SOMALI ENERGY TRANSFORMATION (SET) PROJECT Solar PV installation BOQ MARCH 2016 LOT 1 Health Centers 1. Godmo Biyo Cas MCH- Sanaag Region 2. Kalabyth Health Center- Sool Region. 3. Deg Agabar MCH- Maroji Jeex Region. 4. Garadag MCH- Sanaag Region. 5. Suuqsade Health Center- Sahil Region 1. Godmo Biyo Cas MCH- Sanaag Region Equipment Details Description Units 125W multicrystalline solar panel,12VDC No 800W, 12V Effecto inverter,transformer based No 200Ah,12V Sealed maintenance-free solar batteries No 50Amp PWM charge controller, 12/24VDC No Solar mounting structure No Battery cabinet No 18W energy saving bulbs No Accessories & BOS Lot 1.5sqmm TFE Cable Mtrs 2.5sqmm TFE Cable Mtrs Internal wiring sundries Lot Installation labour Lot Total Qty Unit Cost Total Cost 4 1 2 1 1 1 24 1 200 50 1 1 2. Kalabyth Health Center- Sool Region. Equipment Details Description Units 250W multicrystalline solar panel, 24VDC No 1600W, 24V Effecto inverter No 200Ah,12V Sealed maintenance-free solar battery No 50Amp OPTI MPPT charge controller, 12/24VDC No Solar mounting structure No 18W energy saving bulbs No Accessories & BOS Lot Qty Unit Cost Total Cost 10 1 10 1 1 90 1 1 1.5sqmm TFE Cable 2.5sqmm TFE Cable 2.5sqmm 2-core armored Cable Internal wiring sundries Installation labour Total Mtrs Mtrs Mtrs Lot Lot 800 400 300 1 1 3. Deg Agabar MCH- Maroji Jeex Region. Equipment Details Description Units 125W multicrystalline solar panel,12VDC No 800W, 12V Effecto inverter Transformer based No 200Ah,12V Sealed maintenance-free solar battery No 45Amp Steca charge controller, 12/24VDC No Solar mounting structure No Battery cabinet No 18W energy saving bulbs No Accessories & Balance of system Lot 1.5sqmm TFE Cable Mtrs 2.5sqmm TFE Cable Mtrs Internal wiring sundries Lot Installation labour Total Qty Unit Cost Total Cost Unit Cost Total Cost 4 1 2 1 1 1 24 1 200 50 1 1 4. Garadag MCH- Sanaag Region. Equipment Details Description Units 125W multicrystalline solar panel,12VDC No 800W, 12V Effecto inverter, transformer based No 200Ah,12V Sealed maintenance-free solar battery No 45Amp Steca charge controller, 12/24VDC No Solar mounting structure No Battery cabinet No 18W energy saving bulbs No Accessories & Balance of system Lot 1.5sqmm TFE Cable Mtrs 2.5sqmm TFE Cable Mtrs Internal wiring sundries Lot Installation labour Total Qty 4 1 2 1 1 1 24 1 200 50 1 1 2 5. Suuqsade Health Center- Sahil Region Equipment Details for Suuqsade Health Centre Description 125W multicrystalline solar panel,12VDC 200Ah,12V Sealed maintenance-free solar battery 45Amp Steca charge controller, 12/24VDC Solar mounting structure Battery cabinet 18W energy saving bulbs Accessories & Balance of system 1.5sqmm TFE Cable 2.5sqmm TFE Cable Internal wiring sundries Installation labour Total Units No No No No No No Lot Mtrs Mtrs Lot Lot Qty Unit Cost Total Cost 4 4 2 1 1 1 24 1 200 50 1 3 1. EQUIPMENT TECHNICAL SPECIFICATIONS 1.1 Schools and MCHs Inverter/Charger (i.e. Inverters with Built-in AC Battery Chargers) Rated Continuous Output power - specify Surge Power Capability - 200% of rated continuous Power Peak Efficiency (Minimum) - 85% Frequency - 50Hz Nominal Input voltage Output specify Voltage Range Output - 220 - 240V AC (RMS) Voltage Regulation - +/- 5% Output wave form - Pure Sine wave Battery low shut down voltage Protection - specify (electrical) Power factor capability Charging algorithm of - Overload and short circuit charger Charger input voltage range - Low battery disconnect Minimum rated Charging Current specify Guarantee - 3 years minimum a) High Frequency Transformer-less Inverter is NOT acceptable. b) Only Pure Sine-wave output is acceptable. Modified sine wave output wave form is NOT acceptable 1.1 Solar Charger Controller Main features Series or Shunt type, constant-voltage, pulse width modulation (PWM) charging, with battery type (sealed/gel and flooded lead acid) selection provision and temperature compensation. MPPT acceptable Nominal Voltage - specify