Phase III Steel Poles

advertisement
REQUEST FOR PROPOSAL
Steel Distribution Poles
For the
Phase III Distribution Project
City of Safford
Safford, AZ
Prepared by April 2013 TABLE OF CONTENTS
RFP ................................................................................................................................................. i-ii
Steel Distribution Pole RFP Design Sheet ................................................................................. 1
Steel Pole Summary ................................................................................................................... 2
Pole 2 Dimensions ....................................................................................................................... 3
Pole 2 Load Table ....................................................................................................................... 4
Pole 2 Loading Tree Longitudinal / Transverse ........................................................................... 5
Pole 2 Loading Tree Vertical ....................................................................................................... 6
Pole 2 Drilling Guide .................................................................................................................... 7
Pole 8 Dimensions ....................................................................................................................... 8
Pole 8 Load Table ....................................................................................................................... 9
Pole 8 Loading Tree .................................................................................................................. 10
Pole 8 Drilling Guide .................................................................................................................. 11
Pole 27 Requirements ............................................................................................................... 12
Poles 1A, 28 & 31 Dimensions .................................................................................................. 13
Poles 1A, 28 & 31 Load Table ................................................................................................... 14
Poles 1A, 28 & 31 Loading Tree ................................................................................................ 15
Poles 1A, 28 & 31 Drilling Guide ............................................................................................... 16
Poles 35 & 37 Dimensions ......................................................................................................... 17
Poles 35 & 37 Load Table ......................................................................................................... 18
Poles 35 & 37 Loading Tree ...................................................................................................... 19
Pole 35 Drilling Guide ................................................................................................................ 20
Pole 37 Drilling Guide ................................................................................................................ 21
Pole 43 Dimensions ................................................................................................................... 22
Pole 43 Load Table ................................................................................................................... 23
Pole 43 Loading Tree ................................................................................................................ 24
Pole 43 Drilling Guide ................................................................................................................ 25
Pole 46 Dimensions ................................................................................................................... 26
Pole 46 Load Table ................................................................................................................... 27
Pole 46 Loading Tree ................................................................................................................ 28
Pole 46 Drilling Guide ................................................................................................................ 29
Pole 2A Dimensions .................................................................................................................. 30
Pole 2A Load Table ................................................................................................................... 31
Pole 2A Loading Tree................................................................................................................ 32
Pole 2A Drilling Guide ............................................................................................................... 33
REQUEST FOR PROPOSAL
Due Date: May 6, 2013 3:00 PM MST
Phase III Steel Distribution Poles
City of Safford
As consulting engineers for the City of Safford, AZ, Transmission & Distribution Services has
been requested to provide specifications for eleven steel distribution poles. Poles will be mostly
engineered self-supporting (both direct embed and anchor based). Self-supporting poles shall
withstand all forces without guying, including full dead-end loads. One wood-pole equivalent is
needed. All poles shall have a self-weathering steel finish.
Enclosed is the design information and specifications for the poles. Included for each pole are
dimensions, load tables, loading trees and drilling guides.
Cross-arms are not needed in this quote. Owner will provide and attach wood cross-arms as
needed.
Load cases for the poles for each conductor are provided in the bid specifications. Poles are to
be manufactured to the guidelines specified in RUS Bulletin 1724E-204 “Guide Specification for
Steel Single Pole and H-Frame Structures”. All poles will require two stainless steel 2-hole
NEMA ground pads as indicated on the drilling guides. Direct embedded poles will have
Corrocote or equivalent protective coating from the butt of the pole, to the top of the
groundsleeve.
The quotation shall include the moments, axial loading, and shear for each pole as well as
dimensions, weights, and lead time/delivery schedule. Pricing, including delivery and all
applicable taxes, shall be provided for all poles. The FOB delivery site will be City of Safford
Warehouse, 373 W. Discovery Park Blvd, Safford, AZ, 85546.
For technical questions please contact:
Tim McLellan, T&D Services
505-344-4234.
tmclellan@t-d-services.com
For administrative questions please contact:
Hilary Cuenin, Project Management Assistant, City of Safford
928-432-4082
hcuenin@ci.safford.az.us
i
City of Safford reserves the right to waive any informality and to reject any or all bids for any
reason.
