2014 ACUHO-I CONSTRUCTION AND RENOVATION SURVEY FINDINGS


The following tables present detailed cost data on student housing new construction and renovation projects at numerous institutions
participating in the 2014 ACUHO-I Construction and Renovation Survey. The following summary includes:
 Overall summary of new construction projects;
 Overall summary of renovation projects;
 New construction data categorized by housing type
(traditional and modified traditional facilities; adjoining
suite and super suite facilities; and apartment facilities);
 Renovation data categorized by renovation type (rehabilitation,
modified rehabilitation, system refurbishment, cosmetic refurbishment,
and general refurbishment
The data collected represent student housing projects completed from the start of Winter 2012 term through the end of Fall 2013 term. The
following definitions were provided to participants:
 Project Cost – includes all expenses associated with constructing and opening a new facility (e.g., design fees, financing
costs, permits, land purchase, demolition of previous construction on site, parking, furniture, landscaping).
 Construction Cost –includes only the cost to build the residential facilities (i.e., living units and public/common areas).
Do not include permit, parking, landscaping, or design fees. If possible, do not include costs for classrooms, dining
facilities, or other non-residential space in this figure. Do not include furniture or other costs that are not directly related to
construction.

New construction cost data are organized by type of facility (i.e., adjoining suites, super suites, or apartments). Renovation cost data are
grouped according to definitions created for the purposes of this study:
 Rehabilitation – involves total reconfiguration (i.e., gut facility and incorporate all new materials and systems into the
project).
 Modified Rehabilitation – involves system upgrades and/or minor structural changes such as bedroom reconfiguration or
bathroom reconfiguration.
 System Refurbishment – involves upgrades or replacement of one or more building systems without structural changes.
 Cosmetic Refurbishment – involves cosmetic improvements without structural or system changes (e.g., paint, carpet,
furniture).
 General Refurbishment – involves both system upgrades/replacement and cosmetic improvements.

Additional survey findings will be available at the ACUHO-I Web site: www.ACUHO-I.org and by contacting MGT (see below).

For additional information related to a given project, please contact the specific institution.

For additional information related to the survey or analyses, please contact Cynthia Parish Balogh at cbalogh@mgtofamerica.com or Ray
Thompson at rthompso@mgtofamerica.com.
MGT of America, Inc., and ACUHO-I
New Construction Data
Institution
Arkansas State University-Jonesboro
Arkansas State University-Jonesboro
Baylor University
College of William and Mary
Emory University
Florida Gulf Coast University
Florida International University
Florida State University
Indiana University
Indiana University
Minnesota State University, Mankato
North Carolina State University
Pennsylvania State University-University Park
Rhodes College
South Dakota State University
Southeast Missouri State University
Texas A & M University Residence Life
Texas State University
Texas Tech University
The University of Alabama Housing & Residential Com
The University of Texas at Dallas
The University of Texas at San Antonio
University of California-Berkeley
University of Colorado Boulder
University of Georgia
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Massachusetts Amherst
University of North Carolina at Charlotte
University of North Carolina at Charlotte
University of North Carolina at Greensboro
University of Oregon
University of the Witwatersrand, Johannesburg
University of Utah
University of Virginia Housing & Residence Life
University of Washington
University of Washington
University of Wisconsin Oshkosh
University of Wisconsin-Platteville
Virginia Commonwealth University
Virginia Commonwealth University
Wake Forest University Residence Life and Housing
Wake Forest University Residence Life and Housing
Washington State University
Project Name
Greek Village
Honors Living-Learning Community Building 4
East Village
Fraternity housing
Hamilton Holmes Hall
Osprey Hall
Parkview Hall
Traditions Hall
Rose Avenue Residence Hall
Third and Union Apartments
2012 New Residence Hall - Margaret A. Preska Residence Community
Wolf Ridge Apartments Phase I
Chace Halls, South
West Village
Jackrabbit Grove
New Residence Hall at 982 Greek Drive
Hullabaloo Hall
North Campus Housing Project
Talkington Hall
Presidential Village Phase I
Residence Hall #3 and #5
San Saba Hall
Maximino Martinez Commons
Kittredge Central
Rutherford Hall
Maudelle Tanner Brown Bousfield Hall
Nugent Hall (Phase C)
Commonwealth Honors College Residential Community
Belk Hall
Hunt Hall
Spartan Village Phase I
Global Scholars Hall
The Wits Junction
Donna Garff Marriott Honors Residential Scholars Community
Alderman Road Replacement Project Phase 3&4a
Mercer Court Apartments
Lander Hall
Horizon Village
Bridgeway Commons
West Grace South Residential Complex
West Grace North Complex
Magnolia Hall
Dogwood Hall
Northside Residence Hall
Traditional
Rooms
# of beds
yes
100
yes
yes
yes
216
187
61
Modified
Traditional
Rooms
yes
# of beds
27
Adjoining
Suites
# of beds Super Suites
yes
yes
104
368
yes
64
10
yes
yes
yes
478
yes
612
yes
yes
206
207
yes
yes
32
606
yes
285
yes
yes
yes
6
22
128
yes
yes
Individual
Contract
Apartments
yes
yes
yes
# of beds
6
4
yes
436
yes
25
544
yes
24
yes
650
5
yes
yes
618
270
yes
102
yes
401
yes
3
yes
2
Other
# of beds
90
yes
yes
6
288
yes
216
yes
261
yes
yes
33
756
yes
2
302
yes
yes
141
308
yes
yes
yes
516
971
800
240
520
618
yes
56
yes
4
yes
478
yes
638
210
yes
196
yes
804
162
yes
yes
# of beds
yes
142
yes
yes
Apartments
533
yes
yes
yes
# of beds
yes
429
yes
yes
3
450
yes
930
309
yes
yes
440
yes
yes
yes
164
yes
56
yes
80
459
398
yes
yes
yes
yes
Total # of
beds
105
104
701
187
125
533
618
276
440
102
302
401
216
141
802
262
648
612
516
971
800
618
416
263
261
484
332
1440
429
436
804
463
1206
309
571
930
650
344
440
459
398
237
245
302
GSF
40,255
33,924
274,725
72,000
37,715
175,000
244,000
118,070
148,000
71,000
105,000
196,952
48,500
55,000
182,806
82,500
256,747
189,000
178,000
357,780
288,000
187,000
148,000
100,740
80,263
182,566
104,480
515,637
178,000
132,000
387,000
187,000
450,000
161,602
181,830
450,672
243,079
164,352
172,000
164,500
160,000
80,339
82,927
99,655
Project Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
9,400,000
7,100,000
72,544,800
29,000,000
12,000,000
32,500,000
52,805,000
28,076,873
38,000,000
16,000,000
25,036,736
56,000,000
19,000,000
15,500,000
45,000,000
24,500,000
68,000,000
39,383,659
45,000,000
62,500,000
62,000,000
43,000,000
75,287,000
35,000,000
28,000,000
62,000,000
44,000,000
198,000,000
32,000,000
30,000,000
54,000,000
68,000,000
56,000,000
32,000,000
67,500,000
117,000,000
78,000,000
34,000,000
29,287,000
29,950,000
27,455,000
20,066,649
20,066,649
32,600,000
Project Cost
per Bed
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
89,524
68,269
103,488
155,080
96,000
60,976
85,445
101,728
86,364
156,863
82,903
139,651
87,963
109,929
56,110
93,511
104,938
64,352
87,209
64,367
77,500
69,579
180,978
133,080
107,280
128,099
132,530
137,500
74,592
68,807
67,164
146,868
46,434
103,560
118,214
125,806
120,000
98,837
66,561
65,251
68,982
84,669
81,905
107,947
Project Cost
per GSF
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
234
209
264
403
318
186
216
238
257
225
238
284
392
282
246
297
265
208
253
175
215
230
509
347
349
340
421
384
180
227
140
364
124
198
371
260
321
207
170
182
172
250
242
327
Construction
Cost
Construction
Cost per Bed
Construction
Cost per GSF
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
8,200,000
6,000,000
51,473,000
26,000,000
9,528,158
28,200,000
45,463,000
24,335,909
30,617,494
13,500,000
23,427,769
46,000,000
18,000,000
12,500,000
43,000,000
18,900,000
57,100,000
32,730,369
32,215,334
59,000,000
44,000,000
35,750,000
61,000,000
30,000,000
21,000,000
44,800,000
34,270,000
178,000,000
26,000,000
25,000,000
40,000,000
58,000,000
55,000,000
28,000,000
50,300,000
78,000,000
49,000,000
27,000,000
23,263,000
22,890,000
21,825,000
18,813,309
18,813,309
25,000,000
78,095
57,692
73,428
139,037
76,225
52,908
73,565
88,174
69,585
132,353
77,575
114,713
83,333
88,652
53,616
72,137
88,117
53,481
62,433
60,762
55,000
57,848
146,635
114,068
80,460
92,562
103,223
123,611
60,606
57,339
49,751
125,270
45,605
90,615
88,091
83,871
75,385
78,488
52,870
49,869
54,837
79,381
76,789
82,781
204
177
187
361
253
