2014 ACUHO-I CONSTRUCTION AND RENOVATION SURVEY FINDINGS The following tables present detailed cost data on student housing new construction and renovation projects at numerous institutions participating in the 2014 ACUHO-I Construction and Renovation Survey. The following summary includes: Overall summary of new construction projects; Overall summary of renovation projects; New construction data categorized by housing type (traditional and modified traditional facilities; adjoining suite and super suite facilities; and apartment facilities); Renovation data categorized by renovation type (rehabilitation, modified rehabilitation, system refurbishment, cosmetic refurbishment, and general refurbishment The data collected represent student housing projects completed from the start of Winter 2012 term through the end of Fall 2013 term. The following definitions were provided to participants: Project Cost – includes all expenses associated with constructing and opening a new facility (e.g., design fees, financing costs, permits, land purchase, demolition of previous construction on site, parking, furniture, landscaping). Construction Cost –includes only the cost to build the residential facilities (i.e., living units and public/common areas). Do not include permit, parking, landscaping, or design fees. If possible, do not include costs for classrooms, dining facilities, or other non-residential space in this figure. Do not include furniture or other costs that are not directly related to construction. New construction cost data are organized by type of facility (i.e., adjoining suites, super suites, or apartments). Renovation cost data are grouped according to definitions created for the purposes of this study: Rehabilitation – involves total reconfiguration (i.e., gut facility and incorporate all new materials and systems into the project). Modified Rehabilitation – involves system upgrades and/or minor structural changes such as bedroom reconfiguration or bathroom reconfiguration. System Refurbishment – involves upgrades or replacement of one or more building systems without structural changes. Cosmetic Refurbishment – involves cosmetic improvements without structural or system changes (e.g., paint, carpet, furniture). General Refurbishment – involves both system upgrades/replacement and cosmetic improvements. Additional survey findings will be available at the ACUHO-I Web site: www.ACUHO-I.org and by contacting MGT (see below). For additional information related to a given project, please contact the specific institution. For additional information related to the survey or analyses, please contact Cynthia Parish Balogh at cbalogh@mgtofamerica.com or Ray Thompson at rthompso@mgtofamerica.com. MGT of America, Inc., and ACUHO-I New Construction Data Institution Arkansas State University-Jonesboro Arkansas State University-Jonesboro Baylor University College of William and Mary Emory University Florida Gulf Coast University Florida International University Florida State University Indiana University Indiana University Minnesota State University, Mankato North Carolina State University Pennsylvania State University-University Park Rhodes College South Dakota State University Southeast Missouri State University Texas A & M University Residence Life Texas State University Texas Tech University The University of Alabama Housing & Residential Com The University of Texas at Dallas The University of Texas at San Antonio University of California-Berkeley University of Colorado Boulder University of Georgia University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Massachusetts Amherst University of North Carolina at Charlotte University of North Carolina at Charlotte University of North Carolina at Greensboro University of Oregon University of the Witwatersrand, Johannesburg University of Utah University of Virginia Housing & Residence Life University of Washington University of Washington University of Wisconsin Oshkosh University of Wisconsin-Platteville Virginia Commonwealth University Virginia Commonwealth University Wake Forest University Residence Life and Housing Wake Forest University Residence Life and Housing Washington State University Project Name Greek Village Honors Living-Learning Community Building 4 East Village Fraternity housing Hamilton Holmes Hall Osprey Hall Parkview Hall Traditions Hall Rose Avenue Residence Hall Third and Union Apartments 2012 New Residence Hall - Margaret A. Preska Residence Community Wolf Ridge Apartments Phase I Chace Halls, South West Village Jackrabbit Grove New Residence Hall at 982 Greek Drive Hullabaloo Hall North Campus Housing Project Talkington Hall Presidential Village Phase I Residence Hall #3 and #5 San Saba Hall Maximino Martinez Commons Kittredge Central Rutherford Hall Maudelle Tanner Brown Bousfield Hall Nugent Hall (Phase C) Commonwealth Honors College Residential Community Belk Hall Hunt Hall Spartan Village Phase I Global Scholars Hall The Wits Junction Donna Garff Marriott Honors Residential Scholars Community Alderman Road Replacement Project Phase 3&4a Mercer Court Apartments Lander Hall Horizon Village Bridgeway Commons West Grace South Residential Complex West Grace North Complex Magnolia Hall Dogwood Hall Northside Residence Hall Traditional Rooms # of beds yes 100 yes yes yes 216 187 61 Modified Traditional Rooms yes # of beds 27 Adjoining Suites # of beds Super Suites yes yes 104 368 yes 64 10 yes yes yes 478 yes 612 yes yes 206 207 yes yes 32 606 yes 285 yes yes yes 6 22 128 yes yes Individual Contract Apartments yes yes yes # of beds 6 4 yes 436 yes 25 544 yes 24 yes 650 5 yes yes 618 270 yes 102 yes 401 yes 3 yes 2 Other # of beds 90 yes yes 6 288 yes 216 yes 261 yes yes 33 756 yes 2 302 yes yes 141 308 yes yes yes 516 971 800 240 520 618 yes 56 yes 4 yes 478 yes 638 210 yes 196 yes 804 162 yes yes # of beds yes 142 yes yes Apartments 533 yes yes yes # of beds yes 429 yes yes 3 450 yes 930 309 yes yes 440 yes yes yes 164 yes 56 yes 80 459 398 yes yes yes yes Total # of beds 105 104 701 187 125 533 618 276 440 102 302 401 216 141 802 262 648 612 516 971 800 618 416 263 261 484 332 1440 429 436 804 463 1206 309 571 930 650 344 440 459 398 237 245 302 GSF 40,255 33,924 274,725 72,000 37,715 175,000 244,000 118,070 148,000 71,000 105,000 196,952 48,500 55,000 182,806 82,500 256,747 189,000 178,000 357,780 288,000 187,000 148,000 100,740 80,263 182,566 104,480 515,637 178,000 132,000 387,000 187,000 450,000 161,602 181,830 450,672 243,079 164,352 172,000 164,500 160,000 80,339 82,927 99,655 Project Cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 9,400,000 7,100,000 72,544,800 29,000,000 12,000,000 32,500,000 52,805,000 28,076,873 38,000,000 16,000,000 25,036,736 56,000,000 19,000,000 15,500,000 45,000,000 24,500,000 68,000,000 39,383,659 45,000,000 62,500,000 62,000,000 43,000,000 75,287,000 35,000,000 28,000,000 62,000,000 44,000,000 198,000,000 32,000,000 30,000,000 54,000,000 68,000,000 56,000,000 32,000,000 67,500,000 117,000,000 78,000,000 34,000,000 29,287,000 29,950,000 27,455,000 20,066,649 20,066,649 32,600,000 Project Cost per Bed $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 89,524 68,269 103,488 155,080 96,000 60,976 85,445 101,728 86,364 156,863 82,903 139,651 87,963 109,929 56,110 93,511 104,938 64,352 87,209 64,367 77,500 69,579 180,978 133,080 107,280 128,099 132,530 137,500 74,592 68,807 67,164 146,868 46,434 103,560 118,214 125,806 120,000 98,837 66,561 65,251 68,982 84,669 81,905 107,947 Project Cost per GSF $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 234 209 264 403 318 186 216 238 257 225 238 284 392 282 246 297 265 208 253 175 215 230 509 347 349 340 421 384 180 227 140 364 124 198 371 260 321 207 170 182 172 250 242 327 Construction Cost Construction Cost per Bed Construction Cost per GSF $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 8,200,000 6,000,000 51,473,000 26,000,000 9,528,158 28,200,000 45,463,000 24,335,909 30,617,494 13,500,000 23,427,769 46,000,000 18,000,000 12,500,000 43,000,000 18,900,000 57,100,000 32,730,369 32,215,334 59,000,000 44,000,000 35,750,000 61,000,000 30,000,000 21,000,000 44,800,000 34,270,000 178,000,000 26,000,000 25,000,000 