Vol. 34, No. 2 Journal of Semiconductors February 2013 A fast novel soft-start circuit for peak current-mode DC–DC buck converters Li Jie(李杰), Yang Miao(杨淼) , Sun Weifeng(孙伟锋), Lu Xiaoxia(陆晓霞), Xu Shen(徐申), and Lu Shengli(陆生礼) National ASIC System Engineering Research Center, Southeast University, Nanjing 210096, China Abstract: A fully integrated soft-start circuit for DC–DC buck converters is presented. The proposed high speed soft-start circuit is made of two sections: an overshoot suppression circuit and an inrush current suppression circuit. The overshoot suppression circuit is presented to control the input of the error amplifier to make output voltage limit increase in steps without using an external capacitor. A variable clock signal is adopted in the inrush current suppression circuit to increase the duty cycle of the system and suppress the inrush current. The DC–DC converter with the proposed soft-start circuit has been fabricated with a standard 0.13 m CMOS process. Experimental results show that the proposed high speed soft-start circuit has achieved less than 50 s start-up time. The inductor current and the output voltage increase smoothly over the whole load range. Key words: current-mode; DC–DC converter; soft-start; inrush current; overshoot voltage DOI: 10.1088/1674-4926/34/2/025006 EEACC: 2570 1. Introduction In recent years, switching power supplies have been widely applied in portable electronic systems market due to their high efficiency, stability, and dynamic characteristicsŒ1 . A typical block diagram of a current-mode DC–DC buck converter is depicted in Fig. 1. It works in a control loop converting the error signal into a variable duty cycle of the driving signal for the switching element. The problem is that at the beginning of the start-up transient the error amplifier (EA) is unbalanced, thus causing the converter to work at 100% duty cycle. This situation makes the inductor current rise above its equilibrium value, and produces an inrush current. And it will remain above its equilibrium value for a little time because the inductor current cannot change instantaneously. This can induce the output voltage to rise abruptly to exceed its regulated valueŒ2 . The electronic system may be damaged at the start-up period by the inrush current and overshoot voltage. Therefore a soft-start circuit is normally adopted to eliminate the inrush current and reduce the overshoot voltage. The most conventional method is using an external capacitor named Csoft to make the output voltage rise slowlyŒ3 5 . The output of the EA or the reference voltage Vset rises gradually when Csoft is charged linearly. The soft-start time of the converter depends on the charge current and the value of Csoft . The method has an explicit principle and can be used effortlessly, but the capacitor is usually too large to be integrated on chip. Another method to limit the output voltage is the clock-based soft-start circuit, which can precisely control the start-up timeŒ6 . These two methods are both devised to control the output voltage. In addition, the method of suppressing the inrush current is to detect the current of the inductor and compare the current with a constant current value. Considering that the limited current is usually higher than the maximal working current, the piecewise limited current value is used in soft-start phaseŒ7 9 . However, many comparators are used to judge the changing condition, so this method is not suitable for converters that do not have a current limiting function. A high speed soft-start control circuit which can achieve a start time of 150 s is proposed in Ref. [10]. However, the switching does not work at the first period thus causing a prolonged soft-start time, and the circuit implementation is very complex. Therefore, in this paper a fast novel circuit with simple D/A (digital-to-analog) converter and variable minimum duty cycle is proposed for applications in variable output voltage without overshoot voltage and inrush current. The proposed circuit implementation is introduced in Section 2. Simulated and measurement results are shown in Section 3 and the conclusion is made in Section 4. Fig. 1. Typical structure of a peak current-mode DC–DC buck converter. * Project supported by the Natural Science Foundation of Jiangsu, China (No. BK2011059), the Program for New Century Excellent Talents in University (NCET-10-0331), and the Qing Lan Project. † Corresponding author. Email: myron@seu.edu.cn Received 21 June 2012, revised manuscript received 11 September 2012 © 2013 Chinese Institute of Electronics 025006-1 J. Semicond. 