161
186
206
207
190
223
234
371
227
235
229
222
173
181
165
153
191
412
298
262
245
328
345
146
189
103
310
122
173
277
173
202
164
135
139
136
234
227
251
New Construction - Incomplete Data
Institution
American University Housing and Dining Programs
Binghamton University
Bridgewater State University
Brigham Young University
Central Michigan University
Chowan University
Christopher Newport University
Colorado Mesa University
Drexel University
Eastern Kentucky University
Mansfield University of Pennsylvania
Mars Hill University
Misericordia University
Purdue University
Rutgers University- Camden Campus
Saint Leo University
Southern Oregon University
The Ohio State University
The University of Akron
The University of Leeds
University of Alaska-Fairbanks
University of Central Florida
University of Central Florida
University of Florida
University of Florida
University of South Alabama
University of Tampa
Worcester Polytechnic Institute
Young Harris College
Project Name
Cassell Hall
East Campus Housing (NEwing and Dickinson Communities
Weygand Hall
Heritage Housing Phase II
Graduate Housing Project
Whites Crossing Phase 1
New Residence Hall
Orchard Avenue Apartments
Chestnut Square
New Residence Hall
Phase II Housing
Laurel Residence Hall
MacDowell Hall
First Street Towers West
330 Cooper Street
Apartments 5 & 6
Raider Village
The Residence on Tenth
South Hall
Central Village
Sustainable Village
Academic Village II Expansion
Fraternity and Sorority Life Center and two sorority houses
Corry Village Commons
Tanglewood commons
New Residence Hall
West Kennedy Hall
Faraday Hall
Towers Residence Hall
Traditional
Rooms
yes
# of beds
1500
Modified
Traditional
Rooms
yes
yes
yes
# of beds
14
100
4
Adjoining
Suites
yes
yes
# of beds Super Suites
1400
100
# of beds
yes
344
yes
396
Individual
Contract
Apartments
yes
yes
yes
196
yes
174
yes
yes
88
250
yes
yes
256
364
# of beds
Apartments
# of beds
yes
861
yes
102
yes
350
yes
yes
164
48
yes
185
yes
4
67
yes
yes
90
15
yes
80
yes
600
yes
yes
yes
314
8
510
yes
117
4
436
yes
yes
yes
yes
226
yes
14
350
452
yes
23
16
640
yes
yes
Other
920
yes
yes
# of beds
248
yes
10
yes
14
yes
yes
216
208
Total # of
beds
358
3000
500
920
164
136
450
185
869
256
684
67
117
174
350
314
702
525
533
459
16
670
80
216
208
350
452
258
226
GSF
319,372
122,785
328,000
409,793
Project Cost
189,288
11,885
3,170
Project Cost
per GSF
$ 376,000,000
$
125,333
$ 28,500,000
$
173,780
$
232
$ 97,000,000
$ 24,000,000
$ 49,000,000
$
$
$
111,623
93,750
71,637
$
296
$
120
$
$
$
$
$
56,000,000
22,000,000
50,000,000
51,000,000
30,000,000
$
$
$
$
$
$
160,000
70,064
71,225
97,143
56,285
$
163
$
269
$
$
2,356,890
1,000,000
$
$
$
10,912
4,808
-
$
$
198
315
$ 12,500,000
$
55,310
71,882
135,000
Project Cost
per Bed
Construction
Cost
Construction
Cost per Bed
$ 22,000,000
$
85,938
$ 15,513,850
$
89,160
$ 40,000,000
$
56,980
Construction
Cost per GSF
$
216
New Construction - Traditional Rooms
Institution
Arkansas State University-Jonesboro
College of William and Mary
South Dakota State University
Texas State University
University of Colorado Boulder
University of Illinois at Urbana-Champaign
University of Oregon
University of Virginia Housing & Residence Life
Washington State University
Project Name
Greek Village
Fraternity housing
Jackrabbit Grove
North Campus Housing Project
Kittredge Central
Nugent Hall (Phase C)
Global Scholars Hall
Alderman Road Replacement Project Phase 3&4a
Northside Residence Hall
Sub-Mean
Sub-Median
Total # of
beds
105
187
802
612
263
332
463
571
302
404
332
GSF
40,255
72,000
182,806
189,000
100,740
104,480
187,000
181,830
99,655
128,641
104,480
Project Cost
$
$
$
$
$
$
$
$
$
$
$
9,400,000
29,000,000
45,000,000
39,383,659
35,000,000
44,000,000
68,000,000
67,500,000
32,600,000
41,098,184
39,383,659
Project Cost per
Bed
$
$
$
$
$
$
$
$
$
$
$
89,524
155,080
56,110
64,352
133,080
132,530
146,868
118,214
107,947
111,523
118,214
Project Cost per
GSF
$
$
$
$
$
$
$
$
$
$
$
234
403
246
208
347
421
364
371
327
325
347
$
$
$
$
$
$
$
$
$
$
$
Construction
Cost
8,200,000
26,000,000
43,000,000
32,730,369
30,000,000
34,270,000
58,000,000
50,300,000
25,000,000
34,166,708
32,730,369
$
$
$
$
$
$
$
$
$
$
$
Construction
Cost per Bed
78,095
139,037
53,616
53,481
114,068
103,223
125,270
88,091
82,781
93,074
88,091
$
$
$
$
$
$
$
$
$
$
$
Construction
Cost per GSF
204
361
235
173
298
328
310
277
251
271
277
Note: Includes projects that were primarily traditional room facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included.
New Construction - Modified Traditional Rooms
Institution
Purdue University
University of North Carolina at Charlotte
University of Washington
Project Name
First Street Towers West
Hunt Hall
Lander Hall
Total # of
beds
174
436
650
420
436
Sub-Mean
Sub-Median
GSF
71,882
132,000
243,079
148,987
132,000
Project Cost
$
$
30,000,000
78,000,000
54,000,000
54,000,000
Project Cost per
Bed
$
$
$
68,807
120,000
62,936
68,807
Project Cost per
GSF
$
$
227
321
274
274
$
$
$
Construction
Cost
15,513,850
25,000,000
49,000,000
29,837,950
25,000,000
$
$
$
Construction
Cost per Bed
89,160
57,339
75,385
73,961
75,385
$
$
$
Construction
Cost per GSF
216
189
202
202
202
Note: Includes projects that were primarily modified traditional room facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included.
New Construction Data - Traditional and Modified Traditional Rooms
Institution
Project Name
Total Mean
Total Median
Total # of
beds
408
384
GSF
133,727
118,240
Project Cost
$
$
43,443,969
39,383,659
$
$
Project Cost per
Bed
99,376
113,080
$
$
Project Cost per
GSF
315
327
Project Cost per
Bed
Project Cost per
GSF
$
$
Construction
Cost
33,084,518
31,365,185
$
$
Construction
Cost per Bed
88,296
85,436
$
$
Construction
Cost per GSF
254
243
New Construction - Adjoining Suites
Institution
Arkansas State University-Jonesboro
Baylor University
Emory University
Minnesota State University, Mankato
Southeast Missouri State University
Southern Oregon University
Texas A & M University Residence Life
The University of Texas at San Antonio
University of Wisconsin-Platteville
Sub-Mean
Sub-Median
Project Name
Honors Living-Learning Community Building 4
East Village
Hamilton Holmes Hall
2012 New Residence Hall - Margaret A. Preska Residence Community
New Residence Hall at 982 Greek Drive
Raider Village
Hullabaloo Hall
San Saba Hall
Bridgeway Commons
Total # of
beds
104
701
125
302
262
702
648
618
440
434
440
GSF
33,924
274,725
37,715
105,000
82,500
256,747
187,000
172,000
143,701
138,500
Project Cost
$
$
$
$
$
$
$
$
$
$
$
7,100,000
72,544,800
12,000,000
25,036,736
24,500,000
50,000,000
68,000,000
43,000,000
29,287,000
36,829,837
29,287,000
$
$
$
$
$
$
$
$
$
$
$
68,269
103,488
96,000
82,903
93,511
71,225
104,938
69,579
66,561
84,053
82,903
$
$
$
$
$
209
264
318
238
297
$
$
$
265
230
170
$
$
249
251
$
$
$
$
$
$
$
$
$
$
$
Construction
Cost
6,000,000
51,473,000
9,528,158
23,427,769
18,900,000
40,000,000
57,100,000
35,750,000
23,263,000
29,493,547
23,427,769
$
$
$
$
$
$
$
$
$
$
$
Construction
Cost per Bed
57,692
73,428
76,225
77,575
72,137
56,980
88,117
57,848
52,870
68,097
72,137
$
$
$
$
$
$
$
$
$
$
Construction
Cost per GSF
177
187
253
223
229
222
191
135
202
207
Note: Includes projects that were primarily adjoining suite style facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included.
New Construction - Super Suites
Institution
Project Name
Eastern Kentucky University
New Residence Hall
Florida Gulf Coast University
Osprey Hall
Mansfield University of Pennsylvania
Phase II Housing
Rhodes College
West Village
Saint Leo University
Apartments 5 & 6
Texas Tech University
Talkington Hall
The Ohio State University
The Residence on Tenth
The University of Alabama Housing & Residential Com Presidential Village Phase I
The University of Texas at Dallas
Residence Hall #3 and #5
University of Illinois at Urbana-Champaign
Maudelle Tanner Brown Bousfield Hall
University of Massachusetts Amherst
Commonwealth Honors College Residential Community
Wake Forest University Residence Life and Housing Magnolia Hall
Wake Forest University Residence Life and Housing Dogwood Hall
Sub-Mean
Sub-Median
Total # of
beds
256
533
684
141
314
516
525
971
800
484
1440
237
245
550
516
GSF
175,000
409,793
55,000
135,000
178,000
189,288
357,780
288,000
182,566
515,637
80,339
82,927
220,778
180,283
Project Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
24,000,000
32,500,000
49,000,000
15,500,000
22,000,000
45,000,000
51,000,000
62,500,000
62,000,000
62,000,000
198,000,000
20,066,649
20,066,649
51,048,715
45,000,000
Project Cost per
Bed
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Note: Includes projects that were primarily super suite style facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included.
