INSTALLATION INSTRUCTIONS Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes. M9700C SERIES Hydrel's M9700 Series of modular in-grade lights are an assembly of the following components. Each component is shipped and installed separately. Components (in order of installation): Rough-In Section – MRIS rough-in housing is installed first during the electrical installation. This houses the remainder of the M9700 Series components. MRISC97RC -round Power Module – MHSL power (ballast/transformer) module or is installed within the MRIS rough-in housing. The sealed power module operates the M9700 Series MACL lamp module via the attached cord and plug. MHSLC97 Finishing Section – MFS finishing section includes the door trim and rotolock ring for the single lensed M9710 & M9730. The MFS includes the door, lens assembly and aimset ring for the double lensed M9720 and M9740. MFSC97R - round single lens LED Module – MACLC LED module is installed within the MFS support/tilt ring. The sealed module is connected to the MHSL power module for operation via the waterproof cord and plug. MACLC ROUGH-INSECTION MRISC97SC - square MFSC97S - square single lens MFSC97RD - round double lens MFSC97SD - square double lens M9710C M9720C M9730C M9740C Round Single Lens Round Double Lens Square Single Lens Square Double Lens FINISHING SECTION LED MODULE POWER (DRIVER) MODULE ©2005 Hydrel Rev. 6/14/04 REV 0 NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: "Used for information purposes only. It does not govern manufacturing or inspection requirements." (ANSI Y14.5-1973) 9144 Deering Ave., 2nd Floor Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com M9700C Housing INSTALLATION INSTRUCTIONS Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes. TO INSTALL 1. Dig hole to appropriate depth allowing for 6” minimum of pea gravel at bottom of rough-insection for drainage. ROUGH-IN SECTION (MRISC) SUITABLE FOR WET LOCATIONS - IP68 INSTALLATION DIAGRAM Note: More pea gravel or additional drainage may be required in locations that have poor soil drainage and/or subject to freezing. 2. Install the rough-in-section flush with finish grade of earth or concrete only. No specific orientation for the rough-in is required. CAUTION: WHEN INSTALLING IN ORGANIC MULCH, SURROUND ROUGH-IN-SECTION WITH APPROX. SIX INCHES (15cm) OF SAND OR OTHER NON-ORGANIC SUBSTANCE. CAUTION: TEMPORARY COVER MUST REMAIN IN HOUSING DURING INSTALLATION. 3. Connect conduit to junction box. Use suitable thread sealing compound. Duct sealant may be added to the conduit to prevent water from traveling from fixture to fixture in the even the conduit is breached. TO PULL ELECTRICAL CONDUCTORS 1. Remove temporary cover with fastener wrench provided. 2. Remove junction box cover and gasket. Pull conductors. 3. Seal conduit entry with suitable compound to prevent moisture penetration from conduit system. 4. Re-install junction box cover and gasket with fasteners provided. CAUTION: DO NOT OVER TIGHTEN (20 in-lbs or 2 N-m). 5. Re-install temporary cover with supplied fasten-ers. CAUTION: DO NOT OVER TIGHTEN (20 in-lbs or 2 Nm). INSTALLATION DIAGRAM CAUTION: LEAVE TEMPORARY COVER IN PLACE UNTIL READY TO INSTALL FINISHING SECTIONS. ©2014 Hydrel 8/20/15 M9700C Housing Installation NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: “Used for information purposes only. It does not govern manufacturing or inspection requirements.” (ANSI Y14.5-1973) 9144 Deering Ave., 2nd Floor Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com M9700C DRIVER INSTALLATION INSTALLATION INSTRUCTIONS Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes. NOTICE: DO NOT CONNECT LED MODULE WHILE SYSTEM IS ENERGIZED. TURN OFF POWER PRIOR TO LAMPING. CAUTION: TEMPORARY COVER MUST REMAIN IN HOUSING UNTIL READY TO INSTALL INTERNAL COMPONENTS 1. Remove temporary cover from rough-in-section. 2. Remove junction box cover & gasket. 3. Loosen junction box cord seal nut. Run pig tailed supply cord from power module through cord seal and junction box cover (provide enough cord for proper splicing within junction box). 4. Tighten junction box seal nut around power cord. 5. Place power module in bottom of rough-in-section. 