OHCU Brochure - Oklahoma Department of Transportation

advertisement
TYRONE
95
3
183
283
64
64
64
8
34
BUFFALO
64
3
CITY
64
OPTIMA
64
270
56
283
FREEDOM
46
385
GOODWELL
BALKO
287
136
3
HARDESTY
54
60
83
JET
DACOMA
3
270
30
NASH
Summer 2015 Construction Projects
15
57 58
6.E
FARGO
WOODWARD
15
50
270
WOODWARD
ELLIS
283
8
60
60
51
60
51
LONGDALE
SEILING
VICI
ARNETT
47
OKEENE
51
A
270
CAMARGO
8
PAYNE
D
KINGFISHER
51
A
3
58
34
OAKWOOD
3 US-64 Muskogee Co. - Bridge work over
Union Pacific RR south of SH-165. Summer '15.
Becco Const. $1.9 million. Traffic narrowed to
one lane in each direction.
4 US-69 Muskogee Co. - Bridge rehabilitation
over the Arkansas River 3 miles north of US-62.
Fall '15. Logos Const. $1.4 million. Wide load
restrictions.
6 SH-51 Cherokee Co. - Surface & bridge work
from 8 miles east of US-69 extending east.
Summer '15. Jensen Const. $16.8 million.
7 SH-82 Cherokee Co. - Bridge replacements
over Fourteen Mile & Thompson Branch Creeks,
9 & 10 miles north of US-62. Winter '15.
Sherwood Const. $7.2 million.
33
30
13 US-69 Atoka Co. – Resurfacing & cable
barrier installation (southbound lanes only) from
1 mile north of Stringtown north 1 mile. Spring '16.
Interstate Hwy Const. $17.5 million.
US-69 Atoka Co. – Resurfacing from south of
Pittsburg Co. line near Kiowa. Summer '15.
Glover & Assoc. $2.5 million.
14 SH-3 Atoka Co. - Surface & bridge work from
3 miles east of Atoka east 4 miles. Summer '15.
Koss Const. $9.4 million. Traffic narrowed to one
lane in each direction.
15 SH-1 Latimer Co. - Surface & bridge work
from 2 miles west of Talahina west 1 mile.
Summer '16. C-Gawf Const. $5.4 million.
Temporary detours.
16 US-270 Latimer Co. - Bridge rehabilitation
over Gains & Fourche Maline Creeks 4 miles east
of SH-2. Spring '16. OBC, Inc. $3.2 million.
17 SH-3 Pushmataha Co. - Bridge rehabilitation
over Mill Creek, 9 miles east of Antlers.
Summer '15. L&N Bridge. $1.7 million. Traffic
narrowed to one lane with traffic signals.
33
HAMMON
CITY
54
73
CLINTON
CITY
FOSS
152
6
TEXOLA
40
6
50
CADDO
58
58
54
A
A
WASHITA
DILL
33 SH-51 Payne Co. - Surface work & traffic
signal installation at Country Club Rd. in
Stillwater. Summer '15. Becco Const. $7.6 million.
34 SH-74 Logan Co. - Bridge work over
Skeleton Creek 13.5 miles north of SH-33.
Summer '15. Sherwood Const. $5 million.
35 SH-33 Logan Co. - Pavement rehabilitation
from N. Drexel in Guthrie east to SH-105.
Summer '15. Duit Constr. $5.2 million.
Traffic narrowed to one lane in each direction.
152
3
240
152
SENTINEL
BECKHAM
55
BLANCHARD
9
9
B
BUS
49
48
HOBART
GRANITE
KIOWA
9
283
62
58
SLAUGHTERVILLE
WASHIN GTON
66
COOPERTON
19
44
70
ALEX
76
Metro
insets
on back
HARMON
19
MOUNTAIN
62
54
62
HOLLIS
GOULD
17
STERLING
62
5
ALTUS
51
62
BUS
C
36
MANITOU
TILLMAN
5
STEPHENS
7
A
GERONIMO
FAXON
53
COMANCHE
183
54
39 SH-11 Kay Co. Bridge rehabilitation over
Chikaskia River overflow from US-177 east
1.5 miles. Fall '15. Gibson & Assoc. $1.7 million.
Traffic narrowed to one lane with traffic signals.
40 SH-33 Kingfisher Co. – Resurfacing from
Blain Co. line east 9 miles. Summer '15.
Haskell Lemon Const. $2.2 million.
41 I-40 Canadian Co. - Bridge rehab on I-40B
over I-40. Spring '16. Manhattan Road and Bridge.
$2.4 million. Lane shifts.
41A I-40 Canadian Co. - Bridge reconstruction
near US-281 spur. Fall '16. Manhattan Road and
Bridge. $24.8 million. Traffic narrowed to one
lane in each direction
DIVISION 5, Clinton 580-323-1431
42 SH-30 Beckham Co. - Grade, drain, surface,
bridge over the north fork of the Red River
5 miles north of I-40. Fall '15.
Manhattan Road & Bridge. $9.67 million.
43 SH-152 Beckham Co. - Bride rehabilitation
over I-40 1.5 miles east of US-283.
Winter '15-'16. M. J. Hughes Const. $1.7 million.
SH-152 bridge closed; detour on I-40 &US-283.
I-40B Beckham Co. – Resurfacing between
US-283 and I-40. Fall '15. Caswell Contr.
$570,000.
44 I-40/Washington St. Custer Co. - Grade,
drain, surface from mile marker 76 to 84 &
Washington St. bridge over I-40 in Weatherford.
Summer '15. Haskell Lemon Const. $16.7 million.
Traffic narrowed to one lane each direction.
CARTER
TEMPLE
5
A
HEALDTON
70
GRANDFIELD
DEVOL
36
70
C
64
LONEGROVE
68
WAURIKA
142
70
WILSON
79
277
281
JEFFERSON
76
46 SH-33 Roger Mills Co. – Bridge and
approaches over Turkey Creek and Little Turkey
Creek 1 and 2 miles east of SH-30. Fall '15.
Munoz Const. Inc. $2.8 million. Road closed;
detour on SH-30, SH-47 and US-283.
47 US-270 Dewey Co. – Grade, drain and
surface 1 mile southeast of Seiling. Spring '16.
Cornell Const. Co. $8 million.
48 SH-54 Kiowa Co. - Bridge & approaches
over Rainy Mountain Creek & two unnamed
creeks 6-7 miles south of the SH-9 junction at
Gotebo. Summer '15. Sewell Bros. $6.4 million.
Traffic narrowed to one lane with traffic signals.
29
ANTLERS
22
99
C
56 SH-15 Ellis Co. – Grade, drain, surface and
bridge north and west of Shattuck. Winter '15-'16.
Cummins Const. $13.3 million.
57 US-412 Major Co. - Surface work from
Woodward Co. line east 2 miles. Fall '15.
Koss Const. $8.3 million.
3
259
A
KINGSTON
69
MEAD
WOODVILLE
MARSHALL
22
69
BUS
MARIETTA
99
96
70
B
70
109
18
BROKEN
70
SAWYER
GARVIN
209
271
A
CHOCTAW
70
70
IDABEL
98
109
FROGVILLE
70
E
81
271
ORD
109
3
37
ALBANY
75
TERRAL
COLBERT
75
A
I-35
Texas
3
VALLIANT
BOW
BRYAN
70
E
70
A
93
98
98
S
FT. TOWSON
HUGO
70
GOODLAND
McBRIDE
CALERA
SOPER
BOSWELL
BENNINGTON
BOKCHITO
70
70
NEW
32
11
12
DURANT
32
77
S
WRIGHT
CITY
147
75
78
SILO
LEON
55 US-64 Woods Co. – Grade, drain, surface and
bridge work west of Cherokee. Fall '15.
