CeilAiR® OHS Series Installation, Operation & Maintenance Manual Appendix A - Forms Precision Air Conditioning Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Checklist for Completed Installation ❏1 Proper clearances for service access have been maintained around equipment. ❏ 2 Equipment is level and mounting fasteners (if applicable) are tight. ❏ 3 Piping completed to refrigerant or coolant loop (if required). ❏ 4 ❏ 5 Refrigerant charge added (if required). ❏ 6 Condensate pump installed (if required). ❏ 7 ❏8 ❏ 9 All field installed piping leak tested. ❏ 14 Main power wiring connections to the equipment, including earth ground, have been properly installed. ❏ 15 Customer supplied main power circuit breaker (HACR) type or fuses have proper ratings for equipment installed. ❏ 16 All wiring connections are tight. ❏ 17 Control wiring connections completed to evaporator and condenser/condensing unit (if required), including wiring to wall mounted control panel and optional controls. ❏ 18 Foreign materials have been removed from inside and around all equipment installed (shipping materials, construction materials, tools, etc.). ❏ 19 Fans and blowers rotate freely without unusual noise. ❏ 20 Inspect all piping connections for leaks during initial operation. Drain line connected. Water supply line connected to humidifier (if required). Safety pan installed under ceiling mounted equipment (if required). ❏ 10 Filter box installed (if required). ❏ 11 Filter (s) installed (if required). ❏ 12 Duct work completed or optional plenum installed (if required). ❏ 13 Incoming line voltage matches equipment nominal nameplated rating ± tolerances. CEF-1031 Rev B 10.04.00 CRG A-1 (Revised 09-25-01) CeilAiR® OHS Series Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 Precision Air Conditioning Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Warranty Registration and Start-Up Checklist Please fill out the following information and return to Stulz Air Technology Systems, Inc. within 30 days so that your system can be registered for warranty purposes. Failure to register your system may affect your warranty status. Installer's Name: ______________________________ Owner's Name: Company Name: ______________________________ Company Name: ______________________________ Street Address: ______________________________ Street Address: ______________________________ City, State, Zip: City, State, Zip: ______________________________ ______________________________ ______________________________ Model Number: _________________ Item Number: _________________ Serial Number: _________________ Has the Installation, Operation and maintenance Manual been supplied with the unit? If not, when were you told you YES NO would receive it? _____________________________ ❏ ❏ ❏ YES ❏ YES ❏ NO ❏ NO ❏ YES ❏ NO Receiving Inspection Was the unit received in satisfactory condition? If not, was the damage reported to the carrier? If the unit was damaged in transit, who was the carrier? _____________________ Has the damage been reported to SATS? Pre-Start Up Inspection Read The Installation, Operation and Maintenance Manual Before You Do Anything Else! With the POWER OFF: Are all of the support rods secured? (if applicable) Is the unit firmly mounted and secured on the support rods? (if applicable) Is all the wiring done in accordance with applicable codes? Does the unit have an adequate ground? Does the power servicing unit, match the nameplate voltage? Has an adequate p-trap been installed on the condensate line? Has the condensate trap been filled with water? Has field-installed piping been leak tested? ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO With the POWER ON: What is the voltage at main power terminal block? Line #1 ____ Volts Line #2 ____ Volts Line #3 ____ What is the control voltage? ____ Volts ❏ YES Is the blower rotation correct? Name of person filling out this form: __________________________________ (Use continuation Sheet) CEF-1032 Rev B 12.05.00 CRG Volts A-2 ❏ NO Date: __________________ (Revised 09-25-01) CeilAiR® OHS Series Installation, Operation & Maintenance Manual Warranty Registration and Start-Up Checklist (Cont.) Operating Information Refrigeration Circuit Suction Pressure: Discharge Pressure Superheat: Is sight glass clear of bubbles? Is sight glass green or yellow? Circuit #1 _______ PSI _______ PSI _______ °F ❏ YES ❏ NO ❏G ❏Y With both circuits operating: Return Air Temperature _____ °F Dry Bulb _____ °F Wet Bulb Supply Air Temperature _____ °F Dry Bulb _____ °F Wet Bulb Circuit #2 _______ PSI _______ PSI _______ °F ❏ YES ❏ NO ❏G ❏Y Electrical Information Please fill in the current draw for the components: Line #1 Line #2 Evaporator Motor __________ Amps __________ Compressor #1 __________ Amps __________ Compressor #2 __________ Amps __________ Humidifier __________ Amps __________ Electric Reheat #1 __________ Amps __________ Electric Reheat #2 __________ Amps __________ Line #3 __________ __________ __________ __________ __________ __________ Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Any adjustments made? ____________________________________________________________________________________________________________________________________________________________________________________________________________ ____________________________________________________________________________________________________________________________________________________________________________________________________________ Model Number: __________________ Item Number: _________________ Serial Number: __________________ With the POWER ON: What is the voltage at main power terminal block? Line #1 ____ Volts What is the control voltage? _____ Is the blower rotation correct? ❏ YES ❏ NO Line #2 ____ Volts Line #3____ Volts Volts Operating Information With both circuits operating: Refrigeration Circuit: Suction Pressure: Circuit #1 _______ PSI Circuit #2 _______ PSI Return Air Temperature _______ °F Dry Bulb Discharge Pressure: Superheat: _______ PSI _______ °F _______ PSI _______ °F _______ °F Wet Bulb Supply Air Temperature Is sight glass clear of bubbles? Is sight glass green or yellow? ❏ YES ❏ NO ❏G ❏Y ❏ YES ❏ NO ❏G ❏Y _______ °F Dry Bulb _______ °F Wet Bulb Electrical Information Please fill in the current draw for the components: Line #1 Evaporator Motor __________ Amps Compressor #1 __________ Amps Compressor #2 __________ Amps Humidifier __________ Amps Electric Reheat #1 __________ Amps Electric Reheat #2 __________ Amps Line #2 __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps Line #3 __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps Any adjustments made? ________________________________________________________________________________ ___________________________________________________________________________________________________ CEF-1032 Rev B 12.05.00 CRG A-3 (Revised 09-25-01) CeilAiR® OHS Series Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 Precision Air Conditioning Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Periodic General Maintenance Checks and Services Checklist Date: ____________________________ Prepared By: ___________________________ Model Number: ____________________________ Serial Number: __________________________ Item Number: ____________________________ Monthly Filters ❏ ❏ Cleanliness No Obstructions Blower Section Blower Turns ❏ Belts (if applicable) ❏ Condensate Drain Drain is Open ❏ Condensate Pan Safety ❏ Switches Operate Freely Miscellaneous Check Glycol or Chilled water for Air (bleed as required) ❏ External Heat Exchanger Clean and Clear of Obstructions ❏ Humidifier Cylinder and Controls Operate Properly ❏ Semi-Annually ❏ ❏ Check Refrigerant Charge (bubbles in sight glass) Check Suction & Discharge Pressure ❏ ❏ Tighten Electrical Connections Check Contacts on Contactors for Pitting ❏ ❏ Check Glycol Solution Concentration in System Clean Coils ❏ ❏ Clean Unit as Necessary Test the Glycol Solution Inhibitors (flush if necessary) ❏ ❏ Heat/Reheat Operational Clean Condensate Pump Annually Refrigerant Systems Chilled Water Systems Inspect Glycol System for Leaks and Corrosion Inspect Chilled Water System ❏ ❏ for Leaks and Corrosion Conduct a Complete Check of All Services Listed Conduct a Complete Check of ❏ ❏ Above and Clean Unit's Interior All Services Listed Above and Clean Unit's Interior Notes: ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Signature:________________________________ *** If factory assistance is required for any reason, provide the model number, serial number, and SATS item number found on the unit nameplate. This will speed the process and ensure accuracy of information. *** CEF-1033 Rev B 12.05.00 CRG A-4 (Revised 09-25-01) CeilAiR® OHS Series Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 Precision Air Conditioning Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Parts Inquiry Form - Stock Parts Today Date: _________________ Please Check One: ❏ Quote for below parts ❏ Unit Specific Priced Parts List ❏ Purchase Order ___________________ Bill To: Ship To: Phone: Fax: FOB Point Ship Via: (Check One) (prepay & add) Frederick, MD ❏ Next Day ❏ 2nd Day Tag: Attn: Payment Details: (Check One) ❏ Terms with SATS ❏ COD ❏ Credit Card (fill in below) SATS Item No.:____________ Card Type: ❏ VISA ❏ MasterCard CC# __________________________ Expiration Date: _________________ Card Holder's Name:______________ ❏ 3rd Day ❏ UPS Ground Unit Information: (Mandatory) SATS Model No.:__________ SATS Serial No.:___________ Please fill below recommended parts to stock. Fill in quantity column. SATS will complete remaining columns. Part Description Quantity SATS Part No. Avail: Unit Price Total Price Contactors (unit set) Controller Package Includes: Display, Control Board & Sensor Evaporator Belt Filters (unit set) Fuses (unit set) Humidifier Cylinder Overloads (unit set) Switch, Fan Cycling Switch, High Pressure Switch, Low Pressure Prices are subject to change in 30 days Prices do not include shipping charges Prices do not include labor or installation $100.00 Minimum Order Authorized Signature (Please Print Name Also) CEF-1034 Rev A 12.05.00 CRG A-5 (Revised 09-25-01) CyberONE SERIES Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Appendix A - Forms Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Checklist for Completed Installation ❏1 ❏2 ❏3 Proper clearances for service access have been maintained around equipment. Equipment is level and mounting fasteners (if applicable) are tight. Piping completed to refrigerant or coolant loop (if required). ❏ 13 ❏ 14 ❏ 15 ❏4 All field installed piping leak tested. ❏5 Refrigerant charge added (if required). ❏ 16 ❏6 Condensate pump installed (if required). ❏ 17 ❏7 Drain line connected. ❏8 ❏9 Water supply line connected to humidifier (if required). Safety pan installed under ceiling mounted equipment (if required). ❏ 10 Filter box installed (if required). ❏ 11 Filter (s) installed (if required). ❏ 12 ❏ 18 ❏ 19 ❏ 20 Incoming line voltage matches equipment nominal nameplated rating ± tolerances. Main power wiring connections to the equipment, including earth ground, have been properly installed. Customer supplied main power circuit breaker (HACR type) or fuses have proper ratings for equipment installed. All wiring connections are tight. Control wiring connections completed to evaporator and condenser/condensing unit (if required), including wiring to wall mounted control panel and optional controls. Foreign materials have been removed from inside and around all equipment installed (shipping materials, construction materials, tools, etc.). Fans and blowers rotate freely without unusual noise. Inspect all piping connections for leaks during initial operation. Duct work completed or optional plenum installed (if required). A-1 (Revised 4/01) CyberONE SERIES Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Warranty Registration and Start-Up Checklist Please fill out the following information and return to Stulz Air Technology Systems, Inc. within 30 days so that your system can be registered for warranty purposes. Failure to register your system may affect your warranty status. Installer's Name: ______________________________ Owner's Name: Company Name: ______________________________ Company Name: ______________________________ Street Address: ______________________________ Street Address: ______________________________ City, State, Zip: City, State, Zip: ______________________________ ______________________________ ______________________________ Model Number: _________________ Item Number: _________________ Serial Number: _________________ Has the Installation, Operation and maintenance Manual been supplied with the unit? If not, when were you told you would receive it? _____________________________ ❏ YES ❏ NO ❏ YES ❏ YES ❏ NO ❏ NO Receiving Inspection Was the unit received in satisfactory condition? If not, was the damage reported to the carrier? If the unit was damaged in transit, who was the carrier? _____________________ ❏ YES Has the damage been reported to SATS? ❏ NO Pre-Start Up Inspection Read The Installation, Operation and Maintenance Manual Before You Do Anything Else! With the POWER OFF: Are all of the support rods secured? (if applicable) Is the unit firmly mounted and secured on the support rods? (if applicable) Is all the wiring done in accordance with applicable codes? Does the unit have an adequate ground? Does the power servicing unit, match the nameplate voltage? Has an adequate p-trap been installed on the condensate line? Has the condensate trap been filled with water? Has field-installed piping been leak tested? ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO With the POWER ON: What is the voltage at main power terminal block? Line #1 ____ Volts Line #2 ____ Volts Line #3 ____ Volts What is the control voltage? ____ Volts ❏ YES Is the blower rotation correct? Name of person filling out this form: __________________________________ (Use continuation Sheet) CEF-1032 Rev A 7.20.00 CRG A-2 ❏ NO Date: __________________ (Revised 4/01) CyberONE SERIES Installation, Operation & Maintenance Manual Warranty Registration and Start-Up Checklist (Cont.) Operating Information Refrigeration Circuit Suction Pressure: Discharge Pressure Superheat: Is sight glass clear of bubbles? Is sight glass green or yellow? Circuit #1 _______ PSI _______ PSI _______ °F ❏ YES ❏ NO ❏G ❏Y With both circuits operating: Return Air Temperature _____ °F Dry Bulb _____ °F Wet Bulb Supply Air Temperature _____ °F Dry Bulb _____ °F Wet Bulb Circuit #2 _______ PSI _______ PSI _______ °F ❏ YES ❏ NO ❏G ❏Y Electrical Information Please fill in the current draw for the components: Line #1 Line #2 Evaporator Motor __________ Amps __________ Compressor #1 __________ Amps __________ Compressor #2 __________ Amps __________ Humidifier __________ Amps __________ Electric Reheat #1 __________ Amps __________ Electric Reheat #2 __________ Amps __________ Line #3 __________ __________ __________ __________ __________ __________ Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Any adjustments made? ____________________________________________________________________________________________________________________________________________________________________________________________________________ ____________________________________________________________________________________________________________________________________________________________________________________________________________ Model Number: __________________ Item Number: _________________ Serial Number: __________________ With the POWER ON ON: What is the voltage at main power terminal block? Line #1 ____ Volts What is the control voltage? _____ Is the blower rotation correct? ❏ YES ❏ NO Line #2 ____ Volts Line #3____ Volts Volts Operating Information With both circuits operating: Refrigeration Circuit: Circuit #1 Circuit #2 Return Air Temperature Suction Pressure: Discharge Pressure: _______ PSI _______ PSI _______ PSI _______ PSI _______ °F Dry Bulb _______ °F Wet Bulb Superheat: Is sight glass clear of bubbles? _______ °F ❏ YES ❏ NO _______ °F ❏ YES ❏ NO Supply Air Temperature _______ °F Dry Bulb Is sight glass green or yellow? ❏G ❏G _______ °F Wet Bulb ❏Y ❏Y Electrical Information Please fill in the current draw for the components: Line #1 Evaporator Motor __________ Amps Compressor #1 __________ Amps Compressor #2 __________ Amps Humidifier __________ Amps Electric Reheat #1 __________ Amps Electric Reheat #2 __________ Amps Line #2 __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps Line #3 __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps Any adjustments made? ________________________________________________________________________________ ___________________________________________________________________________________________________ CEF-1032 Rev A 7.20.00 CRG A-3 (Revised 4/01) CyberONE SERIES Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Periodic General Maintenance Checks and Services Checklist Date: ____________________________ Prepared By: ___________________________ Model Number: ____________________________ Serial Number: __________________________ Item Number: ____________________________ Monthly Filters ❏ ❏ Cleanliness No Obstructions Blower Section Blower Turns ❏ Belts (if applicable) ❏ Condensate Drain Drain is Open ❏ Condensate Pan Safety ❏ Switches Operate Freely Miscellaneous Check Glycol or Chilled Water for Air (bleed as required) ❏ External Heat Exchanger Clean and Clear of Obstructions ❏ Humidifier Cylinder and Controls Operate Properly ❏ Semi-Annually ❏ ❏ Check Refrigerant Charge (bubbles in sight-glass) Check Suction & Discharge Pressure ❏ ❏ Tighten Electrical Connections Check Contacts on Contactors for Pitting ❏ ❏ Check Glycol Solution Concentration in System Clean Coils ❏ ❏ Clean Unit as Necessary Test the Glycol Solution Inhibitors (flush if necessary) ❏ ❏ Heat/Reheat Operational Clean Condensate Pump Annually Refrigerant Systems Chilled W ater Systems Water Inspect Glycol System for Leaks and Corrosion Inspect Chilled Water System ❏ ❏ for Leaks and Corrosion Conduct a Complete Check of All Services Listed Conduct a Complete Check of ❏ ❏ Above and Clean Unit's Interior All Services Listed Above and Clean Unit's Interior Notes: ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Signature:________________________________ *** If factory assistance is required for any reason, provide the model number, serial number, and SATS item number found on the unit nameplate. This will speed the process and ensure accuracy of information. *** CEF-1033 Rev A 7.20.00 CRG A-4 (Revised 4/01) CyberONE SERIES Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Parts Inquiry Form - Stock Parts T oday Today Date: _________________ Please Check One: ❏ Quote for below parts ❏ Unit Specific Priced Parts List ❏ Purchase Order ___________________ Bill To: Ship To: Phone: Fax: FOB Point Ship Via: (Check One) (prepay & add) Frederick, MD ❏ Next Day ❏ 2nd Day Tag: Attn: Payment Details: (Check One) ❏ Terms with SATS ❏ COD ❏ Credit Card (fill in below) SATS Item No.: ___________ Card Type: ❏ VISA ❏ MasterCard CC# __________________________ Expiration Date: _________________ Card Holder's Name:______________ ❏ 3 rd Day ❏ UPS Ground Unit Information: (Mandatory) SATS Model No.: __________ SATS Serial No.:___________ Please fill below recommended parts to stock. Fill in quantity column. SATS will complete remaining columns. Part Description Quantity SA TS Part No. SATS Avail: Unit Price Total Price Contactors (unit set) Controller Package Includes: Display, Control Board & Sensor Evaporator Belt Filters (unit set) Fuses (unit set) Humidifier Cylinder Overloads (unit set) Switch, Fan Cycling Switch, High Pressure Switch, Low Pressure Prices are subject to change in 30 days Prices do not include shipping charges Prices do not include labor