Permit to Work
Procedure
Corporate Safety – Procedure
Permit to Work
Table of Contents
1.
Purpose.......................................................................................................................... 4
2.
Scope ............................................................................................................................. 4
3.
Definitions ...................................................................................................................... 4
4.
Roles and Responsibilities ............................................................................................. 7
4.1 Level 3 Manager ......................................................................................................... 7
4.2 Manager, Workplace Health and Safety ...................................................................... 8
4.3 Supervisor .................................................................................................................. 8
4.4 Permit Recipient ......................................................................................................... 8
4.5 Second Person ........................................................................................................... 9
4.6 Access Officer ............................................................................................................ 9
4.7 Permit User................................................................................................................. 9
4.8 2nd Tier Permit Authority ............................................................................................ 9
5.
Permit to Work Process Flow ........................................................................................11
6.
Permit to Work Function ................................................................................................12
6.1 A PTW is issued to: ...................................................................................................12
6.2 A PTW is required for the following activities: ............................................................12
7.
Hardware & Software ....................................................................................................13
7.1 The hardware used in the PTW process includes: .....................................................13
8.
Permit to Work Process .................................................................................................13
8.1 Application for a Permit to Work .................................................................................13
8.2 Call outs/ Breakdowns / Reactive Work .....................................................................14
8.3 Approval for Work ......................................................................................................14
8.4 Arrival at Site Entrance ..............................................................................................14
8.5 Arrival on Site ............................................................................................................15
8.6 PTW Activation ..........................................................................................................16
8.7 Undertaking Isolations ..............................................................................................16
8.8 Issuing 2nd Tier Permits ............................................................................................17
8.9 Carrying out Work Under an Activated Permit to Work...............................................17
8.10 Changes to the Work Under the Permit to Work ........................................................18
8.11 Break in Work ............................................................................................................18
8.12 Change of Permit Recipient .......................................................................................18
8.12.1 Change in Permit Recipient, no Break in Work: .....................................................19
8.12.2 Change in Permit Recipient, Break in Work: ..........................................................19
8.12.3 Change in Permit Recipient, Recommencing Work: ..............................................19
8.13 De-Isolating ...............................................................................................................19
8.14 Inching and Testing ...................................................................................................20
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 2 of 23
Corporate Safety – Procedure
Permit to Work
8.15 Completion of Work Under the Permit to Work ..........................................................21
9.
Multiple Permits to Work................................................................................................21
10.
Disciplinary Action .....................................................................................................22
11.
Associated Documents ..............................................................................................23
12.
Appendix....................................................................................................................23
12.1 Emergency Management ...........................................................................................23
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 3 of 23
Corporate Safety – Procedure
Permit to Work
1.
Purpose
The Permit to Work (PTW) procedure defines the minimum requirements to provide a safe
system of Work when plant is taken from service for breakdown, maintenance or capital work
and when Work is not controlled as Pre-Approved Work at Seqwater operational sites. The
system also provides a trigger for the use of other permits for high risk work (2nd Tier
Permits) such as hot work, work at heights, confined spaces work, excavation, fault finding,
HV, and grid mesh, handrail and flooring removal.
This procedure is a documented system that provides a notification of intent and an approval
process, to undertake a specific scope of Work.
2.
Scope
The PTW process forms part of the Site Access and Works Control System (SAWCS) and
covers Seqwater employees, contractors and sub-contractor employees engaged in
operational, maintenance, inspection, construction, commissioning, decommissioning or
alteration activities, that are not controlled as Pre-Approved Work, carried out at Seqwater
owned and operated sites.
All principal contractors shall abide by this procedure or submit a Safety Management Plan
for endorsement by the Seqwater Workplace Health and Safety and Environment
Departments. Any submitted Safety Management Plan must, as a minimum, achieve the
intent of this procedure.
3.
Definitions
TERM
DEFINITION
2nd Tier Permits
Any permit used at Seqwater owned and operated sites to manage
specific High Risk hazards, e.g. hot work, work at heights, confined
spaces work, excavation, fault finding, HV, and grid mesh, handrail and
flooring removal .
2nd Tier Permit
Authority
A Worker holding the appropriate licences, tickets and industry regulated
competencies relevant to the 2nd tier task they are performing. They
approve and issue the relevant 2nd Tier Permit.
Access Officer
The officer in control of dams, natural areas, facilities or water treatment
plants who is nominated to maintain the responsibilities of this
procedure. The Access Officer in responsible for assessing and
approving/rejecting access requests and PTW’s. They must ensure the
proposed work does not produce conflicts in operational and
maintenance requirements for the site and identify area specific and
process hazards that the Worker may not be aware of.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 4 of 23
Corporate Safety – Procedure
Permit to Work
TERM
DEFINITION
Isolations are discipline specific. Isolations and de-isolations must only
be performed within the Workers training, qualifications and competency
e.g.