40,000,000 58,000,000 55,000,000 28,000,000 50,300,000 78,000,000 49,000,000 27,000,000 23,263,000 22,890,000 21,825,000 18,813,309 18,813,309 25,000,000 78,095 57,692 73,428 139,037 76,225 52,908 73,565 88,174 69,585 132,353 77,575 114,713 83,333 88,652 53,616 72,137 88,117 53,481 62,433 60,762 55,000 57,848 146,635 114,068 80,460 92,562 103,223 123,611 60,606 57,339 49,751 125,270 45,605 90,615 88,091 83,871 75,385 78,488 52,870 49,869 54,837 79,381 76,789 82,781 204 177 187 361 253 161 186 206 207 190 223 234 371 227 235 229 222 173 181 165 153 191 412 298 262 245 328 345 146 189 103 310 122 173 277 173 202 164 135 139 136 234 227 251 New Construction - Incomplete Data Institution American University Housing and Dining Programs Binghamton University Bridgewater State University Brigham Young University Central Michigan University Chowan University Christopher Newport University Colorado Mesa University Drexel University Eastern Kentucky University Mansfield University of Pennsylvania Mars Hill University Misericordia University Purdue University Rutgers University- Camden Campus Saint Leo University Southern Oregon University The Ohio State University The University of Akron The University of Leeds University of Alaska-Fairbanks University of Central Florida University of Central Florida University of Florida University of Florida University of South Alabama University of Tampa Worcester Polytechnic Institute Young Harris College Project Name Cassell Hall East Campus Housing (NEwing and Dickinson Communities Weygand Hall Heritage Housing Phase II Graduate Housing Project Whites Crossing Phase 1 New Residence Hall Orchard Avenue Apartments Chestnut Square New Residence Hall Phase II Housing Laurel Residence Hall MacDowell Hall First Street Towers West 330 Cooper Street Apartments 5 & 6 Raider Village The Residence on Tenth South Hall Central Village Sustainable Village Academic Village II Expansion Fraternity and Sorority Life Center and two sorority houses Corry Village Commons Tanglewood commons New Residence Hall West Kennedy Hall Faraday Hall Towers Residence Hall Traditional Rooms yes # of beds 1500 Modified Traditional Rooms yes yes yes # of beds 14 100 4 Adjoining Suites yes yes # of beds Super Suites 1400 100 # of beds yes 344 yes 396 Individual Contract Apartments yes yes yes 196 yes 174 yes yes 88 250 yes yes 256 364 # of beds Apartments # of beds yes 861 yes 102 yes 350 yes yes 164 48 yes 185 yes 4 67 yes yes 90 15 yes 80 yes 600 yes yes yes 314 8 510 yes 117 4 436 yes yes yes yes 226 yes 14 350 452 yes 23 16 640 yes yes Other 920 yes yes # of beds 248 yes 10 yes 14 yes yes 216 208 Total # of beds 358 3000 500 920 164 136 450 185 869 256 684 67 117 174 350 314 702 525 533 459 16 670 80 216 208 350 452 258 226 GSF 319,372 122,785 328,000 409,793 Project Cost 189,288 11,885 3,170 Project Cost per GSF $ 376,000,000 $ 125,333 $ 28,500,000 $ 173,780 $ 232 $ 97,000,000 $ 24,000,000 $ 49,000,000 $ $ $ 111,623 93,750 71,637 $ 296 $ 120 $ $ $ $ $ 56,000,000 22,000,000 50,000,000 51,000,000 30,000,000 $ $ $ $ $ $ 160,000 70,064 71,225 97,143 56,285 $ 163 $ 269 $ $ 2,356,890 1,000,000 $ $ $ 10,912 4,808 - $ $ 198 315 $ 12,500,000 $ 55,310 71,882 135,000 Project Cost per Bed Construction Cost Construction Cost per Bed $ 22,000,000 $ 85,938 $ 15,513,850 $ 89,160 $ 40,000,000 $ 56,980 Construction Cost per GSF $ 216 New Construction - Traditional Rooms Institution Arkansas State University-Jonesboro College of William and Mary South Dakota State University Texas State University University of Colorado Boulder University of Illinois at Urbana-Champaign University of Oregon University of Virginia Housing & Residence Life Washington State University Project Name Greek Village Fraternity housing Jackrabbit Grove North Campus Housing Project Kittredge Central Nugent Hall (Phase C) Global Scholars Hall Alderman Road Replacement Project Phase 3&4a Northside Residence Hall Sub-Mean Sub-Median Total # of beds 105 187 802 612 263 332 463 571 302 404 332 GSF 40,255 72,000 182,806 189,000 100,740 104,480 187,000 181,830 99,655 128,641 104,480 Project Cost $ $ $ $ $ $ $ $ $ $ $ 9,400,000 29,000,000 45,000,000 39,383,659 35,000,000 44,000,000 68,000,000 67,500,000 32,600,000 41,098,184 39,383,659 Project Cost per Bed $ $ $ $ $ $ $ $ $ $ $ 89,524 155,080 56,110 64,352 133,080 132,530 146,868 118,214 107,947 111,523 118,214 Project Cost per GSF $ $ $ $ $ $ $ $ $ $ $ 234 403 246 208 347 421 364 371 327 325 347 $ $ $ $ $ $ $ $ $ $ $ Construction Cost 8,200,000 26,000,000 43,000,000 32,730,369 30,000,000 34,270,000 58,000,000 50,300,000 25,000,000 34,166,708 32,730,369 $ $ $ $ $ $ $ $ $ $ $ Construction Cost per Bed 78,095 139,037 53,616 53,481 114,068 103,223 125,270 88,091 82,781 93,074 88,091 $ $ $ $ $ $ $ $ $ $ $ Construction Cost per GSF 204 361 235 173 298 328 310 277 251 271 277 Note: Includes projects that were primarily traditional room facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included. New Construction - Modified Traditional Rooms Institution Purdue University University of North Carolina at Charlotte University of Washington Project Name First Street Towers West Hunt Hall Lander Hall Total # of beds 174 436 650 420 436 Sub-Mean Sub-Median GSF 71,882 132,000 243,079 148,987 132,000 Project Cost $ $ 30,000,000 78,000,000 54,000,000 54,000,000 Project Cost per Bed $ $ $ 68,807 120,000 62,936 68,807 Project Cost per GSF $ $ 227 321 274 274 $ $ $ Construction Cost 15,513,850 25,000,000 49,000,000 29,837,950 25,000,000 $ $ $ Construction Cost per Bed 89,160 57,339 75,385 73,961 75,385 $ $ $ Construction Cost per GSF 216 189 202 202 202 Note: Includes projects that were primarily modified traditional room facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included. New Construction Data - Traditional and Modified Traditional Rooms Institution Project Name Total Mean Total Median Total # of beds 408 384 GSF 133,727 118,240 Project Cost $ $ 43,443,969 39,383,659 $ $ Project Cost per Bed 99,376 113,080 $ $ Project Cost per GSF 315 327 Project Cost per Bed Project Cost per GSF $ $ Construction Cost 33,084,518 31,365,185 $ $ Construction Cost per Bed 88,296 85,436 $ $ Construction Cost per GSF 254 243 New Construction - Adjoining Suites Institution Arkansas State University-Jonesboro Baylor University Emory University Minnesota State University, Mankato Southeast Missouri State University Southern Oregon University Texas A & M University Residence Life The University of Texas at San Antonio University of Wisconsin-Platteville Sub-Mean Sub-Median Project Name Honors Living-Learning Community Building 4 East Village Hamilton Holmes Hall 2012 New Residence Hall - Margaret A. Preska Residence Community New Residence Hall at 982 Greek Drive Raider Village Hullabaloo Hall San Saba Hall Bridgeway Commons Total # of beds 104 701 125 302 262 702 648 618 440 434 440 GSF 33,924 274,725 37,715 105,000 82,500 256,747 187,000 172,000 143,701 138,500 Project Cost $ $ $ $ $ $ $ $ $ $ $ 7,100,000 72,544,800 12,000,000 25,036,736 24,500,000 50,000,000 68,000,000 43,000,000 29,287,000 36,829,837 29,287,000 $ $ $ $ $ $ $ $ $ $ $ 68,269 103,488 96,000 82,903 93,511 71,225 104,938 69,579 66,561 84,053 82,903 $ $ $ $ $ 209 264 318 238 297 $ $ $ 265 230 170 $ $ 249 251 $ $ $ $ $ $ $ $ $ $ $ Construction Cost 6,000,000 51,473,000 9,528,158 23,427,769 18,900,000 40,000,000 57,100,000 35,750,000 23,263,000 29,493,547 23,427,769 $ $ $ $ $ $ $ $ $ $ $ Construction Cost per Bed 57,692 73,428 76,225 77,575 72,137 56,980 88,117 57,848 52,870 68,097 72,137 $ $ $ $ $ $ $ $ $ $ Construction Cost per GSF 177 187 253 223 229 222 191 135 202 207 Note: Includes projects that were primarily adjoining suite style facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included. New Construction - Super Suites Institution Project Name Eastern Kentucky University New Residence Hall Florida Gulf Coast University Osprey Hall Mansfield University of Pennsylvania Phase II Housing Rhodes College West Village Saint Leo University Apartments 5 & 6 Texas Tech University Talkington Hall The Ohio State University The Residence on Tenth The University of Alabama Housing & Residential Com Presidential Village Phase I The University of Texas at Dallas Residence Hall #3 and #5 University of Illinois at Urbana-Champaign Maudelle Tanner Brown Bousfield Hall University of Massachusetts Amherst Commonwealth Honors College Residential Community Wake Forest University Residence Life and Housing Magnolia Hall Wake Forest University Residence Life and Housing Dogwood Hall Sub-Mean Sub-Median Total # of beds 256 533 684 141 314 516 525 971 800 484 1440 237 245 550 516 GSF 175,000 409,793 55,000 135,000 178,000 189,288 357,780 288,000 182,566 515,637 80,339 82,927 220,778 180,283 Project Cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 24,000,000 32,500,000 49,000,000 15,500,000 22,000,000 45,000,000 51,000,000 62,500,000 62,000,000 62,000,000 198,000,000 20,066,649 20,066,649 51,048,715 45,000,000 Project Cost per Bed $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Note: Includes projects that were primarily super suite style facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included. 