or installation $100.00 Minimum Order Authorized Signature (Please Print Name Also) CEF-1034 Rev A 5.30.00 CRG A-5 (Revised 4/01) CyberTWO SERIES Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Appendix A - Forms Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Checklist for Completed Installation ❏1 ❏2 ❏3 Proper clearances for service access have been maintained around equipment. Equipment is level and mounting fasteners (if applicable) are tight. Piping completed to refrigerant or coolant loop (if required). ❏ 13 ❏ 14 Incoming line voltage matches equipment nominal nameplated rating ± tolerances. Main power wiring connections to the equipment, including earth ground, have been properly installed. ❏ 15 Customer supplied main power circuit breaker ❏4 All field installed piping leak tested. ❏5 Refrigerant charge added (if required). ❏ 16 All wiring connections are tight. ❏6 Condensate pump installed (if required). ❏ 17 Control wiring connections completed to ❏7 ❏8 ❏9 Drain line connected. Water supply line connected to humidifier (if required). Filter box installed (if required). ❏ Filter (s) installed (if required). ❏ 12 evaporator and condenser/condensing unit (if required), including wiring to wall mounted control panel and optional controls. ❏ 18 Safety pan installed under ceiling mounted equipment (if required). ❏ 10 11 (HACR type) or fuses have proper ratings for equipment installed. Duct work completed or optional plenum installed (if required). CEF-1031 Rev B 10.4.00 CRG Foreign materials have been removed from inside and around all equipment installed (shipping materials, construction materials, tools, etc.). ❏ 19 Fans and blowers rotate freely without unusual noise. ❏ 20 Inspect all piping connections for leaks during initial operation. A-1 (Revised 04/01) CyberTWO SERIES Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Warranty Registration and Start-Up Checklist Please fill out the following information and return to Stulz Air Technology System, Inc. within 30 days so that your system can be registered for warranty purposes. Failure to register your system may affect your warranty status. Installer's Name: ______________________________ Owner's Name: Company Name: ______________________________ Company Name: ______________________________ Street Address: ______________________________ Street Address: ______________________________ City, State, Zip: City, State, Zip: ______________________________ ______________________________ ______________________________ Model Number: _________________ Item Number: _________________ Serial Number: _________________ Has the Installation, Operation and maintenance Manual been supplied with the unit? If not, when were you told you would receive it? _____________________________ ❏ YES ❏ NO ❏ YES ❏ YES ❏ NO ❏ NO Receiving Inspection Was the unit received in satisfactory condition? If not, was the damage reported to the carrier? If the unit was damaged in transit, who was the carrier? _____________________ ❏ YES Has the damage been reported to SATS? ❏ NO Pre-Start Up Inspection Read The Installation, Operation and Maintenance Manual Before You Do Anything Else! With the POWER OFF: Are all of the support rods secured? (if applicable) Is the unit firmly mounted and secured on the support rods? (if applicable) Is all the wiring done in accordance with applicable codes? Does the unit have an adequate ground? Does the power servicing unit, match the nameplate voltage? Has an adequate p-trap been installed on the condensate line? Has the condensate trap been filled with water? Has field-installed piping been leak tested? ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ YES ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO ❏ NO With the POWER ON: What is the voltage at main power terminal block? Line #1 ____ Volts Line #2 ____ Volts Line #3 ____ Volts What is the control voltage? ____ Volts ❏ YES Is the blower rotation correct? Name of person filling out this form: __________________________________ (Use continuation Sheet) CEF-1032 Rev B 04.02.01 CRG A-2 ❏ NO Date: __________________ (Revised 04/01) CyberTWO SERIES Installation, Operation & Maintenance Manual Warranty Registration and Start-Up Checklist (Cont.) Operating Information Refrigeration Circuit Suction Pressure: Discharge Pressure Superheat: Is sight glass clear of bubbles? Is sight glass green or yellow? Circuit #1 _______ PSI _______ PSI _______ °F ❏ YES ❏ NO ❏G ❏Y With both circuits operating: Return Air Temperature _____ °F Dry Bulb _____ °F Wet Bulb Supply Air Temperature _____ °F Dry Bulb _____ °F Wet Bulb Circuit #2 _______ PSI _______ PSI _______ °F ❏ YES ❏ NO ❏G ❏Y Electrical Information Please fill in the current draw for the components: Line #1 Line #2 Evaporator Motor __________ Amps __________ Compressor #1 __________ Amps __________ Compressor #2 __________ Amps __________ Humidifier __________ Amps __________ Electric Reheat #1 __________ Amps __________ Electric Reheat #2 __________ Amps __________ Line #3 __________ __________ __________ __________ __________ __________ Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Any adjustments made? ____________________________________________________________________________________________________________________________________________________________________________________________________________ ____________________________________________________________________________________________________________________________________________________________________________________________________________ Model Number: __________________ Item Number: _________________ Serial Number: __________________ With the POWER ON ON: What is the voltage at main power terminal block? Line #1 ____ Volts What is the control voltage? _____ Is the blower rotation correct? ❏ YES ❏ NO Line #2 ____ Volts Line #3____ Volts Volts Operating Information With both circuits operating: Refrigeration Circuit: Circuit #1 Circuit #2 Return Air Temperature Suction Pressure: Discharge Pressure: _______ PSI _______ PSI _______ PSI _______ PSI _______ °F Dry Bulb _______ °F Wet Bulb Superheat: Is sight glass clear of bubbles? _______ °F ❏ YES ❏ NO _______ °F ❏ YES ❏ NO Supply Air Temperature _______ °F Dry Bulb Is sight glass green or yellow? ❏G ❏G _______ °F Wet Bulb ❏Y ❏Y Electrical Information Please fill in the current draw for the components: Line #1 Evaporator Motor __________ Amps Compressor #1 __________ Amps Compressor #2 __________ Amps Humidifier __________ Amps Electric Reheat #1 __________ Amps Electric Reheat #2 __________ Amps Line #2 __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps Line #3 __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps Any adjustments made? ________________________________________________________________________________ ___________________________________________________________________________________________________ CEF-1032 Rev B 04.02.01 CRG A-3 (Revised 04/01) CyberTWO SERIES Installation, Operation & Maintenance Manual Warranty Registration and Start-Up Checklist (Cont.) Operating Information Refrigeration Circuit Suction Pressure: Discharge Pressure Superheat: Is sight glass clear of bubbles? Is sight glass green or yellow? Circuit #1 _______ PSI _______ PSI _______ °F ❏ YES ❏ NO ❏G ❏Y With both circuits operating: Return Air Temperature _____ °F Dry Bulb _____ °F Wet Bulb Supply Air Temperature _____ °F Dry Bulb _____ °F Wet Bulb Circuit #2 _______ PSI _______ PSI _______ °F ❏ YES ❏ NO ❏G ❏Y Electrical Information Please fill in the current draw for the components: Line #1 Line #2 Evaporator Motor __________ Amps __________ Compressor #1 __________ Amps __________ Compressor #2 __________ Amps __________ Humidifier __________ Amps __________ Electric Reheat #1 __________ Amps __________ Electric Reheat #2 __________ Amps __________ Line #3 __________ __________ __________ __________ __________ __________ Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Amps Any adjustments made? ____________________________________________________________________________________________________________________________________________________________________________________________________________ ____________________________________________________________________________________________________________________________________________________________________________________________________________ Model Number: __________________ Item Number: _________________ Serial Number: __________________ With the POWER ON ON: What is the voltage at main power terminal block? Line #1 ____ Volts What is the control voltage? _____ Is the blower rotation correct? ❏ YES ❏ NO Line #2 ____ Volts Line #3____ Volts Volts Operating Information With both circuits operating: Refrigeration Circuit: Circuit #1 Circuit #2 Return Air Temperature Suction Pressure: Discharge Pressure: _______ PSI _______ PSI _______ PSI _______ PSI _______ °F Dry Bulb _______ °F Wet Bulb Superheat: Is sight glass clear of bubbles? _______ °F ❏ YES ❏ NO _______ °F ❏ YES ❏ NO Supply Air Temperature _______ °F Dry Bulb Is sight glass green or yellow? ❏G ❏G _______ °F Wet Bulb ❏Y ❏Y Electrical Information Please fill in the current draw for the components: Line #1 Evaporator Motor __________ Amps Compressor #1 __________ Amps Compressor #2 __________ Amps Humidifier __________ Amps Electric Reheat #1 __________ Amps Electric Reheat #2 __________ Amps Line #2 __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps Line #3 __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps __________ Amps Any adjustments made? ________________________________________________________________________________ ___________________________________________________________________________________________________ CEF-1032 Rev B 04.02.01 CRG A-3 (Revised 04/01) CyberTWO SERIES Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Periodic General Maintenance Checks and Services Checklist Date: ____________________________ Prepared By: ___________________________ Model Number: ____________________________ Serial Number: __________________________ Item Number: ____________________________ Monthly Filters ❏ ❏ Cleanliness No Obstructions Blower Section Blower Turns ❏ Belts (if applicable) ❏ Condensate Drain Drain is Open ❏ Condensate Pan Safety ❏ Switches Operate Freely Miscellaneous Check Glycol or Chilled Water for Air (bleed as required) ❏ External Heat Exchanger Clean and Clear of Obstructions ❏ Humidifier Cylinder and Controls Operate Properly ❏ Semi-Annually ❏ ❏ Check Refrigerant Charge (bubbles in sight-glass) Check Suction & Discharge Pressure ❏ ❏ Tighten Electrical Connections Check Contacts on Contactors for Pitting ❏ ❏ Check Glycol Solution Concentration in System Clean Coils ❏ ❏ Clean Unit as Necessary Test the Glycol Solution Inhibitors (flush if necessary) ❏ ❏ Heat/Reheat Operational Clean Condensate Pump Annually Refrigerant Systems Chilled W ater Systems Water Inspect Glycol System for Leaks and Corrosion Inspect Chilled Water System ❏ ❏ for Leaks and Corrosion Conduct a Complete Check of All Services Listed Conduct a Complete Check of ❏ ❏ Above and Clean Unit's Interior All Services Listed Above and Clean Unit's Interior Notes: ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Signature:________________________________ *** If factory assistance is required for any reason, provide the model number, serial number, and SATS item number found on the unit nameplate. This will speed the process and ensure accuracy of information. *** CEF-1033 Rev B 04.02.01 CRG A-4 (Revised 04/01) CyberTWO SERIES Installation, Operation & Maintenance Manual Frederick, Maryland USA 21704 CyberAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Parts Inquiry Form - Stock Parts T oday Today Date: _________________ Please Check One: ❏ Quote for below parts ❏ Unit Specific Priced Parts List ❏ Purchase Order ___________________ Bill To: Ship To: Phone: Fax: FOB Point Ship Via: (Check One) (prepay & add) Frederick, MD ❏ Next Day ❏ 2nd Day Tag: Attn: Payment Details: (Check One) ❏ Terms with SATS ❏ COD ❏ Credit Card (fill in below) SATS Item No.: ___________ Card Type: ❏ VISA ❏ MasterCard CC# __________________________ Expiration Date: _________________ Card Holder's Name:______________ ❏ 3 rd Day ❏ UPS Ground Unit Information: (Mandatory) SATS Model No.:__________ SATS Serial No.:___________ Please fill below recommended parts to stock. Fill in quantity column. SATS will complete remaining columns. Part Description Quantity SA TS Part No. SATS Avail: Unit Price Total Price Contactors (unit set) Controller Package Includes: Display, Control Board & Sensor Evaporator Belt Filters (unit set) Fuses (unit set) Humidifier Cylinder Overloads (unit set) Switch, Fan Cycling Switch, High Pressure Switch, Low Pressure Prices are subject to change in 30 days Prices do not include shipping charges Prices do not include labor or installation $100.00 Minimum Order Authorized Signature (Please Print Name Also) CEF-1034 Rev A 04.02.01 CRG A-5 (Revised 04/01) 1572 Tilco Drive Frederick, Maryland USA 21704 DESICAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Appendix A- Forms Checklist for Completed Installation 1 Proper clearances for service access have been maintained around equipment. 