Additional Isolator
Only licensed electricians may perform electrical isolations within an
electrical exclusion zone.
As a result, Permit Recipients will require additional resources to carry
out isolations when working with energy sources requiring multi
discipline isolations.
Additional Isolators work only under the direction of the Permit Recipient
or the Pre-Approved Worker.
Applicant
Person applying for access and or PTW from the Access Officer. The
Applicant may be requesting access on behalf of the Worker or
requesting access for themselves and their work party.
Break in work
Any time a Permit Recipient or Permit User of a PTW needs to leave a
job for any period of time other than for meal and ablution breaks.
CIS
Corporate Information System
De-isolation
The process of re-energising hazardous energy sources
Equipment Identification Tags are used to formally identify
equipment (in the field) and associate it to Pre-Approved Work or a
particular PTW.
Equipment
Identification Tag
Equipment Identification Tags are placed by the Pre-Approved
Worker or Permit Recipient prior to the commencement of any work
under the control of a PTW.
Equipment Identification Tags should be removed by the Worker-inCharge or Permit Recipient upon the completion of the task.
Equipment Identification Tags are green in colour.
An emergency is the sudden, unexpected, or impending situation that
may cause injury, loss of life, damage to property, and/or interference
with the normal activities of a worker or operations and which, therefore,
requires immediate attention and remedial action. e.g. fire, flood,
medical emergency.
Emergency
Sources of energy that have the potential to cause injury, property
damage or impact on the integrity of water supply. These sources may
include:
Hazardous Energy
Electrical energy
Rotating or moving parts
Influx of water or liquids
Release of toxic or caustic
substances
Material/substances under
pressure
HV
Potential energy
High Voltage
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 5 of 23
Corporate Safety – Procedure
Permit to Work
TERM
DEFINITION
A documented instruction on the isolations required to be performed in
order to safely conduct Permit to Work tasks. It contains explicit
instructions to:
Identify isolation points
Positively isolate
Discharge stored energy
Isolation
Instruction
Lock and Tag out
Test for dead, prove for dead
De-isolate
Inch and Test
The Isolation Instruction is developed by the Permit Recipient, and
reviewed by the Access Officer prior to use.
Inch and Test
The process of functional testing of equipment during commissioning.
The Inch and Test Program may require the partial or full de-isolation of
equipment and is recorded on the Isolation Instruction.
Isolation Point
A point at which an Isolation Lock and Tag can be applied to effect
positive isolation.
JSEA
Job Safety and Environmental Analysis
Level 3 Manager
Seqwater Managers directly responsible for the day to day operation of
water production facilities and plant.
Operational Site
Any Seqwater owned and/or operated site.
A board consisting of a lockable compartment and document holder that
also provides multiple lockout capability
Permit Boards provide the security for keys from Isolation Locks used to
positively isolate equipment.
Permit boards are used for the retention and displaying of documents
associated to the Permit to Work/ Pre-Approved Work (PTW form, 2nd
Tier Permits, Isolation Instructions, Work Order, etc).
Permit Board
Permit boards are a common personal lockout point for all Workers to
apply their Personal Danger Locks and Tags, protecting themselves from
hazardous energy.
Permit Boards may also be used for Pre-Approved Work where there are
multiple isolations and there is a need for Isolation Lock keys to be
secured in a central location.
Permit Recipient
Any worker formally trained and assessed competent to complete tasks
and accept conditions listed on the Permit to Work. The Permit
Recipient in charge of the Work. They are responsible for applying for
access, coordinating the PTW and any isolations.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 6 of 23
Corporate Safety – Procedure
Permit to Work
TERM
DEFINITION
Permit Recipient
Tag
A white tag applied by a Permit Recipient (with their Personal Danger
Tag) to their Personal Danger Lock identifying them as the recipient of
the corresponding PTW.
PTW
Permit to Work A formal document used to identify the controls to be
implemented to provide a safe workplace and safe systems of work.
Permit User
Any worker who has been trained and assessed competent to complete
the work tasks and works under the direct supervision of the Permit
Recipient.
Positively Isolated
A complete physical separation of energy sources preventing energy
transmission using a current isolation switch, isolating valve or device.
Equipment is not positively isolated if the energy can be activated by
another means while isolated.
Positive Isolation
Hardware
The shrouds (hardware) used in the positive isolation of valves, fuses,
circuit breakers, electric leads and plugs.
RTHA
Real Time Hazard Assessment. A documented hazard assessment, or
infield review, performed at the intended place of work prior to a PTW
being issued, or during tasks where there is a change in conditions.
A person trained in and assessed as competent in the Energy Tag and
Lockout Procedure and the SAWCS process.
Second Person
Isolations are always confirmed by a Second Person cross checking
each isolation point including de-isolations and re-isolations as required
for testing/inching and PTW cancellation.
Shall
To be interpreted as mandatory.
Should
Used in an advisory or discretionary sense.