2013, 34(2) Li Jie et al. Fig. 2. Overshoot suppression circuit. 2. Proposed soft-start circuit Based on the principle of conventional current-mode converters, an improved soft-start scheme is proposed. The scheme is made of two sections: an overshoot suppression circuit and an inrush current suppression circuit. At the beginning of the start-up, the voltage Vset is much higher than Vo , which makes the EA unbalanced. Then the unbalanced EA may damage the whole system. Considering the reasons above, we want to attain a ramp voltage instead of a stable voltage. Obviously, a ramp voltage can be generated by adding Vset with a ladder voltage, which is shown in Fig. 2. The ladder voltage can be generated by a digital-to-analog converter (D/A). Moreover, because of the minimum duty cycle used in the converter, inrush current will be generated in the initial phase. A variable minimum duty cycle is proposed to suppress the inrush current in this paper. 2.1. Overshoot suppression circuit As shown in Fig. 2, the designed overshoot suppression circuit implemented by the internal circuit mainly contains three sections: the D/A, the resistance network, and the OPA. The OPA and resistance network are used to set a variable reference voltage to meet the dynamic voltage scaling performance of the DC–DC converter. The block diagram of the D/A proposed in this paper is shown in Fig. 2. The output of the D/A can be expressed as: Q1 Q2 Q3 Q4 Q5 Q6 Q0 VD=A D Va C C C C C C : 27 26 25 24 23 22 21 (1) The output voltage of the D/A increases slowly with the digital signal counting from 7b0 0000000 to 7b0 1000000 by the clock. When the signal counts from 7b0 0111111 to 7b0 1000000, MOS transistors M4 and M5 are turned off while the MOS transistors M6 and M7 are turned on to prevent the decrease of the Fig. 3. Waveform of output voltage and inductor current at the ideal fastest start-up phase. output voltage of the D/A. So the output of the D/A will remain in the voltage of Va . This structure ensures that the D/A output slowly increases to a stable voltage. The soft-start time is determined by the clock which controls the D/A. The fastest start-time of the system is when the system works using maximum duty cycle up to a limited current. And the start-up includes two phases. If the inrush current is not considered, the system will work using a maximum duty cycle up to limited current Ilimited and then work using Ilimited until the output voltage reaches stable value. The work state is shown in Fig. 3. Therefore the fastest time can be calculated by the two sections as follows. (1) The system works using a maximum duty cycle up to limited current The time is t1 when the system works using a maximum duty cycle up to a limited current, as shown in Fig. 3. As the increment of output voltage is very small, zero is assumed to represent the output voltage. Then the time t1 can be expressed 025006-2 J. Semicond. 2013, 34(2) Li Jie et al. in the following equation t1 Ilimited L : Vin (2) (2) The system works using limited current until the output voltage reaches stability As shown in Fig. 3 the time is t2 when the system works using limited current until output voltage reaches a limited current. The inductor current keeps a stable value. The load and the capacity are both charged. Therefore the charge process can be expressed as follows: ILoad D IC D IL IC D C Vo ; RL (3) ILoad ; (4) dVo : dt (5) The time t2 can be calculated by the differential equations above: Vo Ilimited Ilimited t2 D RLoad C ln C C ln : RLoad C C C (6) Therefore the fastest time is the sum of the two parts: trise D .Ilinited L/ =Vin RLoad C Vo Ilimited Ilimited ln C C ln : RLoad C C C (7) It is obvious that it takes a longer time at a heavy load condition compared with a light condition. In the proposed circuit, the rise time of Vset is designed slightly longer than trise to get the balance of suppression of the overshoot of Vo and the softstart time. As mentioned above, the 6-bits D/A will supply rising voltage slowly to the gate of transistor M1 in Fig. 2. However, the gate voltage of transistor M2, which is larger than the gate voltage of M1, has been fixed on Vref , so at the initial phase of softstart, transistor M2 is cut off. And the drain current of M1, M2, M3 will always meet IM1 C IM2 D IM3 : Fig. 4. Waveform of start-up IL and CLK (a) with constant minimum clock and (b) with 3 times the cycle minimum clock. (8) Because of the virtual short characteristics of the operational amplifier, the gate voltage of transistor M3 will increase with the rising of transistor M1. Moreover, IM1 will decrease while IM2 increases at this phase to keep the balance of current. When the gate voltage of transistor M1 rises to a certain value, transistor M1 will be cut off. At this moment, IM2 D IM3 . The soft start-up of the setting voltage is completed successfully. Therefore the Vo will rise following the setting voltage Vset and avoid the overshoot voltage. And the voltage Vset is set by the resistance network. 