FEE Resolution 15-R-227

advertisement
RESOLUTION
15-R-227
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS OF MARION COUNTY, FLORIDA,
AMENDING FEE SCHEDULES FOR CONSTRUCTION
PERMITS AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the Board of County Commissioners of Marion County, Florida is
authorized to establish fees pursuant to Marion County Ordinance No. 01-34; and
WHEREAS, the Board desires by this Resolution to amend fees for the administration and
enforcement of said Ordinance.
NOW THEREFORE, be it resolved by the Board of County Commissioners of Marion
County, Florida:
SECTION 1. MINIMUM FEES AND REQUIRED DEPOSITS. Thereshall be a
minimum permit feeof$430.00fornewresidential andcommercial projects. Minimum feesforpermits
withoneinspection andnoplanreview shall be $63.00 andpermit withone inspection and a planreview
shall be $106.00. Allpermit applications mustinclude a deposit (non-refundable) which will be credited to
the costofthepermit, Deposit fees shall be $200.00 fornewcommercial permits, $100.00 for new
residential permits and$50.00 forallotherpermits,
lA. STATE OF FLORIDA SURCHARGES (DCA and DBPR)
DCA: 1.5 Percent of all base building permits fees - 52.00 minimum
(DCA: Department ofCommunity Affairs - FloridaStatute553.71)
DBPR: 1.5 Percent ofall base building permit fees - $2.00 minimum
(DBPR: Department of Business & Professional Regulation - Florida Statute468.631)
lB. WORKING WImOUT A PERMIT PENALTY FEE: Work started on a
building structure, electrical, gas, mechanical or plumbing system before obtaining the necessary
permits shall be subject to a penalty of 100% of the usual fee in addition to the required permit
fees (Section 109.4 Florida Building Code 5th Edition). Permits must be posted on the jobsite
during the progress of all work.
SECTION 2. CONSTRUCTION PERMIT FEES. Permit fees for newconstruction projects
shall be calculated based uponthetotal square footage underroofapplicable to construction, plusa base fee.
Each 'PermitType' hasa standard inspection loadwhichincludes the minimum inspections required by
code. Inspections added to the permit's standard inspection load shall be $25.00 each. Allotherfees shall
becharged as specifically listed herein to include anyadditional fees required bythe scopeof workfora
specific project
Defmitions:
REMODEL - the refurbishing, rebuilding or reconstruction of an
existing structure.
ADDITION - to build, construct or add square footage to an
existing structure (habitable or non-habitable)
LOW VOLTAGE ALARM SYSTEM - Burglar Alarm or Smoke
Detection Systems (Hard-wired systems require a permit)
2A. RESIDENTIAL
2A-l. New Construction
(NOTE: Minimum Fee $430.00)
Single Family Residence, Replace Residence, Guest Residence,
Garage with Living Quarters, Duplex, Barn with Residence,
Hangar, and any other new construction project
2A-2. DCA and Other Manufactured Homes
Mobile Home, Mobile Home in M.H. Park,
Mobile Home Replacement, Mobile Home Model,
Mobile Home Guest Residence
2A-3. Other Residential Construction Projects
Accessory Structure (ALUM)
Accessory Structure (FRMlSTEEL)
Addition (ALUM) Habitable
Addition (ALUM) Non-Habitable
Addition (FRM/MSY) Habitable
Addition (FRM/MSY) Non-Habitable
AG Electrical Service &/ or Plumbing
Remodel (FRMlMSY)
Remodel(ALUM)
Remodel (plaster / Stucco)
Barn (Structure Only)
Boathouse / Sundeck
Building Move
Carport / Garage (ALUM)
Carport / Garage (FRMlMSY)
Deck (WOOD)
Demolition
Dock
Door - Exterior Entry (Remodel - New Opening)
2
COST OF PERMIT
$50.00 + $.22 sq.ft.