2 Equipment is level and mounting fasteners (if applicable) are tight. 3 Foreign materials removed from inside and around equipment installed (shipping materials, blower lockdown bolts construction materials, tools, etc.). 4 Blowers rotate freely without unusual noise. 5 Filter(s) installed (if required). 6 Duct work installed and sealed against leaks 7 Air dampers installed in ductwork (if required). 8 9 Main power wiring connections to the equipment, including earth ground, have been properly installed according to applicable codes. 10 Customer supplied main power branch circuit protection device/ fuses have proper ratings for equipment installed. 11 All control wiring completed according to applicable codes to wall mounted control panel, temperature/RH sensor transmitter, etc. (as applicable). 12 Control Sensors (+/-) polarity wired correctly. 13 All control wiring completed to terminal positions for customer control and monitoring lines. 14 All wiring connections are tight. Incoming line voltage matches equipment nominal nameplate rating ± tolerances. Name________________________________________ Date___________ Company_____________________________________________________ DRY Series 500 Installation, Operation & Maintenance Manual A-1 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Warranty Registration and Start-Up Checklist Please fill out the following information and return to Stulz Air Technology System, Inc. (SATS) within 30 days so that your system can be registered for warranty purposes. Failure to register your system may affect your warranty status. Installer’s Name: Owner’s Name: Company Name: Company Name: Street Address: Street Address: City, State, Zip: City, State, Zip: Model Number: _______________ Item Number:________________ Serial Number: _________________ Has the Installation, Operation and maintenance Manual been supplied with the unit? If not, when were you told you would receive it? _____________________________ YES NO Receiving Inspection Was the unit received in satisfactory condition? YES NO If not, was the damage reported to the carrier? YES NO YES NO If the unit was damaged in transit, who was the carrier? _____________________ Has the damage been reported to SATS? Pre-Start Up Inspection Read The Installation, Operation and Maintenance Manual Before You Do Anything Else! With the POWER OFF: 1 Is the unit firmly secured on a level mounting surface? YES NO 2 Is all the wiring done in accordance with applicable codes? YES NO 3 Does the unit have an adequate ground? YES NO 4 Does the power servicing unit match the nameplate voltage? YES NO 5 Are external Temp, RH or other control sensors wired with correct polarity? YES NO With the POWER ON: 1 What is the voltage at main power terminal block? 2 What is the control voltage? 3 Is the blower rotation correct? 4 Static Pressure Gauge Readings: Process Rotor Line #1 _____ Volts _____ Volts YES ______“w.g. Line #2 _____ Volts Line #3 _____ Volts NO Reactivation Rotor Name of person filling out this form: __________________________________ ______“w.g. Date: __________________ (Use continuation Sheet) DRY Series 500 Installation, Operation & Maintenance Manual A-2 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Warranty Registration and Start-Up Checklist (Cont) Electrical Information Fill in the current draw for the following components: Line #1 Line #2 Line #3 FLA __________ Amps __________ Amps __________ Amps Process Blower Motor __________ Amps __________ Amps __________ Amps Reactivation Blower Motor __________ Amps __________ Amps __________ Amps Rotor Drive Motor __________ Amps __________ Amps __________ Amps Electric Reactivation Heater __________ Amps __________ Amps __________ Amps DRY Series 500 Installation, Operation & Maintenance Manual A-3 1572 Tilco Drive Frederick, Maryland USA 21704 DESICAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Periodic General Maintenance Checks and Services Checklist Date: Prepared By: Model Number: Serial Number: Item Number: Monthly Filters Cleanliness No Obstructions Rotor Check Condition of Rotor Face Check Condition of Seals Miscellaneous Check and Tighten Loose Fasteners Check Condition of Belts Check Pressure Drop Readings on Gauges Status Indicator Lights “Press to Test” Feature Operates Properly (Should Illuminate When Pressed) Quarter-Annually Tighten Electrical Connections and Check for Corrosion Check Contacts on Contactors for Pitting Clean Unit as Necessary Check Motor Amps Per Unit Name Plate Check Motors, Lubricate Per Maintenance Schedule Annually Conduct a Complete Check of All Services Listed Above and Clean Unit’s Interior Inspect Wiring For Fraying, Discoloration DRY Series 500 Installation, Operation & Maintenance Manual A-4 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Parts Inquiry Form – Stock Parts Today Date: _______________ Please Check One: Quote for below parts Unit Specific Priced Parts List Purchase Order _____________ Bill To: Ship To: Phone: Tag: Fax: Attn: FOB Point Frederick, MD Ship Via: (Check One) (prepay & add) Next Day 2nd Day 3 rd Day UPS Ground Payment Details: (Check One) Unit Information: Terms with SATS COD Credit Card (fill in below) Card Type: VISA Mastercard CC# __________________ Expiration Date: _________ Card Holder’s Name: ____________ (Mandatory) SATS Model No.: ____________ SATS Item No.: ______________ SATS Serial No.: _____________ Please fill below recommended parts to stock. Fill in quantity column. SATS will complete remaining columns. Part Description Quantity SATS Part No. Avail: Unit Price Total Price Prices are subject to change in 30 days Prices do not include shipping charges Prices do not include labor or installation Authorized Signature (Please Print Name Also) DRY Series 500 Installation, Operation & Maintenance Manual A-5 1572 Tilco Drive Frederick, Maryland USA 21704 DESICAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Appendix A- Forms Checklist for Completed Installation 1 Proper clearances for service access have been maintained around equipment. 2 Equipment is level and mounting fasteners (if applicable) are tight. 3 Foreign materials removed from inside and around equipment installed (shipping materials, blower lockdown bolts construction materials, tools, etc.). 4 Blowers rotate freely without unusual noise. 5 Filter(s) installed (if required). 6 Duct work installed and sealed against leaks 7 Air dampers installed in ductwork (if required). 8 9 Main power wiring connections to the equipment, including earth ground, have been properly installed according to applicable codes. 