DEEE DD SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 1.01 GENERAL SCOPE OF WORK A. Work Included: 1. 2. 3. 4. 5. 6. 7. 1.02 All concrete work shown on Drawings. Reinforcing steel. Concrete accessories. Built-in work furnished under other Sections, including setting and placing unless otherwise specified. Construction, contraction (control) and expansion joints. Forming, finishing, curing and patching. Moisture barrier under interior slabs-on-grade as specified. RELATED WORK A. Precast structural concrete - Section 03400. 1.03 CODES AND STANDARDS A. Conform to the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. ACI 318-89, "Building Code Requirements for Reinforced Concrete." Governing Building Code. Comply with all requirements of the governing building code that are more stringent than the above-referenced codes, standards and Specifications. ACI SP-15 (89), Field Reference Manual. A copy of this publication must be kept in the field office at all times during concrete construction. ACI 304, Recommended Practice for Measuring, Mixing, Transporting and Placing Concrete. ACI 311, Recommended Practice for Concrete Inspection. ACI 211.1, Recommended Practice for Selecting Proportions for Normal and Heavyweight Concrete. ACI 214, Recommended Practice for Evaluation of Compression Test Results of Field Concrete. ACI 305, Recommended Practice for Hot Weather Concreting. ACI 306, Recommended Practice for Cold Weather Concreting. ACI 308, Recommended Practice for Curing Concrete. ACI 309, Recommended Practice for Consolidation of Concrete. AASHTO M 182, Burlap Cloth Made from Jute or Kenaf. B. All work shall be performed to secure for the entire job homogeneous concrete having required strength, durability and weathering resistance, without planes of weakness and other structural defects and free of pronounced honeycombs, air pockets, voids, projections, offsets of plane, and other defacements on exposed surfaces. C. Standard Specifications - DEEE DD The "Specifications for Structural Concrete for Buildings" ACI 301-89 are hereby incorporated as a part of these Specifications and are as much a part of the contract documents as if reproduced herein. Modifications shall take precedence over items specified in ACI 301 and as incorporated in Part III are preceded by the relative ACI 301 designation. All ACI 301 items unless so modified below are incorporated as written. When any part of any item is modified or voided by these modifications, the unaltered provisions of that part shall apply as written. Copy of ACI 301 shall be kept in the project field office at all times. No work shall proceed until persons directly responsible for the project representing the contractors, subcontractors, suppliers and testing agencies have a copy of this Specification and an understanding of the provisions therein. PART 2 PRODUCTS Not used. PART 3 EXECUTION Not used. END OF SECTION *** -