$200.00
$106.00
$137.00
$231.00
$156.00
$271.00
$181.00
$131.00
$115.00
$106.00
$87.00
$159.00
$115.00
$175.00
$131.00
$225.00
$106.00
$87.00
$106.00
$106.00
Door - Exterior Entry (Change Door and Jam)
Electrical (Minor Repair)
Electrical Service (Remodel - New / Add-on)
Electrical (Service Upgrade)
Electric for Wells
Entranceway (No Electric)
Fence / Wall
Fire Alarm (Application Process Fee)
Fire Safety Family Day Care (Application Process Fee)
Fire Safety Residential Board & Care (Application Process Fee)
Fireplace / Chimney
Garage Door (Change Door)
Garage Door (Remodel - New Opening)
Generators (Electric / Gas)
Glass Room Conversion
Heating-Ventilation-Air Condo (Change-out Unit)
Heating-Ventilation-Air Condo (Remodel-New AC System)
Hurricane Shutters
Irrigation Only
Lanai / Screened Room - Screened Roof
Limited Energy Systems (Low Voltage)
LPGas
Mechanical
Natural Gas
New Certificate of Occupancy (Electric Reconnect)
Plumbing (Minor Repair)
Plumbing (Remodel- New or Existing System)
Pool Enclosure
Reroof (Non-Structural SFR & Duplex)
Reroof (Non-Structural Multi-Family Dwelling 3-6 Units)
Reroof (Non-Structural Multi-Family Dwelling 7+ Units)
Retrofit -with Hurricane Braces (Access & Adds)
Roof- Metal / MH Roofs
Roofover - Alum
Roofover - Structural
Seawall
Security Alarm (Low-Voltage Burglar/Smoke System: Hard-wired)
Shed (pre-manufactured - Structure only)
Siding
Skylights / Solar Tubes
Slab / Foundation (No Plan Review)
SlablFoundation (Mono)
SlablFoundation (Stem Wall)
Soffit (Replacement)
3
$73.00
$63.00
$131.00
$106.00
$87.00
$156.00
$106.00
$131.00
$10.00
$10.00
$156.00
$73.00
$106.00
$156.00
$156.00
$73.00
$131.00
$106.00
$63.00
$106.00
$55.00
$131.00
$131.00
$131.00
$63.00
$63.00
$156.00
$106.00
$123.00
$246.00
$369.00
$63.00
$98.00
$106.00
$115.00
$115.00
$40.00
$106.00
$106.00
$106.00
$63.00
$106.00
$115.00
$63.00
Solar-Photovoltaic Electrical System
Solar (Non-Potable)
Solar (Potable)
Solar Tube / Skylight
Spa / Whirlpool (Not Portable)
Spa / Whirlpool (Portable)
Subsurface Stabilization / Grouting
Swimming Pool (Above-ground)
Swimming Pool (In-ground)
Water Hookup
Windows (Change Window)
Windows (Remodel - New Opening)
2B.
$131.00
$131.00
$131.00
$106.00
$156.00
$106.00
$87.00
$63.00
$206.00
$63.00
$73.00
$106.00
COMMERCIAL
2B-l. New Construction
(NOTE: Minimum Fee $430.00)
$200.00 + $.16/sq.ft.
Triplex, Fiveplex or more, Recreation, MotellHotel, Restaurant
OfficelBank/Professional, StorelMercantile, Service Station,
Industrial Structure, Schools/Educational/Childcare,
Church/Religious, Hospitals/Intuitional, Convalescent,
Warehouse/Storage, Fire Station, Treatment Plant, Hangar,
Modular, Additions !Habitable & Non-Habitable, Remodels,
Accessory Structures, Shell Only, Garage, Accessory, Structures
Other than Building, New Certificate of Occupancy with Remodel
2B-2. Other Commercial Construction Projects
Demolition
Dock
Electrical (Minor Repair)
Electrical Service (Remodel)
Electrical Service in R.O.W.
