WALL SLOT INSTALLATION INSTRUCTIONS H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams.com • 417-358-4065 • Fax: 417-358-6015 04/06/10RJ PN#49090051 WALL SLOT PRE-HARD PAN INSTALLATION INSTRUCTIONS NOTE: This fixture ships unassembled. 1. Install wall angle (by other) on wall offset upward by sheet rock thickness. Wall track installs on wall 9” above wall angle. 2. Assemble mounting bracket, cartridge and reflector on floor. 2A. All screws to hold fixture together are installed from inside. 2B. Pay close attention to how tab on reflector holder goes into cartridge slot. H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 1 WALL SLOT PRE-HARD PAN INSTALLATION INSTRUCTIONS 3. Determine location of power supply for the fixture. The back of the cartridge has a KO on either end. The 6’ and 8’ lengths also have one in the center. There is also a KO on each end plate which can work for either power feed or quick connect harness. 6. If it’s desired to extend the lamp slider (standard on 2 lamp cross-sections) loosen the screws shown and move the lamp slider either way. Retighten the screws once the location is reached. 4. Lift fixture onto wall track, install tie wires. Attach reflector holder to wall. Make sure fixture is level and straight. If necessary, straighten wall track if the mounting wall is crooked. 7. Insert reflector and rest on wall angle as shown and install #8 point screws. 5. On row applications, align fixtures. Use #8x1/4” screws in locations shown on end plates. Reflector mounting holes also need to be aligned as shown. Failure to follow this step will make it impossible to align the fixtures. 7A. Place wireway cover under clips on lamp slider, then squeeze and insert tabs into slots on cartridge. If louver is used it hooks over cartridge hook with the other side resting on the wall angle. Finished sheetrock opening is to be 8-1/2”. H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 2 WALL SLOT PRE-GRID INSTALLATION INSTRUCTIONS 1. Install wall angle (by other) on wall level with intended ceiling grid. Wall track installs on wall 9” above wall angle. 2. Assemble mounting bracket, cartridge and reflector on floor. 2B. Pay close attention to how tab on reflector holder goes into cartridge slot. 3. Determine location of power supply for the fixture. The back of the cartridge has a KO on either end. The 6’ and 8’ lengths also have one in the center. There is also a KO on each end plate which can work for either power feed or quick connect harness. 2A. All screws to hold fixture together are installed from inside. 4. Lift fixture onto wall track, install tie wires. Attach reflector holder to wall. Make sure fixture is level and straight. If necessary, straighten wall track if the mounting wall is crooked. H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 3 WALL SLOT PRE-GRID INSTALLATION INSTRUCTIONS 5. On row applications, align fixtures. Use #8x1/4” screws in locations shown on end plates. Reflector mounting holes also need to be aligned as shown. Failure to follow this step will make it impossible to align the fixtures. 6. If it’s desired to extend the lamp slider (standard on 2 lamp cross-sections) loosen the screws shown and move the lamp slider either way. Retighten the screws once the location is reached. 7A. Place wireway cover under clips on lamp slider, then squeeze and insert tabs into slots on cartridge. If louver is used it hooks over cartridge hook with the other side resting on the wall angle. 8. After installation of ceiling grid determine locations for EQ clips and install using provided 8-32x1/2” screws. Multiple EQ clip locations are provided to accommodate different ceiling structures. 7. Insert reflector and rest on wall angle as shown and install #8 point screws. H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 4 WALL SLOT POST-HARD PAN INSTALLATION INSTRUCTIONS 1. Opening preparation, by others: sheetrock must be installed with an 8-1/2” opening as shown with a stud laid on edge at 9” from the wall, edge of sheetrock to be capped with J-Trim. Install grid ceiling wall angle on wall. Offset angle upwards by thickness of the sheetrock. 3. Determine location of power supply for fixture. The back of the cartridge has a KO on either end. The 6’ and 8’ lengths also have one in the center. There is also a KO on each end plate which can work for either a power feed or quick-connect harness. 4. Lift fixture into opening by folding reflector holder in. Once inside spread them out and rest the cartridge on the stud and reflector holder on the wall angle. 2. Assemble mounting bracket, cartridge and reflector on floor. 2A. 4A. Insert #8 screw on each end of reflector holder to hold the fixture open. 4B. Attach cartridge and reflector holder to stud and wall as shown. All screws to hold fixture together are installed from inside. Pay attention to how tabs on reflector holder goes into the cartridge slot. H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 5 WALL SLOT POST-HARD PAN INSTALLATION INSTRUCTIONS 5. On row applications, align fixtures. Use #8x1/4” screws in locations shown on end plates. Reflector mounting holes also need to be aligned as shown. Failure to follow this step will make it impossible to align the fixtures. 