93,750 60,976 71,637 109,929 70,064 87,209 97,143 64,367 77,500 128,099 137,500 84,669 81,905 89,596 84,669 Project Cost per GSF $ $ $ $ $ $ $ $ $ $ $ $ $ $ 186 120 282 163 253 269 175 215 340 384 250 242 240 246 $ $ Construction Cost 22,000,000 28,200,000 $ $ $ 12,500,000 $ $ $ $ $ $ $ $ $ Construction Cost per Bed Construction Cost per GSF 85,938 52,908 $ 161 $ 88,652 $ 227 32,215,334 $ 62,433 $ 181 59,000,000 44,000,000 44,800,000 178,000,000 18,813,309 18,813,309 $ $ $ $ $ $ 60,762 55,000 92,562 123,611 79,381 76,789 $ $ $ $ $ $ 165 153 245 345 234 227 45,834,195 30,207,667 $ $ 77,804 78,085 $ $ 215 227 New Construction Data - Adjoining Suites and Super Suites Total Mean Total Median 502 500 189,947 176,500 $ $ 45,231,902 37,750,000 $ $ 87,328 83,786 $ $ 243 246 $ $ 38,093,888 28,200,000 $ $ 73,206 73,428 $ $ 209 222 Notes: Includes projects that were primarily adjoining and super suites but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included. New Construction - Individual Contract Apartments Institution Drexel University University of California-Berkeley University of North Carolina at Greensboro University of Utah Virginia Commonwealth University Virginia Commonwealth University University of Wisconsin Oshkosh Sub-Mean Sub-Median Project Name Chestnut Square Maximino Martinez Commons Spartan Village Phase I Donna Garff Marriott Honors Residential Scholars Community West Grace South Residential Complex West Grace North Complex Horizon Village Total # of beds 869 416 804 309 459 398 344 514 416 GSF 328,000 148,000 387,000 161,602 164,500 160,000 164,352 216,208 164,352 Project Cost $ $ $ $ $ $ $ $ $ 97,000,000 75,287,000 54,000,000 32,000,000 29,950,000 27,455,000 3,400,000 45,584,571 32,000,000 Project Cost per Bed $ $ $ $ $ $ $ $ $ 111,623 180,978 67,164 103,560 65,251 68,982 9,884 86,777 68,982 Project Cost per GSF $ $ $ $ $ $ $ 296 509 140 198 182 172 21 $ $ 217 182 Construction Cost $ $ $ $ $ $ $ $ 61,000,000 40,000,000 28,000,000 22,890,000 21,825,000 27,000,000 33,452,500 27,500,000 Construction Cost per Bed $ $ $ $ $ $ $ $ 146,635 49,751 90,615 49,869 54,837 78,488 78,366 66,663 Construction Cost per GSF $ $ $ $ $ $ 412 103 173 139 136 164 $ $ 188 152 Note: Includes projects that were primarily individual contract apartment facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included. New Construction - Apartments Institution Central Michigan University Florida International University Florida State University Indiana University Indiana University North Carolina State University Pennsylvania State University-University Park University of Florida University of Florida University of Georgia University of North Carolina at Charlotte University of the Witwatersrand, Johannesburg University of Washington Sub-Mean Sub-Median Project Name Graduate Housing Project Parkview Hall Traditions Hall Third and Union Apartments Rose Avenue Residence Hall Wolf Ridge Apartments Phase I Chace Halls, South Corry Village Commons Tanglewood commons Rutherford Hall Belk Hall The Wits Junction Mercer Court Apartments Total # of beds 164 618 276 102 440 401 216 216 208 261 429 1206 930 421 276 GSF 122,785 244,000 118,070 71,000 148,000 196,952 48,500 11,885 3,170 80,263 178,000 450,000 450,672 163,331 122,785 Project Cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 28,500,000 52,805,000 28,076,873 16,000,000 38,000,000 56,000,000 19,000,000 2,356,890 1,000,000 28,000,000 32,000,000 56,000,000 117,000,000 36,518,366 28,500,000 Project Cost per Bed $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 173,780 85,445 101,728 156,863 86,364 139,651 87,963 10,912 4,808 107,280 74,592 46,434 125,806 92,433 87,963 Project Cost per GSF $ $ $ $ $ $ $ $ $ $ $ $ $ 232 216 238 225 257 284 392 198 315 349 180 124 260 $ $ 252 238 Construction Cost Construction Cost per Bed Construction Cost per GSF $ $ $ $ $ $ 45,463,000 24,335,909 13,500,000 30,617,494 46,000,000 18,000,000 $ $ $ $ $ $ 73,565 88,174 132,353 69,585 114,713 83,333 $ $ $ $ $ $ 186 206 190 207 234 371 $ $ $ $ 21,000,000 26,000,000 55,000,000 78,000,000 $ $ $ $ 80,460 60,606 45,605 83,871 $ $ $ $ 262 146 122 173 $ $ 35,791,640 28,308,747 $ $ 83,227 81,897 $ $ 210 198 Note: Includes projects that were primarily contract-by-the-unit apartment facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included. New Construction - Incomplete and Other Data Institution Binghamton University Brigham Young University Christopher Newport University Colorado Mesa University Mars Hill University Misericordia University Rutgers University- Camden Campus The University of Akron The University of Leeds University of Alaska-Fairbanks University of Central Florida University of Central Florida University of South Alabama University of Tampa Worcester Polytechnic Institute Young Harris College Sub-Mean Sub-Median Project Name East Campus Housing (NEwing and Dickinson Communities Heritage Housing Phase II New Residence Hall Orchard Avenue Apartments Laurel Residence Hall MacDowell Hall 330 Cooper Street South Hall Central Village Sustainable Village Fraternity and Sorority Life Center and two sorority houses Academic Village II Expansion New Residence Hall West Kennedy Hall Faraday Hall Towers Residence Hall Total # of beds 3000 920 450 185 67 117 350 533 459 16 80 670 350 452 258 226 508 350 GSF 319,372 Project Cost Project Cost per Bed $ 376,000,000 $ 125,333 $ $ 56,000,000 30,000,000 $ $ 160,000 56,285 $ 319,372 319,372 $ $ $ 12,500,000 118,625,000 43,000,000 $ $ $ Project Cost per GSF Construction Cost Construction Cost per Bed Construction Cost per GSF #DIV/0! #NUM! #DIV/0! #NUM! #DIV/0! #NUM! #DIV/0! #NUM! - 55,310 79,386 56,285 Renovation Data Institution Arkansas State University-Jonesboro Bangor University Beacon College Bowling Green State University Brown University California State University, Long Beach California State University, Long Beach California State University, Long Beach California State University, Sacramento Christendom College Coastal Carolina University Colorado College Columbia University Columbia University Drexel University East Central University East Tennessee State University Eastern Illinois University Eastern Illinois University Eastern Illinois University Eastern Illinois University Eastern Illinois University Eastern Illinois University Eastern Illinois University Embry-Riddle Aeronautical University Emory University Florida International University Florida State University Florida State University Florida State University Florida State University Florida State University Florida State University Frostburg State University George Mason University Indiana University Johns Hopkins University Johns Hopkins University Johns Hopkins University Johns Hopkins University Johns Hopkins University Johnson & Wales University - Denver Kansas State University Kansas State University Kansas State University Kent State University Kent State University Kent State University Landmark College Louisiana State University Lourdes University Loyola Marymount University Marshall University Marshall University Michigan State University Michigan Technological University New Jersey City University North Dakota State University North Dakota State University North