6. Make electrical connections. INSTALLATION DIAGRAM WIRING THE DRIVER Temporary Cover Power Module Note: Use silicone-filled wire nuts or fill junction box with re-enterable potting compound (PC21) prior to replacing lid and gasket. If using potting compound be sure to seal the conduit with plumbers putty before pouring the potting compound to prevent it leaking into the conduit. 7. Re-install junction box cover and gasket. Driver Module Tighten to ensure proper sealing. CAUTION: DO NOT OVER TIGHTEN (20 inlbs or 2 N-m). 1. STANDARD 3 WIRE ELECTRICAL - SINGLE CORD TO SINGLE CORD SPLICE POWER FROM FIXTURE 2. SUPPLY POWER LDIM (0-10 volt) 5 WIRE - SINGLE CORD TO DOUBLE CORD SUPPLY POWER - LINE VOLTAGE POWER FROM FIXTURE - + ©2014 Hydrel 8/20/15 M9700C LED MODULE INSTALLATION 0-10 LOW VOLTAGE DIMMING LINE NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: “Used for information purposes only. It does not govern manufacturing or inspection requirements.” (ANSI Y14.5-1973) 9144 Deering Ave., 2nd Floor Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com M9700C LED INSTALLATION INSTALLATION DIAGRAM FINISHING SECTION INSTALLATION Door Door Top Lens LED Module Tilt Ring Rotolock Ring LED Module Rough-In Housing Aim Lock Ring Rough-In Housing Single lens fixture assemblies (M9710/M9730) Double lens fixture assemblies (M9720/M9740) 1. Install rotolock ring or aimlock ring into top of rough-in housing. Do not secure ring to housing. 2. For single lensed luminaires skip to step 3. For double lensed luminaires secure the tilt adjustment ring to lamp module while assembly is outside of the housing. Position the module into the tile ring by aligning the module pin with the tilt ring slot and then tighten the three set screws around the rim. 3. Plug driver module into base of lamp module assembly. 4. Place LED module assembly into the rotolock or aimlock ring. PUSH CORD DIRECTLY INTO LAMP MODULE - DO NOT TWIST! ©2014 Hydrel 8/20/15 M9700C LED MODULE INSTALLATION NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: “Used for information purposes only. It does not govern manufacturing or inspection requirements.” (ANSI Y14.5-1973) 9144 Deering Ave., 2nd Floor Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com M9700C LED INSTALLATION AIMING INSTRUCTIONS CAUTION: AVOID LOOKING DIRECTLY INTO LIGHT SOURCE DURING AIMING. FIXTURE LENS MAY BECOME HOT. AVOID CONTACT WITH BARE SKIN. 5. Energize the fixture, allowing it to fully reach operating temperature and light output. 6. Rotate the LED module and its support ring (rotolock or aimlock) until desired position is achieved. 7. Once the desired aiming position is determined, secure the support ring into the housing with the attached fasteners. CAUTION: DO NOT OVER TIGHTEN (20 in-lbs or 2 N-m). 8. For the double lensed luminaires adjust the lamp module tilt by turning the single phillips head screw at the top of the module tilt ring. 9. Install the finish door assembly with the fasteners provided. CAUTION: DO NOT OVER TIGHTEN (20 in-lbs or 2 N-m). 20° 10° FLC10 FLC20 Single lensed fixture can be aimed using 10°and 20° tilt lenses only. Lenses are made of prismatic glass that bend the beam of light. Tile lenses have an arrow molded into the top showing the direction the beam of light will be aimed. The entire lamp module and roto-lock ring can be spun 360°to aim. Once aiming has been set, lock the roto-lock ring down to maintain the aiming. Double lens fixtures can be mechanically and optically aimed. The LED module can be mechanically aimed up to 15° by adjusting the tilt ring. FLC10 and FLC20 tilt lenses may also be used to optically aim the beam of light. The entire lamp module and aim set ring can be spun 360° to aim. Once aiming has been set, lock the aimset ring into the housing to maintain aiming. The tilt ring is keyed into the aimset ring to ensure that fixture aiming is never compromised. ©2014 Hydrel 8/20/15 M9700C LED MODULE INSTALLATION NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: "Used for information purposes only. It does not govern manufacturing or inspection requirements." (ANSI Y14.5-1973) 9144 Deering Ave., 2nd Floor Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com