93,750
60,976
71,637
109,929
70,064
87,209
97,143
64,367
77,500
128,099
137,500
84,669
81,905
89,596
84,669
Project Cost per
GSF
$
$
$
$
$
$
$
$
$
$
$
$
$
$
186
120
282
163
253
269
175
215
340
384
250
242
240
246
$
$
Construction
Cost
22,000,000
28,200,000
$
$
$
12,500,000
$
$
$
$
$
$
$
$
$
Construction
Cost per Bed
Construction
Cost per GSF
85,938
52,908
$
161
$
88,652
$
227
32,215,334
$
62,433
$
181
59,000,000
44,000,000
44,800,000
178,000,000
18,813,309
18,813,309
$
$
$
$
$
$
60,762
55,000
92,562
123,611
79,381
76,789
$
$
$
$
$
$
165
153
245
345
234
227
45,834,195
30,207,667
$
$
77,804
78,085
$
$
215
227
New Construction Data - Adjoining Suites and Super Suites
Total Mean
Total Median
502
500
189,947
176,500
$
$
45,231,902
37,750,000
$
$
87,328
83,786
$
$
243
246
$
$
38,093,888
28,200,000
$
$
73,206
73,428
$
$
209
222
Notes: Includes projects that were primarily adjoining and super suites but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included.
New Construction - Individual Contract Apartments
Institution
Drexel University
University of California-Berkeley
University of North Carolina at Greensboro
University of Utah
Virginia Commonwealth University
Virginia Commonwealth University
University of Wisconsin Oshkosh
Sub-Mean
Sub-Median
Project Name
Chestnut Square
Maximino Martinez Commons
Spartan Village Phase I
Donna Garff Marriott Honors Residential Scholars Community
West Grace South Residential Complex
West Grace North Complex
Horizon Village
Total # of
beds
869
416
804
309
459
398
344
514
416
GSF
328,000
148,000
387,000
161,602
164,500
160,000
164,352
216,208
164,352
Project Cost
$
$
$
$
$
$
$
$
$
97,000,000
75,287,000
54,000,000
32,000,000
29,950,000
27,455,000
3,400,000
45,584,571
32,000,000
Project Cost per
Bed
$
$
$
$
$
$
$
$
$
111,623
180,978
67,164
103,560
65,251
68,982
9,884
86,777
68,982
Project Cost per
GSF
$
$
$
$
$
$
$
296
509
140
198
182
172
21
$
$
217
182
Construction
Cost
$
$
$
$
$
$
$
$
61,000,000
40,000,000
28,000,000
22,890,000
21,825,000
27,000,000
33,452,500
27,500,000
Construction
Cost per Bed
$
$
$
$
$
$
$
$
146,635
49,751
90,615
49,869
54,837
78,488
78,366
66,663
Construction
Cost per GSF
$
$
$
$
$
$
412
103
173
139
136
164
$
$
188
152
Note: Includes projects that were primarily individual contract apartment facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included.
New Construction - Apartments
Institution
Central Michigan University
Florida International University
Florida State University
Indiana University
Indiana University
North Carolina State University
Pennsylvania State University-University Park
University of Florida
University of Florida
University of Georgia
University of North Carolina at Charlotte
University of the Witwatersrand, Johannesburg
University of Washington
Sub-Mean
Sub-Median
Project Name
Graduate Housing Project
Parkview Hall
Traditions Hall
Third and Union Apartments
Rose Avenue Residence Hall
Wolf Ridge Apartments Phase I
Chace Halls, South
Corry Village Commons
Tanglewood commons
Rutherford Hall
Belk Hall
The Wits Junction
Mercer Court Apartments
Total # of
beds
164
618
276
102
440
401
216
216
208
261
429
1206
930
421
276
GSF
122,785
244,000
118,070
71,000
148,000
196,952
48,500
11,885
3,170
80,263
178,000
450,000
450,672
163,331
122,785
Project Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
28,500,000
52,805,000
28,076,873
16,000,000
38,000,000
56,000,000
19,000,000
2,356,890
1,000,000
28,000,000
32,000,000
56,000,000
117,000,000
36,518,366
28,500,000
Project Cost per
Bed
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
173,780
85,445
101,728
156,863
86,364
139,651
87,963
10,912
4,808
107,280
74,592
46,434
125,806
92,433
87,963
Project Cost per
GSF
$
$
$
$
$
$
$
$
$
$
$
$
$
232
216
238
225
257
284
392
198
315
349
180
124
260
$
$
252
238
Construction
Cost
Construction
Cost per Bed
Construction
Cost per GSF
$
$
$
$
$
$
45,463,000
24,335,909
13,500,000
30,617,494
46,000,000
18,000,000
$
$
$
$
$
$
73,565
88,174
132,353
69,585
114,713
83,333
$
$
$
$
$
$
186
206
190
207
234
371
$
$
$
$
21,000,000
26,000,000
55,000,000
78,000,000
$
$
$
$
80,460
60,606
45,605
83,871
$
$
$
$
262
146
122
173
$
$
35,791,640
28,308,747
$
$
83,227
81,897
$
$
210
198
Note: Includes projects that were primarily contract-by-the-unit apartment facilities but may be in combination with any other type. Only projects that provided either Number of Bed or GSF, and either Project Cost or Construction Cost were included.
New Construction - Incomplete and Other Data
Institution
Binghamton University
Brigham Young University
Christopher Newport University
Colorado Mesa University
Mars Hill University
Misericordia University
Rutgers University- Camden Campus
The University of Akron
The University of Leeds
University of Alaska-Fairbanks
University of Central Florida
University of Central Florida
University of South Alabama
University of Tampa
Worcester Polytechnic Institute
Young Harris College
Sub-Mean
Sub-Median
Project Name
East Campus Housing (NEwing and Dickinson Communities
Heritage Housing Phase II
New Residence Hall
Orchard Avenue Apartments
Laurel Residence Hall
MacDowell Hall
330 Cooper Street
South Hall
Central Village
Sustainable Village
Fraternity and Sorority Life Center and two sorority houses
Academic Village II Expansion
New Residence Hall
West Kennedy Hall
Faraday Hall
Towers Residence Hall
Total # of
beds
3000
920
450
185
67
117
350
533
459
16
80
670
350
452
258
226
508
350
GSF
319,372
Project Cost
Project Cost per
Bed
$
376,000,000
$
125,333
$
$
56,000,000
30,000,000
$
$
160,000
56,285
$
319,372
319,372
$
$
$
12,500,000
118,625,000
43,000,000
$
$
$
Project Cost per
GSF
Construction
Cost
Construction
Cost per Bed
Construction
Cost per GSF
#DIV/0!
#NUM!
#DIV/0!
#NUM!
#DIV/0!
#NUM!
#DIV/0!
#NUM!
-
55,310
79,386
56,285
Renovation Data
Institution
Arkansas State University-Jonesboro
Bangor University
Beacon College
Bowling Green State University
Brown University
California State University, Long Beach
California State University, Long Beach
California State University, Long Beach
California State University, Sacramento
Christendom College
Coastal Carolina University
Colorado College
Columbia University
Columbia University
Drexel University
East Central University
East Tennessee State University
Eastern Illinois University
Eastern Illinois University
Eastern Illinois University
Eastern Illinois University
Eastern Illinois University
Eastern Illinois University
Eastern Illinois University
Embry-Riddle Aeronautical University
Emory University
Florida International University
Florida State University
Florida State University
Florida State University
Florida State University
Florida State University
Florida State University
Frostburg State University
George Mason University
Indiana University
Johns Hopkins University
Johns Hopkins University
Johns Hopkins University
Johns Hopkins University
Johns Hopkins University
Johnson & Wales University - Denver
Kansas State University
Kansas State University
Kansas State University
Kent State University
Kent State University
Kent State University
Landmark College
Louisiana State University
Lourdes University
Loyola Marymount University
Marshall University
Marshall University
Michigan State University
Michigan Technological University
New Jersey City University
North Dakota State University
North Dakota State University
North Dakota State University
Oakland University
Oklahoma City University
Project Name
Kays Hall HVAC Renovation
Garth Hall
McDonald Hall
MMA
Parkside College Dining Hall renovation
Building J renovation
Building G renovation
Sierra Hall Renovation
Gardens Renovation
Slocum Hall Renovation
Wallach
Schapiro
Pontotoc Hall
West and Powell Hall
McKinney Hall renovations
Andrews 5 and 6
Wireless - Pemberton, Greek Court
GC 3A carpet
Univ Apt kitchens
GC 2B carpet
Stevenson flooring replacement
Halls 6 and 9
Harris Hall
Lakeview Lighting
GilchrisHall Envelope and Waterproofing
Rogers Hall Structural and Mechanical
Salley Hall Envelope and Waterproofing
Landis Hall Envelope and Waterproofing
Cawthon Hall Envelope and Waterproofing
Kellum Hall 2012 Projects
Gray Hall
Commonwealth
Briscoe Quad Renovation
AMR Bldg
Dining Transitions
Levering Market Front of House
McCoy Common Kithcne
A&B Bldg
Johnson Hall Renovation
Honors House
Building H
Moore Hall HVAC replacement
HVAC and room upgrades
Prentice Bathroom Renovation
Wright Hall - HVAC and Room Upgrades
Hall 4 Update
Annie Boyd Hall
Rains Renovation
HVAC Replacement
Armstrong Hall
East McNair kitchenette lounges
HVAC and bathroom rehab.