The quote should be sent to:
City of Safford City Clerk
PO Box 272
Safford, AZ 85548
The quotation is to be received no later than 3:00 PM MST, May 6th, 2013. Please note that
some delivery services consider this address a rural location and may not honor their
standard delivery times. Please check this with your delivery provider to ensure your bid
arrives by the deadline.
ii
Steel Pole RFP Design Sheet
Customer Name
Project Name
Location
Engineer
Contact Name
Contact Number
Contact e‐mail
Contact Fax
City of Safford
Phase III Distribution
Safford, AZ
Transmission & Distribution Services, LLC
Tim McLellan
505‐344‐4234
tmclellan@t‐d‐services.com
505‐344‐4748
RFP Date
Due Date
Desired Delivery Date
April 2013
May 6, 2013
July 2013
Total Pole Quantity
11
Project Information
Voltage
NESC Loading District
Structure Type(s)
7.2/12.5 kV
Light
Three phase distribution poles
self supporting steel
Pelican, 477‐18/1 ACSR
Polymer Suspension, 15 kV
Porcelain Pin, 15 kV
C5.71L, Alumaform HD‐DEA‐86‐EB‐REA
Conductor
Insulators
Cross‐arm (wood)
Ruling Span
Horizontal Span
250 ft
Vertical Span
20% of RBS at 60°F
Initial Stringing Conditions
Steel Structure Requirements
Type
Finish
Embedment
Protection
Self‐supporting steel, wood pole equivalent
Self‐weathering
Direct embedment and anchor bolt cage foundations
Deflection
Deflection shall be no more than 5% of the length of the pole under NESC Light loading conditions.
NEMA 2‐hole steel grounding pads, corrocote
Conductor Information
Diameter (in.)
Weight (lbs/ft)
Rated Breaking Strength (lbs)
Pelican
477 kcmil
18/1
ACSR
Code Name
Size
Stranding
Material
0.814
0.517
11,800
Communications Cable Information
Diameter
Weight
Type
Unfactored Conductor Design Loads
Pelican Conductor
0.518
0.6105
0.8506
NESC Light Loading District
0.00" ice vertical load
9 psf wind, transverse load
constant K = 0.305 (resultant + K)
Communications Cable
Unfactored Longitudinal Tensions
Load Case
Tension (lbs)
Pelican Conductor
Initial unloaded, 60°
NESC Light
Ahead
Back
Ahead
Back
2360
2360
3526
3526
Initial unloaded, 60°
Ahead
Back
NESC Heavy
Ahead
Back
Overload Factors
Vertical
NESC District Loading
High Wind
1.90
n/a
Transverse
Longitudinal
Wind
Tension General
Dead‐end
2.20
1.30
1.10
1.30
n/a
n/a
n/a
n/a
1
City of Safford Phase III Distribution Project
Steel Poles
Pole #
2
8
Qty Length
Embedment
1
60 Direct Embed, 12.5'
1
45 Direct Embed, 6.5'
27
1A, 28, 31
35, 37
43
1
3
2
1
45‐3
45
45
45
46
2A
1
1
50
50
Total
11
Description
Junction pole with single DE, double DE and Tangent
Tangent with unguyed 3∅ tap
Direct Embed, 10'
Anchor Bolt Foundation
Anchor Bolt Foundation
Direct Embed, 12'
2° angle, wood pole equivalent
90° buckarm corner
115° buckarm corner
8° angle with 3∅ tap Direct Embed, 11'
Direct Embed, 12.5'
Single DE pole, inserted into existing line
Tangent with unguyed 3∅ tap
2
City of Safford
Phase III Distribution
Pole #2
Spans to North & South = 250'
Spans to East and West = 300'
Junction Pole
Unfactored Load Cases
NESC Light
Wind Weight Load
Tension Load
Level 1 Phase Conductors North (336 ACSR, Qty 3)
Level 1 Phase Conductors South (336 ACSR, Qty 3)
Level 2 Phase Conductors North (336 ACSR, Qty 3)