Electrical Service Upgrade
Fence / Wall
Fire Alarm
Fire Extinguisher (Application Process Fee)
Fire Sprinkler
Fire Suppression for Hoods (Application Process fee)
Heating Ventilation Air-Cond. (Change-out only)
Heating Ventilation Air-Cond, (Remodel- New System)
Hood and Duct
Irrigation Only
Limited Energy Systems (Commercial)
L.P. Gas Installation
Mechanical
Mobile Home Park (Electric or Plumbing)
Natural Gas Installation
4
$87.00
$106.00
$106.00
$131.00
$106.00
$106.00
$106.00
$106.00
$10.00
$115.00
$10.00
$106.00
$131.00
$156.00
$63.00
$55.00
$131.00
$131.00
$131.00
$131.00
zc,
New Certificate of Occupancy
Plumbing (Minor Repair)
Plumbing (Remodel to Existing System / New System)
Pollutant Storage Tanks - Dispenser
Refrigeration
Reroof (Non-Structural)
Roof-Metal
Seawall (Commercial)
Security Alarm (Low-Voltage Burglar/Smoke System: Hard-wired)
Sewer / Septic Hookup
_
Sign (No Electric)
Sign (with Electric)
Slab / Foundation (Mono)
Slab / Foundation (Stem Wall)
Solar (Commercial - Potable or Non-Potable)
Spa / Whirlpool
Swimming Pool
Swimming Pool Permit Modifications
Tent - Temp Auto Sales
Tent - Temporary Use
Tower
Water Hookup
Window & Replacement Doors / New Openings
ADMINISTRATIVE & OTHER FEES
2C-l. Administrative Fees
AHRI Review (Ale Compatibility Verification ­ if not included inpennit fee)
Change of Contractor/Sub-Contractor
Copy of Construction Plans ($10.00 + Print Fee)
Document Copies
Fax Back - Long Distance
Permit Extension (30 Days)
Permit and Lien Violation Search:
Standard Search (2-3 days)
Expedited Search (Same Day)
Product Approval (If not included in permitfee)
Process Fee for Indemnification Agreement
Process Fee for Lot Change
Process Fee for SWWMD
Process Fee for Temporary Certificate of Occupancy
Process Fee for Ten Day Temporary Pole
Preliminary Power Release
Replacement of Building Permit Card
2C-2. Other Fees
5
$106.00
$106.00
$156.00
$156.00
$106.00
$156.00
$131.00
$115.00
$40.00
$106.00
$106.00
$115.00
$106.00
$131.00
$131.00
$247.00
$750.00
$150.00
$106.00
$106.00
$231.00
$63.00
$115.00
$10.00
$50.00
$10.00 + Print Fee
$.25
$2.00
$30.00
$35.00
$50.00
$10.00
$20.00
$20.00
$10.00
$20.00
$20.00
$30.00
$5.00
Certify Additional Sets of Plans (over two) per set
Change of Residential Model
Inspection - After Business Hours / Weekend (l Hr Min)
Inspection Requested for Informational Purposes Only
Master File Plan Review - Residential (initial review)
Modify previously Approved Plans:
Residential (per trade)
Commercial (per trade)
Plan Resubmittals or Rejected Plans:
Residential (per trade)
Commercial (per trade)
Preliminary Plan Review (per trade)
Reinspection of Rejected Inspection
SECTION 3. REFUND POLICY. Permit fees shall be refunded for
permits issued in error by the Building Department. The following fees are
non-refundable:
Permit Deposit Fees
Expired Permit Fees
Minimum Permit Fees
Fees Paid for Permits Issued, Closed or Cancelled
$25.00
$50.00
$75.00
$25.00
$35.00
$50.00
$50.00
$50.00
$50.00
$30.00
$50.00
SECTION 4. REPEAL. All resolution or parts thereof of Marion County in conflict with
the provisions herein contained are, to the extent of such conflict, hereby superseded and repealed.
SECTION 5. EFFECTIVE DATE. This resolution shall take effect on upon adoption by
the board.
DULY ADOPTED this
21st
day of
July
,2015.
Y COMMISSIONERS
,FLORIDA
ATTEST:
DAVI.RMM:rN'"CLERK
6
Download