10 Customer supplied main power branch circuit protection device/ fuses have proper ratings for equipment installed. 11 All control wiring completed according to applicable codes to wall mounted control panel, temperature/RH sensor transmitter, etc. (as applicable). 12 Control Sensors (+/-) polarity wired correctly. 13 All control wiring completed to terminal positions for customer control and monitoring lines. 14 All wiring connections are tight. Incoming line voltage matches equipment nominal nameplate rating ± tolerances. Name________________________________________ Date___________ Company_____________________________________________________ DEZ Series 1000 Installation, Operation & Maintenance Manual A-1 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Warranty Registration and Start-Up Checklist Please fill out the following information and return to Stulz Air Technology System, Inc. (SATS) within 30 days so that your system can be registered for warranty purposes. Failure to register your system may affect your warranty status. Installer’s Name: Owner’s Name: Company Name: Company Name: Street Address: Street Address: City, State, Zip: City, State, Zip: Model Number: _______________ Item Number:________________ Serial Number: _________________ Has the Installation, Operation and maintenance Manual been supplied with the unit? If not, when were you told you would receive it? _____________________________ YES NO Receiving Inspection Was the unit received in satisfactory condition? YES NO If not, was the damage reported to the carrier? YES NO YES NO If the unit was damaged in transit, who was the carrier? _____________________ Has the damage been reported to SATS? Pre-Start Up Inspection Read The Installation, Operation and Maintenance Manual Before You Do Anything Else! With the POWER OFF: 1 Is the unit firmly mounted and secured on the mounting surface? YES NO 2 Is all the wiring done in accordance with applicable codes? YES NO 3 Does the unit have an adequate ground? YES NO 4 Does the power servicing unit match the nameplate voltage? YES NO 5 Are external Temp, RH or other control sensors wired with correct polarity? YES NO With the POWER ON: 1 What is the voltage at main power terminal block? 2 What is the control voltage? 3 Is the blower rotation correct? 4 Static Pressure Gauge Readings: Process Rotor Line #1 _____ Volts _____ Volts YES ______“w.g. Line #2 _____ Volts Line #3 _____ Volts NO Reactivation Rotor Name of person filling out this form: __________________________________ ______“w.g. Date: __________________ (Use continuation Sheet) DEZ Series 1000 Installation, Operation & Maintenance Manual A-2 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Warranty Registration and Start-Up Checklist (Cont) Electrical Information Fill in the current draw for the following components: Line #1 Line #2 Line #3 FLA __________ Amps __________ Amps __________ Amps Process Blower Motor __________ Amps __________ Amps __________ Amps Reactivation Blower Motor __________ Amps __________ Amps __________ Amps Rotor Drive Motor __________ Amps __________ Amps __________ Amps Electric Reactivation Heater __________ Amps __________ Amps __________ Amps DEZ Series 1000 Installation, Operation & Maintenance Manual A-3 1572 Tilco Drive Frederick, Maryland USA 21704 DESICAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Periodic General Maintenance Checks and Services Checklist Date: Prepared By: Model Number: Serial Number: Item Number: Monthly Filters Cleanliness No Obstructions Rotor Check Condition of Rotor Face Check Condition of Seals Miscellaneous Check and Tighten Loose Fasteners Check Condition of Belts Check Pressure Drop Readings on Gauges Status Indicator Lights “Press to Test” Feature Operates Properly (Should Illuminate When Pressed) Quarter-Annually Tighten Electrical Connections and Check for Corrosion Check Contacts on Contactors for Pitting Clean Unit as Necessary Check Motor Amps Per Unit Name Plate Check Motors, Lubricate Per Maintenance Schedule Annually Conduct a Complete Check of All Services Listed Above and Clean Unit’s Interior Inspect Wiring For Fraying, Discoloration DEZ Series 1000 Installation, Operation & Maintenance Manual A-4 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Parts Inquiry Form – Stock Parts Today Date: _______________ Please Check One: Quote for below parts Unit Specific Priced Parts List Purchase Order _____________ Bill To: Ship To: Phone: Tag: Fax: Attn: FOB Point Frederick, MD Ship Via: (Check One) (prepay & add) Next Day 2nd Day 3 rd Day UPS Ground Payment Details: (Check One) Unit Information: Terms with SATS COD Credit Card (fill in below) Card Type: VISA Mastercard CC# __________________ Expiration Date: _________ Card Holder’s Name: ____________ (Mandatory) SATS Model No.: ____________ SATS Item No.: ______________ SATS Serial No.: _____________ Please fill below recommended parts to stock. Fill in quantity column. SATS will complete remaining columns. Part Description Quantity SATS Part No. Avail: Unit Price Total Price Prices are subject to change in 30 days Prices do not include shipping charges Prices do not include labor or installation Authorized Signature (Please Print Name Also) DEZ Series 1000 Installation, Operation & Maintenance Manual A-5 1572 Tilco Drive Frederick, Maryland USA 21704 DESICAiR PRODUCT DIVISION Telephone: (301) 620-2033 Facsimile: (301) 620-1396 Appendix A- Forms Checklist for Completed Installation 1 Proper clearances for service access have been maintained around equipment. 10 Customer supplied main power branch circuit protection device/ fuses have proper ratings for equipment installed. 2 Equipment is level and mounting fasteners (if applicable) are tight. 11 3 Foreign materials removed from inside and around equipment installed (shipping materials, blower lockdown bolts construction materials, tools, etc.). All control wiring completed according to applicable codes to wall mounted control panel, temperature/RH sensor transmitter, etc. (as applicable). 12 Control Sensors (+/-) polarity wired correctly. 13 All control wiring completed to terminal positions for customer control and monitoring lines. 14 All wiring connections are tight. 15 Steam piping, control valves, etc. installed (if required). 17 All field installed piping leak tested. 19 Gas inlet supply pressure matches nominal nameplate rating (if required). 4 Blowers rotate freely without unusual noise. 5 Filter(s) installed (if required). 6 Duct work installed and sealed against leaks 7 Air dampers installed in ductwork (if required). 8 Incoming line voltage matches equipment nominal nameplate rating ± tolerances. 