Dakota State University Oakland University Oklahoma City University Project Name Kays Hall HVAC Renovation Garth Hall McDonald Hall MMA Parkside College Dining Hall renovation Building J renovation Building G renovation Sierra Hall Renovation Gardens Renovation Slocum Hall Renovation Wallach Schapiro Pontotoc Hall West and Powell Hall McKinney Hall renovations Andrews 5 and 6 Wireless - Pemberton, Greek Court GC 3A carpet Univ Apt kitchens GC 2B carpet Stevenson flooring replacement Halls 6 and 9 Harris Hall Lakeview Lighting GilchrisHall Envelope and Waterproofing Rogers Hall Structural and Mechanical Salley Hall Envelope and Waterproofing Landis Hall Envelope and Waterproofing Cawthon Hall Envelope and Waterproofing Kellum Hall 2012 Projects Gray Hall Commonwealth Briscoe Quad Renovation AMR Bldg Dining Transitions Levering Market Front of House McCoy Common Kithcne A&B Bldg Johnson Hall Renovation Honors House Building H Moore Hall HVAC replacement HVAC and room upgrades Prentice Bathroom Renovation Wright Hall - HVAC and Room Upgrades Hall 4 Update Annie Boyd Hall Rains Renovation HVAC Replacement Armstrong Hall East McNair kitchenette lounges HVAC and bathroom rehab. Stockbridge Hall Bathroom Project Johnson Hall Painting/Flooring Reed Hall Building Painting/Flooring Replacement Hamlin South Plumbing renovation Banning Hall renovation project Type of Renovation System Refurbishment Rehabilitation Cosmetic Refurbishment Modified Rehabilitation Rehabilitation Rehabilitation General Refurbishment General Refurbishment Modified Rehabilitation General Refurbishment General Refurbishment Modified Rehabilitation General Refurbishment General Refurbishment System Refurbishment Cosmetic Refurbishment System Refurbishment Modified Rehabilitation Cosmetic Refurbishment System Refurbishment Cosmetic Refurbishment Modified Rehabilitation Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment General Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment Modified Rehabilitation System Refurbishment General Refurbishment General Refurbishment Rehabilitation General Refurbishment General Refurbishment Cosmetic Refurbishment General Refurbishment General Refurbishment General Refurbishment Modified Rehabilitation Modified Rehabilitation System Refurbishment System Refurbishment Modified Rehabilitation System Refurbishment Cosmetic Refurbishment Rehabilitation Modified Rehabilitation General Refurbishment System Refurbishment Cosmetic Refurbishment Modified Rehabilitation Modified Rehabilitation Rehabilitation Rehabilitation Cosmetic Refurbishment Cosmetic Refurbishment Rehabilitation System Refurbishment GSF Project Cost 117,371 33,400 $ $ 33,000,000 6,200,000 $ $ 12,500 19,045 19,045 41,662 $ $ $ $ 10,500,000 476,607 472,885 1,900,000 32,000 85,845 65,000 103,000 $ $ $ $ $ 47,473 1,000 3,000 175,000 1,000 3,000 5,500 15,000 Project Cost per GSF Construction Cost Construction Cost per GSF 281.16 185.63 $ $ 30,000,000 5,785,000 $ $ 255.60 173.20 $ $ $ $ 840.00 25.03 24.83 45.61 $ $ $ $ 6,500,000 406,704 402,982 1,350,000 $ $ $ $ 520.00 21.35 21.16 32.40 1,000,000 14,000,000 6,900,000 5,500,000 430,000 $ $ $ $ 31.25 163.08 106.15 53.40 $ $ $ $ 1,000,000 11,000,000 5,900,000 500,000 $ $ $ $ 31.25 128.14 90.77 4.85 $ 1,500,000 $ 31.60 $ $ $ $ $ $ $ $ 1,334,000 1,046,000 35,000 480,410 3,500 85,000 30,024 165,000 $ $ $ $ $ $ $ $ 28.10 1,046.00 11.67 2.75 3.50 28.33 5.46 11.00 $ $ $ $ $ $ $ $ 10,000,000 130,000 441,604 1,110,879 1,018,626 829,124 604,539 613,859 $ $ $ $ $ $ $ 0.65 7.22 16.41 8.66 7.72 6.48 5.11 $ $ $ $ $ $ $ $ 8,000,000 130,000 422,893 998,191 884,141 716,632 543,018 565,021 $ $ $ $ $ $ $ 0.65 6.92 14.75 7.52 6.67 5.82 4.71 256,400 91,081 16,864 8,593 2,237 39,932 $ 46,000,000 $ 179.41 $ $ $ $ $ $ 33,760,000 3,325,000 1,864,817 757,000 106,327 1,881,468 $ $ $ $ $ $ 131.67 36.51 110.58 88.09 47.53 47.12 15,000 16,000 250,000 52,528 65,234 108,389 22,275 37,093 $ $ $ $ $ $ 1,800,000 925 950,000 2,625,000 2,600,000 13,000,000 $ $ $ $ $ $ 120.00 0.06 3.80 49.97 39.86 119.94 $ $ $ 1,500,000 825,000 850,000 $ $ $ 100.00 51.56 3.40 $ 8,500,990 $ 229.18 $ $ 535,711 7,705,937 $ $ 24.05 207.75 85,000 1,000 200 $ $ $ 20,000 35,000 25,000 $ $ $ 0.24 35.00 125.00 $ 180,000 $ 2.12 2,700 101,250 101,250 71,936 $ $ $ $ 1,430,992 110,000 105,000 3,000,000 $ $ $ $ 530.00 1.09 1.04 41.70 $ $ $ $ 1,430,992 110,000 105,000 2,800,000 $ $ $ $ 530.00 1.09 1.04 38.92 200,000 61,148 67,694 117,566 107,444 93,281 120,075 Oregon Institute of Technology Oregon State University Oregon State University Oregon State University Oregon State University Pennsylvania State University-University Park Pennsylvania State University-University Park Pratt Institute Pratt Institute Purdue University Purdue University Purdue University Purdue University Purdue University Ramapo College of New Jersey Rhodes College Rhodes College Saint Leo University Seton Hall University Southeast Missouri State University Southeast Missouri State University Southeast Missouri State University Southeast Missouri State University St. Mary's College of Maryland St. Mary's College of Maryland St. Mary's College of Maryland St. Mary's College of Maryland St. Mary's College of Maryland St. Mary's University St. Mary's University St. Mary's University St. Mary's University St. Mary's University Stanford University Stetson University Stetson University Stevens Institute of Technology Office of Residence Life Stevens Institute of Technology Office of Residence Life Stony Brook University SUNY Geneseo Tarleton State University Tennessee Technological University Tennessee Technological University Texas A & M University Residence Life Texas Tech University Texas Tech University Texas Tech University The Ohio State University The University of Arizona The University of Memphis The University of Texas at Austin The University of Texas at Austin The University of Texas at Austin The University of Texas at Austin The University of Texas at Austin The University of Texas at Austin The University of Texas at Austin Thomas Jefferson University University of California-Berkeley University of California-Santa Barbara University of California-Santa Barbara University of Central Florida University of Colorado Boulder University of Florida University of Florida Sacket Hall - Fire Suppression System and Window Replacement Callahan Hall - Renovations West Hall - Flooring and Windows Wilson Hall Renovation Apartment Renovation, Behrend Campus Haller/Lyons, South Halls Bathroom Renovation Townhouse Renovation Harrison Residence Hall Bathroom Renovation Phase I Hilltop Apartments Buildings 7, 8, 9 and 10 Kitchen and Bath Renovations Meredith Hall Accessibility Renovation Hillenbrand Hall East Wing Elevator Renovation Harrison Residence Hall Bathroom Renovation Phase II Phase two Housing Renovations Ellett Hall Voorhies, Townsend and Trezevant Halls Roderick & Alumni Aquinas Bathrooms Towers Cafe Seating Renovation HVAC Renovation - Greek F, G, H Student Room Furniture Upgrade Ground Floor Security Screen Installation Building Envelope Improvements Prince George Hall Building Envelope Improvements Caroline Hall Conditioned Air Make-Up System - Caroline Hall Exterior Building Envelope Improvements Queen Anne Conditioned Air Make-up System Prince George Hall Marian Hall Renovation Archbishop Flores Hall Renovation Anthony Frederick Hall Renovation Treadaway Hall Renovation Leies Hall Renovation Haus Mitt Upgrades for Backlog Reduction 2012 Stetson Cove Apartments University Hall Residence Hall power and air condition upgrade Residence Hall room renovation Roosevelt Quad 2013 renovation Monroe Hall Centennial Hall MS Cooper/Pinkerton Hall Renovation Living Learning Village Lacy (Dorm 6) Hall Chitwood Bath, Laundry, Trash, Elevator Lobby Remodel H/C Student Room and Bath Renovations Wiggins USH Office Remodel South High Rise Renovation and Addation (Multi-Building Project) 2011-2013 Carney Johnston Renovation Dining Renovation Phase 3 Residential Floor Renovations Lobby Renovation Dining Renovation Phase 4 Roof Replacement Residential Floor Renovations Air Handler Replacement Martin Residence Renovation Unit 1, Unit 2, and Unit 3 Residence Hall Seismic Retrofit