Venture Corp. $8.9 million.
259
McCURTAIN
OLETA
48
LITTLE
CITY
199
106
377
77
DIVISION 6, Buffalo 580-735-2561
17
271
CADDO
32
54 US-62 Jackson Co. – Resurfacing west of
Duke. Summer '15. Caswell Const. $1.6 million.
3
KENEFIC
32
53 US-283/SH-6 Jackson Co. – Resurfacing at
SH-19 near Blair. Fall '15. Cornell Const.
$1.3 million.
RATTAN
CANEY
48
99
OAKLAND
76
BETHEL
3
69
MILBURN
78
MADILL
70
77
S
35
PUSHMATAHA
2
22
89
LOVE
14
ATOKA
ATOKA
48
A
TISHOMINGO
MANNSVILLE
177
COURTNEY
45 I-40 Custer Co. – Resurfacing and bridge
rehabilitation between Clinton and Weatherford
(mm 69 to mm 77). Winter '15. Haskell Lemon
Const. $10.4 million. Traffic to one lane in each
direction.
I-40 Custer Co. – Resurfacing east of
Weatherford from mile marker 84 to mile marker
86. Fall '15. Haskell Lemon Const. $1.4 million.
Traffic narrowed to one lane in each direction.
62
DICKSON
BUGDEN
RYAN
4
TUSHKA
377
1
199
65
70
70
SMITHVILLE
271
RAVIA
RINGLINGS
65
7
WAPANUCKA
JOHNSTON
AUTRY
53
A
ARDMORE
CORNISH
I-44
Texas
177
7
5
5
B
7
D
99
GENE
53
35
144
43
STRINGTOWN
MILL
CREEK
SPRINGER
ADDINGTON
HASTINGS
70
D
37 US-60 Kay Co. - Bridge rehabilitation &
approaches over Bois D'Arc & overflow 13 miles
east of I-35. Fall '15. Wildcat Const. $10.5 million.
38 US-177 Noble Co. - Surface, shoulders &
drainage from US-64 extending north 6 miles.
Fall '15. Cummins Const. $6.7 million. Traffic
narrowed to one lane with pilot car directing.
81
5
36
DAVIDSON
53
144
T
LEHIGH
LOCO
76
259
2
13
75
77
77
53
A
53
WALTERS
277
281
271
PHILLIPS
DOUGHERTY
5
43
31
31
B
BROMIDE
7
D
FREDERICK
36 SH-18 Payne Co. - Bridge & approaches just
south of Pawnee Co. line. Summer '15. OBC.
$4.2 million. Detour on US-64, SH-108 and SH-51.
71
63
SULPHUR
110
COTTON
277
5
CITY
COALGATE
48
377
7
MURRAY
RATLIFF
CITY
44
LOVELAND
7
270
1
BIG CEDAR
HARDEN CITY
HICKORY
SCULLIN
63
22
69
DAVIS
TATUMS
7
EMPIRE
CHATTANOOGA
HOLLISTER
76
VELMA
28
A
59
21
1
63
CLAYTON
3
TUPELO
T
5
5
ELMER
JACKSON
TALIHINA
ALBION
43
131
COAL
CENTRAHOMA
99
A
DUNCAN
74
15
2
PITTSBURG
ROFF
COMANCHE
183
TIPTON
128
LE FLORE
31
STONEWALL
7
7
OLUSTEE
63
A
1
63
99
29
17
A
CITY
63
HARTSHORNE
63
PITTSBURG
75
WYNNEWOOD
ELMORE
82
69
KIOWA
3
29
29
A
23
ASHLAND
48
1
29
BRAY
MARLOW
LAWTON
LATIMER
HAILEYVILLE
SAVANNA
1
27
PONTOTOC
GARVIN
35
62
CACHE
INDIANOMA
20
271
1
19
STRATFORD
65
SNYDER
HEADRICK
34
25
115
HEAVENER
LE FLORE
WILBURTON
270
FRANCIS
3
W
177
77
81
54
HOWE
270
ALDERSON
31
VALLEY
283
83
270
FANSHAWE
OAK
16
KREBS
270
31
A
271
WISTER
RED
1
1
GERTY
PAULS
PARK
MARTHA
DUKE
82
2
31
24
CALVIN
STUART
ADA
76
49
113
McALESTER
ALLEN
19
SPRINGS
ELGIN
44
KONAWA
CAMERON
POTEAU
BYNG
133
19
112
31
KINTA
270
48
99
LINDSAY
MAYSVILLE
59
271
McCURTAIN
QUINTON
120
BOKOSHE
31
HOLDE NVILLE
59
A
59
RUSH
49
MEDICINE
PARK
3
E
SASAKWA
145
GRADY
81
BUS
58
MEERS
183
377
9
A
ROSEDALE
BRADLEY
53
59
ST. LOUIS
3
W
McCLAIN
FLETCHER
BLAIR
34
82
INDIANOLA
56
24
112
POCOLA
270
ASHER
59
B
2
CROWDER
BYARS
277
9
STIGLER
CANADIAN
HUGHES
112
271
69
WAYNE
59
9
A
SPIRO
26
52
WANETTE
74
19
D
ARKHOMA
59
WHITEFIELD
71
YEAGER
75
LEXINGTON
19
C
19
69
BUS
64
D
COWLINGTON
KEOTA
9
A
LAMAR
39
NINNEKAH
2
HANNA
WEWOKA
40
GANS
1.K
HASKELL
9
BOWLEGS
ROLAND
MOFFETT
71
EUFAULA
9
DUSTIN
59
MAUD
64
B
MULDROW
141
PORUM
McINTOSH
T
9
REMUS
10
TAMAHA
WETUMKA
39
39
DIBBLE
277
6
30
59
B
102
TABLER
SALLISAW
75
84
NEW
LIMA
64
2
69
150
I-40
Ark.
101
VIAN
40
WELEETKA
48
59
5
64
266
STIDHAM
SEMINOLE
59
92
19
CYRIL
ROOSEVELT
283
39
3
E
9
A
177
PURCELL
CEMENT
281
19
MANGUM
NORGE
74
277
69
CHICKASHA
MACOMB
77
35
TRIBBEY
9
62
8
APACHE
44
A
6
115
54
44
9
67
CARNEGIE
9
44
LONE
WOLF
3.L
ETOWAH
NOBLE
COLE
74
B
VERDEN
27
1
CHECOTAH
40
9
GOLDSBY
62
ANADARKO
FT. COBB
VIEW
BUS
270
TECUMSEH
9
81
281
9
MOUNTAIN
GOTEBO
99
A
EARLSBORO
9
PARK
74
A
9
76
55
183
34
B
BRINKMAN
AMBER
266
HOFFMAN
BRYANT
CROMWELL
377
PINK
NORMAN
HALL
44
GRACEMONT
34
52
130
92
146
15
ROCKY
26
99
A
3
E
BETHEL
ACRES
CLEVELAND
NEWCASTLE
30
28
77
H
37
8
CITY
SEQUOYAH
82
GORE
FALLS
WARNER
RENIESVILLE
KUSA
62
40
MINCO
BINGER
54
MARBLE
100
OKTAHA
HITCHITA
8
DEWAR
HENRYETTA
56
SHAWNEE
MO ORE
AQUA
PARK
10
A
WEBBER
OKEMAH
102
CORDELL
42
55
99
40
37
TUTTLE
56
CASTLE
18
62
283
GREER
177
270
37
PARADISE
HILL
64
COUNCIL
HIll
GRAYSON
BOLEY
PADEN
MCLOUD
MUSTANG
152
OKFUSKEE
PRAGUE
MEEKER
35
LOOKEBA
59
3
BRAGGS
62
52
62
62
40
4
152
281
RANDLETT
32 US-64 Garfield Co. - Cable barrier installation
in Enid from 78th St. east .5 miles. Summer '15.
