TENDER FOR AIR CONDITIONING WORKS IN Branch Office at GAUR CITY, GREATER NOIDA For ORIENTAL BANK OF COMMERCE SIGNATURE OF THE BIDDER Page 1 ISSUED TO M/S_______________________________ TENDER DOCUMENT FOR PROPOSED AIR CONDITIONING WORKS IN OBC’S BRANCH OFFICE AT GAUR CITY, GREATER NOIDA CLIENT CMO (DEPUTY GENERAL MANAGER) ORIENTAL BANK OF COMMERCE HARSHA BHAWAN, E-BLOCK CONNAUGHT PLACE NEW DELHI PH: 011-49270922, 49270928 CONSULTANT NARENDER CONSULTANTS NARENDER K. MALHOTRA ARCHITECT/CONSULTANTS 2/87, NIRANKARI COLONY, DELHI- 110009. PH: 27659642, 9810039762 SIGNATURE OF THE BIDDER Page 2 NOTICE OF INVITATION TO TENDER Sealed tenders in prescribed form are invited from the eligible empanelled contractors of OBC for AIR CONDITIONING WORKS in Branch Office AT GAUR CITY, GREATER NOIDA Earnest Money : Rs.2,500/- ( Two Thousand Five Hundred only) in the form of Demand draft in favour of Oriental Bank of Commerce” only Payable at New Delhi in separate sealed envelope Time of Completion : 4 weeks Last date & time of submission of Tender : 21-09-2016 upto 3.00 P.M. Date & Time of Opening of Tender Estimated cost : 21-09-2016 at 3.30 P.M. : ₹. 262600.00 Details & Conditions of Tenders are enclosed CMO (Deputy General Manager) Oriental Bank of Commerce Harsha Bhawan, E-Block, Connaught Place, New Delhi SIGNATURE OF THE BIDDER Page 3 DETAIL OF TENDER TENDER FOR THE AIR CONDITIONING WORKS IN BRANCH OFFICE OF OBC BANK AT GAUR CITY, GREATER NOIDA 1. Details of work to be done : Air Conditioning works in OBC’s Branch Office at GAUR CITY, GREATER NOIDA 2. Form of Contract :Item wise rate 3. : Rs.2,500/- ( Two Thousand Five Hundred Earnest Money &Tender money only) The Earnest money is to be deposited in the form of Demand draft in favour of Oriental Bank of Commerce” only payable at New Delhi 4. Period of contract / Time of Completion : 4 weeks from the date of issuing the work-order 5. Last Date & time for receiving of sealed tender. : 21-09-2016 upto 3:00 p.m. SIGNATURE OF THE BIDDER Page 4 6. Liquidated damages for non- : Completion of work in time 2.0% of the contract value per week subject to a max of 10% of the contract value. 7. Defect Liability Period :12 months (Twelve months) from the date of virtual completion as certified by Architect / employer. 8. Retention amount for 12 months 9. Period of submitting of Final bill. :15days from the date of completion Of work duly certified by Architect & Bank Official. 10. Mobilization Advance / Secured Advance : No. Mobilization Advance / secured Advance will be given to the Contractor. 11. Place and date of opening : 21-09-2016 at 3.30 p.m. in the of Tender Office of the Regional Head, OBC Bank, Harsha Bhawan, E-block, Connaught Place, New Delhi 12. Tender Form Fee of tender :DD Rs.500/- in favour of “ORIENTAL BANK OF COMMERCE” only Payable at New Delhi (Non Refundable) :10% of total bill certified by architect 13. Only empanelled contractors/furnishers can apply. 14. DD should be given in the name of “ORIENTAL BANK OF COMMERCE” Only Payable at New Delhi 15. Tender can be downloaded from bank website and can be submitted along with tender fee of Rs 500/- in favour of Oriental bank of Commerce payable at New Delhi SIGNATURE OF THE BIDDER Page 5 GENERAL CONDITIONS TENDER FOR THE AIR CONDITIONING WORKS IN ORIENTAL BANK OF COMMERCE’s BRANCH OFFICE AT GAUR CITY, GREATER NOIDA Contract documents consisting of the detailed plans, complete technical specifications, the schedule of quantities of the various classes of work to be done and the set of 'conditions of contract' to be complied with by the person whose tender may be accepted are printed in the form of tender which can be submitted along with on payment of Rs. 500/- (Rupees Five Hundred only) (Non-Refundable) in the form of demand draft favoring, “ORIENTAL BANK OF COMMERCE, payable at NEW DELHI. Tenders to be submitted in the form of hard copy to CMO-NCR, OBC BANK, Harsha Bhawan, E-Block, C.P. New Delhi during the period upto 21-09-2016, 3.00 p.m. (Except Sundays and Bank Holidays). 1. TECHNICAL BID (Envelope-I) shall contain Earnest Money Deposit (EMD), Tender conditions, specifications and Tender drawings. PRICE BID (EnvelopeII) shall contain Priced Schedule of quantities. 