Stockbridge Hall Bathroom Project
Johnson Hall Painting/Flooring
Reed Hall Building Painting/Flooring Replacement
Hamlin South Plumbing renovation
Banning Hall renovation project
Type of Renovation
System Refurbishment
Rehabilitation
Cosmetic Refurbishment
Modified Rehabilitation
Rehabilitation
Rehabilitation
General Refurbishment
General Refurbishment
Modified Rehabilitation
General Refurbishment
General Refurbishment
Modified Rehabilitation
General Refurbishment
General Refurbishment
System Refurbishment
Cosmetic Refurbishment
System Refurbishment
Modified Rehabilitation
Cosmetic Refurbishment
System Refurbishment
Cosmetic Refurbishment
Modified Rehabilitation
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
General Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
Modified Rehabilitation
System Refurbishment
General Refurbishment
General Refurbishment
Rehabilitation
General Refurbishment
General Refurbishment
Cosmetic Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
Modified Rehabilitation
Modified Rehabilitation
System Refurbishment
System Refurbishment
Modified Rehabilitation
System Refurbishment
Cosmetic Refurbishment
Rehabilitation
Modified Rehabilitation
General Refurbishment
System Refurbishment
Cosmetic Refurbishment
Modified Rehabilitation
Modified Rehabilitation
Rehabilitation
Rehabilitation
Cosmetic Refurbishment
Cosmetic Refurbishment
Rehabilitation
System Refurbishment
GSF
Project Cost
117,371
33,400
$
$
33,000,000
6,200,000
$
$
12,500
19,045
19,045
41,662
$
$
$
$
10,500,000
476,607
472,885
1,900,000
32,000
85,845
65,000
103,000
$
$
$
$
$
47,473
1,000
3,000
175,000
1,000
3,000
5,500
15,000
Project Cost
per GSF
Construction Cost
Construction Cost
per GSF
281.16
185.63
$
$
30,000,000
5,785,000
$
$
255.60
173.20
$
$
$
$
840.00
25.03
24.83
45.61
$
$
$
$
6,500,000
406,704
402,982
1,350,000
$
$
$
$
520.00
21.35
21.16
32.40
1,000,000
14,000,000
6,900,000
5,500,000
430,000
$
$
$
$
31.25
163.08
106.15
53.40
$
$
$
$
1,000,000
11,000,000
5,900,000
500,000
$
$
$
$
31.25
128.14
90.77
4.85
$
1,500,000
$
31.60
$
$
$
$
$
$
$
$
1,334,000
1,046,000
35,000
480,410
3,500
85,000
30,024
165,000
$
$
$
$
$
$
$
$
28.10
1,046.00
11.67
2.75
3.50
28.33
5.46
11.00
$
$
$
$
$
$
$
$
10,000,000
130,000
441,604
1,110,879
1,018,626
829,124
604,539
613,859
$
$
$
$
$
$
$
0.65
7.22
16.41
8.66
7.72
6.48
5.11
$
$
$
$
$
$
$
$
8,000,000
130,000
422,893
998,191
884,141
716,632
543,018
565,021
$
$
$
$
$
$
$
0.65
6.92
14.75
7.52
6.67
5.82
4.71
256,400
91,081
16,864
8,593
2,237
39,932
$
46,000,000
$
179.41
$
$
$
$
$
$
33,760,000
3,325,000
1,864,817
757,000
106,327
1,881,468
$
$
$
$
$
$
131.67
36.51
110.58
88.09
47.53
47.12
15,000
16,000
250,000
52,528
65,234
108,389
22,275
37,093
$
$
$
$
$
$
1,800,000
925
950,000
2,625,000
2,600,000
13,000,000
$
$
$
$
$
$
120.00
0.06
3.80
49.97
39.86
119.94
$
$
$
1,500,000
825,000
850,000
$
$
$
100.00
51.56
3.40
$
8,500,990
$
229.18
$
$
535,711
7,705,937
$
$
24.05
207.75
85,000
1,000
200
$
$
$
20,000
35,000
25,000
$
$
$
0.24
35.00
125.00
$
180,000
$
2.12
2,700
101,250
101,250
71,936
$
$
$
$
1,430,992
110,000
105,000
3,000,000
$
$
$
$
530.00
1.09
1.04
41.70
$
$
$
$
1,430,992
110,000
105,000
2,800,000
$
$
$
$
530.00
1.09
1.04
38.92
200,000
61,148
67,694
117,566
107,444
93,281
120,075
Oregon Institute of Technology
Oregon State University
Oregon State University
Oregon State University
Oregon State University
Pennsylvania State University-University Park
Pennsylvania State University-University Park
Pratt Institute
Pratt Institute
Purdue University
Purdue University
Purdue University
Purdue University
Purdue University
Ramapo College of New Jersey
Rhodes College
Rhodes College
Saint Leo University
Seton Hall University
Southeast Missouri State University
Southeast Missouri State University
Southeast Missouri State University
Southeast Missouri State University
St. Mary's College of Maryland
St. Mary's College of Maryland
St. Mary's College of Maryland
St. Mary's College of Maryland
St. Mary's College of Maryland
St. Mary's University
St. Mary's University
St. Mary's University
St. Mary's University
St. Mary's University
Stanford University
Stetson University
Stetson University
Stevens Institute of Technology Office of Residence Life
Stevens Institute of Technology Office of Residence Life
Stony Brook University
SUNY Geneseo
Tarleton State University
Tennessee Technological University
Tennessee Technological University
Texas A & M University Residence Life
Texas Tech University
Texas Tech University
Texas Tech University
The Ohio State University
The University of Arizona
The University of Memphis
The University of Texas at Austin
The University of Texas at Austin
The University of Texas at Austin
The University of Texas at Austin
The University of Texas at Austin
The University of Texas at Austin
The University of Texas at Austin
Thomas Jefferson University
University of California-Berkeley
University of California-Santa Barbara
University of California-Santa Barbara
University of Central Florida
University of Colorado Boulder
University of Florida
University of Florida
Sacket Hall - Fire Suppression System and Window Replacement
Callahan Hall - Renovations
West Hall - Flooring and Windows
Wilson Hall Renovation
Apartment Renovation, Behrend Campus
Haller/Lyons, South Halls
Bathroom Renovation
Townhouse Renovation
Harrison Residence Hall Bathroom Renovation Phase I
Hilltop Apartments Buildings 7, 8, 9 and 10 Kitchen and Bath Renovations
Meredith Hall Accessibility Renovation
Hillenbrand Hall East Wing Elevator Renovation
Harrison Residence Hall Bathroom Renovation Phase II
Phase two Housing Renovations
Ellett Hall
Voorhies, Townsend and Trezevant Halls
Roderick & Alumni
Aquinas Bathrooms
Towers Cafe Seating Renovation
HVAC Renovation - Greek F, G, H
Student Room Furniture Upgrade
Ground Floor Security Screen Installation
Building Envelope Improvements Prince George Hall
Building Envelope Improvements Caroline Hall
Conditioned Air Make-Up System - Caroline Hall
Exterior Building Envelope Improvements Queen Anne
Conditioned Air Make-up System Prince George Hall
Marian Hall Renovation
Archbishop Flores Hall Renovation
Anthony Frederick Hall Renovation
Treadaway Hall Renovation
Leies Hall Renovation
Haus Mitt Upgrades for Backlog Reduction 2012
Stetson Cove Apartments
University Hall
Residence Hall power and air condition upgrade
Residence Hall room renovation
Roosevelt Quad 2013 renovation
Monroe Hall
Centennial Hall
MS Cooper/Pinkerton Hall Renovation
Living Learning Village
Lacy (Dorm 6) Hall
Chitwood Bath, Laundry, Trash, Elevator Lobby Remodel
H/C Student Room and Bath Renovations
Wiggins USH Office Remodel
South High Rise Renovation and Addation (Multi-Building Project) 2011-2013
Carney Johnston Renovation
Dining Renovation Phase 3
Residential Floor Renovations
Lobby Renovation
Dining Renovation Phase 4
Roof Replacement
Residential Floor Renovations
Air Handler Replacement
Martin Residence Renovation
Unit 1, Unit 2, and Unit 3 Residence Hall Seismic Retrofit
Santa Rosa Residence Hall
Anacapa Residence Hall
Kittredge West
Buckman
Tanglewood
Modified Rehabilitation
General Refurbishment
General Refurbishment
Cosmetic Refurbishment
Modified Rehabilitation
System Refurbishment
Rehabilitation
Rehabilitation
Rehabilitation
Modified Rehabilitation
Cosmetic Refurbishment
Modified Rehabilitation
System Refurbishment
Modified Rehabilitation
General Refurbishment
General Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Modified Rehabilitation
Cosmetic Refurbishment
System Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
General Refurbishment
General Refurbishment
Modified Rehabilitation
Modified Rehabilitation
Cosmetic Refurbishment
System Refurbishment
Cosmetic Refurbishment
System Refurbishment
Rehabilitation
Cosmetic Refurbishment
General Refurbishment
General Refurbishment
Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Rehabilitation
