PV`S PV`S PV`S PV`S PV`S PV`S PV`S PV`S rooms and windows

advertisement
NOTES
DO NOT SCALE FROM THIS DRAWING.
ALL DIMENSIONS TO BE CHECKED ON SITE.
ALL OMISSIONS AND DISCREPANCIES TO BE
REPORTED TO THE ARCHITECT IMMEDIATELY.
PV’S
RWO
PV’S
BLOCK 4
PRIVATE
BLOCK 5
AFFORDABLE SOCIAL(LG)
AFFORDABLE INTERM (LG-3)
PRIVATE (LG,3-9)
The internal layouts within
apartments will be subject
to design development. The
precise location of walls and
internal doors, and the detailed
layout of bathroom and kitchen
areas will be the subject of
non-material changes and may
vary from the internal layouts
set out in these plans. These
minor alterations will not affect
the position and arrangements
of external doors and windows
nor will they affect the relative
relationship between habitable
rooms and windows.
Levels of affordable housing
shown are indicative and
subject to viability and
agreement with relevant
authorities.
BLOCK 3
PRIVATE
BLOCK 2
EXTRA CARE
PV’S
PV’S
PV’S
PV’S
Revision description
BLOCK 1A
AFFORDABLE: SOCIAL
Date
Check
BLOCK 1B
AFFORDABLE: SOCIAL
PV’S
PV’S
Project
195 Warwick Road
London W8
Drawing
N
Homebase_Combined Site Plan
Roof
Tenure Change
Drawn
Date
Scale
DBE
October 2013
1: 250@A1
1: 500@A3
Job number
Drawing number
Revision
07067
P_RF_C645_100
-
Rev
Download