2. Tenders placed in sealed covers (in two envelopes duly marked as TECHINICAL BID (Envelope-I) and PRICE BID (Envelope-II) with the name of the project written on the envelopes will be received till 13-09-2016 up to 3.00 pm in the office of CMO-NCR, Oriental Bank of Commerce Harsha Bhawan , C.P., New Delhi. The technical bid & financial bid shall be opened on 21-092016 at 3.30 PM in the presence of the tender committee & tenderers or their representatives who wish to be present. “No Prior intimation shall be given in case of any change in Time”. *Earnest Money Deposit (EMD) amounting to Rs.2,500/- (Rupees Two Thousand Five Hundred only) to be deposited with the tender in the form of Demand Draft/ Banker's Cheque payable at New Delhi and drawn in the favour of “ ORIENTAL BANK OF COMMERCE” ONLY payable at New Delhi, otherwise the tender is liable for rejection. E.M.D in the form of Bank Guarantee or any other form is not acceptable. (*) No interest shall be paid on EMD amount. 3. 4. The Contractor shall sign each page of this tender 5. Payment to the Contractor Agency shall be made as per actual work done at site. Quantity of work may increase or decrease at site as per requirement, which shall not affect the rates quoted by the contractor. 6. 7. All works shall be done to the complete satisfaction of Bank and Architect-incharge. SIGNATURE OF THE BIDDER Page 6 OTHER TERMS & CONDITIONS: 1. All teak / Cedar wood / rubber wood to be used should be knotless which is to be polished with all background surface preparation courses maintaining the visibility of wood grains. 2. The rates to be quoted shall include the cost of material, labour charges, carriage, sales tax, or any / all other taxes any required hardware etc. 3. The contractor agency shall keep particular vigil on his workers / carpenters / painters etc. to maintain very good workmanship of all items, failing which no payment shall be made and no claim of material / labour used shall be made to him in any case, and the same work shall be executed by him again without charging any extra cost. 4. The tenders must be submitted in the prescribed format only. The tenderer must quote the rates and amount in the Bill of Quantities (BOQ). The rates should be written both in words and figures without any erasures and alterations. However, if errors are made, the wrong figures or words must be neatly scored out under full signature of the tenderer and the correct figures and words neatly rewritten. Over writing is not permitted. White fluid should never be used for corrections. 6. In the event of an error occurring in the amount columns as a result of wrong multiplication and extension of unit rate and quantities, the unit rate shall be regarded as firm and the amount shall be amended accordingly. 7. All items to be executed, as per drawings, if any change is required, the same shall be brought to the notice of Architect-in-Charge. 8. Any tender / quotation containing clerical or arithmetical mistakes shall be amended as per actual. 9. Any addition, alteration or correction shall be signed and stamped properly. 10. Contractor agencies are advised (before quoting the rates) to inspect the site of the proposed work. He must go through all drawings and specifications and documents. 11. All materials to be used should be of specified makes only. The Bank/ Architect may ask the contractor to produce the Bill of purchase of the specified material from the authorized dealers of the respective items.. 12. The Contractor agency should have already executed works of furnishing interiors & exterior, civil works of very good workmanship. SIGNATURE OF THE BIDDER Page 7 13. Quality of material and workmanship rejected by the Architect / Concerned Authorities shall be removed immediately by the contractor and rectified / replaced. 14. No payment shall be made to the Contractor before the completion of 50% of the work. a. Ist Interim bill shall be paid after completion of 50% of work after the duly signed certificate from the Architect & the bank-official (if any). b. Second Interim bill shall be paid after completion of 75% of work, after the duly signed certificate from the Architect & the bank-official. c. Only two running bills shall be claimed during the completion of furnishing work as per the given time period of 30 days. d. Apart from the initial security deposits, retention money shall be deducted from progressive running bills @ 10% of the gross value of each running bill. e. Final bill shall be submitted to the bank within 15 days after the completion of work along with certificate from the Architect and bank official. All taxes, duties, etc. including Sales Tax, octroi, Excise duty or any other tax on material or on finished works like work’s contract tax, turn over tax, Income tax, etc. as applicable till completion of work in respect of this contract shall be payable by contractor and the Bank will not entertain any claim whatsoever in this respect. The rate quoted by the contractor should take care of all such taxes, octroi, duties etc. till the completion of work. 15. Any payment to the contractor on account of execution of work, whether it is running payment or final, shall be verified by the Architect-in-Charge. Then only it can be submitted to the bank. Payment will be made within 5 days after receiving the certified bill at Regional office. 