Rehabilitation
System Refurbishment
Modified Rehabilitation
General Refurbishment
Modified Rehabilitation
Rehabilitation
Modified Rehabilitation
System Refurbishment
Modified Rehabilitation
System Refurbishment
General Refurbishment
Modified Rehabilitation
General Refurbishment
General Refurbishment
General Refurbishment
Cosmetic Refurbishment
Modified Rehabilitation
Modified Rehabilitation
178,981
72,000
66,959
72,410
56,100
15,000
1,500
10,600
3,261
$
$
$
$
$
$
$
$
3,000,000
3,000,000
100,000
1,824,000
3,000,000
6,900,000
127,000
3,750,000
$
$
$
$
$
$
$
$
16.76
41.67
1.49
25.19
53.48
460.00
84.67
353.77
3,248
5,435
9,050
81,375
10,200
57,300
33,681
33,681
33,681
33,681
33,681
29,686
11,304
11,052
44,863
19,291
$
$
$
5,321,000
20,000
450,000
$
$
$
103,000
1,150,000
388,000
$
$
2.21
5.53
$
$
10.10
20.07
$
$
$
$
$
$
$
$
$
$
$
$
2,400,000
68,000,000
127,000
3,600,000
1,137,000
530,800
726,000
373,412
2,041,700
6,651,000
200,000
450,000
$
$
$
$
$
42.78
4,533.33
84.67
339.62
348.67
$
223.52
$
375.66
$
$
22.10
5.53
$
94,000
$
9.22
$
$
$
$
$
$
$
$
$
$
215,000
215,000
160,000
100,000
160,000
224,575
124,935
119,906
344,312
117,576
$
$
$
$
$
$
$
$
$
$
6.38
6.38
4.75
2.97
4.75
7.57
11.05
10.85
7.67
6.09
$
$
$
$
$
227,225
127,185
122,156
349,262
120,125
$
$
$
$
$
7.65
11.25
11.05
7.79
6.23
$
$
$
$
800,000
225,000
2,000,000
13,000,000
$
$
$
25.00
5.77
7.69
$
$
$
$
800,000
225,000
2,000,000
10,000,000
$
$
$
25.00
5.77
7.69
35,344
134,816
168,874
12,836
605,332
145,850
$
$
$
$
$
$
8,828,150
1,895,000
5,009,140
1,650,000
172,000,000
23,877,000
$
$
$
$
$
$
249.78
14.06
29.66
128.54
284.14
163.71
$
$
$
$
7,449,015
1,757,500
4,758,683
1,518,000
$
$
$
$
210.76
13.04
28.18
118.26
$
20,800,000
$
142.61
21,500
60,000
12,000
21,536
$
$
$
$
$
$
$
3,500,000
8,800,000
4,300,000
4,100,000
1,350,000
6,000,000
3,000,000
$
$
$
$
162.79
146.67
358.33
190.38
96.74
124.17
319.17
178.77
100.00
2,080,000
7,450,000
3,830,000
3,850,000
1,470,000
7,100,000
3,500,000
$
$
$
$
$
$
$
$
$
$
$
$
$
118.33
87,290
79,079
$
$
$
33,500,000
6,500,000
7,800,000
$
$
74.46
98.64
$
$
5,300,000
6,200,000
$
$
60.72
78.40
74,296
29,580
10,480
$
$
$
2,178,000
1,435,549
170,625
$
$
$
29.32
48.53
16.28
$
17,163,813
$
231.02
26,400
28,756
32,000
39,000
260,000
60,000
University of Florida
University of Florida
University of Florida
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Hawaii at Manoa
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Iowa
University of Iowa
University of Iowa
University of Iowa
University of Iowa
University of Iowa
University of Iowa
University of Iowa
University of Iowa
University of Iowa
University of Maryland Baltimore County
University of Maryland Baltimore County
University of Maryland Baltimore County
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Mississippi
University of Missouri-Columbia
University of Missouri-Columbia
University of North Carolina at Greensboro
University of North Dakota
University of North Dakota
University of North Dakota
University of North Dakota
University of Notre Dame
University of Notre Dame
University of Oregon
University of Oregon
University of Oregon
University of Oregon
University of Southern Mississippi
University of Southern Mississippi
University of Southern Mississippi
University of Southern Mississippi
University of Tasmania Accommodation Services
University of Tasmania Accommodation Services
UVS
Modified Rehabilitation
Maguire
Modified Rehabilitation
Broward
Modified Rehabilitation
Brown Hall
Modified Rehabilitation
McGowan road
Modified Rehabilitation
Payne Hall exterior and roof
Cosmetic Refurbishment
Vandiver Hall
System Refurbishment
Russell ethernet installation
System Refurbishment
Creswell Electric switch
System Refurbishment
Payne Hall
System Refurbishment
Myers Hall Chiller Plant
System Refurbishment
McWhorter Hall
System Refurbishment
Oglethrope House
Modified Rehabilitation
Walkway Light Retrofit Project
System Refurbishment
Allen Hall - remodel dining room serving lines
Cosmetic Refurbishment
Orchard Downs Apartments - Remodel one building
General Refurbishment
Allen Hall - Student room furniture replacement
Cosmetic Refurbishment
Goodwin & Green Apartments - Window Replacement
System Refurbishment
Snyder Hall - Electrical Upgrade & Window air conditioners
Cosmetic Refurbishment
Snyder Hall - Life Safety upgrade
System Refurbishment
Hopkins Hall & Weston Hall - Life Safety upgrade
System Refurbishment
Goodwin & Green Apartments - Life Safety upgrades
System Refurbishment
Hillcrest Finishes
Cosmetic Refurbishment
Hillcrest Dock & Pluming Improvements
System Refurbishment
Slater Restroom Renovation
Modified Rehabilitation
Currier Roof Replacement
System Refurbishment
Slater Masonry Repairs
System Refurbishment
Hillcrest Dishroom Renovation
System Refurbishment
Hillcrest Rotunda Floor Replacement
Cosmetic Refurbishment
Daum Custodial Suite Addition
Modified Rehabilitation
Currier Hall Sprinkler Addition
Rehabilitation
Cold Food Preparation Kitchen
Rehabilitation
Susquehanna Hall
General Refurbishment
Apartment Renovation
General Refurbishment
Chesapeake Hall
General Refurbishment
Northwood 1, 2 & 3 Boilers and Fire Alarms
System Refurbishment
Northwood 4 & 5 Roof Replacement
System Refurbishment
East Quad Renewal
Rehabilitation
Martha Cook Fire Suppression
System Refurbishment
Oxford Goddard Dining Renovation
Rehabilitation
Baits 2 Renewal
Modified Rehabilitation
Northwood 1, 2 & 3 IT
System Refurbishment
2150 Cram Community Center
Rehabilitation
Northwood 1, 2 & 3 Electrical Ugrades
System Refurbishment
Northwood 4 & 5 Roof Replacements
System Refurbishment
Removel and replacment of outside brick of Two Residental halls
System Refurbishment
Mark Twain Hall Renovation
Modified Rehabilitation
Pershing Hall Renovation
General Refurbishment
Quad Comprehensive Renovation
Rehabilitation
Walsh Hall
General Refurbishment
McVey Hall
Cosmetic Refurbishment
West Hall
General Refurbishment
Fulton Hall
System Refurbishment
Lyons hall
Cosmetic Refurbishment
Lewis Hall
Cosmetic Refurbishment
Hamilton Hall New Bedroom Door Locks
System Refurbishment
Barnhart Hall, Library Commons and Lounges
Cosmetic Refurbishment
Earl Hall Fire Protection
System Refurbishment
Earl Hall, Morton and McClure Bedrooms
Cosmetic Refurbishment
Hillcrest Hall window replacement, asbestos removal, re-painting, flooring replacemCosmetic Refurbishment
Hillcrest Hall Card Access Project
Cosmetic Refurbishment
McCarty Flooring Replacement
Cosmetic Refurbishment
Wilber chapter room renovations
Cosmetic Refurbishment
Launceston Kitchen and bathroom upgrades
General Refurbishment
Refurbishment of Investigator Hall, Launceston
Modified Rehabilitation
7,330
7,330
80,000
47,678
33,096
42,406
134,734
230,312
192,567
42,406
126,177
107,452
93,536
5,000
8,900
137,000
138,000
92,000
92,000
88,000
138,000
200,000
8,000
6,000
5,000
6,000
1,000
1,000
2,000
190,000
20,000
83,504
139,000
83,079
420,000
320,000
8,000
170,000
3,000
420,000
213,255
110,146
41,217
255,000
72,063
67,276
67,184
39,062
5,154
84,195
9,332
84,540
40,000
3,500
3,000
23,850
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
189,811
191,210
9,095,106
2,000,000
1,000,000
355,000
550,000
550,000
110,000
270,000
300,000
520,000
5,000,000
250,000
300,000
1,870,000
915,000
2,600,000
800,000
700,000
1,400,000
2,000,000
2,027,000
185,000
6,236,000
741,000
414,000
548,000
139,000
131,000
900,000
909,870
2,300,000
30,000,000
6,400,000
7,500,000
250,000
108,000,000
2,200,000
1,800,000
13,400,000
2,000,000
725,000
1,810,000
250,000
8
21,731,000
5,687,485
55,200,000
1,500,000
500,000
900,000
202,000
$
$
$
$
$
$
$
$
$
$
113,000
166,000
1,000,000
532,000
848,000
193,500
100,000
100,000
303,000
2,214,000
$
$
$
$
$
$
$
$
$
$
$
$
$
25.90
26.09
113.69
41.95
30.22
8.37
4.08
2.39
0.57
6.37
2.38
4.84
53.46
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
60.00
210.11
6.68
18.84
8.70
7.61
15.91
14.49
10.14
