In 1974, the movie Towering Inferno sparked the imagination of
Richard Licht, a 3M product developer who passionately believed 3M technologies could be used to improve the safety of multi-story buildings.
Several devastating fires – including the 1980 MGM Grand Hotel fire that killed 84 people and injured 679, inspired Licht to develop the first firestop products based on existing 3M intumescent technology.
Recognized by many as “The Father of Fire stopping,” Licht also helped develop some of the first firestop requirements in commercial building codes. He worked tirelessly to make the codes more demanding to improve the safety of buildings.
and
As an industry leader, 3M drives technologies that enable lower cost building solutions. For instance, 3M intumescent technology enabled the use of plastic pipes that were originally banned in commercial buildings due to their combustible nature – providing a cheaper, easyto-install solution for electrical conduits and plumbing lines.
3M TM gains reputation for leadership and earns the industry's trust:
1980
3M TM Fire
Barriers
FS-195
Wrap/Strip
Introduced.
1981
3M TM helps write the first specific test standard for through penetration firestop systems
(ASTM E 814).
1982
3M TM Fire
Barrier CP25
Caulk,
3M TM Fire
Barrier Putty
303 and
3M TM Interam
Mat indroduced.
1990
3M developes an insustry milestone with reformulated,
TM Fire water-based 3M
Barrier
CP25WB Caulk - easier to clean and less environmentally inpactful than most solvent based caulks.
1994
3M TM introduces fire protection wraps for grease, air, fume and plenum ducts. This established
3M TM as a full service fire protection provider for through penetrations, construction joints and now protective insulative wraps.
1997
3M TM
Introduces
Firedam spray for construction joints to meet AS TM
1399 test criteria.
2003
3M TM launches first firestop sealants to meet new UL Water
Leakage test, W
Rating-Class 1 requirements.
2004
3M TM named #1 brand preffered by installers of firestop products.
2006
3M TM develops e-Train, a comprehensive on-line firestop program that has become the industry benchmark for training.
Passive fire protection functions to contain fires at the source, preventing loss of life by preventing the products of combustion (smoke, hot gases and flames) from spreading throughout a building.
Passive fire protection is a proven method of protecting structures against fire, and of providing protection to services within concealed spaces by reducing/minimizing/delaying the spread of a fully grown fire to different compartments to prevent/reduce loss in terms of life and property. A vital factor in reducing this risk is to provide physical barriers to the spread of fire within the building by dividing it in to a series of compartments.
The protection of the structural flame, the enclosure and protection of vertical and horizontal openings, effective firestopping at junctions, protection of service penetrations, and use of low flame spread finishing materials and non-combustible materials are all economically viable, effective & important considerations.
Having passive protection in place helps assure building occupants that there will be time to exit before gases, fire and smoke spread throughout the building. If active systems fail, as they often do, then there is still a passive system in place for life safety.
It can be achieved by use of an effective Firestopping system. Firestopping is an integral part of fire protection engineering. Firestop systems protect against the passage of flames, deadly gases and toxic smoke through openings that are created for penetrations, joints and gaps in fire. Resistive walls, floors and floor/ceiling assembly.
The integrity of fire-rated assemblies is restored by firestop systems.
3M TM is proud to be the industry leader in firestopping.
Our dedication to stringent testing and code developments help make buildings safer today than they were even
10 years ago. And when that dedication is backed by the 3M TM brand, you get what you would expect – proven reliability and outstanding service.
The construction industry is increasingly moving towards easy-to-use firestop solutions. That’s why 3M TM , in its leadership role, provides cutting-edge and fully integrated systems. These systems are designed to help you efficiently build safer buildings that protect lives and property.
The majority of 3M TM ’s firestopping innovations are tested on-site in the company’s own UL and Intertek certified fire-test center. By testing these systems in actual job-specific conditions, we help you with high-quality, effective firestopping solutions.
Building designs and uses continue to evolve, and so too must 3M TM firestop technology. For example, in buildings where telecommunication cables are constantly being upgraded, the 3M™ Fire Barrier Pass-Through Device allows for re-enter ability and helps keep cables organized and protected.
From time-tested fire barrier sealants to today’s innovative firestop devices and duct wraps,
3M TM scientists work to develop solutions to firestop virtually anything on a building site. With over 100 products and over 1000 tested approved systems, 3M TM has the most complete program for all your firestopping needs.