16.Unless, otherwise mentioned all materials to be used shall be I.S.I. marked. Failure to do so, the work may be rejected and in that case contractor shall have to remove the defective materials and replace / re-do the work for which no claim shall be entertained. 17. All materials to be used should be of specified makes only. The Bank/ Architect may ask the contractor to produce the Bill of purchase of the specified material from the authorized dealers of the respective items.. SIGNATURE OF THE BIDDER Page 8 18.The total work shall be supervised by the Architect-in-Charge and he/she shall be kept fully informed by the contractor regarding the progress of work. 19.Bank may award the work in part or whole to a single party or any other party. 20.It may please be noted that the Bank is not bound to allot the work to the lowest party. And as such, the allotment of work shall be based on workability of rates quoted by the contractor on account of quality work. If work allotted to L-1 and he/she back out for whatsoever the reason/ does not response to the work, then work may be allotted to the L-2 at the same rate awarded to L-1. 21.The L-1 will be calculated separately for furnishing, electrical, ac work and other work. 22.The bank reserves the right to reject any or all the tenders without assigning any reason whatsoever. 23.The earnest money deposited shall not carry any interest and will be refunded to the unsuccessful tenderers. 24. Earnest money paid by the contractor shall be forfeited by the Bank if contractor fails to undertake the job within 7 days from the date of allotment of work – order. 25.If the selected contractor does not start the work within the 7 days after date of issuing the work order & do not inform the Bank about the same, Then the Bank reserves the right to issue the work to the L-2 at the same rate awarded to L-1. Also no written communication shall be given to the L-1 for withdrawal of the work-order from L-1. 26.If the contractor does not complete the work as per the tender/ work-order, then the penalty of 2% of the actual amount paid to the contractor for the actual work done. This will be in addition to the penalty @2% of the contract value, per week on account of delay in work. However both the penalties as mentioned above will not be more than the 10% of the work order. 27.The contractor shall take all the necessary precautions while working and to safe guard adjacent property, Bank’s property, Bank’s Employees, and traffic persons. SIGNATURE OF THE BIDDER Page 9 28.The contractor shall not directly or indirectly sublet the work to other party without written permission of the Bank. 29.The quantities mentioned in schedule are provisional and likely to increase/decrease to any extent or may be omitted thus altering the aggregate value of the contract. No claim for loss of profit / business shall be entertained on this account. 30.The Bank reserves the right to distribute the work for which quotations have been called, among more than one parties, if found necessary. No claim in this respect shall be considered and the contractor agrees to cooperate with other agencies appointed by the Bank. 31. All the workers of the contractor must be properly covered by an insurance policy under “Workman’s Compensation act” and “Fatal Accidents Act”. The contractor at his own expenses arrange to effect and maintain until the virtual completion of the contract, insurance policy in the joint name of Bank and the contractor against this risk to be retained by the Bank until the virtual completion of the work, and indemnify the Bank from all the liabilities arising out of such events. In case of delay, contractor shall arrange to extend insurance policy till work is completed. 32. All the work should be completed within the specified period in the tender. If the work is delayed due to the reasons beyond the control of the contractor, he should keep intimating the Bank explaining, therein the reasons for such delays, immediately and if in the opinion Bank’s authorities the delay is justified, the contractor shall be granted extension in time limit. 