Santa Rosa Residence Hall Anacapa Residence Hall Kittredge West Buckman Tanglewood Modified Rehabilitation General Refurbishment General Refurbishment Cosmetic Refurbishment Modified Rehabilitation System Refurbishment Rehabilitation Rehabilitation Rehabilitation Modified Rehabilitation Cosmetic Refurbishment Modified Rehabilitation System Refurbishment Modified Rehabilitation General Refurbishment General Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Modified Rehabilitation Cosmetic Refurbishment System Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment General Refurbishment General Refurbishment Modified Rehabilitation Modified Rehabilitation Cosmetic Refurbishment System Refurbishment Cosmetic Refurbishment System Refurbishment Rehabilitation Cosmetic Refurbishment General Refurbishment General Refurbishment Rehabilitation Modified Rehabilitation Modified Rehabilitation Rehabilitation Rehabilitation System Refurbishment Modified Rehabilitation General Refurbishment Modified Rehabilitation Rehabilitation Modified Rehabilitation System Refurbishment Modified Rehabilitation System Refurbishment General Refurbishment Modified Rehabilitation General Refurbishment General Refurbishment General Refurbishment Cosmetic Refurbishment Modified Rehabilitation Modified Rehabilitation 178,981 72,000 66,959 72,410 56,100 15,000 1,500 10,600 3,261 $ $ $ $ $ $ $ $ 3,000,000 3,000,000 100,000 1,824,000 3,000,000 6,900,000 127,000 3,750,000 $ $ $ $ $ $ $ $ 16.76 41.67 1.49 25.19 53.48 460.00 84.67 353.77 3,248 5,435 9,050 81,375 10,200 57,300 33,681 33,681 33,681 33,681 33,681 29,686 11,304 11,052 44,863 19,291 $ $ $ 5,321,000 20,000 450,000 $ $ $ 103,000 1,150,000 388,000 $ $ 2.21 5.53 $ $ 10.10 20.07 $ $ $ $ $ $ $ $ $ $ $ $ 2,400,000 68,000,000 127,000 3,600,000 1,137,000 530,800 726,000 373,412 2,041,700 6,651,000 200,000 450,000 $ $ $ $ $ 42.78 4,533.33 84.67 339.62 348.67 $ 223.52 $ 375.66 $ $ 22.10 5.53 $ 94,000 $ 9.22 $ $ $ $ $ $ $ $ $ $ 215,000 215,000 160,000 100,000 160,000 224,575 124,935 119,906 344,312 117,576 $ $ $ $ $ $ $ $ $ $ 6.38 6.38 4.75 2.97 4.75 7.57 11.05 10.85 7.67 6.09 $ $ $ $ $ 227,225 127,185 122,156 349,262 120,125 $ $ $ $ $ 7.65 11.25 11.05 7.79 6.23 $ $ $ $ 800,000 225,000 2,000,000 13,000,000 $ $ $ 25.00 5.77 7.69 $ $ $ $ 800,000 225,000 2,000,000 10,000,000 $ $ $ 25.00 5.77 7.69 35,344 134,816 168,874 12,836 605,332 145,850 $ $ $ $ $ $ 8,828,150 1,895,000 5,009,140 1,650,000 172,000,000 23,877,000 $ $ $ $ $ $ 249.78 14.06 29.66 128.54 284.14 163.71 $ $ $ $ 7,449,015 1,757,500 4,758,683 1,518,000 $ $ $ $ 210.76 13.04 28.18 118.26 $ 20,800,000 $ 142.61 21,500 60,000 12,000 21,536 $ $ $ $ $ $ $ 3,500,000 8,800,000 4,300,000 4,100,000 1,350,000 6,000,000 3,000,000 $ $ $ $ 162.79 146.67 358.33 190.38 96.74 124.17 319.17 178.77 100.00 2,080,000 7,450,000 3,830,000 3,850,000 1,470,000 7,100,000 3,500,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 118.33 87,290 79,079 $ $ $ 33,500,000 6,500,000 7,800,000 $ $ 74.46 98.64 $ $ 5,300,000 6,200,000 $ $ 60.72 78.40 74,296 29,580 10,480 $ $ $ 2,178,000 1,435,549 170,625 $ $ $ 29.32 48.53 16.28 $ 17,163,813 $ 231.02 26,400 28,756 32,000 39,000 260,000 60,000 University of Florida University of Florida University of Florida University of Georgia University of Georgia University of Georgia University of Georgia University of Georgia University of Georgia University of Georgia University of Georgia University of Georgia University of Georgia University of Hawaii at Manoa University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Iowa University of Iowa University of Iowa University of Iowa University of Iowa University of Iowa University of Iowa University of Iowa University of Iowa University of Iowa University of Maryland Baltimore County University of Maryland Baltimore County University of Maryland Baltimore County University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Mississippi University of Missouri-Columbia University of Missouri-Columbia University of North Carolina at Greensboro University of North Dakota University of North Dakota University of North Dakota University of North Dakota University of Notre Dame University of Notre Dame University of Oregon University of Oregon University of Oregon University of Oregon University of Southern Mississippi University of Southern Mississippi University of Southern Mississippi University of Southern Mississippi University of Tasmania Accommodation Services University of Tasmania Accommodation Services UVS Modified Rehabilitation Maguire Modified Rehabilitation Broward Modified Rehabilitation Brown Hall Modified Rehabilitation McGowan road Modified Rehabilitation Payne Hall exterior and roof Cosmetic Refurbishment Vandiver Hall System Refurbishment Russell ethernet installation System Refurbishment Creswell Electric switch System Refurbishment Payne Hall System Refurbishment Myers Hall Chiller Plant System Refurbishment McWhorter Hall System Refurbishment Oglethrope House Modified Rehabilitation Walkway Light Retrofit Project System Refurbishment Allen Hall - remodel dining room serving lines Cosmetic Refurbishment Orchard Downs Apartments - Remodel one building General Refurbishment Allen Hall - Student room furniture replacement Cosmetic Refurbishment Goodwin & Green Apartments - Window Replacement System Refurbishment Snyder Hall - Electrical Upgrade & Window air conditioners Cosmetic Refurbishment Snyder Hall - Life Safety upgrade System Refurbishment Hopkins Hall & Weston Hall - Life Safety upgrade System Refurbishment Goodwin & Green Apartments - Life Safety upgrades System Refurbishment Hillcrest Finishes Cosmetic Refurbishment Hillcrest Dock & Pluming Improvements System Refurbishment Slater Restroom Renovation Modified Rehabilitation Currier Roof Replacement System Refurbishment Slater Masonry Repairs System Refurbishment Hillcrest Dishroom Renovation System Refurbishment Hillcrest Rotunda Floor Replacement Cosmetic Refurbishment Daum Custodial Suite Addition Modified Rehabilitation Currier Hall Sprinkler Addition Rehabilitation Cold Food Preparation Kitchen Rehabilitation Susquehanna Hall General Refurbishment Apartment Renovation General Refurbishment Chesapeake Hall General Refurbishment Northwood 1, 2 & 3 Boilers and Fire Alarms System Refurbishment Northwood 4 & 5 Roof Replacement System Refurbishment East Quad Renewal Rehabilitation Martha Cook Fire Suppression System Refurbishment Oxford Goddard Dining Renovation Rehabilitation Baits 2 Renewal Modified Rehabilitation Northwood 1, 2 & 3 IT System Refurbishment 2150 Cram Community Center Rehabilitation Northwood 1, 2 & 3 Electrical Ugrades System Refurbishment Northwood 4 & 5 Roof Replacements System Refurbishment Removel and replacment of outside brick of Two Residental halls System Refurbishment Mark Twain Hall Renovation Modified Rehabilitation Pershing Hall Renovation General Refurbishment Quad Comprehensive Renovation Rehabilitation Walsh Hall General Refurbishment McVey Hall Cosmetic Refurbishment West Hall General Refurbishment Fulton Hall System Refurbishment Lyons hall Cosmetic Refurbishment Lewis Hall Cosmetic Refurbishment Hamilton Hall New Bedroom Door Locks System Refurbishment Barnhart Hall, Library Commons and Lounges Cosmetic Refurbishment Earl Hall Fire Protection System Refurbishment Earl Hall, Morton and McClure Bedrooms Cosmetic Refurbishment Hillcrest Hall window replacement, asbestos removal, re-painting, flooring replacemCosmetic Refurbishment Hillcrest Hall Card Access Project Cosmetic Refurbishment McCarty Flooring Replacement Cosmetic Refurbishment Wilber chapter room renovations Cosmetic Refurbishment Launceston Kitchen and bathroom upgrades General Refurbishment Refurbishment of Investigator Hall, Launceston Modified Rehabilitation 7,330 7,330 80,000 47,678 33,096 42,406 134,734 230,312 192,567 42,406 126,177 107,452 93,536 5,000 8,900 137,000 138,000 92,000 92,000 88,000 138,000 200,000 8,000 6,000 5,000 6,000 1,000 1,000 2,000 190,000 20,000 83,504 139,000 83,079 420,000 320,000 8,000 170,000 3,000 420,000 213,255 110,146 41,217 255,000 72,063 67,276 67,184 39,062 5,154 84,195 9,332 84,540 40,000 3,500 3,000 23,850 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 