Action Safety. $675,000.
US-64 Garfield Co. - Safety improvement at
78th St. 7 miles of the US-81/US-412 jct.
Summer '15. Cummins Const. $855,000.
UNION
CITY
EAKLY
COLONY
283
31 SH-11 Grant Co. - Shoulder improvement,
resurfacing & bridge work from 7 miles east of
Alfalfa Co. line east 7 miles. Winter '15.
Cummins Const. $10 million.
81
54
B
FLATT
152
WILLOW
MIDWAY
62
STILWELL
100
10
MUSKOGEE
69
WAINWRIGHT
56
LINCOLN
JACK TOWN
CHOCTAW
270
92
8
102
HARRAH
CITY
235
100
82
SPARKS
OKLAHOMA
CITY
MIDWEST
YUKON
66
37
CORN
183
BURNS
EL DORADO
30 US-64 Grant Co. - Bridge & approaches over
Coldwater, Sand & 3 unnamed Creeks 6 miles east
of SH-132. Spring '15. Cummins Const. $9 million.
Speed reduction & occasional flagging.
4
40
BUS
40
MORRIS
56
JONES
OKLAHOMA
WARR
ACRES
CITY
CARTER
DIVISION 3, Ada 580-332-1526
Division 4 Perry 580-336-7340
41A 41
HINTON
54
BESSIE
44
CANUTE
6
29 SH-22 Johnston Co. - Bridge and approach
over Butcher Pen Creek 4 miles west of SH-78.
Winter '15-'16. L&N Bridge. $2.5 million.
Short detour, lane shifts.
44
NICHOLS
HILLS
VILLAGE
EL RENO
BETHANY
183
6
34
A
28 SH-102 Pottawatomie Co. - Reconstruction
and shoulders from 3 miles north of SH-9 north
4 miles. Spring '16. Haskell Lemon Constr. Co.
$11.2 million. Lane shifts.
LUTHER
CALUMET
34
SAYRE
43
ERICK
22 SH-63 LeFlore Co. - Bridge rehabilitation over
Buzzard, unnamed and Birney creeks 5 miles east
of Talihina. Spring '16. OBC, Inc. $3.8 million.
25 US-77 Garvin Co. - Bridge replacement over
Owl Creek half a mile south of SH-145. OBC, Inc.
$2.8 million. Spring '16. Lane shifts.
270
8
BRIDGEPORT
44
40
45
73
SWEETWATER
24 US-69 Pittsburg Co. - Resurfacing from
US-69B in McAlester north 3 miles. Fall '15.
JOB Constr. $859,700.
GEARY
58
283
BUS
165
BOYNTON
377
51
62
10
OKMULGEE
18
B
59
51
TAHLEQUAH
FT. GIBSON
TAFT
MUSKOGEE
WARWICK
77
51
64
16
48
DAVENPORT
66
66
PIEDMONT
WEATH ERFORD
HYDRO
40
OKMULGEE
BEGGS
162
72
SLICK
CHANDLER
77
EDMOND
CANADIAN
ARAPAHO
44
40
HASKELL
WINCHESTER
75
ALT
77
66
177
66
B
WELLSTON
74
3
BUTLER
ELK
9 SH-10 Cherokee Co. - Bridge replacement
over Black Fox Creek, 6.5 miles south of US-412.
Summer '15. M.J. Hughes Const. $309,883. Wide
load restrictions.
12 US-70 Bryan Co. (Durant Bypass) - Surface &
bridge work from SH-78 east to US-70. Summer
'15. Dondlinger & Sons. $23.3 million. Temporary
detours at US-70 and SH-78.
281
281
270
34
42
STROUD
FALLIS
35
TULLAHASSEE
75
16
62
ELDON
HULBERT
251
A
4
104
BRISTOW
44
KENDRICK
DEPEW
4.O
CUSTER
40
18
59
WESTVILLE
OKAY
51
B
PORTER
40
A
ADAIR
80
16
72
64
9
CHEROKEE
6
51
51
MOUNDS
99
CARNEY
81
CUSTER
47
A
152
WAGONER
105
105
MERIDAN
LOGAN
OKARCHE
CHEYENNE
27 SH-19 Pontotoc Co. - Bridge rehabilitation
over Big Sandy Creek 1 mile east of SH-3W.
Winter '15. Manhattan Road & Bridge. $6.1 million.
Traffic narrowed to one lane in each direction.
11 SH-78 Bryan Co. - Surface & bridge work
from US-69 to SH-48. Summer '15. Cummins
Const. $11.9 million. Temporary detours & lane
shifts.
CITY
33
30
SHAMROCK
GUTHRIE
VALLEY
66
16
AGRA
10
82
51
COWETA
GREENFIELD
47
I-40
Texas
CEDAR
74
F
CASHION
PEGGS
RED BIRD
TYRON
35
33
33
8
183
STRONG
REYDON
47
26 I-40 Okfuskee Co. - Bridge rehabilitation over
SH-27. Summer '15. PBX Corp. $1 million.
DIVISION 2, Antlers 580-298-3371
33
47
ROGER MILLS
47
19 US-259 McCurtain Co. – Resurfacing from
US-70B south 10 miles. Summer '15.
Cummins Constr. $2.1 million.
23 US-69 Pittsburg Co. - Cable barrier installation
from Kiowa north 6 miles. Summer '15.
Midstate Traffic Control. $858,800.
33
BLAINE
THOMAS
8 US-75 Okmulgee Co. - Cable barrier
installation from 2 miles north of I-40 extending
north. Summer '15. Glover & Assoc. $1.9 million.
Traffic narrowed to one lane in each direction.
10 US-64 Sequoyah Co. - Grade, drain, bridge &
resurfacing at Sallisaw Creek 2 miles west of
Sallisaw. Summer '16. Glover & Assoc. $5 million.
270
47
47
40
WATONGA
PUTNAM
46
9
5 I-40 Sequoyah Co. - Pavement rehabilitation
east of Vian from mile marker 303 extending east.
Summer '15. Duit Const. $10 million. Intermittent
lane closures.
LANGSTON
33
WATTS
7
BIXBY
67
KELLYVILLE
CIMMARRON
KINGFISHER
51
64
GLENPOOL
48
412
OAKS
WAGONER
JENKS
117
33
DRUMRIGHT
412
ALT
412
A
69
33
33
PERKINS
SPRINGS
412
ARROW
169
SAPULPA
74
C
CITY
18 US-70 McCurtain Co. - Grade, drain & bridge
work from 6 miles east of Broken Bow east
3 miles. Winter '15. Cummins Const. $16.1 million.