Test for Dead,
Prove for Dead
The test conducted by a Permit Recipient/ Pre-Approved Worker to ‘test
for dead, Prove for Dead’ after attaching Isolation Locks and Tags to an
isolation point. This process ensures that the plant and equipment
cannot be started and is documented in the Isolation Instruction
Work
Any task that is conducted on an operational site outside of an
administration, meeting or office environment. The term Work excludes
courier drivers, mail delivery, waste collection, security personnel.
Worker
A Seqwater employee or business partner authorised and inducted to
carry out work at an operational site. The term Worker may encompass
Permit Recipients, Permit Users and Pre-Approved Workers
4.
Roles and Responsibilities
4.1 Level 3 Manager
Level 3 Managers are responsible for:
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 7 of 23
Corporate Safety – Procedure
Permit to Work
1.
2.
3.
4.
Ensuring that a PTW program is established and maintained for the protection of
all personnel and assets within their jurisdiction, at Seqwater owned and operated
sites.
Ensuring personnel are trained and assessed in the SAWCS process (SPE00215) and competent to perform the PTW roles and processes.
Authorising the forced removal of any padlock used under the PTW system as
outlined in the Energy Tag and Lockout procedure (PRO-00014), where required.
Ensuring PTW system hardware needs are readily available for field application.
4.2 Manager, Workplace Health and Safety
The Manager, Workplace Health and Safety is responsible for:
1. Developing processes and systems for auditing and providing a training program
that enables effective field application of this procedure.
2. Reviewing safety management plans submitted by principal contractors for
approval.
3. Ensuring audits are conducted at regular intervals to monitor the PTW process
and ensure continuous improvement.
4.3 Supervisor
Supervisors are responsible for:
1. Assigning work to Workers via the CIS Work Order System
2. Ensuring Workers have the relevant competencies to carry out the assigned work
3. Controlling the keys to Out of Service Locks that are in use
4. Assembling lists of Pre-Approved Work
4.4 Permit Recipient
Permit Recipients are responsible for:
1. Abiding by the requirements of this procedure at all times when Working at
Seqwater operational sites.
2. Ensuring that they and their Permit Users have the relevant competencies to carry
out the assigned work.
3. Ensuring a JSEA is developed (Refer to TEM-00013) for the proposed works in
conjunction with the work party. Is reviewed, understood and accepted by the
work party and is reviewed by the Access Officer and additional controls added
where appropriate.
4. Obtaining a full understanding and ensuring that all Permit Users have a full
understanding of the requirements and restrictions imposed by the PTW and any
required 2nd Tier Permits, including the boundary of the work area.
5. Ensuring Isolation Instructions are available for the required isolations, and where
not available, to develop the Isolation Instruction.
6. Performing isolations by securing each point with an Isolation Lock and Tag and or
coordinating multi disciplined isolations as per the Isolation Instruction.
7. Ensuring a Second Person cross checks each isolation, de-isolation and reisolation as required for testing/inching and PTW cancellation.
8. Administering the PTW process, ensuring all sections of the PTW are completed in
accordance with this procedure.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 8 of 23
Corporate Safety – Procedure
Permit to Work
9.
Closing the PTW and handing all documentation over to the Supervisor.
4.5 Second Person
The Second Person is responsible for:
1. Abiding by the requirements of this procedure at all times when Working at
Seqwater operational sites.
2. Ensuring they have competencies in the Energy Tag and Lockout Procedure
(PRO-00014) and the SAWCS process (SPE-00215).
3. Cross checking each isolation point including de-isolations and re-isolations as
required for testing/inching and PTW Closure.
4.6 Access Officer
Access Officers are responsible for:
1. Abiding by the requirements of this procedure at all times when Working at
Seqwater operational sites.
2. Reviewing the JSEA with the Permit Recipient, to ensure conflicts do not occur in
operational and maintenance requirements for the site and identifying area specific
and process hazards that the Permit Recipient may not be aware of (e.g. other
workgroups in the area, chemical storage facilities, changed conditions, etc).
3. Confirming the competencies of the work party undertaking the PTW.
4. Issuing the Site Access approval and managing the Access Log (FRM-00426) to
the Permit Recipient to allow site access.
5. Signing local PTW Activations or issuing the PTW Activation Number from the
Access Log to the Permit Recipient.
6. Signing local PTW Cancellations or issuing the PTW Cancellation Number from
the Access Log to the Permit Recipient.
4.7 Permit User
Permit Users are responsible for:
1. Abiding by the requirements of this procedure at all times when Working at
Seqwater operational sites.
2. Holding the appropriate licences, tickets and industry regulated competencies to
perform the task (e.g. rigger, crane operator, etc).
3. Obtaining from the Permit Recipient, a full understanding of the requirements of
and restrictions imposed by the JSEA, PTW and any 2nd Tier Permits.