Level 3 Phase Conductors East & West (477 ACSR, Qty3)
Level 4 Neutral South (1/0 ACSR, Qty 1)
Level 5 Neutral East & West (477 ACSR, Qty 1)
5.628
5.628
5.628
3.526
1.824
3.526
0.068
0.068
0.068
0.183
0.038
0.183
0.095
0.095
0.095
0.255
0.048
0.255
Loads per conductor in kips
60° F, no wind, no ice
Full Dead‐end
Wind Weight Wind Weight Load
Load
Tension Load
Tension Load
5.628
0.000
5.628
3.526
0.000
3.526
0.068
0.000
0.068
0.183
0.000
0.183
0.095
0.000
0.095
0.155
0.000
0.155
4.935
4.935
4.935
2.360
1.528
2.360
0.000
0.000
0.000
0.000
0.000
0.000
0.058
0.058
0.058
0.155
0.018
0.155
Conductor Height Above Ground 60'
<‐‐Pole Length
45'‐9"
45'‐9"
41'‐9"
37'‐9"
34'‐0"
33'‐3"
Factored Load Cases
NESC Light
Wind Weight Load
Tension Load
Level 1 Phase Conductors North (336 ACSR, Qty 3)
Level 1 Phase Conductors South (336 ACSR, Qty 3)
Level 2 Phase Conductors North (336 ACSR, Qty 3)
Level 3 Phase Conductors East & West (477 ACSR, Qty3)
Level 4 Neutral South (1/0 ACSR, Qty 1)
Level 5 Neutral East & West (477 ACSR, Qty 1)
7.316
7.316
7.316
3.879
2.371
3.879
0.150
0.150
0.150
0.403
0.084
0.403
0.181
0.181
0.181
0.485
0.091
0.485
Loads per conductor in kips
60° F, no wind, no ice
Full Dead‐end
Wind Weight Wind Weight Load
Load
Tension Load
Tension Load
5.628
0.000
5.628
3.526
0.000
3.526
0.068
0.000
0.068
0.183
0.000
0.183
0.095
0.000
0.095
0.155
0.000
0.155
4.935
4.935
4.935
2.360
1.528
2.360
0.000
0.000
0.000
0.000
0.000
0.000
0.058
0.058
0.058
0.155
0.018
0.155
Conductor Height Above Ground
60'
<‐‐Pole Length
45'‐9"
45'‐9"
41'‐9"
37'‐9"
34'‐0"
33'‐3"
4
City of Safford
Phase III Distribution
Pole #8
Horizontal Span = 240'
Vertical Span = 266'
Tangent, 477‐18/1 ACSR
Single Dead‐end 3 phase tap, 1/0‐6/1
Unfactored Load Cases
Load per conductor in kips
NESC Light
Wind Weight Tension Load
Load
Level 1 Phase Conductor (477 ACSR, Qty 1)
Level 2 Phase Conductors (477 ACSR, Qty 2)
Level 3 Phase Conductors (1/0 ACSR, Qty 3)
Level 4 Neutral (477 ACSR, Qty 1)
Level 5 Neutral (1/0 ACSR, Qty 1)
3.526
3.526
1.824
3.526
1.824
0.711
0.177
0.045
0.177
0.045
Wind Weight Tension Load
Load
0.226
0.226
0.057
0.226
0.057
60° F, no wind, no ice
Wind Weight Tension Load
Load
2.360
2.360
1.528
2.360
1.528
0.000
0.000
0.000
0.000
0.000
0.138
0.138
0.022
0.138
0.022
Conductor Height Above Ground (ft)
45
<‐‐Pole Length
38'‐6"
37'‐0"
34'‐8"
31'‐11"
30'‐8"
Factored Load Cases
NESC Light
Wind Weight Tension Load Load
Level 1 Phase Conductor (477 ACSR, Qty 1)
Level 2 Phase Conductors (477 ACSR, Qty 2)
Level 3 Phase Conductors (1/0 ACSR, Qty 3)
Level 4 Neutral (477 ACSR, Qty 1)
Level 5 Neutral (1/0 ACSR, Qty 1)
3.879
3.879
2.006
3.879
2.006
0.362
0.362
0.099
0.362
0.099
0.429
0.429
0.108
0.429
0.108
Load per conductor in kips
0
Wind Weight Tension Load Load
60° F, no wind, no ice
Wind Weight Tension Load Load
2.360
2.360
1.528
2.360
1.528
0.000
0.000
0.000
0.000
0.000
0.138
0.138
0.022
0.138
0.022
Conductor Height Above Ground
45
<‐‐Pole Length
38'‐6"
37'‐0"
34'‐8"
31'‐11"
30'‐8"
9
City of Safford
Phase III Distribution
Poles # 28, #31, #1A
Back Span = 225'
Ahead Span ‐ 225'
90° Buckarm corner
477‐18/1 ACSR
Unfactored Load Cases
Load per conductor in kips
NESC Light
Wind Weight Tension Load Load
Level 1 Phase Conductors, Qty 3