189,811 191,210 9,095,106 2,000,000 1,000,000 355,000 550,000 550,000 110,000 270,000 300,000 520,000 5,000,000 250,000 300,000 1,870,000 915,000 2,600,000 800,000 700,000 1,400,000 2,000,000 2,027,000 185,000 6,236,000 741,000 414,000 548,000 139,000 131,000 900,000 909,870 2,300,000 30,000,000 6,400,000 7,500,000 250,000 108,000,000 2,200,000 1,800,000 13,400,000 2,000,000 725,000 1,810,000 250,000 8 21,731,000 5,687,485 55,200,000 1,500,000 500,000 900,000 202,000 $ $ $ $ $ $ $ $ $ $ 113,000 166,000 1,000,000 532,000 848,000 193,500 100,000 100,000 303,000 2,214,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 25.90 26.09 113.69 41.95 30.22 8.37 4.08 2.39 0.57 6.37 2.38 4.84 53.46 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 60.00 210.11 6.68 18.84 8.70 7.61 15.91 14.49 10.14 23.13 1,039.33 148.20 69.00 548.00 139.00 65.50 4.74 45.49 27.54 215.83 77.04 17.86 $ 337.50 $ $ 225.00 78.82 $ $ 241.67 4.31 $ $ $ $ $ $ $ $ 0.00 197.29 137.99 216.47 20.82 7.43 13.40 5.17 $ $ $ $ 32.21 11.88 57.01 10.03 $ $ $ $ 2.50 28.57 101.00 92.83 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2,000,000 1,000,000 355,000 550,000 550,000 110,000 270,000 300,000 520,000 5,000,000 250,000 300,000 1,350,000 915,000 2,000,000 550,000 500,000 1,000,000 1,500,000 1,448,000 138,000 4,797,000 549,000 318,000 422,000 98,000 94,000 693,000 699,900 2,000,000 27,000,000 5,400,000 5,200,000 250,000 93,400,000 1,500,000 1,400,000 10,000,000 2,000,000 440,000 1,810,000 250,000 8,000,000 14,919,544 2,967,377 45,000,000 1,250,000 150,000 400,000 $ $ $ $ $ $ $ $ $ $ 113,000 166,000 750,000 532,000 801,000 193,500 100,000 30,000 303,000 2,214,000 $ $ $ $ $ $ $ $ $ $ 41.95 30.22 8.37 4.08 2.39 0.57 6.37 2.38 4.84 53.46 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 60.00 151.69 6.68 14.49 5.98 5.43 11.36 10.87 7.24 17.25 799.50 109.80 53.00 422.00 98.00 47.00 3.65 35.00 23.95 194.24 65.00 12.38 $ 291.88 $ $ 175.00 58.82 $ $ 146.67 4.31 $ $ $ $ $ $ $ 37.51 135.45 71.99 176.47 17.35 2.23 5.95 $ $ $ $ 32.21 8.91 57.01 9.47 $ $ $ $ 2.50 8.57 101.00 92.83 University of Technology, Sydney University of Tennessee at Chattanooga University of the Pacific University of Vermont University of Vermont University of Virginia Housing & Residence Life University of Virginia Housing & Residence Life University of Virginia Housing & Residence Life University of Wisconsin-Stout University of Wisconsin-Whitewater Utah State University Housing and Residence Life Virginia Commonwealth University Virginia Polytechnic Institute & State University University Wake Forest University Residence Life and Housing Western Illinois University Whitman College Wilkes University Yavapai College Gumal residence- Renovating 3 levels of student apartment and rooms- total 90 beCosmetic Refurbishment Stagmaier Hall Modified Rehabilitation Beta Theta Pi Fraternity House Renovation Modified Rehabilitation Living/Learning C Building Modified Rehabilitation Marsh Main Lounge Rehabilitation McCormick Road Renovation Project w/ Fire System Final Phase General Refurbishment Hereford Furniture Upgrade Cosmetic Refurbishment Lambeth Field Apartment Renovation Final Phase General Refurbishment Fleming Modified Rehabilitation Wellers Hall Renovation (part 2 of the Fischer-Wellers renovation project) Rehabilitation Jones Hall General Refurbishment Johnson Hall Lobby/CommunityBaths Modified Rehabilitation Residential College at West Ambler Johnston Rehabilitation Student Apartments Modified Rehabilitation Thompson Hall Renovation System Refurbishment Anderson Hall renovation Modified Rehabilitation Fortinsky Rehabilitation Kachina Hall System Refurbishment 27,000 $ 140,000 $ 5.19 $ 130,000 $ 4.81 11,081 $ $ $ $ $ $ $ $ $ $ $ $ $ 30,000 4,000,000 2,000,000 1,401,681 1,161,329 8,246,860 70,000,000 6,100,000 1,100,000 4,202,988 72,113,670 1,630,564 25,800,000 $ 2.71 52.34 7.16 10.19 46.51 1,737.06 114.83 53.15 40.19 265.12 58.21 85.97 580,000 4,000,000 2,000,000 1,067,189 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 5.45 $ $ $ $ $ $ $ $ 6,281,775 6,300,000 5,400,000 1,100,000 3,912,334 53,063,670 1,400,000 21,000,000 $ $ $ $ $ $ $ $ 35.43 156.34 101.65 53.15 37.41 195.09 49.98 69.98 195,731 113,980 177,318 40,298 53,122 20,695 104,579 272,000 28,012 300,097 Renovation Data - Rehabilitation, Modified Rehabilitation, System Refurbishment, Cosmetic Refurbishment, General Refurbishment Renovation - Rehabilitation Institution Bangor University Brown University California State University, Long Beach Indiana University Louisiana State University New Jersey City University North Dakota State University Oakland University Pennsylvania State University-University Park Pratt Institute Pratt Institute SUNY Geneseo Texas A & M University Residence Life Texas Tech University The Ohio State University The University of Texas at Austin University of Iowa University of Iowa University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of North Carolina at Greensboro University of Vermont University of Wisconsin-Whitewater Virginia Polytechnic Institute & State University University Wilkes University Project Name Garth Hall MMA Parkside College Dining Hall renovation Briscoe Quad Renovation Annie Boyd Hall HVAC and bathroom rehab. Stockbridge Hall Bathroom Project Hamlin South Plumbing renovation Haller/Lyons, South Halls Bathroom Renovation Townhouse Renovation Monroe Hall Lacy (Dorm 6) Hall Wiggins USH Office Remodel South High Rise Renovation and Addation (Multi-Building Project) 2011-2013 Lobby Renovation Currier Hall Sprinkler Addition Cold Food Preparation Kitchen East Quad Renewal Oxford Goddard Dining Renovation 2150 Cram Community Center Quad Comprehensive Renovation Marsh Main Lounge Wellers Hall Renovation (part 2 of the Fischer-Wellers renovation project) Residential College at West Ambler Johnston Fortinsky Type of Renovation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Sub-Total Mean Sub-Total Median GSF Project Cost 33,400 $ 6,200,000 $ 12,500 256,400 37,093 $ $ $ 10,500,000 46,000,000 8,500,990 2,700 71,936 15,000 1,500 10,600 53,122 272,000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,430,992 3,000,000 6,900,000 127,000 3,750,000 13,000,000 8,828,150 1,650,000 172,000,000 4,300,000 900,000 909,870 108,000,000 1,800,000 725,000 55,200,000 2,000,000 6,100,000 72,113,670 106,084 33,400 $ $ 23,214,594 6,100,000 35,344 12,836 605,332 12,000 190,000 20,000 320,000 8,000 3,000 255,000 Project Cost per GSF Construction Cost Construction Cost per GSF 185.63 $ 5,785,000 $ 173.20 $ $ $ 840.00 179.41 229.18 $ $ $ 6,500,000 33,760,000 7,705,937 $ $ $ 520.00 131.67 207.75 $ $ $ $ $ 530.00 41.70 460.00 84.67 353.77 530.00 38.92 4,533.33 84.67 339.62 249.78 128.54 284.14 358.33 4.74 45.49 337.50 225.00 241.67 216.47 1,430,992 2,800,000 68,000,000 127,000 3,600,000 10,000,000 7,449,015 1,518,000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 210.76 118.26 319.17 3.65 35.00 291.88 175.00 146.67 176.47 114.83 265.12 3,830,000 693,000 699,900 93,400,000 1,400,000 440,000 45,000,000 2,000,000 5,400,000 53,063,670 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 101.65 195.09 $ $ 256.00 229.18 $ $ 16,118,296 4,615,000 $ $ 416.64 175.74 Rehabilitation - Modified Rehabilitation Institution Bowling Green State University California State University, Sacramento Colorado College Eastern Illinois University Eastern Illinois University Florida State University Kansas State University Kansas State University Kent State University Lourdes University Michigan State University Michigan Technological University Oregon Institute of Technology Oregon State University Purdue University Purdue University Purdue University Seton Hall University Stanford University Stetson University Texas Tech University Texas Tech University The University of Memphis The University of Texas at Austin The University of Texas at Austin The University of Texas at Austin University of California-Berkeley Project Name McDonald Hall Sierra Hall Renovation Slocum Hall Renovation McKinney Hall renovations Univ Apt kitchens Cawthon Hall Envelope and Waterproofing Honors House Building H Prentice Bathroom Renovation Armstrong Hall East McNair kitchenette