Fires are a major hazard to human life and cause costly damage to infrastructure. With major information/data, huge investments and above all life at risk, the IT-
ITES and Telecom sector stands at a higher risk than any normal office complex. The losses in terms of life, resources, business downtime are huge. The limited escape facilities and the difficulties encountered by intervention forces in gaining access, call for extensive safety arrangements which must be complementary and mutually coordinated.
Application Areas
Application Area
Vertical Shaft and risers
Electrical, Mechanical, telecom and all other service shafts at floor level
Sealing of all wall openings in through the shaft
Construction and Expansion Joint
Curtain wall opening
Opening around HVAC ducts
Cable entrance facility (CEF) area
Power Area
Main Distribution Frame (MDF) Area
Standby Engine Area
Signal processing equipment areas
Reference to System details
3M TM Fire Barrier Composite Sheet 195+
3M TM Fire Barrier Endothermic Mortar
3M TM Fire Barrier Sealant IC 15WB
3M TM Fire Barrier FD 200
3M TM Fire Barrier FD 200
3M TM Fire Barrier Mortar/IC 15WB
3M TM Fire Barrier CS 195/ FD 240/ FD 2000
3M TM Fire Barrier FD 240/CS 195+/FD 2000
3M TM Fire Barrier Mortar/FD 240/FD 2000
3M TM Fire Barrier CS 195+
3M TM Fire Barrier CS 195+/ Mortar
Fire safety not only provides life safety but it also gives you a competitive
Fire protection is the prevention and reduction of the hazards associated with fires. It involves the study of the behavior, compartmentalization, suspension and investigation of fire and its related emergencies as well as the research and development, production, testing and application of mitigating systems.
Application Areas
Application Area
Vertical Shaft and risers
Electrical, Mechanical, telecom & all other service shafts at floor level
Sealing of all wall openings in through the shaft
Construction and Expansion Joint
Curtain wall opening
Opening around HVAC ducts
Kitchen Exhaust Duct
Basement Electrical Room
Reference to System details
3M TM Fire Barrier Composite Sheet 195+
3M TM Fire Barrier Endothermic Mortar
3M TM Fire Barrier Sealant IC 15WB
3M TM Fire Barrier FD 200
3M TM Fire Barrier FD 200
3M TM Fire Barrier Mortar/IC 15WB
3M TM Fire Barrier Duct Wrap 615+
3M TM Fire Barrier FD 240/CS 195+/FD 2000
Hospitality industry is one of the most prominent symbols of economic growth which has evolved dramatically in order to cater to specific and ever demanding customer needs. Structures are no longer built out of simple
Main design issues in regards to fire protection and fire safety in the Hospitality Industry is due to High
Occupant load, demographic and cultural differences, increased value of exposed materials, introduction of escalator and mezzanine floors and inter-relationships between multiple classification buildings within modern buildings.
Application Area
Application Area
Vertical Shaft and risers
Electrical, Mechanical, telecom and all other service shafts at floor level
Sealing of all wall openings in through the shaft
Construction and Expansion Joint
Curtain wall opening
Opening around HVAC ducts
Kitchen Exhaust Duct
Services passing through the corridor
Opening around the pressurization duct
Any services passing through lift lobby area
Reference to System details
3M TM Fire Barrier Composite Sheet 195+
3M TM Fire Barrier Endothermic Mortar
3M TM Fire Barrier Sealant IC 15WB
3M TM Fire Barrier FD 200
3M TM Fire Barrier FD 200
3M TM Fire Barrier Mortar/IC 15WB
3M TM Fire Barrier Duct Wrap 615+
3M TM Fire Barrier FD 240/CS 195+/FD 2000
3M TM Fire Barrier Mortar/FD 240
3M TM Fire Barrier FD 240
Product Description
3M™ Fire Barrier CS-195+ Composite Sheet is a one-part composite system comprised of four components. The heart of the system is an organic/ inorganic, fire-resistive elastomeric sheet.
3M™ Fire Barrier CS-195+ Composite Sheet is designed to seal larger penetrations through fire-rated walls and floors. The nominal
0.3 inch (7.62 mm) thick composite sheet provides up to a 4-hour fire rating. When exposed to temperatures in excess of 250°F
(121°C), the fire-resistive sheet begins to volumetrically expand and swells 8-10 times its original size, forming a high strength, hard char that retards heat transmission. This expansion process is called “intumescence”.