9 Main power wiring connections to the equipment, including earth ground, have been properly installed according to applicable codes. Name________________________________________ Date___________ Company_____________________________________________________ DES Series 2000 Installation, Operation & Maintenance Manual A-1 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Warranty Registration and Start-Up Checklist Please fill out the following information and return to Stulz Air Technology System, Inc. (SATS) within 30 days so that your system can be registered for warranty purposes. Failure to register your system may affect your warranty status. Installer’s Name: Owner’s Name: Company Name: Company Name: Street Address: Street Address: City, State, Zip: City, State, Zip: Model Number: _______________ Item Number:________________ Serial Number: _________________ Has the Installation, Operation and maintenance Manual been supplied with the unit? If not, when were you told you would receive it? _____________________________ YES NO Receiving Inspection Was the unit received in satisfactory condition? YES NO If not, was the damage reported to the carrier? YES NO YES NO If the unit was damaged in transit, who was the carrier? _____________________ Has the damage been reported to SATS? Pre-Start Up Inspection Read The Installation, Operation and Maintenance Manual Before You Do Anything Else! With the POWER OFF: 1 Is the unit firmly mounted and secured on the mounting surface? YES NO 2 Is all the wiring done in accordance with applicable codes? YES NO 3 Does the unit have an adequate ground? YES NO 4 Does the power servicing unit match the nameplate voltage? YES NO 5 Has field-installed piping been leak tested (if applicable)? YES NO 6 Are external Temp, RH or other control sensors wired with correct polarity? YES NO With the POWER ON: 1 What is the voltage at main power terminal block? 2 What is the control voltage? 3 Is the blower rotation correct? 4 Static Pressure Gauge Readings: Line #1 _____ Volts _____ Volts YES Line #2 _____ Volts Line #3 _____ Volts NO Process Rotor ______“w.g. Reactivation Rotor ______“w.g. *Process Filter ______“w.g. *Reactivation Filter ______“w.g. Burner ______“w.g. *If applicable Name of person filling out this form: __________________________________ Date: __________________ (Use continuation Sheet) DES Series 2000 Installation, Operation & Maintenance Manual A-2 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Warranty Registration and Start-Up Checklist (Cont) Electrical Information Fill in the current draw for the following components: Line #1 Line #2 Line #3 FLA __________ Amps __________ Amps __________ Amps Process Blower Motor __________ Amps __________ Amps __________ Amps Reactivation Blower Motor __________ Amps __________ Amps __________ Amps Rotor Drive Motor __________ Amps __________ Amps __________ Amps *Electric Reactivation Heater #1 __________ Amps __________ Amps __________ Amps *Electric Reactivation Heater #2 __________ Amps __________ Amps __________ Amps *Electric Reactivation Heater #3 __________ Amps __________ Amps __________ Amps *Electric Reactivation Heater #4 __________ Amps __________ Amps __________ Amps *If Applicable Gas Reactivation Operating Information (If Applicable) Type Natural LP Inlet Air Temperature Outlet Air Temperature Gas Inlet Pressure: _______ In w.c. _____ °F Dry Bulb _____ °F Dry Bulb Modulation Output Signal _______ mA _____ °F Wet Bulb _____ °F Wet Bulb Any adjustments made? __________________________________________________________________________________ Steam Operating Information (If Applicable) Inlet Air Temperature Outlet Air Temperature Inlet Pressure: _________ PSIG _____ °F Dry Bulb _____ °F Dry Bulb Modulation Output Signal _________ mA _____ °F Wet Bulb _____ °F Wet Bulb Any adjustments made? __________________________________________________________________________________ DES Series 2000 Installation, Operation & Maintenance Manual A-3 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Periodic General Maintenance Checks and Services Checklist Date: Prepared By: Model Number: Serial Number: Item Number: Monthly Filters Rotor Reactivation Heater Cleanliness Check Condition of Rotor Face Inspect Flame (Gas Units) No Obstructions Check Condition of Seals Inspect For Leaks (Steam Units) Miscellaneous Check and Tighten Loose Fasteners Check Condition of Belts Check Pressure Drop Readings on Gauges Check Steam Lines for Air (bleed as required) Status Indicator Lights “Press to Test” Feature Operates Properly (Should Illuminate When Pressed) Quarter-Annually Tighten Electrical Connections Check Motors, Lubricate Per Maintenance Schedule Check Contacts on Contactors for Pitting Check Gas/Steam Pressure Per Unit Name Plate Clean Unit as Necessary Clean Strainers as Necessary (Steam Units) Check Motor Amps Per Unit Name Plate Clean Coils as Necessary Annually Conduct a Complete Check of All Services Listed Above and Clean Unit’s Interior Inspect Wiring For Fraying, Discoloration Inspect Piping System for Leaks and Corrosion (If Applicable) Notes:______________________________________________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ Signature:________________________________ *** If factory assistance is required for any reason, provide the model number, serial number and SATS item number found on the unit nameplate. This will speed the process and insure accuracy of information. *** DES Series 2000 Installation, Operation & Maintenance Manual A-4 1572 Tilco Drive Frederick, Maryland USA 21704 Telephone: (301) 620-2033 Facsimile: (301) 620-1396 DESICAiR PRODUCT DIVISION Parts Inquiry Form – Stock Parts Today Date: _______________ Please Check One: Quote for below parts Unit Specific Priced Parts List Purchase Order _____________ Bill To: Ship To: Phone: Tag: Fax: Attn: FOB Point Frederick, MD Ship Via: (Check One) (prepay & add) Next Day 2nd Day 3 rd Day UPS Ground Payment Details: (Check One) Unit Information: Terms with SATS COD Credit Card (fill in below) Card Type: VISA Mastercard CC# __________________ Expiration Date: _________ Card Holder’s Name: ____________ (Mandatory) SATS Model No.: ____________ SATS Item No.: ______________ SATS Serial No.: _____________ Please fill below recommended parts to stock. Fill in quantity column. SATS will complete remaining columns. Part Description Quantity SATS Part No. Avail: Unit Price Total Price Prices are subject to change in 30 days Prices do not include shipping charges Prices do not include labor or installation Authorized Signature (Please Print Name Also) DES Series 2000 Installation, Operation & Maintenance Manual A-5