33.The rates quoted by the contractor shall be firm throughout the duration of contract (including extension of time if any granted) and will not be subject to any fluctuation due to variation in cost of material and labour. 34.Conditional tenders are liable to be rejected. 35.The successful tenderer is bound to carry out any item of work necessary for the completion of the job even those such items are not included in schedule of quantities. SIGNATURE OF THE BIDDER Page 10 36.If in any case of work required to be abandoned, the contractor shall not be entitled for any claims and he will be paid as per the actual work done till that period, if deemed fit. 37. Decision of the Bank shall be final and binding on any matter connected with the work. The matter of any dispute shall be decided after mutual discussions based on the terms and conditions of this contract. However, if the matter cannot be resolved then the same shall be referred to the respected qualified person/arbitrator agreeable to both the parties and his opinion shall be binding. This is precourse to any legal action in this regard. 38.If at any stage during the progress of work, it is observed that the contractor is not progressing the work with due diligence, care of lagging much behind the schedule or fails to gear up the work despite instructions from Bank’s Architect, the Employer (Bank) reserves the right to terminate the contract with 7 days notice. In such case the contractor shall be liable to pay the Employer any extra cost involved for the completion of the said work and will not obstruct any way in completing the work through other agency. After completion of entire work the contractor shall be paid for the actual work executed by him at the quoted rates after deducting any claims, damages. In case of such termination the security deposit held by the Bank will be forfeited. 39. Contractor shall follow all rules / regulations in force and should posses the license for employing labour and also follow all safety measures, labour bye laws and shall be responsible for any lapse. 40.At any stage i.e. during the execution of work, any kind of change reqd. whether it is in design or specification, the same has to be in-corporate by the contractor. CONTRACTOR ORIENTAL BANK OF COMMERCE SIGNATURE OF THE BIDDER Page 11 List of Approved Makes/Brands for Material Air Conditioning Works S.No. 1 Item Indoor/Outdoor unit Carrier Make Voltas /Hitachi/Blue Star (Copper coil) 2 Starters L&T 3 Cables (power) Finolex /power flex /RR-Kabel 4 Cables(control) Finolex /power flex /RR-Kabel 5 Pipe PVC Kalinga / AKG / Precision 6 Thermocole Beardsell 7 Grills / Diffusers Air Master / Air Breeze 8 Voltage Stabilizer LUMINOUS, VOLTAS , BLUE BIRD 9 Insulation Foam PARAMOUNT, SUPREME 10 Copper Pipes MET, DIAMOND SIGNATURE OF THE BIDDER Page 12 SCHEDULE OF QUANTITIES ( M/S Narender Consultants) Sub: Air Conditioning works for OBC's at B/O GAUR CITY NCR , NEW DELHI CLUSTER S.No. ITEM QTY UNIT RATE (Rs.) HIGH WALL SPLIT UNITS 1 Providing/Supplying of Air cooled Hi Wall Split AC Units Comprising of aircooled split AC complete with indoor & outdoor unit with cordless remote control as required a Nominal Capacity - 1.5 TR ( Make - Blue Star,Hitachi , Voltas. 2 Nos b 2 TR 3 Nos 2 Installation testing comisioning of Hi -Wall Split AC 1.5 TR Capacity 2 Nos 2 TR Capacity 3 Nos. 5 Nos a b VOTAGE STABLIZER FOR HIGH WALL SPLIT AC 3 Supply installation testing & comisioning of Voltage Stabilizer of approved make- 4 KVA Note: All voltage stabilizer is sufficient for A.C.should have time delay facility. SIGNATURE OF THE BIDDER Page 13 AMOUNT (Rs.) 4 Copper Refrigerant Piping : Installation & commissioning of Soft copper piping 12mm with complete fiting & insulation including chisling, plastering of walls to conceal copper pipe & electrical wire with plaster finish 5 60 Rmt 55 Rmt 5 Nos Electrical Cable Providing & fixing of interconected electrical wiring between indoor & outdoor unit as req. complete as per design & specification of manufacturer 7 Rmt Drain Piping Hard PVC insulated drain water piping work of size 25 mm dia with complete fitting including Chisling, plastering of walls etc complete 6 50 Frame Work :Supply fabrication & installation of MS angle iron stand with safety cage for ODU complete with hanger& suporting Arrange-ments as required For High Wall split ACs TOTAL AMOUNT Note:1. Components of A.C. should have 5 years warranty 2. Air- Conditioners should be 3 star rated 3. Amount to be received for existing AC's under payback scheme as per Bank's policiy SIGNATURE OF THE BIDDER Page 14 SIGNATURE OF THE BIDDER Page 15