lounges Wilson Hall Renovation Harrison Residence Hall Bathroom Renovation Phase I Meredith Hall Accessibility Renovation Harrison Residence Hall Bathroom Renovation Phase II Aquinas Bathrooms Haus Mitt Upgrades for Backlog Reduction 2012 Stetson Cove Apartments Chitwood Bath, Laundry, Trash, Elevator Lobby Remodel H/C Student Room and Bath Renovations Carney Johnston Renovation Residential Floor Renovations Dining Renovation Phase 4 Residential Floor Renovations Unit 1, Unit 2, and Unit 3 Residence Hall Seismic Retrofit Type of Renovation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation GSF Project Cost Project Cost per GSF 41,662 85,845 1,000 3,000 93,281 15,000 16,000 65,234 $ $ 1,900,000 14,000,000 $ $ 45.61 163.08 $ $ $ $ 604,539 1,800,000 925 2,600,000 $ $ $ $ 6.48 120.00 0.06 39.86 72,410 3,261 3,248 5,435 $ 1,824,000 $ 25.19 26,400 134,816 168,874 60,000 21,536 60,000 Construction Cost Construction Cost per GSF $ $ $ $ $ $ $ 1,350,000 11,000,000 1,046,000 85,000 543,018 1,500,000 825,000 $ $ $ $ $ $ $ 32.40 128.14 1,046.00 28.33 5.82 100.00 51.56 $ $ $ 1,137,000 726,000 2,041,700 $ $ $ 348.67 223.52 375.66 $ $ 1,895,000 5,009,140 $ $ 14.06 29.66 $ $ 1,757,500 4,758,683 $ $ 13.04 28.18 $ $ $ $ 8,800,000 4,100,000 6,000,000 33,500,000 $ $ $ 146.67 190.38 100.00 $ $ $ 7,450,000 3,850,000 7,100,000 $ $ $ 124.17 178.77 118.33 University of Florida University of Florida University of Florida University of Florida University of Florida University of Georgia University of Georgia University of Georgia University of Iowa University of Iowa University of Michigan-Ann Arbor University of Missouri-Columbia University of Tasmania Accommodation Services University of Tennessee at Chattanooga University of the Pacific University of Vermont University of Wisconsin-Stout Virginia Commonwealth University Wake Forest University Residence Life and Housing Whitman College Buckman Tanglewood UVS Maguire Broward Brown Hall McGowan road Oglethrope House Slater Restroom Renovation Daum Custodial Suite Addition Baits 2 Renewal Mark Twain Hall Renovation Refurbishment of Investigator Hall, Launceston Stagmaier Hall Beta Theta Pi Fraternity House Renovation Living/Learning C Building Fleming Johnson Hall Lobby/CommunityBaths Student Apartments Anderson Hall renovation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Modified Rehabilitation Sub-Total Mean Sub-Total Median 29,580 10,480 7,330 7,330 80,000 47,678 33,096 93,536 6,000 2,000 170,000 110,146 23,850 $ $ $ $ $ $ $ $ $ $ $ $ $ 1,435,549 170,625 189,811 191,210 9,095,106 2,000,000 1,000,000 5,000,000 6,236,000 131,000 13,400,000 21,731,000 2,214,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 48.53 16.28 25.90 26.09 113.69 41.95 30.22 53.46 1,039.33 65.50 78.82 197.29 92.83 11,081 30,000 4,000,000 70,000,000 4,202,988 1,630,564 $ 2.71 40,298 104,579 28,012 $ $ $ $ $ $ $ $ 48,057 29,580 $ $ 7,248,112 2,214,000 $ $ $ $ $ $ $ $ $ $ 2,000,000 1,000,000 5,000,000 4,797,000 94,000 10,000,000 14,919,544 2,214,000 $ $ $ $ $ $ $ $ 41.95 30.22 53.46 799.50 47.00 58.82 135.45 92.83 580,000 4,000,000 6,300,000 3,912,334 1,400,000 $ 52.34 1,737.06 40.19 58.21 $ $ $ $ $ $ $ $ 156.34 37.41 49.98 157 49 $ $ 3,620,956 2,020,850 $ $ 161.40 58.82 Rehabilitation - Cosmetic Refurbishment Institution Beacon College East Central University Eastern Illinois University Eastern Illinois University Eastern Illinois University Eastern Illinois University Embry-Riddle Aeronautical University Johns Hopkins University Landmark College Marshall University North Dakota State University North Dakota State University Oregon State University Purdue University Rhodes College Saint Leo University Southeast Missouri State University Southeast Missouri State University Southeast Missouri State University St. Mary's University St. Mary's University St. Mary's University Stetson University Stevens Institute of Technology Office of Residence Life Tarleton State University University of Colorado Boulder University of Georgia University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Iowa University of Iowa University of North Dakota University of Notre Dame University of Notre Dame University of Oregon University of Oregon Project Name Pontotoc Hall Andrews 5 and 6 GC 3A carpet GC 2B carpet Stevenson flooring replacement Halls 6 and 9 Levering Market Front of House Hall 4 Update Johnson Hall Painting/Flooring Reed Hall Building Painting/Flooring Replacement West Hall - Flooring and Windows Hilltop Apartments Buildings 7, 8, 9 and 10 Kitchen and Bath Renovations Voorhies, Townsend and Trezevant Halls Roderick & Alumni Towers Cafe Seating Renovation Student Room Furniture Upgrade Ground Floor Security Screen Installation Marian Hall Renovation Archbishop Flores Hall Renovation Anthony Frederick Hall Renovation University Hall Residence Hall room renovation Centennial Hall Kittredge West Payne Hall exterior and roof Allen Hall - remodel dining room serving lines Allen Hall - Student room furniture replacement Snyder Hall - Electrical Upgrade & Window air conditioners Hillcrest Finishes Hillcrest Rotunda Floor Replacement McVey Hall Lyons hall Lewis Hall Barnhart Hall, Library Commons and Lounges Earl Hall, Morton and McClure Bedrooms Type of Renovation Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Cosmetic Refurbishment Construction Cost Construction Cost per GSF 3,000 1,000 5,500 15,000 $ $ $ $ 35,000 3,500 30,024 165,000 $ $ $ $ 11.67 3.50 5.46 11.00 8,593 22,275 200 101,250 101,250 66,959 $ $ 757,000 535,711 $ $ 88.09 24.05 $ $ $ $ 25,000 110,000 105,000 100,000 $ $ $ $ 125.00 1.09 1.04 1.49 $ $ 110,000 105,000 $ $ 1.09 1.04 81,375 $ 450,000 $ 5.53 $ $ 530,800 450,000 $ 5.53 10,200 $ $ 103,000 388,000 $ 10.10 $ 94,000 $ 9.22 29,686 11,304 11,052 28,756 39,000 $ $ $ 227,225 127,185 122,156 $ $ $ 7.65 11.25 11.05 $ $ $ 224,575 124,935 119,906 $ $ $ 7.57 11.05 10.85 $ 225,000 $ 5.77 $ 225,000 $ 5.77 74,296 42,406 5,000 137,000 92,000 200,000 1,000 67,276 $ $ $ $ $ $ $ $ 2,178,000 355,000 300,000 915,000 800,000 2,027,000 139,000 500,000 $ $ $ $ $ $ $ $ 29.32 8.37 60.00 6.68 8.70 10.14 139.00 7.43 $ $ $ $ $ $ $ $ 17,163,813 355,000 300,000 915,000 550,000 1,448,000 98,000 150,000 $ $ $ $ $ $ $ $ 231.02 8.37 60.00 6.68 5.98 7.24 98.00 2.23 5,154 9,332 $ $ 166,000 532,000 $ $ 32.21 57.01 $ $ 166,000 532,000 $ $ 32.21 57.01 GSF Project Cost Project Cost per GSF University of Southern Mississippi University of Southern Mississippi University of Southern Mississippi University of Southern Mississippi University of Technology, Sydney University of Virginia Housing & Residence Life Hillcrest Hall window replacement, asbestos removal, re-painting, flooring replacemCosmetic Refurbishment Hillcrest Hall Card Access Project Cosmetic Refurbishment McCarty Flooring Replacement Cosmetic Refurbishment Wilber chapter room renovations Cosmetic Refurbishment Gumal residence- Renovating 3 levels of student apartment and rooms- total 90 beCosmetic Refurbishment Hereford Furniture Upgrade Cosmetic Refurbishment Sub-Total Mean Sub-Total Median 84,540 40,000 3,500 27,000 113,980 44,965 27,878 $ $ $ $ $ $ $ $ 848,000 193,500 100,000 100,000 140,000 1,161,329 460,644 225,000 $ 10.03 $ $ $ $ 2.50 28.57 5.19 10.19 $ $ 24 10 $ $ $ $ $ 801,000 193,500 100,000 30,000 130,000 $ 9.47 $ $ $ 2.50 8.57 4.81 $ $ 881,425 179,750 $ $ 26.07 8.47 Rehabilitation - General Refurbishment Institution California State University, Long Beach California State University, Long Beach Christendom College Coastal Carolina University Columbia University Columbia University Emory University Frostburg State University George Mason University Johns Hopkins University Johns Hopkins University Johns Hopkins University Johns Hopkins University Johnson & Wales University - Denver Loyola Marymount University Oregon State University Oregon State University Ramapo College of New Jersey Rhodes College St. Mary's University St. Mary's University Tennessee Technological University Tennessee Technological University The University of Texas at Austin Thomas Jefferson University University of California-Santa Barbara University of California-Santa Barbara University of Central Florida University of Illinois at