21 US-259 LeFlore Co. – Resurfacing from
SH-63 north 5 miles. Summer '15. Vance Bros.
$186,000.
34
99
B
99
CUSHING
COYLE
8
A
281
LEEDEY
DURHAM
CREEK
WEST SILOM
INOLA
FAIR OAKS
NEW TULSA
97
48
KANSAS
412
78
CATOOSA
44
OILTON
18
116
412
ALT
GROVE
412
B
BROKEN
RIPLEY
77
74
CRESCENT
DOVER
LOYAL
82
LOCUST
88
CHOUTEAU
TULSA
TULSA
177
183
DEWEY
36
108
MULHALL
74
81
CANTON
TALOGA
167
169
SANDS
SPRINGS
LOTSEE
51
YALE
STILLWATER
LOVELL
A
51
283
MANNFORD
99
51
75
72
COLCORD
59
DELAWARE
244
64
20
69
A
412
4.M
51
51
58
97
TERLTON
412
33
51
C
ORLANDO
74
E
HENNESSEY
51
51
64
11
QUAY
58
74
20
88
266
WESTPOINT
JENNINGS
86
33
20 US-271 LeFlore Co. – Bridge rehabilitation
over Jackson & Rock Creeks 2.5 miles & 3.5 miles
north of the Pushmataha Co. line. Fall '15. OBC.
$3.4 million. Traffic narrowed to one lane with
signals.
GLENCO
77
MARSHALL
www.odot.org
2 SH-9 McIntosh Co. - Bridge replacement
over Union Pacific Railroad just east of US-69B
near Eufaula. Fall '15. Manhattan Road & Bridge.
$5.85 million.
HALLETT
412
81
60
MAYES
PRYOR
20
MARAMEC
20
JAY
SALINA
SPERRY
DOUGLAS
CHESTER
183
HITCHCOCK
1 US-69 McIntosh Co. – Cable barrier
installation from Muskogee Co. line extending
south 14 miles. Fall '15. Glover & Assoc.
$3.7 million. Intermittent lane closures.
18
20
SPAVINAW
135
108
MORRISON
AMES
82
STRANG
66
OSAGE
64
WAUKOMIS
MUTUAL
ADAIR
CLAREMORE
OWASSO
PAWNEE
177
64
164
20
127
28
28
28
A
88
20
CLEVELAND
PERRY
58
34
(including anticipated completion dates)
DIVISION 1, Muskogee 918-687-5407
SUMNER
COVINGTON
132
46
35
FAIRMONT
GARFIELD
LAKE
DISNEY
PENSACOLA
28
FOYIL
SKIATOOK
20
99
BLACKBURN
DRUMOND
FAIRVIEW
GRAND
LANGLEY
SKEDEE
PAWNEE
10
CHELSEA
ROGERS
VERA
COLLINSVILLE
15
412
74
58
60
MAJOR
281
38
77
125
KETCH UM
CABIN
TALALA
44
64
ENID
25
85
HOMINY
20
85
A
82
BIG
OOLOGAH
18
10
66
RED
412
64
NEW
ALLUWE
169
75
AVANT
ROCK
32
412
11
99
D
MENO
60
3
Major construction projects
affecting traffic from
July through September
GARBER
64
CLEO
SPRINGS
RINGWOOD
SHARON
WYNONA
RALSTON
15
15
BRECKINRIDGE
8
412
GAGE
15
SHATTUCK
45
CARRIER
OCHELA TA
BARNSDALL
4.J
NOBLE
BILLINGS
15
ENID
MOORELAND
412
11
FAIRFAX
15
NORTH
56
123
99
KREMLIN
60
GOLTRY
60
BERNICE
GROVE
18
MARLAND
FAIRLAND
59
NOWATA
RAMON
132
8
B
QUINLAN
AFTON
2
VINITA
60
HUNTER
45
ALINE
3
OTTAWA
60
BARTLE SVILLE
Oklahoma
Turnpike
Authority
Info.
(405)
425-3600
60
WYANDOTTE
69
60
177
64
28
35
OSAGE
FORT
50
B
PAWHUSKA
11
156
77
HELENA
SUPPLY
34
C
37
TONKAWA
POND CREEK
81
HILLSDALE
15
77
60
73
11
60
CARMEN
WAYNOKA
46
11
BURBANK
LAMONT
79
125
BLUE
JACKET
123
CITY
177
137
59
DEWEY
CRAIG
10
C
10
10
25
DELAWARE
PONCA
35
60
MIAMI
76
KAW CITY
281
23
283
CITY
KILDALE
11
SHIDLER
74
WELCH
10
80
PEORIA
CENTRALIA
MEDFORD
60
58
50
95
WANN
FORAKER
WEBB
JEFFERSON
64
MAY
270
39
4.I
NOWATA
10
COPAN
LENAPAH
8
BLACKWELL
11
GRANT
281
ELMWOOD
3
MIAMI
NEWKIRK
8
LAMBERT
14
45
TEXHOMA
132
ALFALFA
50
A
DEER
CREEK
11
38
AVARD
183
GUYMON
31
11
34
149
3
INGERSOLL
CHEROKEE
HARPER
LAVERNE
61
177
11
A
64
ALVA
BEAVER
83
95
171
55
14
64
64
81
I-44
Missouri
44
QUAPAW
2
10
KAY
WAKITA
DRIFTWOOD
BOISE CITY
94
99
GRAINOLA
BRAMAN
132
BYRON
CAPRON
59
ROSSTON
BEAVER
64
64
AMORITA
11
GATE
COMMERCE
NORTH
75
77
RENFROW
BURLINGTON
WOODS
KNOWLES
TURPIN
136
KEYES
59
169
HARDY
58
HOOKER
3
325
281
FORGAN
270
TEXAS
MANCHESTER
23
54
56
WASHINGTON
CIMARRON
SEMINOLE
385
PICHER
SOUTH
COFFEYVILLE
83
270
POTTAWA TOMIE
325
69
ALT
69
I-35 - Kansas
287
287
KENTON
78
HAWORTH
70
T
87
ACHILLE
78
259
HENDRIX
19
3
87
259
DIVISION 7, Duncan 580-255-7586
62 US-177 Carter Co. - Bridge & approaches
over Washita River 3 miles north of SH-199 in
Dickson. Fall '15. Dondlinger & Sons Const.
$6.6 million.
US-177 Carter Co. - Bridge rehabilitation
over Kemp Creek 1.5 miles south of SH-53.
Early summer '15. B&B Const. $1.13 million.
63 SH-7 Carter Co. – Resurfacing from 1 miles
east of SH-76 extending east 4 miles.
Summer '15. Overland Corp. $1.4 million.
64 SH-53 Carter Co. - Bridge rehabilitation over
Big Branch Creek, 7 miles east of US-77. Fall '15.
K&R Builders. $800,000. Traffic narrowed to one
lane with traffic signals.
SH-53 Carter Co. - Bridge rehabilitation over
Washita River, 9 miles east of I-35. Winter '15-'16.
PBX Corp. $1.3 million. Traffic narrowed to one
lane with traffic signals.
