB command outputs). To meet
Voltage measuring range 0 - 150 VAC
the highest of standards, a 2-channel unit
Nominal frequency
can be used.
Hz,
Measuring accuracy
100 VAC
1V
Frequency measuring
0,005 Hz
16.7, 50, 60
Setting ranges
All operating modes, commands and con-
depending on
straints are shown by means of LEDs and a
completion
Load impedance
Voltage measuring
1 VA
Selector inputs
2 oder 10,
depending on type
6 x 140 MVA, Birecik, Turkey
Permitted phase angle
0 - 15/45 deg.
Synchronizing with success
Residual voltage for de-
gorously tested technology. Our synchroni-
a steady hand and full concentration, and
zation equipment combines your stringent
this then set the pulse soaring. Nowadays,
reliability demands with our experience of
you can relax and perform this operation au-
over 40 years in this sector.
energized power systems 0-20 VAC
Product range
tomatically using state-of-the-art, technically
mature technology. Watch calmly as the
Convenience
needles move over your screen, all to the
What are your visions? Easy-to-learn screen
barely discernible sound of synchronization
visualizations, measurement of CB closing
coming from the machine room. All data are
time, plotting of curves, LAN capability with
logged, allowing you to analyze even the
Ethernet log to the other technological sy-
most complicated sequences afterwards in
stems, operator control via PC/laptop as
the office.
well as at the equipment itself? Do you want
2 x 84 MVA, Chimay, Peru
to simply forget about hex tables, operating
Safety
manuals, painstaking calibrating, and te-
Everything must run perfectly during syn-
sting?
chronization. What would you have done
That’s the reason why we’ve made it all as
previously at zero beat? Were you able to
easy for you as possible.
measure the breaker closing time at each
5 x 16.7 MVA, 5 de Noviembre, El Salvador
yes
yes
no
yes
no
yes
Supply
0,01 - 0,25 Hz
only be met with reliable, redundant, and ri-
no
Technical data SYN 3000
1 - 30 VAC
cularly tricky undertaking. At one time, it took
no
no
yes
Voltage difference
or one power system to another is a parti-
yes
yes
Difference frequency
periodic inspection? These demands can
Both
One
systems
system
dedeenergized energized
yes
based on IEC 60870-5-104 (in preparation).
Paralleling of generators to power systems
Both
systems
energized
Monitoring
of high-speed
busbar transfer
Voltage control
entered, modified and saved with password
4-line LC display. LAN communication is
Synchronism check
and
CB close interlock
Speed control
As a special function, the circuit breaker (CB)
as a parameter. The basic design contains
Paralleling of
two asynchronous
systems
Synchronizing
two asynchronous
systems
power system,
supply line or
busbars
SYN 3000 in use
Voltage
90 - 260 VAC
and DC
Optional
20 - 56 VDC
Power input
8W
Temperature range
0-50°C
05 NEPTUN – Synchronization
Your benefit
Optimal use:
by meeting high safety standards
NEPTUN – the comprehensive solution
for secondary systems can offer addi-
through ergonomic operations with password protection
tional notable advantages in step-by-
with different equipment models
step expansion of your plant.
by supporting different configurations
This gives you integrated advantages in
Synchronization
addition to the current benefits of your
synchronization system if additional
Reduced costs:
with easy integration into existing plants
through highly reliable synchronization based on
intelligent algorithm
with software support for rapid start-up
components are used (for example excitation, protection, automation and
control).
Efficient communication standard
(IEC 60870-5-104)
Comprehensive system concepts for
Increased earnings:
through faster synchronization
with longer life cycle thanks to equipment-friendly configuration
remote functions
Central engineering toolkit
Simplified plant configuration
Less engineering and documentation
required
Minimum of additional infrastructure
for signal communication
Minimum of spare parts required
Liquidation of previously tied capital
Fewer maintenance and service
assignments on site
www.andritz.com/NEPTUN
05 NEPTUN – Synchronization
Your benefit
Optimal use:
by meeting high safety standards
NEPTUN – the comprehensive solution
for secondary systems can offer addi-
through ergonomic operations with password protection
tional notable advantages in step-by-
with different equipment models
step expansion of your plant.
by supporting different configurations
Synchronization
This gives you integrated advantages in
addition to the current benefits of your
synchronization system if additional
Reduced costs:
with easy integration into existing plants
through highly reliable synchronization based on
intelligent algorithm
with software support for rapid start-up
components are used (for example excitation, protection, automation and
control).
Efficient communication standard
(IEC 60870-5-104)
Comprehensive system concepts for
Increased earnings:
through faster synchronization
with longer life cycle thanks to equipment-friendly configuration
remote functions
Central engineering toolkit
Simplified plant configuration
Less engineering and documentation
required
Minimum of additional infrastructure
for signal communication
Minimum of spare parts required
Liquidation of previously tied capital
Fewer maintenance and service
assignments on site
www.andritz.com/NEPTUN
ANDRITZ HYDRO GmbH
Penzinger Strasse 76
1141 V ienna, P.O.B. 5, Austria
Phone: +43 (1) 89100
Fax: +43 (1) 8946046
e-mail: contact-hydro@andritz.com
MX6-001-1.71
HP.NEP_SYN 01.e.04.10
www.andritz.com/NEPTUN
Download