7. Insert reflector and rest on wall angle as shown and install with #8 point screws. 7A. 6. If it’s desired to extend the lamp slider (standard on 2 lamp cross-sections) loosen the screws shown and move the lamp slider either way. Retighten the screws once the location is reached. Place wireway cover under clips on lamp slider, then squeeze and insert tabs into slots on cartridge. If louver is used it hooks over cartridge hook with the other side resting on the wall. H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 6 WALL SLOT POST-GRID INSTALLATION INSTRUCTIONS 1. Install ceiling system leaving 9” gap between centerline of T-bar and wall. Install wall angle (by other) on wall at same height as grid system. If needed use a spacer to hold the distance between grid system and wall to 9”. 4. Determine locations for EQ clips; install using provided 8-32 x 1/2” screws. Multiple EQ clip locations are provided to accommodate different ceiling structures. Leave EQ clips loose to fit over T-bar upon installation. 5. Insert lamp cartridge into ceiling and hook onto reflector holder as shown. 2. Starting at one end attach reflector holder to wall through provided holes using drywall screws or nails. Remove and discard spacer if used. When row mounting holders make sure they are touching and aligned vertically to each other. 3. Determine location of power supply for fixture. The end of the cartridge has a KO on either end. The 6’ and 8’ lengths also have one in the center. There is also a KO on each endplate which can work for either a power feed or quick-connect harness. 5A. Place against T-bar with EQ clips over T-bar. 5B. Attach cartridge to reflector holder using #8 screws in locations shown and tighten EQ clip screws. H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 7 WALL SLOT POST-GRID INSTALLATION INSTRUCTIONS 6. On row applications, align fixtures. Use #8x1/4” screws in locations shown on end plates. Reflector mounting holes also need to be aligned as shown. Failure to follow this step will make it impossible to align the fixtures. 9. Insert reflector and rest on wall angle as shown and install with #8 point screws. Place wireway cover under clips on lamp slider, then squeeze and insert tabs into slots on cartridge. 9A. If louver is used it hooks over cartridge hook with the other side resting on wall. 7. If it’s desired to extend the lamp slider (standard on 2 lamp cross-sections) loosen the screws shown and move the lamp slider either way. Retighten the screws once the location is reached. 8. Pull out wire tie tabs on top side of cartridge and tie fixture to ceiling support structure. H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 8 WALL SLOT ROW FILLER INSTALLATION INSTRUCTIONS 1. 4. Insert channel and endplate assembly into ceiling, hook earthquake clips over T-bar if needed. Align endplates to adjacent fixtures through provided screw holes, and finish tightening endplates to channel. Measure opening for length. Go from corner of wall to nearest WS fixture. Filler adjustment range, 2”-14”. Tools: Tape measure 2. Layout and be before will be and trim these parts. Refer to diagram certain each part is oriented correctly marking and cutting. All cut edges hidden when assembly is finished. Tools: /4 ” socket, #8 screws 1 Tools: Combination square, marker or pencil, tape measure, and aviation snips. A hammer is handy for flattening parts back into shape after cutting. a. Channel, subtract /8 ” from the opening measurement. Cut on end opposite wall. b. Wireway cover, subtract /16 ” from the opening measurement. IMPORTANT, cover must be cut on the same end as Channel. c. Louver Hook (if needed). Subtract /16 ” from the opening measurement. Using tin snips add notch on cut end to match the one cut off. 1 3 3 5. Bend tabs on large endplate and mount against wall. Tabs will bend to either side as needed. Use drywall screws to secure to wall, and sheet metal screws against the channel. Tools: /4 ” socket, #8 screws, drywall screws (provided by others) 1 Note: Wall not shown for clarity 3. Assemble left and right endplate to channel. Leave endplates slightly loose (optional, attach earthquake clips, louver hooks). Screws go from inside fixture. Tools: /4 ” socket, #8 screws 1 6. Screw wireway cover into channel and screw down as needed. If power needs to be run between the fixtures on either side of the corner it goes inside the wireway cover. Tools: /4 ” socket, #8 screws 1 H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 9 WALL SLOT ROW FILLER INSTALLATION INSTRUCTIONS 7. Peel vinyl cover off of and mount reflectors. The reflectors are NOT cut, but are slid behind the reflectors on adjacent fixtures. Screw into reflector holder. Tools: /4 ” socket, #8 screws 1 Note: Due to the short length a reflector holder is not needed 9. If needed trim louver to length and insert. One side of louver hangs on louver hook with the other side resting on the wall angle. To trim for length a bandsaw is ideal. If not available use aviation snips and flatten back out after cutting. Tools: bandsaw or aviation snips, hammer 8. Attach wireway cover trims over cut ends on each end of wireway cover with supplied VHB tape. Tools: Utility knife, VHB tape H.E. Williams, Inc. • Carthage, Missouri • www.hewilliams .com • 417-358-4065 • Fax: 417-358-6015 PAGE 10