49 SH-9 Kiowa Co. - Grade, drain, surface &
bridge over Big Elk Creek 12 miles east of the
Greer Co. line. Fall '15. Sherwood Const.
$10.5 million.
58 US-412 Major Co. - Surface work from just
east of US-281 extending east 4 miles. Fall '15.
J & R Sand. $13.6 million.
50 I-40B/SH-34 Beckham Co. - Pavement
resurfacing in Elk City. Fall '15. Duit/TTK Const.
$5.4 million.
59 US-64 Woods Co. – Grade, drain, surface and
bridge from Woods Co. line east 5 miles. Fall '15.
Venture Corp. $8.9 million.
51 US-62 Tillman Co. - Bridge repairs over
BNSF railroad (westbound only). Summer '15.
Gibson. $261,057.
60 US-412 Beaver Co. – Surface work from
7 miles east of US-83 east 10 miles. Summer '15.
J & R Sand. $2.4 million.
66 US-277 Comanche Co. - Grade, drain &
surface work from just east of US-62 extending
east 4 miles. Winter '15-'16. T&G Const.
$15 million. Traffic narrowed to one lane with
flaggers directing.
52 US-283 Greer Co. – Resurfacing from
SH-34 north. Summer '15. Caswell Const.
$1.3 million.
61 US-54 Texas Co. Surface work from 9 miles
southwest of SH-3 extending northeast 7 miles.
Fall '15. Highway Contrs. $2.2 million.
67 US-62 Caddo Co. - Resurfacing from east of
Mission Ave. in Anadarko extending east 2 miles.
Summer '15. T & G Constr. $900,419.
Flaggers directing traffic.
65 I-35 Carter Co. - Bridge rehabilitation over
US-70 & BNSF Railroad in Ardmore. Summer '16.
Overland Corp. $7.5 million. Traffic narrowed to
one lane in each direction.
68 US-70 Cotton Co. - Bridge rehabilitation over
Cache Creek overflows 12 miles east of H.E. Bailey
Trnpk. Fall '15. K & R Builders. $2.6 million.
Traffic narrowed to one lane with traffic signals.
69 US-81 Grady Co. - Pavement rehabilitation
beginning at east SH-19 extending north into
Chickasha. Summer '15. Interstate Improvements.
$3.3 million. Traffic narrowed to one lane with
flaggers directing.
US-81 Grady Co. – Pavement rehabilitation
beginning at US-277 north 3 miles. Summer '15.
Interstate Improvements. $1.3 million. Flaggers
directing traffic, load restrictions.
70 SH-19 Grady Co. - Bridge & approaches over
Washita River & overflow 1.5 miles northwest of
the Garvin Co. line. Summer '15. Sherwood Const.
$7.3 million. One lane with traffic signals.
71 I-35 Murray Co. – Surface and rock slide
repairs at mile marker 50 near Turner Falls. Summer
'15. GeoStablization International $870,000. Silver
Star Const. $474,000. Traffic narrowed to one lane
in both directions with traffic signals.
DIVISION 8, Tulsa 918-838-9933
72 SH-266 Rogers Co. – Bridge & Approaches
over Verdigris Overflow. Winter '15, Sherwood
Const. $3.5 million.
73 US-60 Osage Co. - Surface & bridge work
from 2 miles east of SH-99 to SH-35. Winter '16.
Sherwood Const. $37 million.
74 SH-82 Mayes Co. - Bridge replacement over
the Grand River near Langley. Winter '15-'16.
Jensen Const. $8.9 million.
75 SH-266 / SH-167 Rogers Co. - Bridge work on
SH-266 over SH-66; SH-167 over BNSF railroad &
Bird Creek overflow. Fall '15. Becco Contr.
$5.5 million.
SH-266 Rogers Co. – Bridge & approaches
over Verdigris Overflow. Winter '15-'16.
Sherwood Const. $3.5 million.
76 US-59 Craig Co. - Bridge & approaches over
Russell & Elm Creeks 1.3 miles south of Kansas
state line. Fall '15. B & B Bridge. $5.4 million.
77 SH-16 Creek Co. - Grade, drain, surface &
bridge over Skull Creek. Fall '15. Paradigm Const.
& Eng. $3.8 million.
78 SH-69A Mayes Co. - Bridge rehabilitation over
Pryor Creek south of Pryor. Fall '15. Becco Contrs.
$2.9 million. Detour route from SH-69A/SH-412B jct.
west to US-69, north to SH-20, east to Carbide Rd.,
south to SH-69A.
79 SH-137 Ottawa Co. - Bridge & approaches
3.5 miles south of the SH-10 & SH-137 junction.
Fall' 15. Glover Const. $700,000. Detour route from
US-60/SH-137 jct., east to SH-10, north & west to
SH-137. From US-60/SH-137 west to SH-125,
north to SH-10, east to SH-137.
80 SH-10C Ottawa Co. - Bridge & approaches
over Lost Creek 1 mile west of Missouri state line.
Fall'15. Glover Const. $1.7 Million. Detour route
from SH-10/SH-10C jct. south to US-60, east to
Missouri SH-43, north to SH-10C.
PKWY.
SHANNON MILLER
k
bac
Hog
Rd.
Henney
Rd.
Rd.
Rd.
Rd.
Rd.
Rd.
Meridian
Rd.
Triple X
Indian
Peebly
Rd.
Henney
Choctaw
Rd.
Rd.
Ave.
108th
E.
E.
120th
Ave.
Ave.
Ave.
84th
E.
E.
72nd
E.
PRSRT STD
U.S. POSTAGE
PAID
OKLAHOMA CITY, OK
PERMIT NO. 618
r
Riv
e
S
PI
KE
RN
TU
ER
RO
G
IL
L
W
151st St. S.
Rd.
Rd.
Oneta
Midway
Rd.
Evans
Rd.
Line
E. Ave.
N
209th
Lane
Lynn
Ave.
BIXBY
Olive
Yazzo
er
County
Jasper
185th
364
Media and Public Relations Division
200 N.E. 21st Street
Oklahoma City, OK 73105
241st E. Ave.
9th
1st
EK
Tucson
121st St. S.
(to 351
ll)
Building Oklahoma
Highway Construction Update
The Oklahoma Department of Transportation
257th E. Ave.
225th E. Ave.
TURNPIKE
E. Ave.
193rd E. Ave.
209th
Main
Pl.
E
ONETA
CRE
Rd.
64
67
EE
PIK
Florence
111th St. S.
Garnett
St. S.
OG
RN
New Orleans
Ave.
St. S.
SK
TU
Aspen
141st
MU
51
Pl.
St.
Ave.
Elwood
Elm
St. S.
364
Washington
(toll)
ROGERS CO.
WAGONER CO.
St.
BROKEN
ARROW
Houston
91st St. S.
131st
151st
TULSA COUNTY
WAGONER COUNTY
St.
Kenosha
64
St. S.
GLENPOOL
kee
ero
Ch
161st E. Ave.
177th E. Ave.
Ave.
129th E.
145th E. Ave.
Rd.
MINGO
Mingo
St. S.
Memorial
Yale
81st
Sheridan
Harvard
Ave.
Lewis
71st St. S.
101st St. S.
JENKS
156th
144th
E.
120th
108th
84th
TULSA COUNTY
ROGERS COUNTY
EXPY.
Garnett
Y.
