Elective half-hourly settlement: tracker Last updated: 22 July This table is intended to consolidate information about the changes to enable cost-effective elective half-hourly settlement, making it easier for parties to keep track of them. 1 2 It should be read alongside Ofgem’s conclusions paper and the recommendations of the Balancing and Settlement Code Settlement Reform Advisory Group (SRAG) led by ELEXON. For papers on each change, please follow the links in the ‘change reference’ column to the relevant pages on code administrators’ websites. If you would like to get in touch with Ofgem on this subject, please e-mail half-hourlysettlement@ofgem.gov.uk. Change area Revised end to end process Increased HH data precision Source SRAG SRAG Code BSC Change reference TBC Proposer ELEXON Current status Preparing to raise Change Proposal (CP) incorporating increased HH data precision – alongside DTC change Next workgroup/ committee SVG – 6 September Next consultation Change Proposal Circular consultation – date TBC Expected decision November (SVG) MRA TBC ELEXON IREG – 10 August BSC CP1466 - Removing SMETS compliant Meters from the scope of BSCP601 ‘Metering Protocol Approval and Compliance Testing’ BSC CP1464 – Requiring HH consumption data to be processed to appropriate precision DTC CP3492 – Increasing the precision of data items relating to Half-Hourly (HH) Advances ELEXON Impact Assessment consultation – date TBC Change Proposal Circular consultation – date TBC October (MDB) BSC Discussion as DTC Issue (before change is raised) Raised Changes since last version First discussion one month later, to allow end to end process and data precision to be treated as a single change “ October (SVG) n/a SVG – 6 September N/A – Change Proposal Circular consultation closed 1 July N/A – Impact Assessment consultation closed 12 July TBC (SVG) Status updated. Consultation now closed. Expected decision TBC. Status updated. Consultation now closed. Ovo Energy Awaiting decision (although expected to be superseded by new BSC CP referenced above) Awaiting decision (although expected to be superseded by new DTC CP referenced above) Assessment by workgroup Second workgroup meeting – w/c 22 August Industry Impact Assessment – 29 July to 19 August December Next milestones updated. “ “ “ “ “ “ ELEXON-led working group (CSMWG) to develop CoMC process to enable BSC and DTC changes to be raised Assessment by workgroup Second CSMWG meeting – 3 August Request for Information from CSMWG – 15 to 29 July Impact Assessment consultation – date TBC Assessment procedure consultation – 9 to 27 September November Next milestones for CSMWG added. Next milestones for CSMWG added. Change reference added. Status and next milestones updated to reflect timescales set by BSC Panel. Status and next milestones updated to reflect timescales set by BSC Panel. Change reference added. Status and next milestones updated to reflect timescales set by BSC Panel. BSC MRA ELEXON ELEXON SVG – 2 August MDB – 28 July July (MDB) New Consumption Component Classes Applying Group Correction Factor to certain HH sites Additional CoMC process for smart meters SRAG BSC Conclusions paper BSC P339 - Introduction of new Consumption Component Classes for Measurement Classes E-G Considered through P339 Conclusions paper BSC TBC ELEXON MRA TBC ELEXON Relaxation of read performance requirements Conclusions paper BSC P347 – Relaxation of R1 Read performance requirements RWE Npower Addressing overcharging for transmission charges BSC specified charges Conclusions paper CUSC CMP266 - Removal of Demand TNUoS charging as a barrier to future elective Half Hourly settlement National Grid Workgroup process Second workgroup – 3 August Workgroup consultation – 15 August to 5 September November Conclusions paper BSC P346 – Changes to the BSC Specified Charges to facilitate Elective HH settlement British Gas Assessment by workgroup First workgroup – 25 August Industry Impact Assessment – 10 to 24 August November 1 2 https://www.ofgem.gov.uk/publications-and-updates/elective-half-hourly-settlement-conclusions-paper https://www.elexon.co.uk/wp-content/uploads/2015/10/27_249_13A_SRAG_Report_PUBLIC2.pdf First workgroup – 25 August November November