From 2 hours to 4 hours depending on the system and application for walls and floors penetration.
Product Features and benefits:
• Intumescences (expands with heat) to form a hard char that tightly seals penetrations against flame spread, smoke and toxic fumes.
• Multiple applications: It can be used for through penetration firestop, heat shield and
firebreak protection.
• Easy to install using common trade tools, No mixing or damming required
• Lightweight: It is easy to handle, cut and form to desired shape.
• Easy to fasten: Bolt punch or drill through. Use self-tapping screws or anchor bolts.
• Thermally conductive: Allows unwanted heat build-up to escape.
• UL Classifi ed: Tried and tested. Peace of mind for the customer.
• Cost eff ective: High performance versus installed cost.
• Versatile and Re- enterable: Can be cut to fit irregular shapes.
Installation
1. Cover Sheet: The opening is covered with 3M™ Fire Barrier
CS-195+ Composite Sheet cut to fit snugly around pipes and to overlap the opening by a minimum of 50.8 mm. The sheet’s galvanized steel layer should face outward (exposed).
2. The 3M™ Fire Barrier CS-195+ Composite is secured with 6.35 mm x
38.1 mm steel masonry fasteners with steel washers spaced
152.4 mm O.C.
3. Seal: 3M™ Fire Barrier CP 25 WB+ Caulk and Moldable Putty+
is used to seal the CS-195+ Composite Sheet.
1. The 3M™ Fire Barrier CS-195+ Composite must be placed on both sides of the wall and overlap the edge of the opening a minimum of
50.8 mm.
2. Wrap the required number of layers of FS-195+ Wrap/Strip around the insulated pipe, foil side out.
3. Cut the 3M™ Fire Barrier CS-195+ Composite to closely follow the contours of the FS-195+ Wrap/Strip around the insulated pipe. Do not allow an annular space greater than 6.35 mm to remain between the 3M™ Fire Barrier CS-195+ Composite and the FS-195+ Wrap/Strip.
4. Install the 3M™ Fire Barrier CS-195+ Composite with the foil side facing into the penetration opening. Apply a 6.35 mm minimum bead of CP 25 WB+ Caulk or Moldable Putty+ around the perimeter of
the opening on the concrete before installing the 3M™ Fire Barrier
CS-195+ Composite. To allow for fastening, there must be a 50.8 mm minimum overlap of the 3M™ Fire Barrier CS-195+ Composite
onto the concrete on all sides of the opening.
Coverage:
Size of the sheet Size of the opening (Blank) Number of sheets
711.2 mm x 1320.8 mm 1000mm x 1000mm 1.064 number
609.6 mm x 914.4 mm 1000mm x 1000mm 1.793 number
* The above installation details is a typical one which changes as per site and as per the system passing. Always follow UL specification details for installation. The above details will just provide the overview of the installation.
* The coverage does not take into account the percentage of the hole filled with services. Also add 50mm all over the perimeter for fastening the
CS 195+ with the substrate. The applicator should be responsible for the quantity measurement.
Installation Methodology:
Blank opening Apply Caulk / MPP Cut CS 195+ Fasten Board Seal with caulk / MPP
Product Description
Up to 4-hour fire protection in construction joints per ASTM E 1966.
Up to 2-hour fire protection for through penetration systems per
ASTM E 814 (UL 1479) & CAN/ULC-S115
Product Features and benefits:
• Performance: Highly elastic material enables ± 50% movement capabilities.Fulfills a very Basic requirement of
Construction joints.
• Minimize sound transfer: Provides STC of 56 db in the wall assembly.
• Widely applicable: Extensive portfolio of tested and listed building and perimeter joint systems
• Robust: Jobsite formula freeze/thaw resistant and uniform seal formation in hot or cold drying conditions.
• Ease of Use: Paintable, Easy water cleanup, can use conventional airless spray equipment
• Better aesthetics
Installation:
1. Equipment: 3M™ FireDam™ Spray 200 is applied using an airless sprayer in order to achieve the thickness and coverage necessary to comply with the tested systems
2. Pump requirements (minimum specifi cations):
Flow Output: 0.7 gpm minimum
Liquid Pressure: 2000 psi minimum
Motor Size: Minimum 0.75 horsepower.
