ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 614 SEPTEMBER 1984 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 614.01 SCOPE 614.02 REFERENCES 614.05 MATERIALS 614.05.01 .02 .03 .04 .05 .06 .07 .08 Substation Distribution Assembly Distribution Assembly Supply Control Cabinet Assembly Photoelectric Controllers Aluminum Poles Cables and Cable Connectors Grounding Materials Conduit and Fittings 614.07 CONSTRUCTION 614.07.01 .02 .03 .04 .05 .06 Pad Mounted Power Supply Equipment Pole Mounted Power Supply Equipment Cable and Fuse Grounding Photoelectric Controllers Quality Control 614.09 MEASUREMENT FOR PAYMENT 614.10 BASIS OF PAYMENT 614.10.01 .02 All Inclusive Price Method Individual Item Method 614.01 SCOPE This specification covers the requirements for the installation of Substation Distribution Assembly, Distribution Assembly, and Supply Control Cabinet Assembly. The requirements of OPSS 601 shall apply to this work. Page 1 Rev. Date: 09/1984 OPSS 614 614.02 REFERENCES This specification refers to the following standards, specifications or publications: Ontario Provincial Standard Specifications, Construction: OPSS 601 OPSS 603 OPSS 604 OPSS 609 Electrical Work - General Underground Ducts Cable Installation Grounding Ontario Provincial Standard Specifications, Material: OPSS 2413 OPSS 2414 OPSS 2452 OPSS 2480 OPSS 2485 Substation Distribution Assembly Single Phase and Three Phase Distribution Assembly - Single Phase and Three Phase Aluminum Poles Supply Control Cabinet Assembly Photoelectric Controllers Others: CSA Standard C 22.2 No. 136 - 1966 - Rigid PVC (Unplasticized) Conduit 614.05 MATERIALS 614.05.01 Substation Distribution Assembly Substation distribution assemblies - single phase and three phase shall meet the requirements of OPSS 2413. 614.05.02 Distribution Assembly Distribution assemblies - single phase and three phase, shall meet the requirements of OPSS 2414. 614.05.03 Supply Control Cabinet Assembly Supply control cabinet assemblies shall meet the requirements of OPSS 2480 and the specific requirements indicated in the contract. 614.05.04 Photoelectric Controllers Photoelectric controllers shall meet the requirements of OPSS 2485. 614.05.05 Aluminum Poles Aluminum poles shall meet the requirements of OPSS 2452. 614.05.06 Cables and Cable Connectors Cables and cable connectors shall meet the requirements of section 604.05 of OPSS 604. 614.05.07 Grounding Materials Grounding materials shall meet the requirements of section 609.05 of OPSS 609. Page 2 Rev. Date: 09/1984 OPSS 614 614.05.08 Conduit and Fittings Rigid PVC conduit and fittings for the installation of pole mounted equipment shall meet the requirements of CSA Standard C 22.2 No. 136. 614.07 CONSTRUCTION 614.07.01 Pad Mounted Power Supply Equipment Equipment enclosures shall be trial fitted squarely and symmetrically on the concrete pad prior to drilling for concrete inserts. Drilling locations shall be marked to maintain this alignment. A neoprene gasket shall be attached squarely and symmetrically on the bottom channel of the enclosure prior to installation, with holes for mounting bolts drilled where necessary. Anchor bolts shall be secured in place in the locations shown in the manufacturer's instructions or where bolt holes have been provided. 614.07.02 Pole Mounted Power Supply Equipment Supply control cabinet assemblies shall be mounted securely on poles using stainless steel strapping. Rigid PVC conduit and fittings shall be installed on wood poles using PVC coated pip straps with galvanized lag screws at 1.5 m maximum centres. Installation on metal or concrete poles shall be done using stainless steel strapping at 1.5 m maximum centres. The conduit system shall be installed in straight lengths to follow the taper of the pole. Offset bends shall be used where required to avoid pole attachments and shall be kept free of kinks or scorch marks. Cabinets shall be accurately drilled to accept bolt-on weatherproof meter hubs for top entry or terminal adapters for bottom entry. A meter socket, acceptable to the Supply Authority, shall be installed where indicated in the contract. 614.07.03 Cable and Fuse Cables, terminations and connections shall be installed in accordance with the requirements of OPSS 604. Service cables, from the point of service connection to the main disconnecting means shall meet the requirements of the Code. High voltage fuses shall be approved by the Supply Authority prior to installation. 614.07.04 Grounding All pad mounted equipment shall be grounded by means of ground wire jumpers connected between the equipment ground bus and the exterior ground grind. Lighting arrestors shall have the ground cable connected securely to the equipment ground bus. The neutral bus of the main disconnecting means or the secondary neutral terminal of the transformer shall be grounded. In supply control cabinet assemblies, the system ground wire and the service ground wire shall be connected to the neutral bus. All grounding work shall be carried out in accordance with the requirements of OPSS 609. 614.07.05 Photoelectric Controllers Photoelectric controllers shall be installed on poles with twist lock mounting adapters and brackets. Brackets shall be mounted on metal or concrete poles with stainless steel strapping or on wood poles with galvanized lag screws. The photo-conductive cell window shall be set to face in a northerly direction but away from any nearby light sources. Page 3 Rev. Date: 09/1984 OPSS 614 614.07.06 Quality Control The Contractor shall perform all tests on wiring of equipment in accordance with the requirements of section 604.07 of OPSS 604. The Contractor shall perform all tests on grounding of equipment in accordance with the requirements of section 609.07 of OPSS 609. 614.09 MEASUREMENT FOR PAYMENT Where the contract includes tender items using the Individual Item Method, measurement for each will be made for: Substation Distribution Assemblies Distribution Assemblies Supply Control Cabinet Assemblies 614.10 BASIS OF PAYMENT 614.10.01 All Inclusive Price Method Payment at the contract price for the tender item 'Power Supply Equipment' shall be full compensation for all labour, equipment and materials required to do all work described herein including the installation of substation equipment - single phase and three phase, substation distribution assembly single phase and three phase, distribution assembly single phase and three phase, supply control cabinet assembly, photoelectric controllers, adapters and brackets, aluminum poles, cables, conduits and fittings connecting items of equipment or installed vertically on poles, ground wire and connections installed in equipment or vertically on poles excluding ground wire and ground rods beyond the edge of concrete pads or poles. Such payment shall include compensation for all testing accessories required. 614.10.02 Individual Item Method Payment at the contract price for the tender item(s): "Substation Distribution Assemblies". "Distribution Assemblies" shall be full compensation for all labour, equipment and materials required to install substation distribution equipment, substation distribution assembly, distribution assembly, aluminum poles, cables and connections between items of equipment, conduits and fittings connecting items of equipment, photoelectric controllers, adapters and brackets, ground wire and connections installed in equipment excluding ground wire and ground rods beyond the edge of the concrete pad. Such payment shall include compensation for tests and accessories required. Payment at the contract price for the tender item 'Supply Control Cabinet Assemblies' shall be full compensation for all labour, equipment and materials required to install supply control cabinet assembly, regardless of type, size, location or type of pole and shall include vertical runs of conduit and cables, connections and fittings, photoelectric controllers, adapters and brackets, protective moulding, vertical runs of ground wire and all connections, excluding ground wire and ground rods beyond the edge of the pole. Such payment shall include compensation for all testing and accessories required. Page 4 Rev. Date: 09/1984 OPSS 614