4. Complying at all times with the requirements of:
the JSEA
the PTW
any 2nd Tier Permits
4.8 2nd Tier Permit Authority
The 2nd Tier Permit Authority is responsible for:
1. Abiding by the requirements of this procedure at all times when Working at
Seqwater operational sites.
2. Reviewing the requirements of the PTW to ensure the correct 2nd Tier Permits
have been allocated to the task.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 9 of 23
Corporate Safety – Procedure
Permit to Work
3.
4.
5.
Ensuring controls are adequate for the hazard and are implemented prior to the
commencement of work.
Holding the appropriate licences, tickets and industry regulated competencies
relevant to the 2nd tier task they are performing.
Approving and issuing the relevant 2nd Tier Permit.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 10 of 23
Corporate Safety – Procedure
Permit to Work
5.
Permit to Work Process Flow
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 11 of 23
Corporate Safety – Procedure
Permit to Work
6.
Permit to Work Function
6.1 A PTW is issued to:
Communicate the impacts and implications of the work being undertaken
Ensure all hazards are identified and the associated risks are adequately controlled to
reduce the risk to an acceptable level.
Detail how equipment should be positively isolated and worked on safely.
Identify and record the task being undertaken and the people carrying them out.
Ensure workers are aware of plant or equipment isolation and availability.
6.2 A PTW is required for the following activities:
Work requiring the isolation of hazardous energy or substances (Removing a plug in
device fed from a GPO is not deemed an isolation unless it is part of process control)
Work within an electrical exclusion zone (refer to QLD Electrical Safety Act 2002).
For the following activities that have recorded a high uncontrolled /inherent risk score
using the Seqwater JSEA (Refer to TEM-00013)
o Tasks that have the potential to impact on the water treatment process,
equipment or adjacent work activities.
o Tasks that have the potential to result in a physical change to the work
environment (e.g. scaffolding, excavation).
o Tasks that have the potential to impact the environment (e.g. noise, dust,
vibration, light, soil disturbance (excavation), possible contamination by oil,
paint or other chemical).
o Tasks where there is a risk of exposure to dangerous goods or hazardous
chemicals.
For work that falls into the above categories where personnel are not assessed
competent under the Seqwater Pre-Approved Work process.
Or as directed by an Seqwater representative.
6.3
A PTW is not required for:
Pre-Approved tasks where at least one worker has been assessed as competent.
Tasks that do not impact on others or Seqwater’s ability to supply water to customers.
Tasks that do not impact on others or Seqwater’s ability to release water from
infrastructure during flood events.
Work performed in maintenance workshops, except when a 2nd Tier Permit or
hazardous energy isolations are required.
Emergency situations where the Access Officer has provided verbal clearance to the
worker or other persons (i.e. emergency services, etc) requesting access to the area,
however the Energy Tag and Lockout process shall be observed.
Minor tool changes and adjustments and other minor servicing activities, if they:
o Take place during normal production operations and do not require the
removal or bypass of a guard; or
o Are routine, repetitive and integral to the use of the equipment.
o Office work
o Safety inspections or audits. ( Will require an RTHA and if required a JSEA)
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 12 of 23
Corporate Safety – Procedure
Permit to Work
7.
Hardware & Software
7.1 The hardware used in the PTW process includes:
HARDWARE
DESCRIPTION
Book-fast Permit to Work
Written record of work approval
2nd Tier Permits
Written record of 2nd Tier activities
Book-fast JSEA
Written record of job hazards and their controls
RTHA Cards
Real Time Hazard Assessment record
Permit Boards
Secure Isolation Lock keys and associated paperwork
Permit Recipient Tag
Identifies the Permit Recipient on the Permit Board
Equipment Identification
Tag
Identifies the equipment to be worked on
Information Tag
Displays information relevant to the equipment
Isolation Lock and Tag
Secures isolation points
Personal Danger Lock and
Tag
Secures isolation lock keys in the Permit Board and
identifies Workers working on the PTW
Out of Service Lock and
Tag
Identifies defective equipment and secures isolation keys in
the Permit Board while there is a break in work
In addition, a multitude of positive isolation hardware is available at operational sites.
Further information on the listed hardware is available in the Energy Tag and Lockout
Procedure.
8.
Permit to Work Process
8.1 Application for a Permit to Work
Work is generally planned in advance allowing appropriate time for the management of plant
output to minimise disruption to services.
To begin the process the Permit Recipient or Applicant acting on their behalf sends the
request for Site Access and PTW via a MS Outlook Calendar Appointment addressed to the
appropriate Access Officer at least 48 hours in advance of the planned start date, where
possible by:
1. Searching the Access Officer Register (REG-00538) for the appropriate Access
Officer
2. Generating a MS Outlook Calendar Appointment addressed to the appropriate
Access Officer
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 13 of 23
Corporate Safety – Procedure
Permit to Work
3.
4.
