05 NEPTUN – Synchronization Your benefit Optimal use: by meeting high safety standards NEPTUN – the comprehensive solution for secondary systems can offer addi- through ergonomic operations with password protection tional notable advantages in step-by- with different equipment models step expansion of your plant. by supporting different configurations Synchronization This gives you integrated advantages in addition to the current benefits of your synchronization system if additional Reduced costs: with easy integration into existing plants through highly reliable synchronization based on intelligent algorithm with software support for rapid start-up components are used (for example excitation, protection, automation and control). Efficient communication standard (IEC 60870-5-104) Comprehensive system concepts for Increased earnings: through faster synchronization with longer life cycle thanks to equipment-friendly configuration remote functions Central engineering toolkit Simplified plant configuration Less engineering and documentation required Minimum of additional infrastructure for signal communication Minimum of spare parts required Liquidation of previously tied capital Fewer maintenance and service assignments on site www.andritz.com/NEPTUN ANDRITZ HYDRO GmbH Penzinger Strasse 76 1141 V ienna, P.O.B. 5, Austria Phone: +43 (1) 89100 Fax: +43 (1) 8946046 e-mail: contact-hydro@andritz.com MX6-001-1.71 HP.NEP_SYN 01.e.04.10 www.andritz.com/NEPTUN 02 NEPTUN – Synchronization 03 NEPTUN – Synchronization 04 NEPTUN – Synchronization Synchronization Strategic products The comprehensive solution Synchronizing a SYN 3000 operating modes generator to a SYN 3000 SYN-WIN SICAM 1703 ACP SYN 3000 features 5 synchronizing modes: With the easy-to-use SYN-WIN software, If the Al 6303 automation module from the generator to grid or supply line synchronization processes are displayed on- SICAM 1703 ACP product line is used, the synchronous or asynchronous grids or line on a computer screen. The synchroni- synchronization process can be integrated supply lines zing process can be tracked on analog mea- directly into the automation and control sy- synchronous or asynchronous systems suring instruments (double voltmeter, double stem. or lines with dead bus or line de- frequency meter, and synchronoscope) over- With the direct transformer signal interface, energized systems laid on screen. The entire synchronizing pro- there is no need for an additional interface synchro-check for manual connections cess is logged automatically and can be dis- level. As an integrated component, this syn- CB close command synchro-check for high-speed busbar played afterwards graphically for analysis chronization tool has all the system proper- transfer and optimization purposes. This software al- Paralleling of two asynchronous systems Synchronizing two asynchronous systems power system, supply line or busbars Both systems energized One system deenergized One system deenergized Both systems energized One system deenergized One system deenergized yes no no manual yes no no manual no single pulse*) single pulse*) single pulse*) continuous*) single pulse*) Synchronization time monitoring yes yes yes yes yes ties of the SICAM 1703 ACP product line Frequency comparison yes Voltage comparison yes lows the parameters of the SYN 3000 to be for project planning and visualization in ad- Phase angle check yes As a special function, the circuit breaker (CB) entered, modified and saved with password dition to its own specific features. closing time can be measured and stored protection. yes no yes no yes yes no no no yes no no no numerous internal safety functions (double Voltage measuring voltage measuring circuits, fail-safe connec- Nominal voltage tions for the CB command outputs). To meet Voltage measuring range 0 - 150 VAC the highest of standards, a 2-channel unit Nominal frequency can be used. Hz, Measuring accuracy 100 VAC 1V Frequency measuring 0,005 Hz 16.7, 50, 60 Setting ranges All operating modes, commands and con- depending on straints are shown by means of LEDs and a completion Load impedance Voltage measuring 1 VA Selector inputs 2 oder 10, depending on type 0,01 - 0,25 Hz 1 - 30 VAC 6 x 140 MVA, Birecik, Turkey Permitted phase angle 0 - 15/45 deg. Synchronizing with success Residual voltage for de- gorously tested technology. Our synchroni- a steady hand and full concentration, and zation equipment combines your stringent this then set the pulse soaring. Nowadays, reliability demands with our experience of you can relax and perform this operation au- over 40 years in this