23.13
1,039.33
148.20
69.00
548.00
139.00
65.50
4.74
45.49
27.54
215.83
77.04
17.86
$
337.50
$
$
225.00
78.82
$
$
241.67
4.31
$
$
$
$
$
$
$
$
0.00
197.29
137.99
216.47
20.82
7.43
13.40
5.17
$
$
$
$
32.21
11.88
57.01
10.03
$
$
$
$
2.50
28.57
101.00
92.83
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2,000,000
1,000,000
355,000
550,000
550,000
110,000
270,000
300,000
520,000
5,000,000
250,000
300,000
1,350,000
915,000
2,000,000
550,000
500,000
1,000,000
1,500,000
1,448,000
138,000
4,797,000
549,000
318,000
422,000
98,000
94,000
693,000
699,900
2,000,000
27,000,000
5,400,000
5,200,000
250,000
93,400,000
1,500,000
1,400,000
10,000,000
2,000,000
440,000
1,810,000
250,000
8,000,000
14,919,544
2,967,377
45,000,000
1,250,000
150,000
400,000
$
$
$
$
$
$
$
$
$
$
113,000
166,000
750,000
532,000
801,000
193,500
100,000
30,000
303,000
2,214,000
$
$
$
$
$
$
$
$
$
$
41.95
30.22
8.37
4.08
2.39
0.57
6.37
2.38
4.84
53.46
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
60.00
151.69
6.68
14.49
5.98
5.43
11.36
10.87
7.24
17.25
799.50
109.80
53.00
422.00
98.00
47.00
3.65
35.00
23.95
194.24
65.00
12.38
$
291.88
$
$
175.00
58.82
$
$
146.67
4.31
$
$
$
$
$
$
$
37.51
135.45
71.99
176.47
17.35
2.23
5.95
$
$
$
$
32.21
8.91
57.01
9.47
$
$
$
$
2.50
8.57
101.00
92.83
University of Technology, Sydney
University of Tennessee at Chattanooga
University of the Pacific
University of Vermont
University of Vermont
University of Virginia Housing & Residence Life
University of Virginia Housing & Residence Life
University of Virginia Housing & Residence Life
University of Wisconsin-Stout
University of Wisconsin-Whitewater
Utah State University Housing and Residence Life
Virginia Commonwealth University
Virginia Polytechnic Institute & State University University
Wake Forest University Residence Life and Housing
Western Illinois University
Whitman College
Wilkes University
Yavapai College
Gumal residence- Renovating 3 levels of student apartment and rooms- total 90 beCosmetic Refurbishment
Stagmaier Hall
Modified Rehabilitation
Beta Theta Pi Fraternity House Renovation
Modified Rehabilitation
Living/Learning C Building
Modified Rehabilitation
Marsh Main Lounge
Rehabilitation
McCormick Road Renovation Project w/ Fire System Final Phase
General Refurbishment
Hereford Furniture Upgrade
Cosmetic Refurbishment
Lambeth Field Apartment Renovation Final Phase
General Refurbishment
Fleming
Modified Rehabilitation
Wellers Hall Renovation (part 2 of the Fischer-Wellers renovation project)
Rehabilitation
Jones Hall
General Refurbishment
Johnson Hall Lobby/CommunityBaths
Modified Rehabilitation
Residential College at West Ambler Johnston
Rehabilitation
Student Apartments
Modified Rehabilitation
Thompson Hall Renovation
System Refurbishment
Anderson Hall renovation
Modified Rehabilitation
Fortinsky
Rehabilitation
Kachina Hall
System Refurbishment
27,000
$
140,000
$
5.19
$
130,000
$
4.81
11,081
$
$
$
$
$
$
$
$
$
$
$
$
$
30,000
4,000,000
2,000,000
1,401,681
1,161,329
8,246,860
70,000,000
6,100,000
1,100,000
4,202,988
72,113,670
1,630,564
25,800,000
$
2.71
52.34
7.16
10.19
46.51
1,737.06
114.83
53.15
40.19
265.12
58.21
85.97
580,000
4,000,000
2,000,000
1,067,189
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
5.45
$
$
$
$
$
$
$
$
6,281,775
6,300,000
5,400,000
1,100,000
3,912,334
53,063,670
1,400,000
21,000,000
$
$
$
$
$
$
$
$
35.43
156.34
101.65
53.15
37.41
195.09
49.98
69.98
195,731
113,980
177,318
40,298
53,122
20,695
104,579
272,000
28,012
300,097
Renovation Data - Rehabilitation, Modified Rehabilitation, System Refurbishment, Cosmetic Refurbishment, General Refurbishment
Renovation - Rehabilitation
Institution
Bangor University
Brown University
California State University, Long Beach
Indiana University
Louisiana State University
New Jersey City University
North Dakota State University
Oakland University
Pennsylvania State University-University Park
Pratt Institute
Pratt Institute
SUNY Geneseo
Texas A & M University Residence Life
Texas Tech University
The Ohio State University
The University of Texas at Austin
University of Iowa
University of Iowa
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of North Carolina at Greensboro
University of Vermont
University of Wisconsin-Whitewater
Virginia Polytechnic Institute & State University University
Wilkes University
Project Name
Garth Hall
MMA
Parkside College Dining Hall renovation
Briscoe Quad Renovation
Annie Boyd Hall
HVAC and bathroom rehab.
Stockbridge Hall Bathroom Project
Hamlin South Plumbing renovation
Haller/Lyons, South Halls
Bathroom Renovation
Townhouse Renovation
Monroe Hall
Lacy (Dorm 6) Hall
Wiggins USH Office Remodel
South High Rise Renovation and Addation (Multi-Building Project) 2011-2013
Lobby Renovation
Currier Hall Sprinkler Addition
Cold Food Preparation Kitchen
East Quad Renewal
Oxford Goddard Dining Renovation
2150 Cram Community Center
Quad Comprehensive Renovation
Marsh Main Lounge
Wellers Hall Renovation (part 2 of the Fischer-Wellers renovation project)
Residential College at West Ambler Johnston
Fortinsky
Type of Renovation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Sub-Total Mean
Sub-Total Median
GSF
Project Cost
33,400
$
6,200,000
$
12,500
256,400
37,093
$
$
$
10,500,000
46,000,000
8,500,990
2,700
71,936
15,000
1,500
10,600
53,122
272,000
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1,430,992
3,000,000
6,900,000
127,000
3,750,000
13,000,000
8,828,150
1,650,000
172,000,000
4,300,000
900,000
909,870
108,000,000
1,800,000
725,000
55,200,000
2,000,000
6,100,000
72,113,670
106,084
33,400
$
$
23,214,594
6,100,000
35,344
12,836
605,332
12,000
190,000
20,000
320,000
8,000
3,000
255,000
Project Cost
per GSF
Construction Cost
Construction Cost
per GSF
185.63
$
5,785,000
$
173.20
$
$
$
840.00
179.41
229.18
$
$
$
6,500,000
33,760,000
7,705,937
$
$
$
520.00
131.67
207.75
$
$
$
$
$
530.00
41.70
460.00
84.67
353.77
530.00
38.92
4,533.33
84.67
339.62
249.78
128.54
284.14
358.33
4.74
45.49
337.50
225.00
241.67
216.47
1,430,992
2,800,000
68,000,000
127,000
3,600,000
10,000,000
7,449,015
1,518,000
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
210.76
118.26
319.17
3.65
35.00
291.88
175.00
146.67
176.47
114.83
265.12
3,830,000
693,000
699,900
93,400,000
1,400,000
440,000
45,000,000
2,000,000
5,400,000
53,063,670
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
101.65
195.09
$
$
256.00
229.18
$
$
16,118,296
4,615,000
$
$
416.64
175.74
Rehabilitation - Modified Rehabilitation
Institution
Bowling Green State University
California State University, Sacramento
Colorado College
Eastern Illinois University
Eastern Illinois University
Florida State University
Kansas State University
Kansas State University
Kent State University
Lourdes University
Michigan State University
Michigan Technological University
Oregon Institute of Technology
Oregon State University
Purdue University
Purdue University
Purdue University
Seton Hall University
Stanford University
Stetson University
Texas Tech University
Texas Tech University
The University of Memphis
The University of Texas at Austin
The University of Texas at Austin
The University of Texas at Austin
University of California-Berkeley
Project Name
McDonald Hall
Sierra Hall Renovation
Slocum Hall Renovation
McKinney Hall renovations
Univ Apt kitchens
Cawthon Hall Envelope and Waterproofing
Honors House
Building H
Prentice Bathroom Renovation
Armstrong Hall
East McNair kitchenette lounges
Wilson Hall Renovation
Harrison Residence Hall Bathroom Renovation Phase I
Meredith Hall Accessibility Renovation
Harrison Residence Hall Bathroom Renovation Phase II
Aquinas Bathrooms
Haus Mitt Upgrades for Backlog Reduction 2012
Stetson Cove Apartments
Chitwood Bath, Laundry, Trash, Elevator Lobby Remodel
H/C Student Room and Bath Renovations
Carney Johnston Renovation
Residential Floor Renovations
Dining Renovation Phase 4
Residential Floor Renovations
Unit 1, Unit 2, and Unit 3 Residence Hall Seismic Retrofit