The Appointment should contain the following information:
a. A description of the work (may include Work Order Number)
b. The location
c.
The time and duration for access
d. A message containing relevant information for the Access Officer to
approve your application, e.g. PTW.
Attach the required supporting documentation if available e.g. JSEA, Isolation
Instruction etc and send the outlook meeting request
If the Applicant/ Permit Recipient is unable to send an outlook meeting request they may use
the Access Officer Group telephone number to contact the relevant Access Officer. The
relevant information above must be provided verbally.
If there is no JSEA and or Isolation Instruction, one must be drafted on arrival to site before a
PTW Activation Number can be issued.
8.2 Call outs/ Breakdowns / Reactive Work
In the case where work is unscheduled (i.e. a breakdown/callout), the PTW process must still
be followed by the submission and review of a JSEA however:
1. The Access Officer may grant approval for access verbally via the call out and
record it in the Access Log at a later date
2. Review of the JSEA may be accepted by the signature of the Access Officer on
the JSEA and recorded in the Site Access Log at a later date
3. Approval and closure of the PTW may be granted by the signature of the Access
Officer on the PTW and recorded in the Access Log at a later date
8.3 Approval for Work
The Access Officer assesses the application by reviewing the JSEA and taking into account:
1. The type, priority and timing of the work.
2. Production and maintenance plans.
3. The items of plant and equipment that would require isolation and the impact this
would have on operations.
4. Confirm with the Supervisor the training and competency of those nominated to
conduct the work.
5. The impact of 2nd Tier Permits on operations.
The Access Officer notifies the applicant of acceptance or rejection of the application
Where a conflict with other works arises and or, there is a lack of information in the
application, the Access Officer may reject the Application.
Where a rejection occurs, the Access Officer identifies the issues with the Applicant and may
suggest an appropriate re-scheduling time.
8.4 Arrival at Site Entrance
Every Seqwater Operational Site will have a sign located at the entrance showing the Access
Officers contact details, see below:
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 14 of 23
Corporate Safety – Procedure
Permit to Work
On arrival at the operational site entrance the Permit Recipient shall:
5. Contact the Access Officer to notify them of their arrival. Where there is limited
phone coverage, contact shall be made with the Access Officer prior to arriving on
site.
6. Where the access has not been pre-arranged the Permit Recipient must provide
all the information required from 8.1 above and wait for the Access Officer to
approve access.
The Access Officer shall:
1. Where the Site Access has not been pre-arranged, assess the application for
access following 8.1 above.
2. Confirm access approval for the Permit Recipient in the Access Log and allow
access into the site for sign in (mandatory) and induction (if not previously).
8.5 Arrival on Site
Once inside the Operational Site the Permit Recipient must:
1. Ensure they and the working party sign in; and complete the induction
requirements if not previously inducted.
2. If there are no sign in facilities i.e. remote site, the Permit Recipient must inform
the Access Officer of the date and time of arrival for inclusion in the Access Log.
3. Conduct an RTHA (Refer to GDE-00089)
4. Develop a JSEA (Refer to TEM-00013) for the Work if not already done
5. Develop an Isolation Instruction (Refer to TEM-00077) if not already done
6. Undertake a review of the JSEA with the Access Officer and implement any
additional controls.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 15 of 23
Corporate Safety – Procedure
Permit to Work
The Access Officer shall:
1. If there are no sign in facilities i.e. remote site, the Access Officer must enter the
date and time of arrival in the Access Log.
2. Review the JSEA and Isolation Instruction with the Permit Recipient to:
Ensure the proposed Work does not produce conflicts in operational and
maintenance requirements for the site.
Identify area specific and process hazards that the Worker may not be
aware of (e.g. other workgroups in the area, chemical storage facilities,
changed conditions, etc).
Add any necessary controls to the JSEA.
3. Access to Work may be denied based on an inadequate JSEA, conflicting
priorities, and or a lack of information in the application.
4. Where a rejection occurs, identify the issues with the Permit Recipient. This may
include suggesting an appropriate re-scheduling time.
8.6 PTW Activation
When the Permit Recipient is ready to have the PTW activated they carry out the following
tasks:
1. Fill out the PTW
2. Review the JSEA with the work party
3. Fill out any 2nd Tier Permits as required
4. Confirm controls are in place for 2nd Tier permits if required
5. Attach the green Equipment Identification Tag to the equipment work is proposed
for, where appropriate
6. Contact the Access Officer to request a signature or a PTW Activation number.
A PTW can be activated by either the signature of the Access Officer or a PTW Activation
Number. The PTW Activation Number is generated from the Access Log. The Access
Officer must carry out the following tasks before activating the PTW:
1. Review the JSEA and check for work conflicts that impact or may be impacted
upon by the work proposed under the PTW.
2. Confirm controls are in place for 2nd Tier permits if required.
3. Confirm there is an isolation Instruction if required.
The Access Officer then signs the PTW or issues the PTW Activation Number and the Permit
Recipient records the number on the PTW to confirm the permit is activated.