sector. energized power systems 0-20 VAC Product range tomatically using state-of-the-art, technically mature technology. Watch calmly as the Convenience needles move over your screen, all to the What are your visions? Easy-to-learn screen barely discernible sound of synchronization visualizations, measurement of CB closing coming from the machine room. All data are time, plotting of curves, LAN capability with logged, allowing you to analyze even the Ethernet log to the other technological sy- most complicated sequences afterwards in stems, operator control via PC/laptop as the office. well as at the equipment itself? Do you want 2 x 84 MVA, Chimay, Peru to simply forget about hex tables, operating Safety manuals, painstaking calibrating, and te- Everything must run perfectly during syn- sting? chronization. What would you have done That’s the reason why we’ve made it all as previously at zero beat? Were you able to easy for you as possible. measure the breaker closing time at each 5 x 16.7 MVA, 5 de Noviembre, El Salvador no yes yes no yes no yes Supply Voltage difference only be met with reliable, redundant, and ri- no yes yes Difference frequency cularly tricky undertaking. At one time, it took yes no Technical data SYN 3000 based on IEC 60870-5-104 (in preparation). or one power system to another is a parti- Both One systems system dedeenergized energized Voltage control 4-line LC display. LAN communication is periodic inspection? These demands can Both systems energized Monitoring of high-speed busbar transfer Speed control as a parameter. The basic design contains Paralleling of generators to power systems Synchronism check and CB close interlock SYN 3000 in use Voltage 90 - 260 VAC and DC Optional 20 - 56 VDC Power input 8W Temperature range 0-50°C 02 NEPTUN – Synchronization 03 NEPTUN – Synchronization 04 NEPTUN – Synchronization Synchronization Strategic products The comprehensive solution Synchronizing a SYN 3000 operating modes generator to a SYN 3000 SYN-WIN SICAM 1703 ACP SYN 3000 features 5 synchronizing modes: With the easy-to-use SYN-WIN software, If the Al 6303 automation module from the generator to grid or supply line synchronization processes are displayed on- SICAM 1703 ACP product line is used, the synchronous or asynchronous grids or line on a computer screen. The synchroni- synchronization process can be integrated supply lines zing process can be tracked on analog mea- directly into the automation and control sy- synchronous or asynchronous systems suring instruments (double voltmeter, double stem. or lines with dead bus or line de- frequency meter, and synchronoscope) over- With the direct transformer signal interface, energized systems laid on screen. The entire synchronizing pro- there is no need for an additional interface synchro-check for manual connections cess is logged automatically and can be dis- level. As an integrated component, this syn- CB close command synchro-check for high-speed busbar played afterwards graphically for analysis chronization tool has all the system proper- transfer and optimization purposes. This software al- Paralleling of two asynchronous systems Synchronizing two asynchronous systems power system, supply line or busbars Both systems energized One system deenergized One system deenergized Both systems energized One system deenergized One system deenergized yes no no manual yes no no manual no single pulse*) single pulse*) single pulse*) continuous*) single pulse*) Synchronization time monitoring yes yes yes yes yes ties of the SICAM 1703 ACP product line Frequency comparison yes Voltage comparison yes lows the parameters of the SYN 3000 to be for project planning and visualization in ad- Phase angle check yes As a special function, the circuit breaker (CB) entered, modified and saved with password dition to its own specific features. closing time can be measured and stored protection. yes no yes no yes yes no no no yes no no no numerous internal safety functions (double Voltage measuring voltage measuring circuits, fail-safe connec- Nominal voltage tions for the CB command outputs). To meet Voltage measuring range 0 - 150 VAC the highest of standards, a 2-channel unit Nominal frequency can be used. Hz, Measuring accuracy 100 VAC 1V Frequency measuring 0,005 Hz 16.7, 50, 60 Setting ranges All operating modes, commands and con- depending on straints are shown by means of LEDs and a completion Load impedance Voltage measuring 1 VA Selector inputs 2 oder 10, depending on type 0,01 - 0,25 Hz 1 - 30 VAC 6 x 140 MVA, Birecik, Turkey Permitted phase angle 0 - 15/45 deg. Synchronizing with success