Recommended Tip Size: 419 (8 in. fan with 0.019 in. orifice) which can be changed based upon application conditions
3. Preparatory Work: Surfaces must be frost free, clean, dry and dust free.
4. Installation Details: Tested and listed system details must be followed for each specific application. Install mineral fiber insulation in accordance with system details for density, depth and compressions requirements.
Note: 3M™ Fire Barrier Packing Material PM-4 can be used as a suitable insulation material in through penetration applications only.
5. Apply 3M™ FireDam™ Spray 200 using an airless sprayer. A nominal 3mm wet coating should be applied over the insulation, adjacent substrates and penetrant (if applicable) maintaining all required overlaps.
* The above installation details provides just an overview of the installation and actual procedure may change as per site and as per the system passing.
Always follow manufacturer’s recommendation for installation. The above picture is a typical representation of the system.
Coverage:
Wet Film Thickness
3mm
Coverage
0.31sq. m/liter
* The coverage does NOT take into account any wastage. The applicator should be responsible for the quantity measurement.
Installation Methodology:
Clean the surface Prepare the spray gun Spray on the surface Wait for 24 hours to dry
Fire Resistance Rating
From 2 hours to 4 hours depending on the system and application for walls penetration.
BS EN 1366-3: 2004
Product Features and benefits:
• Tightly seals penetrations: Coating on top of 3M™ FireDam™ 240 Intumesces (expands with heat) to form a hard char against flame spread, smoke and toxic fumes.
• Up to 4 hours fi re rating for penetration
• Suppresses toxic gases and smoke emission, Helps in human egress during fire break
• Ease of application: Flexible coating, Lightweight, easy to handle, cut and form to desired shape
• Ease of use: Applied using common trade tools, Spray, trowel or brush
• Environmentally friendly: Halogen free formula does not give off corrosive gases during a fire
• Bonds strongly: Good adhesion to most surfaces
• Easy to maintain: Only water cleanup of tools and equipment required
• Multiple applications: For through penetration, heat shield and firebreak protection
Installation:
1. Two layers of 50mm thick 3M™ FireDam™ 240 Coated Mineral Board with 50mm air gap between (150mm overall) for the wall application
2. The density of the Mineral board for this application will be 160kg/m3 minimum
3. The wet film thickness of the 3M™ FireBarrier™ FD 2000 coating on top of the mineral board will be around 2mm
4. Boards tightly friction fitted into the aperture flush with the outer faces of the wall
5. Seal the board to aperture junction and butt joints
6. Apertures for penetrating cables/trays are to be tightly fitting and be sealed/’made good’ with 3M™ Fire Barrier IC 15 WB+ Sealant to give a cold-smoke seal
7. The surfaces of the caulk and 50 mm out from the opening are coated with a final layer of 3M™ FireDam™ 2000 Coating
8. The electrical cables are then coated over a distance of 150 mm from each side of the seal
* The above installation details is a typical one which changes as per site and as per the system passing. The above details will just provide the overview of the installation.
Coverage:
Size of the sheet
600 mm x 1000 mm
Size of the opening (Blank)
1000mm x 1000mm
Number of sheet
1.67 number
* The coverage does not take into account the percentage of the hole filled with services. Also add extra sealant and FD 2000 paint for the penetration. The applicator should be responsible for the quantity measurement.
Installation Methodology:
Clean the surface Cut the board Apply 3M™ FireDam™ 2000 Apply Sealant
Product Description
3M™ FireDam™ 2000 Coating is a white, ready mixed, water based thixotropic coating. It is designed to provide fire protection to a variety of substrates.
The spread of flames along electrical cables can also be suppressed, and the generation of corrosive or toxic gases from PVC cables suppressed. In the presence of heat or fire, the 3M FireDam™ 2000
Coating intumesces (expands) up to 10 times, forming an insulating char which significantly slows any heat transfer. The expanding char fills voids, including those left by perishing materials.
Up to 3 hours fire rating for the cable coating.
IEC 331:
Product Features and benefits:
• Up to 3 hours fi re rating for cable
• Suppresses toxic gases and smoke emission, Helps in human egress during fire break
• Ease of application: Flexible coating, fit to any condition
• Environmental friendly: Halogen free formula does not give off corrosive gases during fire.
• Bonds strongly: Good adhesion to most surfaces
• Easy to Use: Apply Spray, trowel or brush.