2.2. Inrush current suppression circuit In order to prevent the power MOSFET from thoroughly closing and suppress the noise influencing the stability of the converter between opening and closing the MOSFET, a clock Fig. 5. Inrush current suppression circuit. named CLK is used to guarantee the minimum duty cycle in our DC–DC converter. At the time of soft-start, because the output voltage is very small, the converter will work on the maximum duty cycle. The inductor current increases to the limited current within ‘m’ cycles, as shown in Fig. 4(a). When the clock works on a high level, the modulator-out signal and currentlimited signal will both be shielded, as shown in Fig. 5. On the other hand, when the clock works on a low level, modulator and current-limited circuits are working. Then the inductor current will decrease when the clock signal is low because the current limited circuit is working. And when the clock signal is high, the inductor current will still increase, as shown in Fig. 4. The charge slope of the inductor is Kup_slope D (Vin Vo /=L, while the discharge slope is Kdown_slope D Vo =L. It is obvious that the charge slope is much larger than the discharge slope at the incipient stage of Vo rising. As shown in Fig. 4(a) the inductor current will exceed the limited current value easily after several cycles; then the inrush current is generated. The essential reason of generating the inrush current is that the charge current is larger than the discharge current. Considering the above problems, 3 times the cycle minimum clock is adopted in the proposed soft-start circuit. As shown in Fig. 5 when Vo is smaller than Vref1 a much smaller cycle clock called CLK2 generating a smaller duty cy- 025006-3 J. Semicond. 2013, 34(2) Li Jie et al. cle is adopted in the initial phase, and then the discharge current will be larger than that in CLK1. When Vo is larger than Vref1 , the system switches to CLK1. As shown in Fig. 4(b), several clock cycles in CLK1 will be shielded to compose CLK2 and the cycle of CLK2 is three times as much as the cycle of CLK1. At the initial phase, the time the system spends rising to the limited value is the same. Then the discharge time of inductor is longer and the charge time is shorter when the converter works in CLK2. It is obvious that the inductor current will rise slower and decrease larger when the converter works in CLK2. The charge current is smaller than the discharge current, so the inrush current can easily be suppressed. When the voltage Vo is larger than Vref1 , the system automatically switches to CLK1. The key of this circuit is to set the voltage Vref1 . The voltage Vref1 is set complying with the following principles. (1) When the circuit switches to CLK1, the charge current must be equal to or smaller than the discharge current. Otherwise, the circuit will generate inrush current after it switches to CLK1, and the inrush current suppression circuit will lose its function. (2) The inductor current must be smaller than the limited current when the circuit switches to the CLK1, so it can guarantee that the circuit has not generated inrush current. The above principles can be expressed by the following formulas: Vin Ik D Ik Vref1 Vref1 Dmin1 T1 6 .1 Dmin1 / T1 ; L L Z mT Vin Vo .t/ I1 D t.k D 1/; L 0 1 Z C Z mT C.k 2CDmin2 /T2 mT C.k 2/T2 mT C.k 1/T2 mT C.k 2CDmin2 /T2 Vin (9) (10) Fig. 6. Simulated results of start-up Vset , Vout , IL and CLK (a) with constant minimum duty cycle and (b) with variable minimum duty cycle. Vo .t/ t L Vo .t/ t 6 Ilimited .k D 2–n/: L (11) Dmin1 is the minimum duty cycle when the converter works in CLK1 while Dmin2 is the minimum duty cycle in CLK2. T1 is the cycle of CLK1 and T2 is the cycle of CLK2. And the cycle T1 , T2 meet 3T D 3T1 D T2 . Stable values are used to replace the changing value of Vo . When I 6 I1 , Vo .t/ 0. When I2 6 I 6 In=3 , Vo .t/ 13 Vref1 . When In=3 6 I 6 I2n=3 , Vo .t/ 23 Vref1 . When I2n=3 6 I 6 In , Vo .t/ Vref1 . Matlab is applied to calculate the value of Eqs. (10) and (11) supposing the value of Vref1 is the critical value determined by Eq. (9). The result shows the critical value of Eq. (9) can meet Eq. (11). So the value of Vref1 is Vin Dmin1 . And when Vo is larger than Vref1 , the system automatically switches to CLK1. At this time, the charge current is equal to the discharge current until the output voltage rises to the set value. When the system is stable the current will decrease and the start-up phase is completed. 