Urbana-Champaign University of Maryland Baltimore County University of Maryland Baltimore County University of Maryland Baltimore County University of Missouri-Columbia University of North Dakota University of North Dakota University of Tasmania Accommodation Services University of Virginia Housing & Residence Life University of Virginia Housing & Residence Life Utah State University Housing and Residence Life Project Name Building J renovation Building G renovation Gardens Renovation Wallach Schapiro Harris Hall Gray Hall Commonwealth AMR Bldg Dining Transitions McCoy Common Kithcne A&B Bldg Johnson Hall Renovation Rains Renovation Sacket Hall - Fire Suppression System and Window Replacement Callahan Hall - Renovations Phase two Housing Renovations Ellett Hall Treadaway Hall Renovation Leies Hall Renovation MS Cooper/Pinkerton Hall Renovation Living Learning Village Dining Renovation Phase 3 Martin Residence Renovation Santa Rosa Residence Hall Anacapa Residence Hall Orchard Downs Apartments - Remodel one building Susquehanna Hall Apartment Renovation Chesapeake Hall Pershing Hall Renovation Walsh Hall West Hall Launceston Kitchen and bathroom upgrades McCormick Road Renovation Project w/ Fire System Final Phase Lambeth Field Apartment Renovation Final Phase Jones Hall Type of Renovation General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment General Refurbishment Sub-Total Mean Sub-Total Median GSF Project Cost Project Cost per GSF Construction Cost Construction Cost per GSF 19,045 19,045 $ $ 476,607 472,885 $ $ 25.03 24.83 $ $ 406,704 402,982 $ $ 21.35 21.16 32,000 65,000 103,000 $ $ $ $ 1,000,000 6,900,000 5,500,000 10,000,000 $ $ $ 31.25 106.15 53.40 $ $ $ $ 1,000,000 5,900,000 500,000 8,000,000 $ $ $ 31.25 90.77 4.85 $ $ $ $ 3,325,000 1,864,817 106,327 1,881,468 $ $ $ $ 36.51 110.58 47.53 47.12 $ 180,000 $ 2.12 91,081 16,864 2,237 39,932 85,000 178,981 72,000 20,000 3,000,000 3,000,000 5,321,000 20,000 349,262 120,125 $ $ $ 0.24 16.76 41.67 9,050 44,863 19,291 $ $ $ $ $ $ $ $ $ $ 2.21 7.79 6.23 $ $ $ $ 6,651,000 200,000 344,312 117,576 $ $ $ 22.10 7.67 6.09 21,500 $ 3,500,000 $ 162.79 $ 2,080,000 $ 96.74 87,290 79,079 $ $ 6,500,000 7,800,000 $ $ 74.46 98.64 $ $ 5,300,000 6,200,000 $ $ 60.72 78.40 8,900 83,504 139,000 83,079 41,217 72,063 67,184 3,000 195,731 177,318 20,695 $ $ $ $ $ $ $ $ $ $ $ 1,870,000 2,300,000 30,000,000 6,400,000 5,687,485 1,500,000 900,000 303,000 1,401,681 8,246,860 1,100,000 $ $ $ $ $ $ $ $ $ $ $ 210.11 27.54 215.83 77.04 137.99 20.82 13.40 101.00 7.16 46.51 53.15 $ $ $ $ $ $ $ $ $ $ $ 1,350,000 2,000,000 27,000,000 5,400,000 2,967,377 1,250,000 400,000 303,000 1,067,189 6,281,775 1,100,000 $ $ $ $ $ $ $ $ $ $ $ 151.69 23.95 194.24 65.00 71.99 17.35 5.95 101.00 5.45 35.43 53.15 64,722 65,000 $ $ 4,210,700 2,300,000 $ $ 62 42 $ $ 3,226,880 1,350,000 $ $ 52.23 36.51 Rehabilitation - System Refurbishment Institution Arkansas State University-Jonesboro Drexel University East Tennessee State University Eastern Illinois University Florida International University Project Name Kays Hall HVAC Renovation West and Powell Hall Wireless - Pemberton, Greek Court Lakeview Lighting Type of Renovation System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment GSF 117,371 47,473 175,000 200,000 Project Cost Project Cost per GSF Construction Cost Construction Cost per GSF $ $ $ 33,000,000 430,000 1,500,000 $ 281.16 $ 30,000,000 $ 255.60 $ 31.60 $ 130,000 $ 0.65 $ $ $ 1,334,000 480,410 130,000 $ $ $ 28.10 2.75 0.65 Florida State University Florida State University Florida State University Florida State University Florida State University Kansas State University Kent State University Kent State University Marshall University Oklahoma City University Pennsylvania State University-University Park Purdue University Southeast Missouri State University St. Mary's College of Maryland St. Mary's College of Maryland St. Mary's College of Maryland St. Mary's College of Maryland St. Mary's College of Maryland Stevens Institute of Technology Office of Residence Life Stony Brook University The University of Arizona The University of Texas at Austin The University of Texas at Austin University of Georgia University of Georgia University of Georgia University of Georgia University of Georgia University of Georgia University of Hawaii at Manoa University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Illinois at Urbana-Champaign University of Iowa University of Iowa University of Iowa University of Iowa University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Michigan-Ann Arbor University of Mississippi University of North Dakota University of Oregon University of Oregon Western Illinois University Yavapai College Sub-Total Mean Sub-Total Median GilchrisHall Envelope and Waterproofing Rogers Hall Structural and Mechanical Salley Hall Envelope and Waterproofing Landis Hall Envelope and Waterproofing Kellum Hall 2012 Projects Moore Hall HVAC replacement HVAC and room upgrades Wright Hall - HVAC and Room Upgrades HVAC Replacement Banning Hall renovation project Apartment Renovation, Behrend Campus Hillenbrand Hall East Wing Elevator Renovation HVAC Renovation - Greek F, G, H Building Envelope Improvements Prince George Hall Building Envelope Improvements Caroline Hall Conditioned Air Make-Up System - Caroline Hall Exterior Building Envelope Improvements Queen Anne Conditioned Air Make-up System Prince George Hall Residence Hall power and air condition upgrade Roosevelt Quad 2013 renovation Roof Replacement Air Handler Replacement Vandiver Hall Russell ethernet installation Creswell Electric switch Payne Hall Myers Hall Chiller Plant McWhorter Hall Walkway Light Retrofit Project Goodwin & Green Apartments - Window Replacement Snyder Hall - Life Safety upgrade Hopkins Hall & Weston Hall - Life Safety upgrade Goodwin & Green Apartments - Life Safety upgrades Hillcrest Dock & Pluming Improvements Currier Roof Replacement Slater Masonry Repairs Hillcrest Dishroom Renovation Northwood 1, 2 & 3 Boilers and Fire Alarms Northwood 4 & 5 Roof Replacement Martha Cook Fire Suppression Northwood 1, 2 & 3 IT Northwood 1, 2 & 3 Electrical Ugrades Northwood 4 & 5 Roof Replacements Removel and replacment of outside brick of Two Residental halls Fulton Hall Hamilton Hall New Bedroom Door Locks Earl Hall Fire Protection Thompson Hall Renovation Kachina Hall System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment System Refurbishment 61,148 67,694 117,566 107,444 120,075 250,000 52,528 108,389 1,000 $ $ $ $ $ $ $ $ $ 441,604 1,110,879 1,018,626 829,124 613,859 950,000 2,625,000 13,000,000 35,000 $ $ $ $ $ $ $ $ $ 7.22 16.41 8.66 7.72 5.11 3.80 49.97 119.94 35.00 $ $ $ $ $ $ 422,893 998,191 884,141 716,632 565,021 850,000 $ $ $ $ $ $ 6.92 14.75 7.52 6.67 4.71 3.40 56,100 $ 3,000,000 $ 53.48 $ $ 2,400,000 373,412 $ 42.78 57,300 33,681 33,681 33,681 33,681 33,681 32,000 260,000 145,850 $ 1,150,000 $ 20.07 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 215,000 215,000 160,000 100,000 160,000 800,000 2,000,000 20,800,000 1,470,000 3,500,000 550,000 550,000 110,000 270,000 300,000 520,000 250,000 2,000,000 500,000 1,000,000 1,500,000 138,000 549,000 318,000 422,000 5,200,000 250,000 1,500,000 2,000,000 1,810,000 250,000 8,000,000 $ $ $ $ $ $ $ $ 6.38 6.38 4.75 2.97 4.75 25.00 7.69 142.61 $ $ $ $ $ $ 4.08 2.39 0.57 6.37 2.38 4.84 $ $ $ $ $ $ $ $ $ 14.49 5.43 11.36 10.87 17.25 109.80 53.00 422.00 12.38 $ 4.31 $ 37.51 800,000 2,000,000 23,877,000 1,350,000 3,000,000 550,000 550,000 110,000 270,000 300,000 520,000 250,000 2,600,000 700,000 1,400,000 2,000,000 185,000 741,000 414,000 548,000 7,500,000 250,000 2,200,000 2,000,000 1,810,000 250,000 8 202,000 113,000 1,000,000 25,800,000 $ $ $ 25.00 7.69 163.71 $ $ $ $ $ $ 4.08 2.39 0.57 6.37 2.38 4.84 $ $ $ $ $ $ $ $ $ 18.84 7.61 15.91 14.49 23.13 148.20 69.00 548.00 17.86 $ 4.31 $ $ 0.00 5.17 84,195 300,097 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 11.88 85.97 $ $ $ 113,000 750,000 21,000,000 $ $ 8.91 69.98 114,688 92,000 $ $ 3,111,393 814,562 $ $ 49 14 $ $ 2,519,674 550,000 $ $ 36.11 7.22 134,734 230,312 192,567 42,406 126,177 107,452 138,000 92,000 88,000 138,000 8,000 5,000 6,000 1,000 420,000 420,000 213,255 39,062