• Easy to maintain: Only water cleanup of tools and equipment required
Application
1. Surface preparation: Surface to be coated must be free from oil, grease, visible moisture, dust, dirt or other materials likely to impair adhesion
2. Coating preparation: Stir content if necessary. Content may be diluted with water to adjust viscosity for spraying
3. Temperature during application: Substrate and air temperature to be above 4°C and below 40°C
4. Coating thickness: Recommended wet film thickness is 3mm
5. Brush: For small applications: standard paint brushes suitable
6. Airless spray: Most industrial pumps: e.g. Graco, Wagner, Volume air,
DeVillois, etc. Use air supply of at least 4 bars with electrical engine; remove the strainer if necessary.
* The above installation details provides just an overview of the installation and actual procedure may change as per site and as per the system passing. Always follow manufacturer’s recommendation for installation. The above picture is a typical representation of the system.
Coverage:
Wet Film Thickness
0.6 mm
1 mm
2 mm
3 mm
Coverage
1.6 m
1 m 2
0.5 m
2
2
0.33 m
/liter
/liter
/liter
2 /liter
* The coverage does NOT take into account any wastage. The applicator should be responsible for the quantity measurement.
Installation Methodology:
Clean opening Mix properly Apply with suitable tool
Product Description
Fire Resistance Rating
Up to 3 hours fire protection rating as per ASTM E 1966.
Product Features and benefits:
• Complete peace of mind - Fire rating up to 3 hours: Tested in accordance with ASTM E 814
(UL 1479), ASTM E 1966 (UL 2079) & CAN/ULC-S115
• Bonds Strongly: CPVC compatible
• Complies with requirement: Expanded fire protection systems
• Reduce sound transfer: Provide STC up to 54 when tested in 54db tested wall
• Ease of application: Sag-resistant, Excellent caulk rate
• Environmentally friendly: Halogen-free
• Bonds strongly: Excellent adhesion
• Re-enterable/repairable: Without additional cost
• Ease of Use: Paintable, Water clean up
• Aesthetically good
Installation
1. Preparatory Work: The surface of the opening and any penetrating items should be cleaned to allow for the proper adhesion of the 3M™
Fire Barrier Sealant IC 15WB+
2. Ensure that substrate surface is dry and frost free
3. Sealant can be installed with a standard caulking gun, pneumatic pumping equipment or it can be easily applied with a putty knife or trowel
4. Packing Material – Polyethylene backer rod or 25 mm thickness
of min 64 kg/m3 mineral wool bat insulation firmly packed into
opening as a permanent form. Packing material to be recessed from top
surface of floor or from both surfaces of wall as required, accommodating the required thickness of fill material
5. In floors constructed of hollow-core concrete, packing material
to be recessed from top and bottom surfaces of floor as required
to accommodate the required thickness of fill material
6. Installation Details: Install the applicable depth of backing material,
if required, as detailed within the applicable UL, cUL, ULC, Intertek,
FM or other third-party listed system. Cut the end of the 3M™ Fire
Barrier Sealant IC 15WB+ tube spout to achieve the desired bead
width when applying
7. Install the applicable depth of 3M™ Fire Barrier Sealant IC 15WB+ into the opening flush with the surface of the substrate, or as
detailed within the applicable listed system, at the depth for the assembly and rating that is required. Tool within 5 minutes.
For a fire resistance of 2 hours, minimum 25 mm thickness of
caulk applied within the annulus, flush with top surface of floor or with both surfaces of wall
8. Clean all tools immediately after use with water
* The above installation details is a typical one which changes as per site and as per the system passing.
Always follow manufacturer’s recommendation for installation. The above picture is a typical representation of the system. The above details will just provide the overview of the installation.
Coverage:
Opening
25mm
Diameter of penetrant
100mm
Depth of Sealant
25mm
Volume required (300ml cartridge)
0.5 cartridge
* The coverage does NOT take into account any wastage. It also does not take into account the beading around the penetrants. The depth of the sealant will change as per site.
The applicator should be responsible for the quantity measurement.
Installation Methodology:
Clean the surface Prepare the spray gun Pack Mineral wool Apply sealant
Product Description
3M™ Fire Barrier Mortar is a lightweight gypsum-based and endothermic firestop that is ready for mixing with potable water.
