Acronyms In Alphabetical Order A. A/C ac ADDJUST ADJ AF AFQA AFR AFSCF AFSCN AFSCN AGE AIAA Amp AMSC ARAR ARCM ARCU AREP ARIA ARSR AS ASCII ATE ATP ATS AWG Air Conditioning Alternating Current Automated Determination and Dissemination of Just Updated Steering Terms Attach, Disconnect, and Jettison Air Force Air Force Quality Assurance Air Force Regulation Air Force Satellite Control Facility Air Force Satellie Control Network Air Force Space Control Network Aerospace Ground Equipment American Institute of Aeronautics and Astronautics Ampere American Mobile Satellite Corporation Accident and Risk Assessment Report Atlas Roll Control Module Atlas Remote Control Unit Atlas Reliability Enhancement Program Advanced Range Instrumentation Aircraft Air Route Surveillance Radar Atlas Station American Standard Code for Information Interchange Automated test Equipment Authorization To Proceed Advanced Technology Satellite American Wire Gage B. Batt BECO BIT BLS BOS BOS bpi BPJ BPSK BSS Btu Battery Booster Engine Cutoff Built In Test Boeing Launch Services Booster on Stand Booster On Stand Bit(s) per Inch Booster Package Jettison Binary Phase Shift Key Boeing Satellite Services British Thermal Unit C. °C CAB CAD CAD CAE CAM CC Degree(s) Celsius Customer Awareness Board Computer Aided Design Computer-Aided Design Computer Aided Engineering Computer Aided Manufactoring Commander CCAFS CCAM CCAPS CCAS CCLS CCP CCTV CCVAPS CCWG CDR CERT CFD cg CIB CLA CLS CRB CRCU CRES CRR CRRES CS CSAT CSO CT CV CVCM CW CWA CX Cape Canaveral Air Force Station Collision and Contamination Avoidance Maneuver Computer-Controlled Atlas Pressurization System Cape Canaveral Air Station Computer-Controlled Launch Set Contamination Control Plan Closed Circuit Television Computer-Controlled Vent and Pressurization System Contamination Control Working Group Critical Design Review Composite Electrical Readiness Test Computational Fluid Dynamics Center of Gravity Change Integration Board Coupled Loads Analysis Commercial Launch Services Change Review Board Centaur Remote Control Unit Corrosion-Resistant Steel Contractor Readiness Review Combined Release and Radiation Effects Satellite Centaur Station Constellation Sustainment Assessment Team Complex Safety Officer Command Transmitter Computervision Collected Volatile Condensable Material Continuous Wave Controlled Work Area Complex D. DAS DAT dB dBm dBW dc DCMA DDR DEC DEC DER DLF DMSP DoD DOF DPF DSCS DSN Dstr DUF Data Acquisition System Digital Audio Tape Decibel(s) Decibel(s) Relative to 1 Milliwatt Decibel(s) Relative to 1 Watt Direct Current Defense Contract Management Agency Detailed Design Review Digital Equipment Corporation Dual-Engine Centaur Design Equivlancy Review Design Load Factor Defense Meteorological Satellite Program Defense Of Defense Degree(s) of Freedom Defense System Communications Satellite (DSCS) Processing Facility Defense System Communications Satellite Deep Space Network Destructor Dynamic Uncertainty Factor E. ε EAGE EB ECA ECS EED EELV EGSE EHF EIA ELAN ELS ELV EM EMARS EMC EMI EMK EOC EPA EPF ER ERB ERR ESABASE ESD ESMCR ETR EUTELSAT EVCF EWR Emissivity Electrical Aerospace Ground Equipment East Bay Environmentally Controlled Area Environmentally Controlled System Electro-Explosive Device Evolved Expandable Launch Vehicle Electrical Ground Support Equipment Extreme High Frequency Electronics Industry Association Electronic Library for Analysis of Nonconformances Eastern Launch Site Expendable Launch Vehicle Electromagnetic Electronic Martin Anomaly Reporting System Electromagnetic Compatibility Electromagnetic Interference