Albany
Riv
67
EXP
51
169
75
Indiana
72th
TULSA COUNTY
ROGERS COUNTY
Garnett
Rd.
Rd.
Dr.
Rd.
Ave.
Ave.
229
TURNPIKE
NEW
TULSA
230
51st St. S.
75
KIEFER
Ave.
E.
48th
E.
60th
Rd.
Main
Dr.
Mingo
d.
CHEROKEE
Blv
Lewis
Peoria
Ave.
Peoria
228
FAIR OAKS
240
229
61st St. S.
117
ALT
96th Ave.
Ave.
Ave.
36th
E.
E.
E.
Porter
Jenkins
Berry
Sheridan
Memorial
232
VALLEY
LU
TH
ER
Union
33rd W. Ave.
49th W. Ave.
364
126th
151st St. S.
Ave.
Ave.
24th
60th
Ave.
Ave.
12th
Ave.
W.
Rd.
Flood
W. 24th
Rd.
Yale
Lewis
Ave.
Ave.
Union
Osage
EXPY.
Harvard
Ave.
Peoria
MLK Jr.
Mus. Rd.
33rd W. Ave.
Gilcrease
MARTIN
49th W. Ave.
E
PIK
TU
RN
thw
est
St.
Ave.
Ave.
Ave.
Ave.
COUNTY
COUNTY
OSAGE
TULSA
W. Ave.
41st
Ave.
97th W. Ave.
Sou
TUR
NER
Mission
St.
Main
a
Sahom Lake
12th
Ave.
Ave.
36th
48th
Cincinnati Ave.
Lombard Ln.
Peoria
Norfolk
Newport
Detroit
Madison
Cincinnati
Cin
cin
nati
53rd W. Ave.
65th W. Ave.
113th W.
Southwest Blvd.
Ave.
Willow
129th W. Ave.
145th W. Ave.
W.
Peoria
Cincinnati
Ave.
Ave.
Ave.
St.
Main
Boston
Baltimore
Ave.
Ave.
Boulder
Carson
Cheyenne Ave.
Ave.
Rd.
y
McKinle
Creek
Hickory
Ave.
44
31st St. S.
44
.
A
HARVEY
YOUNG
AIRPORT
235
EL
e
Av
Taft
I
DR
SK
RO
W
ware
117
51
Dela
33
Rd.
Rd.
SAPULPA
Line Ave.
Ave.
EM
215
DRIVE
Main St.
CREEK
66
Rd.
Dewey
Teel
Hilton
166
44
75
ST
LAKE
SAHOMA
91st St.
N
s
sa
an
86st St.
SY
227
44
ll)
(to
412
44
VE
k
Ar
75
ALT
JONES
AIRPORT
Switch Rd.
15
13A
11th St. S.
41st St. S.
LY
SKEL
s
238
236
244
12A
LY
227
226B
66
N
226
225
223
Rd.
12B
412
EXPY.
AR
221
Land
10
Pl.
21st St. S.
BR
OK
E
Dr.
81st St.
1
64
de
BOWDEN
9
INSET AREA
71st St.
97
8
JR.
Riversi
(t
r
14
11
11
Admiral
Ro
llin
CATOOSA
Tig
e
75
224
167
169
PY
.
VERDIGRIS
TIO
GA
7
266
266
Pine St.
6B
OAK-
)
oll
PORT
OF
CATOOSA
TULSA
INTERNATIONAL
AIRPORT
GILCR
75
244
244
1B
s
2
1D
Blvd. HURST
MARGLO
St. N.
N.
EX
Dr.
COUNTY
COUNTY
lane
St.
Verd
igri
OWASSO
St. N.
VI
NA
2
20
St. N.
66th
St.
ide
TULSA
CREEK
31st
Dr.
Sky
51st St. S.
St. N.
20
LAKE
YAHOLA
KING
3B
Avery
41st St. S.
61st St.
r
Rive
21st St. S.
SAND
SPRINGS
96th
SE
EA
51
St. N.
N.
Apache
64
d.
Morrow Rd.
Dr.
106th
76th
Moh
Rivers
as
St.
awk
PKWY
ns
St. N.
EXPY.
Newton
51
ka
46th
36th
56th
Charles Page Blv
EXPY.
S
Ar
Edison St.
412
10th St.
St. N.
RR
St. N.
E
S
SPRING
St. N.
- KE
AN
LL
11
TISDAL
.
ngs Rd.
6 M I LES
LE
ve
d
Airport R
64 SAND
126th
116th
86th
TURLEY
53rd St. N.
Spri
5
4
3
cC
Elmwood
St.
St.
GILCREASE
d
an
2
M
Denver
15th
97
POGUE
MUNICIPAL
AIRPORT
Santa Fe
May
Ave.
Ave.
Owasso
Madison
Norfolk
Ave.
Peoria
N. 68th W.
Ave.
N. 60th W.
Lenapaw
Kenosha
Lansing
51
16th
1
0
KEETONVILLE
64
43rd
Cr
Main St.
75
St.
Rd.
Dr.
Rd.
eek
Shell
W.
W.
Ave.
Portland
12th St.
St. N.
Rd.
TULSA
SPERRY
Main St.
Blvd.
Ave.
Ave.
Galveston
Guthrie
Frisco
60th
72th
W.
Country Club
od
Ave.Green wo
Boulder
Cheyenne
d.
Indian
Houston
Pennsylvania Ave.
GRADY COUNTY
McCLAIN COUNTY
Denver
Osage
Park
Ave.
Nogales
Blv
n
Jackso
uth
we
st
Lawton
St.
Lane
169
11th Pl.
St.
88th
Cedar
AND VICINITY
Pl.
11th St.
Frankfort
Elgin Ave.
So
St. N.
St.
64
17th
n
.
St.
sse
Ave
St.
16th
Dri
k
.
e
r
Overloo
Ave
.
sid
ve
Cla
.
.
St.
Ave
Ave
15th
er
Ri
AIRPORT
St.
14th Pl.
Rd.
St. N.
20
8th St.
13th
51
ool
Lane
7th
10th
St. Sch
14th
Cedar
5th
5th
St.
Imhoff.
9
136th St. N.
St. N.
12th
13th
ck
Ro
3rd
SKIATOOK
4th
THUNDERBIRD
Lindsey
SKIATOOK
St.
103rd
11th
412
2nd
LAKE
Rd.
St. N.
6th
St.
St.
Riv
as
St.
9th
75
ns
Ave
.
Ave.
Ave.
13th
fort
.
ston
Ave
Ave
.
Hou
Ave
7th
8th
ka
Frank
n
co
6th
St.
COLLINSVILLE
1st
75
St.
113th
5th
7th
Ar
ood
enw
Mai
St.
St.
St.
9
156th
146th
Rd.
77
r
Gre
ati
e
ver
St.
4th
W. 144th St. N.
W. 134th St. N.
St.
St.
3nd
Imhoff
108A
Rd.
Rd.
eda
Alam
11
Admiral Pl.
it
nn
Cinci
yenn
St.
lder
Che
Detro
Elgin
Blvd.
St.
1st
4th
7th
W. C. Rogers Blvd.
2nd
Fris
3rd
St.
St.
Rd.
Bethel
Rd.
Rd.
Alameda
Boyd
St.
Stella
St.
Creek
Haskell
Edison St.