Fire Resistance Rating
Up to 3 hours depends on the system and application for wall and floor penetration.
Product Features and benefits:
• Firestop tested up to 3 hours in accordance with ASTM E 814 (UL 1479) & CAN/ULC-S115
• Reliable performance UL/ULC listed systems
• Excellent Adhesion Bonds strongly to concrete, metals, wood, plastic and cable jacketing
• Re-enterable/repairable with common hole saw
• Aesthetically good Paintable with primer
• Environment Friendly Halogen-free formula
• Ease of application Water cleanup (prior to cure)
• Variable Mix Ratio Permits self-leveling as well as trowelable application consistencies, resulting in labor savings
Installation
1. Preparatory Work: The surface of the opening and any penetrating items should be cleaned to allow for the proper adhesion of the 3M™ Fire Barrier Mortar. Ensure that
the surfaces are free of frost.
2. Mixing Instructions: Mix ratio can be varied from 1 part water to 2 parts powder for self-leveling and 1 part water to 3
parts powder for trowelable mortar. Mix the mortar until it is homogeneous and smooth, for a total of not less than 5 minutes.
Watch for dry spots at the bottom edges of the pail.
3. Installation Details: Install the applicable depth of damming material as detailed within the listed system. For a fire resistance period of up to 180 minutes 63.5mm Mortar to be installed. Install the applicable depth of 3M™ Fire Barrier Mortar into
the opening flush with the surface of the substrate, or as detailed within the applicable listed system, at the depth for the assembly and rating that is required. Concrete screws, spaced at maximum
305 mm OC, to be partially embedded into the vertical sides of opening all-around to key the mortar to the opening periphery. A
Nominal 6 mm to 10 mm high crown bead of mortar to be applied at the top surface of the floor or both surfaces of wall to cover the edges. Tool within 20 minutes. Immediately clean all tools after use with water.
4. Limitations: 3M™ Fire Barrier Mortar cannot be installed in below freezing temperatures. Do not apply 3M™ Fire Barrier Mortar when surrounding temperature is less than 40°F (4°C) and in conditions where seals may be exposed to rain or water spray within 18 hours of application. Do not apply 3M™ Fire Barrier
Mortar on frost-coated surfaces or to areas that are continuously immersed in water.
Coverage:
Size of the bag Size of the opening (Blank) Number of bags
20kg 1000mm x 1000mm 3.92 number
* CAUTION: This product will conduct electricity when wet. DO NOT install in contact with live exposed conductors of electricity such as bus bars or on old (cloth-like) cable jacketing. Consult an electrician or electrical engineer. Avoid bonding 3M™ Fire Barrier
Mortar to moving pipes. Wrap such pipes with a bond breaker tape. This mortar is not intended to be load bearing. For penetrations subject to foot traffic, consult a structural engineer for support requirements.
* The above installation details is a typical one which changes as per site and as per the system passing. Always follow UL specification details for installation. The above details will just provide the overview of the installation.
* The coverage does NOT take into account the percentage of the hole filled with services without any wastage. The applicator should be responsible for the quantity measurement.
Installation Methodology:
Mix Mortar with water Clean Opening Trowel Mortar Level Clean
Product Description
3M TM Fire Barrier Moldable Putty+ consists of a synthetic elastomer designed for use as a one part, intumescent fire resistive putty used to restore the integrity of fire rated building constructions. Up to a four hour fire rating is achieved when tested in accordance with the time/temperature curves and water hose stream tests of UL 1479 and ASTM E 814.
This is achieved by the unique intumescent (expanding when heated) and high strength insulating char-forming properties of this material.
3M Moldable Putty is available in form of Stix and Pads which can be molded in any shape and can filled on openings to make it fire resistant.
Fire Resistance Rating
Up to 3-hour fire rating per ASTM E 814 (UL 1479)
Product Features and benefits:
• Tested to UL 910 flammability test
• Environmental Friendly: Halogen-free formula- Free from corrosive gases during a fire breakout
• Long shelf-life: Stix and pad packages can be sealed for reuse
• Easily re-enterable: Putty will not dry out or crumble
• Easy to use: Easily hand molded, adheres to all common building surfaces (Cement, gypsum, wood and plastic), including metal and plastic electrical boxes
• Intumescent: Expands when heated, forming a hard char, preventing the transmission of hot gases and fire
• No special tools required
• Minimal odor
Product Description
The 3M Fire Barrier Pillow is a self-contained, highly intumescent product designed to firestop a wide variety of through-penetrations including cable trays (up to two per opening), conduit and blank openings, which penetrate fire-rated construction.