Type of Renovation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
GSF
Project Cost
Project Cost per
GSF
41,662
85,845
1,000
3,000
93,281
15,000
16,000
65,234
$
$
1,900,000
14,000,000
$
$
45.61
163.08
$
$
$
$
604,539
1,800,000
925
2,600,000
$
$
$
$
6.48
120.00
0.06
39.86
72,410
3,261
3,248
5,435
$
1,824,000
$
25.19
26,400
134,816
168,874
60,000
21,536
60,000
Construction Cost
Construction Cost
per GSF
$
$
$
$
$
$
$
1,350,000
11,000,000
1,046,000
85,000
543,018
1,500,000
825,000
$
$
$
$
$
$
$
32.40
128.14
1,046.00
28.33
5.82
100.00
51.56
$
$
$
1,137,000
726,000
2,041,700
$
$
$
348.67
223.52
375.66
$
$
1,895,000
5,009,140
$
$
14.06
29.66
$
$
1,757,500
4,758,683
$
$
13.04
28.18
$
$
$
$
8,800,000
4,100,000
6,000,000
33,500,000
$
$
$
146.67
190.38
100.00
$
$
$
7,450,000
3,850,000
7,100,000
$
$
$
124.17
178.77
118.33
University of Florida
University of Florida
University of Florida
University of Florida
University of Florida
University of Georgia
University of Georgia
University of Georgia
University of Iowa
University of Iowa
University of Michigan-Ann Arbor
University of Missouri-Columbia
University of Tasmania Accommodation Services
University of Tennessee at Chattanooga
University of the Pacific
University of Vermont
University of Wisconsin-Stout
Virginia Commonwealth University
Wake Forest University Residence Life and Housing
Whitman College
Buckman
Tanglewood
UVS
Maguire
Broward
Brown Hall
McGowan road
Oglethrope House
Slater Restroom Renovation
Daum Custodial Suite Addition
Baits 2 Renewal
Mark Twain Hall Renovation
Refurbishment of Investigator Hall, Launceston
Stagmaier Hall
Beta Theta Pi Fraternity House Renovation
Living/Learning C Building
Fleming
Johnson Hall Lobby/CommunityBaths
Student Apartments
Anderson Hall renovation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Modified Rehabilitation
Sub-Total Mean
Sub-Total Median
29,580
10,480
7,330
7,330
80,000
47,678
33,096
93,536
6,000
2,000
170,000
110,146
23,850
$
$
$
$
$
$
$
$
$
$
$
$
$
1,435,549
170,625
189,811
191,210
9,095,106
2,000,000
1,000,000
5,000,000
6,236,000
131,000
13,400,000
21,731,000
2,214,000
$
$
$
$
$
$
$
$
$
$
$
$
$
48.53
16.28
25.90
26.09
113.69
41.95
30.22
53.46
1,039.33
65.50
78.82
197.29
92.83
11,081
30,000
4,000,000
70,000,000
4,202,988
1,630,564
$
2.71
40,298
104,579
28,012
$
$
$
$
$
$
$
$
48,057
29,580
$
$
7,248,112
2,214,000
$
$
$
$
$
$
$
$
$
$
2,000,000
1,000,000
5,000,000
4,797,000
94,000
10,000,000
14,919,544
2,214,000
$
$
$
$
$
$
$
$
41.95
30.22
53.46
799.50
47.00
58.82
135.45
92.83
580,000
4,000,000
6,300,000
3,912,334
1,400,000
$
52.34
1,737.06
40.19
58.21
$
$
$
$
$
$
$
$
156.34
37.41
49.98
157
49
$
$
3,620,956
2,020,850
$
$
161.40
58.82
Rehabilitation - Cosmetic Refurbishment
Institution
Beacon College
East Central University
Eastern Illinois University
Eastern Illinois University
Eastern Illinois University
Eastern Illinois University
Embry-Riddle Aeronautical University
Johns Hopkins University
Landmark College
Marshall University
North Dakota State University
North Dakota State University
Oregon State University
Purdue University
Rhodes College
Saint Leo University
Southeast Missouri State University
Southeast Missouri State University
Southeast Missouri State University
St. Mary's University
St. Mary's University
St. Mary's University
Stetson University
Stevens Institute of Technology Office of Residence Life
Tarleton State University
University of Colorado Boulder
University of Georgia
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Iowa
University of Iowa
University of North Dakota
University of Notre Dame
University of Notre Dame
University of Oregon
University of Oregon
Project Name
Pontotoc Hall
Andrews 5 and 6
GC 3A carpet
GC 2B carpet
Stevenson flooring replacement
Halls 6 and 9
Levering Market Front of House
Hall 4 Update
Johnson Hall Painting/Flooring
Reed Hall Building Painting/Flooring Replacement
West Hall - Flooring and Windows
Hilltop Apartments Buildings 7, 8, 9 and 10 Kitchen and Bath Renovations
Voorhies, Townsend and Trezevant Halls
Roderick & Alumni
Towers Cafe Seating Renovation
Student Room Furniture Upgrade
Ground Floor Security Screen Installation
Marian Hall Renovation
Archbishop Flores Hall Renovation
Anthony Frederick Hall Renovation
University Hall
Residence Hall room renovation
Centennial Hall
Kittredge West
Payne Hall exterior and roof
Allen Hall - remodel dining room serving lines
Allen Hall - Student room furniture replacement
Snyder Hall - Electrical Upgrade & Window air conditioners
Hillcrest Finishes
Hillcrest Rotunda Floor Replacement
McVey Hall
Lyons hall
Lewis Hall
Barnhart Hall, Library Commons and Lounges
Earl Hall, Morton and McClure Bedrooms
Type of Renovation
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Cosmetic Refurbishment
Construction Cost
Construction Cost
per GSF
3,000
1,000
5,500
15,000
$
$
$
$
35,000
3,500
30,024
165,000
$
$
$
$
11.67
3.50
5.46
11.00
8,593
22,275
200
101,250
101,250
66,959
$
$
757,000
535,711
$
$
88.09
24.05
$
$
$
$
25,000
110,000
105,000
100,000
$
$
$
$
125.00
1.09
1.04
1.49
$
$
110,000
105,000
$
$
1.09
1.04
81,375
$
450,000
$
5.53
$
$
530,800
450,000
$
5.53
10,200
$
$
103,000
388,000
$
10.10
$
94,000
$
9.22
29,686
11,304
11,052
28,756
39,000
$
$
$
227,225
127,185
122,156
$
$
$
7.65
11.25
11.05
$
$
$
224,575
124,935
119,906
$
$
$
7.57
11.05
10.85
$
225,000
$
5.77
$
225,000
$
5.77
74,296
42,406
5,000
137,000
92,000
200,000
1,000
67,276
$
$
$
$
$
$
$
$
2,178,000
355,000
300,000
915,000
800,000
2,027,000
139,000
500,000
$
$
$
$
$
$
$
$
29.32
8.37
60.00
6.68
8.70
10.14
139.00
7.43
$
$
$
$
$
$
$
$
17,163,813
355,000
300,000
915,000
550,000
1,448,000
98,000
150,000
$
$
$
$
$
$
$
$
231.02
8.37
60.00
6.68
5.98
7.24
98.00
2.23
5,154
9,332
$
$
166,000
532,000
$
$
32.21
57.01
$
$
166,000
532,000
$
$
32.21
57.01
GSF
Project Cost
Project Cost per
GSF
University of Southern Mississippi
University of Southern Mississippi
University of Southern Mississippi
University of Southern Mississippi
University of Technology, Sydney
University of Virginia Housing & Residence Life
Hillcrest Hall window replacement, asbestos removal, re-painting, flooring replacemCosmetic Refurbishment
Hillcrest Hall Card Access Project
Cosmetic Refurbishment
McCarty Flooring Replacement
Cosmetic Refurbishment
Wilber chapter room renovations
Cosmetic Refurbishment
Gumal residence- Renovating 3 levels of student apartment and rooms- total 90 beCosmetic Refurbishment
Hereford Furniture Upgrade
Cosmetic Refurbishment
Sub-Total Mean
Sub-Total Median
84,540
40,000
3,500
27,000
113,980
44,965
27,878
$
$
$
$
$
$
$
$
848,000
193,500
100,000
100,000
140,000
1,161,329
460,644
225,000
$
10.03
$
$
$
$
2.50
28.57
5.19
10.19
$
$
24
10
$
$
$
$
$
801,000
193,500
100,000
30,000
130,000
$
9.47
$
$
$
2.50
8.57
4.81
$
$
881,425
179,750
$
$
26.07
8.47
Rehabilitation - General Refurbishment
Institution
California State University, Long Beach
California State University, Long Beach
Christendom College
Coastal Carolina University
Columbia University
Columbia University
Emory University
Frostburg State University
George Mason University
Johns Hopkins University
Johns Hopkins University
Johns Hopkins University
Johns Hopkins University
Johnson & Wales University - Denver
Loyola Marymount University
Oregon State University
Oregon State University
Ramapo College of New Jersey
Rhodes College
St. Mary's University
St. Mary's University
Tennessee Technological University
Tennessee Technological University
The University of Texas at Austin
Thomas Jefferson University
University of California-Santa Barbara
University of California-Santa Barbara
University of Central Florida
University of Illinois at Urbana-Champaign
University of Maryland Baltimore County
University of Maryland Baltimore County
University of Maryland Baltimore County
University of Missouri-Columbia
University of North Dakota
University of North Dakota