Residual voltage for de- gorously tested technology. Our synchroni- a steady hand and full concentration, and zation equipment combines your stringent this then set the pulse soaring. Nowadays, reliability demands with our experience of you can relax and perform this operation au- over 40 years in this sector. energized power systems 0-20 VAC Product range tomatically using state-of-the-art, technically mature technology. Watch calmly as the Convenience needles move over your screen, all to the What are your visions? Easy-to-learn screen barely discernible sound of synchronization visualizations, measurement of CB closing coming from the machine room. All data are time, plotting of curves, LAN capability with logged, allowing you to analyze even the Ethernet log to the other technological sy- most complicated sequences afterwards in stems, operator control via PC/laptop as the office. well as at the equipment itself? Do you want 2 x 84 MVA, Chimay, Peru to simply forget about hex tables, operating Safety manuals, painstaking calibrating, and te- Everything must run perfectly during syn- sting? chronization. What would you have done That’s the reason why we’ve made it all as previously at zero beat? Were you able to easy for you as possible. measure the breaker closing time at each 5 x 16.7 MVA, 5 de Noviembre, El Salvador no yes yes no yes no yes Supply Voltage difference only be met with reliable, redundant, and ri- no yes yes Difference frequency cularly tricky undertaking. At one time, it took yes no Technical data SYN 3000 based on IEC 60870-5-104 (in preparation). or one power system to another is a parti- Both One systems system dedeenergized energized Voltage control 4-line LC display. LAN communication is periodic inspection? These demands can Both systems energized Monitoring of high-speed busbar transfer Speed control as a parameter. The basic design contains Paralleling of generators to power systems Synchronism check and CB close interlock SYN 3000 in use Voltage 90 - 260 VAC and DC Optional 20 - 56 VDC Power input 8W Temperature range 0-50°C 02 NEPTUN – Synchronization 04 NEPTUN – Synchronization 03 NEPTUN – Synchronization The comprehensive solution Synchronization SYN 3000 SYN-WIN SYN 3000 features 5 synchronizing modes: With the easy-to-use SYN-WIN software, Synchronizing a SYN 3000 operating modes generator to a generator to grid or supply line synchronization processes are displayed on- synchronous or asynchronous grids or line on a computer screen. The synchroni- supply lines zing process can be tracked on analog mea- synchronous or asynchronous systems suring instruments (double voltmeter, double or lines with dead bus or line de- frequency meter, and synchronoscope) over- energized systems laid on screen. The entire synchronizing pro- synchro-check for manual connections cess is logged automatically and can be dis- CB close command synchro-check for high-speed busbar played afterwards graphically for analysis transfer Both systems energized One system deenergized One system deenergized Both systems energized One system deenergized One system deenergized no no manual yes no no manual no single pulse*) single pulse*) single pulse*) continuous*) single pulse*) Synchronization time monitoring yes yes yes yes yes and optimization purposes. This software al- Frequency comparison yes Voltage comparison yes lows the parameters of the SYN 3000 to be Phase angle check yes closing time can be measured and stored protection. yes no yes no yes yes no no no yes no no no numerous internal safety functions (double Voltage measuring voltage measuring circuits, fail-safe connec- Nominal voltage tions for the CB command outputs). To meet Voltage measuring range 0 - 150 VAC the highest of standards, a 2-channel unit Nominal frequency can be used. Hz, Measuring accuracy 100 VAC 1V Frequency measuring 0,005 Hz 16.7, 50, 60 Setting ranges All operating modes, commands and con- depending on straints are shown by means of LEDs and a completion Load impedance Voltage measuring 1 VA Selector inputs 2 oder 10, depending on type 6 x 140 MVA, Birecik, Turkey Permitted phase angle 0 - 15/45 deg. Synchronizing with success Residual voltage for de- gorously tested technology. Our synchroni- a steady hand and full concentration, and zation equipment combines your stringent this then set the pulse soaring. Nowadays, reliability demands with our experience of you can relax and perform this operation au- over 40 years in this sector. energized power systems 0-20 VAC Product range tomatically using state-of-the-art, technically mature technology. Watch calmly