Level 2 Phase Conductors, Qty 3
Level 3 Neutral Conductors, Qty 1
Level 4 Neutral Concuctor, Qty 1
3.526
3.526
3.526
3.526
0.076
0.076
0.076
0.076
Tension
Wind Weight Load
Load
0.106
0.106
0.106
0.106
60° F, no wind, no ice
Wind Weight Tension Load
Load
2.360
2.360
2.360
2.360
0.000
0.000
0.000
0.000
0.065
0.065
0.065
0.065
Conductor Height Above Ground 45
<‐‐Pole Length
32'‐6"
28'‐6"
25'‐9"
24'‐6"
Factored Load Cases
NESC Light
Wind Weight Tension Load Load
Level 1 Phase Conductors, Qty 3
Level 2 Phase Conductors, Qty 3
Level 3 Neutral Conductors, Qty 1
Level 4 Neutral Concuctor, Qty 1
4.584
4.584
4.584
4.584
0.167
0.167
0.167
0.167
0.201
0.201
0.201
0.201
Load per conductor in kips
0
Wind Weight Load
Tension Load
60° F, no wind, no ice
Wind Weight Load
Tension Load
2.360
2.360
2.360
2.360
0.000
0.000
0.000
0.000
0.065
0.065
0.065
0.065
Conductor Height Above Ground
45
<‐‐Pole Length
32'‐6"
28'‐6"
25'‐9"
24'‐6"
14
City of Safford
Phase III Distribution
Pole # 35, #37
Back Span = 300'
Ahead Span = 300'
115° Buckarm Corner
477‐18/1 ACSR
Unfactored Load Cases
Load per conductor in kips
NESC Light
Wind Weight Tension Load Load
Level 1 Phase Conductors, Qty 3
Level 2 Phase Conductors, Qty 3
Level 3 Neutral Conductors, Qty 1
Level 4 Neutral Concuctor, Qty 1
3.526
3.526
3.526
3.526
0.092
0.092
0.092
0.092
Wind Weight Tension Load
Load
0.128
0.128
0.128
0.128
60° F, no wind, no ice
Wind Weight Tension Load
Load
2.360
2.360
2.360
2.360
0.000
0.000
0.000
0.000
0.078
0.078
0.078
0.078
Conductor Height Above Ground 45
<‐‐Pole Length
32'‐6"
28'‐6"
25'‐9"
24'‐6"
Factored Load Cases
NESC Light
Wind Weight Tension Load Load
Level 1 Phase Conductors, Qty 3
Level 2 Phase Conductors, Qty 3
Level 3 Neutral Conductors, Qty 1
Level 4 Neutral Concuctor, Qty 1
4.584
4.584
4.584
4.584
0.202
0.202
0.202
0.202
0.243
0.243
0.243
0.243
Load per conductor in kips
0
Wind Weight Load
Tension Load
60° F, no wind, no ice
Wind Weight Load
Tension Load
2.360
2.360
2.360
2.360
0.000
0.000
0.000
0.000
0.078
0.078
0.078
0.078
Conductor Height Above Ground
45
<‐‐Pole Length
32'‐6"
28'‐6"
25'‐9"
24'‐6"
18
City of Safford
Phase III Distribution
Pole #43
Horizontal Span = 250'
Vertical Span = 200'
Tangent, 477‐18/1 ACSR
Small angle, 3 phase tap, 1/0‐6/1
Unfactored Load Cases
Load per conductor in kips
NESC Light
Tension
Level 1 Phase Conductor (477 ACSR, Qty 1)
Level 2 Phase Conductors (477 ACSR, Qty 2)
Level 3 Phase Conductors (1/0 ACSR, Qty 3)
Level 4 Neutral (477 ACSR, Qty 1)
Level 5 Neutral (1/0 ACSR, Qty 1)
3.526
3.526
1.354
3.526
1.354
60° F, no wind, no ice
Wind Weight Load
Load
0.153
0.153
0.022
0.153
0.022
Wind Weight Load
Tension Load
0.170
0.170
0.029
0.170
0.029
Tension
2.360
2.360
1.000
2.360
1.000
Wind Weight Load
Load
0.000
0.000
0.000
0.000
0.000
0.104
0.104
0.011
0.401
0.011
Conductor Height Above Ground (ft)
50
<‐‐Pole Length
38'‐0"
36'‐6"
34'‐2"
31'‐5"
30'‐2"
Factored Load Cases
NESC Light
Wind Weight Load
Tension Load
Level 1 Phase Conductor (477 ACSR, Qty 1)
Level 2 Phase Conductors (477 ACSR, Qty 2)
Level 3 Phase Conductors (1/0 ACSR, Qty 3)
Level 4 Neutral (477 ACSR, Qty 1)
Level 5 Neutral (1/0 ACSR, Qty 1)
3.879
3.879
1.489
3.879
1.489
0.337
0.337