Extended Mission Kit Evidence Of Completion Environmental Protection Agency Extended Payload Fairing Eastern Range Engineering Review Board Eastern Range Regulation Thermal Control Geometric Math Modeling Code ElectroStatic Discharge Eastern Space and Missile Center Regulation Eastern Test Range European Telecommunications Satellite Organization Eastern Vehicle Checkout Facility Eastern/Western Range Regulation F. °F FAB FAST FCDC FCS FDLC FEM FLSC FLTSATCOM FM FM FMEA FO FOD FOIR FOM FOTS Degree(s) Fahrenheit Final Assembly Building Flight Analogy Software Test Flexible Confined Detonating Cord Flight Control Subsystem Final Design Loads Cycle Finite Element Model Flexible Linear-Shaped Charge Fleet Satellite Communications Flight Model Frequency Modulation Failure Modes and Effects Analysis Foreign Object Foreign Object Damage Foreign Object Incident Report Figure of Merit Fiber-Optics Transmission System FOV FPA FPR FSO ft FTA FTP FTS Field Of View Flight Plan Approval Flight Performance Reserve Flight Safety Officer Foot; Feet Fault Tree Analysis File Transfer Protocol Flight Termination System G. G&N GCS GEO GG GHe GIDEP GMM GN&C GN2 Guidance and Navigation Guidance Commanded Shutdown Geosychronous Earth Orbit Gas Generator Gaseous Helium Government-Industry Data Exchange Program Geometric Mathematical Model Guidance, Navigation, and Control GOES GOWG GSE GSFC GSO GSTDN GTO GTR GTS GTV H. H2 Gaseous Nitrogen Geostationary Operational Environmental Satellite Ground Operations Working Group Ground Support Equipment Goddard Space Flight Center Geostationary Orbit Ground Spaceflight Tracking and Data Network Geosynchronous Transfer Orbit Gantry Test Rack Ground Telemetry Station Ground Transport Vehicle HAIR HAWK HEAO HEO HEO HEPA HP HPF hr Hz Hydrogen Gas High Accuracy Instrumentation Radar U.S. Government Radar System High-Energy Astronomy Observatory High Earth Orbit High-Energy (High-Eccentricity) Orbit High-Efficiency Particulate Air Hewlett-Packard Hazardous Processing Facility Hour(s) Hertz I. I&T I/F ICD ICWG IFR IGES IIP ILC Integration and Test Interface Interface Control Document Interface Control Working Group Inflight Retargeting Initial Graphics Exchange Specification Instantaneous Impact Point Initial Launch Capability/Capacity ILS IMP IMS in. INTELSAT INU IPJ IPT IRD IRR IRRT ISA ISD ISDS ISO ISP International Launch Services (Lockheed Martin) Integration Management Plan Inertial Measurement Subsystem Inch(es) International Telecommunications Satellite Organization Inertial Navigation Unit Insulation Panel Jettison Integrated Product Team Interface Requirements Document Incremental Readiness Review Incremental Readiness Review Team Interstage Adapter Interface Scheduling Document Inadvertent Separation Destruct System International Organization for Standardization ITA ITP Specific Impulse Integrated Thermal Analysis Integrated Test Procedure J. JCSAT JOSLE JPL Japan Communications Satellite Jettison of Shroud with Latches and Elasticity Jet Propulsion Laboratory K. kg km kN kPa KSC kV Kilogram(s) Kilometer(s) Kilonewton(s) Kilopascal(s) Kennedy Space Center Kilovolt(s) L. LAN lb LC LCC LCD LCD LD LDA LEO LH2 LKEI LM LMAO LMCLS LMD LN2 LO2/LOX LOB Local Area Network pound(s) Launch Complex Launch Control Center Launch Constraints Document Launch Countdown Director Launch Director Launch Site Authority Low Earth Orbit Liquid Hydrogen Khrunichev-Energia International Incorporated Lockheed Martin Lockheed Martin Astronautics Operations Lockheed Martin Commercial Launch Services Lockheed Martin Mission Director Liquid Nitrogen Liquid