If there are no Isolations required, the Permit Recipient locks their Personal Danger Lock and
Tag and Permit Recipient Tag onto the Permit Board.
8.7 Undertaking Isolations
Isolations are discipline specific. Isolations must only be performed within the Worker’s
discipline specific training, qualifications and competency. As a result, Permit Recipients will
require Additional Isolators when working with energy sources requiring multi discipline
isolations.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 16 of 23
Corporate Safety – Procedure
Permit to Work
Additional Isolators work only under the direction of the Permit Recipient.
If isolations are required, the Permit Recipient must undertake a RTHA for the isolations
before any are performed. Then they must, carry them out personally, and or coordinate the
isolations by following the Isolation Instruction explicitly to:
1. Identify the Isolation Points.
2. Where no effective isolation hardware exists they must submit a work request to
install a suitable device and an alternative means of isolation shall be established
until the issue can be rectified.
3. Isolate the energy source.
4. Discharge or release stored energy.
5. Lock and tag out the Isolation Points.
6. Sign the Isolation Tags and the relevant sections of the Isolation Instruction.
7. Have isolations checked by a Second Person and have that Worker initial the
Isolation Tags and sign the relevant sections of the Isolation Instruction.
8. Test for dead, prove for dead.
9. Secures the Isolation Lock keys in the Permit Board.
10. Locks the Permit Board with their Personal Danger Lock, Tag and Recipient Tag.
Once this is complete the energy sources are deemed Positively Isolated.
The Permit Recipient then secures the PTW on the Permit Board with the JSEA, Isolation
Instruction, 2nd Tier Permits and other relevant documents.
Refer to the Energy Tag & Lockout Procedure (PRO-00014) for further explanation of
positively Isolating energy sources.
8.8 Issuing 2nd Tier Permits
2nd Tier Permits are required for the following high risk work activities:
Confined space work
Hot work
Trenching and excavation
High voltage
Fault finding
Work at height
Grid Mesh, Hand Rail and Flooring Removal
If a 2nd Tier Permit is required the 2nd Tier Permit Authority must fill out the required permits
and implement the appropriate controls as described in the JSEA for the work.
8.9 Carrying out Work Under an Activated Permit to Work
Once all the controls are in place for the work as described in the JSEA the Permit Recipient
ensures;
1. The Permit Users sign on to the PTW.
2. The Permit Users lock their personal danger tags and locks onto the Permit Board.
3. The work party carry out a RTHA for the work.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 17 of 23
Corporate Safety – Procedure
Permit to Work
4.
5.
6.
7.
The Permit Recipient signs the PTW Acceptance section of the PTW form
The Permit Recipient signs the Permit User section of the PTW
The work party then proceed with the work.
If an emergency occurs during the course of the work, follow the steps outlined in
the Appendix below.
8.10 Changes to the Work Under the Permit to Work
If there is a change to the task and or work conditions after the PTW has commenced (e.g.
an emergency, 2nd Tier Permit is required):
1. Work shall immediately cease.
2. The Permit Recipient will immediately contact the Access Officer and in
consultation they will determine if the change alters the Scope of Work that the
original PTW was issued under.
Where the Scope of Work has changed a new PTW shall be obtained.
Where there is no change in the Scope of Work but new hazards have been introduced to
the job (i.e. 2nd Tier Permit), the JSEA must be reviewed and updated and additional
controls implemented prior to the re-commencement of work.
8.11 Break in Work
A break in work is any prolonged break in the work other than meal and ablution breaks. The
most common example of a break in work is the end of a shift. When a break in work occurs
the following takes place:
1. Permit Recipient leaves all isolations in place.
2. Permit Users remove their Personal Danger Locks and Tags from the Permit
Board.
3. Permit Users sign off the PTW.
4. Permit Recipient places an Out of Service Lock and Tag onto the Permit Board,
explaining the reason for the delay or break in work.
5. Permit Recipient removes his Personal Danger Lock, Tag and Recipient Tag from
the Permit Board.
6. The Permit Board remains on site if break is less than one day if the break is
longer than 24hrs the PTW board remains at the operational control room.
7. The key to the Out of Service Lock stays with the Permit Recipient if the break is
not longer than 24hrs.
8. The key to the Out of Service Lock stays with the Supervisor if the break is longer
than a day.
For a break in work and a change of Permit Recipient refer to 8.12.2 below.
8.12 Change of Permit Recipient
From time to time a change in Permit Recipient may be required to complete work under a
PTW. Changes to Permit Recipients may occur under the following conditions:
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 18 of 23
Corporate Safety – Procedure
Permit to Work
8.12.1
1.
2.
3.
4.
5.
Change in Permit Recipient, no Break in Work:
Permit Recipient informs Access Officer of change.
New Permit Recipient signs onto PTW.