244
HALL
PARK
Lindsey
7
Rock
Robinson
Archer
W. Country Rd.
20
St.
Bou
Den
hrie
Gut Lawton
244
Admiral
ton
r
Arche
St.
Bos
IATon
er O
LCam
AK OK
dy
BraE
MLK
n
Mai
SK
106
Franklin
Tecumseh
Main St.
108B
134th
Anderson
St.
St.
Hiwassee
164th
Rive
75
0.5 Miles
412
64
109
an
)
0.25
Edison
NORMAN
9
Haskell St.
0
MAX
WESTHEIMER
FIELD
Canadi
(toll
277
110
A&B
St.
St.
166
OKLAHOMA COUNTY
CLEVELAND COUNTY
Indian Hills
77
H
Rd.
TY
62
Rock Rd.
Quail Haven Dr.
77
112
104th
Rd.
35
Robinson
TY
COUN
BLANCHARD
Sand
113
Rd.
Creek
COUN
24th St. S.
SPUR
NORMAN
32nd St. S.
Owasso
EY
16th St. S.
Tecumseh
Rock
Ave.
TUR
AIL
E. B
277
Main St.
44
)
(toll
62
NEWCASTLE
130
Fox Lane
NPIK
H.
Franklin
Rockwell
76
Indian Hills
S. 49th St.
107
Western
Rd.
Morgan
16th St. N.
Lane
114
179th
24th St. N. W.
Council
County Line Rd.
Rd.
Rd.
Mustang
Sara
Hall
4
Choctaw
Blvd.
Rd.
149th
Westminster
S.E.
S.E.
Douglas
Midwest
Blvd.
Blvd.
Blvd.
Air Depot
Rd.
Sooner
S. 34th
Sunnylane Rd.
Ave.
Bryant
116
St.
119th
S.E.
37
St.
dway
Rd.
37
Anderson
Post
Spe
nce
r
Westminster
Midwest
Rd.
Spencer
Sunnylane
Ave.
Eastern
Ave.
Eastern
Telephone Rd.
Santa Fe Ave.
Ave.
Western
S. 19th
108
32nd St. N. W.
Rd.
St.
Hiwassee
Blvd.
Rd.
Blvd.
Rd.
Blvd.
Rd.
Coltrane
Ave.
M. L. King
Rd.
Shields
Pennsylvania
164th
Indian Meridian
Douglas Blvd.
Ave.
Ave.
Bryant
Eastern
Blvd.
Lincoln
Byers
High St.
Blvd.
Walker
Ave.
Sooner
Santa Fe
Ave.
Kelley
BROADWAY
Ave.
Ave.
Robinson
Ave.
Agnew
Ave.
109
44
77
Broa
Czech
Air Depot
Ave.
Ave.
Villa
May
Walker
Ave.
Portland
May
Ave.
MacArthur
Ave.
Rockwell
NTY
S.E.
S.E.
N
TUTTLE
Main
37
Rd.
Cemetery
149th
COU
N TY
E
I-244 Tulsa Co. - Pavement rehabilitation from US-75 at
the northeast corner of the Inner Dispersal Loop to
Delaware Ave. Spring '16. Sherwood Const. $20 million.
Lane & ramp closures, wide load restrictions.
I-244 Tulsa Co. - Pavement & bridge rehabilitation
from Delaware Ave to 73rd E. Ave. Spring '16. Duit
Const. Inc. $36.2 million. Lane & ramp closures, wide
load restrictions.
37
37
110
D
LAIN
89th
er
LAKE
STANLEY
DRAPER
N. 12th St.
MOORE
S. 4th St.
St.
Drap
77
H
N. 27th St.
119A
LAN
McC
Rd.
40th St.
Bridge Creek Rd.
Division 8 – 918-838-9933
For daily Tulsa and Oklahoma City metro lane closures visit:
http://www.okladot.state.ok.us/newsmedia/traffic-advisory.htm
Western
Ave.
May
Ave.
Ave.
Meridian
Council
CANADIAN COUNTY
OKLAHOMA COUNTY
Blvd.
Rd.
Rd.
County Line
Rd.
Morgan
Portland
RH
OV
E
Drive
51
US-169 Tulsa Co. - Bridge & approaches over Bird
creek. Winter '16-'17. Becco Contrs. $33 million.
Classen Blvd.
Stinchcomb Rd.
OL
SE
R
AK
E
ol s e r
OverLh
JOHN
Rd.
Sara
Mustang Rd.
Rd.
Tyler
Ridge
S.E.
120
40
74th
14
St.
89th
118
VE
Fox
Tulsa Metro Area
Construction Projects
2
EXTENSION
Dr.
Council
Rockwell
MacArthur
Lakeshore
County Line
Ave.
Blvd.
CANADIAN COUNTY
OKLAHOMA COUNTY
(toll)
Morgan
TURNPIKE
KILPATRICK
Pennsylvania
Rd.
Rd.
Rd.
Rd.
Sara
Rd.
Mustang
Ave.
Rd.
Rd.
Piedmont
Cemetery
Ave.
11th St.
Cornwell
Garth Brooks
Rd.
Rd.
Cemetery
Hall
Czech
CLE
City
240
35
119B
134th
COUNTY
Silver
S.E.
Project Key
N
11
8
4C
117
Y
7
6
Building Oklahoma
Oklahoma
AD
165
5
S.E.
OKLAHOMA COUNTY
CLEVELAND COUNTY
119th
St.
St.
Highway Construction Update
GR
44th
59th
S.E.
3B
COUNTY
DIA
L
Only major construction projects that affect traffic from July through
September are shown on this publication.
NA
ONA
162
TINKER
AIR FORCE
BASE
3
111
CA
DIAG
270
S.E.
Dr.
112
CENTRAL TULSA
1
44
159B
Regardless of the type of work (e.g., reconstruction, widening), work
zones will have a lower speed limit than open highway. Please observe
the posted speed limit and be especially alert in work zones.
The following road work descriptions will give you an idea of what
to expect when you encounter them. The amount of delay and
congestion depends on overall traffic volume, time of day and number
of miles the project extends. Also, accidents in constricted traffic areas
can cause significant delays.
St.
157C
Reconstruction: The highway is being rebuilt. Some lanes may be shut
down for work while others remain open to keep traffic flowing.
Sometimes, in high volume areas, traffic will be rerouted. Signs will
be in place.
104th
6B
40
(918) 687-5407
S.W.
DEL
CITY
VALLEY
BROOK
2B
3A
St.
159A
Division 1, Muskogee
St.
62
St.
29th
157B
157A
“Building Oklahoma” is published by the Oklahoma Department of
Transportation as an aid for trip planning and routing. Information contained in this
publication is based on approximations available at press time. Other factors may
delay, extend or interrupt work on projects beyond published completion dates.
Not all projects under construction are represented on this map. Short-term jobs
and projects that do not significantly affect traffic flow are not included.
89th
114
113
15th
S.E.
156A
123A
122B
66th
2A
Reno
MIDWEST CITY
S.E.
Adair, Cherokee, Haskell, McIntosh, Muskogee, Okmulgee, Sequoyah, Wagoner
S.W.
1C
E.
CHOCTAW
St.
155B
123B
240
D
ELAN
CLEV
LAIN
McC
7 I-35/SH-9E Interchange & Lindsey St. over I-35 Cleveland
Co. - Interchange reconstruction & added lanes. Fall '16.