University of Tasmania Accommodation Services
University of Virginia Housing & Residence Life
University of Virginia Housing & Residence Life
Utah State University Housing and Residence Life
Project Name
Building J renovation
Building G renovation
Gardens Renovation
Wallach
Schapiro
Harris Hall
Gray Hall
Commonwealth
AMR Bldg
Dining Transitions
McCoy Common Kithcne
A&B Bldg
Johnson Hall Renovation
Rains Renovation
Sacket Hall - Fire Suppression System and Window Replacement
Callahan Hall - Renovations
Phase two Housing Renovations
Ellett Hall
Treadaway Hall Renovation
Leies Hall Renovation
MS Cooper/Pinkerton Hall Renovation
Living Learning Village
Dining Renovation Phase 3
Martin Residence Renovation
Santa Rosa Residence Hall
Anacapa Residence Hall
Orchard Downs Apartments - Remodel one building
Susquehanna Hall
Apartment Renovation
Chesapeake Hall
Pershing Hall Renovation
Walsh Hall
West Hall
Launceston Kitchen and bathroom upgrades
McCormick Road Renovation Project w/ Fire System Final Phase
Lambeth Field Apartment Renovation Final Phase
Jones Hall
Type of Renovation
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
General Refurbishment
Sub-Total Mean
Sub-Total Median
GSF
Project Cost
Project Cost per
GSF
Construction Cost
Construction Cost
per GSF
19,045
19,045
$
$
476,607
472,885
$
$
25.03
24.83
$
$
406,704
402,982
$
$
21.35
21.16
32,000
65,000
103,000
$
$
$
$
1,000,000
6,900,000
5,500,000
10,000,000
$
$
$
31.25
106.15
53.40
$
$
$
$
1,000,000
5,900,000
500,000
8,000,000
$
$
$
31.25
90.77
4.85
$
$
$
$
3,325,000
1,864,817
106,327
1,881,468
$
$
$
$
36.51
110.58
47.53
47.12
$
180,000
$
2.12
91,081
16,864
2,237
39,932
85,000
178,981
72,000
20,000
3,000,000
3,000,000
5,321,000
20,000
349,262
120,125
$
$
$
0.24
16.76
41.67
9,050
44,863
19,291
$
$
$
$
$
$
$
$
$
$
2.21
7.79
6.23
$
$
$
$
6,651,000
200,000
344,312
117,576
$
$
$
22.10
7.67
6.09
21,500
$
3,500,000
$
162.79
$
2,080,000
$
96.74
87,290
79,079
$
$
6,500,000
7,800,000
$
$
74.46
98.64
$
$
5,300,000
6,200,000
$
$
60.72
78.40
8,900
83,504
139,000
83,079
41,217
72,063
67,184
3,000
195,731
177,318
20,695
$
$
$
$
$
$
$
$
$
$
$
1,870,000
2,300,000
30,000,000
6,400,000
5,687,485
1,500,000
900,000
303,000
1,401,681
8,246,860
1,100,000
$
$
$
$
$
$
$
$
$
$
$
210.11
27.54
215.83
77.04
137.99
20.82
13.40
101.00
7.16
46.51
53.15
$
$
$
$
$
$
$
$
$
$
$
1,350,000
2,000,000
27,000,000
5,400,000
2,967,377
1,250,000
400,000
303,000
1,067,189
6,281,775
1,100,000
$
$
$
$
$
$
$
$
$
$
$
151.69
23.95
194.24
65.00
71.99
17.35
5.95
101.00
5.45
35.43
53.15
64,722
65,000
$
$
4,210,700
2,300,000
$
$
62
42
$
$
3,226,880
1,350,000
$
$
52.23
36.51
Rehabilitation - System Refurbishment
Institution
Arkansas State University-Jonesboro
Drexel University
East Tennessee State University
Eastern Illinois University
Florida International University
Project Name
Kays Hall HVAC Renovation
West and Powell Hall
Wireless - Pemberton, Greek Court
Lakeview Lighting
Type of Renovation
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
GSF
117,371
47,473
175,000
200,000
Project Cost
Project Cost per
GSF
Construction Cost
Construction Cost
per GSF
$
$
$
33,000,000
430,000
1,500,000
$
281.16
$
30,000,000
$
255.60
$
31.60
$
130,000
$
0.65
$
$
$
1,334,000
480,410
130,000
$
$
$
28.10
2.75
0.65
Florida State University
Florida State University
Florida State University
Florida State University
Florida State University
Kansas State University
Kent State University
Kent State University
Marshall University
Oklahoma City University
Pennsylvania State University-University Park
Purdue University
Southeast Missouri State University
St. Mary's College of Maryland
St. Mary's College of Maryland
St. Mary's College of Maryland
St. Mary's College of Maryland
St. Mary's College of Maryland
Stevens Institute of Technology Office of Residence Life
Stony Brook University
The University of Arizona
The University of Texas at Austin
The University of Texas at Austin
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Georgia
University of Hawaii at Manoa
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Illinois at Urbana-Champaign
University of Iowa
University of Iowa
University of Iowa
University of Iowa
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Michigan-Ann Arbor
University of Mississippi
University of North Dakota
University of Oregon
University of Oregon
Western Illinois University
Yavapai College
Sub-Total Mean
Sub-Total Median
GilchrisHall Envelope and Waterproofing
Rogers Hall Structural and Mechanical
Salley Hall Envelope and Waterproofing
Landis Hall Envelope and Waterproofing
Kellum Hall 2012 Projects
Moore Hall HVAC replacement
HVAC and room upgrades
Wright Hall - HVAC and Room Upgrades
HVAC Replacement
Banning Hall renovation project
Apartment Renovation, Behrend Campus
Hillenbrand Hall East Wing Elevator Renovation
HVAC Renovation - Greek F, G, H
Building Envelope Improvements Prince George Hall
Building Envelope Improvements Caroline Hall
Conditioned Air Make-Up System - Caroline Hall
Exterior Building Envelope Improvements Queen Anne
Conditioned Air Make-up System Prince George Hall
Residence Hall power and air condition upgrade
Roosevelt Quad 2013 renovation
Roof Replacement
Air Handler Replacement
Vandiver Hall
Russell ethernet installation
Creswell Electric switch
Payne Hall
Myers Hall Chiller Plant
McWhorter Hall
Walkway Light Retrofit Project
Goodwin & Green Apartments - Window Replacement
Snyder Hall - Life Safety upgrade
Hopkins Hall & Weston Hall - Life Safety upgrade
Goodwin & Green Apartments - Life Safety upgrades
Hillcrest Dock & Pluming Improvements
Currier Roof Replacement
Slater Masonry Repairs
Hillcrest Dishroom Renovation
Northwood 1, 2 & 3 Boilers and Fire Alarms
Northwood 4 & 5 Roof Replacement
Martha Cook Fire Suppression
Northwood 1, 2 & 3 IT
Northwood 1, 2 & 3 Electrical Ugrades
Northwood 4 & 5 Roof Replacements
Removel and replacment of outside brick of Two Residental halls
Fulton Hall
Hamilton Hall New Bedroom Door Locks
Earl Hall Fire Protection
Thompson Hall Renovation
Kachina Hall
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
System Refurbishment
61,148
67,694
117,566
107,444
120,075
250,000
52,528
108,389
1,000
$
$
$
$
$
$
$
$
$
441,604
1,110,879
1,018,626
829,124
613,859
950,000
2,625,000
13,000,000
35,000
$
$
$
$
$
$
$
$
$
7.22
16.41
8.66
7.72
5.11
3.80
49.97
119.94
35.00
$
$
$
$
$
$
422,893
998,191
884,141
716,632
565,021
850,000
$
$
$
$
$
$
6.92
14.75
7.52
6.67
4.71
3.40
56,100
$
3,000,000
$
53.48
$
$
2,400,000
373,412
$
42.78
57,300
33,681
33,681
33,681
33,681
33,681
32,000
260,000
145,850
$
1,150,000
$
20.07
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
215,000
215,000
160,000
100,000
160,000
800,000
2,000,000
20,800,000
1,470,000
3,500,000
550,000
550,000
110,000
270,000
300,000
520,000
250,000
2,000,000
500,000
1,000,000
1,500,000
138,000
549,000
318,000
422,000
5,200,000
250,000
1,500,000
2,000,000
1,810,000
250,000
8,000,000
$
$
$
$
$
$
$
$
6.38
6.38
4.75
2.97
4.75
25.00
7.69
142.61
$
$
$
$
$
$
4.08
2.39
0.57
6.37
2.38
4.84
$
$
$
$
$
$
$
$
$
14.49
5.43
11.36
10.87
17.25
109.80
53.00
422.00
12.38
$
4.31
$
37.51
800,000
2,000,000
23,877,000
1,350,000
3,000,000
550,000
550,000
110,000
270,000
300,000
520,000
250,000
2,600,000
700,000
1,400,000
2,000,000
185,000
741,000
414,000
548,000
7,500,000
250,000
2,200,000
2,000,000
1,810,000
250,000
8
202,000
113,000
1,000,000
25,800,000
$
$
$
25.00
7.69
163.71
$
$
$
$
$
$
4.08
2.39
0.57
6.37
2.38
4.84
$
$
$
$
$
$
$
$
$
18.84
7.61
15.91
14.49
23.13
148.20
69.00
548.00
17.86
$
4.31
$
$
0.00
5.17
84,195
300,097
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
11.88
85.97
$
$
$
113,000
750,000
21,000,000
$
$
8.91
69.98
114,688
92,000
$
$
3,111,393
814,562
$
$
49
14
$
$
2,519,674
550,000
$
$
36.11
7.22
134,734
230,312
192,567
42,406
126,177
107,452
138,000
92,000
88,000
138,000
8,000
5,000
6,000
1,000
420,000
420,000
213,255
39,062