Oxygen Launch Operations Building LOC LPF LR LRR LSB LSC LSI LV LVC LVCE LVD LVDC LVIC LVRT Launch Operations Center Large Payload Fairing Load Ratio Launch Readiness Review Launch and Service Building Linear-Shaped Charge Launch Systems Integrator Launch Vehicle Launch Vehicle Contractor Launch Vehicle Chief Engineer Launch Vehicle Director Launch Vehicle Data Center Launch Vehicle Integration Contractor Launch Vehicle Readiness Test M. m M m2 MAPS MAT MD MDC MDP MDU MECO MEO MES MGSE MHz MICD MICD MILA MLP MLV MMU MOA MOC MP MPDR MR MRB MRR MS MS&PA MSPSP MSPSP MSR MST MUOS MWG meter(s) Million(s) square meter(s) Mission Air Purge System Mission Assurance Team Mission Director Mission Director’s Center Maximum Design Pressure Master Data Unit Main Engine Cutoff Medium Earth Orbit Main Engine Start Mechanical Ground Support Equipment MegaHertz Mechanical Interface Control Document Mechanical Interface Control Drawing Merritt Island Launch Area Mobile Launch Platform Medium Launch Vehicle Memory Management Unit Memorandum Of Agreement Mission Operations Center Mission Peculiar Mission-Peculiar Design Review Mixture Ratio Materials Review Board Mission Readiness Review Mission Specification Mission Success and Product Assurance Missile System Pre-Launch Safety Plan Missile System Prelaunch Safety Package Mission Support Room Mobile Service Tower Mobile User Objective System Management Working Group N. N N2H4 Newton(s) Hydrazine NASA NASA NHB NIOSH nmi NOAA NPG NRZ-L NTE NVR National Aeronautics And Space Administration National Aeronautics and Space Administration NASA HandBook National Institute for Occupational Safety and Health nautical mile(s) National Oceanic and Atmospheric Administration NASA Policy Guidence Nonreturn-to-Zero Level Not To Exceed Nonvolatile Residue O. OAO OASPL OCC OD OH OOS Ops ORCA ORD OSA OSHA Orbiting Astronomical Observatory Overall Sound Pressure Level Operations Communication Center Outer Diameter Overhead Out Of Sequence Operations Ordnance Remote Control Assembly Operations Requirements Document Operational Support Agreement Occupational Health and Safety Administration P. P&S P&W P/L PA PAF PAFB PB PCM PCOS PDLC PDR PDSM PEB Perf PFJ PFM PHSF PIU Pk PLA PLCP PLCU PLF Planning and Scheduling Pratt & Whitney Payload Public Address Payload Adapter Fitting Patrick Air Force Base Preburner Pulse-Code Modulation Power Changeover Switch Preliminary Design Loads Cycle Preliminary Design Review Product Delivery System Manual Payload Equipment Building Performance Payload Fairing Jettison Protoflight Model Payload Hazardous Servicing Facility Pyroinhibit Unit Peak Payload Adapter Propellant Leak Contingency Plan Propellant Loading Control Unit Payload Fairing PLIS PLRR PMO PMP PMP PMPCM PMR PMR PO POC POD POL PPF PRD psi psig PSS PST PSW PTC PU PVA PVan PVC Pwr PYC Propellant-Level Indicating System President’s Launch Readiness Review Program Management Office Program Management Plan Parts, Materials, and Processes Parts, Materials, and Processes Control Board Program Management Review Preliminary Material Review Program Office Point Of Contact Program Office Directive Paints, Oils, and Lubricants Payload Processing Facility Program Requirements Document pound(s) per square inch pound(s) per square inch, gage Payload Separation System Product Support Team Payload Systems Weight Payload Test Conductor Propellant Utilization Perigee Velocity Augmentation Payload Van Polyvinyl Chloride Power Pyrotechnic Control Q. QTSS QMR QPR Qualification Test Summary Sheets Quarterly Management Review Quarterly Progress Review R. R R&D RAAN RC RCS