Sherwood Const. $73 million. Lane shifts, ramp closures,
detours, speed reductions, narrowed lanes.
1B
115A
St.
155A
124A
122A
WHEATLAND
152
COU
6A I-40 & I-44 Oklahoma Co. - Resurfacing. Summer '15, PBX
Corp. $1.7 million. Detours and lane shifts.
6B I-40 between Hudiburg Dr. & Hruskocy Gate in Midwest
City I-44 at SH-152 (Airport Rd.)
WORLD AIRPORT
R
15th
125D VILLAGE
77
62
124B
116A
115B
4
5 US-77 Oklahoma Co. - Intersection modification at
Broadway Ext. and 33rd St. Summer '16. Allen Contracting.
$5.1 million. Lane closures.
WILL ROGERS
KE
127
SMITH
a
44
116B
10th
Cable Barrier: Cable barrier is being installed in the median, requiring
some lane closures.
Ne
St.
150A
Rd.
4 I-40 Crosstown Blvd Oklahoma Co. - Grade, drain, surface &
bridge on multiple ramps & bridges at the I-35/I-235 junction.
Summer '15. Sherwood Const. $26.4 million.
e
126
River)
ahom
Grand Blvd.
IRP
ORT
RD.
N.E.
TIN
40
Pole
MUSTANG
S.W.
74th
RdA.
152
stl
wca
3
118
St.
St.
NICOMA PARK
153
CONSTRUCTION 150B
149
(Okl
6A
119
29th
62
129
.
Ave OKC Blvd.
ge
han
Exc
130
35
23rd
(580) 298-3371
92
River
Canadian
S.W.
St.
146
145
St.
36th
N.E.
N.E.
Division 2, Antlers
59th
144
143
North
St.
44th
S.W.
142
131
(580) 332-1526
S.W.
Sheridan
148C
148A 148B
St.
St.
FOREST
PARK
STATE
CAPITOL
10th
63rd
50th
r
SPENCER
132A
36th
St.
121
Reno
N.E.
Rive
Atoka, Bryan, Choctaw, Latimer, Leflore, McCurtain, Marshall, Pittsburg, Pushmataha
4
23rd
235
N.E.
132B
50th
St.
Division 3, Ada
3 I-40 Canadian Co. – Reconstruct lanes, bridge and barrier
wall installation at mile marker 1336 in Yukon. Summer '15.
Duit Const. $48 million. Lane shifts
St.
44
270
40
15th
125A
122
4
W.
140
139
S.W.
St.
10th
N.W.
3
92
23rd
BETHANY
125B
44
123A
78th
Coal, Cleveland, Garvin, Hughes, Johnston, Lincoln, McClain, Okfuskee, Pontotoc, Pottawatomie,
Seminole
4
129
124
EXPWY
N.E.
JONES
St.
.
Rd
93rd
Construction on new alignment: Usually only affects traffic with lower
speed limits and some construction where the project ties into
existing highway.
Vandament
39TH
66
St.
WOODLAWN
PARK
N.E.
LAKE
ALUMA
44
125B
36th
Nort
Blvd.
Wilshire
128B
127
ian
(580) 336-7340
Blvd.
Canad
Division 4, Perry
2 I-44 Oklahoma Co. - Bridge rehabilitation on Belle Isle
bridges & ramps between Western Ave. & Penn Ave. Spring
'16. Restek, Inc. $2.6 million. Sherwood Const. $13.5 million.
Ramp closures, various overnight lane closures, various lane
closures on NW Expressway & Classen Blvd.
63rd128A
126
3
2
123B
N.W.
35
125C
WARR
ACRES
St.
(580) 323-1431
St.
63rd
St.
Rd.
108th
Canadian, Garfield, Grant, Kay, Kingfisher, Logan, Noble, Oklahoma, Payne
NICHOLS
HILLS
Britton
N.E.
Division 5, Clinton
3
Rd.
h
135
134
Blvd.
Hefner
Beckham, Blaine, Custer, Dewey, Greer, Harmon, Jackson, Kiowa, Roger Mills, Tillman, Washita
Wilshire
St.
136
77
Grand
WILEY
POST
AIRPORT
44
St.
Surfacing/Resurfacing/Pavement Rehabilitation: Adding pavement
over existing road structure. Will have lane closures and a lower
speed limit.
66
THE
VILLAGE
74
137
122nd
(580) 735-2561
Main St.
N.W. 50th
Britton Rd.
HEFNER
136th
N.E.
N.E.
Division 6, Buffalo
Rd.
WY
.
Rd.
138B
(toll)
TURNPIKE
(580) 255-7586
N.W.
YUKON
Wagner
LAKE
EXP
44
TURN
Alfalfa, Beaver, Cimarron, Ellis, Harper, Major, Texas, Woods, Woodward
EST
Blvd.
Memorial
.
RdSt.
150th
Division 7, Duncan
RTH
W
Hefner Rd.
PIKE
TURN
(918) 838-9933
Wilshire
1 SH-74 Oklahoma Co. – Grade, drain, surface & bridge from
Memorial Rd. north. Summer '16. Haskell Lemon Const.
$32.4 million.
Rd.
5
(toll)
LAKE
St.
ER
122nd
PKWY.
Britton
NO
St.
NER
Rd.
122nd
KILPATRICK
139
33rd
Caddo, Carter, Comanche, Cotton, Grady, Jefferson, Love, Murray, Stephens
3
Hefner
Rd.
EDMOND
77
33rd
Division 8, Tulsa
N.W.
1
Memorial
JOHN
150th
St.
St.
Craig, Creek, Delaware, Mayes, Nowata, Osage, Ottawa, Pawnee, Rogers, Tulsa, Washington
SUNDANCE
AIR PARK
6 M I LES
HEF
OKC Annex – 405-319-3580
4
5
4
3
178th
164th
ARCADIA
St.
Bridge work: New bridges will normally be built alongside existing
ones, with little in the way of delays. Work on existing bridges, such
as rehabilitation and resurfacing, will include lane closures.
Replacing an existing bridge will sometimes require rerouting traffic
at the site.
Oklahoma City Metro Area
Construction Projects
2
15th
Widening: Usually require some lane closures, but typically for only
portions of the project length.
1
0
15th
141
This publication, printed by the Office Services Branch Division, Oklahoma Department of
Transportation, as authorized by Secretary of Transportation Gary Ridley. 5,500 copies have been
prepared and distributed at a cost of $0.16 per issue. Copies have been deposited with the Publications
Clearinghouse of the Oklahoma Department of Libraries.
ODOT strongly discourages texting or tweeting while driving.
AND VICINITY
164th
Washington
35
140
ARCADIA
66
St.
2nd
Edmond Rd.
KNOW B4 U GO! Follow us on Twitter.com @OKDOT
178th
For turnpike information call the Oklahoma Turnpike Authority at 405-425-3600.
For road conditions call the Department of Public Safety at 888-425-2385.
To report maintenance concerns in the OKC metro call 231-4DOT
OKLAHOMA CITY
The Oklahoma Department of Transportation ensures that no person or groups of person shall, on
the grounds of race, color, sex, age, national origin, disability/handicap, or incomes status, be excluded
from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any
and all programs, services, or activities administered by ODOT, its recipients, sub-recipients, and
contractors.
PIEDMONT
Download