3. Simulation and measurement results The proposed circuits are implemented in a CMOS SMIC 0.13 m process. The simulated contrastive results are shown in Fig. 6. Figure 6(a) is the simulated result when the constant Fig. 7. Chip microphotograph of the buck converter with the proposed soft-start circuit. minimum duty cycle is adopted. It is obvious that the inrush current still exists. The inductor current will exceed the limited current value after several cycles. But in Fig. 6(b) the variable minimum duty cycle is used in the system, so the inrush current is effective controlled. The simulated results are presented to the theoretical analysis. The DC–DC converter with the proposed soft-start circuits has been fabricated in CMOS SMIC 0.13 m process. The chip microphotograph is shown in Fig. 7 and the area of the proposed circuits is only 0.06 mm2 . The input voltage of the 025006-4 J. Semicond. 2013, 34(2) Li Jie et al. rent suppression circuit. The overshoot suppression circuit generates a linear ramp voltage which can effectively suppress the overshoot of the output voltage. The inrush current suppression circuit with a variable minimum duty cycle can suppress the inrush circuit effectively. The simulation results show that the proposed high speed soft-start circuit implemented to the current-mode DC–DC converter is well consistent with the theory. Using a standard 0.13 m CMOS process, the test chip has been fabricated and experimental results are presented to the theoretical analysis. The test result shows that this technology can achieve a very fast start-up time of about 43.5 s. Furthermore, because the proposed soft-start circuit is designed with a CMOS process, it is convenient to be transplanted to other converters. References Fig. 8. Measured output voltage Vout (Channel 1) and inductor current IL (Channel 2) during the start-up (a) with no load and (b) with load 200 mA. converter is 3.3 V and the output voltage is 1.5 V. Figure 8 shows the measured output voltage and inductor current during the soft-start with no load in Fig. 8(a) and with load in Fig. 8(b). The experimental results match with the analysis results, which did not induced the overshoot voltage and inrush current. The soft-start time is only 43.5 s, resulting from the quick start response. This result has been shortened to 1/3 compared with an available high speed converter, which achieves it in about 150 s in Ref. [10]. Therefore, the functionality of the proposed soft-start circuit is successfully verified. 4. Conclusion This paper presented a fast integrated soft-start circuit consisting of an overshoot suppression circuit and an inrush cur- [1] Lai Xinquan, Jia Ligang, Hu Juncai, et al. The design of a low voltage and high speed driver circuit for boost DC–DC converter. 5th International Conference on ASIC Proceeding, 2003, 1(10): 635 [2] Lai Xinquan, Guo Jianping, Yu Weixue. A novel digital soft-start circuit for DC–DC switching regulator. 6th International Conference on ASIC Proceeding, 2005, 2(10): 564 [3] Yuan Bing, Lai Xinquan, Ye Qiang, et al. A novel compact softstart circuit with internal circuitry for DC–DC converter. 7th International Conference on ASIC Proceeding, 2007: 450 [4] Chen K H, Chang C T, Liu T H. Bidirectional current-mode capacitor multipliers for on-chip compensation. IEEE Trans Power Electron, 2008, 23(1): 180 [5] Wang Y, Xu D, Guo D, et al. The new soft starting methods for electronics ballasts of UV lamps based on microcontroller. IEEE Conference on Industrial Electronics and Applications, 2006: 1 [6] Ryu Y C, Hwang Y W. A new soft-start method with abnormal over current protection function for switching power supplies. IEEE International Conference on Electric Machines and Drives, 2005: 431 [7] Li Sizhen, Zou Xuecheng, Chen Xiaofei. Designing a compact soft-start scheme for voltage-mode DC–DC switching converter. Microelectron J, 2010, 41(7): 430 [8] Lee K C, Chae C S, Cho G H, et al. A PLL-based high-stability single-inductor 6-channel output DC–DC buck converter. IEEE International ISSCC, 2010: 200 [9] Barrado A, Quintero J, Lazaro A, et al. Linear-non-linear control applied in multiphase VRM. IEEE Power Electronics Specialists Conference, 2005: 904 [10] Shibata K, Pham C K. A DC–DC converter using a high speed soft-start control circuit. IEEE International Symposium on Circuits and Systems, 2010: 833 025006-5