0.048
0.337
0.048
0.323
0.323
0.055
0.323
0.055
Load per conductor in kips
0
Wind Weight Load
Tension Load
60° F, no wind, no ice
Wind Weight Load
Tension Load
2.360
2.360
1.000
2.360
1.000
0.000
0.000
0.000
0.000
0.000
0.104
0.104
0.011
0.401
0.011
Conductor Height Above Ground
50
<‐‐Pole Length
38'‐0"
36'‐6"
34'‐2"
31'‐5"
30'‐2"
23
City of Safford
Phase III Distribution
Pole #46
Spans East/West = 100'
Span South = 200'
Deadend, 477‐18/1 ACSR
(Inset into existing 336 Line)
Unfactored Load Cases
Load per conductor in kips
NESC Light
Tension
Level 1 Phase Conductor (336 ACSR, Qty 1)
Level 2 Phase Conductors (336 ACSR, Qty 1)
Level 3 Phase Conductors (336 ACSR, Qty 1)
Level 4 Phase Conductors (477 ACSR, Qty 3)
Level 5 Neutral (1/0 ACSR, Qty 1)
Level 6 Neutral (477 ACSR, Qty 1)
5.628
5.628
5.628
3.526
1.824
3.526
60° F, no wind, no ice
Wind Weight Load
Load
0.054
0.054
0.054
0.061
0.030
0.061
Wind Weight Load
Tension Load
0.076
0.076
0.076
0.085
0.038
0.085
Tension
4.935
4.935
4.935
2.360
1.528
2.360
Wind Weight Load
Load
0.000
0.000
0.000
0.000
0.000
0.000
0.046
0.046
0.046
0.052
0.015
0.052
Conductor Height Above Ground (ft)
50
<‐‐Pole Length
38'‐3"
36'‐3"
34'‐3"
30'‐3"
26'‐3"
25'‐6"
Factored Load Cases
NESC Light
Wind Weight Load
Tension Load
Level 1 Phase Conductor (336 ACSR, Qty 1)
Level 2 Phase Conductors (336 ACSR, Qty 1)
Level 3 Phase Conductors (336 ACSR, Qty 1)
Level 4 Phase Conductors (477 ACSR, Qty 3)
Level 5 Neutral (1/0 ACSR, Qty 1)
Level 6 Neutral (477 ACSR, Qty 1)
6.191
6.191
6.191
3.879
2.006
3.879
0.119
0.119
0.119
0.134
0.066
0.134
0.144
0.144
0.144
0.162
0.072
0.162
Load per conductor in kips
0
Wind Weight Load
Tension Load
60° F, no wind, no ice
Wind Weight Load
Tension Load
4.935
4.935
4.935
2.360
1.528
2.360
0.000
0.000
0.000
0.000
0.000
0.000
0.046
0.046
0.046
0.052
0.015
0.052
Conductor Height Above Ground
50
<‐‐Pole Length
38'‐3"
36'‐3"
34'‐3"
30'‐3"
26'‐3"
25'‐6"
27
City of Safford
Phase III Distribution
Pole #2A
Mainline Spans = 200'
Tap Span = 130'
Tangent, 366‐26/7 ACSR
3 phase tap, 477‐18/1 ACSR
Unfactored Load Cases
Load per conductor in kips
NESC Light
Tension
Level 1 Phase Conductor (477 ACSR, Qty 3)
Level 2 Phase Conductors (336 ACSR, Qty 3)
Level 3 Neutral Conductor (477 ACSR, Qty 1)
Level 4 Neutral Conductor (1/0 ACSR, Qty 1)
3.526
5.628
3.526
1.824
60° F, no wind, no ice
Wind Weight Load
Load
0.079
0.108
0.079
0.060
Wind Weight Load
Tension Load
0.085
0.152
0.085
0.076
Tension
2.360
4.935
2.360
1.528
Wind Weight Load
Load
0.000
0.000
0.000
0.000
0.052
0.093
0.052
0.029
Conductor Height Above Ground (ft)
50
<‐‐Pole Length
36'‐0"
33'‐0"
29'‐9"
29'‐0"
Factored Load Cases
NESC Light
Wind Weight Load
Tension Load
Level 1 Phase Conductor (477 ACSR, Qty 3)
Level 2 Phase Conductors (336 ACSR, Qty 3)
Level 3 Neutral Conductor (477 ACSR, Qty 1)
Level 4 Neutral Conductor (1/0 ACSR, Qty 1)
3.879
6.191
3.879
2.006
0.174
0.238
0.174
0.132
0.162
0.289
0.162
0.144
Load per conductor in kips
0
Wind Weight Load
Tension Load
60° F, no wind, no ice
Wind Weight Load
Tension Load
2.360
4.935
2.360
1.528
0.000
0.000
0.000
0.000
0.052
0.093
0.052
0.029
Conductor Height Above Ground
50
<‐‐Pole Length
36'‐0"
33'‐0"
29'‐9"
29'‐0"
31
Download