During a fire, 3M Fire Barrier Pillow intumesces (expands) and locks itself into place, completely surrounding the penetrant(s) stopping smoke, fire and toxic gases from spreading to the next room or next floor for the rated time period. They are easy to install and great for retrofit projects. Just remove and replace pillows as needed.
Fire Resistance Rating
Up to 3-hour fire rating per ASTM E 814 (UL 1479)
Product Features and benefits:
• Tested to UL 910 flammability test
• Ease of use: Multiple sizes available
• Easy to inspect: Red Color of pads
• Easy retrofi t: remove and replace pillows, as needed
• Easy to install: Interlocking strips lock pillows together
TM
Product Description
3M Fire Barrier Duct Wrap 615 is a fire-resistant protective cladding consisting of an organically compatible glass fibre blanket and gridreinforced foil. It is certified as a single-layer fire-resistant protective wrap in compliance with ISO 6944 “Fire Resistance
Fire Resistance Rating
Up to 3-hour fire rating per ASTM E 814 (UL 1479)
Product Features and benefits:
• Easy installation: Lower weight, High flexibility for installation ease
• Thinnest , standard one layer wrap for grease ducts rated as a shaft alternative per UL 1978
• Up to 2 hours fire protection
• Bio-soluble
• Low thermal conductivity
• Temperature-resistant up to 1200°C
• Temperature-shock-resistant
• Monolithic construction (“single-piece” blanket)
• Tested in accordance with ISO 6944 “Fire Resistance Tests - Ventilation Ducts”
• Zero clearance to the overlap or collar for congested spaces
3M TM Passive Fire Products- Certification & Test Reports
XHEZ.C-AJ-8206 - Through-penetration Firestop Systems Page 1 of 3
XHEZ.C-AJ-8206
Through-penetration Firestop Systems
Page Bottom
Design/System/Construction/Assembly Usage Disclaimer
Listed or Classified products, equipment, system, devices, and materials.
Authorities Having Jurisdiction should be consulted before construction.
Fire resistance assemblies and products are developed by the design submitter and have been investigated by UL for compliance with applicable requirements. The published information cannot always address every construction nuance encountered in the field.
When field issues arise, it is recommended the first contact for assistance be the technical service staff provided by the product manufacturer noted for the design. Users of fire resistance assemblies are advised to consult the general Guide Information for each product category and each group of assemblies. The Guide Information includes specifics concerning alternate materials and alternate methods of construction.
Only products which bear UL's Mark are considered as Classified, Listed, or Recognized.
Through-penetration Firestop Systems
See General Information for Through-penetration Firestop Systems
System No. C-AJ-8206
October 07, 2010
F Rating — 3 Hr
T Rating — 0 Hr
1.
Floor or Wall Assembly —
2400 kg/m3) concrete. Wall may also be constructed of any UL Classified sq in. (1.07 m2) with max dimension of 46 in. (1168 mm).
Concrete Blocks* . Max area of opening is 1656
See Concrete Blocks manufacturers.
(CAZT) category in the Fire Resistance Directory for names of
2.
Through Penetrants — A max of seven penetrants to be installed in opening. Min clearance between pipes, conduits or http://database.ul.com/cgi-bin/XYV/template/LISEXT/1FRAME/showpage.html?name=X...