New Permit Recipient attaches their Personal Danger Lock and Tag and Permit
Recipient Tag to the Permit Board.
Old Permit Recipient signs off PTW.
Old Permit Recipient removes their Personal Danger Lock and Tag and Permit
Recipient Tag from the Permit Board.
New Permit Recipient informs all Permit Users of change.
8.12.2
1.
2.
3.
4.
5.
6.
7.
8.
Change in Permit Recipient, Break in Work:
Permit Recipient leaves all isolations in place.
Permit Users sign off PTW.
Permit Users remove their Personal Danger Locks and Tags from the Permit
Board.
Permit Recipient places an Out of Service Lock and Tag onto the Permit Board,
explaining the reason for the delay or break in work.
Permit Recipient signs off the PTW and notifies the Access Officer.
Permit Recipient removes their Personal Danger Lock, Tag and Recipient Tag.
The Permit Board remains on site if break is less than 24hrs. If the break is longer
than 24hrs the PTW board remains at the operational control room.
The key to the Out of Service Lock stays with the Supervisor.
8.12.3
Change in Permit Recipient, Recommencing Work:
When the new Permit Recipient is ready to recommence work under the PTW he must:
1. Reapply for site access using the steps outlined above.
2. Review the JSEA for the PTW and implement any controls.
3. Lock his Personal Danger Lock, Tag and Recipient Tag on the Permit Board.
4. Sign onto the PTW.
5. Remove the Out of Service Lock and Tag.
Once all the controls are in place for the work as described in the JSEA;
1. The Permit Users lock their Personal Danger Locks and Tags onto the Permit
Board.
2. The work party carry out a RTHA and then proceed with the work.
8.13 De-Isolating
De-Isolating is the process of removing Isolation Locks and Tags from Isolation Points and
re-energising equipment. De-isolating is done at the end of Work and or for Inching and
Testing. The following process is followed:
1. Permit Recipient contacts the Access Officer to discuss the implications of Deisolating
2. Access Officer ensures the proposed De-isolation does not produce conflicts in
operational and maintenance requirements for the site.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 19 of 23
Corporate Safety – Procedure
Permit to Work
3.
Access Officer Identifies area specific and process hazards that the Permit
Recipient may not be aware of (e.g. other workgroups in the area, chemical
storage facilities, changed conditions, etc).
4. Permit Recipient confirms all work has ceased on the equipment and the
equipment is ready to be De-isolated.
5. Permit Recipient assembles Additional Isolators as required.
6. Where the Workers who placed the Isolation Locks and Tags cannot be located,
the Permit Recipient must assemble Additional Isolators with discipline specific
training, qualifications and competency for the De-isolations.
7. Permit Recipient considers all 2nd Tier Permit controls before any attempt to reenergise equipment is made.
8. Permit Recipient undertakes a RTHA (Refer to GDE-00089) for the de-isolation
with the Working Party
9. Permit Users then remove their Personal Danger Locks and Tags, sign off the
PTW form and remain clear of the area throughout the De-isolation.
10. Permit Recipient removes their Personal Danger Lock, Tag and Recipient Tag
11. Permit Recipient confirms all Persons are in a position of safety before any
attempt to re-energise equipment is made.
12. Permit Recipient is in control of the Isolation Lock keys and must carry out the Deisolations personally, and or coordinate the De-isolations by following the Isolation
Instruction explicitly to:
a. Identify the Isolation Points.
b. Remove the Isolation Locks and Tags and sign the relevant sections of
the Isolation Instruction.
c.
Have De-isolations checked by a Second Person and have that Worker
sign the relevant sections of the Isolation Instruction.
d. De-Isolate the energy sources.
e. Recharge the energy sources.
8.14 Inching and Testing
If Inching and Testing is required the process below is followed:
1. Permit Recipient must temporarily suspend the PTW by contacting the Access
Officer and filling out the Inching and Testing section of the PTW.
2. Permit Users remove their Personal Danger Locks and Tags from the Permit
Board and sign off the PTW
3. Permit Recipient removes their Personal Danger Lock and Tags from the Permit
Board and signs off the PTW (User Section)
4. Permit Recipient de-isolates the required isolation following 8.13 above
5. Permit Recipient performs a RTHA (Refer to GDE-00089) prior to commencing the
testing/inching
6. Permit Recipient follows the Inching and Testing Program on the Isolation
Instruction.
Once the testing/inching is completed:
1. Permit Recipient either completes work under the PTW following 8.15 below or;
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 20 of 23
Corporate Safety – Procedure
Permit to Work
2.
3.
4.
5.
6.
7.
Permit Recipient contacts the Access Officer to discuss the implications of reisolating the equipment
Work party review the JSEA for the PTW and implement any controls.
Permit Recipient re-isolates following 8.7 above.