Rated solar charging current - specify Earthing - Negative earth Metering - Digital metering for currents and voltages Operating temperature - -40 to + 60o C Protection - Reversed polarity protection - Overload and short circuit protection - Lightning and transients surge protection - Night reverse current protection (blocking diode or equivalent.) Self- Consumption - 0.5% (Maximum) of rated current Status Indicators (minimum) Charging and low battery visual indicators Guarantee - 3 years minimum 1.2 Solar Batteries Rated capacity - minimum capacity of 100Ah. Battery Type - specify. Plate type - Flat plate or Tubular acceptable. 4 Electrolyte Nominal Voltage Casing material Warranty 1.3 Solar Photovoltaic Modules Module Type: - specify. - specify. -Supply may be in 12V or 24V mono blocks. Self-discharge per month - 6% maximum Cycle Life - 1,500 cycles at 20% daily depth of discharge - Polypropylene or similar translucent/transparent case or equivalent - 3 years - High efficiency crystalline silicon modules (mono or Poly crystalline) or equivalent - please specify - specify - specify Voltage at maximum Open circuit Voltage (Minimum power minimum Power rating:) Warranted - specify Number of cells per module Maximum system voltage: Guarantee: - 20 Years minimum 1.4 Electrical Fittings, Switchgear and Accessories Electrical switchgear (such as switches, sockets, consumer units, fuses etc.) must be high quality certified to the relevant Kenyan (KS), IEC, British (BS) or equivalent standard. Proof of such certification and origin may be requested. 1.5 Installation Hardware a) Mounting structure: The solar modules shall be mounted on structures fabricated using Iron or Aluminum, strong enough to withstand windstorms of 100km/hr. and be painted to reduce corrosion. Fasteners and other installation accessories (screws, bolts, etc.) should be galvanized or stainless steel. The structures when mounted shall have the modules tilted at an appropriate angle from the horizontal plane and the space between them and the roof/ground shall be at least 6 inches. b) Battery box/rack: The solar batteries (Accumulators) shall be placed in wooden boxes and stacked on racks fabricated from steel and painted to reduce corrosion. c) Cabling: The works shall be carried out in cable routes and therefore the wiring shall be as per standards of existing cable routing or better. Cables and wires shall be of the correct size and quality to carry the minimum requisite current and appropriate voltage drop, laid neatly, adequately fixed, and appropriately terminated. d) Earthing: The array structure of the PhotoVoltaic yard shall be grounded using adequate number of earthing kits. All metal casing / shielding shall be thoroughly grounded to ensure safety of the Solar Photovoltaic power system. Earth resistance readings must be measured by a qualified person and submitted. Resistance values shall conform to IEE regulations. e) Lightning: The system shall be provided with lightning & over voltage protection. The main aim in this protection shall be to reduce the over voltage to a tolerable value before it reaches the PV or other sub system components. The source of over voltage 5 can be lightning, atmosphere disturbances etc. Metal oxide variastors shall be provided inside the Array Junction Boxes. In addition suitable MOV‟s (Metal Oxide Varistors) also shall be provided in the Inverter to protect the inverter from over voltage. f) Installation: The installation will be done in conformity with relevant Kenyan (KS), IEC, British (BS) or equivalent. g) Testing and Commissioning: After the completion of the works, the vendor will perform all necessary tests to ensure the Works comply with the client’s requirements and proceed to the systems‟ commissioning and handing over to the client. h) Preferred origin of equipment should be EU and ACP countries System outline Solar Panels Solar Inverter Battery bank Charge Controller Loads/Consumer units 6