5/23/2011
Date:
Subject:
April 1, 2009
Shelf Life Definitions and Lot Number Interpretations
Issued By: Michael G. Dykhoff
The following 3M products do not have a shelf life requirement when stored indoors:
Fire Barrier CS-195+ Composite Sheet
Fire Barrier FS-195+ Wrap Strip
Fire Barrier Plastic Pipe Device (PPD)
Fire Barrier Ultra Plastic Pipe Device
(PPD)
Fire Barrier Ultra RC Pack
Fire Barrier Moldable Putty+ (MP+)
Interam™ E-5 Series Mats
Interam™ I-10 Series Mats
Interam™ Ultra GS Strip
Interam™ T-49 Tape
Interam™ T-65 Tape
Fire Barrier Cast-In Device & Accessories
3M Fire Barrier Pillow
3M Fire Barrier Self-Locking Pillow
Fire Barrier Expantrol™ Flexible
Intumescent Strip (E-FIS)
Fire Barrier Duct Wrap 15A, 20A
Fire Barrier Duct Wrap Collar
Fire Barrier Plenum Wrap 5A
Fire Barrier Packing Material
Fire Barrier Grease Duct Access Door
Fire Barrier Pass-Through Device
Fire Barrier RC-1Restricting Collar
Ultra Fast Anchors
Marine Fire Wrap
Fire Barrier Packing Material
The following 3M products have shelf lives:
Fire Barrier Sealant CP 25WB+ Caulk
Fire Barrier Sealant IC 15WB Caulk
Fire Barrier Sealant IC 15WB+ Caulk
FireDam™ 150+ Caulk
Fire Barrier Water Tight Sealant 3000 WT
Fire Barrier Water Tight Sealant 1003 SL
Fire Barrier Water Tight Sealant 1000 NS
Fire Barrier Silicone Sealant 2000 N/S
Fire Barrier Silicone Sealant 2000+
Fire Block Sealant FB 136
Fire Barrier Silicone RTV Foam 2001
FireDam™ Spray 200
Fire Barrier Mortar
Shelf life and lot number interpretation is listed on the following pages.
Page 1 of 3
Our Clientele
Have we sparked your interest?
For more information feel free to get in touch with us at any of the following touch points
3M™ Fire Barrier
CP 25WB+ Sealant
C-AJ-1551
3M™ Fire Barrier
Plenum Wrap
PP 101 P
3M™ Fire Barrier
1003 SL Sealant
Floor to Floor Joint Assembly
FF-D-1021
3M™ Fire Barrier
CP 25 WB+ Sealant
C-AJ-1427
3M™ Fire Barrier
Fire Dam Spray 200
HW-D-0020
3M™ Fire Barrier
1000NS Sealant
HW-D-0168
3M™ Fire Barrier
Ultra Plastic Pipe
Device
C-AJ-2227
3M™ Fire Barrier
MP+ Moldable
Putty Stix
C-AJ-3021
3M™ Fire Barrier
FireDam Spray 200
CEJ 370 P
3M™ Fire Barrier
Ultra PPD Plastic
Pipe Device
C-AJ-2001
3M™ Fire Barrier Pillow &
3M™ Fire Barrier
Self-Locking Pillow
W-L-4037
3M™ Fire Barrier
3000WT Sealant
C-AJ-2510
3M™ Fire Barrier
Ultra GS Wrap Strip
RC-1 Restricting Collar
Ultra RC Pack
W-L-2147
3M™ Fire Barrier
3000WT Sealant
C-AJ-2299
3M™ Fire Barrier
IC 15WB+ Sealant
W-L-3195
3M™ Fire Barrier
CS-195+,
FS-195+,
MP+ Putty Stick
C-AJ-8001
3M™ Fire Barrier
FS-195+ Wrap Strip
C-AJ-5002
3M™ Fire Barrier
Duct Wrap 15A or 20A
Rated Grease Duct Flexible Wrap
GD 531 F / GD 538 F
3M™ Interam™ E5A-4
Endothermic Mat
System No. 8
3M™ Fire Barrier
FB 1003 SL Sealant
C-AJ-8075
3M™ Fire Barrier
1003 SL Sealant
FS561
3M™ Fire Dam
FD150+ Sealant
HW-D-0111
3M™ Fire Dam
Moldable Putty+
CLIV
3M™ Fire Barrier Pass
Through Device
C-AJ-3250
3M Fire Barrier
CP 25 WB+ Sealant
& PM 4 Packing Material
C-AJ-5210
3M™ Fire Barrier
Cast-In Device
F-A-5028
The listed systems are typical applications only. Please refer to the volume of your 3M™ specification guide for your specific application.
3M India Limited,
Building & Commercial Services Division,
Concorde Block, UB City,
24, Vittal Mallya Road, Bangalore - 560001,
Tel: +91 80 2223 1414, Fax: +91 80 2223 1450
For more info on Fire Solutions visit : http://solutions.3mindia.co.in/wps/portal/3M/en_IN/Building Construction_Services/home/Product/two/ or connect with us at the following touch points
building.in@mmm.com
Bangalore - 56001, Tel: +91 80 2223 1414, Fax: +91 80 2223 1450