Permit Users lock their Personal Danger Locks and Tags onto the Permit Board
and sign back onto the PTW
Permit Recipient locks their Personal Danger Lock and Tags onto the Permit
Board and signs back onto the PTW
Work party carry out a RTHA and then recommences the work
8.15 Completion of Work Under the Permit to Work
On completion of work the following steps are taken:
1. Permit Recipient confirms all work has finished and all equipment has been deIsolated where required.
2. Permit Recipient ensures the area has been left safe and clear of tools, equipment
and rubbish.
3. Permit Recipient ensures all Permit Users have removed their Personal Danger
Locks and Tags and have signed off the PTW if not already done.
4. Permit Recipient removes their Personal Danger Lock, Tag and Recipient Tag if
not already done.
5. Permit Recipient signs the PTW Closure section of the PTW.
6. Permit Recipient contacts Access Officer and requests the PTW Cancellation
Number.
7. If Access Officer is satisfied that the work area has been left clean and the
equipment has been returned to service satisfactorily they sign the PTW
Cancellation section of the PTW or issue the PTW Cancellation Number from the
Access Log.
8. Permit Recipient records PTW Cancellation Number on PTW if issued.
9. Permit Recipient surrenders all PTW paperwork, including the JSEA, RTHAs, 2nd
Tier Permits and Isolation Instruction to the Supervisor for review.
10. Supervisor files all relevant documentation in CIS.
9.
Multiple Permits to Work
From time to time, multiple work parties may need to work under the same master isolations
for their PTWs e.g. plant shutdowns. In this instance multiple Permit Boards may be used
following the process below:
1. The Permit Recipient undertakes the master isolation following 8.7 above and
secures the master Permit Board with their Personal Danger Lock and Tag and
Permit Recipient Tag.
2. The 2nd Permit Recipient locks an Isolation Lock and Tag to the master Permit
Board and secures the Isolation Lock key inside the 2nd Permit Board with their
Personal Danger Lock and Tag and Permit Recipient Tag. An Isolation Instruction
noting the PTW of the Master Board must be attached to this Permit Board
3. The 3rd Permit Recipient locks an Isolation Lock and Tag to the 2nd Permit Board
and secures the Isolation Lock key inside the 3rd Permit Board with their Personal
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 21 of 23
Corporate Safety – Procedure
Permit to Work
Danger Lock and Tag and Permit Recipient Tag. An Isolation Instruction noting
the PTW of the Master Board must be attached to this Permit Board
This process can continue on to support as many Permit Boards as required. Refer to the
diagram below for a description of the process.
10. Disciplinary Action
Unauthorised removal of Personal Danger and/or Isolation Locks and Tags and failure to
follow correct Isolation Instructions has the potential to cause serious injury or death and/or
serious equipment damage.
Individuals found to have removed another person’s Personal Danger and/or Isolation Lock
and Tag or failed to follow the correct Isolation Instruction for isolating equipment will be
subject to investigation and potentially the disciplinary action outlined below:
Seqwater internal disciplinary action.
Penalties as outlined in Electrical Safety and Work Health and Safety Legislation.
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 22 of 23
Corporate Safety – Procedure
Permit to Work
11. Associated Documents
SPE-00215 Site Access and Works Control System Overview
PRO-01487 Operational Site Access Authority Procedure
PRO-01488 Pre-Approved Work Procedure
PRO-00014 Energy Tag and Lockout Procedure
REG-00538 Access Officer Register
FRM-00426 Access Log Form
GDE-00089 Conduct a RTHA Guidance Note
TEM-00013 Job Safety and Environmental Analysis Template
TEM-00077 Isolation Instruction Template
ERP-00022 Incident Emergency Response Plan - Responsibilities
12. Appendix
12.1 Emergency Management
An emergency is the sudden, unexpected, or impending situation that may cause injury, loss
of life, damage to property, and/or interference with the normal activities of a worker or
operations and which, therefore, requires immediate attention and remedial action.
No further Work shall be performed on that plant/equipment until cleared to return to
work. All PTWs are deemed suspended immediately
Contact Emergency Services on ‘000’, if required
Make the area safe where possible
Emergency Services do not require an Access approval
Notify the Access Officer for assistance
Administer first aid where required until relieved by trained medical relief and supply
any relevant details
NOTE: Emergency Services have control of the site on arrival.
Post emergency:
Verbal approval shall be gained from Emergency Services/Seqwater Person-inControl when it is safe to re-enter the site.
Where necessary maintain the state of the site to conduct internal/external
investigations.
PTW shall be re-assessed and re-issued prior to re-commencement of work.
Where a Worker becomes overdue in their communication with the Access Officer refer to
Corporate - Incident Emergency Response Plan – Responsibilities (ERP-00022).
The controlled version of this document is registered. All other versions are uncontrolled
Document Number:
Document Owner:
PRO-00900
Y Dong
Version Date:
19/11/2012
Document Approver: Manager, WH&S
Page: 23 of 23
Download