as the Convenience needles move over your screen, all to the What are your visions? Easy-to-learn screen barely discernible sound of synchronization visualizations, measurement of CB closing coming from the machine room. All data are time, plotting of curves, LAN capability with logged, allowing you to analyze even the Ethernet log to the other technological sy- most complicated sequences afterwards in stems, operator control via PC/laptop as the office. well as at the equipment itself? Do you want 2 x 84 MVA, Chimay, Peru to simply forget about hex tables, operating Safety manuals, painstaking calibrating, and te- Everything must run perfectly during syn- sting? chronization. What would you have done That’s the reason why we’ve made it all as previously at zero beat? Were you able to easy for you as possible. measure the breaker closing time at each 5 x 16.7 MVA, 5 de Noviembre, El Salvador yes yes no yes no yes Supply 0,01 - 0,25 Hz only be met with reliable, redundant, and ri- no Technical data SYN 3000 1 - 30 VAC cularly tricky undertaking. At one time, it took no no yes Voltage difference or one power system to another is a parti- yes yes Difference frequency periodic inspection? These demands can Both One systems system dedeenergized energized yes based on IEC 60870-5-104 (in preparation). Paralleling of generators to power systems Both systems energized Monitoring of high-speed busbar transfer Voltage control entered, modified and saved with password 4-line LC display. LAN communication is Synchronism check and CB close interlock Speed control As a special function, the circuit breaker (CB) as a parameter. The basic design contains Paralleling of two asynchronous systems Synchronizing two asynchronous systems power system, supply line or busbars SYN 3000 in use Voltage 90 - 260 VAC and DC Optional 20 - 56 VDC Power input 8W Temperature range 0-50°C 05 NEPTUN – Synchronization Your benefit Optimal use: by meeting high safety standards NEPTUN – the comprehensive solution for secondary systems can offer addi- through ergonomic operations with password protection tional notable advantages in step-by- with different equipment models step expansion of your plant. by supporting different configurations This gives you integrated advantages in Synchronization addition to the current benefits of your synchronization system if additional Reduced costs: with easy integration into existing plants through highly reliable synchronization based on intelligent algorithm with software support for rapid start-up components are used (for example excitation, protection, automation and control). Efficient communication standard (IEC 60870-5-104) Comprehensive system concepts for Increased earnings: through faster synchronization with longer life cycle thanks to equipment-friendly configuration remote functions Central engineering toolkit Simplified plant configuration Less engineering and documentation required Minimum of additional infrastructure for signal communication Minimum of spare parts required Liquidation of previously tied capital Fewer maintenance and service assignments on site www.andritz.com/NEPTUN 05 NEPTUN – Synchronization Your benefit Optimal use: by meeting high safety standards NEPTUN – the comprehensive solution for secondary systems can offer addi- through ergonomic operations with password protection tional notable advantages in step-by- with different equipment models step expansion of your plant. by supporting different configurations Synchronization This gives you integrated advantages in addition to the current benefits of your synchronization system if additional Reduced costs: with easy integration into existing plants through highly reliable synchronization based on intelligent algorithm with software support for rapid start-up components are used (for example excitation, protection, automation and control). Efficient communication standard (IEC 60870-5-104) Comprehensive system concepts for Increased earnings: through faster synchronization with longer life cycle thanks to equipment-friendly configuration remote functions Central engineering toolkit Simplified plant configuration Less engineering and documentation required Minimum of additional infrastructure for signal communication Minimum of spare parts required Liquidation of previously tied capital Fewer maintenance and service assignments on site www.andritz.com/NEPTUN ANDRITZ HYDRO GmbH Penzinger Strasse 76 1141 V ienna, P.O.B. 5, Austria Phone: +43 (1) 89100 Fax: +43 (1) 8946046 e-mail: contact-hydro@andritz.com MX6-001-1.71 HP.NEP_SYN 01.e.04.10 www.andritz.com/NEPTUN