RCS RCU RDU RDU RF RF RFP RFTS RGU RGU RH RLCC RLV RM Recorder Research and Development Right Ascension of Ascending Node Range Coordinator Reaction Control System Reaction Control System Remote Control Unit Remote Data Unit Remote Data Unit Radio Frequency Radio Frequency Request For Proposal Radio Frequency Test Set Rate Unit Gyro Rate Gyro Unit Relative Humidity Remote Launch Control Center Reusable Launch Vehicle Risk Management Rm RNCO ROCC ROM ROO RP RPO RSA RSC RSSR RTN RTS Room Range Noncommissioned Officer Range Operations Control Center Rough Order of Magnitude Range Operations Officer Rocket Propellant Radiation Protection Officer Range Standardization and Automation Range Safety Console Range Safety System Report Requirement Tracking Number Remote Tracking Stations S. s S/A S/C SAEF SAI SAR SAR SASA SC SCAPE SCAPE SCC SCC SCD SCM SCTC SDR SEC SECO SEIT SERB SFC SIL SIMFLT SIP SIP SIS SIU SL SLC SLC SLV SMRD SOC SOHO SOW SPF SPL Second(s) Safe and Arm Spacecraft Spacecraft Assembly and Encapsulation Facility Safe/Arm Initiator Safety Assessment Report Software Anomaly Report Safe/Arm and Securing Unit Spacecraft Self-Contained Air-Pressurized Enviornment Self-Contained Atmospheric-Protective Ensemble Spacecraft Contractor Spacecraft Control Center Spacecraft Director Spacecraft Manager Spacecraft Test Conductor System Design Review Single-Engine Centaur Sustainer Engine Cutoff Systems Engineering and Integration Team Systems Engineering Review Board Spacecraft Facility Controller Systems Integration Laboratory Simulation Flight Standard Interface Plane Standard Interface Plan Standard Interface Spec Servo Inverter Unit Sea Level Space Launch Complex Spacecraft Launch Conductor Space Launch Vehicle Spin Motor Rotation Detection Spacecraft Operations Center Solar and Heliospheric Observatory Statement Of Work Spacecraft Processing Facility Sound Pressure Level SPO SPRB SRB SRCR SRM SRR Sta STC STE STK STM STV SVC System Program Office Space Program Reliability Board Solid Rocket Booster System Requirements Change Request Solid Rocket Motor System Requirements Review Station Satellite Test Center Special Test Equipment Satellite Took Kit Structural Test Model Spacecraft Transport Vehicle Space Vehicle Contactor T. T T&E TC TCO TDRS TDRSS TEMP Tlm TML TMRSS TOPS TRAJEX TRD TVC TVCF TWG Table Test and Evaluation Test Conductor Thrust Cutoff Tracking and Data Relay Satellite Tracking and Data Relay Satellite System Test and Evaluation Master Plan Telemetry Total Mass Loss Triple Modular Redundant Transistorized Operational Phone System Trajectory Simulation Program Test Requirements Document Thrust Vector Control Transportable Vehicle Checkout Facility Technical Working Group U. UDS UFO UHF Umb UPS UPS USAF USG USSN UT Universal Document System Ultra High Frequency Follow-On Ultra High Frequency Umbilical Uniterruptible Power Supply Uninterruptible Power System United States Air Force United States Government Universal Spacecraft Separation Node Umbilical Tower V. V V/m VAB Vac VAFB Vdc VGP volt(s) volt(s) per meter Vehicle Assembly Building (Kennedy Space Center) volt(s), alternating current Vandenberg Air Force Base volt(s) direct current Virtual Ground Plane VIF VTF VTS Vertical Integration Facility Vertical Test Facility Verification Task Sheet W. W WB WDR WSMCR WTR watt(s) West Bay Wet Dress Rehersal Western Space and Missiles Control Regulation Western Test Range X. Xdcr Transducer Y. Z. Other ωρ Argument of Perigee mated Determination and Dissemination of Just Updated Steering Terms nse System Communications Satellite (DSCS) Processing Facility